CHAUTAUQUA/COACHMAN RIDGE RECLAIMED WATER PROJECT - 07-0053-UT - ADMINISTRATIVE CHANGE ORDER #2 & FINALADltit�'NITRAC'CIVE CHANGF, ORDER 2& Final
PROdECT: CHAUTALIQ�IA/(;OACHMAN RIDGE R�;CLA[MED WATER PRQJECT
CONTRACTQR; GREGORY ELECTRIC CQ., INC.
P.O. I7rawer 1419
Columbia, SC 29202
DATE: . _ „ ,June 29. 2011
PROJECT NLJMBER: 07-0053-UT
PO REFER�.NGE NO.: ST105S38
COLIN(:II, AWARD:_ _ June 18, 2009
DATE OF CONTRACT:._ _ Julv 15,, 2009
CODF.: 0376-96739-563800-533-000-0000 A
�315-96739-563800-533-000-0000 B
SCOPE OF CHANGE: THIS CHANG� ORDER ACCEPTSI,It�VISIUNS TO THE C�NTRACT
Adjust quantitiea to what were actually used in the project and add items due to unforeseen tield conditions. Sec details attached �
STATEMENT OF CONTRACT AMOUNT ���•�" """' ACCEPTED BY: ��� ���''
�� , <,_
Gregory Electric Co., Inc. •
ORIGINAL CONTRACT AMQUNT $ 2,172,942.57 ... ' ' ,,,.
CO I Admin - CM 1/19/2011 $ 122,653.63 `'
: r �.1X
CO 2& Final Adim - CM ���� $ (75,074.12) B. � �,p��, ""
N�W CONTRACT AMQLiNT �(�� C'�� $ 2,220,522.08 Lisa Phillips, Vice President ;+
ATTEST: �\I � � Date: r' , i °� �' k
� �� �
�� � � � Witnesses:
Rosemarie Call, '� e�� ��
Date• �f17 �� ���i ��/*7���
CITY OF CLEARWATER, in
PINELLAS COUNTY, FLURIDA
" �.�. �G �
�
William B, Home, Il City Manager
APPROVED AS TO FQRM:
� �
Leslie K. Dougall-Sides, ssistant C.ity Attorney
� `
Recommended $y:
City of earwater �
,... , _ . . �=: .�_C'�y1....-� �,_�
Lan-Anh Nguyen, PE, Proj ct Mngr �
� �
Michael D. Quillen, P.E.
City Engineer
Paga � of 2 F•
RE: Administrativc Change Order 2& Fin�l
�r�M DESCRIPTIpN
Cade B: 03i5-96739-563800-533-000-0000
Decreases• �
3b F&I 6" Certa-1,ok PVC Pipe by Horizontal Directional Drill
3e F&I 12" �'usible PVC Pipe by Horizontal Directional Drill on
Landmark Drive as shown on 5heets 32 to 35 of the Construction
Drawin�s
3g F&I 8" HDPE Pipe by Horizontal Directianal prill '
4a F&I 4" Certa-Lok PVC .Pipe by Open Cut
4e F&I 4" HDPE Pipe by Open Cut
4f F&I 8" HI7P� Pipe by Open Cut
8 F'&I I" 5hort 5ide Service Assembly for Reclaimed Water System
10 F&I Combination Air Valve & Polyethylene Caver
12 Root Pruning
14 Sod Restoration as Directed by the Owner or the Qwner's Authorized
Project Representative
16 Concrete Sidewalk Restoration as Directed by the Owner ar the
Owner's Authorized Project Representative
17 Conerete Curb Restoration as Directed by the Owner or the Owner's
Authorized Pro,ject Representative
18 Asphalt Paving Restoration as Directed by the Owner or the Owner's
Authorized Pro.ject Representative
Renaissance Oaks Estates Subdivisions.
38 F&I 4" PVC Pipe by Horizontal Direction Drill
39 F&I b" PVC Pipe by Horizontal Direction 1,7ri11
40 F&14" PVC Pipe by Open Cut
41 F&I 6" PVC Pipe by Open Cut
48 Sod Restoration as Directed 6y the Qwner or the Owner's Authorized
Project Representative
49 Concrete Driveway Restoration as Directed by the Owner or tha
Owner's Authoriaed Project Representative
50 Concrete 5idewalk Restoration as Directed by the Qwner or the
Owner's Authorized Project Representative
51 Concrete Curb Restoration as Directed by the Owner or the Qwner's
Authorized Project Representative
52 Asphalt Paving RestorHtion as Directed by the Owner or the Owner's
Authorized Project Representative
19 Owncr Contingency
Increases•
3a F&I 4" Certa-Lok PVC Pipe by Horizontal Directional brill
3c F&I 8" Certa-1.ok PVC Pipe by Horizontal Directional Drill
3d F&I 12" Certa-Lok PVC Pipe by Horizontal birectional Drill
3f F&14" HDPE Pipe by Horizontal Directional Drill
3h F&I ] 0" HDPE Pipe by Horizontal pirectional Drill
3i F&1 16" HDP� Pipe by Harizontal birectional Drill
4b F&I 6" Certa-tok PVC Pipe hy Open Cut
7 F&i 4" Blow-off Assembly, Reclaimad Water System
9a F&I Single 1" Long Side Service Assembly for Reclaimed Water
5ystem (2" CasinR)
1 S Concrete Driveway Restoration as Directed by the Owner or the
Owner's Authorized Project Representative
18a Compliance with American Recovery and Reinvestment Act Criteria
Renaissance Oaks E tates Subdivisi ns.
OUANTITY UNIT UNIT COST TOTAL COST
132 Lr $ 19.59 $ (2,585.88)
690 LF $ 42.25 $ (29,152.50)
115 LF $ 24.68 $ (2,838.20)
400 LF' $ 13.20 $ (5,280,00)
390 LF $ 8.73 $ (3,404.50)
120 LF $ 12.35 $ (1,482.00)
20 EA $ 464.64 $ (9,292.80)
1 F,A $ 1,630.83 $ (1,630.83)
i,000 LF $ a.2s $ �z,zso.00�
250 5Y $ 3.15 $ (787.50)
87 SY $ 55.50 $ (A,828.50)
ioo LF $ Zs.so $ �z,aso.00�
123 SY $ 42.75 $ (5,25825)
2
63
31
66
10
10
10
10
]0
1
1,813
3$
238
120
130
180
60
3
132
15.8
1
LF $ 15.05 $ (30.10)
I.F $ 23.51 $ (1,481.13)
LF $ 15.84 $ (�191.04)
LF $ 25.73 $ (1,698.18)
SY $ 3.1 S $ (31.50)
5Y $ 60.75 $ (6'07.50)
SY $ 55.50 $ (555.00)
LF $ 28.50 $ (285.00)
SY $ 42.75 $ (427.50)
LS $ 197,540.23 $ ]97,540.23
Total(decreases): $ (274,788.14)
LF $ 11.80 $ 21,393.40
LF $ 29.36 $ 1,115.68
LF $ 49.37 $ 11,750.06
LF $ 10.90 $ 1,308.00
LF $ 71.00 $ 9,230.00
LF $ 73.16 $ 13,168.80
Ll� $ 23.39 $ 1,403.40
EA $ 1,320.SR $ 3,961.74
EA $ 620.89 $ 81,957.48
5Y $ 60.75 $ 959.85
L3 $ 3,500.00 $ 3,500.00
46 F&I Smgle 1" Long Side Serv�ce Assembly for Reclaimed Water 9 EA $ 745.07 $ b,705.63
System (2" CasinR)
53 Surveying & As Builts 1 LS $ 0.01 $ 0.01
7'otalincreases: $ 156,454.05
Additions•
54 Additional work for Jack and Bore item 1 L5 $ 39,909.97 $ 39,909.97
55 ARV Concrete Collars 5 EA $ 150.�0 $ 750.00
Lo Center Mc ullen Booth c ool & Tran fer Station
56 McMullen Booth School Well Connections 1 LS $ S,OOp.00 $ 5,000.00
S7 McMullen Booth School Well Conneetions CSX invoice credit 1 LS ($2,400.00) $ 2 400.00
Total additions: $ A3,259.97
T'otal net (decreases)/increases/additions Code B: g 75,074.12