WORK ORDER INITIAION FORM; BROWNFIELDS CLEANUP REVOLVING LOAN FUND ACTIVITIES; CAR PRO SITE; 1359 CLEVELAND ST �� Cardno
TBE
Shaping the W4ire
CARDNO TBE WORK ORDER INITIATION FORM
FOR THE CITY OF CLEARWATER
Date: October 27, 2011 Project Number: TBD
City Project Number:
1. PROJECT TITLE: Brownfields Cleanup Revolving Loan Fund Activities for the
CAR Pro Site located at 1359 Cleveland Street— Clearwater, Florida.
2. SCOPE OF SERVICES: To complete remediation activities at the former Car Pro
Site, as outlined in the Combined Document- Brownfields Site Assessment Report
and Remedial Action Plan (Cardno TBE, May 2011), in accordance with
regulations outlined in Chapter 62-785.700, F.A.C. Specifically, the following tasks
are designed to support the active remediation of contaminated groundwater using
enhanced bio-remediation of dissolved chlorinated solvents, via the addition of a
hydrogen-release compound (HRC-3DMeT"') and halo-respiring bacteria (Bio-
Dechlor INOCULUM PLUS [BDI PIusT""]). While the design and implementation of
the remedial action plan is based on the cleanup target levels (CTLs) outlined in
Chapter 62-777, F.A.C., the practicability of achieving the default groundwater
CTLs through active site remediation cannot be fully determined at this time.
The remedial activities outlined in this work order are to be completed in
accordance with the Terms and Conditions of the current City of Clearwater
Brownfields Grants and in accordance with Chapter 62-785 FAC (The Brownfields
Cleanup Criteria Rule). Unfettered access to all impacted properties is an over-
riding assumption of the current remediation plan. The specific tasks related to site
remediation are as follows:
RAP Task 1: QAPP, CRP, Davis-Bacon Requirements
Preparation or updates to various support documents will be required based on the
use of U.S. EPA grant funding for site restoration activities. Activities are tied
specifically to the grant being utilized and, as a result, preparation of a Community
Relations Plan (CRP), a Quality Assurance Project Plan (QAPP), specific Davis
Bacon reports during each invoicing cycle, EPA quarterly reports, and a grant
close-out report will be required to support this project.
RAP Task 2: Horizontal Well Installation
As outlined in the RAP document, one challenge to site remediation is the
apparent presence of contaminants beneath a building on an adjacent property. In
order to overcome this challenge, two (2) horizontally drilled injection wells will be
installed beneath the former IHOP restaurant building, with the drilling activities
occurring on the current (former) Car Pro property, and the pull back activities
occurring on the former IHOP restaurant site. Access to the two (2) wells from
both the east and west ends will be required to implement subsequent subsurface
1
injection activities. This task includes well development and storage and offsite
disposal of drill cuttings and development water. It is assumed that water for the
drilling process will be made available by the City of Clearwater.
RAP Task 3: Utility Location / Evaluation
Numerous injection borings will be required to implement the proposed remediation
program for the site. In order to eliminate or minimize the hand digging required to
clear injection locations, an underground utilities evaluation will be completed to
identify buried utilities throughout the three private properties. Both ground
penetrating radar and electro-magnetic designating equipment will be used to flag
all utilities that are identified.
RAP Task 4: HRC and BDI Injection Program
Tank staging and materials storage areas will be set up on the former Car Pro site
to store and mix reagent materials prior to injection. This system will include
compressed nitrogen tanks for maintaining the BDI microbes in a reduced oxygen
environment, in order to maintain their viability. Daily mixing and re-formulation of
materials is anticipated throughout the injection process.
The primary method of injection will be track-mounted Direct Push Technology
(DPT), wherein no permanent wells or materials are left in place. The secondary
injection method will be via drop tubes and packers within each end of the two
horizontal injection wells. For the DPT injections, drive rods will be advanced to
approximately one-foot into the underlying confining unit at the site (approximately
20-ft bls). A combination of HRC and BDI will then be injected at pre-determined
quantities as the drive rod is retracted, from the base of the aquifer, to
approximately 1-ft above the water table (at the time of injection). This injection
program will continue at a 10-ft spacing within the established treatment zone.
Approximately 100 injection points are anticipated based on the current definition
of the solvent plume; however, minor modifications may be required based on
supplemental assessment activities.
For this proposal, a second (minor) polishing injection program of less than 10% of
the initial program (on a fee basis), is included in order to address recalcitrant
areas.
RAP Task 5: Active and Post Active Remediation Monitoring and Reporting
Post-active remediation monitoring (PARM) will be required at the site until the
cleanup objectives are achieved. The rate of bio-degradation is somewhat
concentration dependent and can slow as concentrations are reduced, or as less
chlorinated daughter products (e.g., Dichloroethene or vinyl chloride) are
generated. As a result, PARM may extend beyond one year. However, based on
the current design and assumptions, this work order includes quarterly sampling of
up to 15 monitor wells for a period of one year, and quarterly reports that will
summarize the degradation processes noted. If CTLs are achieved within one
year, a No Further Action proposal will be submitted to FDEP. If, however,
concentrations remain higher than GCTLs, then an evaluation regarding the
2
extension of PARM, the implementation of additional remedial measures, or the
pursuit of conditional site closure will be evaluated. While an evaluation of
conditional closure requirements and approaches is included in this proposal, the
actual preparation of engineering or institutional control documentation is not
included. Cooperation with adjacent property owners will be required to achieve
conditional site closure, and such negotiations are difficult to predict by Cardno
TBE.
RAP Task 6: Post-Injection Parking Lot Repairs
While each of the 100± injection point locations located within adjacent property
paved parking areas can be patched, the result will be a heavily damaged and
uneven surface. As a result, Cardno TBE anticipates that the affected areas of the
paved parking lots within both the Idle Spur and the former IHOP restaurant
properties will need to be cut and replaced with new underlayment and asphalt.
For this proposal, we are assuming approximately 8,600 square feet of parking
area being repaired for a cost of approximately $2.50 per square foot. The City
may be able to provide this service in a more cost effective manner using City
resources; however, Cardno TBE is providing a cost estimate to support turnkey
services for this project.
3. PROJECT GOALS: Reduce documented groundwater contamination emanating
from the former Car Pro site to CTLs outlined in Chapter 62-777, F.A.C., to the
satisfaction of the FDEP, while meeting the Terms and Conditions of the most recent
EPA Brownfields Recovery Act Funds and Revolving Loan Fund requirements.
4. BUDGET: This price includes all labor and expenses anticipated to be incurred by
Cardno TBE for the completion of this task, on a lump sum basis, based on the
following costs:
Task 1 - QAPP, CRP, and Davis Bacon Requirements
Cardno TBE Fees and Expenses................................................................... 8 500
Subtotal......................................................................................................... $8,500
Task 2 - Horizontal Well lnstallation
Subcontracted Services
Driller.................................................................................................... $36,000
IDW Management & Disposal ................................................................ 3 600
Subtotal....................................................................................................... $39,600
Task 3- Utility Location/Evaluation
Cardno TBE Fees and Expenses................................................................... 3 000
Subtotal......................................................................................................... $3,000
Task 4- HRC and BDI Injection Program (including minor polishing phase)
Cardno TBE Fees and Expenses................................................................. $40,000
Subcontracted Services
Driller..................................................................................
.................. $46,000
Reagent Purchase and Management................................................... 69 000
3
Subtotal..................................................................................................... $155,000
Task 5- Remediation Monitoring and Reporting (5 Events +Reports)
Cardno TBE Fees and Expenses................................................................. $38,000
Subcontracted Services
Laboratory............................................................................................ 24 000
Subtotal....................................................................................................... $62,000
Task 6— Parking Lot Repairs
Cardno TBE Fees and Expenses................................................................... $6,000
Subcontracted Services
Laboratory............................................................................................ 28 000
Subtotal....................:.................................................................................. $34,000
PROJECTTOTAL................................................................................... $302,100
Contingency Costs— Owners Allowance
Because bench scale testing has not been conducted, and because the Remedial
Action Plan is not yet approved by FDEP, a contingency to the HRC and BDI injection
program is proposed in order to refine the plan and to implement any changes required
by FDEP.
Contingency on HRC/BDI Injection Program................................................ 23 340
Subtotal....................................................................................................... $23,340
PROJECTTOTAL ............................................................................................. $325,440
5. SCHEDULE:
• To meet approaching grants deadlines, QAPP Modifications, and Horizontal
Well Installation activities wi/l begin immediate/y upon execution of this Work
Order Initiation Document.
The estimated timeline for this assumes approval of QAPP modifications within 60
days of notice to proceed, with utility location services being completed during this
time period. Horizontal well installation will be completed within 45 days of QAPP
approval and commencement of injection activities will occur within 45 days of well
installation. The injection program is anticipated to require approximately five (5)
weeks to complete, resulting in the completion of active remediation approximately
six months after the approval of this work order.
Active remediation monitoring will occur 30-days after injection is completed and will
occur quarterly thereafter for a period of one year. Based on this schedule, the
remediation and initial PARM program will be completed approximately 1.5 years
after project initiation.
4
6. STAFF ASSIGNMENT (Consultant): Joe Marsh (727) 431-1589, Miles Ballogg
(727) 431-1555, Terry Griffin (727) 431-1679. Dana Kress (727) 639-5572.
7. CORRESPONDENCE/REPORTING PROCEDURES: Coordinator's project
correspondence shall be directed to Joe Marsh/Miles Ballogg/Terry Griffin. All City
project correspondence shall be directed to Diane Hufford and Ed Chesney, with
copies to others as may be appropriate.
8. INVOICING/FUNDING PROCEDURES: Invoices shall be submitted monthly to
the City of Clearwater, Attn: Diane Hufford, Brownfields Coordinator, Economic
Development & Housing Department, P. O. Box 4748, Clearwater, Florida 33758-
4748, for work perFormed. Invoices will be prepared on a lump-sum basis
(milestone driven).
City Invoicing Code:
9. ITEM 9 INTENTIONALLY LEFT BLANK
10. SPECIAL CONSIDERATIONS: N/A
PREPARED BY:
(� /o.Z 7- /�
Steven P. Howarth, PE Date
Vice President
Cardno TBE
� /� 27-f�
Miles Ballogg Date
Director
Cardno TBE
5
Countersigned: CITY OF CLEARWATER, FLORIDA
—% � � '• ��:.� �
,�,_.�,�_ / `..,� By: -�.
Frank V. Hibbard liam B. Horne II
Mayor City Manager
Approved as t form: Attest: ���„oFt,yFc/
� ��,�I�, ��
a�
Pame a K. kin Rosemarie Call � �
City Attorney City Clerk .g� ��
����� ��
6