Loading...
CHAUTAUQUA/COACHMAN RIDGE RECLAIMED WATER PROJECT - 07-0053-UT - ADMINISTRATIVE CHANGE ORDER #2 & FINALADltit�'NITRAC'CIVE CHANGF, ORDER 2& Final PROdECT: CHAUTALIQ�IA/(;OACHMAN RIDGE R�;CLA[MED WATER PRQJECT CONTRACTQR; GREGORY ELECTRIC CQ., INC. P.O. I7rawer 1419 Columbia, SC 29202 DATE: . _ „ ,June 29. 2011 PROJECT NLJMBER: 07-0053-UT PO REFER�.NGE NO.: ST105S38 COLIN(:II, AWARD:_ _ June 18, 2009 DATE OF CONTRACT:._ _ Julv 15,, 2009 CODF.: 0376-96739-563800-533-000-0000 A �315-96739-563800-533-000-0000 B SCOPE OF CHANGE: THIS CHANG� ORDER ACCEPTSI,It�VISIUNS TO THE C�NTRACT Adjust quantitiea to what were actually used in the project and add items due to unforeseen tield conditions. Sec details attached � STATEMENT OF CONTRACT AMOUNT ���•�" """' ACCEPTED BY: ��� ���'' �� , <,_ Gregory Electric Co., Inc. • ORIGINAL CONTRACT AMQUNT $ 2,172,942.57 ... ' ' ,,,. CO I Admin - CM 1/19/2011 $ 122,653.63 `' : r �.1X CO 2& Final Adim - CM ���� $ (75,074.12) B. � �,p��, "" N�W CONTRACT AMQLiNT �(�� C'�� $ 2,220,522.08 Lisa Phillips, Vice President ;+ ATTEST: �\I � � Date: r' , i °� �' k � �� � �� � � � Witnesses: Rosemarie Call, '� e�� �� Date• �f17 �� ���i ��/*7��� CITY OF CLEARWATER, in PINELLAS COUNTY, FLURIDA " �.�. �G � � William B, Home, Il City Manager APPROVED AS TO FQRM: � � Leslie K. Dougall-Sides, ssistant C.ity Attorney � ` Recommended $y: City of earwater � ,... , _ . . �=: .�_C'�y1....-� �,_� Lan-Anh Nguyen, PE, Proj ct Mngr � � � Michael D. Quillen, P.E. City Engineer Paga � of 2 F• RE: Administrativc Change Order 2& Fin�l �r�M DESCRIPTIpN Cade B: 03i5-96739-563800-533-000-0000 Decreases• � 3b F&I 6" Certa-1,ok PVC Pipe by Horizontal Directional Drill 3e F&I 12" �'usible PVC Pipe by Horizontal Directional Drill on Landmark Drive as shown on 5heets 32 to 35 of the Construction Drawin�s 3g F&I 8" HDPE Pipe by Horizontal Directianal prill ' 4a F&I 4" Certa-Lok PVC .Pipe by Open Cut 4e F&I 4" HDPE Pipe by Open Cut 4f F&I 8" HI7P� Pipe by Open Cut 8 F'&I I" 5hort 5ide Service Assembly for Reclaimed Water System 10 F&I Combination Air Valve & Polyethylene Caver 12 Root Pruning 14 Sod Restoration as Directed by the Owner or the Qwner's Authorized Project Representative 16 Concrete Sidewalk Restoration as Directed by the Owner ar the Owner's Authorized Project Representative 17 Conerete Curb Restoration as Directed by the Owner or the Owner's Authorized Pro,ject Representative 18 Asphalt Paving Restoration as Directed by the Owner or the Owner's Authorized Pro.ject Representative Renaissance Oaks Estates Subdivisions. 38 F&I 4" PVC Pipe by Horizontal Direction Drill 39 F&I b" PVC Pipe by Horizontal Direction 1,7ri11 40 F&14" PVC Pipe by Open Cut 41 F&I 6" PVC Pipe by Open Cut 48 Sod Restoration as Directed 6y the Qwner or the Owner's Authorized Project Representative 49 Concrete Driveway Restoration as Directed by the Owner or tha Owner's Authoriaed Project Representative 50 Concrete 5idewalk Restoration as Directed by the Qwner or the Owner's Authorized Project Representative 51 Concrete Curb Restoration as Directed by the Owner or the Qwner's Authorized Project Representative 52 Asphalt Paving RestorHtion as Directed by the Owner or the Owner's Authorized Project Representative 19 Owncr Contingency Increases• 3a F&I 4" Certa-Lok PVC Pipe by Horizontal Directional brill 3c F&I 8" Certa-1.ok PVC Pipe by Horizontal Directional Drill 3d F&I 12" Certa-Lok PVC Pipe by Horizontal birectional Drill 3f F&14" HDPE Pipe by Horizontal Directional Drill 3h F&I ] 0" HDPE Pipe by Horizontal pirectional Drill 3i F&1 16" HDP� Pipe by Harizontal birectional Drill 4b F&I 6" Certa-tok PVC Pipe hy Open Cut 7 F&i 4" Blow-off Assembly, Reclaimad Water System 9a F&I Single 1" Long Side Service Assembly for Reclaimed Water 5ystem (2" CasinR) 1 S Concrete Driveway Restoration as Directed by the Owner or the Owner's Authorized Project Representative 18a Compliance with American Recovery and Reinvestment Act Criteria Renaissance Oaks E tates Subdivisi ns. OUANTITY UNIT UNIT COST TOTAL COST 132 Lr $ 19.59 $ (2,585.88) 690 LF $ 42.25 $ (29,152.50) 115 LF $ 24.68 $ (2,838.20) 400 LF' $ 13.20 $ (5,280,00) 390 LF $ 8.73 $ (3,404.50) 120 LF $ 12.35 $ (1,482.00) 20 EA $ 464.64 $ (9,292.80) 1 F,A $ 1,630.83 $ (1,630.83) i,000 LF $ a.2s $ �z,zso.00� 250 5Y $ 3.15 $ (787.50) 87 SY $ 55.50 $ (A,828.50) ioo LF $ Zs.so $ �z,aso.00� 123 SY $ 42.75 $ (5,25825) 2 63 31 66 10 10 10 10 ]0 1 1,813 3$ 238 120 130 180 60 3 132 15.8 1 LF $ 15.05 $ (30.10) I.F $ 23.51 $ (1,481.13) LF $ 15.84 $ (�191.04) LF $ 25.73 $ (1,698.18) SY $ 3.1 S $ (31.50) 5Y $ 60.75 $ (6'07.50) SY $ 55.50 $ (555.00) LF $ 28.50 $ (285.00) SY $ 42.75 $ (427.50) LS $ 197,540.23 $ ]97,540.23 Total(decreases): $ (274,788.14) LF $ 11.80 $ 21,393.40 LF $ 29.36 $ 1,115.68 LF $ 49.37 $ 11,750.06 LF $ 10.90 $ 1,308.00 LF $ 71.00 $ 9,230.00 LF $ 73.16 $ 13,168.80 Ll� $ 23.39 $ 1,403.40 EA $ 1,320.SR $ 3,961.74 EA $ 620.89 $ 81,957.48 5Y $ 60.75 $ 959.85 L3 $ 3,500.00 $ 3,500.00 46 F&I Smgle 1" Long Side Serv�ce Assembly for Reclaimed Water 9 EA $ 745.07 $ b,705.63 System (2" CasinR) 53 Surveying & As Builts 1 LS $ 0.01 $ 0.01 7'otalincreases: $ 156,454.05 Additions• 54 Additional work for Jack and Bore item 1 L5 $ 39,909.97 $ 39,909.97 55 ARV Concrete Collars 5 EA $ 150.�0 $ 750.00 Lo Center Mc ullen Booth c ool & Tran fer Station 56 McMullen Booth School Well Connections 1 LS $ S,OOp.00 $ 5,000.00 S7 McMullen Booth School Well Conneetions CSX invoice credit 1 LS ($2,400.00) $ 2 400.00 Total additions: $ A3,259.97 T'otal net (decreases)/increases/additions Code B: g 75,074.12