Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
TROPIC HILLS STORMWATER OUTFALL PROJECT - 99-0018-EN - ADMINISTRATIVE CHANGE ORDER #1 & FINAL
� Administrative Change Order 1 & �'inal PRO.IECT: Tropic Hills Stormwater Outfall CONTRACTOR: Sunshine Pipe Corp. 1713 Bermuda Court Safety Harbor, F13a69S-4824 Date: Au�ust 2. 201] . PROJECT NU-MBER: 99-0018-E1�1 PO REFERENCE NO.: ST106593 COiJNCIL AWARD: Jane 17. 2010 DATE OF CONTRACT: __ Ju_l_v 9, 2010 CODE: 0315-9617a-563700-539-000-0000 SCOPE OF CHAI�TGE; THIS CHANGE ORDER ACCEPTS REVISIONS TQ THE CONTRACT This chanQe order is to adjust quantities to actual used on the project and add items due to %eld conditions aud add g. c�l@ndar da s to the contrac� See Att�ched. STATEMENT Ok' CONTRACT AMOUNT ORIGINAL C�NTRACT AMOUNT Admin CO 1 - CM - NEW CONTRACT AMOUNT A'I'TEST: L�(.�. �• �i.r'4'L Rasemarie Call, 1 Date: �.4 - t' 7, „� // CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA ACCEPTED BY: Sunshine Pipe Co�p:`"""`_'"' �'r,,,,Y , $1,893,512.50 �..' , '?;. $16,431.80 ° ,- '", , 4� ;. ::�,�,' ...,��, .`.�. $1,909,944.30 By: �(�F�pL) ''.�• ; �;' µ � .�+ � �, , r� � ,�-� -_ � ..; ,'' ' �`, :rc � w.4.� Date: D$'l 0' 1 I : y W�;� � t��: .:=. �E' ,. ' � �- °y c� � �W ��'"a'. '� io� d � ri"` - � Witnesses• ""'• +�`� �" ,� ��_�. ;71tN'�` ,���;`` � ' � � � � ea��� � �%C ' �� • Iliam . H ne, II City M�n�ger APP VED AS TO Camilo Soto, Assistant City Attorpey . -` ' ' - - Recommended By: City of Clearwater P ong Vo, Project Manager \ . Michael D. Quillen, , City �ngineer , � Page 2 of 2 Administrative Change Order 1& Final Re: Tropic Hills Stormwater Dutfall ITEM UESCKLF'llUlV Decreases: 2.4 Tree Barricades (including cushionin� 2.5 Root Pruning 2.7 Unsuitable Material Removal &c Repl� 3.1 15" RCP 3.2 18" RCA 3.3 Outfall Modifications (Piping Through Gabiou Wall, Piping Through Seawall and Concrete Spillway Reconstruction) 3.4 Seawall Construction (South Bank) 3.8 Box Culvert Connection (to Existing � 4.1 Overlay (1 ") 7.0 Contingency Increases• S.1 Sod (Bahia) Additions: 3.13 Bax Culvert Modification 3.14 Arbor Shoreline Outfall Modification 3.15 Rock Gradation, Bedding Material, E: 3.16 Guardrail 3.17 Arbor Shoreline Rip Rap Installation 3.18 Frotect �xisting Seawall 3.19 Repair of Seawall iJNIT OUANTITY UN1T COST LF �.� GY LF LF EA 260 $8.00 zs $io.00 500 $8.00 50 $50.00 32.5 $75.00 1 $3,0�0.00 TOTAL COST ($2,080.00) �$zso.00> ($4,00�.00) ($2,500.00) ($2,437.50) ($3,000.00) LF 2 $406.00 ($812.00) LS 1 $16,b40.00 ($16,6a0.00) SY l0 $10.00 ($1 U0.00) LS 1 $172,137.50 ($172,137.50 Total (Decreases): (5203,957.00) SF LS LS LS LS LS LS I.S 34900 0.40 $13,960.00 Total Increases: $13,960.00 1 1 1 r l 1 1 12,500.00 9,zoo.00 110,ODU.00 $36,220.80 14,808.00 z2,000.00 1,700.00 Total Additions $12,500.00 $9,200.00 $110,OOQ.00 $36,220.80 $14,808.00 $a2,000.00 $1,700.00 $�Ob,42$.$0 Tatal Net (Decreases)/Increases/Additions: $]6,431.80