Loading...
2011 SIDEWALK CONTRACT - 11-0012-EN - ADMINISTRATIVE CHANGE ORDER #2� ADMINISTRATIVE CHANGE ORDER #2 � � PROJECT: 2011 Sidewalk Contract CONTRACTOR: Central Florida Contractors, Inc. P.O. Box 3987 Seminole, Florida 33775 Date: March 12. 2012 PROJECT NUMBER: 11-0012-EN PO REFERENCE NO.: ST 108005 CONTRACT AWARD: November 03. 2011 CONTRACT DATE: December 13, 2011 CODE: 0315-92339-563700-541-000-0000 A CODE: 0315-92273-563700-541-000-0000 B SCOPE OF CI3ANGE: ' THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT ` This change order is necessary to adjust quantities used in the field. ' STATEMENT OF CONTRACT AMOUNT ACCEPTED BY: ORIGINAL CONTRACT AMOUNT Adm. CO#1 - CM Approved 2/15/12 Adm. CO#2 NEW CONTRACT AMOUNT Camilo Soto, Assistant City Attorney Date: ATTEST: ' /l_ �e Be�/.�11 Rosemarie Call, City Clerk �n,. -_— � '�t9. � CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA �C��w �'�-' . /N-a-c.u�-� William B. Horne, II City Manager $568,337.00 $56,832.00 $a.00 $625,169.00 r� �,� ' r o� �,`.� !'� Central Florida Contractors, I1�c z�',f ; . x . ,.. �, .. �: , . .:_ By: (�EAL} George no , President Date: �v1- Witnesses: , 1 ��- �� Hob Divi �1 ��° � �.��Q. ��1 cl..►ee � Alice Eckman • Recommended By: City of Clearwater �L� �• _ Tara L. Kivett Engineering Construction Manager � � �^ , � Michael D. Quillen, PE City Engineer <. . • Page 2 of 2 Administrative Change Order #2 Re: 2011 Sidewalk Contract ITEM DESCRIPTION QUANTITY UNIT UNIT COST TOTAL COST Remove & Renlace Sidewalks Code: 0315-92273-563700-541-000-0000 "B" Decreases• 19 Constuct 5 Ft. wide ADA Ramp 20 EA $1,050.00 20 Constuct 4 Ft. wide ADA Ramp 56 EA $1,050.00 �$21,000.00) ($58,800.00) Total Decreases: ($79,800.00) Increases• 21 Sod 20400 SF $0.45 $9,180.00 24 Gravity Wall (Max Height 24") 1350 LF $50.00 $67,500.00 27 Removal of 4" only 1560 SY $2.00 $3,120.00 TotalIncreases: $79,800.00 Total Net (Decreases)/Increases/Additions to the Contract $0.00