FIRST AMENDMENT TO DREW STREET WIDENING - FROM FORT HARRISON AVENUE TO NORTHEAST COACHMAN ROAD . I. , ,I I DREW STREET WIDENING FROM FT. HARRISON AVENUE TO N. E. COACHMAN ROAD AMENDMENT NO.1 TO AGREEMENT BETWEEN CITY AND ENGINEER FOR PROFESSIONAL SERVICES I. GENERAL SCOPE OF THIS AMENDMENT The AGREEMENT, dated the 6th day of December 1991, between the City of Clearwater, Florida, hereinafter referred to as the CITY, and Post, Buckley, Schuh & Jernigan, Inc., Tampa, Florida, hereinafter referred to as the CONSULTANT, is amended to evaluate potential one-way pair alternatives for the project as required by the Federal Highway Administration (FHW A) and the Florida Department of Transportation (hereinafter referred to as the DEPARTMENT). II. PROFESSIONAL AND TECHNICAL SERVICES The one~way pair alternatives will consist of analyzing the use of Cleveland Street in conjunction with Drew Street. The additional services are incorporated into . the Agreement and are further described in EXHIBIT A outlining the additional work-effort needed to collect and analyze the necessary data along Cleveland Street and evaluate one- way pair alternatives. ill. PERIOD OF SERVICE Period of service is unchanged from the terms set forth in the original Agreement. IV. GENERAL CONSIDERATIONS General considerations are unchanged from the terms set forth in the original Agreement. V. INSURANCE REQUIREMENTS Insurance requirements are unchanged from the terms set forth in the original Agreement. VI. ..COMPENSATION The CONSULTANT shall be compensated for all services rendered under this ~ ~(!,' ~ V, J1l~ O:J~ /;??-/" (/1) , ~ I I Amendment in accordance with the provisions of EXHIBIT B. VIT. TERMINATION Termination of contract conditions are unchanged from the terms set forth in the original Agreement. VITI. SUSPENSION. CANCELLATION OR ABANDONMENT Suspension, cancellation or abandonment conditions are unchanged from the terms set forth in the original Agreement. IX. AOOIDONAL ENGINEERING SERVICES Additional engineering services are unchanged from the terms set forth in the original Agreement. x. ATTACHMENTS The following Exhibits are attached to this Amendment and made a part hereof, Exhibit "A" - Scope of Services, p. Al-l through Al-8 Exhibit "B" - Method of Compensation, p. Bl-l through Bl-20 I I IN WITNESS WHEREOF, the parties hereto have accepted, made and executed this Amendment upon the terms and conditions above stated on the day and year first written above. ENGINEER: CITY: POST, BUCKLEY, SCHUH & JERNIGAN, INC. 5300 West Cypress Street, Suite 300 Tampa, PI 33607 BY {!My Q~ CITY OF CLEARWATER, 112 Osceola Avenue South Clearwater, FI 34616 BY~~~~tff SIG D: ATTES~~4' .;L~ DATE /..2/;7/?;L , ATTEST: r~~fZ'.' ~C?-~ ~k...~..'....= Approved as 10 ~orm &'CQrrect:-.f~ss DATE /~/~ ha. DRBWST\AMENDN01.DL 49\( I I EXHIBIT A, SECTION V SERVICES TO BE PERFORMED ADD THE FOLLOWING: V.B.3. Aerial Photos 1" = 100' scale uncontrolled black and white photo mylars shall be used for developing concept plans for illustrating the one-way pair alternatives. The ENGINEER shall obtain these aerial photos and coordinate the final sheet layout. V.CA. Existin~ Hi~hway Characteristics a. Roadway The pertinent data outlined in Section V. C.1.a of Exhibit A of the original Agreement shall be collected for Cleveland Street. b. Accidents Accident data shall be obtained from the DEPARTMENT and the Pinellas County Engineering Department for the five year period between 1986 and 1990 for the following segments: 1. Drew Street from SR 60 to North Fort Harrison Avenue 2. Cleveland Street from Drew StreetlSR 60 to Belcher Road. The accident data shall be analyzed to provide the information specified in Section V.C.3 of Exhibit A of the original Agreement. DRBWSNlX-A-SV.DL A1-1 1 I c. Traffic The traffic data collection effort outlined in Section V.C.2 of Exhibit A of the. original Agreement shall be amended to include the following: 1. The ENGINEER shall select and propose to the DEPARTMENT and the CITY three (3) traffic count control stations on Cleveland Street for seven-day machine traffic counts which shall provide directional volumes at IS-minute increments. After concurrence by the DEPARTMENT and the CITY, the ENGINEER shall conduct the counts and analyze the resulting data. 2. The ENGINEER shall furnish 24-hour machine traffic counts (approach volumes at IS-minute increments) and two-hour (from 4:00 to 6:00 PM) manual turning movement counts including pedestrian and bicycle counts at the following locations as a minimum: (1) Drew Street/Osceola Avenue (2) Drew Street/S.R. 60 (3) Cleveland Street (SR 6O)/Osceola Avenue (4) Cleveland Street (SR 6O)/North Fort Harrison Avenue (Alt. US 19) (5) Cleveland Street (SR 6O)/Garden Street (6) Cleveland Street (SR 6O)/East Avenue (7) Cleveland Street (SR 6O)/North Myrtle Avenue (8) Cleveland Street (SR 6O)/North Greenwood Avenue (9) Cleveland Street (SR 6O)/Missouri Avenue (10) Cleveland Street (SR 6O)/Lincoln Avenue (11) Cleveland Street/Hillcrest Avenue (12) SR 6O/Hillcrest Avenue (13) Cleveland Street/North Highland Avenue (14) Cleveland Street/Lake Avenue (15) Cleveland Street/North Duncan Avenue (16) Cleveland Street/Saturn Avenue (17) Cleveland Street/North Hercules Avenue (18) Cleveland Street/Main Avenue (19) Cleveland Street/Belcher Road DRBWST\BX-A-SV.DL AI-2 V.D.12. I I 3. The ENGINEER shall conduct manual pedestrian and bicycle counts at two (2) intersections along Cleveland Street to be proposed by the ENGINEER and approved by the DEPARTMENT. The counts shall be conducted according to the procedure outlined in Section V.C.2.c of Exhibit A of the original Agreement. d. Evaluation of Roadway Pavement Cores of the existing roadway pavement shall be taken along the City portion of Cleveland Street (Hillcrest A venue to Belcher Road). An evaluation of the existing roadway pavement shall be made based on these cores. Environmental Data Collection and Analysis The pertinent data collection and analysis effort outlined in Sections V.D.1 through V .0.11 of Exhibit A of the original Agreement shall be conducted for Cleveland Street. The original Agreement report submittals, where applicable, shall be expanded to include this effort. This activity includes the following: a. Social and Economic Impacts b. Natural and Physical Impacts c. Utilities d. Transportation Plans e. Permit Coordination f. Biological Assessment g. Relocation Impact h. Noise Impact Analysis 1. Air Quality Impact Analysis J. Hazardous materials k. Archaeological/Historical Assessment AMEND THE FOLLOWING: V.E.l. DRRWSNlX-A-SV.DL Corridor Analysis A comparison of viable corridors shall be made with respect to social and environmental impacts, right-of-way and construction costs, while satisfying the travel demand in the project area. Al-3 I I ADD THE FOLLOWING: V.EA. One-Way Pair Alternatives The following sections outline the work-effort associated with developing, analyzing and presenting the one-way pair alternatives. a. Traffic Analysis The following tasks shall be performed in addition to those outlined in Sections E.2.a, b and c of Exhibit A of the original Agreement: 1. Determine the existing (1992) evening peak hour level-of-service for the 19 intersections listed in Section V.CA.c of this Amendment and the segments of Cleveland Street between the noted intersections. 2. Develop the Design Year (2015) and interim years (1995 and 2(05) daily traffic volumes for the following two one-way pair alternatives: (1) One-way pair utilizing Drew Street and Cleveland Street between Pierce Boulevard and Hillcrest A venue. Hillcrest Avenue between SR 60 and Drew Street will be modeled as a one-way northbound facility. East of Hillcrest A venue, both streets will be modeled as two-way facilities. (2) One-way pair utilizing Drew Street and Cleveland Street between Pierce Boulevard and Nimbus Avenue. Nimbus Avenue between Cleveland Street and Drew Street will be modeled as a one-way northbound facility. East of Nimbus Avenue, both streets will be modeled as two-way facilities. DlUlWSI'IIlX-A-SV.DL Al-4 I DRIlWSTIEX-A-sY.DL I The CITY shall request Pinellas County Planning Department to provide the ENGINEER with the FSUTMS model runs for each of the above described alternatives for the years 1995 and 2010. The ENGINEER shall use methodologies similar to those applied previously in the traffic projections covered under the original Agreement to evaluate the FSUTMS data and develop the above specified daily traffic volumes. 3. The ENGINEER shall evaluate if the K,D, and T factors, calculated to fulfill the requirements of the original Agreement, are suitable for the one-way pair alternatives design hour volume projections. If these factors are found to be not suitable, a new set of factors will be calculated. 4. The ENGINEER shall develop Year 2015 design hour volumes for both one-way pair alternatives. 5. Level-of-service (HCM) analysis shall be conducted based on the design hour volumes to determine geometric requirements at intersections and segments under both one-way pair alternatives. 6. PASSER 11-90 runs shall be performed for both one-way pair alternatives and the results tabulated for comparison. 7. An addendum to the approved Traffic Technical Memorandum, which was prepared under the original Agreement, shall be prepared documenting the analyses described herein. Al-5 . l I I b. Base Concept Plans The following pertinent information shall be plotted on I" = 100' scale aerial photo mylars: . Natural and cultural features . Public and private development . Existing right-of-way and property lines . North arrow and scale . Aerial flight date . Street names c. Develop Viable Alternatives Viable one-way pair alternatives shall be identified and developed based on review of the traffic demand and analysis, the project corridor and logical termini. Both typical section and alignment alternatives shall be developed. d. Prepare Design Alternatives The viable alternatives shall be plotted on base concept plans in sufficient detail to permit evaluation of costs and associated impacts. e. Evaluation of Alternatives Each alternative shall be analyzed and evaluated in terms of economic, environmental and social impact. The evaluation criteria shall include construction, right-of-way and engineering costs, relocation estimates, business damage estimates and environmental impacts. Right-of-way costs shall be provided by the DEPARTMENT. f. Hydraulic Analysis (LHR) The Hydraulic Analysis outlined in Section V.E.2 of Exhibit A of the original Agreement shall be expanded to include Cleveland Street. DJUlWmBX.A-SV.DL AI-6 V.FA. V.G.5. DlIBWmBll-A-SV.DL I I g. Soils The Preliminary Geotechnical Report (dated April 15, 1992) submitted for Drew Street shall be revised to include Cleveland Street. h. Conceptual Desien Plans After the viable alternatives are selected, Conceptual Design Plans of the selected alternatives shall be prepared in reproducible form on base concept plans. The Conceptual Design Plans shall be prepared for use in review and public involvement meetings. Preliminary Eneineerine Reports Sections V.F.1 through V.F.3 of Exhibit A of the original Agreement shall be expanded to include documentation on the development and evaluation of the one-way pair alternatives. This activity includes the following: a. First Draft Engineering Report b. Second Draft Engineering Report c. Final Preliminary Engineering Report Environmental Documents Sections V. G.1 through V. G A of Exhibit A of the original Agreement shall be expanded to include documentation on the development and evaluation of the one-way pair alternatives. This activity includes the following: a. b. c. d. Air and Noise Reports Wetlands Evaluation Report Environmental Data Report Environmental Determination Al-7 V.H.? DRBWSTIIlX.A.SV.DL I I Public Meetings a. Public Involvement The ENGINEER shall collect public input throughout the study as it pertains to the one-way pair alternatives. The ENGINEER may be called upon to make presentations to concerned citizens and interest civic or neighborhood groups. In addition to coordinating and conducting these presentations, the ENGINEER shall prepare the necessary displays and graphics for these meetings. b. Mailing List The ENGINEER shall identify and compile (from county tax rolls) a mailing list of all persons owning property within 300 feet of either side of the centerline of all viable alternatives to be presented at the public meetings. c. Displays and Graphics The ENGINEER shall prepare the necessary displays and graphics for use during the Alternatives Public Meeting and Public Hearing. These graphics shall specifically illustrate the viable one-way pair alternatives being considered. d. Comments and Coordination Report Comments on the one-way pair alternatives shall be summarized and responded to for subsequent inclusion in the final Comments and Coordination Report being prepared for the project as part of the original Agreement. AI-8 I I EXIDBIT B, SECTION IV COMPENSATION AMEND THE FOLLOWING: N. With the addition of the services described in Amendment No.1, the maximum limiting compensation is established at $686,830.29. This is based on the following: Amendment No. 1 Total Oriirlnal Fee Fee Fee Labor Services(PBS&J): DirectIReimbursable Expenses (pBS&J): Subconsultants (Includes Direct Expenses): Transportation Solutions. Inc. Archaeological Consultants. Inc. Florida Transportation Engineering Scheda Ecological Associates Cline/Conlee South Total Maximum Limiting Compensation: $333.465.00 $143,416.25 $476.881.25 32.944.80 8.771.40 41.716.20 78.202.81 9.876.35 11.456.93 4.364.00 26.120.00 $496.429.89 9.465.96 9.327.95 14.318.84 2.400.00 2.700.00 $190,400.40 87.668.77 19.204.30 25,775.n 6.764.00 28.820.00 $686.830.29 The basis for the additional service fee estimates of Amendment No. 1 is included in the following pages. B1-1 ".MANHOUR TABULAllON SHEET - AMENDMENT NO.1 PROJECT: DREW STREET R>&E SllJDY . PREPARED BY: POST, BUCKLEY, SCHJH & JERNlGIN, INC. DATE: NOVEMBER 19,1992 PAGE I OF 3 I STATE PROJECT NO. 15050-1501 WPA NO. 7117121 FAPNO. M-1464(9) ===================================================================================================: 1 EMPLOYEE CLASSIFICA liON I 1 ___________________.___________________________________1 I 1 1 1 1 1 I 1 1 1 1 ACTIVI1Y 1 PROJ. 1 PROJ. 1 SEN. 1 1 DESIGN./ I TECH.I 1 I 1 I I I DIR. 1 MAN. I PROF. 1 PROF. I CADD I DRAFT. 1 ENVlR. 1 PLANNER 1 CLER. I TOTAL 1 ---------------------------------1 -----1 -----1 -----1 -----1 ------1 -----1 -----1 ------1 -----1 -----1 I 1 1 I 1 1 I 1 1 1 1 V.B.3. ADDmONALAERIALA-OTOS 1 0 1 4 1 2 1 8 1 0 1 0 1 0 I 0 I 2 1 16 I ____~----------------------------I -----1 -----1 -----1 -----1 ------1 -----1 -----1 ------1 -----1 -----1 I 1 I 1 I I I I 1 1 1 V.C.4. EXISllNG HIGHWAY CHARACTERISTICS I 1 1 I 1 1 1 1 I 1 1 ----------------------------1 -----1 -----1 -----1 -----1 ------1 -----1 -----1 ------1 -----1 -----1 1 1 I I 1 1 I 1 1 I 1 a. FOADWAY I 0 1 12 1 16 I 40 1 24 I 24 1 0 1 0 I 8 1 124 I ----------------------------1 -----1 -----1 -----1 -----1 ------1 -----1 -----1 ------1 -----1 -----1 1 1 1 I I 1 I 1 I 1 1 b. ACCIDENTS I 0 1 0 1 6 1 16 1 0 1 2 1 0 I 0 1 2 1 26 1 ----------------------------1 -----1 -----1 -----1 -----1 ------1 -----1 -----1 ------1 -----1 -----1 1 1 I 1 1 1 I I I 1 I c. TflAFFIC (Collection & Reduction) I 0 1 0 1 24 I 40 1 0 1 4 I 0 1 0 1 4 1 72 1 ----------------------------1 -----1 -----1 -----1 -----1 ------1 -----1 -----1 ------1 -----1 -----1 1 1 1 1 1 1 I 1 1 1 1 d. EVALUATION OF ROADWAY PAVEMENT 1 0 1 4 I 4 1 8 I 21 2 1 0 1 0 I 2 I 22 I ---------------------------------1 -----1 -----1 -----1 -----1 ------1 -----1 -----1 ------1 -----1 -----1 1 1 1 1 1 I 1 1 1 1 I V.D.12.ENVlFON.DATACOLLECllON&ANALYSIS 1 1 1 1 I 1 1 I 1 1 I ----------------------------1 -----1 -----1 -----1 -----1 ------1 -----1 -----1 ------1 -----1 -----1 1 1 1 1 1 1 1 1 I I I a. SOCIAL AND ECONOMIC IMPACTS 1 0 1 4 I 2 1 4 I 2 1 2 I 24 1 20 1 2 I 60 1 ----------------------------1 -----1 -----1 -----1 -----1 ------1 -----1 -----1 ------1 -----1 -----1 - 1 1 1 1 1 1 1 1 1 1 I b. NATURALAND PHYSICALlMPACTS 1 0 I 2 1 0 1 2 1 1 I 1 1 14 1 12 1 1 1 33 1 ----------------------------1 -----1 -----1 -----1 -----1 ------1 -----1 -----1 ------1 -----1 -----1 1 1 I I 1 1 1 1 1 1 1 c. UTIUllES 1 0 1 4 1 4 1 16 1 4 1 4 1 0 1 0 I 4 1 36 I ----------------------------1 -----1 -----1 -----1 -----1 ------1 -----1 -----1 ------1 -----1 -----1 1 1 1 I 1 1 1 1 1 1 1 d. TflANSPORTAll0N PLANS I 0 I 2 1 2 1 4 1 0 1 1 1 0 1 2 1 1 I 12 I ----------------------------1 -----1 -----1 -----1 -----1 ------1 -----1 -----1 ------1 -----1 -----1 1 1 I 1 1 1 1 I I 1 I e. PERMITCOORDlNA1l0N 1 0 1 2 1 12 I 16 1 0 1 2 1 2 1 0 1 2 I 36 1 ----~-----------------------I -----1 -----1 -----1 -----1 ------1 -----1 -----1 ------1 -----1 -----1 1 1 1 1 1 I 1 1 1 1 1 1. BIOLOGICAL ASSESSMENT 1 0 I 2 1 2 1 2 I 0 1 2 1 16 1 0 1 2 1 26 1 ----------------------------1 -----1 -----1 -----1 -----1 ------1 -----1 -----1 ------1 -----1 -----1 1 1 I 1 1 1 1 I I 1 1 g. RELOCATION IMPACT 1 0 1 1 I 2 I 2 1 2 1 2 1 0 I 2 1 1 1 12 1 ----------------~-----------I -----1 -----1 -----1 -----1 ------1 -----1 -----1 ------1 -----1 -----1 I I 1 1 1 1 I 1 1 1 1 h. NOISE IMPACT ANALYSIS 1 0 1 2 1 1 1 0 I 0 1 0 I 0 I 0 I 1 I 4 I ----------------------------1 -----1 -----1 -----1 -----1 ------1 -----1 -----1 ------1 -----1 -----1 I 1 1 I 1 I 1 1 1 1 I i. AIR IMPACT ANALYSIS I 0 I 2 1 1 1 0 1 0 I 0 I 0 1 0 1 1 1 4 I ----------------------------1 -----1 -----1 -----1 -----1 ------1 -----1 -----1 ------1 -----1 -----1 1 1 I 1 1 1 I I I 1 1 j. HAZARDOUSMATERALS 1 0 1 4 I 60 1 120 1 8 1 24 1 0 1 0 1 24 I 240 1 ----------------------------1 -----1 -----1 -----1 -----1 ------1 -----1 -----1 ------1 -----1 -----1 1 I I 1 1 1 1 1 1 I 1 I I k. ARCHEOLOGICALJHISTORICALASSESSMENT 1 0 1 2 1 ) 1 0 I 0 1 0 1 0 1 0 I 1 1 4 1 1 ---------------------------------1 -----1 -----1 -----1 -----1 ------1 -----1 -----1 ------1 -----1 -----1 1 1 1 I 1 1 1 1 1 I I 1 1 V.E.1 CORRIDOR ANALYSIS 1 2 1 8 1 12 I 16 1 4 I 4 1 0 1 2 1 4 1 52 1 I ---------------------------------1 -----1 -----1 -----1 -----1 ------1 -----1 -----1 ------1 -----1 -----1 81-2 - .MANHOUR TABULAllON SHEET - AMENDMENT NO.1 PROJECT: DREW STREET fD&E STUDY 1 PREPARED BY: POST, BUCKLEY, SCHJH & JEANI , INC. DATE: NOVEMBER 19, 1992 PAGE Z. OF 3 I STATE PROJECT NO. 15050-1501 WPA NO. 7117121 FAPNO. M-1464(9) ~~================================~=====~=================~=====~===========:===================: I EMPLOYEE CLASSIFICA liON 1 I -------------------------------------------------- I I I I I I I I I I I ACTIVITY I PROJ. I PROJ. I SEN. 1 I DESIGN.! 1 TECH.! I I I I I I DIA. I MAN. I PROF. I PROF. I CADD I DRAFT. I ENVlA. I PlANNER I CLEA. I TOTAL I ---------------------------------1 -----1 -----1 -----1 -----1 ------1 -----1 -----1 ------1 -----1 -----1 I I 1 I I I I I 1 I I V.E.4.0NE-WAYPAlRAlTERNATlVES I I I I I I I I I I I --~-------------------------I -----1 -----1 -----1 -----1 ------1 -----1 -----1 ------1 -----1 -----1 I I I I I I I I I 1 I a. TPAFFIC ANALYSIS & RERJRT I 2 I 12 I 240 I 208 I 0 I 66 I 0 I 0 I 40 I 568 I ----------------------------1 -----1 -----1 -----1 -----1 ------1 -----1 -----1 ------1 -----1 -----1 I I I I 1 1 I I I 1 1 b.BASECONCEPTPLANS I 01 21 21 41 01 701 01 01 21 SOl ----------------------------1 -----1 -----1 -----1 -----1 ------1 -----1 -----1 ------1 -----1 -----1 I I I I 1 I I 1 I I I c. DEVELOPVIABLEALTE~llVES I 2 I 12 I 12 1 16 I 4 I 4 I 0 1 4 I 2 I 56 I ----------------------------1 -----1 -----1 -----1 -----1 ------1 -----1 -----1 ------1 -----1 -----1 I I I I I I I I I I I d. PFEPAREDESIGNALTE~llVES I 0 I 4 I 8 1 16 I 12 I 48 I 0 I 0 I 2 I 90 I ----------------------------1 -----1 -----1 -----1 -----1 ------1 -----1 -----1 ------1 -----1 -----1 I I I 1 I 1 I I I I I e.EVALLUmONOFALlERNATIVES I 21 121 121 241 81 81 81 41 41 821 ----------------------------1 -----1 -----1 -----1 -----1 ------1 -----1 -----1 ------1 -----1 -----1 1 I I I I I I I I I I f. HYDRAUUC ANALYSIS (LH~ 1 0 I 2 I 24 I 24 I 0 1 6 I 0 I 0 I 4 1 60 I ----------------------------1 -----1 -----1 -----1 -----1 ------1 -----1 -----1 ------1 -----1 -----1 I I I I I I I I 1 I I g. CONCEPlUAL PC)I'.ID LOCATION FERJRT I 0 1 2 I 12 I 20 I 0 I 4 I 0 I 0 1 2 I 40 I ----------------------------1 -----1 -----1 -----1 -----1 ------1 -----1 -----1 --~---I -----1 -----1 . I I I I I I 1 I I I I h. SOILS I 0 I 1 I 1 I 1 I 0 1 0 I 0 I 0 1 1 I 4 I ----------------------------1 -----1 -----1 -----1 -----1 ------1 -----1 -----1 ------1 -----1 -----1 I I I I I 1 I I I I I I. CONCEPlUALDESIGN PlANS I 0 I 4 1 4 I 12 I 4 1 40 1 0 I 0 I 2 I 66 I ---------------------------------1 -----1 -----1 -----1 -----1 ------1 -----1 -----1 ------1 -----1 -----1 I I I I I I I I I I I V.F.4. PFEUMINARY ENGINEERING FERJRTS I I I I I I 1 I I I I ----------------------------1 -----1 -----1 -----1 -----1 ------1 -----1 -----1 ------1 -----1 -----1 I I I I 1 I 1 1 1 I I a. FIRST DRAFT ENGINEERING REPORT I 2 I 16 I 12 1 16 I 6 I 16 I 4 I 4 I 12 1 88 I ----------------------------1 -----1 -----1 -----1 -----1 ------1 -----1 -----1 ------1 -----1 -----1 I I I I I I 1 I I I I b. SECOND DRAFT ENGINEERING RERJRT I 1 I 1 1 2 I 2 I 2 I 4 1 2 I 2 I 8 I 24 I ----------------------------1 -----1 -----1 -----1 -----1 ------1 -----1 -----1 ------1 -----1 -----1 I I I I I I I 1 I 1 I I c. FINAL PREUMINARY ENGINEERING RERJRT I 2 I 4 I 4 I 8 I 2 I 4 I 2 1 2 1 8 I 36 I I ---------------------------------1 -----1 -----1 -----1 -----1 ------1 -----1 -----1 ------1 -----1 -----1 I I I I I I I I I I I I I V.G.5. ENVlFONMENTAL DOCUMENTS I I I I 1 I I 1 I 1 I I ----------------------------1 -----1 -----1 -----1 -----1 ------1 -----1 -----1 ------1 -----1 -----1 I I I I I I I I 1 I 1 a. AIR AND NOISE RERJRTS I 0 I 2 I 2 I 1 I 0 I 0 I 0 I 0 1 1 1 6 I ----------------------------1 -----1 -----1 -----1 -----1 ------1 -----1 -----1 ------1 -----1 -----1 I 1 I I I I I 1 1 I I b. WETlANDS EVALUATION RERJRT I 0 I 2 I 8 I 16 I 2 I 2 I 2 I 0 I 4 I 36 1 ----------------------------1 -----1 -----1 -----1 -----1 ------1 -----1 -----1 ------1 -----1 -----1 I 1 I I I I I I I 1 I c. ENVIRONMENTAL DATA FEPORT 1 0 I 2 I ~ I 6 I 4 1 8 I 20 I 16 I 8 I 72 I ----------------------------1 -----1 -----1 -----1 -----1 ------1 -----1 -----1 ------1 -----1 -----1 I I I I I I I I I I I d. ENVlFDNMENTAL DETERMINAllON I 0 I 2 I 8 1 0 I 0 I 0 I 20 I 4 I 2 I 36 I ---------------------------------1 -----1 -----1 -----1 -----1 ------1 -----1 -----1 ------1 -----1 -----1 81-3 -. MANHOWR TABULAllON SHEET - AMENDMENT NO. 1 PROJECT: DREW STREET FO&E SllJDY L . PREPARED BY: POST, BUCKLEY, SCI-UH & JEAN! . INC. DATE: NOVEMBER 19, 1992 PAGE J OF 3 I STATE PROJECT NO. 15050-1501 WPA NO. 7117121 FAPNO. M-1464(9) ::=======================================:=======================================:================== 1 EMPLOYEE CLASSIFICAllON I 1 _______________________________________________________1 I 1 I 1 I 1 I 1 1 1 I ACTIVITY 1 PROJ. I PROJ. 1 SEN. I 1 DESIGN.! 1 TECH.I I 1 I 1 1 1 DIR. 1 MAN. 1 PROF. 1 PROF. 1 CADD 1 DRAFT. 1 ENVlA.1 PLANNER 1 CLEA. I TOTAL 1 ---------------------------------1 -----1 -----1 -----1 -----1 ------1 -----1 -----1 ------1 -----1 -----1 I 1 1 1 1 1 I I I 1 I V.H.7. PUBUC MEETINGS 1 I 1 I 1 1 I I I I 1 ----------------------------1 -----1 -----1 -----1 -----1 ------1 -----1 -----1 ------1 -----1 -----1 I 1 I 1 I 1 I I 1 I I a. COORDr'RJBUCOFFICIAlMTG'S 1 4 I 8 1 8 I 8 1 4 1 8 1 6 1 6 1 8 1 60 1 ----------------------------1 -----1 -----1 -----1 -----1 ------1 -----1 -----1 ------1 -----1 -----1 I 1 1 1 1 1 I I I I I b. MAIUNG UST 1 0 I 2 1 0 I 4 1 0 1 2 I 0 1 0 I 2 I 10 1 ----------------------------1 -----1 -----1 -----1 -----1 ------1 -----1 -----1 ------1 -----1 -----1 I 1 I 1 I I 1 I I I I c. DISPLAYSANDGRAPHICS I 0 1 12 1 4 1 16 1 8 1 40 1 4 I 4 I 8 I 96 1 ----------------------------1 -----1 -----1 -----1 -----1 ------1 -----1 -----1 ------1 -----1 -----1 1 1 1 1 I I 1 1 1 1 1 d. COMMENTSANDCOORDlNATDl REPORT I 2 1 4 I 2 1 2 I 0 1 2 1 1 I 1 1 2 1 16 I ===================================:=:=:====--===--===========:====================:====== =::===========: ======================================== =============:=================:==================: LABOR SERVICES SUBTOTAL MANHOURS BY CLASSIFICA liON 1 I I 1 19 1 161 I 524 1 698 1 I 1 1 103 I 406 1 125 1 I 1 1 85 1 184 I 2,305 1 81-4 "0 I SUMMARY OF PBS&J LABOR COSTS - AMENDMENT NO.1 I PROJECT: DREW STREET PD&E STUDY PREPAFED BY: POST, BUCKLEY, SCHUH & JERNIGAN, INC, DAlE: NOVEMBER 19,1992 EMPLOYEE FY 1992-93 CLASSIFlCAll0N MAN HOURS RA lE ($/HR) TOTAL ($) -------- Project Director 19 $132.50 $2,517.50 Project Manager 161 95,50 15,375,50 Senior Prof. 524 89.25 46,767.00 Professional 698 56.75 39,611.50 Designer/CADD 103 53.00 5,459,00 Tech./Drafter 406 35.00 14,210.00 Environ. Scient. 125 63.00 7,875.00 Planner 85 67.75 5,758,75 Clerical 184 31.75 5,842.00 --------- -------- 2305 $143,416.25 81-5 . . I I ESTIMATE OF DIRECT/REIM8URSABLE EXPENSES (Page 1 OF 2) - AMENDMENT NO.1 PROJECT: DREW STREET PD&E STUDY PREPARED BY: POST, BUCKLEY, SCHUH & JERNIGAN, INC. DATE: SEPTEMBER 15, 1992 ---------------------------------------------------------------------------------------- MATERIAL (Mylar) 7 sht x $6.00 = $42.00 (TOT AU REPRODUCTION (Sepias, 8lueline, Xerox) I I Sepia 1 8luel ine I Xerox I 1--------------------------------------------1-----------1---------------1--------------1 IAdvance Notification Package I I I 0 I 1--------------------------------------------1-----------1---------------1--------------1 IHazardous Materials Report I I I 1,000 I 1-----------------.----------.-------.--..-.-1-.--..-----1---------------1----.--------- ITraffic Technical Memorandum I 1,500 1--------------------------------------------1----------- --.------------ --.-..-------- ILocation Hydraulic Report I 1-----------------------_._------------------1----------- --------------- -------------- IConceptual Pond Location Report I 1-----------------------------------------.-. ----------- --------------- -------------- ICorridor Base Maps 1--.....-----.-----------------------------.. ----------- --------------- -------------- IBase Conceptual Plans 1-------------------------------------------- ----------- --------------- -------------- IConceptual Design Plans 1-------------------------------------------- -------.--- --------------- -------------- 113 Points Summary Report 1--------------------------------------.----- ----------- -------.--.---- -------------- IFirst Draft Engineering Report 1-------------------------------------------- -----------1--------------- -------------- ISecond Draft Engineering Report I 250 I 1-------------------------------------------- -----------1--------------- --------------1 IFinal Engineering Report I 750 I 1-------------------------------------------- -----.-----1--------------- --------------1 IWetlands Evaluation Report I I 60 I 1------------.-------------------.-----------1-----------1--------------- -.------------1 IDraftEnvironmental Data Report I I 100 I 1---.----------------------.--.---------.----1-----------1--------------- ------.-------1 IFinal Environmental Data Report 1 I 150 I 1--------------.----"-----..-------.-.-------1---.-------1---------------1--------------1 IDraft Environmental Determination (Cat. Ex.)1 I I 30 1 1----------------------.-------------------.-1-------.---1---------------1--------------1 IFinal Environmental Determination (Cat. Ex.)1 I I 30 1 1-----------------------------------------..-1-----------1---------------1--------------1 Iproject Miscellaneous 1 7 I 140 I 350 I 1----------------.----------------.----------1----.------1---------------1--------------1 I TOTAL SHEETS 1 28 I 490 I 4,980 I 1--------------------------------------------1-----------1----.----------1--------------1 REPRODUCTION COSTS: Mylar Sepia = 8luel ine = Xerox = 500 30 7 70 7 140 7 140 30 200 28 sheets 490 sheets 4,980 sheets iil iil iil $7.90 / -sheet = $0.51 / sheet = $0.10 / sheet = $221.20 $249.90 $498.00 ---------------------------------------------------------------------------------------- TOTAL EXPENSES (Page 1 of 2) = $1,011.10 81-6 , . I ESTIMATE OF DIRECT/REIMBURSA8LE EXPENSES (Page 2 OF 2) - AMENDMENT NO. 1 PROJECT: DREW STREET PD&E STUDY PREPARED BY: POST, BUCKLEY, SCHUH & JERNIGAN, INC. DATE: SEPTEM8ER 15, 1992 I TRAVEL ------------------------------------------------------------------------------------------------------------------- To/from P8S&J (Per Diem) (Com) (RentaL) To/from PBS&J (Per Diem) (Com) (Motel) (Rental) Tallahassee office: o trips x o trips x o trips x person x person x days/trip x 1 day/trip x 5326.00 per/trip = 540.00 daiLy rate = 2 day/trip x 5120.00 per/trip = 550.00 per night = 540.00 daiLy rate = 59.00 per diem = 518.00 per diem = TOTAL 50.00 50.00 50.00 50.00 50.00 50.00 50.00 = 50.00 Miami office: o trips x o trips x o trips x o trips x person x person x person x days/trip x POSTAGE ------------------------------------------------------------------------------------------------------------------- = 5290.00 1000 pieces @ 50.29 TOTAL ------------------------------------------------------------------------------------------------------------------- COMPUTER AIDED DESIGN/DRAFTING CADD - 75 hours @ Microcomp . 150~hours @ 535.00 per hour = 52,625.00 515.00 per hour = 52,250.00 TOTAL ------------------------------------------------------------------------------------------------------------------- = 54,875.00 TELEPHONE & SHIPPING 12 months @ 550.00 per month TOTAL -.----------------------------------------------------------------.------------------------------------------.------ 5600.00 OTHER Presentation 80ards PMT's FiLm Purchase & Processing 10 pieces @ 21 pieces @ 5 rolls @ Database Service for Environ. Records CoLor Copies for Haz. Mat. HistoricaL AeriaLs AdditionaL AeriaL Photos (7 sheets @ 1"=100') (Covered in originaL Agreement; ACA, Inc.) 545.00 per piece = 515.00 per piece = 516.06 per roLL = 5450.00 5315.00 580.30 = $800.00 = 570.00 = 5280.00 = 50.00 TOTAL TOTAL EXPENSES (Page 1 of 2) TOTAL EXPENSES (Page 2 of 2) TOTAL EXPENSES Bl-7 = 51,995.30 = 51,011.10 57,760.30 = 58,771.40 ~ 0A I TRANSPORTATION SOLukIONS, I . f\ .:.' v IY.:;:' '1 fB S J, . ',' .,... ~ - TAr;~'=' i . --- ;; \ ~ I, _.___." _____ _ ~ June 29, 1992 Mr. Dan Kelly, P.E. Post, Buckley, Schuh & Jernigan, Inc. 5300 West Cypress suite 300 Tampa, FL 33607 ._.____ "f . ~ ~ ~ . Reference: Additional Services Drew Street PD&E Study "to , . . -.....--'.-----.. t.. t FILE Df!~:r n.::lr.~ Enclosed for your use are our labor hours and cost estimates to provide air quality, noise and public involvement services for the expansion of the Drew Street study. The estimated increase represents about a 20 percent increase in air quality services, 40 percent in noise services and about a 7 percent increase in public involvement effort. Overall, the additional studies amount to an increase of about 12 percent. We have assumed that air quality analysis of additional intersections and noise monitoring and analysis for representative noise sen~itive sites would be required along Cleveland Street. For public involvement we have shown efforts in securing names of property owners along Cleveland street to update the mailing list; preparation of a new board mounted exhibit showing the new limits of the study; additional handouts for the public meeting; additional newsletters needing to be sent due to the expanded number of people affected; one additional meeting resulting from the modified scope and the inclusion of additional public input into the comments and coordination report. Thp tot:a.l ~O!!t fer tb~=~ &dditio:i"l sc~,riceo i::~luding out-of- pocket expenses amounts to $ 9,465.96. Should you have any questions concerning the enclosed, please do not hesitate to call. Sincerely, Richard D. Alberts, P.E. Principal RDA:ar Enclosures 81-8 Rocky Point Island Reserve · 2709 Rocky Point Drive Suite 202 · Tampa, FL 33607 · 813-289-3332 --------.--..---s-.D-.s.--.--==-==s-==I~=_.==...=.__.._=.___==____._________=_.___..I.=--..--=-a--~.-====.=-==.-. :__ : BMPLOYBE CLASSIFICATION" : : .. . Drew Street PD'E Manhoure .---~---------------------------------------~---------------.. .. : Transportation Solutions, Inc. Only .: TOTAL .: : ADDITIONAL SERVICES .. HOURS :: TASK PM SR PLNR :DRAP/TECR:ENVIRON : PLANNER .CLERICAL:: .: 1_______________________________________1_________1___------:---------1---------1---------1---------11---------II Al NOTICE TO PROCBED MEETING I 0 : 0 . 0 : 0 . 0 . 0 .. 0 :1 :---------------------------------------1---------:---------:---------.---------.---------:---------::---------I: : A2 PUBLIC INVOLVEMENT PLAN 0 : 0 : 0 : 0 : 0 : 0 I: 0 :: :---------------------------------------:---------:---______._________:---------1---------.---------..---------.: . A4 INTRODUCTORY/KICK OFF MEETINGS : 0 : 0 : 0 : 0 : 0 : 0 .. 0 .. 1---------------------------------------:---------1---------1---------1---------1---------1---------11---------II . D8 NOISE IMPACT DATA 2 : 6 . 6 : 24 : 0 : 2 .. 40 .. ._______________________________________._________1_________1_________:_________1_________1_________:.______---I: . D9 AIR QUALITY IMPACT DATA 2 : 6 : 6 : 8 : 0 : 2 .. 24 :: 1---------------------------------------1---------1---------1---------1---------1---------1---------11---------.: . G1 PREPARE AIR , NOISE" IMPACT REPORTS : 2 : 2 . 2 I 2 . 0 : 2 .: 10 .. 1_______________________________________:_________:_________:_________1_________._________1_________11______---I' : H1a MAILING LIST PREPARATION 0 : 0 : 0 : 6 : 16 : 8 :: 30 :: :_______________________________________:_________:___------:---------:---------.---------1---------1.---------II . RIb IDENTIFY , INSPECT MEETING SITES 0 : 0 : 0 : 0 . 0 . 0 .. 0 .: ._______________________________________:_________:___------1---------1---------1---------1---------11---------II . HIe COLLECT PUBLIC INPUT 0 : 0 : 8 . 0 : 4 : 4 :: 16 :: 1---------------------------------------:---------:---------1---------:---------1---------1---------11---------I: : H2 ALTERNATIVES PUBLIC MEETING o : 4 : 8 : o : 4 . 4 " 20 .. .---------------------------------------:---------.---______.---------.---------.---------.---------..---------I' . H3 COORDINATION MEETINGS LOCAL OFFICIA: 8 . 0 . 0 . 0 . 0 . 0 8 .. :---------------------------------------1---------.---------1---------1---------1---------:---------::---------II . H4 COMMENTS , COORDINATION REPORT o : 4 : o : o . 4 : o " 8 .. .---------------------------------------:---------.---------.---------.---------.---------1---------..---------'1 . H5 PUBLIC HEARING 0 : 0 . 0 . 0 . 0 . 0 .. 0 :. .---------------------------------------1---------1---------.---------1---------1---------1---------11---------II : H6 LOCATION/DESIGN ACCEPTANCE NOTICE o : o : o : o : o . o .. o I: 1---------------------------------------1---------1---------:---------:---------.---------1---------.,---------" o : o : o : o : o . o I: o " 1_______________________________________1_________1___------.---------.---------1---------.---------11---------II o : 0 : 0 . 0 : 0 . 0 .. 0 .. ._______________________________________1_________1_________1_________1_________1_________1_________11______---11 o : 0 . 0 . 0 . 0 . 0 .. 0 .. .-------------------~-------------------:---------.---------.---------:---------.---------.---------..---------.. . 0 : 0 . 0 . 0 : 0 . 0 .. 0 .. 1_______________________________________1_________1_________1_________1---------1---------1---------11---------II o : o : o : o : o . o II o I: :---------------------------------------:---------:---------.---------.---------1---------.---------.:---------.. o : 0 : 0 : 0 I 0 . 0 :: 0 .: 1_______________________________________1_________1___------1---------1---------1---------1---------11---------II o : o : o : o . o I o .. o .. 1_______________________________________1_________:_________:_________1_________1_________._________:1______---I: . 0 . 0 : 0 . 0 . 0 . 0 .: 0 .. 1_______________________________________1_________1_________1_________1_________1_________1_________11______---I' . O. O. O. 0: 0: 0.. 01: 1---------------------------------------1---------1---------:---------1---------.---------1---------11---------" . 0 : 0 . 0 . 0 : 0 : 0 :. 0 .. .---------------------------------------1---------1---______:_________I_____~___I---------I---------II---------II o : o : o . o : o : o .. o .. :_______________________________________1_________1___------1---------1---------1---------.---------::---------II o : 0 : 0 : 0 . 0 . 0 :: 0 .. :---------------------------------------1---------.---------1---------:---------1---------1---------:1---------I: o . o . o . o . o I o " o .. la====__.......____________._____.___===I.______=_I...------:---------1----..---1---.-----1--------.,1-=--.----" . TOTAL 14 : 22 : ]0 . 40 . 28 . 22 .. 156 .. ..__....._====.._=..........=___..____=.=____..__=_......_e....................._......._.._........___...._---.- 81-9 I I 1---------..._=___..==_________======___===__====_=___..________................___c.....______=__...__==___.-...: . DREW STREBT LABOR COSTS . NOVEMBBR 1, 1991-SEPTBMBBR 30, 1992 PM SPLN D/T : :: . PLN/ENV ,CLERICAL., TOTAL ,- -,- -.- I ., -:- - - - -:- - - - -,,---------------------, ADDITIONAL SERVICBS , $107.46. $60.16, $35.81, $50.15, $20.77 I' BOURS FBB 1---------------------------------------1---------1---------1---------1---------1---------11---------1-----------1 . AIR AND NOISB 4 , 8 : 8 , 24 , 4 ,. 48 , $2,484.28 . 1---____________________________________:_________1___------1---------1---------1---------11---------1-----------1 , PUBLIC INVOLVEMENT . 0 . 0 , 8 . 18 , 8 .. 34 . $1,355.34 , 1---------------------------------------1---------,---------.---------1---------,---------:,---------.-----------. : 0 . 0 , 0 I 0 , 0 ,. 0 . $0.00 . .---------------------------------------:---------:---------,---------1---------1---------11---------1-----------t . 0 , 0 . 0 . 0 I 0 .. 0 . $0.00 . 1---------------------------------------.---------,---------.---------.---------.---------..---------.-----------. o . 0 , 0 : 0 . 0 .. 0 : $0.00 , 1---------------------------------------:---------1---------1---------,---------.---------11---------1-----------1 o , o . o , o . o " o . $0.00 . 1---------------------------------------:---------1---------1---------1---------.---------:.---------1-----------. o , o , o , o , o " o : $0.00 , 1---------------------------------------1---------:---------.---------1---------1---------11---------1-----------1 o . o . o , o . o .. o , $0.00 . 1---------------------------------------1---------1---------.---------1---------.---------1.---------.-----------1 o , o , o I o . o " o , $0.00 . :---------------------------------------:---------1---------1---------:---------.---------11---------1-----------: o , o , o , o . o II o : $0.00 : .---------------------------------------:---------:---------1---------1---------1---------11---------1-----------1 o : 0 , 0 , 0 : 0 II 0 , $0.00 I .---------------------------------------.---------:---------,---------.---------,---------..---------.-----------. . 0 , 0 , 0 . 0 . 0 .. 0 . $0.00 . .---------------------------------------.---------,---------.---------,---------.---------..---------.-----------. . 0 , 0 . 0 , 0 . 0 .. 0 . $0.00 . 1---------------------------------------:---------1---------1---------1---------1---------11---------1-----------I o , o . o , o . o " o . $0.00 , 1---------------------------------------1---------1---------,---------1---------1---------1'---------1-----------1 . . 0 . 0 . 0 , 0 , 0 .. 0 . $0.00 . .---------------------------------------.---------1---------1---------1---------1---------11---------1-----------1 . 0 . 0 . 0 . 0 , 0 " 0 , $0.00 . ,---------------------------------------,---------,---------.---------.---------,---------,.---------.-----------, , 0 , 0 . 0 . 0 . 0 .1 0 , $0.00 . l.e.==__D..Dc=_a__ms======._____e=====~_I__B=_====:_______e=:_____e=__I_________.________=II______=__I__==ae__._~I , TOTAL 4 . 8 . 16 . 42 , 12 " 82 , $3,839.62 . 1===-_.____==__=====____.===========_======_==_..=..=_...e====.....____=__.______..........................._._._: TOTAL LABOR PEE .. OUT-OF-POCKET BXPENSBS $3,839.62 $0.00 TOTAL PEE $3,839.62 81-10 '. I I 1________________=____________~~~_=OBS_==___e=__=__D___...~._________._______.___._______________._._____.__._---. I DREW STREET LABOR COSTS , OCTOBER 1, 1992-MAY 1,1993 PM SPLN D/T " , PLN/BNV ,CLERICAL . I TOTAL , ADDITIONAL SERVICES t- -,- -1- , $112.83' $63.17, -1- -1- $37.60' $52.66. " . -..---------------------1 $21.81.. HOURS FBB 1_______________________________________:_________:_________:_________1_________1_________.1_________:______-----1 . AIR AND NOISE 2 , 6 . 6 , 10 I 2 " 26 , $1,400.50 , 1_______________________________________:_________:___------1---------,---------1---------'1---------1-----------1 . PUBLIC INVOLVEMENT 8 , 8 , 8 . 16 , 8 ., 48 , $2,725.84 I 1---------------------------------------1---------1---------I---------I---------I---------II---~-----I-----------1 o , o , o . o . o " o , $0.00 . 1---------------------------------------.---------1---______1_________1_________1_________11_________1______-----: o , o , o : o , o " o , $0.00 , 1--_____________________________________,_________:___------1---------1---------1---------11---------1-----------1 o , 0 . 0 . 0 . 0 .. 0 1 $0.00 . ._______________________________________._________.___------.---------1---------.---------1.---------.-----------. o , 0 : 0 : 0 : 0 ,: 0 , $0.00 : ,---------------------------------------.---------,---------,---------,---------.---------..---------.-----------, o , 0 . 0 I 0 . 0 .. 0 . $0.00 . ._______________________________________,_________.___------.---------1---------.---------..---------.-----------. : 0 , 0 . 0 , 0 , 0 ,. 0 , $0.00 . 1---------------------------------------:---------,---------1---------,---------1---------1.---------:-----------. o : 0 : 0 . 0 , 0 ,. 0 , $0.00 . 1---------------------------------------,---------1---------1---------1---------1---------1'---------1-----------, , 0 , 0 . 0 1 0 , 0 " 0 . $0.00 . :---------------------------------------,---------:---------,---------:---------,---------11---------1-----------1 o : 0 , 0 . 0 , 0 " 0 : $0.00 . ,---------------------------------------.---------.---------,---------.---------1---------..---------.-----------. . . 0 , 0 , 0 , 0 . 0 .: 0 . $0.00 . :---------------------------------------1---------1---------.---------I---------,---------tl--~------I-----------1 o , 0 , 0 , 0 , 0 " 0 , $0.00 : .---------------------------------------,---------.---------.---------.---------.---------.,---------.-----------1 , 0 , 0 , 0 , 0 . 0 :. 0 . $0.00 , ,---------------------------------------,---------1---------,---------,---------1---------11---------,-----------1 o , 0 . 0 . 0 . 0 .. 0 . $0.00 . :---------------------------------------:---------:---------1---------,---------1---------'1---------1-----------1 o , 0 : 0 , 0 . 0 :, 0 , $0.00 , :---------------------------------------:---------,---------1---------1---------.---------.1---------1-----------. , 0 . 0 , 0 . 0 . 0 ., 0 . $0.00 . ,=8========__==_======______======____==:=__===__=1___--____._________,_________.___._____1._________.__________at , TOTAL 10 : 14 , 14: 26 , 10 :: 74 : $4,126.34 : J=====_===========================_===================.=_=_e=_e.___.____.e.==___._.___.D_.==.==.==.._._=~a~m-----1 . TOTAL LABOR FBE .. OUT-OF-POCKET BXPENSES $4,126.34 $0.00 TOTAL PEE $4,126.34 81-11 . '- I DREW STREET TRANSPORTATION SOLUTIONS, INC. ADDITIONAL SERVICES Out-of-Pocket Exoenses Xerox I Notification of Additional Property Owner Letters 2000 @ .10/copy Four Newsletters (Additional letters) 4 x 2 pages x 100 distribution x .10 Additional Public Meeting/Hearing handouts @ 2 pages ea x 125 copies x 2 meetings/ hearings x .10 Reports Draft Comments and Coordination Report (Additional Pages) 100 pages x 5 copies x .10 Final Comments and Coordination Report (Additional Pages) 100 pages x 5 copies x .10 3 copies of hearing transcript letters received, and publications etc. assume an additional 100 sheets @ 3 copies each 300 sheets for distribution Mailinqs Additional Notification Letters 2000 @ .35/per mailout Additional Newsletters to be Mailed 400 (4 x 100) at .35 per mailout Ot.her Tax Assessors Office Computer Time TOTAL ADDITIONAL OUT-OF-POCKET COSTS 81-12 200.00 80.00 50.00 50.00 50.00 $ 30.00 460.00 $ 700.00 $ 140.00 840.00 $ 200.00 $ l,500.00 I ARCHAEOLOGICAL CONSULTANTS INCORPORATED POST OFFICE BOX 5103 / SARASOTA. FLORIDA 34277-5103 / TELEPHONE (813) 955-6876 / FAX (813) 365~ I1Q I CLEVEU\ND S'l'~l' CULTURAL RESOURCES ASSESSMENT COST PIDFa;AL Bill Backgr . Field Report MeetingS/ Task Rate Res. Survey lab Writing Planning Costs Personnel P.M. $45.00 0 0 0 8 16 $1,080.00 P.l. 40.00 8 0 0 24 0 1,280.00 Proj. Arch. 32.00 8 16 4 16 0 1,408.00 Sr. Hist. 32.00 20 24 0 80 4 4,096.00 Arch. Tech. 14.50 0 24 4 0 0 4Q6.00 . Crew 10.80 0 16 0 0 0 172.80 Crew 10.80 0 16 0 0 0 172.80 Clerical 10.80 0 0 0 40 0 432.00 Total Labor Cost: $9,047.60 Direct Expenses: Film and ProcessiIlg + 40 buildings X 3 prints each ~5.00 per roll; $35.00 per roll Processing - 3 rolls needed $120.00 Leased vehicle: daily rate $18.34 X 3 days (Archaeologists) 55.35 Mileage (Historians) $0.20 X 150 Peport printing/binding :t 50 pages X 6 copies Total Direct Expenses 30.00 75.00 $280.35 TOrAL PRQJEC1'ED JOB OOST: $9,327.95 81-13 '. ARCHAEOLOGICAL CONSUlTAf\j"TS INCORPORATED I I After driving Cleveland Street on June 26, 1992 and calling the FMSF office in Tallahassee, \VIe have dete:rmined there to be approximately 40 structures requiring new FMSF fonns. One structure, the Cleaxwater Post Office at 650 Cleveland Street, is currently listed in the National Register. Another structure, 503 Cleveland Street, has an existing FMSF fonn but would require an update. There are two fOtentially significant buildings which might require DOE's: the Calva..ry Baptist Church at 331 Cleveland Street and the Bank of Clearwater at 500 Cleveland Street. 81-14 . , I I DREW STREET WIDENING ONE-WAY PAIRS CONCEPT (CLEVELAND STREET) City of Clearwater, Florida TOTAL CONTRACT FEE COMPUTATIONS FOR SCHEnA ECOLOGICAL ASSOCIATES Labor Senior Environmental Scientist - 40 hours @ $60.oo/hour $ 2,400.00 Direct Reimbursables None. $ 0.00 Jrotal ~~.................................................................. $ 2,400.00 (06-29-92) B 1-15 I I ~ f-o g o 00 N 00 ~ , ... 1! i o ~ ~ ~ g., ~ ] ... ~ :s .- G) .2 c::: ~ u .E! e 0 ~Q ~ 00 .. 00 f-o < tn ...;l Q < j <<I S 0 "0 U Z .t:: .- c:l_ - u:l ..9 ~ ~ .~ Z u:l > ~ S c:l 5$ Q ~ ~ e 'u ~ 0 .- tn (J ~ i; '-' ~ u:l Iii f-o ~ g., u:l u:l < ~ (J Z - &J s tn 0 u 55 ~ (J ...... = tn 0 U ~- ClI::: ~ 00 e .~ Q :( .- ~ .- c:l ~ 00 00 ~ , U > G) g., c:l .- >- ~ u:l~ < ~ ~ 00 '6 u:l ~ tn Z 0 0 ~ ~ Ill) a ~ ij '2' - 0 g., ~ '" lXl 'r;; ~ = < >. ~ ::s ..J "ii 8 ~ ~ Q ::s c:l G) S ~ 8 0:: ~ Q .S! ....:.. e u:l - 1 ~ ] as - c::: "0 ~ ~ e u:l (J oil 02' Q c::: .c 0 I e ~ (J g., e :2 ~I ri iii cO g., Q Q '-' F- ~ f"\ f"\ ~ II') 0 ci Q ~ u:l 0 0 F- 81-16 ;. 't_ I I SDBCORSU1'JPA1iPJ!: I'LOlU:DA !!lWI~OH E!IG:IlIEE1UB'G PBOJECT: DRBII S~ PD&B S":mDy AC".r.L v .L~X: BIFFLe DAn CnT.T.'RC'rrOll (DSK V.C2) EIlPLO!BB . !.'ODL ~R()R LABOR CLASSD']:r~-A"'IOlI ....HI JU.RS RUE !'BE P%oject lfanager 8 $88.92 $ 711.36 Senior BnqiDeer 16 67.36 1,077.76 senior '!!&en"'; c1cm. 89 49.85 4,436.65 !!eclmi.cimL 267 28.29 7,553.4:3 CJ.erica1 16 18.89 302.24 ~ Labor Fees $1.4,081.44 IJIntal D.i.%&ct ~...CO'_ 237.40 ~ Fee $11,318.84 81-17 . . I I laSMU.T "1IR()tJS ~ om OF POCkB':r JaPD'SES munr S"mEKT STATE PRO.mCT NO. W.P.I. NO .AElUAL PHOTOGRAPH!' 1t.OADWAY lUC2l OF WAY MAPS SHEETS X $ SHEETS X $ = - J!ATBRUL (H!LAR) SHRE1'S X $ r J 'RRI)RODtrCTIQI BLUELDlE SEPI1\ X1l:RnX PHASE I (30%> PHASE II (60%) PHASE III (90\) PHASE :IV (100\> BRIDGE PR.E.LIICDl:ARY BRIDGE FIDL KISCfi.T.QEOUS TODL SBEE~S COST PER SBBET romLS 474 474 S $ $ 0.10 $ $ $ 47.40 I 47.40 TRAVEL (PROM' 'Pnnt#4 Gnrda..P1. ) TO PROJECT: CI'D DmQ _ ~ x _ peap1a 41: $ _ Ga:1&It:;:1p x $_ IIBr d1.- . _ (0;111) t:C.IlS ~ l*JPla x $ ~ 1:Z:ip .. (l!aV) 10 1Z1pI X ~ .u.. X $ ~ pee IIU8 . 100;00 (DII!I!Iit) _ 1:z:::I.ps X z:::=... -./:p X $ _ eIAUy ft8 + _ m. X $_ rte)- __ TO DISTRICT: (1'DD DZIM) _ t:r::lpa x _ ~ % $ _ ~1'I:I:::1p x $_ po: di8m .. CeDI) t:rlps X pl!lIlIp1e % $ per 1:d.p .. (JOIr) ~ z - mUss x $ - par mUe .. (DE!AL) _ ~1"'l1r r:=.. ~ % . ==: ~ -.. . _ m.. :z: ~_ ......)- TO ~T.T.:a1n.~SEE: CI'lm nJ:Dl) _ t:clp& x ~ % S ~t:ip X $_ pc 4i&m a (CCIQ tdpa :I: == plIepIO Z $ == p8Z ~ .. CJCWl =:tils z: .u.. X s _ por ...,,. _ (DIII!II.) _ toz:1iIs X r::=..: ~ X $ _ liiIily ne . _ m. X $_ rte)- ~- r 1M.nn ................. a !I!Bro1K'DCIIID , ::J -=-- e 0 30 /8lIUI:h 90.001 ~ ~._--- - 237.40 81-18 ... ~ ~ ~tCLINE I ~- ~ c 0 ?S~~7N: ~?~TR~ 157 STEVENS AVENUE. P.O. BOX 1689. OLDSMAR, FL 34677 (813) 855-6645 . (813) 785-8834 . (813) 855-6392 FAX July Mr. Abed Daas Post, Buckrey, Schuh and Jernigan, Inc. 5300 West Cypress Street Suite 300 Tampa, Florida 33607 RE: Cleveland Street Existing Pavement Evaluation Clearwater, Florida Dear Mr. Daas: ~ECEIVfD ~Ul1 0 0 1992 f B SJ, INC. TAMPA I J I FILE Pursuant to our telephone conversation of July 1, 1992 we are hereby transmitting the requested scope of work and fee schedule for the above referenced project. Our services relative to this project are as follows: 1. Perform one core through the road. surface and base material every 700 + feet. 2. Perform one 6 foot auger location. classification 3. Patch each location. 4. Submit report documenting our findings. at each Our field work will also include providing traffic control during field operations. If you have any questions, or if we can be of help finalizing this agreement, do not hesitate to contact our office. Respectfully Submitted, cJ~>?/$~ f/C- Theresa M. Bailey, P. E. Vice President 81-19 SPECIALISTS IN CONSTRUCTION TECHNOLOGY l~:a ~~ . I I EVALUATION OF EXISTING CLEVELAND STREET ROAD SURFACE BASE AND SUBBASE FROM HILLCREST AVENUE TO BELCHER ROAD CLEARWATER, FLORIDA 1. Core and 6 Foot Auger - Includes Core, Auger and Patch: One every 700 + feet for a 2 mile section of road: 15 locations at $65.00/each . Lump Sum 2. Technician Time: Estimate 2 days at $600.00/day Lump Sum ... Equipment Charges - Core Machine .). and Generator: Estimate 2 days at $50.00/day Lump Sum 4. Traffic Control: Tow Behind Arrow Board Lump Sum 5. Report Lump Sum ESTIMATED TOTAL Note: Mileage will be charged (portal to portal). separately 81- 20 $ 975.00 1,200.00 100.00 125.00 300.00 $2,700.00 at $0.35/mile ~ ~