FLORIDA AVENUE - PHOENIX AVENUE TRAFFIC CALMING PROJECT - 08-0014-EN - ADMINISTRATIVE CHANGE ORDER #1Administrative Change Order 1 PROJECT: Florida/Phoenix Ave. Traffic Csl�tting Project CONTRACTOR: R.A.M. Excavating, Inc. 569 Hammock Drive Palm Harbor, FL 346$3-6114 Date: September 21, 2011 PROJECT NUMBER: 08-0055-EN PO REFERENCE NO.: ST 1 Q7139 COUNCIL AWARD: 11/16/2010 DATE OF CONTRACT: l2/15/201.0 CODE: O 1$1-99144-563700-541-000-0000 SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVIS�ONS TO THE CONTRACT This change order decreases unused items, increases item due to overruns and adds items needed to complete the project. STATEMENT OF CONTRACT AMOUNT ACCEPTED BY: :;,� ;,. ORIGINAL CONTRACT AMOUNT Admin CO 1 - CM - NEW CONTRACT AMOUNT ATTEST: Rosemarie Catl, ��� r C; ,•�' �, � --�. � a�. "�.�!!.. Date;�Q�iv].�yflf r� (� j ��7 / � � �i CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA r,� Camilo Soto, Assistant City Attorney RA.M. Egcavat'rn , Inc. ''e : � �� � S].65,OSU30 � �� '�� ��. �p : � rr w`-Y t=' � : �13,047.90 By: � : �. �� �. �;�. � � ��•; � $X78,12$.20 Richard Slack, President " �; ., , F� .,.•�• � � �' ' ' ���.' Date: q � �.3 1 WITNESSES: � � d`�' � Recommended Sy: City of Clearwater ._ - � "' �.� Tara Kivett, Engineering Construction Manager � P ,� Michael D. Quillen, City Engineer . o. P�ge 2 of 3 Administrative Change Order ] Re: Florida/Phaenix Ave. Traffic Calming (0&0055-E1� ITEM # DESCRIPTION UrTIT Code A: 0181-99144-563700-541-0(10-0000 Decreases: Roads 4 Concrete Curb Removal LF Relvcate Palms (Height 7 dependent - see plans) EA 9 Mill Asphalt Pavement SY 10 Relocate Hydrant Assembly EA Skip Traffic Stripe (3'-3' Skip) 22 Thermoplastic White (12) LF Solid Trafiic Strip, 23 Thermoplastic (White)(l2") LF Solid Traffic Stripe, 24 Thermoplastic (Ye11ow)(4") LF Solid Traffic Stripe, 25 Thermoplastic (Yellow)(8") LF Herringbone Pattern from Flint 26 Trading (for Crasswalk) SF' Optic-Curb Reflective Pavement 27 Marking E.A Lighting Accessory: GP19B Gard 34 n Posts (V.ISTA) EA 42 10% Contingency LS Decreases: Stormwater 45 1, 5" RCP LF 46 18" RCP LF 49 ].0% Contingency LS Decreases: Sidew�lk 54 Establishment and Maintenance YRS 55 10% Conti.ngency LS QUANI'iTY UNTI' COST 10 2 654 1 120 352 505 80 1195 SO $2.00 $1,500.00 $8.00 �2,000.00 $2.00 $2.00 $1.00 $2_00 $13_00 $48.00 TOTAL COST ($20.00) ($3,000.00) ($5,232.Op) ($2,000.00) ($240.00) ($704.00) ($505.00) ($160.00) ($15,535.00) (�3,840_00) 14 $20.00 (�280.0�) 1 $11,097.40 ($11,097.40) Total Raads (Decreases): (�42,613,40) 10 $31.00 ($310.U0) 3 �3�.00 ���oz.00> 1 $2,083.30 ($2,083.30) Total Stormwater ([)ecreases): ($2,495.30) 1.5 $4,200.00 1 $1,826.60 Total Sidewalk (Decreases): ($6,300.�0) ($1,826.60) ($8,126.6Q) Total Net (Decreases): ($53,235.30) k � �' Page 3 of 3 Administrative Ch�nge Order 1 Re: Flarida/Phoenix Ave. Traffic Calming (OS-0055-E1� I�ncreases: Roads 5 Concrete Sidewalk Removal 6 Pavement Removal 8 Tree Removal 13 2�� Asphalt Pavement (Type S-1 ) 14 8" Crushed Concrete Base 1 S 12" Type B Stabilization 16 Concrete Brick Pavers 17 Cancrete Sidewalk, 4" Thick W/Reinforcing 19 Straight Curb 20 Cancrete Type RA Curb 21 Curb & Gutter, Type 1 39 Irrigation & Electrical Sleeves (SCH 80 - 2 Inch Incre�ses: Sidewalk SO Concrete Sidewalk, 4" Thick Additions: Roads 56 LED Uplights 57 6" Concrete 58 Survey 54 Recycled Mulch Additions: Sidew Ik 60 6" Concrete Sidewalks SY 37 SY 228 6A 2 Ton 80.33 SY 655 SY 571 SF 31 SF 443 LF 255 I,F' 10 FL 21 LF SF EA SF LS CY $io.00 $3_OU $1,SOO.OQ $300.00 $20.OU $16.00 $7.00 $G_QO $20.00 $14.00 $14_00 33 $10.00 Total Roads Increases: 12 $6.00 Total $idewalk Increases: $370.00 $684.00 $3,p00.00 $24,099.00 $13,100.00 $9,136.00 $217.00 $2,658.00 $5,100.00 $140.00 $294.00 $330.00 $59,128.00 $72_00 $72.00 Total Net Increases: $59,200.00 4 $ 123.05 456 $ 8.00 1 $ 345.00 30 $ 53.00 Total Roads Additions: $492.20 $3,648.00 $345.00 $1,590.00 $6,075.2b SF 126 $ 8.00 $1,008.00 Total Sidewalk Additions: $1,008.00 Total Net Additions: $7,083.20 Total Net (Decreases)/Increases/Additions: $13,047.90