LUP2011-01002 AND REZ2011-01002; 2995 DREW ST COMMON; BAYCARE PROPERTIES INC�
2995 DREW ST COMMON
Date Received: 2/7/2011 10:39:44 AM
Baycare Properties, Inc.
ZONING DISTRICT:
LAND USE:
ATLAS PAGE: 291B
PLANNER OF RECORD: CL
PLANNER: Cate Lee, Planner III
CDB Meetin�: August 16, 2011
Case Number: LUP2011-01002
Applicant: Ba�Care Health System, Inc.
Address: 2995 Drew Street
A�enda Item: E.1 (Related to E2 and E.3)
STAFF REPORT
LAND USE PLAN AMENDMENT
I. GENERAL INFORMATION
Request: To amend the present Future Land Use Map designations from Residential
Medium (RM) and Residential/Office/Retail (R/O/R) to Residential/Office
Limited (R/OL)
Location: 2995 Drew Street, located on the southwest corner of Drew Street and Bayview
Avenue
Site Area: 1,733,252 square feet or 39.79 acres MOL
II. BACKGROUND
This case involves a 39.79-acre property located at the southwest corner of Drew Street and
Bayview Avenue and is owned by the Clearwater Housing Authority. The property is
comprised of one p arcel and is currently vacant. From the 1970s to 2004 the subject
property contained a public housing project, Jasmine Courts.
The request is to change the property's Future Land Use Map designations of Residential
Medium (RM) and Residential/Office/Retail (R/O/R) to Residential/Office Limited (R/OL).
The applicant, BayCare Health Systems, Inc., has indicated that the intended future use of
the property will be corporate offices.
A Development Agreement and a request for a rezoning of the property from Medium
Density Residential (MDR) and Commercial (C) to Office (0) are being processed
concurrently with this case (see REZ2011-01002 and DVA2011-06001). The Development
Review Committee reviewed a Flexible Standard Development application (FLS2011-
06011) for Baycare Health System, Inc. at its July 7, 2011 meeting. Issuance of the
development order is pending approval of the associated cases and required revisions to the
site plan.
III. SITE AND VICINITY CHARACTERISTICS
A. Site Characteristics
The property is currently vacant, with internal roads remaining from the previous use as
multi-family housing. Adjacent to the property, to the east, is the Calvary Baptist Church, to
the west is a mobile home park, to the north are recreational ball fields, and to the south are
mobile homes and an RV park.
Community Development Boazd — August 16, 2011 - Case LUP2011-01002 -Page 1 of 8
S:�Planning Department\C D BU.and Use AmendmentsU.and Use Amendments�Drew St 2995 LUP2011-01002 Baycaze Properties, Inc\Staff
Report\LUP2011-01002 staffreport.doc
B. Surrounding Future Land Use and Zoning Designations
� � i � t
Direction Land Use FLUM Designation Zoning Atlas
Desi nation
North: Recreational ball fields Recreation/Open Space Open Space/Recreation
(R/OS) and Preservation (OS/R) and Preservation
�P) �P
East: Church Institutional (I} Institutional (I
South: Mobile homes Residential Low Mobile Home Park
RV Park Medium (RLIv� and (MHP) and Tourist (T)
Resort Facilities High
(RFH)
West: Mobile homes Residential Low Mobile Home Park
Medium (RLIv� (MHP)
C. Uses and Intensities Allowed by Present and Requested Future Land Use
Designations
� � ' •�
�• , � � 1 1• � ��
�, � '. � '• i• i
i � ' � � � 1 � �
1 TT• 1 T_ z: 1 7 T T��.��1�.
Yrimary Uses: ivioaeraie io nign tcesiaenii�i; �.,uw Lc�,�,�y
Density Residential Residential ResidentiaUOffice
Equivalent; Office;
Retail; Overnight
accommodation;
PersonalBusiness
Services
Maximum Density: 15 Dwelling Units 18 Dwelling Units 7.5 Dwelling Units
Per Acre Per Acre; 30 Per Acre
Overnight
Accommodation
Units Per Acre
Maximum Intensity: FAR 0.50; ISR 0.75 FAR 0.40; ISR 0.85 FAR 0.40; ISR 0.75
Consistent Zoning Medium Density Office (0); Office (0); Low
Districts: Residential (MDR); Commercial (C); Medium Density
Medium High Medium Density Residential
Density Residential Residential (MDR) (LMDR)
(MHDR)
Communiry Development Boazd — August 16, 2011 - Case LUP20ll-01002 - Page 2 of 8
S:�Planning Department\C D B�L,and Use Amendments�I,and Use Amendments�Drew St 2995 LUP2011-01002 Baycare Properties, Inc\Staff
ReportU.UP2011-01002 staffreport.doc
IV. REVIEW CRITERIA
No amendment to the Comprehensive Plan or Future Land Use Map shall be recommended
for approval or receive a final action of approval unless it complies with the standards
contained in Section 4-603.F, Community Development Code.
A. Consistency with the Clearwater Comprehensive Plan [Section 4-603.F.1]
Recommended Findings of Fact.•
Applicable goals, objectives and policies of the Clearwater Comprehensive Plan which
support the proposed amendments include:
Goal A.2 A sufficient variety and amount of Future Land Use categories shall be
provided to accommodate public demand and promote infll development.
Goal A.4 The City shall not permit development to occur unless an adequate level of
service is available to accommodate the impacts of development. Areas in which the
impact of existing development exceeds the desired levels of service will be upgraded
consistent with the target dates for infrastructure improvements included in the
applicable functional plan element.
Policy A.6.1.6 Land use decisions in Clearwater shall support the expansion of
economic opportunity, the creation of jobs and training opportunities as well as the
maintenance of existing industries through establishment of enterprise zones, activity
centers and redevelopment areas and by coordination with the Chamber of Commerce,
Tourist Development Council and other economic development organizations and
agencies.
Policy A.6.2.1 On a continuing basis, the Community Development Code and the site
plan approval process shall be utilized in promoting infill development and/or planned
developments that are compatible.
Policy B.1.3.1 Requests for amendment to the Future Land Use Map will have an
analysis of traffic impacts.
Objective B.1.4 The City shall specifically consider the existing and planned LOS the
road network affected by a proposed development, when considering an amendment to
the land use map, rezoning, subdivision plat, or site plan approval.
Recommended Conclusions of Law
The request does not conflict with the goals, objectives and policies of the Clearwater
Comprehensive Plan and furthers said plan as indicated in the following. The proposed
corporate offices are compatible with the mix of uses in the area and expand economic
opportunity in the City. In addition, the proposal does not degrade the level of service
for public facilities below the adopted standards (a detailed public facilities analysis
follows in this report).
Community Development Boazd — August 16, 2011 - Case LUP2011-01002 -Page 3 of 8
S:�Planning Department\C D BU.and Use AmendmentsU.and Use Amendments�Drew St 2995 LUP2011-01002 Baycare Properties, Inc\Staff
Report\LUP2011-01002 staffreport.doc
B. Consistency with the Countywide Plan Rules
Recommended Findings of Fact:
Section 2.3.3.4.1 of the Countywide Plan Rules states that the purpose of the
Residential/Ofiice Limited (R/OL) future land use classification is to depict those areas
of the county that are now developed, or appropriate to be developed, in an office and/or
urban low density residential use; and to recognize such areas as well-suited for such
limited mixed-use consistent with the surrounding uses, transportation facilities and
natural resource characteristics of such areas. Section 2.3.3.4.1 also states that the
Residential/Office Limited (R/OL) future land use classification is generally appropriate
to those locations where it would serve as a transition from more intensive
nonresidential use to low density residential or less intensive public/semipublic use; and
in areas where a combination of office and residential use is established or is determined
appropriate as a means of encouraging reuse and neighborhood scale conversion. These
areas are typically in proximity to and served by the collector and arterial highway
network.
The subject property is located on the south side of Drew Street (a collector road),
between US Highway 19 and McMullen Booth Road (both arterial highways), an area
that contains a mix of commercial, office and residential uses. Future use of the subject
property, with offices, is consistent with the purposes of the ResidentiaUOffice Limited
(R/OL) future land use category and compatible with surrounding properties and the
neighborhood.
Recommended Conclusions of Law
The proposed Future Land Use Map amendment is consistent with the purpose and
locational characteristics of the Countywide Plan Rules.
G Compatibility with Surrounding Property/Character of the City & Neighborhood
[Section 4-603.F.3 and Section 4-603.F.6]
Recommended Findings of Fact.•
Existing surrounding uses consist of the Calvary Baptist Church and associated
buildings, recreational ball fields, and multifamily dwellings. Not immediately adjacent,
but in proximity to the subject site, are offices and commercial uses. The future land use
designations of surrounding properties include Institutional (I), Recreation/Open Space
(R/OS), Preservation (P), Residential Low Medium (RLM) and Resort Facilities High
(RFH). The proposed offices on the subject property are compatible with the
surrounding properties and neighborhood.
The proposed Residential/Office Limited (R/OL) future land use category permits 7.5
dwelling units per acre and a floor area ratio (FAR) of 0.40. The future land use
designations of surrounding properties include Institutional (I) (12.6 Dwelling Units Per
Acre; �'AR 0.65), Recreation/Open Space (R/OS) (FAR 0.25), Preservation (P) (FAR
0.10), Residential Low Medium (RL1V� (10 Dwelling Units Per Acre; FAR 0.50) and
Resort Facilities High (RFH) (30 Dwelling Units Per Acre; FAR 1.2). The
Residential/Office Limited (R/OL) future land use classification requested is consistent
Community Development Boazd — August I6, 2011 - Case LUP2011-01002 -Page 4 of 8
S:�Planning Department\C D B�I,and Use Amendments�L,and Use Amendments�Drew St 2995 LUP2011-01002 Baycare Properties, Inc\Staff
Report\LUP2011-01002 staffreport.doc
with the surrounding future land use classifications that exist in the vicinity of the
subject property.
Recommended Conclusions of Law
The proposed future land use designation will allow offices at a density and scale that is
consistent with existing institutional and residential uses in the vicinity of the subject
property. As such, the proposed amendment will allow development that is in character
with the surrounding area.
The proposed future land use designation is in character with the overall Future Land
Use Map designation in the area. Further, the proposal is compatible with sunounding
uses and consistent with the character of the sunounding properties and neighborhood.
D. Sufficiency of Public Facilities (Section 4-603.F.5]
Recommended Findings of Fact:
To assess the sufficiency of public facilities needed to support potential development on
the property, the m�imum development potential of the property under the present and
requested Future Land Use Map designations was analyzed (see Table 1}. The request
for amendment to the Residential/Office Limited (R/OL) Future Land Use Map category
would decrease the amount of development potential allowed on the site (see Table 1
below).
Table 1. Development Potential for Existing & Proposed FLiTM Designations
Site Area 37.09 AC 2.70 AC 39.79 AC
(1,615,640 SF) (117,612 SF) (1,733,252 SF)
Present FLUM Present FLUM Requested
Designation Designation FLUM Net Change
«�„ «���„ Designation
"R/OL"
556 DUs 48 DUs 298 DUs -306 DUs
M�imum g07,820 SF 47,044 SF 693,300 SF -161,564 SF
Development
0.50 FAR 0.40 FAR 0.40 FAR -0.05 FAR
Abbreviations:
FLIJM — Future Land Use Map DUs — Dwelling units
AC — Acres FAR — Floor area ratio
SF — Square feet
Community Development Boazd — August 16, 2011 - Case LUP2011-01002 - Page 5 of 8
S:�Planning Department\C D B�L,and Use Amendments�L,and Use Amendments�Drew St 2995 LUP2011-01002 Baycaze Properties, Inc\Staff
Report\LUP2011-01002 staffreport.doc
As shown in Table 2 below, the proposed change will not degrade public facilities and
services below acceptable levels.
Table 2. Public Facilities Level of Service Analysis
� '� • � ' �
Public Present FLUM Requested Net Capacity
Facility/Service present FLUM Designation FLUM Change Available?
Designation ��R/O/R" Designation
��RM�� "R/OL „
Streets 3,783 Trips 915 Trips 4,974 Trips 276 Yes
Potable Water 144,874 GPD 4,704 GPD 69,330 GPD -80,248 Yes
Wastewater 130,386 GPD 3,763 GPD 55,464 GPD -78,685 Yes
1,410 240 Tons/Year 1,872 222
Solid Waste Tons/Year Ton/Year Yes
Parkland 0.0 Acres 0.0 Acres 0.0 Acres 0 Yes
Public School
Facilities3 Yes
Elementary 83.4 Students 72 Students 44.7 Students -45.9 Yes
Middle 3.36 Students -21.42
School 38.92 Students 20.86 Students Yes
High School 55.6 Students 4.8 Students 29.8 Students -30.6 Yes
Notes:
�_:�_. • r.__.-,. n:_,.n,.,. �,........ �,..... .:4o ua.,., v,.�o
1. ISQJCIl Vll'cIVGId�G Ually Ui�JJ }lci $i.7casc u�w�.� i ��i�.un� �,vuiiiy �.vuaaij�Jra a. uu u w.
- Residential Medium (RM)
- ResidentiaUOffice/Retail (R/O/R)
- ResidentiaUOffice Limited (R/OL)
,. GPD — Gallons per day.
�. Based on 4.0 acres of parkland per 1,000 persons and 2.2 persons per unit.
4. Pinellas County School Board student generation rate per unit:
- Elementary School: 0.15 students per unit x 1 unit
- Middle School: 0.07 students per unit x 1 unit
- High School: 0.10 students per unit x 1 unit
As shown in Table 3 below, the potential additional maximum daily trips associated
with the requested for amendment to the Residential/Office Limited (R/OL) Future Land
Use designation would not lower the operating level of service for Drew Street.
Communiry Development Board — August 16, 20ll - Case LUP2011-01002 -Page 6 of 8
S:�Planning Department\C D BU.and Use AmendmentsU.and Use Amendments�Drew St 2995 LUP2011-01002 Baycaze Properties, Inc\Staff
Report\LUP2011-01002 staff report.doc
Table 3: Maximum Potential Traffic
Drew Street Existing Current Proposed Net
(US 19 to McMullen Booth Road) Conditions FLUMI FLUMZ Tri s
Potential Additional Maximum Daily Tri s N/A 4,698 4,974 275
Potential Additional Maximum PM Peak N/A 446 473 26
HourTri s3
Roadway Volume 18,784 23,480 23,758' 275
Roadway Level of Service PM Peak Hour C C C'
Ado ted Roadway Level of Service Standard D Peak Hour
Abbreviations and Notes:
N/A = Not Applicable.
FLUM = Future Land Use Map, Clearwater Comprehensive Plan.
1. Based on PPC calculations of 339 trips per day per acre in the ResidentiaUOffice/Retail (R/O/R) future land use category
and 102 trips per day per acre in the Residential Medium (RM) future land use category.
2. Based on PPC calculations of 125 trips per day per acre in the Residential/Office Limited (R/OL) future land use category
3. Based on MPO K-factor of 0.095.
4. Source: Pinellas County Metropolitan Planning Organization 2010 Level of Service Report.
5. Based on a comparison between the Pinellas County Metropolitan Planning Organization 2010 Level of Service Report
and the 2009 Florida Department of Transportation Quality/Level of Service Handbook.
Recommended Conclusions of Law
Based upon the findings of fact, it is determined that the traffic generated by the
proposed amendment will not result in the degradation of the existing level of service on
Drew Street. The Development Agreement proposes several transportation
improvements that will enhance the operational efficiency of the intersection at Drew
Street and Bayview Avenue, as well as improve site access at the two points of ingress
and egress. There is an increase in demand of solid waste service, but there is adequate
capacity to accommodate the maximum demand generated by the proposed amendment.
Furthermore, potable water, wastewater, parkland, recreation facilities, public school
facilities and mass transit will not be affected by the proposed amendment.
E. Impact on Natural Resources [Section 4-603.F.5]
Recommended Findings of Fact:
No wetlands appear to be located on the subject property. The property contained multi-
family housing unti12004.
Recommended Conclusions of Law
Based on current information, no wetlands appear to be located on the subject property.
The intent of the applicant is to redevelop the property as offices. The proposed
redevelopment is required to be compliant with the City's tree preservation and storm
water management requirements.
Community Development Boazd — August 16, 2011 - Case LUP2011-01002 -Page 7 of 8
S:�Planning Department\C D B�I,and Use Amendments�I,and Use Amendments�Drew St 2995 LUP2011-01002 Baycare Properties, Inc\Staff
ReportU.UP20ll-01002 staff report.doc
V. REVIEW PROCEDURE
Approval of the Future Land Use Map amendment does not guarantee the right to develop
the subject property. The Future Land Use Map amendment is subject to approval by the
Pinellas Planning Council and Board of County Commissioners acting as the Countywide
Planning Authority. Based on the size of the parcel, review and approval by the Florida
Department of Economic Opportunity (Division of Community Planning) is required. The
property owner must comply with all laws and ordinances in effect at the time development
permits are requested, including transportation concurrency provisions of the Concurrency
Management System in Division 9, Community Development Code.
VI. RECOMMENDATION
Based on the foregoing, the Planning and Development Department recommends the
following action:
Recommend APPROVAL of the request for Future Land Use Map amendment from the
Residential Medium (RM) and Residential/Office/Retail (R/O/R) classifications to the
Residential/Office Limited (R/OL) classification.
Prepared by Planning & Development Department staff: �%"'v
--������
Catherine Lee
Playny ar TTT
Attachments:
Resume
Application for Future Land Use Plan Amendment
Location Map
Aerial Photograph of Site and Vicinity
Future Land Use Map
Zoning Map
Existing Surrounding Use Map
Site Photographs
Community Development Boazd — August 16, 2011 - Case LUP2011-01002 -Page 8 of 8
S:�Planning Department\C D BU.and Use Amendments�L,and Use Amendments�Drew St 2995 LUP2012-01002 Baycare Properties, Inc\Staff
ReportU.UP20] 1-01002 staff report.doc
Catherine Lee, LEED Green Associate
100 South Myrtle Avenue
Clearwater, FL 33756
727-562-4557
catherine.lee(a�mvclearwater.com
PROFESSIONAL EXPERIENCE
Planner III, Long Range Division October 201 D to Present
Planner II, Long Range Division November 2008 to October 2010
City of Clearwater, Clearwater, Florida
Responsible for numerous aspects of the Growth Management Act of Florida such as comprehensive
planning, Future Land Use Plan amendments, rezonings, and annexations. Update Community
Development Code by Ordinance. Prepare staff reports for the City Council and Community
Development Board. Coordinate and manage various projects.
Planner I and Planner II, Development Review Division
City of Clearrvater, Clearwater, Florida March to October 2008
Provided information to the public concerning the City's Community Development Code, Clearwater
Downtown Redevelopment Plan, Beach by Design and general zoning information. Reviewed
building plans for compliance with the Community Development Code. Presented Flexible Standard
Development applications before the Development Review Committee.
• Research Assistant
Geography Department, Brigham Young University, Provo, Utah September 2007 to January 2008
Contributed research on various land use and planning issues, including locally unwanted land uses
and their roles in the American West for Dr. Richard H. Jackson, AICP.
• Teaching Assistant
Geography Department, Brigham Young University, Provo, Utah January 2007 to December 2007
Explained North American land use patterns and concepts to students, including planning history and
current practices. Graded student writing and exams, providing feedback for improvement and
clarification of planning concepts.
Planning Intern
City of Port Angeles, Port Angeles, Washington May to August 2007
Assisted citizens at the zoning counter regarding the City's Municipal Code. Performed research
related to intergovernmental cooperation, comprehensive plan amendments, and code changes.
Presented research fmdings to the Planning Commission.
EDUCATION
Bachelor of Science in Urban, Rural and Environmental Planning, Brigham Young University, 2007
ASSOCIATION MEMBERSHIP
• American Planning Association
• LEED Green Associate
S:�Planning Department\C D B\Land Use Amendments�I,and Use Amendments\Drew St 2995 LUP2011-01002 Baycare Properties,
Inc\Maps\LUP,REZ201 1-01 002,DVA2011-06001 Location Map.doc
�
�
;t
d
�� ;' :"'
� Ef
�,,, � �
1 _ �l1�IIIt� ,
• . �rs _ �. _ .� 1 � � ± sF',. t r .' R : : - -
: � _ ., a � �► • '�r � . . . . . - . . _
w.
' . � .,, .� � 4,� �". �, -., . a ^ . . .. ,. - `r . � , ..
.
_ � i , —"`� ��� f �.�" " z �'.�.,{ i £ � . X�W���.�� ;�
o ,— �,t � • � %,� � ,,�•,, -; �„ � '�" ��s . � ' � � � . i� �i 1
__ c`�a.� <. �. ^5��� '� * f t �*',- �.. ; �, ��
/ •^' ' � ' : . � � . � tr� , • � f • e�
t . ,_� r
` "; }� � ��, r r�"�! , ti
�. � � i+� � a ' "�" i; '� o ,. '"} ...i � t.�
tc " z
� y� 6 �,.' � .�" ` , .7 � � �
,�� � �
: � ,� , � �
,� t�, � �� �:�
S$�� M1 � e aA .
��4 1� I , II '. = J.�9Y �i �
, �..I�z � '� ����+ N ,i'7 Vi,�.� T ' �, ��f � ♦ ns.mMb•� I� �
. , . � �
� � i ♦
, �f
'. ��� F.� - � , ' �� � �;"",�' 'f .�;.;....t i �
y } �s \ � � 5� �^ , f ;' �� � - � ::- �.., ,
� . � ��,�':: �'� !� �'� �,f �' �'x � � � �i �9��` r_��'r :. i k �
S^ Rx l � "5 1 � 1
1. � �,� , i!,�.,k � +�'At � � 1 � � .
a' � „z. ,�� ��� �'.,f" �. , � . � �f� a ia µ . �.
q ti
� � i ?F e� �n y . . y k t� �/ t `� `� . �_i�
A�
�1 � �,�, S � � '� � � a ��� �. � .I � � � .
i. . � � ,� �.,� _.� ���� t$Sr�� �. . � �-��` • ;j# �.-.
� fP.� �� . .- .._ .. p � .�• .r`' • J ' . �
..�� � '�:: . 'Y: �� �. 5. .� ' ,
r � � � ' � � • � ��
� o .. � , � ., ".,;3 ��:. �',�`� ' �
..�f r . � �1 Y�`���� � � .:'�`�ks��� '
f � •` � �� �. w 1 R ! , �! "3�, � * ..1 �4 e _ �r Y .
1 i` 1 �. ;
r, ;,,. �„ �" ,.,,� �c..��. p �'S' ' . j� . �n:
� �r , — � � ���' , �` _ �.
� � � r: ��W ►'�i+
� � i � +' ,4 ��� �.�v.� / � ����� .
�,� � r �
' R� . �� "t-"i�l ...
,�' i,' --� s,,, , �J :,,�,�.._.... f
- 1::, b '—� ?�' �, '-� ..� � -
,� � �;,, =�.�—{ �� �`' � ..
�� ' �'� �'-�� �� � '
� � �f
AERIAL PHOTOGRAPH
Owner: Clearwater Housing Authority Case:
Applicant: BayCare Health System, Inc.
�
Site: 2995 Drew Street
From
To:
Land Use
RM and R/O/R
R/OL
Properfy
Size(Acres):
Zoning
PIN
MDR and C
O
f �
LUP/REZ2011-01002
DVA201 1-06001
39.79
1 7-29-1 6-00000-1 1 0-01 00
Atlas Page: 291 B
S:\Planning Department\C D B\Land Use Amendments\Land Use AmendmentslDrew St 2995 LUP20] ]-01002 Baycare Properties,
Inc\Maps\LUP,REZ20 1 1-01002,DVA2011-06001 Aerial Photograph.doc
S:�Planning Department\C D B\Land Use Amendments\Land Use Amendments\Drew St 2995 LUP201 1-0 1 002 Baycare Properties,
Inc�Maps\LUP,REZ201 1-01 002,DVA2011-06001 Future Land Use Map.doc
°o '
N �
N y
N o
< 2
MDR OS/R ---- --
�
�
N N M M
. ..__._._...... . ��.����1J�fJl_�l�llllJ■. ■�/I.����li�i��.��.• ����.��u�������������a������ _
BERMUDA 0
� +
v
Q�e O
�Q'� ` � •'•
r y
HP � � �
z W� � DR N
I ])°`'
� � y � L
N
� V � �.
o'
N �O�'!J'iR
O O O O
LEEWARD ISLE " �o " `" "' �'
'
13 �
— i%���n►rii k vi _° -�, - �
.� O "p"i.�__'_� �'1_-f�_M-i �
�,.� ' � . � _ _O �O9 B� c�°� n. �r�j I
M
��. _•.. �� ---im� _112� '. i
a� • 115 ;oo �, . 72Q'►)
� DR ��� _YNN -
' ,ze "' � ° ° ,,
. . .:
, _ _ R 1VIHP T ._ � ._.
�, �
' "' � . zo,
� ..
.•.�
p�� � .22 ���, 225
2� 209_ '�� o `" ' -
�.i213 _22�i'�`b �_• .7. i
�
ZONING MAP
Owner: Clearwater Housing Authority Case: LUP/REZ201 1-01 002
Applicant: BayCare Health System, Inc. DVA201 1-06001
Site: 2995 Drew Street Properfy 39.79
Size (Acres) :
Land Use Zoning
PIN: 17-29-16-00000-110-0100
From : RM and R/O/R MDR and C
To: R/OL O Atlas Page: 291 B
S:�Planning Department\C D B\Land Use Amendments\Land Use .Amendments\Drew St 2995 LUP2011-01002 Baycare Properties,
Inc\Maps\LUP,REZ2011-01002,DVA2011-06001 Zoning Map.doc
0
e d >
—� N � � �z:mo j a � �' �
N �O a � Z
99< R�rci -- _
Multi-Family Recreational
Residential Recreational ball fields w� ball�elds 0
I N � � a� O Oz.e n��.,
N � �
STREET
STftEET
DREW
BERMUDA
Ch urch
Mobile
H�ime Park � �
- � Q -I- -� �,�o , �' � , � , �
g J p,� � O L I
Q--�-- --
� z �. �„ _�_T----
�� W � � , � O L�_' �
� z Q ' �• ' ' ,-
2 W �
I� m F� � - y � ;
� � � N N aEV[urvo
Q Q �.
� V � � �
LEEWARD ISLE �o ° ° � C
13 . '� �
.., ■�������������■������■ '�N -
.. ,.r � � ,8� �., �
Mobile � 9
� ,�,...� _� ,, . s
�+ RV Park � �, N w.- ,- i
--- -� Home � ,a s e �� ,'' `
eFamil Par k ,s A�,., nz � I., .� �_ L�
ential y i:':�`: � ��' �. L -
`� 2 � a r—� € z I„ o�e. •g �'��'3, , �, � �
`_� oo �,
- „e n�K� 'I � 4 4 R
TENHESSEEt,�. �•� AVENUE
EXISTING SURROUNDING USES MAP
Owner: Clearwater Housing Authority Case: LUP/REZ201 1-01002
Applicant: BayCare Health S stem, Inc. DVA201 1-06001
Site: 2995 Drew Street Properfy 39.79
Size (Acres) :
Land Use Zoning
P I N : 17-29-16-00000-110-0100
From : RM and R/O/R MDR and C
To: R/OL 0 Atlas Page: 291 B
S:�Planning Department\C D B\Land Use Amendments\Land Use Amendments\Drew St 2995 LUP201 I-OI002 Baycare Properties,
Inc\Maps\LUP,REZ20 1 1-01002,DVA2011-06001 Existing Surrounding Uses Map.doc
�.:'� , a :,'s.. . . �
I�e.�'.:: . '.. . a_:�........:.... .....__..�
View looking south at the subject property, 2995 Drew Street
\.
.�, e
�. � ���
South of the subject property, on Bayview Avenue
I__ ,_--
� __
. _ _ ------ - �
East of the subject property, on Drew Street, Calvary Christian
High School
. �, rt�'�:fY .. . . � 5 { ! i� i �)� 6 c
�, �. `-A"�.� �a i ��.
. . �.�„ . ..,��„_.... ,.:, , , ��...:.,,3. _ ,. � .... .. . ...... .. . . .
+sr�hm^u°s+
Across Drew Street, to north of the subject property, Eddie C.
Moore Complex
West of the subject property, on Drew Street
East of the subject property, on Drew Street, Calvary Baptist
Church
LUP2011-01002, REZ2011-01002 and DVA2011-06001
Baycare Health System, Inc.
2995 Drew Street
0
{ �,
�{
B
. , 'e �a�����',�'`.�.
� �
,, ��o-,��"`�
`� `*� ; ``^.
�F "s°c"*,. . �'`,.,_ . ..
View looking westerly along Drew Street
View looking northerly along Bayview Avenue
View looking south at "Drive A" from Drew Street
. . . '.�j (1�;�
� . � M ,� m .c < ,� �{� �
' s^^^��;. ; n ,.c.
s '
z. �� � `j¢ ..
�� �
� . .�
E� � � �
� ' "�� � _ >$
�.4r.. � ,. , .# ' ..xA � .av �i�AiiSPd . , ��.
View looking easterly along Drew Street
�
View looking southerly along Bayview Avenue
.:
� d�t. � .a� �; ,�- r ,a• '- ,� :�r � � �
������
a� . , . -�� �'` � �` . .
. _ .,
. __ . . .. . �. _ . . .. .�.--�c;` ...
View looking west at "Drive B" from Bayview Avenue
LUP2011-01002, REZ2011-01002 and DVA2011-06001
Baycare Health System, Inc.
2995 Drew Street
�
�
2995 DREW ST CUMMON
Date Received: 1/31/2011 3:09:13 PM
Baycare Properties
ZONING DISTRICT:
LAND USE:
ATLAS PAGE: 291B
PLANNER OF RECORD: CL
PLANNER: Cate Lee, Planner III
CDB Meetin�: Au�ust 16, 2011
Case Number: REZ2011-01002
Applicant: BavCare Health Svstem, Inc.
Address: 2995 Drew Street
A�enda Item: E.2 (Related to E.1 and E.3)
STAFF REPORT
ZONING ATLAS AMENDMENT
I. GENERAL INFORMATION
Request: To amend the Zoning Atlas designation from the Medium Density
Residential (MDR) and Commercial (C) Districts to the Office (0) District
Location: 2995 Drew Street, located on the southwest corner of Drew Street and
Bayview Avenue
Site Area: 1,733,252 square feet or 39.79 acres MOL
II. BACKGROUND
This case involves a 39.79-acre property located at the southwest corner of Drew Street and
Bayview Avenue and is owned by the Clearwater Housing Authority. The property is
comprised of one p arcel and is currently vacant. From the 19�Os to 2004 the subject
property contained a public housing project, Jasmine Courts.
The request is to change the property's Zoning Atlas designations of Medium Density
RPC;�1Pr,tial (Mi�RI and Commercial (Cl to Office (Ol. A Develonment Agreement and a
request for a future land use amendment of the properiy from Residential Medium (RM) and
Residential/Office/Retail (R/O/R) to Residential/Office Limited (R/OL) are being processed
concurrently with this case (see LUP2011-01002 and DVA2011-06001).
III. SITE AND VICINITY CHARACTERISTICS
A. Site Characteristics
The subject property is cunently vacant, with internal roads remaining from the previous
multi-family housing use. Adjacent to the property, to the east, is the Calvary Baptist
Church, to the west is a mobile home park, to the north are recreational ball fields, and to
the south are mobile homes and an RV park.
Communiry Development Board — August 16, 2011 - Case REZ2011-01002 -Page 1 of 7
S:�Planning Department\C D B�Zoning Atlas Amendments�REZ 2011�Drew St 2995 REZ201 I-01002 Baycaze Properties, Inc\Staff
Report�REZ2011-01002 StaffReport.docx
B. Surrounding Future Land Use and Zoning Designations
i �i� �
Direction Land Use FLUM Designation Zoning Atlas
Desi nation
North: Recreational ball fields Recreation/Open Space Open Space/Recreation
(R/OS) and Preservation (OS/R) and Preservation
�p) �P)
East: Church Institutional (I) Institutional (I)
South: Mobile homes Residential Low Mobile Home Park
RV Park Medium (RLIvn and (MHP) and Tourist (T)
Resort Facilities High
(RFH
West: Mobile homes Residential Low Mobile Home Park
Medium (RLIv� (MHP)
IV. REVIEW CRITERIA
No amendment to the Zoning Atlas shall be recommended for approval or receive a final
action of approval unless it complies with the standards contained in Section 4-602.F,
Community Development Code.
A. Consistency of Development with the Clearwater Comprehensive Plan and
(:ommunity llevelopment t;ode and t;ity Kegulations �aection 4-6U1.1+.1 and 4-
602.F.2]
Recommended Findings of Fact:
Applicable goals, objectives and policies of the Clearwater Comprehensive Plan which
support the proposed amendments include:
Goal A.2 A sufiicient variety and amount of Future Land Use categories shall be
provided to accommodate public demand and promote infill development.
Goal A.4 The City shall not permit development to occur unless an adequate level of
service is available to accommodate the impacts of development. Areas in which the
impact of existing development exceeds the desired levels of service will be upgraded
consistent with the target dates for infrastructure improvements included in the
applicable functional plan element.
Policy A.6.1.6 Land use decisions in Clearwater shall support the expansion of
economic opportunity, the creation of jobs and training opportunities as well as the
maintenance of existing industries through establishment of enterprise zones, activity
centers and redevelopment areas and by coordination with the Chamber of Commerce,
Tourist Development Council and other economic development arganizations and
agencies.
Community Development Board — August 16, 2011 - Case REZ2011-01002 -Page 2 of 7
S:�Planning Department\C D B�Zoning Atlas Amendments�REZ 2011�Drew St 2995 REZ2011-01002 Baycare Properties, Inc\Staff
Report�REZ2011-01002 StaffReport.docx
Policy A.6.2.1 On a continuing basis, the Community Development Code and the site
plan approval process shall be utilized in promoting infill development and/or planned
developments that are compatible.
Objective B.1.4 The City shall specifically consider the existing and planned LOS the
road network affected by a proposed development, when considering an amendment to
the land use map, rezoning, subdivision plat, or site plan approval.
Recommended Conclusions of Law
The request does not conflict with the goals, objectives and policies of the Clearwater
Comprehensive Plan and furthers said plan as indicated in the following. The proposed
corporate offices are compatible with the mix of uses in the area and expand economic
opportunity in the City. In addition, the proposal does not degrade the level of service
for public facilities below the adopted standards (a detailed public facilities analysis
follows in this report).
B. Compatibility with Surrounding Property/Character of the City & Neighborhood
[Sections 4-602.F.3 and 4-602.F.4]
Existing surrounding uses consist of the Calvary Baptist Church and associated
buildings, recreational ball fields, and multifamily dwellings. Not immediately adjacent,
but in proximity to the subject site, are offices and commercial uses. The zoning
designations of surrounding properties include Institutional (I), Open Space/Recreation
(OS/R), Preservation (P), Mobile Home Park (MHP) and Tourist (T). The proposed
offices on the subject property are compatible with the sunounding properties and
neighborhood.
The proposed Office (0) District primarily permits offices, parks and recreation
facilities, places of worship and schools. All of these uses are in the general vicinity of
the subject parcel, two of which are immediately adjacent (parks and recreation facilities
and places of worship). The Office (0) zoning district requested is consistent with the
surrounding zoning districts that exist in the vicinity of the subject property.
The proposed zoning district will allow offices at a density and scale that is consistent
with existing institutional and residential uses in the vicinity of the subject property. As
such, the proposed amendment will allow development that is in character with the
surrounding area.
Recommended Conclusions of Law
The proposed Zoning Atlas designation is in character with the overall Zoning Atlas
designations in the area. Further, the proposal is compatible with surrounding uses and
consistent with the character of the surrounding properties and neighborhood.
C. Sufficiency of Public Facilities [Section 4-602.F.5]
Recommended Findings of Fact:
To assess the sufficiency of public facilities needed to support potential development on
the property, the maximum development potential of the property under the present and
Community Development Board — August 16, 2011 - Case REZ2011-01002 -Page 3 of 7
S:�Planning Department\C D B�Zoning Atlas Amendments�REZ 2011�Drew St 2995 REZ201 I-01002 Baycaze Properties, Inc\Staff
Report�REZ201 l -01002 Staff Report.docx
requested Future Land Use Map designations was analyzed (see Table 1). The request
for amendment to the Residential/Office Limited (R/OL) Future Land Use Map category
would allow a decrease in the number of possible dwelling units by 306 and decreases
the amount of nonresidential floor area permitted by 161,564 square feet on the subject
property.
Table 1. Development Potential for Existing & Proposed FLUM Designations
Site Area 37.09 AC 2.70 AC 39.79 AC
(1,615,640 SF) (117,612 SF) (1,733,252 SF)
Present FLUM Present FLUM Requested
Designation Designation FLUM Net Change
«�„ «���„ Designation
"R/OL"
556 DUs 48 DUs 298 DUs -306 DUs
Maximum g07,820 SF 47,044 SF 693,300 SF -161,564 SF
Development
0.50 FAR 0.40 FAR 0.40 FAR -0.05 FAR
Abbreviations:
FLUM — Future Land Use Map DUs — Dwelling units
AC — Acres FAR — Floor area ratio
SF — Square feet
The proposed change in designations would allow a decrease in the number of dwelling
units and amount of allowable Floor Area Ratio (thus a decrease in square footage).
The current Medium Density Residential (MDR) district primarily permits attached and
rlPtar_,hPrl riwPllino�; commi�nity resiciential hpme� �n�i sc1���15. The current Commercial
(C) district primarily permits offices, overnight accommodations, restaurants and retail
sales and services. The proposed Office (0) District primarily permits offices, parks and
recreation facilities, places of worship and schools.
Community Development Boazd — August I6, 2011 - Case REZ2011-01002 -Page 4 of 7
S:�Planning Department\C D B�Zoning Atlas Amendments�REZ 2011�Drew St 2995 REZ201 1-01 002 Baycaze Properties, Inc\Staff
ReportUZEZ20ll-01002 StaffReport.docx
Table 2. Public Facilities Level of Service Analysis
�� . � � �
Public Present FLUM Requested Net Capacity
Facility/Service Present FLLTM Designation FLUM Change Available?
Designation ��R/O/R" Designation
��RM�� °°R/OL "
Streets 3,783 Trips 915 Trips 4,974 Trips 276 Yes
Potable Water 144,874 GPD 4,704 GPD 69,330 GPD -80,248 Yes
Wastewater 130,386 GPD 3,763 GPD 55,464 GPD -78,685 Yes
1,410 240 Tons/Year 1,872 222
Solid Waste Tons/Year Ton/Year Yes
Parkland 0.0 Acres 0.0 Acres 0.0 Acres 0 Yes
Public School
Facilities3 Yes
Elementary 83.4 Students 7.2 Students 44.7 Students -45.9 Yes
Middle 3.36 Students -21.42
School 38.92 Students 20.86 Students Yes
High School 55.6 Students 4.8 Students 29.8 Students -30.6 Yes
NoteS:
1. Based on average daily trips per acreage figure, Pinellas County Countywide Plan Rules.
- i:.°.5�.'�.:.^..,31 1����1��m ;RTA�
- ResidentiallOffice/Retail (R/O/R)
- ResidentiaUOffice Limited (R/OL)
2. GPD — Gallons per day.
3. Based on 4.0 acres of parkland per 1,000 persons and 2.2 persons per unit.
4. Pinellas County School Board student generation rate per unit:
- Elementary School: 0.15 students per unit x 1 unit
- Middle School: 0.07 students per unit x 1 unit
High School: 0.10 students per unit x 1 unit
The Trip Generation Comparison by Zoning Atlas Designation in Table 3 below
indicates the estimated trip generation for specific uses allowed in the current and
proposed zoning districts based on the Institute of Transportation Engineer's (ITE) Trip
Generation 8ry Edition. The table shows that while there would be a net increase in PM
Peak Trips for a General Office Building, allowed in the proposed Office (0) District,
there would be a net decrease in PM Peak Trips for the development proposed in the
current Development Agreement case (see DVA2011-06001), Corporate Headquarters
Office Building. The Development Agreement proposes several transportation
improvements that will enhance the operational efficiency of the intersection at Drew
Street and Bayview Avenue, as well as improve site access at the two points of ingress
and egress.
Community Development Boazd — August 16, 2011 - Case REZ201 I-01002 -Page 5 of 7
S:�Planning Department\C D B�Zoning Atlas Amendments�REZ 2011�Drew St 2995 REZ2011-01002 Baycare Properties, Inc\Staff
Report�REZ2011-01002 Staff Report.docx
Table 3: Trip Generation Comparison by Zoning Atlas Designation
PM Net
Development A�g' C ange Peak PM peak Change
Land Use p o t e n t i a l Daily A v g D a i l y Trips T r i p s PM
Trips Trips A�g Peak
Rate Tri s
Existin Desi nation: Commercial District
Specialty Retail Center 47,044 SF 2,085 N/A 5.02 236 N/A
(4432 trips/1,000 SF
GFA
Existin Desi nation: Medium Densi Residential District
Single-Family Detached 556 DU 5,320 N/A 1.02 567 N/A
Housing2 (9.57 trips/unit)
Low-Rise Apartment 556 DU 3,664 N/A 0.62 344 N/A
6.59 tri s/unit
Pro osed Desi nation: Office District
General Office Building 693,300 SF 7,633 228 1.49 1,033 230
(11.01 trips/1,000 SF
GFA)
Permitted Use throu h Develo ment A reement VA2011-06001
Corporate Headquarters 300,000 SF 2,394 -5,011 1.40 420 -383
Office Building5 (7.98
tri s/1,000 SF GFA
Abbreviations and Notes:
N/A = Not Applicable. SF = Square Feet GFA = Gross Floor Area
1. Institute of Transportation Engineer's Trip Generation 8th Edition Land Use 814.
2. Institute of Transportation Engineer's Trip Generation 8th Edition Land Use 210.
3. Institute of Transportation Engineer's Trip Generation 8th Edition Land Use 22l .
4. Institute of Transportation Engineer's Trip Generation 8th Edition Land Use 710.
5. Institute of Transportation Engineer's Trip Generation 8th Edition Land Use 714.
6. Total gross floor area ratio permitted by the underlying R/O/R Future Land Use Map category is 0.40.
7. Total dwelling units permitted by the underlying RM Future Land Use Map category is 15 units per acre.
8. Total dwelling units permitted by the underlying RM Future Land Use Map category is 15 units per acre.
9. Total gross floor azea ratio permitted by �e underlying R/OL Future Land Use Map category is 0.40.
] 0. DVA2011-06001 limits development of the subject site to 300,000 square feet of office space.
Recommended Conclusions of Law
Based upon the findings of fact, it its determined that the traffic generated by the
proposed amendment will not result in the degradation of the existing level of service on
Drew Street. There is an increase in demand of solid waste service, but there is adequate
capacity to accommodate the maximum demand generated by the proposed amendment.
Furthermore, potable water, wastewater, parkland, recreation facilities, public school
facilities and mass transit will not be affected by the proposed amendment.
Community Development Board — August 16, 2011 - Case REZ201 I-01002 -Page 6 of 7
S:�Planning Department\C D B�Zoning Atlas Amendments�REZ 201 I�Drew St 2995 REZ201 1-0 1 002 Baycare Properties, Inc\Staff
Report�REZ201 1-0 1 002 StaffReport.docx
D. Location of District Boundaries [Section 4-602.F.6]
Recommended Findings of Fact:
The location of the proposed Office (0) District boundaries is consistent with the
boundaries of the subject property.
The proposed Office (O} District boundaries would consolidate the subject property into
a single zoning district. The proposed Office (0) District is compatible with the place of
worship use to the east, multi-family uses to the west and south and parks and recreation
facilities use to the north.
Recommended Conclusions of Law
The district boundaries are appropriately drawn in regard to location and classifications
of streets, ownership lines, existing improvements and the natural environment.
V. REVIEW PROCEDURE
Approval of the Zoning Atlas amendment does not guarantee the right to develop the subject
property. The property owner must comply with all laws and ordinances in effect at the time
development permits are requested, including transportation concurrency provisions of the
Concurrency Management System in Division 9, Community Development Code.
VI. RECOMMENDATION
Based on the foregoing, the Planning and Development Department recommends the
following action:
Recommend APPROVAL of the request for Zoning Atlas amendment from the Medium
Density Residential (MDR) and Commercial (C) districts to the Office (0) District.
. ��'! �,.
Prepared by Planning & Development Department staff: �.�, �'
Catherine Lee
Planner III
Attachments:
Resume
Application for Future Land Use Plan Amendment
Location Map
Aerial Photograph of Site and Vicinity
Future Land Use Map
Zoning Map
Existing Surrounding Use Map
Site Photographs
Community Development Boazd — August 16, 201 I- Case REZ2011-01002 -Page 7 of?
S:�Planning Department\C D B�Zoning Atlas Amendments�REZ 2011�Drew St 2995 REZ2011-01002 Baycare Properties, Inc\Staff
Report�REZ2011-01002 StaffReport.docx
M
CITY OF CLEARWATER
S��' r�, APPLICATION FOR
� '��� � a COMPREHENSIVE PLAN AMENDMENT
a �
qq�A����� (INCLUDIN pLANNING DEPARTMENT ENDMENT)
MUNICIPAL SERVICES BUILDING, 100 SOUTH MYRTLE AVENUE, 2"d FLOOR
PHONE (727) 562-4567 FAX (727) 562-4576
APPLICANT, PROPERTY OWNERS, AND AGENT INFORMATION:
APPLICANT NAME:
MAILING ADDRESS:
Bay Care Health System, Inc. (Attn: James Orr)
8452-118th Avenue North, Largo, Florida 33773
PHONE NUMBER: 727-394-6576 FAX NUMBER:
Clearwater Housing Authority (Attn: Jacqueline Rivera, CEO)
PROPERTY OWNERS:
P. O. Box 960, C1eaLwater, FL 33757-0960
(List all owners)
. ng , s
AGENTNAME: �TOrll'1SOri� Pope, Bokor, Ruppel & Burns, LLP
MAILING ADDRESS:
PHONE NUMBER:
911 Chestnut Street, Cleazwater, FL 33756
727-461-1818 .727-462-0365
FAX NUMBER:
SITE INFORMATION: 2985 and 2995 Drew Street
LOCATION: SOUt.Y1W2St corner of Drew Street and Bayview Avenue
STREET ADDRESS: VaCc"�rit
LEGAL DESCRIPTION: See �Llblt ��A�� attached.
PARCEI NUMBER:
SIZE OF SITE:
FUTURELAND USE
CLASSIFICATION:
17-29-16-00000-110-0100
39.79. acres m.o.l.
PRESENT:
ZONING CLASSIFICATION: PRESENT
PROPOSED TEXT AMENDMENT
(use additional paper if necessary)
RM and R/O/R
NIDR and C
N/A
I(We), the undersigned, acknowledge that all
representations made in this application
are true and accurate to the best of my/(our)
knowledge
Si ure of property owner or representative
E. D. Armstrong III, Esquire
Signature of property owner or representative
R/OL
REQUESTED:
�
REQUESTED:
STATE OF FLORIDA, COUNTY OF PINELLAS
Sw�y and subscribed before me this ��`— day of
, A.D., ��l to me
by E. ong , who is
personally known ���b
a�.
C� .
Not public
.......�..r.�
my ommission expires: ,,,,,,,,
; �ti:�::r�� : JAYNE E. SEARS
:,: � :�; Commission # DD 907040
Bonded Thru Troy Fan Insu2nc¢ 800.3857019
CITY OF CLEARWATER
APPLICATION FOR ZOIVING ATLAS AMENDMENT
PLANNING DEPARTMENT
MUNICIPAL SERVICES BUILDING, 100 SOUTH MYRTLE AVENUE, 2"d FLOOR
PHONE (727) 562-4567 FAX (727) 562-4576
APPLICANT, PROPERTY OWNERS, AND AGENT INFORMATION:
BayCare Health System, Inc. (Attn: James Orr)
APPLICANT NAME:
MAILINGADDRESS: 8452—�-1HtY1 AVP_IlUe NOY'tl'1� IcZI'CfO� Florida 33773
PHONE NUMBER: 727-394-6576
FAX NUMBER:
Clearwater Housing Authority (Attn: Jacx�ueline Rivera, CEO)
PROPERTY OWNERS:
P. O. Box 960, Clearwater, FL 33757-0960
(List all owners)
E. D. Armstrong III, Esquire and
AGENT NAME:
� i i r
MAILWG ADDRESS: 911 C�7�-'StT1Ut S�'�t � Cleazwater, FL 33756
727-4ti1-1R1R ���-a��-n���
PHONE NUMBER:
FAX NUMBER:
2985 and 2995 Drew Street
SITE INFORMATION: �uthwest corner of Drew Street and Bayview Avenue
STREET ADDRESS: V1C3Tlt
LEGAL DESCR�PTION: �e EXhl�lt ��A�� attached.
PARCEL NUMBER:
EXISTING ZONING:
17-29-16-00000-110-0100
37.09 acres zoned "NIDR" + 2,7 acres zoned "C"
PROPOSED ZONING: Off1Ce ( ��0�� �
LAND USE PLAN Ciirrently RM and O
cwssiFicATiorv: 1�zesting Residential Office Limited R/OL
SIZE OF SITE: 39.:79 acres m.o, l
REASON FOR REQUEST: �OPOS2(3 C�2VE?ZOplTlerit of BayCare cozporate headquarters
I, the undersigned, acknowledge that all
representations made in this application
are true and accurate to the best of my
knowledge.
S' ature of property owner or representative
E. D. Azmstrong IIi, Esquire
STATE OF FLORIDA, COUNTY OF PINELLAS
�iyn to and subscribed before me this.�,� �day of
A.D.,� GU11 to me and/or
by °ng I , who is personally
known�� �
x�
�.
Notary p ic,
my com ission expires:
Page 1 of 2
JAYNE E. SEARS
Bonded iTni Troy fain I�urance 800.385)019
N. AFFIDAVIT TO AUTHORIZE AGENT:
1. Provlde names of ail propeRy owners on deed — PRINT tull nart�es:
Gl.eazwater Housing Authority, a non-profit oorporate body and•politic
�u, °s .
2. That (I am/we are) the owner(s) and rewrd title holder(s} of the following described property (address or general bcation):
Parcel No. 17-29-16-00000-110-0100
3. That this property constitutes the property ior which a request for a: {describe req�st)
Zoning Atlas Amer�ent and
4. That the undersigned thas/have) appoirtted and (doesldo) appoint:
E.- D. �rtt4strong III, E��i re, an�d Johnson, Pope, Bokor, Ru}�pel & Bu�s, LLP
911 Chestnut Street, Q�a�.i�, FL 33756
as (histtheir) agent(s) to execute any pettpons or other documents necessary to effect such petidon;
5. That this affidavit has been executed to induce the Ciry of Clearvvater, Fbrida to consider and act on the above described property;
6. That slte visiis to the property are necessary by City representalives in orcler to process this application and the owner authwizes City
representatives to visit and photograph the property described in this application;
7. That (Ihve), the undersigned authority, hereby ceriify that the foregoing is true and cotrect.
Cleazwater Hpusing Authority
Property Owner - P�opeAy ,
� � � �t�-'
Property Owner % ; Property, Owne� -
t.��cque Riv�era, C�
STATE OF FLORIDA,
COUNTY OF PINELLAS
Before me the undersigned, an officer duly commissfoned by the laws of the State of Florida, on this �� day of
MSy 2�11 �rsonally appeared JacSqueline R1V�Y'1� Cf7�* Who having been first duly swom
Deposes and says that he/she iufly understands the contents of the affidavit that he/she signed.
* of Cleaiwater Hausing Authority
��tnR � Pu•�C� I�fll� � � .. � �.
*� * MY COI�MISSION N EE 067464 r'"�=��L-''" %�i�
,�r � EXPIRES: febNary 24, 2015 Notary Pub'c Signat re
F Bwided iluu Bu 1� %a �% 1s
Notary be°Fa�/Stamp ���S My Commission Expires: �,�c /�-� f
C:�Documents and SerifngsWerek.fergusonlDesktoplplanning dept forms �
��:�i� : ��.�.�
The Northeast '/ of the Northeast '/4 of Section 17, Township 29 South, Range
16 East, Pinellas County, Florida; less and except the North 50 feet thereof for
right-of-way for Drew Street; also less and except the East 33 feet thereof for
right-of-way for Bayview Boulevard.
BAYCARE CORPORATE HQ
LAND USE AMENDMENT / REZONING
NARRATIVE SUMMARY
OWNER:
Clearwater Housing Authority
PO Box 960
Clearwater, F133757-0960
Applicant/Contract Purchaser/Authorized Representative:
BayCare Health System, Inc. (a Florida Corporation)
8452 — 118�' Avenue North
Largo, FL 33773
Attn: James Orr
Authorized Representative: Authorized Representative:
Robert Pergolizzi, AICP/PTP Mr. Ed Armstrong, Esq.
Gulf Coast Consulting, Inc. Johnson, Pope, Bokor, Ruppel & Burns, LLP
13825 Icot Boulevard, Suite 605 911 Chestnut Street
Clearwater, Fl 33760 Clearwater, F133756
I. INTRODUCTION
The subject property consists of 39.79 acres which are located on the south side of Drew
Street west of Bayview Avenue in the City of Clearwater. The property is vacant and had
been previously developed with apartments. BayCare is considering developing its
corporate headquarters and relocating several employees from various locations in the
Tampa Bay area into a unified campus. To develop the property with office uses the
applicants seek to amend the land use plan for approximately Residential Medium (RM)
and Residential/Office/Retail (R/O!R) to Residential/Office Limited (R/OL) and to
rezone the site from Medium Density Residential (MDR and Commercial (C) to Office
(0). This application is accompanied by a Development Agreement including a Master
Plan for the property.
II. LAND USE / ZONING
The property in question has multiple land use designations and zoning classifications.
EXISTING
Parcel ID# Size Land Use Zoninp
Part of 17/29/16/00000/110/0100 37.09 acres RM MDR
Part of 17/29/16/00000/110/0100 2.70 acres R/O/R C
TOTAL 39.79 acres
The Drew Street corridor between US 19 and McMullen Booth Road contains a mixture
of uses including Commercial General (CG), ResidentiaUOffice General (R/OG),
Industrial Limited (IL), Residential Low Medium (RLM), Institutional (I), and
Recreation/Open Space (R/OS.
The proposed land use and zoning are outlined below:
PROPOSED
Parcel ID# Size Land Use ZoninQ
Part of 17/29/16/00000/110/0100 37.09 acres R/OL O
Part of 17/29/16/00000/110/0100 2.70 acres R/OL O
TOTAL 39.79 acres
Surrounding Uses around the subject property:
North: Open space on land having a Recreation/Open Space (R/OS) land use designation
and Open Space/Recreation (O/SR zoning, containing recreational fields.)
South: Mobile home park on land having RLM land use, and MHP zoning, and RV park
on land having RFH land use and T(tourist) zoning.
East: Calvary Baptist Church on land having Institutional (I) land use and Institutional
(I) zoning.
West: Mobile home park on land having RLM land use and MHP zoning, west of
Hampton Road, office uses and light manufacturing uses on land having IL land
use and Industrial Research & Technology (IRT) zoning in the City of
Clearwater.
Given the mixture of uses, the establishment of a single user office compl�x is reasonable
and can be adequately buffered from nearby residential uses by adhering to the standards
set forth in the Community Development Code.
III. TRANSPORTATION
According to Pinellas Planning Council (PPC) criteria the net traffic impact of the plan
amendment would be only 268 daily trips as calculated below:
Current FLUM Desi nation:
37.09 acres RM @ 96 daily trips/acre = 3,560 daily trips
2.7 acres R/O/R (� 336 daily.trips/acre = 907 daily trips
Total = 4,467 daily trips
Proposed FLUM Desi na� tion:
39.79 acres R/OL @ 119 daily trips/acre = 4,735 daily trips
2
According to the MPO 2010 Level of Service Report, the segment of Drew Street
between U.S. 19 and McMullen Booth Road is reported to operate at Level of Service
(LOS) C carrying 18,784 vehicles per day. Capacity is available to support the Land Use
Plan Amendment. Furthermore, the applicant anticipates up to 300,000 square feet of
office space would be constructed. A detailed traffic analysis was prepared that
demonstrates acceptable levels of service along Drew Street will be maintained. Based on
ITE Trip Generation, 8`�' Edition, a 300,000 square foot corporate headquarters facility
would generate 2,394 daily trips of which 447 trips would occur during the AM peak
hour and 420 trips would occur during the PM peak hour.
Access to Drew Street is available through a median opening near the western end of the
site that could be used for the main project access. Secondary access could be taken via
Bayview Avenue. Minor roadway improvements may be necessary to provide safe
access. PSTA has several bus routes along Drew Street, so the area is well served by
mass-transit. In addition, the nearby recreational trail provides alternate means of access
to the area for increased pedestrian usage.
IV. AVAILABILITY OF PUBLIC UTILITIES
Potable water and sanitary sewer appear to be available to the site. Based on site
observation and inspection of the Utility atlas maps obtained from the City of Clearwater,
existing water and sewer facilities are available within and immediately adjacent to the
site as follows: potable water lines are located within Bayview Avenue; sanitary sewer
lines are located within Bayview Avenue, Drew Street, and within the site; reclaimed
water lines (for irrigation) are located within Drew Street; and storm-water drainage pipes
are located within Bayview Avenue and Drew Street as well as throughout the site. In
addition, Clearwater Gas has natural gas lines within Bayview Avenue. It is apparent
that power and cable facilities are also located throughout this Drew Street conidor.
In summary all utilities appear to be readily available to serve this site. Therefore,
sufficient public facilities are available to serve the property.
V. OTHER INFORMATION
The site is located in a NON-Hurricane Evacuation Zone and is not located within a 100-
year floodplain. The consolidation of administrative and back-office functions would
bring 500 to 1500 jobs to the City of Clearwater in an area slated for economic
redevelopment by the City of Clearwater. The site is large enough to accommodate up to
300,000 square feet of building floor area, associated parking and roadways, while
maintaining a large amount of open space, there are no wetlands identified on the
property. Therefore, the amendment will not adversely affect the natural
environment.
3
VI. CONCLUSION
The amendment of the Future Land Use Plan and Zoning Atlas is appropriate and serves
to provide consistency and compatibility of the land use designations and zoning districts
throughout the campus. The property could be appropriately developed in compliance
with all City of Clearwater criteria for Office (0) zoning.
The following Comprehensive Plan Goals, Objectives and Policies are furthered by this
amendment:
Policy A.2.2.6 — Provide for safe on-site traffc circulation and connections to adjacent
arterial and collector streets.
The project is located on Drew Street a City Major Collector roadway with direct
access via full median opening.
Policy A.3.2.1 — All new development or redevelopment of property within the City of
Clearwater shall meet all landscape requirements of the Community Development Code.
The proposed Master Plan provides ample landscape opportunities that can meet
and exceed code requirements
Policy A.4.1.1 — No new development or redevelopment will be permitted which causes
the level of City services (roads, recreation and open space, water, sewage treatment,
garbage collection, public school facilities, and drainage to fall below minimum
acceptable levels.
The development of this property will not cause levels of service for affected city
services to fall below acceptable levels.
Policy A.6.1.6 — Land Use decisions in Clearwater shall support the expansion of
economic opportunity, the creation of jobs and training opportunities as well as the
maintenance of existing industries through establishment of enterprise zones, activity
centers and redevelopment areas and by coordination with the Chamber of Commerce,
Tourist Development Council and other economic development organizations and
agencies
The BayCare Corporate Headquarters will provide several jobs within the City of
Clearwater. The health care industry is vital to the City of Clearwater and is an
existing industry the currently provides thousands of jobs (Morton Plant Hospital).
The establishment of the BayCare headquarters in the City furthers this policy.
Policy A.6.8.9 — Promote a variety of transportation modes such as walking, bicycling,
ride-sharing and mass transit to increase transportation choices and decrease dependence
on the single-occupancy vehicle.
0
The site is well served by mass transit as PSTA has several routes along Drew Street
and Bayview Avenue. The Master Plan includes construction of PSTA bus shelters
at these locations, walking paths through the site to the PSTA bus shelters and
public sidewalks. The Master Plan also shows a connection to the EC Moore
Complex on the north side of Drew Street which in-turn is served by the Ream
Wilson Trail which will encourage alternate modes of transportation.
Policy B.1.3.1 — Requests for amendment to the Future Land Use Map will have an
analysis of traffic impacts.
Using PPC traffic criteria the affect of the land use plan request from RM and
R/O/R to R/OL is minimal, creating an increase of only 268 daily trips. An analysis
was submitted with the application demonstrating acceptable levels of service and
identifying improvements.
Objective B3.2 — The City of Clearwater shall encourage and promote mass transit with
appropriate land use, zoning and land development policies.
The site is well served by mass transit and the ability to place a major employment
enter adjacent to mass transit facilities furthers this objective.
Policy D.1.3.5 — Extend force mains, lift station capacity and gravity wastewater
collection systems to serve existing development as well as new infill development.
The site is presently served by wastewater lines within Drew Street and Bayview
Avenue, this is an infill development that will connect to existing facilities.
Policy D.3.3.4 — Development and redevelopment activities shall comply with all
stormwater management design standards and criteria
The site is large enough to provide on site stormwater retention ponds. The Master
Plan depicts the general location of these ponds which will comply with the City
criteria.
Policy F.1.2.1 — Any construction in the 100-year floodplain shall comply with all
requirements and standards of FEMA and the City's building codes
The site is not located in a 100-year floodplain and does not affect floodplains. The
location of a corporate headquarters complex will not impact floodplains at all.
5
TRAFFIC IMPACT ANALYSIS
FOR
BAYCARE CORPORATE HEADQUARTERS
CLEARWATER, FLORIDA
PREPARED �OR:
BAYCARE PROPERTIES INC.
PREPARED BY:
GULF COAST CONSULTING, INC.
JANUARY 2011
PROJECT # 10-033
TABLE OF CONTENTS
I. INTRODUCTION
II. EXISTING CONDITIONS
III. FUTURE C4NDITIONS WITH PROJECT
IV. CONCLUSION
APPENDIX A
APPENDIX B
Robert Pergolizzi, AICP/PTP
AICP # 9023 / PTP #133
I. INTRODUCTION
Clearwater Housing Authority (CHA) owns a 39.8 acre site along Drew Street
immediately west of Bayview Avenue in Clearwater. (See Figure 1) The site is
presently zoned Medium Density Residential (MDR) and Commercial (C) with a
Future Land Use Designation of Residential Medium (RM) and
Residential/Office/Retail. The CHA plans to sell the property to BayCare for the
purpose of consolidating corporate headquarters functions at this location to
contain up to 300,000 squaxe feet of space. The CHA is filing a Land Use Plan
Amendment and Rezaning Application, and City of Clearwater 1'lanning staff has
requested a traffic impact analysis. Prior to completing this iraff`ic analysis a
methodology was established with City of Clearwater Traf£'ic Engineering staff.
II. EXISTING CONDITIONS
The developnnent of this site will have a trafiic impact on the section of Drew
Street between US 19 and McMullen Booth Road. This section of Drew Street is a
four-lane divided arterial roadway and is controlled by traffic signals at the
Hampton Road intersection, and at McMullen Booth Road.
To establish existing conditions PM peak period (4-6 PM} intersection tutning
movement counts were conducted at the following locations in Januacy 2�11:
Drew Street / Hampton Road (signal)
Drew Street/ Bayview Avenue
Drew Street / McMullen Booth Road (signal)
Gulf-to-Bay Blvd. (SR 60} / Bayview Avenue
Intersection geometrics and signal tirr�ings were recorded in the field. Based on
the MPO 2010 Level of Service Report the adjacent segment of Drew Street
operates at LOS C carrying 18,784 vehicles per day AADT. Existing conditions
were analyzed using HCS softwa,re. Existing PM peak hour traffic volumes are
shown in Figure 2, and the HCS printouts are inciuded in Appendix A. Overall
intersection levels of service (LOS) are shown below:
EXISTING INTERSECTION LEVELS OF SERVICE - 2011
Intersection Location Tvt�e LOS Avera e�De_laX
Drew St. / Hampton Rd. Signal C 28.0 sec/veh
Drew St. / Bayview Avenue Unsignal A/D'� 9.6/26.4 sec/veh
Drew St. / McMullen Booth Rd. Signal E 66.4 sec/veh
Gulf-to-Bay / Bayview Avenue Unsignal C/E* 24.5/42.9 sec/veh
* A/D = LOS major street left turn / minor street approach
�
.00.
.�,
c
0
;
�
�
�
�
�
�
�
W
�
>•
a
x
0
0
aa
z
w
a
a
N �
U
�
EC MO�RE � � M �
� �16
1202 i^,� a� � 83i 857 745 -- 563 585 511 N� N -•-- fi2
� � � t� �' 78 � DREW ST � zz ~ � � 1 � � 3ti
�sz-- z�, � —� � r
940 � f r 9?, �e, i9 ---� r-- �89 63�
13� '�jF
839 -" � N 0^0 r � N 'L$ -'^ O i0 M
88 �
"� � 318 � N M
�� �� CHURCH
W
� �
z W �� " �
o �
�
�
x �� '��
� o
N
� 19d
n o �n � 2875
�J 1 I--� (� 3
t
GULF-TO-BAY BLVD 17 � � � �
�sos -- �n ° N
a --�
EXISTING PM PEAK HOUft TRAFFIC (2Q i i)
Gulf Coast Consulting, Inc. DATG:
Land Development Consulting JAN/201 1
-1
�: DRAWN BY:
MKC
PROJCC!' NO:
10-033
rtGUREr
The adjacent segments of Draw Street were analyzed using the FDOT
Genei•alized Capacity Tabies. The segment between US 19 and Hampton Road
operates at LOS C cat7ying 2,142 vehicles during the PM peak hour, the segment
between Hampton Road and McMullen Booth Road operates at LOS C carrying
1,778 vehicles during the PM peak hour.
EXISTING ROADWAY LEVELS OF SERVICE - 2011
Roadway Segment Lane Peak Hr. LOS D Pk Hr.
�Rrom — To) Type Volume Capacity LOS
Drew (US 19 — Hampton Road) 4LD 2142 3220 C
Drew (Hampton — Bayview) 4LD 1778 3220 C
Drew (Bayview—McMullen Booth) 4LD 1374 3220 C
III. FUTURE CUNDITIONS WITH PROJECT
A. BACKGROUND TRAFFYC
The build-out date of the complex is expected to be 2015. As requested by the
City of Clearwater, background traffic in 2015 was estimated by applying a 1%
annual growth rate to existing traffic.
B. PROJECT TRAFFIC
The BayCare HQ will consolidate office functions into one location and will
contain several meeting rooms, corporate t�aining rootns, file storage and data
processing functions. Project traffic was estimated using ITE Titip Generation, 8�`
Edition, Land Use Code 714 (Corporate Headquarters}. At full huild-out of
300,000 square feet, the project would generate 2,394 daily trips of which 447
would occur during the AM peak hour (416 entering / 31 exiting) and 420 would
occur during the PM peak hour (42 entering / 378 exiting). Projeci traffic was
distributed to the roadway system based on the following percentages which were
based on residence locations of BayCare employees expected tv work at this
complex:
30% west on Drew Street
10% west on Gulf to Bay Boulevard
20% south on McMullen Booth Road
20% north on McMullen Booth Road
20% east on Courtney Campbell Causeway
Project trafiic was distributed to the roadway system and the intersections and
adjacent segments of Drew Street were reanalyzed. Project traffic fiom the
proposed development comprises a moderately significant impact. as compared to
the PM peak hour LOS D capacify of nearby roadways, particularly to Drew
Sneet.
Roadway Segment Lane Project LOS D Project
�From — To) Type Traffic Capacitv %
Drew (US 19 — Hampton) 4LD +12? 3220 3.94%
Drew (Hampton — Site) 4LD +127 3220 3.94%
Drew (Site — Bayview) 4LD +144 3220 4.47%
Drew {Bayview — McMullen Booth) 4LD +234 3220 7.26%
McMullen Booth (SR 60-Drew) 6LD +150 5360 2.80%
McMullen Booth {Drew — SR 590) 6LD +84 5360 1.57%
SR 60 {Hampton — Bayview) 6LD +42 4880 0.08%
SR 60 (Bayview—McMullen Booth) 6LD +17 4880 0.�3%
SR 60 (McMullen Booth-Bayshore} 6LD +84 5360 1.Sb%
Pinellas County is constructing interseciion improvements at the Drew Street /
McMullen Booth Road intersection. These improvements include adding a
southbound right turn lane, reconfiguring the noi�thbound approach to provide
dual left turn lanes, and modifying the eastbound approach to include dual left
turn lanes, a shared leftltluough lane, and an exclusive right turn lane. Other
potential modificatians include restricting movements at the westbound approach.
These extensive improvements combined with signa.l timing modifications will
substantially improve the intersection operations.
Future PM peak hour volumes are shown in �igure 3, the HCS printouts are in
Appendix B. The expected future intersection levels of service are shown below:
FUTURE iNTERSECTION LEVELS OF SERVICE - 2015
Intersection Location
Drew St. / Hampton Rd.
Drew St. / Bayview Avenue
Drew St. / McMullen Booth Rd.
Gulf-to-Bay / Bayview Avenue
Drew St / Drive A
Bayview Ave / Drive B
Tvne
Signal
Unsignal
Signal
Unsignal
Unszgnal
Unsignal
�' A/C = LOS major street left turn / minor street approach
LOS
C
B/D*
D
D/F*
A/C*
A/B*
Averag�e Delay
30.1 sec/veh
10.3/28.8 sec/veh
44.6 sec/veh
27.5/52.2 sec/veh
9.7/16.6 sec/veh
73/11.2sec/veh
The major intersections would continue to operate at an acceptable level of
service considering the Pinellas County improvements ai Drew Street and
McMullen Booth Road. Minor tuin lane improvements may be helpful at minor
intersections to reduce delay to right turning motorists.
With background traffic and project traffic added the adjacent segments of Drew
Street would continue to operate at acceptable levels of service.
/ � ��5
i— 9 cso>
8,2 -- -� r
�, Z5> , z —�
N M
Q '"
Q � v /
a
x
H
0
O
�
z
�
��1
-/-�
�
EC MOORB �� M�
a �17
1363 N o a � 979 1006 784 _.__ 595 618 541 N�n � �- 85
� �1 1 I_,_ � �s � DREW ST � z3 � � J � � � az
99, 4 r s�� 94� 92� -- � r ,045 88� (�
'� 14 � � I I —�' � —� 20 —7 rn ao —.r. —� 356 � � � I
885._-�. � c� � � f °° � , 50 —�- N rn`rQi
92 � `� � 481 � `� �
Q � t ° � c�auxcx
N �
A SITE ¢
� 420 PM TRIPS DRIVE T3 � � N� n�
O(42 ENTERj378 EXIT)
(-� 447 AM TRIPS �8) 90 J ��
(416 ENT£R/31 EXIT) (3) 38 � � N �
� � �
M N
W
o� �t
m N
� 2�5
n o co -- 2990
� 1 L�. � 3
GULF-TO-BAYBLVD ZZ� -7 i r-
� aeo -- � a N
a�
FUTURE PM PEAK HOUR TRAFFIC (2015)
�n Gulf Coast Consulting, Inc. DA7��:
�� JAN/2011
� Land Development Consulting
` �.
�: �
DRAWM BY:
MKC
PROJGCI' NO:
�a-o33
FIGURG:
FUTURE ROADWAY LEVELS OF SERVICE - 2015
Roadway Segment Lane Peak Hr. LOS D Pk Hr.
�From — To) Ty�e Volume Capacitv LO5
Drew (US 19 — Hampton Road) 4LD 2354 3220 C
Drew (Hampton — Site Access) 4LD 1976 3220 C
Drew (Site Access — Bayview) 4LD 1731 3220 C
Drew (Bayview—McMullen Booth) 4LD 1663 3220 C
IV. CONCLUSION
The campus is expected to include up to 300,000 square feet of corporate
headquarters office space at full build-oui. This analysis demonstrates the
additional trafiic wi11 comprise approximately 7.26% of the LOS D capacity of
the adjacent segtnenf of Drew Street and these segments would continue to
operate at acceptable levels of service. The adjacent intersections and roadways
segments would continue to operate at acceptable levels of service given
improvements under construction by Pinellas County. Additional recommended
improvements to be completed by the developer include:
1. Construct project main access to Drew Street (Drive A) to include two exiting
lanes to separate left and right turning vehicles, construct an eastbound right
turn lane on Drew Street. Lengthen the existing westbound left turn Iane to
include 100-feet of full width storage plus deceleration distance.
2. Construct project secondary access to Bayview Avenue. Tha driveway should
include two exiting lanes to separate left and right turning vehicles. Construct
a northbound left tuim lane on Bayview Avenue to include 175 feet of full
width storage plus deceleration distance.
3. At the Drew Street Bayview Avenue intersection construct a northbound left
turn lane.
4. Install bus pads and bus shelters along Drew Street and Bayview Avenue to
accommodate PSTA routes and provide pedestrian access.
5. Provide pedestrian crosswalk across Drew Street to connect to the EC Moore
complex and recreational trail to facilitate pedestrian access.
�:�3�+ I�t:�7� A
Page 1 of 1
Robert Pergolizzi
From: Robert Pergolizzi
Sent: Thursday, January 06, 2011 1:48 PM
To: 'Himanshu.Patni@myClearwater.com'
Subject: Drew Street Site Rezoning - Traffic Study
Hinamshu - As we discussed this morning, we will be conducting a detailed traffic study for a Land Use
Plan Amendment/Rezone ior the 40 acre site located at Drew Street and Bayview Avenue. The project
would include a corpo�ate HQ bulEding(s) for a major employer, and would incfude between 20d,000-
300,000 square feet. According to ITE Trip Generation LUC 714 (Corporate HQ} the site would generate
up to 2,394 trips per day , 447 AM peak trips and 420 PM peak trips.
Access would be to Drew Street and to Bayview Avenue.
GCC will obtain PM peak period (4-6 PM} intersection turning movement counts at the foliowing locations:
Drew Street/ Hampton Road
Drew Street / Bayviw Avenue
Drew Street / McMullen Booth Road
Gulf-to-Say / Bayview Avenue
Existing condi#ions at these intersections will be analyzed, (inluding improvements being completed at
McMulien Booth intersection), future conditions for thes intersections will be anafyzed to include a 1%
annual growth rate and project traffic. The segment of Drew Street beiween US 19 and McMullen Booth
Road will be analyzed for both existing and future conditions.
The study wi{I be submiited with the Plan AmendmentlRezone applications by the February 1, 2011
deadllne.
Thanks for your assistance.
Robert Pergolizzi, AICP, PTP
Gulf Coast ConsulEing, Inc.
13825 ICOT Bouievard, Suite 605
Cleanivater, FI 33760
Phone: 727-524-1818
Fax: i27-524-6090
Celiphon e: 727-644-2695
emaif: pergo@gulfcoastconsultinginc.com
1/6i201 I
2009 Peak Season �actos Category Report - Report Type: ALL
Category: 1500 PZNELLAS COUNTYwIDE
MOCF: 0.93
Week Dates SF PSCF
m,z�za-s-�_-----��s-----:��--_____�__�_�a__���_°�--------------- --
i O1/O1/2009 - O1/03/2009 1.10 1.18
2 O1/04/2009 - O1/10/2009 1.07 1.i4
3 O1/11/2009 - O1/17/2009 trl7�; 1.22
4 O1/18/2009 - O1/24/2009 1.03 1.10
5 O1/25/2009 - O1/31/2009 1.01 1.08
6 •02/O1/2009 - 02/0'I/2�09 0.99 1.06
7 02/OB/2009 - 02/7.4/2009 0.97 1.04
* 6 02/15/2009 - 02/21/2009 0.95 1.02
* 9 02/22/2009 - 02/26/2009 0•94 1.01
*10 03/O1/2009 - 03/07/2009 0.93 1.00
*11 03/OB/2009 - 03/14/2009 0.92 0.98
*12 03/15/2099 - 03/21/2009 0.91 0.97
"13 03/22/2009 - 03/28/2009 0.91 0.97
*14 03/29/2009 - 04/04/2009 0.92 0.98
*15 04/OS/2009 - �9/11/2009 0-92 0.98
*16 04Y12/2009 - 04/18/2009 �.93 1.00
*1'I 04/19/2009 - 04/25/2009 0.94 1.01
*16 04/26/2009 - OS/02/2009 0.95 1.02
*19 OS/03/2009 - OS/09/2009 0.96 1.03
*20 OS/10/2009 - OS/16/2009 0•97 1.04
21 OSl17/2009 - OS/23/2009 0.97 1.04
22 95/24/2009 - OS/30l2009 0.97 1.04
23 05/31/2009 - 06/06/2009 0_97 1.04
24 06/07/2Q09 - 06/13/2009 0.97 1.04
25 06/19/2009 - 06/20/2009 0.97 1.04
26 06/21/2009 - 06/27/2009 0.98 7..05
27 06/28/2009 - 07/04/2009 0.98 1.05 �
28 07/OS/2009 - 0�/11/2009 0.99 1.06 �
29 07/12/2009 - 07/18/2009 0.99 J.•06
30 07/19/2009 - 07/25/2009 I.00 1.07
31 07/26/2009 - 06/O1/2009 1.00 1.07
32 OB/02/2009 - 08/OB/2009 1.01 ' 1.08
33 08/09/2009 - 08/15/2009 1.01 1.06
34 08/16/2009 - 08/22/2009 1.03 1.10
35 OB/23/2009 - OB/29/2009 1.04 1.11
36 08/30/2009 - 09/OS/2009 1.05 1.12
37 09/06/2009 - 09/].2/2009 1.06 1_13
38 09/13/2009 - 09/19/2009 I.07 1.14
39 09/20/2009 - 09/26/2009 1.06 1.13
40 09/27/2009 - 7.0/03/2009 1.06 1_13
41 10/04/2009 - 10/10/2009 1.05 1.12
42 10/11/2009 - 10/1?/2009 1.05 1.12
A3 10/18l2009 - 10/24/2009 1.05 1.12
44 10/25/2009 - 10/31/20�9 1.06 1.13
45 11/O1/2009 - 11/07/2004 1.07 1.14
46 11/08/2009 - 11/lA/2009 1.08 1.16
47 11/15/2009 - 11/21/2009 1.08 1.16
48 11/22/2009 - 11/28/2009 1.09 1.17
49 11/29/2009 - 12/OS/2009 1.09 1.17
50 22/06/2009 - 12/12/2009 1.09 1.1?
51 12/13/2009 - 12/19/2009 1.10 1.18
52 12/20/2009 - 12/26/2009 1.07 1.14
53 12/27/2009 - 12/31/2Q09 1.05 1.12
* Peak Seasoa
Page 1 of 2
Detailed Report Page 1 of 1
HCS+"" DETAILED REPORT
General lnformatlon Site Informatlon
Analysf RP Intersection DREW/HAMPTON
Agency or Co. GCC Area Type A!/ other areas
Date Performed 1/14/2011 Jurisdiction CLEARWATER
Time Period PM PEAK Analysis Year 2091 EX1STlNG
Project ID
Volume and Tfmin In u!
EB WB NB SB
LT TH RT LT TH RT LT TH RT LT TH RT
Number of Lanes, N� 1 2 0 ? 2 4 1 9 0 1 9 0
Lane Grou L TR L TR L TR L TR
Valume, V(v h 13 839 88 18 831 8 344 2 78 4 0 27
% Heavy Vehicles, °loHV 2 2 2 2 2 2 2 2 2 2 2 2
Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 .90 0.90 0.90
Pretimed P) or Actuated A A A A A A A A A A A A A
Start-up Lost Time, I� 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Extension of Effeative Green, e 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Arrival Ty e, AT 3 4 3 4 3 3 3 3
Unit Extension, UE 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
FflteringlMetering, I 1.000 9.000 1.000 1.000 9.000 1.000 7.000 9.000
Initial Unmet Demand, Qn 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Ped / Bike ! RTOF2 Volumes 0 0 20 0 0 0 0 0 30 0 0 10
Lane Width 12.0 12,0 42.0 92.0 12.0 12.0 12.0 �2.0
Parking ! Grade / Parking N 0 N N 0 N N 0 N N 0 N
Parking Maneuvers, Nm
Buses Stopping, Ns 0 0 0 0 0 0 0 0
Min. Time for Pedestrians, GP 3.2 3.2 3.2 3.2
Phasing Excl. I.eft EW Perm 03 04 NS Rerm Q6 07 08
G= 7.0 G= 38.0 G= G= G= 20.0 G= G= G=
Timing Y= 5 Y= 5 Y= Y= Y= 5 Y= Y= Y=
Duration of Anai sis, T= 0.25 C c{e Length, C= 80.0
Lane Grou Ca aci Control De1a , and LOS Deferminaffon
EB WB NB SB
l.T TH RT l.T TH ftT LT TH RT LT TN RT
Adjusted Flow Rate, v �4 1008 20 932 382 55 4 19
Lane Group Capacity,c 373 1666 346 1682 347 398 336 396
v/c Ratio, X 0.04 0.61 0.06 0.55 1.10 0.?4 0.01 0.05
Totai Green Ratio, g/C 0.63 0,47 0.63 0.47 0.25 0.25 0.25 0.25
Uniform Delay, d� 6.7 15.5 7.0 15.0 30.0 23.3 22.6 22.8
Progression Factor, PF 1.000 0.803 9.000 0.803 1.000 �.000 1.000 9.000
Delay Calibration, k 0.11 0.19 0.11 0.15 0.50 0.11 0.19 0.19
Inc�emenial Delay, d2 0.0 0.6 0.1 0.4 78.2 0.2 0.0 0.9
Initial Queue Delay, d3 p.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Control Delay 6.7 13.1 7.1 12.4 108.2 23.5 22.fi 22.8
Lane Group LOS A 8 A B F C C C
Approach Delay 93.0 12.3 97.6 22.8
Approach LOS 8 8 F C
lntersection Delay 28.0 X� = 0•�� Intersection LOS C
Copyright O 2007 University of Florida, Afi Rights Reserved JiCStT�''� Verston 5.3 Generated: 1M412011 70:37 AM
fle://C:1Documents and Settingslrpergolizzi.GULFCOAST1Loca1 Settings\Temp1s2k4D,tmp 1/14/2011
PROJECT:
LOCATION:
DA •
LAN l'YPE:
NB
SB
EB
WB
PEAK HOUR
PEAK HOUR / P.H.F. DATA
BAY CARE DREW ST SITE PROJECTNO: to-033
Hampton Rd {NS) & Drew St (E-YI�
January 12,2011
SPEED LIMff: SIGNAL TIMfNG: @ C,3 Y R
{SECONDS)
3 La�e NB 35 NB WA 16 4 64
2 Lane SB {V/A SB WA 16 4 64
4 Lane Div EB 35 EB 9 55 4 24
4 l.ane Oiv WB 35 WB NIA 33 4 34
PM PEAK NOUR COUNTS
TIME NB NB NB SB S8 SS EB EB E8 WB WB WB TOTAL HOURLY
PM L T R L T R L T R L T R VOLUME VOLUMES
4:00-4:'15 356
4:15�430 368
4:30-4:45 406
4:45-6:00 429 1,559
5:00.5:15 502 1,705
5:15-5:30 593 '1,930
5:3Q5:45 544 2,068 FFOUIiLY FLOW DIAGRAM
5:45-6:00 506 2,945
30 22
596 2 122 6 0 26 22 1,37� 157 43 1.345 12 3,7p4 1 }
I
i7ME NB NB NB SB SB SB EB EB EB WB WB WB TOTAL 26 0 4
PM L T R L T R L T R L T R VOLUME I � I
�_I L.
5:00-5:15 502 1,145 �--- 12 ^^—� t— 8 �--816
5:15-5:30 593 739 —► �--- 791
5:30-5:45 544 895 —► 84 --� .� 17 —► 877
5:45-6:00 506 �-7 � �
I
328 2 74 4 0 26 12 799 84 '17 791 8 2,145 328 2 74
irrr�atsECnoni �a�c Houtt
INTERSECTION PEAlC HOUR VOLUME
PEAK HOIiR VOLUNIE NB
PEAK HOUR VOLt1ME SB
PEAK HOUR VOLtlME ES
PEAK HOUR YOLUME WB
5:00-6:00
2,145
4a4
30
895
8'I6
INTERSECTION PHF
PHF NB
PHF SB
PHF EB
PHF WB
0.90
0.74
0.47
0.92
0.84
1 1
101 404
� --t G �j'
�'j�= i.C� � t �
�✓ t--ai
t 3 --S '�- S
� 3a --� F-- g � ;
�b �3 '"� ,�""" 1 S
¢ � I�
� F f
3� � � V
Two-Way Stop Control Page 1 of 1
_
TWU-WAY STOP CONTROL SUMMARY
General information Site Information
nal st RP Iniersection DREW/BAYVIEW
enc JCo. GCC urisdiction CLEARWATER
Date Performed 9/19/2011 nal sis Year 2011 EXlSTlNG
nal sis Time Period PM PEAK
Pro'ect Descri tion
EasWVest Street: DREW STREET North/South Street: BAYVlEWAVENUE
Intersectian Orientation: East West Stud Period hrs : 0.25
ehicle Vo(umes and Ad'ustments
Ma or Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
olume veh/h 762 99 22 563
Peak-Hour Factor, PHF ?.00 0.96 0.96 0.96 0.96 1.00
Hourly Flow Rate, HFR 0 793 19 22 588 0
vehlh
Percent Hea Vehicies 0 -- -- 2 -- --
Median T e Raised curb
RT Channelized 0 0
Lanes 0 2 0 1 2 0
Confi uration T TR L T
U stream Si nal 0 0
Mtnor Street Northbound Southbound
Movement 7 8 9 10 11 12
l. T R L T R
olume veh/h 982 27
Peak-Hour Factor, PHF 0.96 9,�0 0,96 9.00 9.00 9.00
Hourly Flow Rate, HFR �89 0 28 0 0 0
veh/h
Perceni Heav Vehicles 2 0 2 0 0 0
Percent Grade (°/a) 0 0
Flared Approach N N
Storage 0 0
RT Channefized 0 0
Lanes 0 0 0 0 0 0
Confi uration LR
Dala Queue Len th and Level of Service
pproach Eastbound Westbound Northbound Sauthbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L LR
(vehlh) 22 Z17
C (m) {veh/h) E90 380
v/c 0.03 0.57
95% queue length 0.08 3.42
Controi Delay (s/veh) 9.6 26.4
LOS A D
pproach Delay (s/veh} -- -- 26.4
pproach LOS -- -- D
Copyrlght � 2007 University of Florida, All Rights Reserved NCS+rM Verslon fi.3 Ge�erated: 1/2012011 7:62 AM
file://C:1Documents and Settuigslrpergolizzi.GULFCOAST1Loca1 Settings\Temp\u2k66.tmp 1/20/2011
PEAK HOUR / P.H.F. DATA
PROJECT: 6+4Y CARE DREW ST SITE PROJECT NO: '10-033
LOCATION: 88yview Ave (NB} 3 Drew St (E-VY)
DA7E: January 18, 2011
LANE TYPE: SPEED LIMIi: ^�IGNAL TIMING: � G Y R
(SECONDS) (�atapplicabie)
NB 2 Lene NB 25 NB �
SB WA SB N!A SB
EB 4 Lane piv EB 45 EB
WB 4 Lane Div WB 45 WB
PM PEAK HOUR COUNTS
TdM�6 NB NB SB SB SB EB EB EB WB WB WB TOTAI HOURLY
Pht L T R L T R L T R L T R VOLUME VOLUMES
4:00-4:15 289
4:i5-4:30 297
4:30-4:45 333
4:45-5:00 329 1,248
5:OQ5:15 348 1,307
5:15-5:30 375 1,385
5:305:45 387 1,439 HOURLY FLOW DIAGRAM
5:45-6:00 4 390 1,500
0 0
272 0 44 0 0 0 0 1,303 35 33 1,065 0 2,748 1 ?
I
PEAK HOUR 71ME NB NB NB SB SB SB EB EB EB WB WB YYB TOTAL 0 0 0
PM L T R L T R L T R L T R VOtUME I 1 I
rl L�
5:00-5:'15 348 709 r 0 —� � 0 f— 557
5:15-5:30 375 726 —► �— 536
5:30-S:45 387 74d —+ 18 —� � 21 � 752
5:45-6:00 390 � � �
773 0 26 0 0 0 0 726 18 2'I 536 0 1,500 173 0 26
1 1
WTERSECTION PEAK HOUR 5:00-6:00 INTERSECTION PHF 0.96 39 199
INTERSECTION PEAK HOUR VOLUME 1,500
AEAK HOUR VOLUME NB 199 PHF NB 0.92
PEAK HOUR VOLUME SB 0 PHF SB �DIV/O! S� =��S
PEAK HOUR VOLUME EB �44 PHF EB O.S3
PEAK HOUR VOLUME WB 557 PHF WB 0.34
^ i�2 -- `^� �"- v <e =
`G � � ��
��
1
� sz �-�
Detailed Repart Page 1 of 2
_ ___ _ _ _ _ _ _ _ _ _ _ _ _
NCS+'" DETAfLED REPORT
General Information Site Information
Ana�yst RP (ntersection DREW/MCMULLEN
Agency or Co. GCC BOOTH
Date Performed 9/14/2011 Area Type All other areas
Jurisdiction CLWTR/P!N CO
Time Period PM PEAK Analysis Year 2091 EXlSITNG
Project ID
Volume and Timin !n ut
EB WB NB SB
LT TH RT LT TH RT LT TH RT LT TN RT
Number of Lanes, N� 9 1 9 1 9 0 9 3 0 9 3 0
Lane Grou L LT R L TR L TR L TR
Volume, V v h 271 48 398 31 62 96 204 3265 35 29 1504 245
°!o Heav Vehiciss, °taHV 2 2 2 2 2 2 2 2 2 2 2 2
Peak-Hour Factor, PHF 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Q.98 0.98 0.98
Pretimed P or Actuated (A) A A A A A A A A a a A A
Start-u Lost Time, !� 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Extension of Effective Green, 2 0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
e
Arrival T e, AT 3 3 3 3 3 3 4 3 4
Unit Extension, UE 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3,0 3.0
Filterin /Meterin , I 9.000 1.000 9.000 9.000 9.000 9.000 ?.000 1.000 1.000
Initial Unmet Demand, Q� 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Ped / Bike / RTOR Volumes 0 0 80 0 0 0 0 0 0 0 0 60
Lane Width 12.0 92.0 12.0 12.0 92.0 12.0 12.0 12.0 12.0
Parking / Grade / Parking N D N N 0 N N 0 N N 0 N
Parking Maneuvers, Nm
Buses Sto in , Na 0 0 D 0 0 0 0 0 0
Min. Time for Pedestrians Gp 3.2 3.2 3.2 3.2
Phasin EB Onl WB Onl 03 04 Excl, Left NB Onl Thru & RT 08
Timing
G= 33.0 G= 23.0 G= G= G= 92.0 G= 28.0 G= 11&.0 G_
Y= 7 Y= 7 Y= Y= Y= 6 Y= 0 Y= 6 Y=
Duration of Anal sis, T= 0.25 C cIe Len th, C= 240.0
Lane Grou Ca aci Control Dela and I.OS Determinaifon
EB WB NB SB
LT TH RT l.T TH RT LT TH RT LT TH RT
Adjusted Flow Rate, v 994 132 243 32 79 208 3368 30 1724
Lana Group Capac(ty, c 243 248 521 170 173 339 3082 89 2454
vlc Ratio, X 0.80 0.53 0,47 0.99 0.4fi 0.61 J.09 0.34 0.70
Total Green Ratio, g/C 0.14 O.t4 0.33 0.10 0.90 0.19 0.69 0.05 0.49
Uniform Delay, d� 100.3 g6.3 63.8 gg,g 102.6 gg.g 47.0 �T �"2 47.4
Progression Factor, PF 1.000 1.000 9.000 9.000 1.d00 1.000 0.555 1.000 0.779
Delay Calibration, k 0.34 0.94 0.91 0.19 0. 91 0.20 0.50 0. 91 0.27
(ncrementai Delay, d2 96.9 2.2 0.7 0.5 1.9 3.3 47.8 2.2 0.9
Initial Queue Qelay, d3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Q.0
Control Delay 117.2 98.5 64.5 100.4 904.5 92.1 73.8 912.4 37.8
F F E -F F F E F D
file://C:\Documenis and Settingslrpergolizzi.GULFCOAST1Local Settings\Temp\s2k96.tmp 1/20/20I 1
Detailed Report
_ �� _ ,
Lane Group LOS
Approach Delay 90.3
Approach LOS F
Intersection Delay 66.4
Copyrlght C�i 2007 University of Florida, Alf Rights Reserved
Page 2 of 2
, � � ,� � , i ,i <, _ __
903.3 74.9
F E
X� = 0.94 Intersection LOS
NCS+T� Version 5.3
39.1
D
E
Generated: S/20i2011 8:37 AM
file://C:\Documents and Settingstrpergolizzi.GULFCOASTiLocal Settings\Temp\s2k96.hnp 1f20/2011
P$ JECT:
LqCATION:
�
LANE IYPE•
NB
SB
EB
WB
PF11K HOUR
PEAK NOUR 1 P.fi.F. DATA
BAY CARE DREW ST SfTE PROJECT NO: 10-033
NcMulle�rBooth RO (NSj 8 Drew St (E-IM1�
January 1 �, 201'I
SPEED LIMff: SIGNAL TIMING: A 1C Y R
(SECONDS)
6 lane Div NB 45 NB 40 176 5 55
6 Lane Div SB 45 SB 12 141 5 55
4 Lane Div EB 45 EB 25 25 4 215
2lBne WB 25 WB 9 9 4 230
TIME
PM
4:00�:'I S
4:15-430
4:30�:45
4:455:00
5:00-5:15
5:75-5:30
5:30-5:45
5:45-6:00
TIME
P6i
4:45-5:00
5:00-5:15
5:'I 5-5:30
5:3Q5:45
PM PEAK HOUR COUNTS
NB NB NB SB SB SS EB EB EB WB WB WB TOTAL HOURLY
L T R L T R L T R L T R VOLUME VOLUMES
1,172
1.327
1,243
'1,424 5,166
�,439 5,433
1,413 S,S19
'1,464 6,740 HOURLY FL�W DIAGRAM
1,306 5,622
— t,693 3,383
403 5,822 61 43 2,619 452 508 97 576 60 1i7 30 10,788 1 �
NB NB NB SB SB SB EB ES EB WB WB WB TOTAL 233 1,432 28
L T R L T R L T R L T R VOLUME � I I
� L.
1,424 A86 �— 258 —S '�. 15 �—'103
1,439 46 —+ � 59
1,4�3 60T —► 303 � � 29 -^^► 107
_ ,.� .� r r
194 3.1'10 33 28 1,432 233 258 46 303 28 59 15 5,740 194 3,1'[0 33
INTERSECTION PEAK HOUR
INTERSECTION PEAK }lOilR VOLUME
PEAK HOtJR VOLUME NB
PEAK HOUR VOlUME SB
PEAK HOUR YOLUME EB
PEAK HOUR VOWME VYB
4:45-5:4fi
5,740
3,337
1,693
6D7
103
iNTERSECTION PHF
PHF NB
PHF SB
PHF EB
PHF WB
1 T
0.98 t,764 3,337
0.96 Z4S u0# �c
0.95 � `
o.sz S F = I. a j y
0.86 � { �' � 1..v..-_ � �,
��i
� �s .�, 4— C�,2
G3� �t �y
"� 3� S J,
�1� � r
35
3zC�
Two-Way Stop Control PaEe 1 of 1
- � �%�rvf.•� ..i�.ii�1JtY,tt V�l,Uhtl;':; �r�C�((3Y4:i-� ��;� 70°!J 1'd ���CCr�»7 l=ri�{.. �RI.:Y.i �..iyt��tit�. t° c..�, :�
_ __ ___.
TWO WAY STOP CONTROL SUMMARY
r�< �„r.,�;°:> qa�d
General fnformation Site Information
nal st RP Intersection GULF TO BAY/BAYVIEW
enc /Co. GCC Jurisdiction CLEARWATER/FDOT
Date Performed 9/19/2091 nal sis Year 2099 EXISTlNG
nal sis Time Period PM PEAK
Rro'ect Descri tion
East/West Street: GULF TO BAY SLVD North/South Street: BAYVlEW AVENUE
Intersection Orientation: East-West Stud Period hrs ; 0.25
ehicle Votumes and Ad'ustments
Ma'or Street Eastbound Westbound
Mavement 1 2 3 4 5 6
L T R L T R
oEume veh/h 17 1265 8 3 2092 990
Peak-Hour Factor, PHF 0.93 0.93 0.93 0.93 0.93 0.93
Nourly Flow Rate, HFR q8 1360 8 3 2163 204
veh/h
Percent Heav Vehicles 2 -- -- 2 -- --
Median T e Two Way Leff Turn Lane
RT Channelized D 0
Lanes ? 2 1 9 2 p
Confi uration L T R L T TR
U stream Si nal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 1 a 11 12
L T R L T R
olume veh/h 5 0 92 6 0 34
Peak-Hour Factor, PHF 0.83 Q.93 0.93 0.93 0.93 0.93
Hourly Ftow Rate, HFR 5 0 12 S 0 36
veh/h
Percent Heav Vehicles 0 0 0 0 0 �
Percent Grade (%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 Q
Lanes 0 9 0 0 1 0
Confi uration LTR LTR
Dela Queue Len th and Level of Ssrvlce
pproach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Conftguration L L LTR LTR
v(vehlh) 18 3 17 42
C(m) (veh/h) 203 498 225 136
v/c 0.09 0.01 0.08 0.39
95% queue length 0.29 0.02 0.2a 9.21
Control Delay (s/veh) 24.5 12.3 22.3 42,g
LOS C 8 C E
pproach Delay (s/veh) -- -- 22.3 42.9
pproach L�S -- -- - C E
Copyright 0 2607 University of Florida, All Rlghts Reserved HCS�TM Ve�slon 6,3 Generated: 1/2d/2011 8:14 AM
� d 1...� f
E�
LOCATtON:
DATE"
LAN 7'YPE:
N8
SB
E8
WB
�
PFJ1K HpUR! P.H.F. DATA
BAY CARE DREW ST SITE PROJECT NO: 10-033
Bayview Ave (NS) � Gulf to Bay Blvd (E-11V�
Janu3ry 73. 2011
SPEED LIMIT: SIGNAL Tld[lNG: A_ ,1C, Y R
(SECONDS) (not applieable)
2 Lane NS 25 NB
2 Lane 58 25 SB
7 Lane EB 45 EB
7 Lane WB 45 WS
71ME
PM
4:00-4:15
4:15-4:30
4:30-4:45
4:455:00
5:00-5:15
5:15-5:30
5:30-5:45
5:45-8:00
TiME
PM
5:00-5:15
5:95-5:30
5:3a5:45
5:45�6:00
PM PEAK HOUR COUN7'S
NB NB NB SS SB SB EB EB EB WB WB WB TOTAL HOURLY
L T R L T R L T R L T R VOLUAl1E VOLUMES
932
973
957
1,098 3,960
1,790 4,2'[8
7,276 4,b2'f
'1,124 4,688 HOURRY FLOW DfAGRAM
9.133 4.723
— 39 '197
�4 0 27 12 0 66 28 3,301 25 9 4,927 274 8,683 1 ?
I
NB NB NB SB SB SB EB EB EB WB WB WB TOTAL 33 0 6
L F R L T R L 7 R L T R VOLUME I I I
t.J r �_,.
• 1,190 2,776 �— 16 � L 181 �----2,922
1,276 1,T22 —► t— 2,738
1.124 t,746 —+ g ----�, � 3 —► 1,739
— � �'133 � * �-+
� �
5 0 11 6 0 33 S6 1,722 8 3 2,738 187 4,723 5 0 11
INTERSECTION PEAK HOUR
INTERSECTION PEAK HOUR VOLUME
PEAK HOUR VOLUME NB
PEAK HOUR YOLUME SB
PEAK HOUR VOLUME EB
PEAK HOUR VOLUd1E NB
S:Q0�:00
4,723
18
39
1,746
z,szz
INTERSECTION PHF
PHF NB
PHF SB
PHF EB
PHF WB
0.93
0.80
0.89
0.83
0.99
l t
11 16
J� _ �.��
34 �' Cr�
� � �--a
�! ,..� �-- t 9:?
'4��:t��
�� 4--- 28? a
3
� �� � � �
S o ►�
TABLE 1 �eneralized Annual Average Daify �olumes for Florida's
Urbanized Areas lo�Qi�o
STATG SIGNALIZ�D ART�RIALS T'REEWAYS
�IaSS �(>Q.00 to 1.99 signalized intersections per �nile) �nes B C D �
Lanes Media�i B C D E 4 43,500 59,800 73,b00 74,400
2 Undivided 9,600 15,400 1b,500 �'** 6 65,300 90,500 110,300 122,700
a Dividcd 29,300 35,500 36,,700 *�`* 8 87,000 120,100 146,500 166,000
6 Divided 45,000 53,700 �55,300� �** l0 108,700 151,700 184,000 209,200
4,,.�_.__...._
8 Divided 60,800 71,800 73,800 **M 12 149,300 202,100 238,600 252,500
�ree�vay Adjustments
CIaSS II (2.OQ to 4.50 signalized intersections por mile) Awciliary Ramp
Ianes Median B C D � Lanes Metering
2 Undivided ** 10,500 ;15,2-00! 16,200 +2a.000 t$%
4 Divided �* 25,00� i33�20Q� 3$,100
6 Divided ** 39,000 ;50�3Q0`; 53,100 ��TERRUPTED F�'T.OW flIGHWAYS
8 Divided ** 53,100 67,300 7d,900
Lanes Median B C D �
Class IItIIV (more than 4.5 signalized intersections per mite) 2 Undivided 7,800 15,600 22,200 27,900
Tanes Median B C D E 4 llivided 34,300 49,600 64,300 72,800
2 Undivided *'r 5,100 11,900 14,900 6 Divided 51,500 74,400 96,400 109,400
4 Divided ** 12,600 28,200 31,900
Uninterrupted Flow Highway AdjustmenEs
6 Divided *�' 19,700 43,700 48,200 Lanes Median Exctusive left lanes Adjustment factors
8 Divided �"� 27,000 59,500 64,700 2 Divided Yes +S%
Multi Undivided Yes -5%
Multi Undivided No -25%
Non-State Signalized Road�vay Adjustments BICYCLE MOD�Z
(Alter corresponding state volwnes by the u�diceted percent) (Multiply motorized vehicla volumes shown below by numher of diractional
roadway lanes to determine two-way maximwn service voliunes.)
Major City/County Roadways -10% Paved Shoulder/ Bicycle Lana
Other Signalized Roadways - 35% coverage B C D E
o-a�% ** 3,200 12,100 >12,100
State & Non-Stt�te Signalized Roadway Adjustments so-84% 2,4Q0 3,700 >3,700 ***
(Alter corresponding statc volwnes by the indicated percent.) 85-100% 6,300 >6,340 *�` * ** �`
Divided/Undivided & Turn Lane Adjustments pED�STRIAN MODEZ
Exclusive Exclusiva Adjustmant
Lanes Median Left Lanes Right i.anes Factors (MulHply motorized vehicle volumes shown betow by number of directional
2 Divided Yes No -FS% roadway lanes to determine two-way maximu�n sen+ice volumes.)
2 Undivided IQo No -20°/a Sidewa►k Coverage B C D E
Multi Undivided 1'es No -5% 0•49% '�* �`* $,000 14,400
Multi Undividod No No -25% 50-84% *'� *'� 11,300 18,800
- - - Yes �I- 5% 85-t00% *� 11,400 18,8Q0 >18,800
One-Way I+acility Adjustment BUS MODE (Scheduled Fixed Route)'
{Buses in peak hour in peak direction)
Muttipiy t[u correspoucling two-directional voluutes in tius table by 0.6, Sidewalk Coverage B C D E
0-84/0 >5 >4 >3 >Z
ss-l00% >4 >3 >2 >1
� Valuea shown are prceeiUod as i�vo-way aunual everaga daily volwnas for lavais of serviee aud ara for tha auromobile/truck modes unless specificully steted. Althaug6 presented as
daily volumcs, thcy actuaUy represeut peak hour d'uection co¢dilions tivith applicablo K and D featas epplied, This tablo dces not covseihne a atnudncd vtd sliould ba uscd only for
geneml planoing npplicxtions. The computu models from tivluch this tablo is dcrivcd should be used fnr mom specific plauuing appticotioas, The tablo and deriving comptdcr modds
should nat be used for corridor or intersectian desigq whcro moro rofined techniques axist Calccdatioos are based on planning applications of tho FGglnvay Capecity Manuat, Bicycle
LOS Madcl, Pcdoslrian LOS Madel mul Treosit Cepncity and Qustity oFServico Manual, respectively for tho automobilc/m�ck, bicycle, pedesvien and 6us modes.
� Leval of secvice foz the hicycle and pcdcstrian modes in this table ia besed on num6er of motoriud vehicles,
not number of bicyolisW or pedestrians using the fncility.
3 Huses per ho�v shown aro only for the peak fiovrio thc single direction ofthe highcr haf5c flo�r. SOia'Ce:
•• Can�t be achicved usu�g tabla iuput velue defaults.
Florida Depu�tment of Traztsportation
"'f Not a Gcable for that leLef of swice letter da. For Q�e autoino6i� modc, volwues Systems Planning Office
pp gre gfcatar d�au leval of service D 605 Suwanuee Street MS i9
becamo F Ixcause intecsec�ion capecitics daw ban r�ached For tha bicycle uwde, tha laval of scrvice lettar grade (iueluding .
f) u not aehievable becauso there is no maxiumum vehicta volnme thcesLold usiog table input velua defsalts. T8I18I19SSC0, FL 32399-0450
www dot s�ate fl us/plenning/syste�c/s�n/toc/defauft��htm 2009 �DOT QUALITY/LEVEL OF SERVICE HAN D800K
Generalized Pealt Hour iwo-Way Valumes for Florida's
TA�L� 4- Urt�anized,4reas1 �oiai�o
STAT� SIGNALIZ�D ART�RIALS FREEWAYS
ClflSS 1(>0.00 to 1.99 signalized intersectians per milc) I.a��es B C D �
Lanes Median B C D E 4 4,000 5,500 6,770 �,300
2 Undivided 930 1,500 1,600 *�� G 6,000 8,320 10,150 I1,29U
4 Divided 2,840 3,440 3,560 *** 8 8,000 11,050 13,480 15,270
6 Divided 4,370 5,200 ! 5,360 , *�* 10 10,000 13,960 16,930 19,250
� *** �2 13,730 18,6Q0 21,950 23,230
8 Divided 5,900 6,970 7,160 •
I+reewny Adjustments
C18SS II(2.00 to 4.50 signalized intersectio�u per mile) Auxiliary Ramp
Lanes Median B C D E Lanes Meterutg
2 Uudivided ** 1,020 ; 1,480; I,570 + F,800 +5%
4 T�ivided ** 2,420 �� 0� 3,400
6 Divided ** 3,790 ;4,880 S,I50 UNINTERRUPTED FLOW HIGHWAYS
s Divided '"* 5,150 6,530 6,880
Lanes Median B C D E
Class IIUN {more than 4.50 signaiized iniersections per mile) 2 Undivided 730 1,460 2,080 2,G20
Lanes Median B C D E 4 Divided 3,220 4,660 6,040 6,84Q
2 Undividad ** 500 1,150 1,440 6 Divided 4,840 6,990 9,060 10,28d
4 Aivided *'^ 1,220 2 730 3 100
' ' Unintea•rupted Flow Higt��vay Adjustments
6 Divided �`* 1,910 4,240 4,680 Lanes Median Exclusive left lanes Adjustment factors
8 Divided ** 2,620 5,770 6,280 2 Divided Yes +5%
Mulri Undivided Yes -5%
MuIN Undivided No -25%
lYon-State Signalized Roadwxy Adjustments BICYCLE MODEZ
(Altcr corresponding state volumes by the indicnted percent.) (MidtipEy motorized vehicle volwnes siiown below by number of dicectional
roadway lanes to deteanine two-way maximum service volumes.)
MajOr City/County Roadways - 10% Paved Shoulder/ Bicyele Lane
Othec Sigi�alized Roadways - 350�o coverage B C D �
0-49% ** 310 1,1$0 >1,180
State & 1`7on-Stste Signalized Road�vay Adjusfn�nts 50-84% 240 360 >360 ***
(Alter conesponding state vol�unes by the indicafed percent.) SS-100% G2Q >620 *'�* �`*'�
Divided/Undivided & Turn I,ane Adjustments pED�STRIAN MODEZ
Bxclusive Exclusive Adjushnent
Lanes Median Left L.enes Rigirt Laues I'actors (Miiltigly motorized vehicic volumes shown bcEow by nwnber of directionai
2 Divided Yes No +5% roadway lancs to determine fwo-vmy maxitnwn service voluinesJ
2 Undivided No No -20% Sidewalk Coverage B C D �
Multi Undivided I'es No -5% 0-49% ^`�` *� 480 1,390
Muld Undivided I�o No -25% SQ-84% '�� ** 1,100 1,820
- - -- Yes -h 5% 85-100% '"* 1,100 1,820 >1,820
One-Way T�'acility Adjustmeui BUS MODE (Scheduled Figed Routej3
(IIuses in peak ha�r in peak direetion)
Multiply ttae correspouding two-directional volurues iu this table by 0.6. Sidewallc Coverage B C D E
o-s�°ia >5 >4 >3 >2
85-�00% >4 >3 >2 >1
� Ve6ws shown aze presented aa ho�uiy two-way volwues for lovals of sorvico and aro for tlie euromobile/truck modes u�dcss specificatly steted NHwugh prcsented es peek hour two-
�vey volumes, ihey actuat[y ropresent peak haur peak dicactian conditious with an appllonblo D fuetor applied. 1Lis tab2a doas uot coustituto a stuixlazd and sl�ould be used only for
senaral planaing appGcations, Tha computar nwdals fram whieh this ta61e is derived ahould 6e used for �re s�ecific planning applications. 17u table and deciving camputer �nadels
shauld uot ba used for comdot ot inteaeclion desigq whe�v moro raSucd tecluuques oxisi. Calcuiations are based oa planniug applications of tha Highway Cepacity Maauel, Bicycle
LQS Model, Pedeshinn LOS Model and Traiuit Capacify and Quality of Servica Manual, respectivdy for the eutomo6ilaltruck, bicycle, pedestrian ond 6�u ntodea
= Level of service for the bicycle and peclesUieu modes ia this lablo is besul ou numbu of niotoriud velucfes, not numbcr oi
bicyclisls orpedestrians using the �acility.
; Buses jxx houra6own ure only for �e peatc 4our iu tlw si�rok �lircction oftle hiEher ua6c Ilow. ,Soul'Ce:
•• eeoao� be acwoved �s�g rebfo i�y,uc vau,e de�u�c5. Florida Deparhneut of Tra�ispoitation
i0• Not appliceblc far ttwt Icvel of scrvioo kner grada. For the autamobita moda, volwnos gmator tlien level of sen�ice D Systems PlanniAg Qf$Ce
becana F bxauso inte�section oapacities hare been reachcd. For thc bicyclo modq iLc lowl of suvice let[er gcade (inoludiog 605 Suwannea Stteet, MS 19
F) is not acluevabla bccauso Wcra is no maximum veLicle votume dvesltold usuig tabla input valtta defaults. TaII&i18SS06� I'L 32399-4450
www.dot.state.fl.us/plannin¢/�}}rstems/sm/los/dafault.shtm 20Q9 fDOT QUALITY/LEVEL Of SERVICE HANDBOOK
Generalized Peak Hour Directiona) Volumes for Florida's
TABLE 7 Urbanized Areasl �o�a��o
STATE SIGNALIZ�D ARTERIALS I{'RE�WAYS
Class I(>0.00 to 1.99 signatized intersections per nule) Y.aities B C D E
Le�ies Media�t B C A E 2 2,200 3,020 3,'720 4,020
1 Undivided 510 820 880 **�` 3 3,300 4,580 5,580 6,200
2 D;vided 1,560 1,890 1,960 *** 4 4,400 6,080 7,420 8,400
_ .....�
3 Divided 2,400 2,860 2,940; '"�* 5 5,500 7,680 9,320 10,580
4 Divided 3,240 3,83Q 3�940 *'•`* 6 7,560 10,220 I2,080 12,780
£ree�vay Ad,justments
C1R33 II (2.00 to 4.50 signrilized infersections per mile} Auxiliary Itamp
J.anes Iviedian B C D E Lanes Metering
t Undividecl *`� 56Q ? 810`j 860 + 1,000 + 5%
2 Diviaed "* 1,330 (1,,770j 1,870
3 Divided �* 2,080 ; 2,680 j 2,830 �Ij�jTERRIJI'TED F{LOW HIGHWAYS
4 Aivided '�`�` 2,830 3,590 3,78Q
Lanes Median B C D• E
Class III/IV (more ttian 4.50 signafized intersections per milc) � Undivided 400 800 1,140 1,440
Lanes Medea�i B C D E 2 Divided 1,770 2,560 3,320 3,760
t Undivided *x 270 634 790 3 Divided 2,660 3,840 4,980 5,650
2 Divided '�� 670 1,SOQ I,700 Uninterrupted Fiorv Highwt►y Adjustments
3 Divided '''* 1,050 2,330 2,570 Lanes Median Exclusivelcftlanes Adjushnentfactors
4 Divided *'� 1,440 3,170 3,450 2 Divided Yes +5%
MuIN CJndivided Yes -5%
Mulli Undivided No -25%
Nou-Stnte Signalized Rondway Adjustments BICYCL� MODEZ
(Alter coResponding state volumes by tho indicated percent.) (Miiltiply motorized vehicle voiumes shown below Uy numbar of directional
roadway lanes to deter�ntne two-way maximwn service volumes.)
Major City/County I2Dadw�ys - ld% Paved shoutdarl Bicy�le I.ane
Other Signalized Roadways - 35% coverege B C D �
o-a9°io ** 170 650 >650
Siate & Non-State Signalized Roadway Adjustments so-s4% 130 200 >200 **'�
(Alter conesponding stata volumes by the uidicated percent.) 85-100% 340 >340 '�*'� ***
Divided/CJndivided & Turn L.►ne Adj[�siments pEDESTRIAN MOD��
Exclusive Exclusivo Adjustment
Lanes Median Le$ Lanes Right Lcumes Factors (Multiply �notorized vehicEe volwnes shown below by number of directionat
2 Divided Yes No +So�a roadway lanes to determiva two-way maximwn service volumes.)
2 ilndivided No No -20% Sidewalk Coveragc B C D E
Multi Undivided Yes No -5% 0-d9% ** '�* 270 770
Multi Undivided No Mo -25% 50-84% *�' 100 600 1000
- - - Yes -f' $°/a 85-100°/a �`� b10 1�0� >10��
One-Wa F�cilit Ad ustment BUS MOD� (Scheduled Fi�ed Ro[ate)3
3' y 3 (Buses in peak hour in peak direction)
Multiply tlie correspouding volwues in this tabla by 1,20. Sidewalk Coverage B C D r
U-84% >5 >4 >3 >2
as-toa�i >4 >3 >2 >1
� Valces shmvu aze pcesented as l�audy dirxdoual voluma for levels of secviee and are for the autanobilrJtruck modcs ueless specificnlly stated. To couvert to annuel averege daily
haffic volwnw, tLese voltw�es must bo divided by appropriata D and K ractocs. 7Lie table dpes not constitute a:teudazd aad sltould be used mily for general ptanning �plicntio�. 7'6e
computer, modc)s from which tLis table is dcrived should be used for moro epecific planning npplications. Tho table eud deriving wmputer models ateould not be used Cor coeridar or
iateesec6iou desigu, whera mae ro6ned techniqves exist Ca(culadons era based on pleuning applications of tLe Flighway Capacity Mentutl, IIicycie IAS Model, Pcdwlrian CAS Model
a�id Trausit Cepacily end Quality of5arvico Menuat, respactive(y for the autamobiidtruck, bioycle, pedeshien and bus mades.
t Level of service for tha bicycle end pedestrimt madca in this ta61e is besed ou utun6er of motorized velticics,
nat numher of bicyclists or pedesUrens usieg tha facility.
3 Auses per hour sho�w ere anly for Ure peak Iwur in Uie singlc di�ection ofdu higl�x tralSc flav. SOt(7'C2:
�• Cannoc be ncb;oved usin6 wbta inpur vulue detautis. Florida Deparhnent of Transportation
's• Not n licabla for thac laval of scrvica lener ade. Far thc amomo6i(a mode, volumes Systetns Plannulg Oi6Ce
pp �r �tatu then level of servica Q 605 Suwatwee Street, MS 19
baewma F becnwe iuterswtion capautiw 1�aw Inxu reached For tLo bicycle modo, die level of servicc letter grede (including
F) is not aahievable bacause tl�uo is no maximutn wlucl¢ volwna thteshdd itsing table input velue defnults. T811ff�1&SSee� �L 32399-0450
www.dotstate.fl.us/�lenn�i�/systems(sm/los/default.shhn 2009 FDOT QUALITY/LEVEL OF SERVICE HANDBOOK
APPENDIX B
_ _ _ _ _ __ _ _.. _ _ _ _ _ _ _
_ __
_,
�'
Land lJse: 714
Corpora�e Headquarters �uilding
Description
A corporate headquarters building is a singfe tenanf o�ce building that houses the corporate
; headquarters of a company or organiza#ion, which generally consisfs of offices; meeting rooms;�
space for file storage and data processing; a restaurant or cafeteria; and ofher service funcfions.
General office building (Land Use 71�), single tenant affce building (Land Use 7'f 5), office park
(Land Use 750}, research and development center (Land Use 760) and business park (Land Use
770) are related uses.
� Additional Data
,
The average vehicle occupancy for the 10 studies for which information was submitted was
approx'rmately 1.2 persons per automobile. The vehicle occupancy rates ranged from 1,03 to 1.74
persons per automobile.
The majorify of the sites were surveyed between the late 1980s and the fate 1990s throughout
the United States, with nearly haff conducted in the Washington, DC and Atianta, Georgia
metropolitan areas.
Trip Characteristics
The trip generafion for the a.m. and p.m. peak hours of the generator fypically coincided with the
peak hours of the adjacent street fraffic; therefore, anly one a.m. peak hour and one p.m. peak
hour, which represent both the peak hour of the generator and the peak hour of the adjacent
street traffic, are shown for a corporate headquarters building,
Source Numbers
9, 247, 251, 262, 273, 298, 302, 303, 304, 323, 324, 327, 406, 444, 524, 552
Trip Generation, 8th Edition 1210 Institute of Transpo�tation Engineers
.:�
,�. �
_�
Corporate Headquarters Builcling �
(714) ;,
Average Vehicie Trip Ends vs: 10q0 Sq, Feet Gross Ftoor Area
On a: Weekday '�
Number of Studies: 8
Average 1000 Sq. Feet GFA: 229
Directional Distribution: 50% entering, 50% exiting
Trip Genera#ion per 1000 Sq. F'eet Gross Fioor Area
Average Rate Range of Rates Standard Deviation
7.98 5.87 - 12.39 3.89
Data Plot and Equation
a,000
�,000
6,000
v
G
W
n 5,000
F-
N
U
t
j 4,000
a�
rn
cti
>
Q 3,Od0
I
H
2,000
1,000
0
..--- : - : ._... : .- : .......: ...... : ......: ..... : .. , -.....i
. . , . . . . . X
: .. ......'---....X ........ : ...... ....:...... : -.. : ....
-I -...-•.----...'...- .:..... ...................�..- - -.-- - --�.......;.....__,
� ..... : - -- ; - - : � - - ; ��---� .:.......: ......: ..... : .... : ••••• +
, X : : : , : : :
0 100 200 300 400 500 600 700 800 900 1000
X= 1000 Sq. Feet G�oss Floor Area
%< Actual Data PoEnts Fitted Curve °----� Average Rate '
, I
i
! Fitted Curve Equatiom Ln(1� = 0.97 Ln(X) + 2,23 R2 = 0.94 I
Trip Generation, Sth Edition 1216 Instltufe of Transportation Engineers
�
r
�
�
I
i
: I
i �
� i
Corporate Headq�arie�rs u�ldir�g
(' � �} �
Average Vehicle Trip Ends vs: 1000 Sq. Feet Gross Floor Area
On a: Weekday,
A.M. Peak Nour
Number of Studies: i 9
Average 1000 Sq. Feet GFA: 272
Direciional Distribution: 93% entering, 7% exiting
Trip Generation per 1000 Sq. Feet Gross Floor Area
Average Rate Range of Rates Standard Deviation
1.49 0.46 - 3.01 1.36
Daia Plot and Equation
�
�
c
W
a
�
a�
�
�
a�
>
ro
rn
N
N
4
I I
F-
1,40C
1,30C
1,200
1.100
1,000
900
800
700
600
fi00
400
300
200
100
n
..... : .. - . •� - . •- .. ,_....- , . . ...... ..... .;:.- • �
....-� .......:........�....._....._x._._....%C...�_...._. :. ... ..._...._...
.... : ..... : ... . : .. ... : ...... : ..... -- � ;---... ; -�---�DC� -----
: : ' � ;� : : ; : ..
- ...:...... : .... . : • --- �f'- ... _: ...... : . _ _... :...... ; . _ .. _, :...., .
� ....- : � : �--.k.,. _ ._,x ...... ........ . ...... � . --..: .... ; �
� . . . . . _ _ . . - . � - - - • . - . . . . - . � - . � . . . . . . . . - . - � . - . . . .
� ?ZtX.'�� � : : . ; , -
-�--..X..x.. .r�_..�.,...---�� ..........:........:... ....:...... : ;-.....
.............� `-��- �.`'- -••-:-�.X•--.•........•-
� • • - -�,,..F- - - � ; . . . . . . . . - � - : • . . . . . . . . . . : . . . . . . : . . . . � - ; . . _ . . _ . . . . . . �
?E
0 100 200 300 400 500 G00
X=1000 Sq. Feet Gross Floor Area
X Acival Data Potnts Fltted Curve
Fitted Curve Equatlon: Ln(T) = 0.95 Ln(Xj + 0.66
Tr1p Generation, 8th Edition
1217
70Q 800 900 1000
--"-' Average Rate
R2 = 0.80
Institute of Transportation Engineers
_ ._ _ _ _ _ _ ,
__ _ .
Corporate Headquarters �uiidrng
(714}
Average Vehicle Trip Ends vs: 1000 Sq. Feet Gross Floor Area
On a: Weekday,
P.M. Peak Hour
Number of Studies: 21
Average 1000 Sq. Feet GFA: 279
Directionaf Distribution: 10% entering, 90% exiting
Trip Generatiort per 1000 Sq. Feet Gross Floor Area
Average Rate Range of Rates
1.40 0.52 - 2.67
Data Plot and Equation
1,30C
1,20C
1,100
1,000
� 900
c
W
fl- B00
H
a�
� 7OO
L
�
�
N B�O
m
m
¢ 50Q
II
� 400
300
200
100
n
Standard Deviation
1.28
....._ ... � . --�� , - �-�- , �-- _ .._... - � , ��- .'.' .... , - -•
.._.... -- ...� ............. ..:...x....:_ __....:....... � --...:.. ........
' � • � , � . :
..... :.......:.... � �--- -� �- -...:..X.-• -- : - .; ......K......
......:.......:..........�- -..:...--- •��t•-- ....- ----........:.......:......_
: : : ,'r' : : ; : :
-�• ;--....: � - X;•--�'- :-�-�---;--�-• -; �-�- ; ..-• --.... ;-�--•
- .... .......� ... . : .......:y�-_.-- _ ...- - . ..... ..... , ....__; .._..
� .......:...... - �-X--�- �•----:........:- - ..:.. --.:.-• --:... --• � - --�
x x . . . : . ; ..
. X . . . .
-�- X: .' ... : ...... . ...... : ... . : .. ... :. ...... . .....• : � -- � ; �-•
� ; : . : : : :
:, . �X . ... ....... ....... �---.......... ......- -......_......_......
0 100 200 300 400 500 600
X=1000 Sq. Feet Gross Floor Area
X Actual bata Polnts FRted Curve
Fitted Curve Equation: Ln(T) - 0.87 Ln(X) + 1.01
Trfp Generatron, 8th Edition
1218
700 800 900 1000
"""'" AVerage Rate
R2 = 0.78
Instltute of Transportation Engineers
Detailed Repoi�t Page 1 of 1
HCS+'" DETAILED REPORT
Genera! Information Site lnformation
Analyst RP fnterseotion DREW/HAMPTON
Agency or Co. GCC Area Type All otherareas
Date Performed 1/20/20J1 Jurisdiation CLEARWATER
Time Period PM PEAK Analysis Year 2095 WITH PROJECT
ProjectiD
Volume and Timin !n ut
EB WB NB SB
LT TH RT l,T TH RT LT TH RT LT TH RT
Number of Lanes, N� 9 2 0 1 2 0 1 1 0 1 1 0
Lane Group L TR L TR L TR L TR
Volume, V v h 14 885 92 19 979 8 357 2 89 4 0 27
% Heav Vehicles, °/aHV 2 2 2 2 2 2 2 2 2 2 2 2
Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 4,90 0.90 0.90
Pretimed (P) or Actuated A A A A A A A A A A A a a
Start-up Lost Time, (� 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Extension of Effective Green, e 2.0 2.0 2.0 2.0 2.0 2.0 2.Q 2.0
Arrival T e, AT 3 � 3 4 3 3 3 3
Unit Extension, UE 3,0 3.0 3.0 3.0 3.0 3.0 3.0 3.�
Filterin /Meterin , I 1.000 9.000 9.000 9.000 9.000 9.000 9.000 1.000
Initial Unmet Demand, Qb 0.0 0.0 0.0 0.0 0.0 0.0 0,0 0.0
Ped I Bike I RTOR Volumes 0 0 20 0 0 0 0 0 30 0 0 10
Lane Width 12.0 92.0 12.0 12.0 12.0 12.0 ?2.0 12.0
Parking 1 Grade / Parking N Q N N 0 N N 0 N N 0 N
Parking Maneuvers, Nm
Buses Stopping, Na 0 0 0 0 0 0 0 0
Min. Time for Pedestrians, Gp 3.2 3.2 3.2 3.2
Phasing Excl. Left EW Perm 03 04 NS Perm 06 07 08
G= 7.0 G= 38.0 G= G= G= 20.0 G= G= G=
Timing Y= 5 Y= 5 Y= Y= Y= 5 Y= Y= Y=
Duration of Analysis, T= 0.25 Cycle Length, C= 80.0
Lane Grou Ca aci Control Dela and LOS Determinatfon
EB WB NB SB
LT TH RT LT TH RT LT TN RT LT TH RT
Adjusted Flow Ftate, v 96 9063 29 1097 397 59 . 4 19
Lane Group Capacity,c 317 9666 328 16&2 347 398 335 396
v/c Ratfo, X 0.05 0.64 0.06 0.65 1.74 0.15 0.09 0.05
Total Green Ratio, g/C 0.63 0.47 0.63 0,47 0.25 0.25 0.26 0.25
Uniform Delay, d1 7.4 15.8 7.3 96.0 30.0 23.9 22,6 22.8
Progression Factor, PF i.00Q 0.803 1.000 0.803 9.000 9.000 1.000 1.000
Delay Calibration, k 0. 9 9 0.22 0. 9 9 0.23 0.50 0. 91 0.11 0. ? 9
Incremental Delay, d2 0, 9 0.8 0.1 0,9 93.4 0.2 0.0 0.9
Initial Queue Delay, d3 0.0 0.0 0.0 0.0 O.o 0.0 0.0 0.0
Control Delay 7.5 13.5 7.3 13.7 123.4 23.5 22.6 22,8
Lane Group LOS p B R B F C C C
Approach Delay 13.4 13.6 110.5 22.8
Approach LOS 8 8 F C
Intersectlon Delay 30.1 x� _ �•75 (ntersection LOS C
Copyright � 2007 Unlversity of Florfda, All Rights Reserved HCS+T"� Version 5.3 . Ge+�erated; 1l20/2011 7:48 AM
file://C:1Documents and Settingsirpergolizzi.GULFCOAST1Local SettingslTemp\s2k60.tmp 1/20/2011
Two-Way Stop Control Page 1 of 1
_ _ _ _.
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
nai st RP Intersection DREW/BAYVIEW
enc /Co. GCC Jurisdiction CLEARW,4TER
Date Performed 9/20/2019 nal sis Year 2095 W1TH PROJECT
nal sis iime Period PM PEAK
Pro'ect Descri tion
EastJWest Street: DREW STREET North/South Street: BAYVIEW AVENUE
Intersectian Orientation: Easi West Stud Period hrs : 0.25
ehicle Volumes and Ad'ustments
Ma'or Street Eastbound Wesfbound
Movement 1 2 3 4 5 6
L T R L T R
olume veh/h 927 20 23 595
Peak-Hour Factor PHF 9.00 0.96 0.96 0.9fi 0.95 1.00
Houriy Flow Rate, HFR 0 965 20 23 699 0
veh/h
Percent Meav Vehicles 0 -- -- 2 -- --
Median T e Raised curb
RT Channelized Q �
Lanes 0 2 0 1 2 0
Confi uration 7' TR L T
U stream Si nal a 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
olume veh/h 989 118
Peak-Hour Factor PHF 0.96 9.00 0.96 1.00 9.00 1.00
Hourly Flow Rate, HFR 996 0 922 0 0 0
veh/h
Percent Heav Vehicles 2 0 2 0 0 0
Percent Grade (%} 0 �
Flared Approach N N
Storage 0 0
RT Channelized 0 �
Lanes 0 0 0 0 0 0
Canfi uratian LR
Dela Queue Len th and Level of Service
pproach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L LR
v (veh/h) 23 318
C (m) (veh/h) 697 362
v/c 0.03 0.88
95%queue length 0.?0 8.51
Control Delay {slveh) 10.3 � 56.0
LOS B F
pproach De(ay (s/veh) -- -- 56.0
pp�oach LOS -- -- F
Copyright � 2007 Unlversity of Florfda, All Righfs Reserved NCS+T� Version 5.3 Generated: 1/20/2011 7:65 AM
file:!/C:1Docutnents and Settings\rpergolizzi.GULFCOAST1Loca1 SettingslTemp1u2k6b.tmp 1/20/2011
Twa-Way Stop Control
Page 1 of 1
__ _ ___ _ __ _ ._
TWO-WAY STOP CONTROL. SUMMARY
General Information Site Information
nal st RP Intersection DREW/BAYVIEW
enc /Co. GCC Jurisdiction CLEARWATER
Date Performed 1/20/201 ? nal sis Year 2095 Wl7'H PROJECT
nal sis Time Period PM PEAK
Pro'ect Descri tion
East/West Street: OREW STREET North/South Street: BAYVIEW AVENUE
Intersection Orieniation: East Wesf Stud Period hrs : 0.25
ehicle Volumes and Ad'ustmen#s
Ma'or Street Eastbaund Westbound
Movement 1 2 3 4 5 6
L T R L T R
oEume veh/h 927 20 23 595
Peak-Hour Factor, PHF 1.00 0.96 0.96 0.96 0,96 9.00
Hourly Fiow Rate, HFR 0 965 20 23 699 0
veh/h
Percent Heav Vehicfes 0 -- -- 2 ° --
Median T e Raised curb
RT Channelized D 0
Lanes 0 2 0 1 2 0
Confi uration T TR L T
U stream Si nal 0 0
Minor SEreet Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
olume veh/h 989 918
Peak-Hour Factor, PHF 0.96 1.00 0.96 1.00 1.00 9.00
Hourly Flow Rate, HFR 196 0 122 0 0 0
veh/h
Percent Heav Vehicles 2 0 2 0 0 0
Percent Grade (%) 0 o
Ftared A roach N N
Storage 0 0
RT Channelized 0 �
Lanes 1 0 9 0 0 0
Confi uratlon L R
Qela , Queue Len th and Level of Service
pproach Eastbound Westbaund Northbound Southbaund �
Movement 1 4 7 8 9 10 11 12
Lane Configuration L L R
v (veh/h) 23 196 122
C (m) (veh/h) 697 294 575
v!c 0.03 0.67 0.21
95% queue length 0.10 4.49 0.80
Control Delay (slveh) 10.3 38.7 12.9
La5 B E B
pproach Delay (s/veh} -- -- � 28.8
pproach LOS -- -- D
Copyright � 2007 University of Fiorida, All Rights Reserved HCS+T^� Versfon 5.3 Generated: 1/20I201 t 10:48 AM
file://C:1Documents and Settings�pergolizzi.GULFCOAST1Loca1 SettingslTemp\u2kBE.tmp 1/2012411
Detailed Report
Page 1 of 2
__. _ _ _ _ _
HCS+'" DETAlLED REPORT
General lnformaiion Site lnformation
Intersection DREW/MCMULLEN
Analyst RP BOOTH
Agency or Co. GCC Area 1'ype AI! other areas
Date Performed 1/20/2011 Jurisdiction CLWTR/P!!V CO
Time Period PM PEAK Analysis Year 2015 + PROJECT/
1lVIPROVEMENTS
Project ID
Volume and Timin !n ut
EB WB NB SB
LT TH RT LT TH RT LT TH RT LT TH RT
Number of Lanes, N� 2 1 1 1 J 0 2 3 0 1 3 1
Lane Grou L LT R L TR L TR L T R
Volume, V(vph) 356 50 481 32 65 17 292 3396 36 30 1564 264
% Heav Vehicles, %HV 2 2 2 2 2 2 2 2 2 2 2 2
Peak-Hour Factor, PHF 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98
Pretimed P or Actuated A A A A A A A A A A A A A
Start-up Lost Time, I� 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Extension of Effective Green, 2 0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
e
Arrival T e, AT 3 3 3 3 3 3 4 3 4 3
Unit Extension, UE 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Filtering/Meterin , I 9.000 1.000 1.000 1.000 9.000 9.000 9.000 1.000 9.000 9.000
Inifial Unmet Demand, Qa 0.0 D.0 0.0 0.0 0.0 a.0 0.0 0.0 0.0 0.0
Ped / Bike I RTOR Volumes 0 0 80 0 0 0 0 0 0 0 0 80
Lane Width 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 92.0 12.0
Parking / Grade / Parking N 0. N N 0 N N 0 N N 0 N
Parking Maneuvers, IVm
Buses Sto in , Ns 0 0 0 0 0 0 0 0 0 0
Min. Time for Pedestrians, GP 3.2 3.2 3.2 3.2
Phasin EB Onl WB Onl 03 04 Excl. Left NB Onl Thru & RT 08.
Timing
G= 33.0 G= 1Z.0 G= G= G= 7.0 G= 40.0 G- �22'0 G=
Y= 7 Y= 7 Y= Y= Y= 6 Y= 0 Y= 6 Y=
Duration of Anai sis, T= 0.25 C cle Len th, C= 240.0
Lane Grou Ca acit , Contro! Dela and LOS Determinatlon
EB WB NB SB
LT TH RT LT TH RT LT TH RT LT TH RT
Adjusted Flow F2ate, v 272 142 4�9 33 83 296 3502 31 1596 208
Lane Group Capacity, c 473 248 567 89 90 759 3420 52 2579 1062
v/c Ratio, X 0.58 0.57 0.72 0.37 0.92 0.28 1.02 0.60 0.62 0.20
Totai Green Ratio, g/C 0.14 0.14 0.36 0.05 0.05 0.22 0.68 0.03 0.59 0.67
Uniform Defay, d� 96.9 96.9 66.6 � �0.3 993.5 77 7 39 Q ? 15.9 �2 3 15, 0
Progression Factor, PF 9,000 1.000 9.000 1.000 9.000 1.000 0.354 9.000 0.754 1.000
Delay Calibratfon, k 0.97 0.17 0.28 0.9? Q.44 0.19 0.50 0.19 0.20 0.11
Incremenfal Delay, d2 1.7 3.2 4.5 28 69.7 0.2 21.9 17.3 0.5 0.1
Initial Queue D�lay, d3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Control Detay 98.7 900.1 71.9 192.9 183.2 77.9 35.7 932.4 32.4 95.1
iile://C:\Documents and Settingslrpergolizzi.GULFCOAST1Loca1 SettingslTempls2kA9.tmp 1/20/2011
Detailed Repoi�t Page 2 of 2
_ _ �
Lane Group LOS F_ F_ E F F _ E D F C B ;
Approach Delay 85.2 963.2 38.9 32.1
Approach LOS F F D C
Intersection Delay 44.6 x� = 0.94 Intersection LOS D
Copyright O 2007 Unfversity of Florida, All Rights Reserved HCS+rM Verslon 5.3 Generated: 1/20/2011 8:41 AM
file://C:\Documents and Settings�rpergolizzi.GULFCOAST1Local Settings\Temp�s21cA9.tmp 1/20/2011
Two-Way Stop Control Page I of 1
- ,:: ;, , . . .
"� �N�.i �f{(IUIJU!�( �lU�. 'Mi:`;.. � i. ,.'-� 5�,: t /i;'%"f �� U ���.�.U�:;�i, ( . f':. �? bit-1 �:if.C:r': �'i(.�
�:- �'=
_..... . . . ..... .. ... _. . .....
TW4-WAY STOP CONTROL SUMMARY �`` � �"''` � `� °f` '�►-.;,
General lnformation Site Information
nal st RP Intersection GULF TO BAY/BAYVIEW
enc /Co. GCC Jurisdiction CLEARWATER/FDOT
Date Performed 9/20/2011 nal sis Year 2015 WtTH PROJECT
nal sis Time Period PM PEAK
Pro'ect Descri tlon '
East/West Street: GULF TO 8AY BLVD North/South Street: BAYVIEW AVENUE
Intersection Orientation: East-West Stud Period hrs : 0.25
ehicle Volumes and Ad'ustments
Ma'or StreeE Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
olume veh/h 22 9396 8 3 2093 215
Peak-Hour Factor PHF 0.93 0.93 0.93 0.93 0.93 0.93
Hourly Flow Rate, HFR 23 1495 8 3 2250 231
veh/h
Percent Heav Vehicles 2 -- -- 2 -- --
Medfan T e Two Way Left Turn Lane
RT Channefized o �
Lanes ? 2 1 1 2 0
Confi uration L T R L T TR
U stream Si nal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
olume veh/h 5 0 12 6 0 74
Peak-Wour Factor PHF 0.93 0.93 0.93 0.93 0.93 0.93
Nourly Flow Rate, HFR 5 0 12 6 0 79
veh/h
Peroent Heav Vehicles 0 0 0 0 0 0
Percent Grade (%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Confi uration L.TR LTR
Dela Queue Len th, and L,evel of Service
pproach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuratfon L L LTR LTR
v(veh/h) 23 3 97 85
C(m) (veh/h) 183 474 184 957
v/c 0.93 0.01 0.09 0.54
95% queue length 0.42 0.02 0.30 2.72
Control Delay (s/veh) 27.5 12.6 26.5 52.2
LOS D B D F
pproach Delay (s/veh} -- -- 26.5 52.2
pproach LOS -- -- D F
Copyright� 2007 Unlversity at Florlda, All Wghts Reserved HCS+rM Verslon 5.3 Generated: 1/2012011 8:46 AM
file://C:\Documents and Settings\rpergolizzi.GULFCOAST1Loca1 Settings\Temp\u2kAF.tmp 1/20/2011
Two-Way Stap Contcol
Page 1 of 1
Copyright � 2047 University of Florida, Ail Rights Reserved HCS+T� Version 5.3 Generatea: ��zur�u� i a:uq Hnn
file://C:Wocuments and Settings�rpergolizzi.GULFCOAST1Local SettingslTemp\u2kB4.imp 1/20/2011
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
nai st RP intersection 8AYVIEW/DRIVEB
enc /Co. GCC Jurisdiction CLEARWATER
Date Performed 1/20/2019 nal sis Year 2015 WlTN PROJECT
nal sis Time Period PM PEAK
Pro'eci Descri tion
East/West Street: S17E DRIVE B North/South Street: BAYVIEW AVENUE
Intersection Orientation: North-South Stud Period hrs : 0,25
ehicle Volumes and Ad'ustments
Ma or St�eet Northbound 5outhbound
Movement 1 2 3 4 5 6
L T R L T R
olume veh/h 29 217 5 5 43 0
Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90
Hourly Flow Rate, HFR 23 249 5 5 47 0
veh/h
Percent Heav Vehicles 2 -- -- 2 -- --
Median T e Undivided
RT Channelized 0 0
Lanes 1 1 0 0 1 0
Confi uration L TR tTR
U stream Si nal 0 0
Minor Street Eastbound Westbound
Movement 7 8 9 10 11 12
L T R L T R
olume veh/h 90 0 38 5 0 5
Peak-Hour Factor PHF 0.90 0.90 0.90 0.90 0.90 0.90
Hourly Flow Rate, HFR ��0 0 42 5 0 5
veh/h
Percent Hea Vehicles 2 2 2 2 2 2
Percent Grade (%} 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 1 9 0 0 9 0
Confi uration L TR LTR
Dela , Queue Len th and Level of Service
pproach Northbound Southbound Westbound Eastbound
Movement 1 4 7 8 9 10 11 12
Lan� Configuration L LTR LTR Z TR
v(veh/h) 23 5 90 900 42
C(m) (veh/h) 1560 1320 654 594 9022
lc 0.01 0.00 0.02 0. 97 0.04
95% queue length 0.04 0.01 0.05 0, 60 0.13
Control Delay (slveh) 7.3 7.7 10.6 12.3 8.7
LOS A A B B A
pproach Delay (s/veh) -- -- 10.6 11.2
pproach LOS -- -- B B
Copyright � 200T Unlversity of Florida, Ail Rights Reserved HCS+TM Version 5.3 Generated: 1/20/2011 9:i2 AM
file:l/C:iDocuments and Settings�rpergo�izzi.GULFCOAST�Local Settings\Temp\u2kB8.tmp 1/20/2011
r�:
7'his Instrumcn! Prcparcd By
And Rcturn To:
Ricardo L. Gilmorc, Esq.
Salem, Snxon S Niciscn, P.A.
P.O. Box 3399
Tampa, FL 33C01
00-113093 APR-18-2000 11:46Rn
PINELLRS CO BK 10861 PG 2115
� ���� {�� �{� �� ��� � � E� ��{S� � ���
,'�
�
��
�i
_ ��
__, -- �
_ - ,`
_ ``�
�i .
� '
.
Property Appraiser's Parcel '. �
Identification No.: 17-29-I6-00000-110-0100 - -
� ��� �.�� ` �>
i ��
i ,
�� �,
THIS DEED WAS PREPARED WITHOUT THE $ENEFIT OF A TITL�$EA�2CI������E'
COMMITNIENT, OR SURVEY. �� �' , � - -
� � , ,
, � , ,
WARRANTY DEED =.
THIS INUENTURE, made as of the,� day of Iylarch, 2000�iset�yee,�iCleanvater Housing
Corporation, Inc., a Florida not-for-profit corporation, �Jhi�s�.��dressls 2Y0 South Ewing Avenue,
Clearwater, Florida 33756, as GRANTOR, to th� Clearvt;atei; i�ousgng Authority, a non-profit
. corporate body and politic pursuant to Chapter 4��; �loriaa �fatutes, wliose address is 210 South
Ewing Avenue, Clearwater, Florida 33756, �s t',3�ANT�E. ���
; �,� ��: `
Witnesseth that Grantor, for gaof� and va'�uable�consideration, receipt of which is
acknowledged, grants, bargains and Sells to Grantee a11 t�he real property located in Pinellas County,
Florida, more particulazly describ'ed as; � -'
PAGF:,; �� � - -
�CC�i
fiE:C:?� ,`
�-J U� , ,' `,
��2 � `� — t �.� � � 3E� EXHIBIT "A" ATTACHED
��' --� �-- �� HERETO,AND MADE A PART HEREOF
INl _ __ _ _ .
FE[:� -_ _ .... �
il.? " - -
N��,• .� together with afil�en�anents„Ire�editaments and appurtenances thereto, and all covenants, conditions,
RL-"v restriction�, easements� t�ghis-of-way and other matters of record.
TC)T�,' (; ,• � , ,' ; .
�� � ��T"ahav� ar�d-Co,fiold, the same in fee simple forever.
CK t ��� �
I�Gh„F, ��Y, � �--
-,� �� -''-- ` �.
.;-�rid_�r�ntor hereby covenants with Gi•antee that Grantor is lawfull�seized of s�i�l;la�}dY�,r�-� T;
�, �fees�ila�le; that Grantor has good right and lawful authority to sell and coqvey s�id la��d; aiid�tl�8t y�
� C�r�ntor liereby fully wanants the title to said ]and and wi I1 defend the same a�ains�ihe law�u�'xlaii�ts� `_;
of �11 persons whomsoever. ,^� z, �� - `; ,-,
� �Q� � � �� -,
- � / T� \\-i j ;� T .i.
v..�� � �., i .` _- ^ �--
_ _ � ._ -» y; . i, m
a�z� �-, .-t '" r'i � ni f�_.
� � ? �=� r.n . =
l' '-.�l `7 =p �� �
f" (TI i.� '_" `
Ti� .. ?-
�r� �n
� _! �- .� G'J 1-
�t
��:
i m
ini �; �N .
»i `n':_n i .,a �n 3_
i
- '.:� �_� i ,.� '-
_ :_ __ i � .__ -
r� r
.. : D
��F�
� r
�. �
„ _...
VJ
4 ��
`, i�
_L_'
� -
1-' nl
�A T
�D t- �
D ��
r= �
-r�
�
�xi
-=+
0
�
THIS DOCO!ffiiT OR A PO
OF THIS DOGD!ffiiT IS OP POOB
: QIIALITY AI�ID 2�AY BE ILLEGIBLE.
� ' PINEL�RS COUNTY FLR, �
'' QFF,REC.BK IOB81 PG 2117 I'
_. ,�
. _. _ , ,
��
' ��
__ �-;.�
_ �, �
• `, , .
,� !
�
. __._ .... �
• i, � - . . . -�,', ,\�� .� i
�XHe��IT � ; ; , ,
, �- �
, ,
,, ,
-- -
_ ,;
,' ' �-= ►
,-
,-,
. � . .._ _ _ ..._... . . , �, , , . i
_ . , ,,
. .. .
. __ �
� 1'Dso itostAust qaart�z o! th� tbrt�ast,gut�etar o! e�olion i9. i
u `
lo++ri�1�iP a! rotnb• ltangs lE �aab. Lbl��p �XC�fT,�h��lfozsh I
' 80 !�t o! Wts if�t o! eh� 1tl� o! .Rsotiotr �7. �ip 2! �oaeh,
M�►q� l6 �at !or rlqht-o#-way �'or.c�w �triait'1t� 11�� sast »- I
tpt o! tts� 1�f o! !he lfs� o: ssd,t`�r ir.�i�i2�l,p Z! butA, �
. �o u raee l�or si4ht-ol-waY lor, ayw"tsv �ivd.. a�i iXin�
_ . _ . u�e bw� !a tsa.2�t�s a�o,ush►R :,lorsa�. .,�bi�ot eo �sso�al►t .
lro�a ChRtt�� Oon�r�e s�- e7ult� �o�ia. hts �tii'�, and '
J�es ilarkiA' snd feai�.a-11o3��n. �bh '!a. to th� Mty o! Cl�ar- I
�ratar. lar nsilisi�a,; drala�aq��l�stitlatia� and �i�aaeo�
owt 4b� �e�h 10, la�t ��sd e��; fkst 10 l�at o� tlf� ltt� oP tA� �
�'o! qoliott 19,� '�b+�aonip Zi .Qouth► �gs' 16 �RSt� liaal3si
Coun�►, Y2ori�!%i = : .
• ;. " -
, ', �
;, Z
-_ I
,' �, � I
, ,' ,
� �� � �
i i
, � i
i �
� _ �
� ' ' I
_''-_ I
��� �
� `��
i � '
�i
. . . . . .. � ,;�,-��., . .. . . . ..
' : �::r .. � . .