DE LEON STREET IMPROVEMENTS - 09-0055-EN - ADMINISTRATIVE CHANGE ORDER # 1 & FINAL1 s ADMINISTRATIVE CHANGE ORDER 1 & Final PROJECT: De Leon Street Improvements DATE: 4/19/201 PROJECT NUMBER: 09-0055-EN PO REFERENCE NO.: ST107220 CONTRACTOR: Steve's Excavating & Paving Inc. PO Box 303 COUNCIL AWARD: DATE OF CONTRACT: 3 0 2011 Dunedin, F134698 Code:0315-96124-563700-539-000-0000 A 0181-99628-563700-554-000-0000 B 0315-92273-563700-541-000-0000 C SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT To adjust quantities decrease unused, increase for overruns & add necessary items to close the contract. See attached sheets for quantities and additional items. ORIGINAL CONTRACT AMOUNT $ 77,285.18 ACCEPTED BY: CO# 1 & Final- Admin - CM NEW CONTRACT AMOUNT ($4,722.98) $ 72,562.20 tyf ATTEST: Rosemarie Call, City Clerk qr?R Date: CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA William B Manager AS TO Camilo Soto Assistant City Manager Steve's ing, ?tLE _ - t By. r ,Sealy;, Cathy Sarnago, President Date: Witnesses: ?i?/.(arid wi'?S tj i Sf-•e" 13r-f3A4 IaJ Recommended By: City of Clearwater Steve Doherty Project Manager Michael D. Quillen, P.E. City Engineer i Page 2 continued: RE: Adm. CO# 1 & Final - Deleon Street Improvements ITEM DESCRIPTION QUANTITY UNIT UNIT COST Stormwater Code A:0315-96124-563700-539-000-0000 Decreases 11 10% Contingency 1 LS $3,628.50 Increases: 10 Sod 1,725 SF $0.70 Addition: 18 Remove galvanized 2" gas main 270 LF $3.50 19 Install extra pipe bedding 9 TN $40.00 Total Additions Code A: TOTAL COST ($3,628.50) $1,207.50 $945.00 $360.00 $1,305.00 Total Net (Decreases)/Increases/Additions Code A: ($1,116.00) East Gate wa New Sidewalks Code B: 0181-99628-563700-554-000-0000 Decreases: 12 Construct 4" concrete sidewalk 343 SF $3.15 ($1,080.45) 13 Remove & Replace 6" Concrete 107 SF $3.80 ($406.60) Sidewalk and or Driveways (3,000 PSI w/Fiber Mesh Reinforcing and 6 / 6 x 10 / 10 welded wire mesh) 16 LF $5.00 ($80.00) 15 Root Pruning 16 Install tactile warning surface 24 SF $85.00 ($2,040.00) (truncated domes) Total (Decreases) Code B: ($3,607.05) Additions: 19 Sod 738.1428571420 SF $ 0.70 $516.70 Total Net (Decreases)/Additions Code B: ($3,090.35 New Sidewalks Code C: 0315-922711-563700-541---- Decreases: 17 10% Contingency 1 LS $3,397.43 ($3,397.43) Additions: 21 Install Asphalt on Site 6 TN $185.00 $1,148.30 22 Sod 2,475 SF $ 0.70 $1,732.50 Total Additions Code C: $2,880.80 Total Net (Decreases)/Additions Code C: ($516.63) Total Net (Decreases)/Increases/Additions to Contract: ($4,722.98)