Loading...
FLD2012-01001 Revised Conditions MemoClearwater To: Community Development Board Members From: Kevin W. Nurnberger, Planner III Date: March 20, 2012 RE: FLD2012 -01001 — 1500 Belcher Road The applicant's representative has worked with Staff to create a photometric plan that is compliant with the Community Development Code. Therefore, conditions of approval 43 and 44 are no longer necessary and the following are the conditions of approval as presently recommended by staff: Conditions of Approval: 1. That building permits be obtained for the demolition of existing structures, parking lot improvements, landscaping and building improvements; 2. That the final design and color of the building and dumpster enclosure must be consistent with the conceptual materials, colors and elevations approved by the CDB; 3. That prior to the issuance of a building permit, the applicant shall comply with all engineering comments; 4. That prior to the issuance of any building permits, the applicant shall provide a copy of an approved right -of -way permit from Pinellas County for any improvements in Nursery Road (C.R. 474) and Belcher Road (C.R. 501); and 5. Prior to the issuance of building permits, the Fire Department may require the provision of a Water Study performed by a Fire Protection Engineer in order to ensure that adequate water supply is available and to determine is any upgrades are required by the developer due to the impact of the project. The water supply must be able to support the needs of any required fire sprinkler, standpipe, and /or fire pump. If a fire pump is required, then the water supply must be able to supply 150% of its rated capacity.