FLD2012-01001 Revised Conditions MemoClearwater
To: Community Development Board Members
From: Kevin W. Nurnberger, Planner III
Date: March 20, 2012
RE: FLD2012 -01001 — 1500 Belcher Road
The applicant's representative has worked with Staff to create a photometric plan that is
compliant with the Community Development Code. Therefore, conditions of approval 43 and 44
are no longer necessary and the following are the conditions of approval as presently
recommended by staff:
Conditions of Approval:
1. That building permits be obtained for the demolition of existing structures, parking lot
improvements, landscaping and building improvements;
2. That the final design and color of the building and dumpster enclosure must be consistent
with the conceptual materials, colors and elevations approved by the CDB;
3. That prior to the issuance of a building permit, the applicant shall comply with all
engineering comments;
4. That prior to the issuance of any building permits, the applicant shall provide a copy of an
approved right -of -way permit from Pinellas County for any improvements in Nursery Road
(C.R. 474) and Belcher Road (C.R. 501); and
5. Prior to the issuance of building permits, the Fire Department may require the provision of a
Water Study performed by a Fire Protection Engineer in order to ensure that adequate water
supply is available and to determine is any upgrades are required by the developer due to the
impact of the project. The water supply must be able to support the needs of any required fire
sprinkler, standpipe, and /or fire pump. If a fire pump is required, then the water supply must
be able to supply 150% of its rated capacity.