Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
FLD2011-02006; 249 WINDWARD PSGE; CLEARWATER MARINE AQUARIUM (2)
T FLD2011-02006 249 WINDWARD PSG Date Received: 2/1/201111:54:09 AM Clearwater Marine Aquarium ZONING DISTRICT: Commercial LAND USE: Commercial General ATLAS PAGE: 267B PLANNER OF RECORD: PLANNER: Robert Tefft, Development Review Manager CDB Meeting Date: May 17, 2011 Case Number: FLD2011-02006 Agenda Item: D. 1. Owners/Applicant: Clearwater Marine Aquarium, Inc. Representative: Housh Ghovaee / Renee Ruggiero, Northside Engineering Services, Inc. Address: 249 Windward Passage CITY OF CLEARWATER PLANNING AND DEVELOPMENT DEPARTMENT STAFF REPORT GENERAL INFORMATION: REQUEST: Flexible Development approval to permit the expansion of the Clearwater Marine Aquarium within the Commercial (C) District with a lot area of 197,167 square feet (4.526 acres), a lot width of 546.3 feet, a front (north) setback of 15 feet (to building/pavement), rear (south) setbacks of 12 feet (to building) and zero feet (to marina promenade), side (east) setbacks of 272 feet (to building) and 10 feet (to pavement), a side (west) setback of 10 feet (to building), and side (north) setbacks of 30 feet (to building) and 10 feet (to pavement), a building height of 42.33 feet, and 323 off-street parking spaces as a Comprehensive Infill Redevelopment Project pursuant to Community Development Code Section 2-704.C. along with a reduction to the perimeter buffer requirement along the south property lines from 15 feet to zero feet, and a reduction from the required number of trees within interior landscape islands from 34 to 27 as a Comprehensive Landscape Program pursuant to Community Development Code Section 3-1202.G., with a two-year Development Order. ZONING DISTRICT: Commercial (C) District FUTURE LAND USE PLAN CATEGORY: Commercial General (CG) PROPERTY USE: Current: Aquarium, Marina and Vacant Property Proposed: Aquarium and Marina EXISTING North: Commercial (C) District and SURROUNDING Medium Density Residential (MDR) District ZONING AND USES: Offices and Attached Dwellings South: Preservation (P) District Mandalay Channel (Intracoastal Waterway) East: Commercial (C) District and Preservation (P) District Restaurant and Mandalay Channel West: Commercial (C) District and Preservation (P) District Offices and Mandalay Channel Community Development Board -May 17, 2011 FLD2011-02006 - Page 1 of 12 ANALYSIS: Site Location and Existing Conditions: The 4.52-acre subject property is located on the south side of Windward Passage approximately 210 feet west of Island Way. The property is comprised of three separate parcels of land that when combined result in an awkward property configuration. These properties consist of the existing 39,974 square foot, two-story Clearwater Marine Aquarium (CMA) building, a 25-dock marina, and a mixture of improved and unimproved off-street parking (the majority of which does not comply with current parking design standards). The eastern third of the subject property is vacant. It is noted that at its meeting of March 17, 2011, the City Council approved a subordination agreement and approved the modification of the City's' reverter on the CMA property. The subordination agreement provides, among other things, that the City subordinate its reverter interest up to an $8.6 million loan. In return for the City's subordination, the City obtains the right of first refusal to acquire the first mortgage position and/or title, if applicable, to the property should the City elect to exercise its reverter rights by paying off the existing indebtedness in the event of the default or demise of the CMA property. Should the CMA fail and/or default on the outstanding indebtedness, and BB&T pursues its mortgage rights, the City would have the option to either obtain control of the entire CMA campus in return for payment of the then existing debt balance or waive this option with BB&T then able to proceed with foreclosure on the Parcels. The City has no obligation to purchase the mortgage nor is the City guaranteeing any debt. Development Proposal: The development proposal that is currently before the Community Development Board (CDB) will eliminate all of the existing conforming and non-conforming parking areas from the site and consists of the following improvements: ? The construction of an approximate 11,000 square feet of new floor area for the Clearwater Marine Aquarium building to include a new lobby and gift shop, as well as a new outdoor tank exhibit area with a 660-seat outdoor stadium; ? The construction of several new outdoor aquatic tanks along the west side of the Clearwater Marine Aquarium building; ? The construction of a new 205-space, four-level parking garage between the Clearwater Marine Aquarium building and Windward Passage; ? The construction of a new 118-space surface parking lot on the eastern third of the subject property; ? The construction of a new 12-foot to 14-foot wide marina promenade along that portion of the property abutting the Mandalay Channel; ? The installation of a loading zone, dumpster enclosure and "T" turnaround for Fire Department access at the termination of the right-of-way for Marina Way on the subject property; ? The installation of perimeter, interior and foundation landscaping throughout the site; and ? The installation of stormwater drainage improvements including a vault beneath the surface parking area. Community Development Board - May 17, 2011 FLD2011-02006 - Page 2 of 12 The development proposal's compliance with the various development standards of the Community Development Code (CDC) is discussed below. Intensity: Pursuant to the Countywide Plan Rules and CDC Section 2-701.1, the maximum floor area ratio (FAR) for properties with a future land use plan designation of CG is 0.55. The proposed expansion will result in a total gross floor area of 52,323 square feet at a FAR of 0.265, which is below the above referenced maximum. Impervious Surface Ratio (ISR): Pursuant to the Countywide Plan Rules and CDC Section 2- 701.1, the maximum ISR for properties with a future land use plan designation of CG is 0.95. The proposed ISR is 0.852, which is below the above referenced maximum. Minimum Lot Area and Width: Pursuant to CDC Table 2-704, there is no minimum required lot area or lot width for a Comprehensive Infill Redevelopment Project. The lot area of the subject property is 197,167 square feet (4.53 acres) while the lot width along Windward Passage is 546.3 feet. It is noted that the lot area/width of the subject property exceeds that which is typical for uses in the C District. Minimum Setbacks: Pursuant to CDC Table 2-704, there are no minimum required setbacks for a Comprehensive Infill Redevelopment Project. The development proposal includes a front (north) setback of 15 feet (to building/pavement), rear (south) setbacks of 12 feet (to building) and zero feet (to pavement), side (east) setbacks of 272 feet (to building) and 10 feet (to pavement), a side (west) setback of 10 feet (to building), and north (side) setbacks of 30.6 feet (to building) and 10 feet (to pavement). It is noted that the proposed setbacks are generally consistent with what would typically be required in the C District and, for the most part, will not result in required perimeter landscape buffers being reduced, or result in a site design that is out of character for the surrounding area. The requested front setback of 15 feet to the proposed parking garage and surface parking area will help facilitate the opportunity to locate the facility in its proposed location which will in turn enable parking garage to effectively have a second function as physical buffer from the principal aquarium building and outdoor stadium/tank area and help mitigate any potential acoustic impacts that may stem from these elements. The requested rear setback of zero feet is in order to accommodate the construction of a paver brick promenade along the entire length of the waterfront property line. The promenade will provide a clearly defined path for pedestrian traffic along the waterfront and facilitate easy access to the existing marina/boat slips. Maximum Building Height: Pursuant to CDC Table 2-704, there is no maximum height for a Comprehensive Infill Redevelopment Project. The greatest height for the entire project is for the proposed sun shade over the outdoor stadium/tank area, which is 42.33 feet. The height of the principal aquarium building is 22.5 feet, and the height of the parking garage is 31.5 feet. It is noted that the proposed height is within the maximum range established for multiple uses within the C District and is compatible with the surrounding buildings. Community Development Board - May 17, 2011 FLD20 1 1-02006 - Page 3 of 12 Minimum Off-Street Parking: Pursuant to CDC Table 2-704, the minimum off-street parking requirement for a Comprehensive Infill Redevelopment Project shall be determined by the Community Development Coordinator based on the specific use and/or ITE Manual standards. It is noted that the existing city-marina requires a total of 24 off-street parking spaces (one space per two slips), all of which are provided for and will be reserved exclusively for the use of marina tenants. The aquarium has been determined to have two distinct elements: the principal aquarium building and the 660-seat outdoor stadium/tank area. The ITE Manual does not include an aquarium land use category; therefore alternate, similar comparables were sought out within the ITE Manual for the proposed use/elements. Based upon discussions with the applicant as well as the City's Traffic Engineering staff, the principal aquarium building was found to be most consistent with the Museum land use; and as a Museum the off-street parking requirement for the principal aquarium element was established as 1.32 spaces per 1,000 square feet, or 67.35 spaces. The outdoor stadium/tank area was found to be most consistent with the Live Theater land use; and as Live Theater the off-street parking requirement for the stadium element was established as 1 space per three seats, or 217.80 spaces. Based upon the above, the combined total of required off-street parking spaces for the principal aquarium building, the outdoor stadium/tank area, and the marina is 309. The application currently before the CDB proposes 323 off-street parking spaces, and therefore meets the requirements of CDC Table 2-704. Comprehensive Infill Redevelopment Project - Flexibility Criteria: Pursuant to CDC Section 2- 704.C.6.d, in order to form a cohesive, visually interesting and attractive appearance, the proposed development incorporates a substantial number of the following design elements: ¦ Changes in horizontal building planes; ¦ Use of architectural details such as columns, cornices, stringcourses, pilasters, porticos, balconies, railings, awnings, etc; ¦ Variety in materials, colors and textures; ¦ Distinctive fenestration patterns; ¦ Building step-backs; and ¦ Distinctive roofs forms. As part of their written response to address the above flexibility criterion, the applicant has provided the following: "The proposed development utilizes a number of design elements in order to form a cohesive, visually interesting and attractive appearance. Each structure uses changes in horizontal building planes which is visible at the main structure entrance and stadium. Architectural columns, pilasters, porticos, and railings add interest on both structures which can be seen at the parking garage corners and decks surrounding the show tanks. The incorporation of a variety of materials and landscaping at both structures adds visual interest. Each structure's fenestration patterns are repetitive and rectilinear making it distinctive from surrounding projects and giving the project its own identity. Each structure has unique roof forms which will set it apart from the Community Development Board - May 17, 2011 FLD2011-02006 - Page 4 of 12 surrounding areas and make it a visual landmark to visitors. These elements make the aquarium unique, visually interesting, and distinctive from surrounding areas." With regard to the aquarium building and outdoor stadium/tank area, staff generally agrees with the applicant that the necessary design elements are being incorporated into the building design and that said design will be visually interesting and attractive in its appearance. However, staff cannot make the same finding with respect to the proposed parking garage. The proposed architectural elevations for the parking garage have carried-over the same fenestration pattern found on the aquarium building, and have incorporated columns and railings as architectural details. However, the proposed columns add very little to the building aesthetic; seemingly acting as a structural element only, and the building appears rather plain, unadorned and devoid of any visually interesting and attractive architectural details. Further, there are no discernable changes in horizontal building planes, no use of building step-backs, or anything that would be considered a distinctive roof form. In short, the proposed parking garage does not comply with the required Comprehensive Infill Redevelopment Project criterion. Staff acknowledges that incorporating changes in horizontal building planes and building step- backs into a parking garage is difficult without compromising the functionality of the parking garage itself. Because of this, staff feels strongly that even greater attention must be paid to the incorporation of the other design elements into the final architectural elevations. The plans do not identify any proposed building materials other than concrete and no further specifics have been provided by the applicant in their written response. The parking garage structure will be concrete with no apparent variation in texture, and the only other material incorporated into the design is some type of metal railings for the staircase. Staff does not find that the proposal constitutes variety in materials and textures. Therefore, staff recommends that additional material be incorporated into the design; perhaps through the application of a decorative metal trim (although a different metal from the railings) on the cap of the fenestrated garage walls and stair towers. It is noted that through the incorporation of this trim into the design, the roof of the parking garage would become more distinctive than as presently proposed. Staff would also recommend that the fenestrated garage walls be textured differently from the balance of the garage exterior. Through these modifications staff would find that the design displays a variety in materials, colors and textures. As previously noted, the proposed architectural elevations incorporate columns and railings as architectural details, but that these do little to the overall building appearance. While it is not desirous to add architectural details to the parking garage that would be out of character for not only its style but also the style of the aquarium building and result in the creation of a less cohesive overall design, staff feels that through the incorporation of awnings into the design there will be a benefit to not only the appearance of the parking garage, but also to its functionality. Therefore, staff recommends that an awning be added at the vehicular entry into the parking garage (east elevation) as well as on the third level of the two fenestrated walls on the north elevation. The awnings must be canvas, aluminum or another material acceptable to the Planning and Development Department other than plastic, be of an adequate dimension to be of meaningful aesthetic value, and be of a color compatible with the chosen color palette. Community Development Board -May 17, 2011 FLD2011-02006 - Page 5 of 12 The west elevation of the proposed parking garage appears rather monotonous with a solid concrete wall, three sections of open parking deck, and an open stairwell. Staff would recommend that the center section of open parking deck be modified in some manner to provide architectural diversity to the elevation; perhaps through the utilization/installation of a living wall or green wall. The installation of such a wall, aside from the obvious aesthetic appeal, may also help to purify the air circulating from the parking garage and act as an acoustic control from the parking garage as well. Subject to the above discussed changes being incorporated into the final architectural design of the parking garage, a positive finding can be made with regard to the Comprehensive Infill Redevelopment Project flexibility criteria set forth in CDC Section 2-704.C. Mechanical Equipment: Pursuant to CDC Section 3-201.D.1, all outside mechanical equipment must be screened so as not to be visible from public streets and/or abutting properties. Based upon the plans submitted, it does not appear that any mechanical equipment will be located on the roof of the proposed buildings. Instead, any mechanical equipment would appear to be located within the CMA facility itself, or along the south side of the building adjacent to the promenade. Sight Visibili Triangles: Pursuant to CDC Section 3-904.A, to minimize hazards at the proposed driveways on Windward Passage and where the property is accessed via Marina Way, no structures or landscaping may be installed which will obstruct views at a level between 30 inches above grade and eight feet above grade within 20-foot sight visibility triangles. The proposal was reviewed by the City's Traffic Engineering Department and found to be acceptable. Utilities: Pursuant to CDC Section 3-912, for development that does not involve a subdivision, all utilities including individual distribution lines must be installed underground unless such undergrounding is not practicable. The existing building is served by overhead utilities. Should this application be approved, all utilities serving this building must be relocated underground on- site in compliance with this requirement. Landscaping: Pursuant to CDC Sections 3-1202.D.1 and 3, there is a 15-foot wide landscape buffer required along the property lines abutting the Mandalay Channel/Causeway right-of-way. The proposal includes a reduction to the landscape buffer along the Mandalay Channel/Causeway right-of-way from 15 feet to zero feet. Pursuant to CDC Section 3-1202.E.1, one tree is required within an interior landscape island for every 150 square feet of required greenspace. The proposal includes a reduction to this requirement from 34 to 27. Comprehensive Landscape Program: Pursuant to CDC Section 3-1202.G., the landscaping requirements contained within the Code can be waived or modified if the application contains a Comprehensive Landscape Program satisfying certain criteria. The following table depicts the consistency of the development proposal with those criteria: Community Development Board - May 17, 2011 FLD2011-02006 - Page 6 of 12 Consistent I Inconsistent 1. Architectural theme: a. The landscaping in a comprehensive landscape program shall be designed as a N/A N/A part of the architectural theme of the principle buildings proposed or developed on the parcel proposed for development; or b. The design, character, location and/or materials of the landscape treatment X proposed in the comprehensive landscape program shall be demonstrably more attractive than landscaping otherwise permitted on the parcel proposed for development under the minimum landscape standards. 2. Lighting: Any lighting proposed as a part of a comprehensive landscape program is X automatically controlled so that the lighting is turned off when the business is closed. 3. Community character: The landscape treatment proposed in the comprehensive X landscape program will enhance the community character of the City of Clearwater. 4. Property values: The landscape treatment proposed in the comprehensive landscape x program will have a beneficial impact on the value of property in the immediate vicinity of the parcel proposed for development. 5. Special area or scenic corridor plan: The landscape treatment proposed in the N/A N/A comprehensive landscape program is consistent with any special area or scenic corridor plan which the City of Clearwater has prepared and adopted for the area in which the parcel proposed for development is located. The majority of the perimeter landscape buffer either meets or, as in the case of the buffer adjacent to Windward Passage, exceeds the minimums established in the Code. The exception to this is the south perimeter buffer abutting the Mandalay Channel/Causeway right-of-way. Perimeter buffers are typically desirable elements in the site design; however in the instance of the required south perimeter buffer its provision would actually be an impediment to the functionality of the site, impeding access to the existing, abutting marina/boat slips. As such, the applicant has proposed the construction of a paver brick promenade along the entire length of the waterfront property line. This promenade will provide a clearly defined path for pedestrian traffic along the waterfront and facilitate easy access to the existing marina/boat slips. Some landscaping will be provided between the aquarium building and the waterfront in the form of a three-foot wide planter area consisting of pitch apple and a silver button wood hedge. With regard to the interior of the surface parking area the proposal meets the majority of the applicable Code requirements. However, the application does request a reduction of the requirement to provide 34 trees within interior landscape islands (1 per 150 square feet of required greenspace) to 27 trees. While only 79% of the otherwise required interior trees are to be provided, it does not appear to be possible for the site to accommodate any further interior trees without substantially impacting the number of available off-street parking spaces through the addition of more landscape islands, or by planting further trees in the already proposed landscape islands at the expense of reducing the spacing between the trees and compromising the viability of all trees to be planted. Solid Waste: The development proposal provides for a new 15-foot by 11-foot (approximate) dumpster enclosure within the "T" turnaround area located off of Marina Way. The plans indicate this enclosure will be constructed to City standards. It is a requirement that the enclosure exterior must be consistent with the exterior materials and color of the building. The proposal has been found to be acceptable by the City's Solid Waste Department. Community Development Board -May 17, 2011 FLD2011-02006 - Page 7 of 12 Code Enforcement Analysis: There is no active Code Enforcement case for the subject property. COMPLIANCE WITH STANDARDS AND CRITERIA: The following table depicts the consistency of the development proposal with the standards as per CDC Section 2-701.1 and Table 2-704: Standard Proposed Consistent Inconsistent FAR 0.55 0.265 X ISR 0.95 0.852 X Minimum Lot Area N/A 197,167 square feet (4.52 acres) X Minimum Lot Width N/A 416.12 feet X Minimum Setbacks Front: N/A North: 15 feet (to building) X 15 feet (to pavement) Rear: N/A South: 12 feet (to building) X Zero feet (to pavement) Side: N/A North: 30.6 feet (to building) X 10 feet (to pavement) East: 272 feet (to building) X 10 feet (to pavement) West: 10 feet (to building) X Maximum Height N/A 42.33 feet (outdoor stadium/tank area) X 22.5 feet (aquarium) 31.5 feet (parking garage) Minimum Determined by the 323 parking spaces X Off'-Street Parking Community Development Coordinator based on the specific use and/or ITE Manual standards Community Development Board - May 17, 2011 FLD2011-02006 - Page 8 of 12 COMPLIANCE WITH FLEXIBILITY CRITERIA: The following table depicts the consistency of the development proposal with the Flexibility criteria as per CDC Section 2-704.C (Comprehensive Infill Redevelopment Project): Consistent Inconsistent 1. The development or redevelopment is otherwise impractical without deviations from X the use and/or development standards set forth in this zoning district. 2. The development or redevelopment will be consistent with the goals and policies of X the Comprehensive Plan, as well as with the general purpose, intent and basic planning objectives of this Code, and with the intent and purpose of this zoning district. 3. The development or redevelopment will not impede the normal and orderly X development and improvement of surrounding properties. 4. Adjoining properties will not suffer substantial detriment as a result of the proposed X development. 5. The proposed use shall otherwise be permitted by the underlying future land use X category, be compatible with adjacent land uses, will not substantially alter the essential use characteristics of the neighborhood; and shall demonstrate compliance with one or more of the following objectives: a. The proposed use is permitted in this zoning district as a minimum standard, flexible standard or flexible development use; b. The proposed use would be a significant economic contributor to the City's economic base by diversifying the local economy or by creating jobs; c. The development proposal accommodates the expansion or redevelopment of an existing economic contributor; d. The proposed use provides for the provision of affordable housing; e. The proposed use provides for development or redevelopment in an area that is characterized by other similar development and where a land use plan amendment and rezoning would result in a spot land use or zoning designation; or f. The proposed use provides for the development of a new and/or preservation of a working waterfront use. 6. Flexibility with regard to use, lot width, required setbacks, height and off-street X parking are justified based on demonstrated compliance with all of the following design objectives: a. The proposed development will not impede the normal and orderly development and improvement of the surrounding properties for uses permitted in this zoning district; b. The proposed development complies with applicable design guidelines adopted by the City; c. The design, scale and intensity of the proposed development supports the established or emerging character of an area; d. In order to form a cohesive, visually interesting and attractive appearance, the proposed development incorporates a substantial number of the following design elements: ? Changes in horizontal building planes; ? Use of architectural details such as columns, cornices, stringcourses, pilasters, porticos, balconies, railings, awnings, etc.; ? Variety in materials, colors and textures; ? Distinctive fenestration patterns; ? Building step backs; and ? Distinctive roofs forms. e. The proposed development provides for appropriate buffers, enhanced landscane design and annronriate distances between buildines. Community Development Board -May 17, 2011 FLD2011-02006 -Page 9 of 12 COMPLIANCE WITH GENERAL STANDARDS FOR LEVEL TWO APPROVALS: The following table depicts the consistency of the development proposal with the General Standards for Level Two Approvals as per CDC Section 3-914.A: Consistent Inconsistent 1. The proposed development of the land will be in harmony with the scale, bulk, X coverage, density and character of adjacent properties in which it is located. 2. The proposed development will not hinder or discourage development and use of X adjacent land and buildings or significantly impair the value thereof. 3. The proposed development will not adversely affect the health or safety of persons X residing or working in the neighborhood. 4. The proposed development is designed to minimize traffic congestion. X The Development Review Committee (DRC) reviewed the application and supporting materials at its meeting of March 3, 2011, and deemed the development proposal to be legally sufficient to move forward to the Community Development Board (CDB), based upon the following: Findings of Fact. The Planning and Development Department, having reviewed all evidence submitted by the applicant and requirements of the Community Development Code, finds that there is substantial competent evidence to support the following findings of fact: 1. The 4.52-acre subject property is located on the south side of Windward Passage approximately 210 feet west of Island Way; 2. The subject property is zoned Commercial (C) District with an underlying future land use plan designation of Commercial General (CG); 3. The subject property has approximately 416.12 feet of frontage along Windward Passage; 4. The building setbacks are 15 feet (front), 12 feet (rear), 272 feet, 10 feet and 30.6 feet (side); 5. The pavement setbacks are 15 feet (front), zero feet (rear), and 10 feet (sides); 6. The height of the sun shade for the outdoor stadium/tank area is 42.33 feet, the principal aquarium building is 22.5 feet, and the parking garage is 31.5 feet; 7. Based upon discussions with the applicant and the City's Traffic Engineering staff, as well as in reviewing comparable land uses in the ITE Manual, the off-street parking requirement for the development proposal has been determined to be 309 parking spaces and 323 parking spaces are proposed; and 8. The development proposal will be compatible with the surrounding area. . The proposed development is consistent with the community character of the X immediate vicinity. 6. The design of the proposed development minimizes adverse effects, including X visual acoustic and olfactory and hours of operation impacts on adjacent properties. 5SUMMARY AND RECOMMENDATION: Conclusions of Law. The Planning and Development Department, having made the above findings of fact, reaches the following conclusions of law: 1. That the development proposal is consistent with the Standards as per Community Development Code (CDC) Tables 2-701.1 and 2-704; 2. That the development proposal is consistent with the Flexibility criteria set forth in CDC Sections 2-704.C; Community Development Board -May 17, 2011 FLD2011-02006 -Page 10 of 12 3. That the development proposal is consistent Approvals as per CDC Section 3-914.A; and 4. That the development proposal is consistent criteria as per CDC Section 3-1202.G. with the General Standards for Level Two with the Comprehensive Landscape Program Based upon the above, the Planning and Development Department recommends APPROVAL of the Flexible Development application to permit the expansion of the Clearwater Marine Aquarium within the Commercial (C) District with a lot area of 197,167 square feet (4.526 acres), a lot width of 546.3 feet, a front (north) setback of 15 feet (to building/pavement), rear (south) setbacks of 12 feet (to building) and zero feet (to marina promenade), side (east) setbacks of 272 feet (to building) and 10 feet (to pavement), a side (west) setback of 10 feet (to building), and side (north) setbacks of 30 feet (to building) and 10 feet (to pavement), a building height of 42.33 feet, and 323 off-street parking spaces as a Comprehensive Infill Redevelopment Project pursuant to Community Development Code Section 2-704.C. along with a reduction to the perimeter buffer requirement along the south property lines from 15 feet to zero feet, and a reduction from the required number of trees within interior landscape islands from 34 to 27 as a Comprehensive Landscape Program pursuant to Community Development Code Section 3-1202.G., with a two-year Development Order, subject to the following conditions: Conditions of Approval: 1. That any outstanding comments from the Engineering Department, Fire Department and Parks and Recreation Department be addressed prior to the issuance of any building permits or issuance of a Certificate of Completion/Occupancy, as applicable; 2. That the hours of operation and live presentation schedule remain generally consistent with those times provided to staff by the applicant, and that any substantial variation to those times require the approval of the Community Development Board; 3. That a decorative metal trim (although a different metal from the railings) be provided on the cap of the fenestrated garage walls and stair towers; 4. That the fenestrated garage walls be textured differently from the balance of the garage exterior; 5. That an awning be added at the vehicular entry into the parking garage (east elevation) as well as on the third level of the two fenestrated walls on the north elevation. The awnings must be canvas, aluminum or another material acceptable to the Planning and Development Department other than plastic, be of an adequate dimension to be of meaningful aesthetic value, and be of a color compatible with the chosen color palette; 6. That the center section of open parking deck on the west elevation be modified to provide architectural diversity to the elevation through the utilization/installation of a living wall or green wall; 7. That all utilities serving this building be relocated underground on-site in compliance with the requirement of CDC Section 3-912; 8. That all lighting must be automatically controlled so that it is turned off when the business is closed in compliance with the requirement of CDC Section 3-1202.G.2; 9. That, pursuant to CDC Section 3-1402.I.3, lighting levels in the parking garage shall meet or exceed the current minimum Illuminating Engineering Society (IES) standards, and that evidence depicting said compliance shall be provided prior to the issuance of any building permits for the parking garage; Community Development Board -May 17, 2011 FLD2011-02006 -Page 11 of 12 10. That, pursuant to a written statement provided by the applicants representatives, only low- level amplification be utilized during presentations, and that any amplified sound meet the requirements of any applicable Code requirement; 11. That, pursuant to a written statement provided by the applicants representatives, the parking garage shall be equipped with arms/gates to secure the parking garage when the aquarium is closed, and that details of the arms/gates be provided to and approved by the Planning and Development Department prior to the issuance of any building permits; 12. That the site and landscape plans be modified to provide for a pedestrian access between the western edge of the "T" turnaround, the door at the northwest corner of the aquarium building, and the promenade; 13. That the exterior of the dumpster enclosure must be consistent with the exterior materials and colors of the buildings; and 14. That, prior to the issuance of any building permits, the Parking Easement granting an easement from the Clearwater Marine Aquarium to the City for a total of twenty-four off- street parking spaces on the subject property as depicted and identified on the site plan as "Reserved for Municipal Slip Usage" ("Marina Spaces") is recorded in the Public Records. r Prepared by Planning & Development Dept. Staff: C`- Robert G. Tefft, Development Review Manager ATTACHMENTS: Location Map; Aerial Map; Zoning Map; Existing Surrounding Uses Map; Photographs of Site and Vicinity S. )Planning Departmen6C D BTLEX (FLD) )Pending cases) Up for the next CDBI Windward Passage 249 Clearwater Marine Aquarium (C) 2011.05 - RTStaffReport 2011 05-17.docx Community Development Board - May 17, 2011 FLD2011-02006 - Page 12 of 12 MARINA 235 WINDWARD PASSAGE CLEARWATER, FLORIDA 33767 1-727-443-2466 - SERVICE 1-727-443-2514 - SALES 1-727-442-9786 - FAX April 4, 2011 Q uaiity Boats OF CLEARWATER, INC. www.qualityboatsales.com Frank Dame Clearwater Marine Aquarium 249 Windward Passage Clearwater, FL, 33767 Dear Frank, SHOWROOM 17389 U.S. 19 NORTH CLEARWATER, FLORIDA 3376, 1-727-530-1815 SALES 1-727-533-9247 - FAX Please accept this as a letter of support for the proposed improvements to the Clearwater Marine Aquarium We have been a neighbor of the aquarium for many years and are excited about the prospects of" having such a wonderful attraction to our city located here on Island Estates and remain confident that those involved with the aquarium will make the right decisions to prepare for and handle the influx of traffic and parking on our street that will surely come if the plans you shared with me are approved and executed. We truly want the best for the aquarium and its future endeavors and successes, will continue to support the aquarium and its causes and look forward to a promising; future together. Sincerely, ?anllair Quality Boats of Clearwater, Inc. 235 Windward. Passage Clearwater, FL 33767 c cr,ri L - l?UR?`IlOl` GRADY--WHITE 9 F; 4=-C-j Ak t- ?{ ,411 ?Y ¦4 DEALERS Sheron Nichols 251 Windward Passage Clearwater, Florida 33767 727-441-1454 or 727-409-9373 May 5, 2011 Clearwater Marine Aquarium 249 Windward Passage Clearwater, Florida 33767 Attn: Frank Dame City of Clearwater Planning Dept. 100 South Myrtle Avenue Clearwater, Florida 33756 Attn: Robert Tefft W/copies to CDB members x8 City of Clearwater Engineering Dept. City of Clearwater Engineering Dept. 100 South Myrtle Avenue #220 100 South Myrtle Avenue #220 Clearwater, Florida 33756 Clearwater, Florida 33756 Attn: Bennett Elbo -Traffic Ops. Attn: Donald Melone - Engineering Spec. Re: Clearwater Marine Aquarium Expansion Project I was in attendance at the April 19, 2011 meeting regarding this project only to find out that it had been cancelled and rescheduled for May 17, 2011. Since I am going to be out of town and unable to attend, I do not want my absence reviewed as approval of the project. In my letter of April 1, 2011, all the issues addressed in that letter still stand. In fact, I have an additional request. Garage: In addition to my April 1, 2011 letter: After reviewing the drawings again, the location of the garage to my property and its height concerns me. Since I am already removing garbage and trash that has been thrown up by the more athletic public, the location and height of the proposed garage will allow the public, including infants throwing their "tommy sippy cups" down onto my roof and using my AC units as targets. The open top floor of the garage will attract the public for no other reason than to get a view of the surrounding property, attractions and water. I am requesting the city to take in consideration the garage design and any damage to my property. I am requesting some form of protection from "flying" objects from CMA garage design. Sheron Nichols 251 Windward Passage 680 Island Way #809 Clearwater, Fl. 33767 Clearwater, Fl. 33767 Received MAY 092011 Planning & Development The Village on Island Estates Condominium Association, Inc. 240 Windward.Passage, Clearwater, FL 33767 May 9, 2011 Mr. Frank Dame, EVP/COO Clearwater Marine Aquarium, Inc 249 Windward Passage Clearwater, FL 33767 Dear Mr. Dame: The Village on Island Estates is an adjacent residential community to your proposed project to expand the Clearwater Marine Aquarium. We are located directly to the North on the opposite side of Windward Passage, the street bounded by the CMA. The CMA expansion project application is scheduled to be reviewed by the Clearwater Community Development Board on May 17, 2011. This letter is written to inform whoever may have an interest in this project that our condominium association board of directors has reviewed your project plans for an expanded aquarium and truly appreciates the efforts set forth by you and your development team. Your efforts to moderate traffic congestion and safety through the alignment of the CMA main entrance drive with the street Larboard Way and the care provided in protecting our community is the significant reason for our support. We endorse and support this project. The project, when completed, will upgrade the appearance of the facility, improve landscaping, better control storm water runoff, improve the existing parking situation and minimize visitor traffic congestion due to increasing attendance within the Island Estates community. We understand this project will also allow the Aquarium to expand its mission of educating the public to preserve our marine environment and the rescue, rehabilitation and release of marine animals, a cause that we embrace. Very truly yours, 3 John Ricci - President The Village on Island Estates Condominium Association, Inc Robert G. Tefft 100 South Myrtle Avenue Clearwater, FL 33756 (727) 562-4539 rbert.tefft(ci),.mvelearwater.com PROFESSIONAL EXPERIENCE ¦ Development Review Manager City of Clearwater, Clearwater, Florida August 2008 to Present Direct Development Review activities for the City. Supervise professional planners, land resource specialists and administrative staff. Conduct performance reviews. Serve as staff to the Community Development Board. ¦ Planner III City of Clearwater, Clearwater, Florida June 2005 to August 2008 Duties include performing the technical review and preparation of staff reports for various land development applications, the organization of data and its display in order to track information and provide status reports, and making presentations to various City Boards and Committees. ¦ Planner II City of Clearwater, Clearwater, Florida May 2005 to June 2005 Duties include performing the technical review and preparation of staff reports for various land development applications, the organization of data and its display in order to track information and provide status reports. ¦ Senior Planner City of Delray Beach, Delray Beach, Florida October 2003 to May 2005 Performed technical review of and prepared staff reports for land development applications such as, but not limited to: site plans, conditional uses, rezoning, land use amendments, and text amendments. Organized data and its display in order to track information and provide status reports. Make presentations to various City Boards. Planner City of Delray Beach, Delray Beach, Florida March 2001 to October 2003 Performed technical review of and prepared staff reports for land development applications such as, but not limited to: site plans, conditional use and text amendments. Organization of data and its display in order to track information and provide status reports. Provided in-depth training to the Assistant Planner position with respect to essential job functions and continuous guidance. Assistant Planner City of Delray Beach, Delray Beach, Florida October 1999 to March 2001 Performed technical review of and prepared staff reports for site plan development applications. Performed reviews of building permit applications. Provided information on land use applications, ordinances, land development regulations, codes, and related planning programs/services to other professionals and the public. EDUCATION Bachelor of Arts, Geography (Urban Studies), University of South Florida, Tampa, Florida 1 SE d Na ?SW PPM o ? z o? ST sKrr=? poi bo(,c $ d q-c ? H!/y pp1S,IT o ? ST DORY PASSAGE o z ? a b PROJECT SITE c > Causeway BNd ? 0 WINDWARD P SAGE 1 ! i i i r i DR bcc?CN WA1ER DR BAYSIDE LOCATION Owners: Clearwater Marine Aquarium, Inc. Case: FLD2011-02006 Site: 249 Windward Passage Property Size: 4.53 Acres PIN: 08-29-15-00000-130-0700 08-29-15-43380-003-0070 Atlas Page: 267B 08-29-15-43380-003-0050 ?? ry 146 ti ?ti9 R 144 1 142 140 138 c y a 136 134 2', 2 NNNj,Q 132QQ ? ON O ry?h , ti 110 h^ ti h ?a o ??c n 100 6^ ti A N 50 P 's?IDR 0 P P ZONING Owners: Clearwater Marine Aquarium, Inc. Case: FLD2011-02006 Site: 249 Windward Passage Property Size: 4.53 Acres PIN: 08-29-15-00000-130-0700 Atlas Page: 267B 08-29-15-43380-003-0070 08-29-15-43380-003-0050 ST BRENDEN 4446 A c m ti n 144 9 6 7 6 ti y? Q?P? a CHURCH 4 2 0 140 tiSR n 1138 q G ??ti 36 ° G 134 9 i ? m -5, c+ + 132 s TEAT 3 "ATT ED 13A5 DW N 94.28 \ 315 S F6 7 SF 42.77 2 XIL S ES 99110 49 . PHASE AW SE CE S A ^ 995,E ? ,39a ? ,3A9 P ?P ry? S m N y 141 OFFICES PHASE 10 100 ^h 9 h `a ,yg ss 160 6^ ti vo lip 96 e WINDWARD ?s ?p9 -------------- 7 tit O ,307 4y so 3 2.25 Acp + q 5 ^y 2 C', RESTAURANT 94.26 a? J s SE ?l ?O p ?V \ EXISTING SURROUNDING USES Owners: Clearwater Marine Aquarium, Inc. Case: FLD201 1-02006 Site: 249 Windward Passage Property Size: 4.53 Acres PIN: 08-29-15-00000-130-0700 Atlas Page: 2678 08-29-15-43380-003-0070 08-29-15-43380-003-0050 } M ! ?/ 1 / a, i, t 1 2 z C.. X• 14 `.• r ` ._ 3 , ..?: .. ,,ate ? ?. ? ? ? ice"' ?`' IG' ? ? `? No N ? •! ?R '.?,,, ??t1x-fir . -.1. r .". r ` 11Mr, /' tt P r r, AERIAL Owners: Clearwater Marine Aquarium, Inc. Case: FLD201 1-02006 Site: 249 Windward Passage Property Size: 4.53 Acres PIN: 08-29-15-00000-130-0700 Atlas Page: 2678 08-29-15-43380-003-0070 08-29-15-43380-003-0050 property development Looking N from subject property across Windward Passage toward existing attached dwellings 249 Windward Passage FLD2011-02006 Looking SE from Windward Passage at subject property Looking SW from Windward Passage at the vacant portion of the subject property Looking E along the waterfront from interior of subject Looking N from subject property toward Marina Way, Windward Passage and surrounding development Looking NW from subject property toward surrounding CLEARWATER LQM!?1??1E??CE BEACH`` OM CE WWW.BfAV{H{HAM•"BFRCOM CLEARWATER'5 TOURISM CHAMBER Promoting Tourism and the Business Community EXECUTIVE OFFICERS 2011 April 12 Paul Andrews , Shel)hatd Beach Resort C.'hau'mon of the Board Brian Kramer Bill Horne Mr lly.ELRegency Resort &Spa . i'iceCha`rman City of Clearwater Anna Aliagn P.O. Box 4748 Clearwater Harbor Realty t S Fl. 33758 Clearwater e re art, , Louis Stavropoulos PubbxSuperinarket RE: Clearwater Marine Aquarium Expansion Project Tommy Duff Dear Mr. Horne Send K.°.? Realty , Past Choi?n)un h Chamber of Commerce is aware of a B t Cl Th Darlene Kole er eac earwa e ' uarium water Marine A Cl a d th t d Chow Af nhx hip . q r e e o expan project propose The project application is scheduled to be reviewed by the CFIAIRAIF,X/DIRECTORS Clearwater Community Development Board on May 17, 2011. Fran Bartlett be Lobster of Bistro Rcstariran! Vc-ekChair ' Our chamber has reviewed the project plans for an expanded en Bob Grifl C.irffi31hFi)dlelloni aquarium and we fully endorse and support this exciting iZ <! v(1r pn ( t r, = n, ) t d (;i;ie?s t Lcomnw,De clo )nc,ttChar. . projec Michele Johnson Sandpeari Beach Resort Special vent. chap The project, when completed, will upgrade the appearance of Joanna Patterson-Rizkallah Hilton Clearwater Beach Resort the facility, improve landscaping, better control storm water `'r t `"'`'"w' ''`;`'`"' and minimize visitor traffic congestion arkin noff add es Crag West SynovusBank g p ru , within Island Estates. This project will also allow the Champ ,. Liur.;rJ.n Aquarium to expand its mission of educating the public to Rosemarie Bonnington i R l i h preserve our marine environment and the rescue, m ea ty Sw ss e Darlene (:agle rehabilitation and release of marine animals. Power "larket Florw Knsti Cheatham rCCiassysre:"' uarium is an important part of the The Clearwater Marine A Martin Cole q `33 )"I rowth of tourism in Clearwater and the Tampa Bay continued Frank lla mc Frank t leanvaterl-larineAquarium g area. We are excited about this project, the new facility and Alan Ebbert Frenchy'sRasranrans the visitors that will surely come. Jean Hagan Sunsets at Pier 60 Daily Festivals Sall lie'3t truly yours Ver Stn)Truct Bank , y Robert Longenecker oIlty trolley linroy Mcghie Sam's Chub Ann Quinn $110wilakeInn Paul Andrews Gaillard St.Clair Chairman of the Board J"'!C: Res(3t}'r(rperties Bob Walter Hilton Clcai?vaie) Beach Resov Eric Waltz Samdpeat. Resort Eddie Wright "rahl)v's Beachwalk liar &, G621 ?? Beach ? as C'a m P0. Box 3573 r Clearwater Beach; F(.. 33767 (727) 447.7600 Fax (727) =443.7812 * U.S. Toll Free 853.799.3199 .a Clearwater. Planning Department 100 South Myrtle Avenue Clearwater, Florida 33756 Telephone: 727-562-4567 Fax: 727-562-4865 ? SUBMIT ORIGINAL SIGNED AND NOTARIZED APPLICATION ? SUBMIT 14 COPIES OF THE ORIGINAL APPLICATION -Plans and application are required to be collated, stapled, and folded into sets ? SUBMIT FIRE PRELIMARY SITE PLAN: $200.00 ? SUBMIT APPLICATION FEE CASE #: RECEIVED BY (staff initials): DATE RECEIVED: * NOTE: 15 TOTAL SETS OF INFORMATION REQUIRED (APPLICATIONS PLUS SITE PLAN SETS) FLEXIBLE DEVELOPMENT APPLICATION Comprehensive Infill Redevelopment Project (Revised 07/11/2008) PLEASE TYPE OR PRINT- A. APPLICANT, PROPERTY OWNER AND AGENT INFORMATION: (Code Section 4-202.A) APPLICANT NAME: MAILING ADDRESS: PHONE NUMBER: CELL NUMBER PROPERTY OWNER(S) List ALL owners on the deed AGENT NAME: Address L Phone AGENT NAME: MAILING ADDRESS: PHONE NUMBER: CELL NUMBER: Clearwater Marine Aquarium, Inc. 249 Windward Passage, Clearwater, FL 33767-2244 727-480-6704 FAX NUMBER: EMAIL: Frankc?tbi ,net Clearwater Marine Aquarium, Inc. I uVG DU1 VGl.LC, 1.V11,1. U.7 V1 UUr1, LLV /L,- Do-Y= 618 Pin_eland Ave, Belleair, FL Northside Engineering Services, Inc. Housl Renee 300 S. Belcher Road, Clearwater, FL 33765 727-443,-2869 FAX NUMBER: Renee 727-235-8475 EMAIL: aee, uEu iero, Senior Project Planner 727-446-8036 Renee@northsideengineering.net B. PROPOSED DEVELOPMENT INFORMATION: (Code Section 4-202.A) PROJECT NAME: Clearwater Marine Aquarium, Inc. PROJECT VALUATION: $ 2,000,000.00 STREET ADDRESS 249 Windward Passage, Clearwater, FL 33767-2244 PARCEL NUMBER(S): 08-29-15-00000-130-0'700;08-29-15-43380-003-0070 and 08-29-15-43380-003-0050 PARCEL SIZE (acres): 4.53 Acres PARCEL SIZE (square feet): 197,167 S F LEGAL DESCRIPTION: See Attached Legal Description PROPOSED USE(S): Indoor Recreation/Entertainment ^ DESCRIPTION OF REQUEST: Specifically identify the request (include number of units or square footage of non-residential use and all requested code deviations; e.g. reduction in required number of parking spaces, specific use, etc.) See Attached Narrative C:\Documents and Settings\derek.ferguson\Desktop\planning dept forms 0708\Comprehensive Infill Project (FLD) 2008 07-11.doc Page 1 of 8 . i DOES THIS APPLICATION INVOLVE THE TRANSFER OF DEVELOPMENT RIGHTS (Tj )R), A PREVIOUSLY APPROVED PLANNED UNIT DEVELOPMENT, OR A PREVIOUSLY APPROVED (CERTIFIED) SITE PLAN? YES _ NO 1° (if yes, attach a copy of the applicable documents) C. PROOF OF OWNERSHIP: (Code Section 4-202.A.5) I$ SUBMIT A COPY OF THE TITLE INSURANCE POLICY, DEED TO THE PROPERTY OR SIGN AFFIDAVIT ATTESTING OWNERSHIP (see page 7) D. ? 1. WRITTEN SUBMITTAL REQUIREMENTS: (Code Section 3-913.A) Provide complete responses to the six (6) GENERAL APPLICABILITY CRITERIA - Explain homer each criteria is achieved, in detail: The proposed development of the land will be in harmony with the scale, bulk, coverage, density and character of adjacent properties in which it is located. See Attached Narrative 2. The proposed development will not hinder or discourage the appropriate development and use of adjacent land and buildings or significantly impair the value thereof. See Attached Narrative 3. The proposed development will not adversely affect the health or safety of persons residing or working in the neighborhood of the proposed use. See Attached Narrative 4. The proposed development is designed to minimize traffic congestion. See Attached Narrative 5. The proposed development is consistent with the community character of the immediate vicinity of the parcel proposed for development. See Attached Narrative 6. The design of the proposed development minimizes adverse effects, including visual, acoustic and olfactory and hours of operation impacts, on adjacent properties. See Attached Narrative C:1Documents and Settingslderek.ferguson\Desktoplplanning dept forms 07081Comprehensive Infill Project (FLD) 2008 07-11.doc Page 2 of 8 WRITTEN SUBMITTAL REQUIREMENTS: (Comprehensive Infill Redeve lopment Project Criteria) ? Provide complete responses to the six (6) COMPREHENSIVE INFILL REDEVELOPMENT PROJECT CRITERIA - Explain how each criteria is achieved, in detail: t. The development or redevelopment is otherwise impractical without deviations from the use and/or development standards set forth in this zoning district. See Attached Narrative 2. The development or redevelopment will be consistent with the goals and policies of the Comprehensive Plan, as well as with the general purpose, intent and basic planning objectives of this Code, and with the intent and purpose of [his zoning district See Attached Narrative 3. The development or redevelopment will not impede the normal and orderly development and improvement of surrounding properties. See Attached Narrative 4. Adjoining properties will not suffer substantial detriment as a result of the proposed development. See Attached Narrative 5. The proposed use shall otherwise be permitted by the underlying future land use category, be compatible with adjacent land uses, will not substantially alter the essential use characteristics of the neighborhood; and shall demonstrate compliance with one or more of the following objectives: a. The proposed use is permitted in this zoning district as a minimum standard, flexible standard or flexible development use; b. The proposed use would be a significant economic contributor to the City's economic base by diversifying the local economy or by creating jobs; c. The development proposal accommodates the expansion or redevelopment of an existing economic contributor; d. The proposed use provides for the provision of affordable housing; e. The proposed use provides for development or redevelopment in an area that is characterized by other similar development and where a land use plan amendment and rezoning would result in a spot land use or zoning designation; or f. The proposed use provides for the development of a new and/or preservation of a working waterfront use. See Attached Narrative 6. Flexibility with regard to use, lot width, required setbacks, height and off-street parking are justified based on demonstrated compliance with all of the following design objectives: a. The proposed development will not impede the normal and orderly development and improvement of the surrounding properties for uses permitted in this zoning district; b. The proposed development complies with applicable design guidelines adopted by the City; G. The design, scale and intensity of the proposed development supports the established or emerging character of an area; d. In order to form a cohesive, visually interesting and attractive appearance, the proposed development incorporates a substantial number of the following design elements: ? Changes in horizontal building planes; ? Use of architectural details such as columns, cornices, stringcourses, pilasters, porticos, balconies, railings, awnings, etc.; ? Variety in materials, colors and textures; ? Distinctive fenestration patterns; ? Building stepbacks; and ? Distinctive roofs forms. e. The proposed development provides for appropriate buffers, enhanced landscape design and appropriate distances between buildings. See Attached Narrative C:\Documents and Setting s\derek.ferguson\Desktop\plannIng dept forms 0708\Comprehensive Infill Project (FLD) 2008 07-11.doc Page 3 of 8 E. STORMWATER PLAN SUBMITTAL REQUIREMENTS: (City of Clearwater Storm Drainage Design Criteria Manual and 4-202.A.21) to A STORMWATER NARRATIVE MUST BE SUBMITTED WITH ALL APPLICATIONS. All applications that involve addition or modification of impervious surface, including buildings, must include a stormwater plan that demonstrates compliance with the City of Clearwater Storm Drainage Design Criteria manual. A reduction in impervious surface area does not qualify as an exemption to this requirement. ? If a plan is not required, the narrative shall provide an explanation as to why the site is exempt. ? At a minimum, the STORMWATER PLAN shall include the following; ? Existing topography extending 50 feet beyond all property lines; ? Proposed grading including finished floor elevations of all structures; ? All adjacent streets and municipal storm systems; ? Proposed stormwater detention/retention area including top of bank, toe of slope and outlet control structure; ? A narrative describing the proposed stormwater control plan including all calculations and data necessary to demonstrate compliance with the City manual. ? Proposed stormwater detention/retention area including top of bank, toe of slope and outlet control structure; ? Signature and seal of Florida Registered Professional Engineer on all plans and calculations. ? COPY OF PERMIT INQUIRY LETTER OR SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT (SWFWMD) PERMIT SUBMITTAL (SWFWMD approval is required prior to issuance of City Building Permit), if applicable ? ACKNOWLEDGEMENT OF STORMWATER PLAN REQUIREMENTS (Applicant must initial one of the following): RMR _ Stormwater plan as noted above is included Stormwater plan is not required and explanation narrative is attached. At a minimum, a grading plan and finished floor elevations shall be provided. CAUTION - IF APPLICATION REVIEW RESULTS IN THE REQUIREMENT FOR A STORMWATER PLAN AND NONE HAS BEEN SUBMITTED, APPLICATION MUST BE RESUBMITTED AND SIGNIFICANT DELAY MAY OCCUR. If you have questions regarding these requirements, contact the City Public Works Administration Engineering Department at (727) 562-4750. F. SUPPLEMENTAL SUBMITTAL REQUIREMENTS: (Code Section 4-202.A) SIGNED AND SEALED SURVEY (including legal description of property) - One original and 14 copies; 1 TREE SURVEY (including existing trees on site and within 25' of the adjacent site, by species, size (DBH 4" or greater), and location, including drip lines and indicating trees to be removed) -please design around the existing trees; ? TREE INVENTORY; prepared by a "certified arborist", of all trees 4" DBH or greater, reflecting size, canopy (drip lines) and condition of such trees; Per Rick Albee at BPRC Tree Inventory Not Required for this Project If LOCATION MAP OF THE PROPERTY; ? PARKING DEMAND STUDY in conjunction with a request to make deviations to the parking standards (ie. Reduce number of spaces). Prior to the submittal of this application, the methodology of such study shall be approved by the Community Development Coordinator and shall be in accordance with accepted traffic engineei`rring principles. The findings of the study will be used in determining whether or not deviations to the parking standards are approved; A LX GRADING PLAN, as applicable; ? PRELIMINARY PLAT, as required (Note: Building permits will not be issued until evidence of recording a final plat is provided); ? COPY OF RECORDED PLAT, as applicable; C:\Documents and Setting s\derek.ferguson\Desktop\planning dept forms 0708\Comprehensive Infill Project (FLD) 2008 07-11.doc Page 4 of 8 G. SITE PLAN SUBMITTAL REQUIREMENTS: (Section 4-202.A) L'S SITE PLAN with the following information (not to exceed 24" x 36"): Index sheet referencing individual sheets included in package; North arrow; Engineering bar scale (minimum scale one inch equals 50 feet), and date prepared; All dimensions; Footprint and size of all EXISTING buildings and structures; Footprint and size of all PROPOSED buildings and structures; All required setbacks; All existing and proposed points of access; All required sight triangles; Identification of environmentally unique areas, such as watercourses, wetlands, tree masses, and specimen trees, including _ description and location of understory, ground cover vegetation and wildlife habitats, etc; Location of all public and private easements; Location of all street rights-of-way within and adjacent to the site; Location of existing public and private utilities, including fire hydrants, storm and sanitary sewer lines, manholes and lift stations, gas _ and water lines; All parking spaces, driveways, loading areas and vehicular use areas; Depiction by shading or crosshatching of all required parking lot interior landscaped areas; Location of all solid waste containers, recycling or trash handling areas and outside mechanical equipment and all required screening _ (per Section 3-201(D)(i) and Index #7011; Location of all landscape material; Location of all onsite and offsite storm-water management facilities; Location of all outdoor lighting fixtures; Location of all existing and proposed sidewalks; and Floor plan typicals of buildings for all Level Two approvals. A floor plan of each floor is required for any parking garage requiring a Level Two approval. IX SITE DATA TABLE for existing, required, and proposed development, in written/tabular form: Land area in square feet and acres; Number of EXISTING dwelling units; Number of PROPOSED dwelling units; Gross floor area devoted to each use; Parking spaces: total number, presented in tabular form with the number of required spaces; Total paved area, including all paved parking spaces & driveways, expressed in square feet & percentage of the paved vehicular area; Official records book and page numbers of all existing utility easement; Building and structure heights; Impermeable surface ratio (I.S.R.); and Floor area ratio (F.A.R.) for all nonresidential uses. EXISTING REQUIRED PROPOSED See Site Data Table on Civil Plan Sets a REDUCED COLOR SITE PLAN to scale (8% X 11); Of FOR DEVELOPMENTS OVER ONE ACRE, provide the following additional information on site plan: One-foot contours or spot elevations on site; Offssite elevations if required to evaluate the proposed stormwater management for the parcel; All open space areas; Location of all earth or water retaining walls and earth berms; Lot lines and building lines (dimensioned); Streets and drives (dimensioned); Building and structural setbacks (dimensioned); Structural overhangs; C:\Documents and Settings\derek.ferguson\Desktop\pIanning dept forms 0708\Comprehensive Infill Project (FLD) 2008 07-11.doc Page 5 of 8 H. LANDSCAPING PLAN SUBMITTAL REQUIREMENTS: (Section 4-1102.A) C9 LANDSCAPE PLAN with the following information (not to exceed 24" x 36"): All existing and proposed structures; Names of abutting streets; Drainage and retention areas including swales, side slopes and bottom elevations; Delineation and dimensions of all required perimeter landscape buffers; Sight visibility triangles; Delineation and dimensions of all parking areas including landscaping islands and curbing; Existing trees on-site and immediately adjacent to the site, by species, size and lucati,ons, including driplines (as indicated on required _ tree survey); Location, size, and quantities of all existing and proposed landscape materials, in0c: ted by a key relating to the plant schedule; Plant schedule with a key (symbol or label) indicating the size, description, specifications, quantities, and spacing requirements of all existing and proposed landscape materials, including botanical and common names; Typical planfing details for trees, palms, shrubs and ground cover plants including Instructions, soil mixes, backfilling, mulching and _ protective measures; Interior landscaping areas hatched and/or shaded and labeled and interior landscape coverage, expressing in both square feet and percentage covered; Conditions of a previous development approval (e.g. conditions imposed by the Community Development Board); Irrigation notes. ? REDUCED COLOR LANDSCAPE PLAN to scale (8 %X 11); (a COMPREHENSIVE LANDSCAPE PROGRAM application, as applicable. Landscape associated with the Comprehensive Landscape Program shall exceed minimum Code requirements to offset the areas where minimum Code will not be met. 1. BUILDING ELEVATION PLAN SUBMITTAL REQUIREMENTS: (Section 4-202.A.23) Of BUILDING ELEVATION DRAWINGS -with the following information: All sides of all buildings Dimensioned Colors (provide one full sized set of colored elevations) Materials .M REDUCED BUILDING ELEVATIONS - same as above to scale on 8 Y2 X 11 J. SIGNAGE: (Division 19. SIGNS / Section 3-1806) Not a Part of this Application and Request ? All EXISTING freestanding and attached signs; Provide photographs and dimensions (area, height, etc.), indicate whether they will be removed orto remain. ? All PROPOSED freestanding and attached signs; Provide details including location, size, height, colors, materials and drawing; freestanding signs shall include the street address (numerals) ? Comprehensive Sign Program application, as applicable (separate application and fee required). ? Reduced signage proposal (8 V2 X 11) (color), if submitting Comprehensive Sign Program application. C:\Documents and Setting s\derek.ferguson\Desktop\planning dept forms 0708\Comprehensive Infill Project (FLD) 2008 07-11.d0c Page 6 of 8 K. TRAFFIC IMPACT STUDY: (Section 4-202.A.13 and 4-801.C) (Y Include if required by the Traffic Operations Manager or his/her designee or if the proposed development: Will degrade the acceptable level of service for any roadway as adopted in the Comprehensive Plan. ¦ Will generate 100 or more new vehicle directional trips per hour and/or 1000 or more new vehicle trips per day. ¦ Will affect a nearby roadway segment and/or intersection with five (5) reportable accidents within the prior twelve (12) month period or that is on the City's annual list of most hazardous intersections. Trip generation shall be based on the most recent edition of the Institute of Transportation Engineer's (ITE) Trip General Manual. The Traffic Impact Study must be prepared in accordance with a "Scoping Meeting" held with the Traffic Operations Manager and the Planning Department's Development Review Manager or their designee (727-562-4750) Refer to Section 4-801 C of the Community Development Code for exceptions to this requirement. ? Acknowledgement of traffic impact study requirements (Applicant must initial one of the following): RMR Traffic Impact Study is included. The study must include a summary table of pre- and post-development levels of service for all roadway legs and each turning movement at all intersections identified in the Scoping Meeting. Traffic Impact Study is not required. CAUTION - IF APPLICATION REVIEW RESULTS IN THE REQUIREMENT FOR A TRAFFIC IMPACT STUDY AND NONE HAS BEEN SUBMITTED, APPLICATION MUST BE RESUBMITTED AND SIGNIFICANT DELAY MAY OCCUR. If you have questions regarding these requirements, contact the City Public Works Administration Engineering Department at (727) 562- 4750. L. FIRE FLOW CALCULATIONS/ WATER STUDY: Provide Fire Flow Calculations. Water Study by a FIRE PROTECTION ENGINEER to assure an adequate water supply is available and to determine if any upgrades are required by the developer due to the impact: of this project. The water supply must be able to support the needs of any required fire sprinkler, standpipe and/or fire pump. If a fire pump is required the water supply must be able to supply 150% of its rated capacity. Compliance with the 2004 Florida Fire Prevention Code to include NFPA 13, MFPA 14, NFPA 20, NFPA 291, and MFPA 1142 (Annex H) is required. ? Acknowledgement of fire flow calculationstwater study requirements (Applicant must initial one of the following): Fire Flow Calculations/Water Study is included. MR Fire Flow Calculations/Water Study is not required. N/A per Meeting with Fire (Chief Rickard and Insp R CAUTION - IF APPLICATION REVIEW RESULTS IN THE REQUIREMENT FOR A FIRE FLOW CALCULATIONS/ WATER STUDY AND NONE HAS BEEN SUBMITTED, APPLICATION MUST BE RESUBMITTED AND SIGNIFICANT DELAY MAY OCCUR. If you have questions regarding these requirements, contact the City Fire Prevention Department at (727) 562-4334. M. SIGNATURE: I, the undersigned, acknowledge that all representations made STATE OF FLORIDA, COUNTY OF PIN in this application are true and accurate to the best of my E Sworn to and subscribed before me this day of knowledge and authorize City representatives to visit and =' R J2 rz? , A.D. 20 to me and/or by photograph the property described in this application. fjPV i-11 IL- who is erson onman-has produced as tde tification. Signature of property owner or representative Not` public, ry? My commission expires: C:\Documents and Setting s\derek.ferguson\Desktop\planning dept forms 0708\Comprehensive Infill Project (FLD) 2008 07-11.doc Page 7 of 8 L,]Es?.IR'1?.1 Vt4IC . Uy COMMMOtt A pD8J3S36 g p)S: LSnogev If. 101[2 I.K?61 'ALY 14.11ewy bkw* t r Cr er N. AFFIDAVIT TO AUTHORIZE AGENT: 1. Provide names of all property owners on deed - PRINT full names: Clearwater Marine Aquarium, Inc. 2. That (I am/we are) the owner(s) and record title holder(s) of the following described property (address or general location): 249 Windward Passage, Clearwater, FL, 1 That this property constitutes the property for which a request for a: (describe request) Comprehensive Infill Redevelopment Application associated with redevelopment of the Clearwater Marine Aquarium 4. That the undersigned (has/have) appointed and (does/do) appoint: Joe Burdette, Consus Group, LLC Roush Ghovaee and Renee Ruggiero, Northside Engineering Services, Inc. as (his/their) agent(s) to execute any petitions or other documents necessary to affect such petition; 5. That this affidavit has been executed to induce the City of Clearwater, Florida to consider and act on the above described property; 6. That site visits to the property are necessary by City representatives in order to process this application and the owner authorizes City representatives to visit and photograph the property described in this application; 7. That (1/we), the undersigned authority, hereby certify that the foregoing is true and correct. perty Owner Property Owner Property Owner Property Owner STATE OF FLORIDA, COUNTY OF PINELLAS Before me the undersigned, an officer duly commissioned by the laws of the State of Florida, on this day of G UJ b r'?f personally appeared Qhj who having been first duly sworn Deposes and says that he/she fully understands the contents of the affidavit that he/she signed. - --- = Mw- & pt, Notary P?ubliiq Signat re Notary Seal/Stamp My Commission Expire s: C:1Documents and Settingslderek.ferguson\Desktoplplanning dept forms 07085Comprehensive Infill Project (FLD) 2008 07-11.doc Page 8 of 8 LETTER OF AUTHORIZATION This letter will serve as authorization for Housh Ghovaee (agent Name) with Northside Engineering Services, Inc. to act as an agent for Clearwater Marine Aquarium Inc. (Property Owner's Name) And to execute any and all documents related to securing permits and approvals for the construction on the property generally located at 249 Windward Passage, Clearwater, FL. 33767-2244 (Property Location) Signature of Property Owner '2-VV ?,4K-CAeC Address of Property Owner City/State/Zip Code ? . DA, cam Print Name of Property Owner Title z, --Y - v Lr / -1-7 q o Telephone Number State of _ County of (?J ?JxaAr The foregoing instrument was acknowledge before me this _ E_ day of ;,EiM t , 20-_Lt, by 6E X V4-1-1/4' 1. 1,11-4 , as C ?VP who is personally known to me or who has produced as identification and who did (did not) take an oath. nr+r4ro?+o?o , _ MIY M0WsF" . -A D ,?f- Notary Public ?"? MsMDOU+IbW IL mu (S nature) Commission # -/):D F3 3 (SEAL ABOVE) 1 i L F YJQUP-(Name of Notary Typed, Printed or Stamped) ' OMdww...,l....a. ... - w w . w .rat pia.., uu,r,r ..w q dal .ttaa.tt?, at (ems . ''r'• F?4 Y ?''TT-'' (3 .`,v i g 0.li.61719po 709 CITY Or C.LEARWATER 4 r DEED OF d?NYEYANCE , rr?p° 11t•? M-.TF OF FLORIDA SO Id^ r Lfa MUNI-? OF PINELLAS J Jr t.• THIS INDRNTURke made the t2I'll day of September Pt. D. 19 g6? }}•,,? w tit CC Y O ,g pFp1 CIRILLt a ntut ict aJ for ration, rty of the first a an '?CLP.A1tVltn'vfl RA WL EC?[IMW(:?t.R;'}_ a 'J. not. ur ? p ?fnrl Ills of the ct unct rn i3 ,t1' , ` ` t e •tt t?, fi whox msflinb nddrr is Is. and3taT? 9TFIo``Ckd'1-7TgWRfts ° r"E'SY;nr'I , M ?.. rat' WW1 SETH, That the party of the flr,r pact, for and in considcrtuon of the sum of Daum and other good sod valuable t.•t:nsld.rtat!on to it in hand paid by said part.`! of site second part, at or before the eastaling;md delivery of chase presence, the receipt wheieaf is Iteroby Scknowledged.bas Imur• 45'k, ? h.71.tnld. couvaycl, anti conRrmr?' unto the said pan _,_ of rite second pres. and to t - F - "'jjt?n'dd s rn fo:ecea ill rl.t following ppiietc. pace!. lot or rracr of lami, situate, lying and being in the County of PmeDas and Stara of Florida,, and dcictibed as follotvs, to•witt See Fxn± li.i t h n t•taL-h•: d hov-t•o and mnrle I p;wt hrr:tol. Ot Gash SI $QScLt, to the rrat'ricti.yut: rtnrl liraiLrtti(,nn wr` 10- 01 in I;Yhib>lt 11. v st7 Rec t ty DS t yep IdSEEF ?:f01 _:k?.•`JSl: ? " ."Ai ?!.S??''ell'. TOGMER WrrH Al and stn•ntlar the tenerttoutt., Its:?tlitamanis and ap mrtrnut s thdreuuto belonging e: appertaining; amd v ,.cry right, titre or !merest, legal ur e quit rble, of the Z party .-.i tnt rim pc•r of. in and to the same. oucr:trasrurs Tt) HAVE ANP TO HUIJ'e dv! ante unto the sail part V of the tecond part. _d' -)09 and ass gns• to ;-,a _......,_ ntc•t p: rpr» cur, henef t and k,ehuof forerer. e IN WITNESS M-4,111101 , rhr odd party of ch,• i?rrL par, hi- roused these preierts to be cm-cuttd in its name by its City ht.,ror?er, Ci;%.Clerk, counters'.,,-ned by iti Mayor Commissioner, and apnnnvd as to form and cormcrrm;e by itt City Atf.ytno%,. and Ira corporate seal to he hereunto artached. the da.• and year first abut,: wt!Iten. n CITY OFF IA:A a•I Ett. Ft.t :v `t weer Coan ?? is t. / . ?,` • L?f - ? a ' `City C eth - Apprneed m t9 rnrit a. ,Vcorme:ne. ' Tr Airnmcv ' f STA'L'E OP FLOI' lie COUNTY OF PINFLI AS _ tr t l.' n 1 HEREBY CERTIFY. that on this --1 ' a• ut. mart ,A4 •+I Al U. 19 Jilt. 1 einn we ` ' " t -t persona!lrlrncamd.!.. 11?" _•c1`?]Lt-- ' r A. A_ t7t•lb. Jt. J1?, C'?tst: ?,i t ,. al' 1 r . ! OFF Ghl• 6pll ,111G KAIA.l•.tf1' "_ ?.. rt, ec:n•• .-_ p •Ie city Manager, r:rt .:1r., rrt:}. Clsv Clerk and Ma .et Cum,nisi u.:de of i:re City of (c.lnvau•:, ., :ntuttapal mil orarion visvrat ttm&-r :Ac lasts of ilte State of Florda. to n:r l.ntnt•n to be the inditiduab and nr.;trn described m ad stho cxect;-rj rite ':,rd• / going conveyance, and `cvtj 4:: iciattrvlcdeed the executinn ,heti-nf t?, be their frre •t,:.,nd dzel as sarh t l ricers dtcrunto dull auc;atuedt ind that thr official -cal of said mimic-pal comur.trtrtn is du!q jC t. d thereto. and theiiid -: tw:,vantr t.• :he act and deed t.l'a.ud carpowtinn. \VMESS mt slgn:.ru•e and official sea) at C:Ic arwatrr in the Count% of Ptncllas .utd Slatr of Flonda cite day and year last ebuvr ttrylnrlt. . / _ / f• •,/f ?-` fit ` r . = r IL i t' Vuwn Pu f[ 7LdCd,)t Ufl a it L,rrrr• CummLsiur rxpl?es: t t`'. tBtay pit uc. Stara III Reich {{ ! ! r .. , • : !Ir (04111tiniO41ryres }'M 18. IM • I? .f? TT r.• r lti , le ? Jr l ;Lfv ,l fa. 1 n } ICI N e o.R.63i9 p4GL 800 LEGAL PH6CR1P'TION Fro:'i this SouthweeLorly corner rf Tract. A or Unit 2, Island Estatto of Clar,ruatar ll;int Rook 41, pa,jes 19A and 20, Pui,lic Rccorue of Finollas County, Florida), + •. run N 49'23'41" Iv, along thei Northc•xly right-of-way line of Cinarwatur Chuse%.ay, 57!x.00 fens. for a Point or BPginningl thence continue N 49°::3'41" W, along sr,me lire, 482.06 feut; thonce run S 40°36' 19" W, 147.5x1 feet, along Inn, outor Faces of a aeawali; thence j 44.25 teat along a curve to the left, nlony? said race, mwim, 60.90 rocet, internal nngln 90 00100"; ther,rn? 1942PAI" 3':, 352.00 feet along said fcice; then-v 94.:6 fact along a curv,i to the left, 010119 vald L•aco, Radio,; 60-011 feet, internxi anula 70°00'00"; thenc•c N 43"3f,-19' E:, 147.50 ioeL Lo Hie point oL Nec.tnning. surmf:c:P 'i'lk restrict.iom; and limitations srt torch in Exhibit r... p 36 . 3 1 , .r 5:y 6 i r HXHIRIT A f` y, J a' i 8K&T9ICTIQN$.AND LtMITAT?Qt19 SUBJEM TO THS FOLLOWING: 0.9.?1.9racC ' ?. Thr. pnrry.of the second part: unit its Auccemsoin and aauiy1 na shall devote th, use cA the hinds c:,snvnyod hernLn solely to trio axiuntsi!on of-the Clasrw,10t Marina Science Center, facility, and if any.pol lion t.I Lne,l:inds c )hveyed horain should nv[•r by uevey for ar,y. purpoaa otlier•thnn a Mnrino Sc,inuau Center, not for profit, the title of said lnnda uha3.1 automat.icitily revert to thr..:ity al, Clearwater, subject to, any 11pnu. or encumbrancaa tl- r-qon. Ti,.- City of ClearKaLOX shall hdve t%v i,pti.on tv uptisly,pi y 3Lvnn and runcuinbrances Cr, said lands, but not the obligation to do so. ALSO tlurlJrn- wi 'am VOLLOWING: No th&v thin Iutrty of the accond. rmrt nbr its Nuuocnnora o,-. as,tlgnu sbal,l at:er rcxrlt t,hr property to be (incuadberrd by tiny murlgeg.a Tian or other l :dti os l Lens foc any %iotint exeued i rig, i n ten h(IgrrgaLn, $G0U,0U0,00 of any one =1tum, rind LUD hroviwan shu11_ bu'a eovonant runnli:g with the. land, tn.: hr•rach of ;which Shull ronult in 7 tev-rnlun of the gro}r iAy to'tlie City or Cleatwatur frev and cl•n,tr of nil l trills and ancyiubl,inaan oxcept for n mvr.tgagU..laan at llonn s s•'Lha"t,ggYronta, principal.amov:t or $60U,000.00 or insa. Thls covoitthF shall axpird upon.thr Cl;nrwatux Mayins Sciences obt•nininq i constructaun loan for thr p;,r_lcie oC consuptm.-tting the, rpnpanainn plans of thtl C1,:?list? PIarino Scitncu Centar. 3UBJBC'r TO. a)1 covenant t; and x'^atrircions or record, inclcrl.rq nm ennorient_ dmod in ravor of 11 ,rids Power Corpo••!•ian.as rg6ordud'on July 12, 1984, An otfiviiil Pocar•rt iion;c .tit1U 1, pauiv 1016, ut the Public Records of -r:.irl IaH CounL11, vioriria. I 1 i t 6XULDYT H i8 M 0.L63i9ffiGL $M 1? Y 1 r , ffr ALSO 6U8JMIT 1'o a nun=nxclusive ansaiwnt which is rotained by the Grantor ow•r thv following drus:rih,-rl prcgmrty for aidewalk, draluage, utilities and ar_"eea6, And for the parking of not mare than' twenty-two (22) motor ehicl.est From the Suuthwesatarly corner of Tract A of Unit'2, Island bstatMa ur Clearwater (Plat Book 47, pngah 19A and 20, Public Rracords of Pinellas County, PLorida) run N 49" 23141" W ilonq•the North•:rly right-oC-way ltne of rlenrwAtor Caureway, 575.00 feet Cur a Point 'of Beginning 111 thence rontinow N 49°23'41" W along :tame line, 482.00 taut; thence run 8 40°36'19"W, 147,f50 funk along the outer face or a ssawnil; thence run 94.21) feet along A curve to the left, :Meng sai.1 face, Radius 60.00 Fuet, inturnnl nngle 90°(10'00°; thonver run S 49°23'41" E, 767.00 fact along sa W Cacr,•; thcnre run 94.26 foot along a curve to. thri ,aft, along-said fuse, Radius 60.,"t7!',"Poet, internnl Angle 90`00100"; thcav.%, rut. N 40°36' 19" 1;, 747.50 feEY. to the Point of ltrginain.g ?I; LESS AND M-EPT the fallowing doacrii*d t: not s From the said Southwesterly turner of Tract: A 44l inLr. 2, Jaland Lntatca of Cluarwutcr, run N 49°23'41" W along thu Northerly right-of-wny lino of Clearwatr.r Gnu0away, 575.00 Font; thence, conkinuo N 49° 23'41" W, along slime ltno, 61.50. feet; thoin,•e run ti 40° 36' 19" W, ;19_00 feet for a Point a Putlinning 42; thence run it 49°23'41" W, 206.00 foal.; th?sucu rust U 37°45'38" 1ti, 4.28 Coe'-; r.han,:n run 4 52°14'22" W, 16..73 f'nnt. thence rur. N 11645' 33" 1:, 10.12 foot; '-nt:n.n- run K 47°2.1'41" W. 139.00 fart; thence run 5 40°ib'19" W, 131).50 routs thence run A 45'23141" 3, 28.25 Cout-I ?honot: tun IF 40°36'19" W, 35.50 lvc:r.; thence run. S 49°23''41" F;, 303.50 fer't1 thnnee run N 41)"yb'i9" 1:, 36.50 feet; thenrtr run 494213'41" 1:, 30.01) f-sat ; thonco ruts N 40" 36' 19" L•', 134. 70 lure' to .the, Point or 11t.ginntng 027 TOO 'THt.,t WITH tbo right to ati.nch pf,•rs Anti dockv to the r:enwrtli. end mnintoin tht• V)or% Ord Jae:lt:t. Thu re,..t?-,:r provision Cot, fol Lh 31xj-.%- ha. bp.-ji Irv] Mod as reyuircd by Charter 86•-345, l.itwn of Flori6a, Si,KCiat Acts o' 1986, and is binding upon rho •snrty L,F ?h•i :iccond part and ita suevi=nn,tra and anniana. F?i11TgIT Ll -2 Y .. L. SW'1y Cor. Traci A UAIt• 8 111004 Patcta$. 7 X01 _tknrvot?r +i ¦"'?+? ¦_ p in 4.r x .?v N.409M'19`E 147.60' ! NOTE This it ow a ivy! 1 ( ?p 3j i W 1 n 1 to i P aa.631.9 ? ` 4SGUO' A-94.P6' 4440°00'00` M.40038' 19"E sy o; •A„? d N i PC G{ ¦ Rai vY ?. yr . M ? N a Qt 0 Y1 0 M O M W 4t' 4 v ? R NI B, v = d :+• uai ? w • R _ a M a Maalkq WAY ?l z " ae4o°a "1 , i n a aya_a r w Z ;n 40° 36' 19"W 135.50' A¦80.0fi A-Ooood 8 40936' 19'W 147.50' NOVO. 4/28/60 DIZ--29-t5 - `j30?6 0-0o3- 'I•a\ ID Numb cr or Folio Nunilvr of Propeny: 08-29-1543380-003-0060 Grantee's Social Security Number or 'l'ax ID Number 23-7242598 / Pmr,&rad by and AFIl'sR MCORDING RETURN TO. Pou'cll, Camq'. Heys S: Sih•crsteirl P.\ Poat o1Gcc Box 1689 •.-----?Sr Petcnburs. Florida 33731.1689 -V6e 99-143738 MAY- 3-1999 12;09pn PINELLAS CO SK 10500 PO 335 1 1 It 11 _ 11 / • ? n r 1 SPECIAL WARRANTY DEED ` y NATIONSBANK, N.A., a national banking association, success6r`4y mergef f o BARNETT -BANK, N.A., successor by merger to BARNETT BANK OF PINELLAS bOUNT'Y ("Grantor") .--...-whose address is 100 North Tampa Street, Suite 1700, FL1-007-17-04, Tampa, -Florida 33602, for ---and in consideration of the sum of TEN AND NO/100 D&LARS ($10.00) paid to Grantor and `!40oother good and valuable consideration, the receipt and suflicieney of which al'e hereby acknowledged, `? has GRANTED, SOLD and CONVEYED and does hereby Gk1A'NTs'9ELL and CONVEY unto .- CLEARWATER MARINE AQUARIUM, INC., a Floridaf ;oi;for, profit corporation ("Grantee") whose address is 249 Windward Passage, Clea6lvw r, FloYida 33767, in fee simple, that certain land located in Pinellas County, Florida, being, msre,pMi1uulatjy,described in Exhibit A, attached hereto and incorporated herein by reference, tdgE'ther with'aIl'inip'rovements, if any, located on such land ? (such land and improvements being coll4ctively rdfdrred'to as the "Property'). This conveyance is matte ancl'acceRted subject to all matters (tile "Permitted Exceptions") (?(1 set forth in Exhibit B, attached"hereto\anUincorporated herein by reference. TO HAVE AND TO 14OLD the Property, together with all and singular the rights and appurtenances perwin(ng Orarefo including all of Grantor's right, title and interest in and to adjacent streets, alleys and ri?hts;of--way, subject to the Permitted Exceptions, unto Grantee and Grantee's heirs, success6J5 -qd as§igns forever. And Grantor hereby covenants with Grantee that, except as above noted; that at t? ihji) of the deliveryofthis Special Warranty Deed the Property was free from all encumbrances map$ by it and that Grantor will warrant and defend the same against the lawful clairrisanddnmandsbfall persons claiming by, through or under Grantor, but against none other. ' - -Exempt for the limited warranty of title, GRANTEE ACKNOWLEDGES THAT GRANTOR PIAS MOTf,0,DE, DOES NOT MAKE AND SPECIFICALLY NEGATES AND DISCLAIMS \\'ANYREPRESENTATIONS, WARRANTIES, PROMISES, COVENANTS, AGREEMENTS OR GUARANTIES OF ANY KIND OR CHARACTER WHATSOEVER, WHETHER EXPRESS OR IMPLIED, ORAL OR WRITTEN, PAST, PRESENT OR FUTURE, OF, AS TO CONCERNING :_,OR WITH RESPECT TO (A) THE VALUE, NATURE, QUALITY OR CONDITION OF THE PROPERTY, INCLUDING, WITHOUT LIMITATION, THE WATER, SOIL AND GEOLOGY, (B) THE INCOME TO BE DERIVEDFROM THE PROPERTY, (C) THE SUITABILITY OFTHE lAMTM 8103%DCC CMA 003 wpd Special Warranty Deed PINELLAS COUNTY FLR OFF.REC.BK 10500 PG 336 PROPERTY FOR ANY AND ALL ACTIVITIES AND USES WHICH GRANTEE MAY CONDUCT THEREON, (D) THE COMPLIANCE OF OR BY THE PROPERTY OR ITS ' OPERATION WITH ANY LAWS, RULES, ORDINANCES OR REGULATIONS OF ANY APPLICABLE GOVERNMENTAL AUTHORITY OR BODY, (E) THE HABITABILITY;--2,, MERCHANTABILITY, MARKETABILITY, PROFITABILITY OR FITNESS FOR -.A - - - - PARTICULAR PURPOSE OF THE PROPERTY, (F) THE MANNER OR QUALITY OF,-THE` CONSTRUCTION OR MATERIALS, IF ANY, INCORPORATED INTO THE PROPERT/Y"' (G) THE MANNER, QUALITY, STATE OF REPAIR OR LACK OF REPAIR 01''IA PROPERTY, OR (H) ANY OTHER MATTER WITH RESPECT TO THE PR16PERj`Y,'Ai4Q SPECIFICALLY, THAT GRANTOR HAS NOT MADE, DOES NO?, MAK13 ",A1?D' SPECIFICALLYDISCLAIMS ANYREPRESENTATIONS REGARDING COMkIANCE WITH ANY ENVIRONMENTAL PROTECTION, POLLUTION OR LAtn IISE,`,ZONING'AND DEVELOPMENT OF REGIONAL IMPACT LAWS, RULES, REGULATIONS, ORDERS OR REQUIREMENTS, INCLUDING THE DISPOSAL OR EXISTENCE, 1N, bR ON THE PROPERTY, OF ANY HAZARDOUS MATERIALS, WASTES OR'SfJBSTAI tES DEFINED IN ANY FEDERAL, STATE OR LOCAL LAWS OR ANY OTHER SPECIALLY REGULATED MATERIALS INCLUDING, BUT NOT LIMITED TO, ASBESTOS, PETROLEUM PRODUCTS, POLYCHLORINATED BIPHENYL, OR RADON GAS, EXCEPT THE WARRANTY OF TITLE EXPRESSLY SET FORTH HEREIN. GRAN TEV,'FUgTHEkACKNOWLEDGES THAT TO THE MAXIMUM EXTENT PERMITTED BY LAS ,",M# SAIL O'F THE PROPERTY IS MADE ON AN "AS IS" CONDITION AND BAS15&,WITH ,&L,?,VX_U1TS. By acceptance of this Special?Warranty bP?4 `orantee agrees to and accepts all of the forgoing matters. EXECUTED on the date set,ioi t? 'tn-the acknowledgment attached hereto to be effective as of the 36_`-'' day of April, 1949.; \ - - Signed, scaled and deliv?tcd'iri fhc presence of: NationsBank, N.A., a national banking l association, successor by merger to Barnett Bank, N.A., successor by merger to Barnett Bank of (Signatur,P-of-Witness), Pinellas County Chrisdhere\nn6w 1, Jr. , Jr\ (? (Print NName of Witness) ` By: ` . Gerald P. Ademy ?`.y?(>L?"s Jl:i.c C?? Senior Vice President js5Xatitre,of Witness) ShaPna -E: Taylor (CORPORATE SEA_.) (pint Name of Witness) v Address: 100 North Tampa Street, Suite 1700 FL1-007-17-04 Tampa, Florida 33602 LAM` A B103MOC.CMA.003.wpd Special Warranty Deed 2 ='?:j s bi':` / f 1 11 STATE OF FLORIDA 11 11 ) COUNTY OF HILLSBOROUGH The foregoing instrument was acknowledged before me on the 28th day of April, 1999, by Gerald P. Ademy as Senior Vice President of NATIONSBANK, N.A., a national banking association, successor by merger to Barnett Bank, N.A., successor by merger to Barnett-BaOk,of. \, Pinellas County, on behalf of the association. He M is personally known to me or ? teas produced, as identification. SNARISUZANNE MRITTON MYCOMMMONIcc808058 EXPIR Name: Shari (Suzanne A Vritton ES: Febmary10, 2003 •??( tj,. aanlMdilwNoWryPubGcUnJarnlilen NOTARYPUBLIC, State of Flo?Lda,' Serial Number (if any) CG $ D My Commission Expires: 2110/03 1 1 lAM'U:W BM91D0C.CMA.003,wpd Special Wananly Deed i } d tai .- EXHIBIT A 1 \ LAND - - \ Lots 6, 7 and 8, Block C, UNIT 5 ISLAND ESTATES OF CLEARWATER,_; \\ according to the map or plat thereof as recorded in Plat Book 51, Page 34,bf the '\\\\ \\\;> Public Records of Pinellas County Florida. \ I I 1 , \ 1 I \ / \\ \\ \ \ I I / I 1 1 tAM'U:W B\03M0C.CMA.003.wpd Special Warranty Deed + 1 r'f III ?`+ .. '? ? ??,f1 1`t IS a ? / flnS Il 1? i ,, f - , V 7?, ?5Y P INELLPS COUNTY FL13. OFF.REC.BK 10500 PG 339 EXHIBIT B PERMITTED EXCEPTIONS TO DEED - - - - 1. Rights of parties in possession, if any. 2. Governmental rights of police power or eminent domain unless notice of theoxeFcise o?quW, rights appears in the public records as of the date hereof, and the consequenFes of any,lkw, ordinance or governmental regulation including, but not limited tq,..builc Ag and zoning ordinances. 3. Defects, liens, encumbrances, adverse claims or other matters 1) lot; known;tq the Grantor and not shown by the public records but known to the Grantee as o\ftlie datifl ereof and not disclosed in writing by the Grantee to the Grantor prior to the date hereof, 2) resulting in no loss or damage to the Grantee; or 3) attaching or cteated subsequent to the effective date hereof. ' 4. Visible and apparent easements and all underground ?3??em?nts; if any, the existence of which may arise by unrecorded grant or by use ; \ 5. Any and all unrecorded leases, if arty, and rights,of parties therein. d. Taxes and assessments forj1n:,yea1'pfclosjng and subsequent years. T All valid and enforceable covenants, liens, encumbrances, defects, easements and other matters, if any, os,show n,6orthe public record. 8. All matter which wdul&h' isclosed by an accurate survey performed as of the date of this Deed. i lAM'U:W B1039\DCC,CMA.003.wpd Special Warranty Deed 77 rr I#: 2010338511 BK: 17103 PG: 1760, 12/02/2010 at 04:41 PM, RECORDING 2 PAGES $18.50 D DOC STAMP COLLECTION $21700.00 KEN BURKE, CLERK OF COURT PINELLAS COUNTY, FL BY DEPUTY CLERK: CLKDMC9 ?: ;igsD 'x,71/bra PREPARED BY AND RETURN TO: THOMAS C. NASH, II, Esquire Macfarlane Ferguson & McMullen 625 Court Street, Suite 200 Post Office Box 1669 (33757) Clearwater, Florida 33756 WARRANTY DEED v .A THIS INDENTURE made this _ _Jak day of December, 2010, by and between HARBOUR ESTATES, L.L.C., a Florida limited liability company, of the County of Pinellas, in the State, bf - Florida, Party of the First Part, whose mailing address is 219 Windward Passage, Clearwater, FL 3'3167, and CLEARWATER MARINE AQUARIUM, INC., a Florida not for profit corporation of lhe' - County of Pinellas, in the State of Florida, Party of the Second Part, whose mailing address is 249 Windward Passage, Clearwater, FL 33767. WITNESSETH: That the said Party of the First Part, for and in consideration df the ku' i ol;Ten Dollars ($10.00) to them in hand paid by the said Party of the Second Part, t$e;receipt whi ?i;of Is hereby acknowledged, has granted, bargained and sold to the said Party of the,?ecoiM RiLrt, their lieirs and assigns forever, the following described land, situate lying and being'4fthe County of Pinellas, State of Florida, to-wit: PARCEL I: The East 60 feet of Lot 6, *6& CfbLAN>3 VSTATES OF CLEARWATER, UNIT FIVE,.Bfcording to the map or plat thereof recorded in Plat B9ek 51,4I 4e,34, of the Public Recprdi of Pinellas County, Florida.,','' ` TOGETHER V0+1ta the non&-ekclusive easement created by Reciprocal?Easements and,,*mtenance Agreement recorded in Official Records$odk 14343, Page 2050, and re-recorded in O.R. Boolt 14371,T-a& 1733, and re-recorded in O.R. Book 14381, Page IaJ6 of the Irubiie Records of Pinellas County, Florida. PA11 C L IIr `The West/50 feet of Lots one (1) and four (4) and all of Lot 5, Block C, `IS''LA34)3'ESTATES OF CLEARWATER, UNIT FIVE, according to the Prat thereof, recorded in Plat Book 51, Pale 34, of the Public Records of Pinellas County, Florida. Subject to 2011 real estate taxes, restrictions, reservations and easements of record. Parcel I.D. No. 08/29/15/43380/003/0050 PINFLLAS COUNTY FL OFF. REC. BK 17103 PG 1761 And the said Party of the First Part does hereby fully warrant the title to said land, and will defend the same against the lawful claims of all persons whomsoever. IN WITNESS WHEREOF, the said Party of the First Part has hereunto set their hand and seal the day and year first above written. Signed, Sealed and Delivered in Our Presence: HARBOUR ESTATES, L.L.C, a Florida limited liability company _ By: HARBOUR WATCH, L.L.C., - - a limited liability company, ; its Managing Member ; By: WEATHERSTONE DEVELOPMENT'`; CORP., a Florida corporation, ` -' its Managing Member By: ?/G?CGaeGl? (SEALY FREDERICK H. WICK',. President STATE OF FLORIDA ` - COUNTY OF PINELLAS I HEREBY CERTIFY, that gn'this day\personally appeared before me, an officer duly authorized to administer oaths and take apknowlgdgirlents, FREDERICK H. HARDWICK, President, Weatherstone Develo\ t.Cfltp., a Florida corporation, tome personally known or who has produced as identification, and known to me to be the individual(s) destrib@d\ in.ano who executed the foregoing instrument and acknowledged before ma tAat he executed tha'same for the purposes therein expressed. WITNESS 4y hahd`aad offipfaf seal at Clearwater, said County and State day of December, 2010 _ Notary Public Print Name My Commission Expires: NWeryPiNccStalaat nw* _ V Thumn C Nmh 11 i Wcow wDD838818 e0311412011 HADW.RE WiOLLMI.t-E-a.Mui.Ago\Wu W Ao. LEGAL DESCRIPTION LEGAL DESCRIPTION From the Southwesterly corner of Tract A of Unit 2, Island Estates of Clearwater (Plat Book 47, pages 99A and 20, Public Records of Pinellas County, Florida) , run N 49°23'49" W, along the Northerly right-of-way line of Clearwater Causew 575.00 feet for a Point of Beginning; thence continue= N 4923 ' 9" W, along same line, 482.00 feet; thence run S 40°36'99" W, 947.50 feet along the outer face of a seawall, thence 94.26 feet along a curve to the left along said face, Radius 60.00 feet, internal angle 90°00'00 thence S 49°2349"E, 362.00 feet aloe said face thence 94.26 feet along a curve to the left, along said face, Radius 60.00 feet, internal angle 90°00'00 thence N 40°36'99" E, 94750 feet to the Point of Beginning. TOGETHER WITH Lots 5, 6, 7 and 8, and the West 50 feet of Lots 9 and 4, Block C, UNIT 5 ISLAND ESTATES OF CLEAR WA TER, according to the Plat thereof as recorded in Plat Book 59, Page 34, of the Public Records of Pinellas County, Florida. Northsmide EXHIBIT "B" TO FLEXIBLE DEVELOPMENT APPLICATION FOR COMPREHENSIVE INFILL REDEVELOPMENT PROJECT Clearwater Marine Aquarium, Inc. 249 Windward Passage Discussion: Civil Land Planning Due Diligence Reports Re-Zoning, Land Use, Annexation Stormwater Management Utility Design Traffic Construction Administration The subject site is an aggregate of 4.53 acres and is comprised of three parcels, two of which are occupied by the existing marine aquarium and rehabilitation center for aquatic wildlife. The third parcel (located to the east) which is currently a vacant tract was acquired in 2010 with financial assistance from the City and will be the location of additional parking. The site is situated along the waterfront of Island Estates and is located within the Commercial (C) District. The Clearwater Marine Aquarium has existed at this location since 1978 and will continue to operate as a marine aquarium and rehabilitation center; this use does not vary from the permitted use. A recently produced Hollywood movie based on the story of Winter the dolphin is expected to draw tourists to the aquarium from around the world. In an effort to prepare and be a good neighbor, the Clearwater Marine Aquarium is proactively addressing future guest and staff parking demands due to the anticipated increase of expected patrons. A primary focus of the proposed new construction is to provide additional parking to the facility; the proposed renovation will include a relocated 105-space surface parking lot to be located on the newly acquired parcel and a new 206- space three story parking garage to be constructed in the area which is currently surface parking. Bus parking for school field trips and other groups will be provided on the proposed surface lot. The second area of focus is the proposed renovation of the existing building; including the establishment of an identifiable main entrance, providing the building with a much needed face lift and interior renovations. The proposed work also includes enlarging Winter's live and play areas together with offering an expanded viewing opportunity for visitors. 1 The proposed renovations and construction are within the allowable flexible standards with the exception of the proposed promenade along the waterfront; current development standards require decorative pavers meet the same setbacks as a building, placing this proposal into the Comprehensive In-fill Redevelopment Project category. Section B. Description of Request Specifically, the Applicant requests flexible development approval to permit the expansion of the Clearwater Marine Aquarium within the Commercial (C) District with the following: a. a Lot Area of 197,167 square feet (4.526 acres); b. a Lot Width of 546.30 feet along Windward Passage, 707.00 feet along the waterfront; c. a building height (above BFE) of 46.2 feet; d. a front (north) setback along Windward Passage of 15' to building (proposed garage) and 15' to parking lot pavement; e. aside (east) setback of 7' to parking lot pavement and 181' to building; f. a side (west) setback of 10' to building (proposed garage); g. a side (north) setback of 5' to pavement, 25' to the dumpster enclosure and 30.6' to building (aquarium) h. a front (west) setback of 0' to the decorative brick promenade along the waterfront and 18' to buffer wall; i. a front (south) setback of 0' to the decorative brick promenade along the waterfront, and 12' to building (aquarium); j. a front (east) setback of 0'to the decorative brick promenade along the waterfront, and 18' to building (aquarium) k. providing a total of 3110 on-site parking spaces; 1. an impervious surface ratio of 0.84558 in. anF.A.R. of 0.26; 2 n. allowing for an 8' high solid buffer wall surrounding the aquatic above ground tanks located along the west side of the aquarium building; o. approval of a two-year development order; as a Comprehensive Infill Redevelopment Project, under the provisions of Section 2-704.C of the Code. Section D. Written Submittal Requirements General Applicability Criteria: 1) The proposed development of the land will be in harmony with the scale, bulk, coverage, density and character of adjacent properties in which it is located. The aquarium has been a landmark at this location for approximately 33 years and has long been a good neighbor to the residents of Island Estates, the surrounding business owners and the community as a whole. The Aquarium is a redeveloped City water treatment plant. The proposed improvements seek to upgrade the facility, provide resources for heightened animal care, and reponse to increased public attendance due to the opening of the movie "Winter." The character of adjacent properties are mixed with residential townhomes to the west, a commercial parcel with a commercial building in the shape of an "outparcel" to the subject property, Residences at Windward Passage condominium to the north, as well as commercial retail closer to Island Way, and the Island Way Grill restaurant to the east. The area on which the aquarium facility is located is on a semi-circular shape which extends southerly into the water. The portions of the subject property adjacent to the neighboring parcels will be occupied by surface parking and the parking garage providing a transition from the other commercial uses to the Aquarium. Island Estates is a mixture of residential, office and commercial parcels with varying heights as can be viewed across the causeway. The proposed height of the parking garage at 31' is reasonable as adjoining residential parcels would be allowed heights of up to 50' (through residential infill approval). The outdoor stadium and its associated suncover is located closest to the aquarium's proposed parking lot and the adjacent commercial property to minimize the impact to the nearby residential uses. The "outparcel" property has a two-story building and the other marina-based uses on the properties to the southwest support a larger, more densely development property on the Aquarium site. The restaurant to the east of the Aquarium will be buffered from the Aquarium by the proposed surface parking. With a proposed FAR of .26, the property will not appear to be crowded. 3 The original use of the building as a City Water Treatment Plant is still somewhat evident from the existing architecture of the exterior of the building. As shown on the architectural plans, the proposed improvements to the exterior will provide a more harmonious existence with the adjacent and surrounding properties. 2) The proposed development will not hinder or discourage the appropriate development and use of adjacent land and buildings or significantly impair the value thereof. The adjacent properties are currently developed. The proposed improvements will not discourage the appropriate development and use of the adjacent land and buildings, which are already developed, and the value of adjacent and surrounding properties will not be compromised. The adjacent parcels have a commercial zoning category and a land use category of commercial general and therefore can be development up to 50 ft. in height (greater than the proposed height of the stadium sunshade), and with an FAR of .55 (significantly greater than the proposed FAR). Properties across the Windward Passage right of way are residential medium land use category and medium density residential zoning and can be development with an FAR of .50 and height of 30-50 feet. Adjacent and neighborhood parcels will be enhanced by the proposed upgrading of this facility in a number of ways, including: A. Lush landscaping is included in the redevelopment proposal that will visually enhance the neighborhood and the waterfront. B. New construction will meet current building codes and provide improved accessibility for those with disabilities and safety during storm events C. The proposed parking area and garage will have adequate stacking space and loading areas to eliminate traffic congestion on Windward Passage; accommodate staff and visitors to the aquarium; and provide parking areas for bus parking. D. The visitors of the aquarium will also provide support to the surrounding restaurants and retail businesses. E. The incorporation of the public pedestrian promenade around the site will enhance the waterfront and the neighborhood, providing waterfront access to adjacent properties. F. The Clearwater Marine Aquarium has long been a significant economic contributor to the City's economic base by diversifying the local economy and by creating jobs; G. The proposed use provides the development and or preservation of a working waterfront use. 4 3) The proposed development will not adversely affect the health or safety of persons residing or working in the neighborhood of the proposed use. The aquarium has existed in this location for approximately 33 years and none of the planned improvements will change the use or operation of the facility in a manner that will adversely affect the health or safety of persons residing or working in the neighborhood. The proposed use is not problematic and does not impact the health of residents or visitors as it has coexisted in the neighborhood for years. The proposed parking on the site, including adequate loading area, will eliminate any possible traffic congestion on Windward Passage increasing the safety of neighboring residents. The promenade area leading to the city's docks will be lit making passage around the Aquarium safer. The proposed improvements to the building and site will comply as required with all applicable codes including the Florida Building Code, the Life Safety Code and the Florida Fire Prevention Code. 4) The proposed development is designed to minimize traffic congestion. The Applicant has included in this submittal a traffic assessment prepared by Gulf Coast Consulting, Inc. which determines that traffic impacts as a result of the proposed redevelopment will be minimal and further that nearby intersections and adjacent roadways will continue to operate at acceptable levels of service after the proposed improvements are completed. Special consideration has been given to the on site stacking ability to allow ample room for queuing and to not create a back up of traffic on to Windward Passage. Adequate parking will insure that guests to the aquarium will easily and quickly locate a parking space allowing for a smooth flow of traffic off the main street. 5) The proposed development is consistent with the community character of the immediate vicinity of the parcel proposed for development. The community character of Island Estates is an island of mixed uses, ranging from retail to residential. As the Aquarium has been at this location for over 30 years it has become a part of the community character of Island Estates. The industrial-like look of the existing facility, although consistent with the boat repair and sales uses nearby, will be upgraded and modernized, more reflective of the nearby residential and restaurant uses. The proposed comprehensive infill redevelopment project does not represent a "new" project or a "new" use for the land but makes improvements to the existing facility which will visually enhance the area. 5 6) The design of the proposed development minimizes adverse effects, including visual, acoustic and olfactory and hours of operation impacts on adjacent properties. The existing development and proposed re-use of the site will not cause adverse effects on adjacent properties. The proposed redevelopment project will improve the visual appeal of the property as seen from the properties on Island Estates and from the Memorial Causeway. The architectural design of the project is appropriate and appealing. The outdoor viewing area and stadium seating is located on the southern corner of the property, behind the proposed parking garage. Educational presentations in the outdoor area will be during Aquarium hours. Currently, these presentations/shows do not occur later than 6:00 p.m. Sound will be focused toward the building - not toward the water or residential areas. The architectural components of the shade over the outdoor area will protect sound from penetrating the residential areas to the north of the site. Any amplified sound will comply with the provisions of sec. 3-1508 of the Community Development Code. Live presentations currently are limited between the hours of 10 a.m. and 4 p.m. during the week, with the last Friday/Saturday presentation at 6 p.m. It is not anticipated that show times or Aquarium hours will dramatically change as a result of this redevelopment. Please see attached letter from CMA The hours of operation are primarily daylight and will remain the same: Monday - Thursday from 9 am to 5 pm, Friday - Saturday 9 am to 7 pm and Sunday 10 am - 5 pm. The general operation of the facility will remain much the same as today so as not to impose any adverse effects. The placement of activities and proposed structures, together with the architectural and site design minimize impacts on adjacent properties. Comprehensive Infill Redevelopment Project Criteria: 1. The development or redevelopment is otherwise impractical without deviations from the use and/or development standards set forth in this zoning district. The deviations proposed below are necessary and minimal to provide the proposed improvements to this highly visible waterfront site. Certain deviations are necessary to meet the special laws and regulations associated with the marine aquatic life as the Aquarium strives to be accredited by the Association of Zoos and Aquariums. A copy of the AZA standards are included with this submittal. Additionally, the deviations improve accessibility to the waterfront for all 6 including those with disabilities and to provide appropriate parking and vehicular accessibility. The Applicant has assembled land when possible to better meet the needs of the facility; however the land assembled is irregularly shaped which presents challenges to redevelopment and improvements in accordance with Code requirements. Height The Commercial District allows flexible height of between 25'-50'; the proposed garage and shade structure are within the allowable limits of the flexible standards. The proposed three story garage is minimal and appropriate for area; the height of the proposed shade structure is the minimum necessary to accomplish the shade required for the marine life. The shade structure has been specifically located to the rear of the site as much as possible and is situated toward the adjacent commercial site. Setbacks The Commercial District allows flexible setbacks for front yards of between 15'- 25'; the proposed garage is within the allowable limits of the flexible standards and is proposed at a 15' front setback at the northwest corner and over 25' setback at the northeast corner. Pavement is proposed at a 15' front setback leaving generous area for landscape treatment and required buffers. Side yard flexibility of between 0'-10' is allowed, the proposed 10' side setback of the garage structure is within the allowable limits of the flexible standard and will allow more than sufficient room for the required 5' landscape buffers. Pavement is proposed at a minimum of 5' along the side yards providing area to address the required 5' landscape buffers. Because the District's maximum flexibility of rear yard setbacks allows between 10'-20', the Applicant seeks approval through the Comprehensive Infill process. The proposed setbacks associated with the building, pools and proposed wall/fence are all within the flexible standards however the promenade would need to be located a minimum of 10' from the seawall to meet the allowable flexible standards. The proposed setbacks associated with the buildings, parking area and pools are all within the flexible standards which would not require Comprehensive Infill approval. The use of the site as a marine aquarium beckons for direct access to the waterfront for the visitors of the Clearwater Marine Aquarium. Neither visibility nor use of land will be impeded on surrounding properties due to the proposed on grade promenade. Buffer Wall 7 The Applicant requests a 8' high buffer wall along the western property line adjacent to waterfront and along a portion of the southern property line adjacent to the waterfront to encompass the outdoor rehabilitation tanks located on the west side of the building. The AZA rules and regulations discussed above and previously provided to city staff requires a secure area and minimum heights for walls and fences. Two-Year Development Order The Applicant requests a two-year development order to allow some latitude to complete construction if necessary for the Non Profit organization. 2. The development or redevelopment will be consistent with the goals and policies of the Comprehensive Plan, as well as with the general purpose, intent and basic planning objectives of this Code, and with the intent and purpose of this zoning district. The redevelopment will preserve a working waterfront use; Indoor Recreation uses are allowed in the "Commercial" zoning district and are consistent with the goals of the Comprehensive plan. Tourism is the major industry in the city and the commercial district is intended to provide access to goods and services in the community. The availability of tourist activities is integral to the community - both locally to Clearwater Beach and the broad Clearwater community. Additionally, the application is consistent with the City's comprehensive plan as the redevelopment provides access to the public boat slips adjacent to the Aquarium property and provides access to tourism activities. Applicable Comprehensive Plan Goals/Policies/Objectives include: A.6.6 Objective - Tourism is a substantial element of the City's economic base and as such the City shall continue to support the maintenance and enhancement of this important economic sector. . A.6.7 Objective - Redevelopment activities shall be sensitive to the city's waterfront and promote appropriate public access to the city's waterfront resources. A.6.7.1 Encourage the preservation of recreational and commercial working waterfronts and marinas and other water-dependent facilities. E.1.6.2 The City will encourage the preservation of recreational and commercial working waterfronts and marinas and other water-dependent facilities. The Aquarium itself is identified as a major activity center in the comprehensive plan and this renovation will allow it to accommodate the visitors expected to patronize this facility. 8 3. The development or redevelopment will not impede the normal and orderly development and improvement of surrounding properties. The proposed project is compatible with the neighborhood, as is more particularly discussed in General Applicability Criteria 1 and Comprehensive Infill Criteria 4 below, and will not impede other development. The proposed improvements will benefit the community as a whole and specifically this district. The improvements are limited to the Aquarium property, do not impact the traffic flow, and the major setback relief is limited to the waterfront portion of the site. 4. Adjoining properties will not suffer substantial detriment as a result of the proposed development. The adjoining properties will not suffer detriment of any kind as a result of this proposal; the proposed renovation/improvements will improve the value of the adjoining properties by upgrading the look of the now institutional looking property, increasing the capacity for the facility to withstand storms as the new portions will be constructed to current building codes, and generally upgrading a tired site. The site will be in harmony with the surrounding community in much the same manner as in the past 32 years, however, the proposed parking, access; landscape improvements and renovations to the building will improve the operation of the facility and its appearance. The building will no longer reflect its previous life as a water treatment facility and the upgrades will only provide improve benefits to the community. 5. The proposed use shall otherwise be permitted by the underlying future land use category, be compatible with adjacent land uses, will not substantially alter the essential use characteristics of the neighborhood; and shall demonstrate compliance with one or more of the following objectives: a. The proposed use is permitted in this zoning district as a minimum standard, flexible standard or flexible development use; b. The proposed use would be a significant economic contributor to the City's economic base by diversifying the local economy or by creating jobs; c. The development proposal accommodates the expansion or redevelopment of an existing economic contributor; d. The proposed use provides for the provision of affordable housing; 9 e. The proposed use provides for development or redevelopment in an area that is characterized by other similar development and where a land use plan amendment and rezoning would result in a spot land use or zoning designation; or f. The proposed use provides for the development of a new, and/or preservation of a working waterfront use. The development proposal represents an expansion and redevelopment of the Clearwater Aquarium, which is an existing economic contributor to the City and identified in the comprehensive plan as a activity center. Most recently, a major motion picture based on Winter the dolphin was filmed at the Aquarium and at other locations in the City. Tourism is the top industry in the city and the Aquarium not only provides a resource to tourists but with the debut of the movie will become an attractor in itself. 6. Flexibility with regard to use, lot width, required setbacks, height and off- street parking are justified based on demonstrated compliance with all of the following design objectives: a. The proposed development will not impede the normal and orderly development and improvement of the surrounding properties for uses permitted in this zoning district. The proposed and existing use of the site as a marine aquarium is permitted in the Commercial zoning district as recreational uses are a permitted use. The Aquarium has coexisted with surrounding properties for over 33 years and has not impeded residential or commercial redevelopment in the area. The redevelopment of the Aquarium should create a more attractive site and therefore motivate other properties to upgrade. As previously discussed in detail in General Applicability Criteria 1, the proposed improvements will not impede the surrounding properties. b. The proposed development complies with applicable design guidelines adopted by the City. No specific design guidelines are adopted for this area of the City. c. The design, scale and intensity of the proposed development supports the established or emerging character of an area; The area is comprised of varying uses, designs, scale and intensity; the proposed improvements wili be compatible with the character of the area. There is no true "pattcrn" or "theme" of development. Designs range 10 from coastal (Island Way Grill), Mediterranean (residential), and waterfront industrial-like designs (marine uses and two-story office complex). Please see Corrp. Infill Criteria 4 for additional discussion of compatibility with the neighborhood. a. In order to form a cohesive, visually interesting and attractive appearance, the proposed development incorporates a substantial number of the following design elements: • Changes in horizontal building planes; • Use of architectural details such as columns, cornices, stringcourses, pilasters, porticos, balconies, railings, awnings, etc; • Variety in materials, colors and textures; • Distinctive fenestration patterns; • Building stepbacks; and • Distinctive roofs forms. The proposed development utilizes massing of elements, fenestrations, colors and textures to minimize the scale of the structure so as to allow a cohesive appearance with surrounding property aesthetics and zoning uses. While the project makes a visual and bold statement from public areas like the causeway, it also has a toned down, secure and quiet atmosphere for neighboring residents. Architectural elements such as massing walls are used to obstruct direct vision of vehicular parking while maintaining an open natural cross ventilation system. Plush landscaping will be placed along the entire facade to soften the appearance of a hard exterior on the new structure. Colors play an important role characterizing the structures and portraying the excitement that has become part of the project as well as the community. In order to form a cohesive, visually interesting and attractive appearance, the proposed development incorporates a substantial number of the following design elements: changes in horizontal building planes; use of architectural details such as columns, cornices, stringcourses, pilasters, porticos, balconies, railings, awnings, etc; distinctive fenestration patters; building stepbacks; and distinctive roof forms. The proposed development utilizes a number of design elements in order to form a cohesive, visually interesting and attractive appearance. Each structure uses changes in horizontal building planes which is visible at the main structure entrance and stadium. Architectural columns, pilasters, porticos, and railings add interest on both structures which can be seen at the parking garage corners and decks surrounding the show tanks. The incorporation of steel, stucco, masonry, and landscaping at both structures adds visual interest by using a variety of materials, colors and textures. Each structure's fenestration patterns are repetitive and rectilinear making 11 it distinctive from surrounding projects and giving the project its own identity. Each structure has unique roof forms which will set it apart from the surrounding areas and make it a visual landmark to visitors. These elements make the aquarium unique, visually interesting, and distinctive from surrounding areas. b. The proposed development provides for appropriate buffers, enhanced landscape design and appropriate distances between buildings. The proposed buffers and setbacks will provide appropriate buffers and distances between buildings; the proposed landscape buffers will meet or exceed the dimensional requirement of the code and will be professionally designed to offer a lush tropical appearance. This redevelopment proposal includes the addition of new large landscape areas not currently present on the site. The Applicant has simultaneously submitted a comprehensive landscape application with this application. The proposed development provides buffers within the development itself and between the development and the adjacent properties. The current site includes little to no landscaping #554476 vl - Clwr Aquarium/Narrative for Resubmittal 12 r Clearwater U Planning & Development Department 100 South Myrtle Avenue Clearwater, Florida 33756 Telephone: 727-562-4567 Fax: 727-562-4865 ? SUBMIT ORIGINAL SIGNED AND NOTARIZED APPLICATION ? SUBMIT 14 COPIES OF THE ORIGINAL APPLICATION -Plans and application are required to be collated, stapled and folded into sets CASE NUMBER: RECEIVED BY (Staff Initials): DATE RECEIVED: * NOTE: A TOTAL OF 15 SETS OF THIS APPLICATION AND ALL SUPPORTING DOCUMENTATION IS REQUIRED TO BE SUBMITTED IN CONJUNCTION WITH A COMPLETE LEVEL ONE OR LEVEL TWO APPLICATION. COMPREHENSIVE LANDSCAPE PROGRAM (Revised 11/29/2010) PLEASE TYPE OR PRINT- APPLICANT, PROPERTY OWNER AND AGENT INFORMATION: (Code Section 4-202.A) APPLICANT NAME: MAILING ADDRESS: PHONE NUMBER: E-MAIL ADDRESS: PROPERTY OWNER(S): List ALL owners on the deed Agent Name AGENT NAME: MAILING ADDRESS: PHONE NUMBER: CELL NUMBER: Clearwater Marine Aquarium, Inc. 249 Windward Passage, Clearwater, FL 33767-2244 CELL NUMBER: 727-480-6704 Clearwater Marine Aquarium, Inc. (Joe Burdette - Consus Group, LLC) 727-458-4528 hunraf@aol.com 618 Pineland Ave, Belleair, FL Northside Engineering Services, Inc. (Roush Ghovaee and/or Renee Ruggiero) 300 South Belcher Road Clearwater, FL 33765 727-443-2869 ----'_ FAX NUMBER: 727-446-8036 T? 727-235-8475 E-MAIL ADDRESS: renee@northsideengineering.net The landscaping requirements of Article 3, Division 12, may be modified or waived as part of a Level One (Flexible Standard) or Level Two (Flexible Development) application, as the case may be, if the application for development approval includes a Comprehensive Landscape Program, which satisfies the following criteria. The use of landscape plans, sections/elevations, renderings and perspectives may be necessary to supplement the information provided on this worksheet. Landscaping associated with the Comprehensive Landscape Program shall exceed minimum Code requirements to offset the areas where minimum Code will not be met. 1. ARCHITECTURAL THEME: a. The landscaping in a Comprehensive Landscape Program shall be designed as a part of the architectural theme of the principal buildings proposed or developed on the parcel proposed for the development. Please See Narrative OR b. The design, character, location and/or materials of the landscape treatment proposed in the Comprehensive Landscape Program shall be demonstrably more attractive than landscaping otherwise permitted on the parcel proposed for development under the minimum landscape standards. Please See Narrative Page 1 of 2 i 2. LIGHTING: Any lighting proposed as a part of a comprehensive landscape program is automatically controlled so that the lighting is turned off when the business is closed. Please See Narrative 3. COMMUNITY CHARACTER: The landscape treatment proposed in the Comprehensive Landscape Program will enhance the community character of the City of Clearwater. Please See Narrative 4. PROPERTY VALUES: The landscape treatment proposed in the Comprehensive Landscape Program will have a beneficial impact on the value of the property in the immediate vicinity of the parcel proposed for development. Please See Narrative 5. SPECIAL AREA OR SCENIC CORRIDOR PLAN: The landscape treatment proposed in the Comprehensive Landscape Program is consistent with any special area or scenic corridor plan which the City of Clearwater has prepared and adopted for the area in which the parcel proposed for development is located. Please See Narrative SIGNATURE: I, the undersigned, acknowledge that all representations made in this application are true and accurate to the best of my knowledge and authorize City representatives to visit and photograph the property described in this application. _i Signatu e o property owner or representative STATE OF FLORIDA, COUNTY OF PINELLAS Sworn to and subscribed before me this 14 day of A.D. 20to me and/or by who is persrlly known has pro uced 1> . L. as identification.. ,,wy .Wp A Notary public, My commission expires: A RNA. GOEL ;. ;r su rMMMISSION N DD 949832! ?. APIRES: Mty 3, 2014 tea `? tiaf}d4 TNu swo Notary SgMca C:IDocuments and Settingslderek.fergusonlLocal Settingsl Temporary Internet FileslContent.OutlooklKPMVX8F11Comprehensive Landscape Program 11 2010.docx Page 2 of 2 COMPREHENSIVE LANDSCAPE PROGRAM NARRATIVE Clearwater Marine Aquarium 249 Windward Passage Request: To allow a reduction to the required landscape buffers along the eastern property line from 10' to 5', along the northern property line (near Marina Way) from 10' to 5' and along the Public Waterway (Causeway Right of Way) from 15' to 0' adjacent to the pedestrian promenade and a request to allow a reduction to the minimum size of some of the proposed landscape islands. 1. Architectural Theme: a. The Contemporary Mediterranean landscape design, consisting of silvers, greens and native contemporary plantings will compliment the contemporary architectural theme of the building. b. To provide a landscape plan that is demonstrably more attractive the following are some of the measures taken: i. The proposed number of plantings well exceeds the number prescribed by Code. ii. The proposed variety of plantings exceeds the variety prescribed by Code. iii. Virtually all available green space contains drought tolerant plantings. iv. The plan offers 5-6 levels of plantings; the design will greatly enhance and improve the streetscape. v. Although a reduction to some of the landscape islands is requested, the site design provides 14.4% parking lot interior landscaping where 10% is the minimum required. Some proposed landscape islands are over the minimum size required. 2. Lighting: No outdoor lighting is proposed at this time and any future proposed light will meet required code. 3. Community Character: The proposed installation of over 5,800 new plantings, consisting of 23 different varieties, will provide immediate visual rewards to the vicinity and community. Additionally, the proposed plan provides landscaping that is tolerant to the Florida environment. 4. Property Values: The proposed landscape design, with the proposed number and quality of plantings will offer upgraded and positive value to the immediate vicinity for many years to come. 5. Special Area or Scenic Corridor Plan: N/A 03.14. 11 /rmr % X F % % . .. RADIUS-190.00' / ?I LOT 7 CURRY DATA Delta=3915'24' o.?o zIe00D ARC-130.18• CHORD-127 65 ii (R1 iiBEARING S69'01'23'E , r - Apc-e / CHORD-B] ( BEAR UG-5 6f 5]?Oa' E (R) ?/ 4 ,? / ?Y // W/NDWAM PASSAGE 4923347 E rig NEW PMEONO QAR"E ® 11 III, LOT 9' 'FA BLOCK C P •O S ¢ I - I ,, 11t 11t _ + t' BLOCK D I ( ,pax ( I I I s l ime a....._, z F• 4' a y= I I y ?tlll •= ? ixc >mTCU HDapr - ? rw + v T.-E-ma. F-17 y g o 0 0 S 49'2a1 s0 - -- o - - - - - '" N 49'23'41' w ?_' - 225 ti R n -° --------------i ? Y -? -V' - !' ? ?.'°?•.J NgiT1ERLY 49ZJ'41'W J RWN O _ ] CIEARWATER C SEWAT n f b' u. EXISTING PLI1 o ?o am.. s.....? (CAUSEWAY ° .r• I O o so.vw.r. Ao.rw ? n z A ? z ' O I O N .? v 0 ? I ,. I .. a - I w ' `RA "? - DIUS = 6000' 5 49'2341' E ..36200' " . DELTA = 90'00'00" RADIUS 60.00' ARC = 94.26' - - CHORD = 84.85' DELTA = 90'00'00' nl ARC = 94.26' BEARING - S 85'36'19• E Q CHORD = 84.85' BEARING = S 04'23'41" E 0 MANDALA Y CHANNEL N PAVEMENT LEGEND NEW ABPNALT 0 NEW CONC. NFAW DIM D a' TXILK IIGM DDIY ??I 6" THICK SIDEWALK ? N' 1NICK -ERM uxoscvc L , NEW pOLK PAVERS .." VAGIE EASEMENT 0 2- 0 0 0 IJ I I RAaus = BD.ao? DELTA " BD90'00' ARC " BAYB' CHMD 4.M' BEARING " 5 DA'2S'41' E II=Gi1UC3D4 C3" ?? / ? ? ?. V'O O ry/ i @ I ' 4 1 I / ? / 1 ?1 ilirl A ,,,??rJJJ - - - - - lEBKlL' ?.!m.? ?? ??yA ? ? RADIUS?IBO.OD' ??........%..iZrM----- pyaBP?'y? Iv) LHORD"12].65' BEARMD IMDWAMOPASS40E (?'RM7 p _ ^ _ B B9 ! :.r I 34 R .{t? R rrN I'. Y .A MANDALAY CHANNEL ?o SCALE: 1"=30' ISLANDWAY GRILL RESTAURANT LOT I BLOCK C -- STSDD EX/ST/NG PURLJ'C WATERWAY (G U S E WA Y R/ D N T #? i YA )9 1 fill €11 R d aoA IuD.. Projadi 7037 I- Date: 05105111 Rwbbnr Dab 2 _2 a ? a W Z <y o a ? 6J <W , Q LU Nortl?slde r _f 4k CLEARWATER MARINE AQUARIUM xz MINHING INDEx Al LOVER SI T A7 AQUARILM PLANS/ SQUARE FOOTAGE/ OCCUPANT LOAD AS EXISTING AQUARIUM PLANS/ NOTES A4 PROPOSED AQUARIUM PLANS/ NOTES AS PROPOSED AQUARIUM ELEVATIONS Ab PROPOSED AQUARIUM ELEVATIONS AT PROPOSED PARKING GARAGE PLANS AS PROPOSED PARKING GARAGE ELEVATIONS II SURFACE! J "XX„ A?,w PARKING f AQUARIUM ARCHITECT STRUCTURAL CLIENT MECHANICAL/ CIVIL. ENGINEERS INSIDE OUT GROUP, INC. ENGINEER CLEARWATER MARINE AQUARIUM PLUMBING NORTH SIDE CONTACT: ROBERT VAMM. AYCHI BST QM CONTACT: SCOTT UARTINU CONTACT: FRANRCIEVAS YIDCHANICAL DEEM CONTACT: IHDM GMVARB CONTACT: THOMAS PBRRARO 30D BBLCIM AVffiNIffi 812IAUDENAVHNUB 249 WINDWARD PASSAGE CLEARWATER, FLORIDA 33M5 DUNEDIN, FLORIDA 34M CL3ARWATER, FLORIDA 897 14TH AVENUE SOUM SAFM HARBOR, FLORIDA 34M INSIDE OUT O GROUP INO. 818 IAUDLN AVO1V DUPIEM, 74e1DA 2HNNI (787) 704_2678 IIOBQt7 N. enREA ABCNRECT rYYO C?? d 8? d Z ? r U g 3g S RE a 2Y88 ?C AIM1 • a>Ii I OP O EXISTING STRUCTURE PROPOSED STRUCTURE ' ' ^ l n SQUARE FOOT TABULATION 15T FLOOR SQUARE FOOT AREA 2gi5q S.F. IST FLOOR SQUARE FOOT AREA 10,4g1 S.F. 2ND FLOOR SQUARE FOOT AREA 10655 S.F. 2ND FLOOR SQUARE FOOT AREA 3555 S.F. TOTAL EXISTING SQUARE FOOT AREA 511,-114 S.F. ROOF SQUARE FOOT AREA 4b50 5F TOTAL NEW SQUARE FOOT AREA 18,112 S.F. TOTAL PROJECT GROSS FLOOR AREA 52,52'7 S.F. OCCUPANT LOAD TABULATION OFFICE/ BUSINESS AREAS 2q OCCUPANT LOAD TABULATION OFFICE/ BUSINESS AREAS Ib ASSEMBLY AREAS 242 ASSEMBLY AREAS 1,154 MECHANICAL AREAS 20 MECHANICAL AREAS 12 TOTAL OCCUPANTS 2411 OCCUPANTS TOTAL OCCUPANTS 1,212 OCCUPANTS TOTAL PROJECT OCCUPANT LOAD 1,505 OCCUPANTS 0 EXISTING ROOF PLAN ift?p EXISTING 2nd FLOOR PLAN EXISTING I st FLOOR PLAN AREAS OF NEW CON5TRUCTION AREAS OF NEW CONSTRUCTION AREA OF NEW - CONSTRUCTION 0 PROPOSED ROOF PLAN ro-A INSIDE OUT O GROUP me. 61! lWJM/ AVEM DUNZWK 34 nMDA (M) M-3m mu" M. wmml ANC nwr / c? K ? a w a ? r o a 0.? srs .ee r ..w. aw WIN tore PROPOSED Ist FLOOR PLAN EXISTING AREA ROOF PLAN 5-'ALE: 1/37" •110" LIFE SAFETY NOTES • FIRE AND SAFETY COMPLIANT SIGNAGE LOCATED THROUCSHOUT. • AUDIBLE/ VISUAL ALARMS, EMERGENCY LIGHTS, AND EMERGENCY EXIT LIGHTS TIED INTO FIRE ALARM SYSTEM AND ELECTRIC GENERATOR. • 2 HOUR FIRE SEPARATION BETWEEN EXISTING AND NEW STRUCTURES.-"*-.•-.•- • STAND PIPES AS LOCATED ON PLANS. • TRAVEL DISTANCE: EXISTING 5TR0GTURE AREAS OFFICE/ BUSINESS AREAS. 100 S.F. PER OCCUPANT 29 OCCUPANTS ASSEMBLY AREAS. 15 S.F. PER OCCUPANT 242 OCCUPANTS EXISTING AREA 2nd FLOOR PLAN MEGHANIGAL AREA5 500 S.F. PER OCCUPANT SCALE: I/S2" •1'-O" 20 OCCUPANTS EXISTING AREA Ist FLOOR PLAN SCALE: 1/'32" =1'-O" TOTAL EXISTING STRUCTURE OCCUPANT LOAD 291 OCCUPANTS INSIDE OUT O GROUP aac. Oil Le11DP1 AMW Bt®1. nom ("" swam Room Y. >AYLR ArIMer / I R' Q o at J V QE IU X ZQ f r see r aa: b OPb .Ii I PROPOSED 3rd FLOOR PLAN SCALE: 1/132" al'-O" PROPOSED 2nd FLOOR PLAN SCALE: 1/32" al'-0° SGAIXE t/52" LIFE SAFETY NOTES • NEW 57RUCTURE TO HAVE FULLY AUTOMATIC FIRE SPRINKLER SYSTEM. INSIDE • FIRE AND SAFETY COMPLIANT 51GNAGE LOCATED OUT O THROUGHOUT. GROUP sic. • AUDIBLE/ VISUAL ALARMS, EMERGENCY LIGHT5, AND W ADUW AVEW DUI , MMA 3tm EMERGENCY EXIT LIGHTS TIED INTO FIRE ALARM t>sn 734-W?3 SYSTEM AMC) ELECTRIC GENERATOR. • 2 HOUR FIRE SEPARATION BETWEEN EXISTING AND NEW STRUCTURES. - • • - • • - .. - • STAND PIPES AS LOCATED ON PLANS. xmw R mm ARcorm • TRAVEL DISTANCE ... ._., -..- • ALL FIRE DEPARTMENT CONNECTIONS SHALL BE IDENTIFIED BY SIGN IN ACCORDANCE TO F.D.O.T. STANDARDS NEW STRUCTURE AREA5 OFFICE/ BUSINESS AREAS. 100 S.F. PER OCCUPANT Ib OCCUPANTS ASSEMBLY AREAS. 15 S.F. PER OCCUPANT/ W PER OCCUPANT 1,184 OCCUPANTS w MECHANICAL AREAS Q 500 S.F. PER OCCUPANT E z 12 OCCUPANTS Q g Sz 6 0.A alsas TOTAL NEW STRUCTURE °0D OCCUPANT LOAD " "" 1 212 OCCUPANTS 4 Of 0 i INSIDE OUT GROUP nre uc'nrc w???cr ranm, noiuu. :umm -1.1p e. nMill IL!IS '[311111,11 C 2. y 2 J T Y Q y y Ibb'-4" X ORNAMENTAL ROOF ABOVI ROOF ABOVE ORNAMENT TALL ---------J L -------J ROOF BELOW ROOF BELOW ROOF ABOVE POMM PWOR PLAN SCALbur• t b c 29'-0" 29'-0" 211'-0" 24'-0" 55'-0" b'-b" T I « ARDS P 5 ?.... n .O' RISE M I I6'-0" . 24'-0" 24'-0" . IO'-0" 506 $Lon b9' RUN 5.o' RI9E Q` M N19 Nora, T7! VERTIOAL HNIOW CLEARANC! MOND 71MIt PLAN MM COVERED PARONO "ALL OE A MNIM04 OF 612" PROM" eoKd uw• .r.v ORO" TO THE Lovl5T OVER a dANOINo STRUrnft. Ibb'-4` 2Q'-0" ro i NT L T a P yV I a - ROOF BELOW BOLLARDS ----, I L _ I6'-0" . 24'-0" 24'-0" . W-O" " M N n a h.? 0 OUT o GROUP namR 1.1 I m"m RR I THQiD PLflOR PLAN FAST FUWR PLAN F51 LF11 INSIDE OUT GROUP lVf 6l'< Wuokv r,vE+? Uil\EDN. rWMDA 3008 I-) . - R03ERT R. KkltlCl =T 1.'03 Q Ll ?}T Q 6 1 e o<< a 's c ? ?u 1 Q ylJ own .>sao Walla. _. TRAFFIC IMPACT STUDY FOR CLEARWATER MARINE AQUARIUM 249 WINDWARD PASSAGE CLEARWATER , FLORIDA PREPARED FOR: CLEARWATER MARINE AQUARIUM, INC. PREPARED BY: GULF COAST CONSULTING, INC. REVISED MARCH 2011 PROJECT # 11-005 Robert Pergol z CP, PTP AICP #9023, PTP 4133 I. INTRODUCTION The Clearwater Marine Aquarium is located on the south side of Windward Passage immediately west of Island Way on Island Estates in Clearwater. (See Figure 1) The owner is proposing to modify the facility to include a larger lobby, a maintenance building, increased parking, and install viewing stands for new viewing tanks. The improvements to the property are the subject of a site plan application and this application requires an assessment of the traffic impacts of development. This report was revised based on reduced seating as well as comments and requests for additional information at the March 3, 2011 DRC meeting. The site is currently operating as an aquarium with the hours of 9 AM - 5 PM Monday through Thursday, 9 AM - 7 PM Friday and Saturday, and 10 AM - 5 PM on Sundays. Prior to completing this analysis a methodology was established with the City of Clearwater staff and amended after the March 3, 2011 DRC meeting. II. EXISTING TRAFFIC CONDITIONS The property has direct access to Windward Passage west of Island Way. Island Way is a four-lane divided roadway which is controlled by traffic signals at the Clearwater Memorial Causeway (SR 60) and at Windward Passage. As requested by the City of Clearwater traffic engineering staff PM peak period (4-6 PM) traffic counts were conducted in January 2011 at the following intersections: Island Way / Clearwater Causeway (SR 60) (signal) Island Way / Windward Passage (signal) Windward Passage / Site Driveway As requested at DRC a supplemental analysis was conducted for a Saturday and the same intersections were counted on March 12, 2011 between 11 AM and 1 PM. All traffic counts were converted to annual average equivalents using FDOT seasonal adjustment factors. Existing traffic volumes are shown in Figure 2 and Figure 2S. Existing intersections were analyzed using the HCS+ software. The HCS+ printouts are included in Appendix A. Presently the signalized intersection at Clearwater Memorial Causeway / Island Way operates at LOS B during the weekday PM peak hour with average delay being 13.5 seconds per vehicle. During the Saturday peak hour this intersection operates at LOS B with average delay being 14.4 seconds per vehicle. The intersection at Island Way / Windward Passage operates at LOS B during the weekday PM peak hour with average delay being 12.0 seconds per vehicle. During the Saturday peak hour this intersection operates at LOS B with average delay being 11.9 seconds per vehicle. 1 JECT NO: EXISTING PM PEAK HOUR TRAFFIC VOLUME (2011) 11R1 -005 i= u Gulf Coast Consulting, Inc. DATE: Land Development Consulting JAN/201 1 DRAWN BY: MKC FIGURE: EXISTING SATURDAY PEAK HOUR TRAFFIC VOLUME (2011) PROJECT NO: 111-005 Gulf Coast Consulting, Inc. Land Development Consulting DATE: MARCH/2011 DRAWN BY: MKC FIGURE: 2S At the existing site driveway (Drive A) to Windward Passage the westbound left turns operate at LOS A and the northbound approach (driveway) movements operate at LOS A all with minimal delay during the weekday PM peak hour and during the Saturday peak hour. Island Way functions as collector roadway and according to FDOT 2009 QLOS Handbook capacity tables has a LOS D capacity of 2,900 vehicles per hour on the four-lane divided roadway. The segment between the Clearwater Memorial Causeway and Windward Passage presently operates at LOS C during the weekday PM peak hour carrying 987 vehicles, and the segment north of Windward Passage operates at LOS C carrying 621 vehicles. During the Saturday peak hour Island Way carries 748 vehicles between Clearwater Memorial Causeway and Windward Passage and 536 vehicles north of Windward Passage which represents LOS C operations. The Clearwater Memorial Causeway is a four-lane divided arterial roadway with a LOS D peak hour capacity of 3,560 vehicles per hour. The causeway operates at LOS B during the weekday PM peak hour carrying 2,234 vehicles east of Island Way and 1,825 vehicles west of Island Way. During the Saturday peak hour the causeway operates at LOS B carrying 2,351 vehicles east of Island Way and 2,155 vehicles west of Island Way. III. FUTURE TRAFFIC CONDITIONS Existing traffic was adjusted by a 1% annual growth rate to the expected build-out year of 2012 to account for background traffic from other nearby redevelopment projects. The site will be redeveloped to include expanded parking, lobby area, and a 660 seat viewing area near the viewing tanks. Using Institute of Transportation Engineers (ITE) Trip Generation, 8t' Edition rates, the amount of project trips was calculated and estimate is shown below: TRIP GENERATION ESTIMATES Land Use Amount PM Peak Trips Saturday Peak hr Movie Theater 660 seats 53(19/34) 60(22/38) All vehicular access will be taken from Windward Passage which intersects with Island Way and the expected distribution is as follows: 95% to / from the south (50 PM peak trips, 57 Saturday peak hour trips) 5% to /from the north (3 PM peak trips, 3 Saturday peak hour trips) 2 PROJECT IMPACT CALCULATIONS Weekday PM Project Road Segment Lanes Project Trips Capacity Percent Island Way. (Causeway - Windward Pass) 4LD 50 2900 1.72% Island Way (Windward Pass - North) 4LD 3 2900 0.01% Memorial Causeway (East of Island Way) 4LD 34 3560 0.95% Memorial Causeway (west of Island Way) 4LD 16 3560 0.45% With project traffic added the signalized intersection at Clearwater Causeway / Island Way would continue to operate at LOS B with average delay being 13.8 seconds per vehicle during the weekday PM peak hour. During the Saturday peak hour this intersection would operate at LOS B with average delay being 14.8 seconds per vehicle. With project traffic added the intersection at Island Way / Windward Passage would continue to operate at LOS B with average delay being 12.4 seconds per vehicle during the weekday PM peak hour. During the Saturday peak hour this intersection would operate at LOS B with average delay being 12.3 seconds per vehicle. At the site western driveway (Drive A) to Windward Passage the westbound left turns into the site would continue to operate at LOS A and the northbound approach movements would continue to operate at LOS A with minimal delay both during the weekday PM peak hour and the Saturday peak hour. Queue calculations indicate there would be no vehicle stacking for any movement at this driveway. At the proposed eastern driveway (Drive B) to Windward Passage all movements would operate at LOS A with minimal delay both during the weekday PM peak hour and the Saturday peak hour. Queue calculations indicate there would be no vehicle stacking for any movement at this driveway. With background traffic and project traffic added the segment of Island Way between the Clearwater Memorial Causeway and Windward Passage would carry 1,047 vehicles during the weekday PM peak hour and the segment north of Windward Passage would carry 630 vehicles during the weekday PM peak hour. This represents LOS C operations which are acceptable. During the Saturday peak hour Island Way would carry 811 vehicles between Clearwater Memorial Causeway and Windward Passage and 544 vehicles north of Windward Passage which represents LOS C operations. The Memorial Causeway would continue to operate at LOS B during the PM peak hour carrying 2,290 vehicles east of Island Way and 1,859 vehicles west of Island Way during the weekday PM peak hour. During the Saturday peak hour the causeway would continue to operate at LOS B carrying 2,412 vehicles east of 3 PROJECT NO: FUTURE PM PEAK HOUR TRAFFIC VOLUME (2012) 1 1 -005 As- Gulf Coast Consulting, Inc. DATE: FIGURE: Land Development Consulting MAR/201 1 t DRAWN BY: i r:. ; , M K C o a ? ?? N Mf 80 L - 50 -- °° N 11 --10 Sg 30 30 136 I ` I I I- ?J _ F43 ti 133 } ?1f N N s 10- ° N 117 ^7 N I M-PAf, + 1 j L CAUSEWAY 1209 i x7 v v PROJECT NO: FUTURE SATURDAY PEAK HOUR TRAFFIC VOLUME (2012) 11-005 DATE: FIGURE: Gulf Coast Consulting, Inc. Land Development Consulting MARCH/2011 DRAWN BY: m U 3S MKC M N WINDWARD PASSAGE iz ?J 4 4 cC O 8129 '?22 04 j _ 6 856ti 7285 7j2;? ti Island Way and 2,194 vehicles west of Island Way. Future traffic volumes are shown in Figure 3 and Figure 3S, and the HCS+ printouts are included in Appendix B. IV. CONCLUSION This analysis was conducted in accordance with a specific methodology established with City of Clearwater staff. This analysis demonstrates traffic operations at nearby intersections and on adjacent roadways presently operate at acceptable levels of service and would continue to operate at acceptable levels of service with the project impacts. 4 APEENIIX A a a a) R4 E 4 4 O a O a 4j ?4 O 04 N Ri O 7 H 0 3 O E- b E- C) 2 +j m roO U U u u) O < Jp a u a ro w w2 H r, PJ 0 N O ro O O M N xH ro •• 0 Q4 $4 0 m o O 0 N ro u M rn 0 W w U U O w 44 M m N 11 ro D x N N 3 N C' N O O l0 C' N H O OJ h [- OJ O7 0 H N M C C' d• C' N '17 l0 ? rr, m OJ O H N M C M M N N N M C' lD lD [- r- m N H H H H 0 0 0 0 0 0 O) Ol al Ol al 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 H H H H H H H H H ?"? H H H H H H '"'? H `-"? H oOOOOHHHH???,?,??,?,?,?•-+,?,?,?H,?,?,?,?H,? H H H H HHHHH ?H O r- N H- h- C M ?N H H N (N M C L:) l0 l- r r [- r- I N N al m c) O H H M C c l0 c c c n c Ln u-) c o r O O c l m 01 O f 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o H o 0 H O o 0 o D) dl dl a> 61 ;lm, 01 m 01 o) a) a) 41 Q) Ol Ol Ol 41 Q) Ol 61 Ql Ol o 0 0 H H H•Wi H O O D O O ?' (D O O O O O O O O O O O O O O O O O r-I •-1 rl rl r-I •-'? ?-1 H rl rl •-I rl rI ?I ri rI H '""? H `H `-'? H dl dl Ol Ol al dl a> at 61 dl Ol rn 61 dl al 01 al 61 dl Ol Ol T d> dl dl Ol 61 T Ol 01 al d> a1 41 al al dl a1 d> 61 Ol Ol Q) a1 dl dl Q1 dl dl dl Ol dl rn 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N (N N N N N N N N N N N N N N N N N N N N N N \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ M O [- C' H f- C' H co I- C' H N C' H co L1') N Ol l0 M O l0 M O l- H co V') H co N N dl u-) N 61 l0 M O [- C H [- C+ H co if7 N Ol lD H O H H N M O H N N O H N N O H H N O O H N M O H N N O H H N O O H N N O H H N O H H N M O H N N O H H N M \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ H H H H H N N N N M M M M C C C C Ln n Ln Ln o lD ?o l0 l0 f r l- r- N m m m m m m m m O O O O O H H H H N N N N N O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O H H H H H H H H H H H H H H I I I I I I I I I I I I I I I I I I I I I I I I I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 O) Ol 6) 01 61 Ol Ol O) Ol 61 O) dl T O1 Ol O1 dl O1 Ol Ol Ol O) O) D1 O1 61 O1 dl 61 O) 61 dl dl dl 61 61 O1 O1 dl O) T 61 Ol Ol Ol 61 61 T O1 61 Q) Q1 dl 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00 0 0 0 0 0 00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ C H co N m H N H C7 N Ol N N a> M O r C H C) C H N 0 N 61 l0 N 6) -4 M O W M O C H W? H CO H LO M N l0 M O r C> O O H H N C, O O H N O O H N N O H H N N O H H N M O H N N O H H N O O H N M O H N N N O H H N O O H N N N O H N N \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ H H H H H N N N N M CO M C' C' C' C N N N CD C> \0 lD (D 10 r- O O O CD 0 CD CD 0 0 0 o H H H H H N N N N 0 0 0 0 0 0 0 0 0 0 CD 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o H H H H H H H H H H H H H H N M C N lD [? co D1 O H N M C' N lD l- OJ 01 O H N M C• In r, O H N M C tf) m ?o r- m m OJ M m M O H N M C Lf) l0 [- m al c> H N M H H H H H H H H H H N N N N N N N N N N N N N M M M M M M M C C C C C C C C C C N lf) u) Lf) d O m O V) x ro 0 P4 N W 0 H 0 ro W Detailed Report Page 1 of 1 HCS+" DETAILED REPORT General Information Site Information Analyst Agency or Co. GCC Date Performed 112012011 Time Period PM PEAK Intersection CAUSEWAY/ISLAND WAY Area Type All other areas Jurisdiction CLEARWATER Analysis Year 2011 EXISTING Project ID Volume and Timing Input EB WB NB SIB LT TH RT LT TH RT LT TH RT LT TH RT Number of Lanes, Ni 1 2 2 1 2 1 Lane Group L T T R L R Volume, V (vph) 130 824 712 377 321 159 % Heavy Vehicles, %HV 2 2 2 2 2 2 Peak-Hour Factor, PHF 0.96 0.96 0.96 0.96 0.96 0.96 Pretimed (P) or Actuated (A) A A A A A A Start-up Lost Time, 11 2.0 2.0 2.0 2.0 2.0 2.0 Extension of Effective Green, a 2.0 2.0 2.0 2.0 2.0 2.0 Arrival Type, AT 3 4 4 3 3 3 Unit Extension, UE 3.0 3.0 3.0 3.0 3.0 3.0 Filtering/Metering, 1 1.000 1.000 1.000 1.000 1.000 1.000 Initial Unmet Demand, Qb 0.0 0.0 0.0 0.0 0.0 0.0 Ped / Bike / RTOR Volumes 0 0 0 0 80 0 0 0 0 40 Lane Width 12.0 12.0 12.0 12.0 12.0 12.0 Parking / Grade / Parking N 0 N N 0 N N 0 N N 0 N Parking Maneuvers, Nm Buses Stopping, NB 0 0 0 0 0 0 Min. Time for Pedestrians, G p 3.2 3.2 3.2 3.2 Phasing EB Only EW Perm 03 04 SB Only 06 07 08 I G= 15.0 I G= 40.0 G= G= G= 20.0 G= G= G= Timing Y= 5 Y= 5 Y= Y= Y= 5 Y= Y= Y= Duration of Analysis, T = 0.25 Cycle Length, C = 90.0 Lane Group Capacity, Control Delay, an d LOS Determination EB WB NB SIB LT TH RT LT TH RT LT TH RT LT TH RT Adjusted Flow Rate, v 135 858 742 309 334 124 Lane Group Capacity, c 555 2365 1576 704 764 352 v/c Ratio, X 0.24 0.36 0.47 0.44 0.44 0.35 Total Green Ratio, g/C 0.67 0.67 0.44 0.44 0.22 0.22 Uniform Delay, d1 6.3 6.6 17.6 17.3 30.2 29.5 Progression Factor, PF 1.000 0.383 0.843 1.000 1.000 1.000 Delay Calibration, k 0.11 0.11 0.11 0.11 0.11 0.11 Incremental Delay, d2 0.2 0.1 0.2 0.4 0.4 0.6 Initial Queue Delay, d3 0.0 0.0 0.0 0.0 0.0 0.0 Control Delay 6.5 2.6 15.0 17.7 30.6 30.1 Lane Group LOS A A B B C C Approach Delay 3.2 15.8 30.4 Approach LOS A B C Intersection Delay 13,5 Xc = 0.46 Intersection LOS B Copyright @ 2007 University of Florida, All Rights Reserved HCS+TM Version 5.3 Generated: 1/20/2011 12:14 PM file://C:\Documents and Settings\rpergolizzi.GULFCOAST\Local Settings\Temp\s2kD4.tmp 1/20/2011 PROJECT: LOCATION: DATE: LANE TYPE: NB SB EB WB PEAK HOUR PEAK HOUR / P.H.F. DATA CLEARWATER MARINE AQUARIUM PROJECT NO: Island Way (SB) & Clearwater Memorial Causeway (E-W) January 19, 2011 SPEED LIMIT: SIGNAL TIMING: A (SECONDS) N/A NB N/A NB 4 Lane Div SB 30 SB 4 Lane Div EB 45 EB 4 Lane Div WB 45 WB TIME NB NB NB SB PM L T R L 4:00-4:15 0 0 0 92 4:15-4:30 0 - 0 0 60 4:30-4:45 0 0 0 88 4:45-5:00 ' 0 0 0 74 5:00-5:15 0 > 0 0 90 5:15-5:30 0 0 0 67 5:30-5:45 0 0 _ 0 48 5:45-6:00 0 0' "-0 54 0 0 0 573 TIME NB NB NB SB PM L T R L 4:15-4:30 0 0 0 ' 60 4:30-4:45 0 0 0' 88 " 4:45-5:00 0 0 0 74 5:00-5:15 0 0 0 90 0 0 0 312 PM PEAK HOUR COUNTS 11-005 G Y R N/A N/A N/A N/A - 20 N/A 4 8T 16 56 4 26 N/A 39 4 44 SB SB EB EB EB WB WB WB TOTAL HOURLY T R L T R L T R VOLUME VOLUMES 0 36 31 217 0 0 182 76 634 0 30 37 205 0 0 193 99 624 0' 44 33 202 0 0 152 82 601 0 42 26 170 0 0 183 94 589 2,448 0 38 30 223 0 0 164 91 636 2,450 0 40 28 211 0 0 185 76 607 2,433 0 29 32 166 0 0 188 72 535 2,367 HOURLY FLOW DIAGRAM 0 38 25 153 0 0 198 90 558 2,336 466 492 0 297 242 1,547 0 0 1,445 680 4,784 l } 1 SB SB EB EB EB WB WB WB TOTAL 164 0 3 12 T R L T R L T R VOLUME I I i L 0 30 37 205 0 0 193 99 624 846 126 + ~ ? 366 11,058 0 44 33 202 0 0 152 82 601 800 -? 692 0 42 26 170 0 0 183 94 589 926 0 -? 0 --? 1,112 0 38 30 223 0 0 164 91 636 } I 0 154 126 800 0 0 692 366 2,450 0 O 0 INTERSECTION PEAK HOUR 4:15-5:15 INTERSECTION PHF 0.96 INTERSECTION PEAK HOUR VOLUME 2,450 PEAK HOUR VOLUME NB 0 PHF NB #DIV10! PEAK HOUR VOLUME SB 466 PHF SB 0.88 PEAK HOUR VOLUME EB 926 PHF EB 0.92 PEAK HOUR VOLUME WB 1.058 PHF WB 0.91 i t 0 0 yj Detailed Report Page 1 of 1 HCS+- DETAILED REPORT General Information Site Information Analyst RP Agency or Co. GCC Date Performed 311512011 Time Period SATURDAYPEAK Intersection Area Type Jurisdiction Analysis Year Project ID CAUSEWAY/ISLAND WAY All other areas CLEARWATER 2011 EXISTING Volume and Timing Input EB WB NB SB LT TH RT LT TH RT LT TH RT LT TH RT Number of Lanes, Ni 1 2 2 1 2 1 Lane Group L T T R L R Volume, V (vph) 121 848 1031 228 244 155 % Heavy Vehicles, %HV 2 2 2 2 2 2 Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 Pretimed (P) or Actuated (A) A A A A A A Start-up Lost Time, 11 2.0 2.0 2.0 2.0 2.0 2.0 Extension of Effective Green, a 2.0 2.0 2.0 2.0 2.0 2.0 Arrival Type, AT 3 4 4 3 3 3 Unit Extension, UE 3.0 3.0 3.0 3.0 3.0 3.0 Filtering/Metering, 1 1.000 1.000 1.000 1.000 1.000 1.000 Initial Unmet Demand, Qb 0.0 0.0 0.0 0.0 0.0 0.0 Ped / Bike / RTOR Volumes 0 0 0 0 0 0 0 0 0 0 Lane Width 12.0 12.0 12.0 12.0 12.0 12.0 Parking / Grade / Parking N 0 N N 0 N N 0 N N 0 N Parking Maneuvers, Nm Buses Stopping, NB 0 0 0 0 0 0 Min. Time for Pedestrians, Gp 3.2 3.2 3.2 3.2 Phasing EB Only EW Perm 03 04 SIB Only 06 07 08 G= 15.0 G= 40.0 G= G= G= 20.0 G= G= G= Timing Y= 5 Y= 5 Y= Y= Y= 5 Y= Y= Y= Duration of Analysis, T = 0.25 Cycle Length, C = 90.0 Lane Group Capacity, Control Delay, an d LOS Determination EB WB NB SIB LT TH RT LT TH RT LT TH RT LT TH RT Adjusted Flow Rate, v 127 893 1085 240 257 163 Lane Group Capacity, c 431 2365 1576 704 764 352 v/c Ratio, X 0.29 0.38 0.69 0.34 0.34 0.46 Total Green Ratio, g/C 0.67 0.67 0.44 0.44 0.22 0.22 Uniform Delay, d1 8.4 6.7 20.0 16.4 29.4 30.3 Progression Factor, PF 1.000 0.383 0.843 1.000 1.000 1.000 Delay Calibration, k 0.11 0.11 0.26 0.11 0.11 0.11 Incremental Delay, d2 0.4 0.1 1.3 0.3 0.3 1.0 Initial Queue Delay, d3 0.0 0.0 0.0 0.0 0.0 0.0 Control Delay 8.8 2.7 18.2 16.7 29.7 31.3 Lane Group LOS A A B B C C Approach Delay 3.4 17.9 30.3 Approach LOS A B C Intersection Delay 14.4 X = 0.58 Intersection LOS B Copyright © 2007 University of Florida, All Rights Reserved HCS+rM Version 5.3 Generated: 3/15/2011 9:21 AM file://C:\Documents and Settings\rpergolizzi.GULFCOAST\Local Settings\Temp\s2k65.tmp 3/15/2011 !. w k i rc nr+eA@ Intcracn4inn Pcnk Method for determining peak hour: Total Entering Volume yr. 11 LOCATION: Island Way -- Clearwater Memorial Causeway QC JOB #: 10592902 CITY/STATE: Clearwater, FL DATE: 3/12/2011 433 0.93 379 Peak-Hour: 11:15 AM -- 12:15 PM 2.3 3.2 a I 168 0 265 I Peak 15-Min: 11:1 5 AM --11:30 AM a * L 3.6 0.0 1.5 ? 1* *P 129140 132 f t, 248 61369 4) i t? 1.5 ?. 5.3 t L 2.0 40 1.3 FO 922 ? 0.95 40 1121 0.94 1.2 ,?\;' 40 1.2 105440 0 7 {- 0 *1186 h? P 0 0 0 a 1? UcLI Counts (IQ 1.7 .? 0.0 'i r 0.0 ? 1.3 h t P 0.0 0.0 0.0 ? F_ o H o a * °.o 0.0 32 L 1 4) i t* 0 t < 2 71 0 6 ? 40 2 L ° I0 0 0 F s ... ,: R* - RTOR - 15-Min Count Period Island Way (Northbound) Island Way (Southbound) Clearwater Memorial Cau ewapearwater Memorial Caus eway Total Hourly Beginning At Left Thru Right U R* Left Thru Ri ht U R* Left Thu R* Left T u i R. Totals 1100 AM 0 0 0 0 0 61 0 33 0 0 35 235 0 1 0 0 250 48 0 0 663 11:30 AM it AM 0 0 0 0 - 0 l 75 G U f 0- - 41 30 223 0 1 ? L 2 68 65 0 0 J 703 11:4 12:00 PM - 0 0 0 0 0 0 0 0 0 0 61 68 51 0 0 34 1 0 2 232 0 1 2 41 204- a 0 0 0 56 0 0 0 311 0. 260 63 - 0..- 0 734 671 2848 2856 12:15 PM 12:30 PM 0 0 0 0 0 0 0 0 0 0 53 62 0 31 0 0 0 40 0 0 26 224 0 0 26 213 0 0 0 0 0 293 75 0 0 0 317 66 0 0 702 724 2810 2831 12:45 PM 0 0 0 0 0 44 0 32 0 0 34 209 0 1 0 0 300 71 0 0 691 2788 C?--° I U 3 i Iz1 - Peak 15-Min Northbound Southbound Eastbound Westbound Total Flowrates Left Thru Right U R* Left Thru Ri ht U R* Left Thru Ri ht U R* Left Thru Ri ht U R* All Vehicles 0 0 0 0 0 240 4 0 168 0 0 0 0 148 1052 0 0 8 16 0 0 0 1128 256 0 0 0 12 8 2992 48 Heavy Trucks Pedestrians 0 0 0 0 56 92 0 148 Bicycles 0 0 0 0 0 0 0 2 0 0 1 2 5 Railroad stopped Buses , I Comments: Report generated on 3/14/2011 3:57 PM SOURCE: Quality Counts, LLC (nttp:awww.quautycounts.net) Detailed Report Page 1 of 1 HCS+'M DETAILED REPORT General Information Site Information Analyst RP Agency or Co. GCC Date Performed 1/21/2011 Time Period PM PEAK Intersection Area Type Jurisdiction Analysis Year Project ID ISLAND WAY/ WINDWARD All other areas CLEARWATER 2011 EXISTING Volume and Timing Input EB WB NB SIB LT TH RT LT TH RT LT TH RT LT TH RT Number of Lanes, Ni 0 1 1 0 1 1 1 2 0 1 2 0 Lane Group LT R LT R L TR L TR Volume, V (vph) 4 2 79 35 2 8 88 338 63 20 240 11 % Heavy Vehicles, %HV 2 2 2 2 2 2 2 2 2 2 2 2 Peak-Hour Factor, PHF 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Pretimed (P) or Actuated (A) A A A A A A A A A A A A Start-up Lost Time, 11 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Extension of Effective Green, a 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Arrival Type, AT 3 3 3 3 3 3 3 3 Unit Extension, UE 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Filtering/Metering, 1 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Initial Unmet Demand, Qb 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Ped / Bike / RTOR Volumes 0 0 20 0 0 0 0 0 0 0 0 0 Lane Width 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 Parking / Grade / Parking N 0 N N 0 N N 0 N N 0 N Parking Maneuvers, Nrn Buses Stopping, Ns 0 0 0 0 0 0 0 0 Min. Time for Pedestrians, G p 3.2 3.2 3.2 3.2 Phasing EW Perm 02 03 04 Excl. Left NS Perm 07 08 G= 15.0 G= G= 1 G= G= 9.0 G= 32.0 G= G= Timing Y= 4 Y= Y= Y= Y= 5 Y= 5 Y= Y= Duration of Analysis, T = 0.25 Cycle Length, C = 70.0 Lane Group Capacity, Control Delay, an d LOS Determination EB WB NB SIB LT TH RT LT TH RT LT TH RT LT TH RT Adjusted Flow Rate, v 6 61 38 8 91 413 21 258 Lane Group Capacity, c 364 339 318 339 762 1583 660 1611 v/c Ratio, X 0.02 0.18 0.12 0.02 0.12 0.26 0.03 0.16 Total Green Ratio, g/C 0.21 0.21 0.21 0.21 0.66 0.46 0.66 0.46 Uniform Delay, d1 21.7 22.5 22.2 21.7 4.4 11.7 4.4 11.1 Progression Factor, PF 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Delay Calibration, k 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 Incremental Delay, d2 0.0 0.3 0.2 0.0 0.1 0.1 0.0 0.0 Initial Queue Delay, d3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Delay 21.7 22.7 22.3 21.7 4.5 11.8 4.4 11.2 Lane Group LOS C C C C A B A B Approach Delay 22.6 22.2 10.5 10.7 Approach LOS C C B B Intersection Delay 12.0 Xc = 0.26 Intersection LOS B Copyright © 2007 University of Florida, All Rights Reserved HCS+TM Version 5.3 Generated: 1/21/2011 10:00 AM file://CADocuments and Settings\rpergolizzi.GULFCOAST\Local Settings\Temp\s2k5E.tmp 1/21/2011 PROJECT: LOCATION: DATE: LANE TYPE: NB SIB EB WB PEAK HOUR PEAK HOUR / P.H.F. DATA CLEARWATER MARINE AQUARIUM PROJECT NO: Island Way (N-S) & Windward Passage (E-W) January 20, 2011 SPEED LIMIT: SIGNAL TIMING: A_ (SECONDS) 4 Lane Div NB 30 NB 4 Lane Div SB 30 SIB 2 Lane EB 25 EB 2 Lane WB 25 WB 11-005 G Y R 14 32 4 20 9 25 4 20 N/A 15 4 35 N/A 15 4 35 PM PEAK HOUR COUNTS TIME NB NB NB SB SB SB EB EB EB WB WB WB PM L T R L T R L T R L T R 4:00-4:15 14 62 14 1 79 2 0 4 19 . 10 .1 2 4:15-4:30 22 73 17 4 54 .. 1 2_ 2 19 11 2 2 4:30-4:45 13 69 11 7 - 46 6 1 3 27 13 1 4 4:45-5:00 23 77 13 57 3 1' - 0 27 10 1 1 5:00-5:15 25 77 12 5 58 2 4' 1 - 2Z 9 0 2 5:15-5:30 15 79 15 5 57 5 0 0 13 7 0 3 5:30-5:45 ' 22 90 17 3 .64 . " 2 0 _ 0 13 9 0 3 5:45-6:00 24 82 17 6 54 2 0 1 24 9 2 0 158 609 116 36 469 23 8 11 169 78 7 17 TIME NB NB NB SB SB SB EB EB EB WB WB WE PM L T R L T R L T R L T R 5:00-5:15 25 77 12 5 58 2 4 1 27 9 0 2 5:15-5:30 15 79 15 _5 57 5 0 0 13 7 0 3 5:30-5:45 22 90 17 3 64 2 0' 0 13 9 0 3 5:45-6:00 . 24 82 17 6 54 2 0 1 24 9 2 0 86 328 61 19 233 11 4 2 77 34 2 8 INTERSECTION PEAK HOUR 5:00-6:00 INTERSECTION PHF INTERSECTION PEAK HOUR VOLUME 865 PEAK HOUR VOLUME NB 475 PHF NB PEAK HOUR VOLUME SIB 263 PHF SIB PEAK HOUR VOLUME EB 83 PHF EB PEAK HOUR VOLUME WB 44 PHF WB 0.97 TOTAL HOURLY VOLUME VOLUMES 208 209 201 218 836 222 850 199 840 223 862 HOURLY FLOW DIAGRAM 221 865 263 340 1,701 1 t TOTAL 11 233 19 VOLUME I I ? L 222 99 ?- 4 + ? ? 8 44 199 2 2 223 83 -? 77 -? j- 34 82 221 1 865 86 32 8 61 1 1 344 475 0.92 C ._ 0.95 (,J 0.65 0.92 4J -? r, t Detailed Report Page 1 of 1 HCS+'" DETAILED REPORT General Information Site Information Analyst RP Agency or Co. GCC Date Performed 311512011 Time Period SATURDAY PEAK Intersection Area Type Jurisdiction Analysis Year Project ID ISLAND WAY/ WINDWARD All other areas CLEARWATER 2011 EXISTING Volume and Timing Input EB WB NB SB LT TH RT LT TH RT LT TH RT LT TH RT Number of Lanes, Ni 0 1 1 0 1 1 1 2 0 1 2 0 Lane Group LT R LT R L TR L TR Volume, V (vph) 4 10 80 43 10 11 86 220 30 14 270 17 % Heavy Vehicles, %HV 2 2 2 2 2 2 2 2 2 2 2 2 Peak-Hour Factor, PHF 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Pretimed (P) or Actuated (A) A A A A A A A A A A A A Start-up Lost Time, 11 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Extension of Effective Green, a 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Arrival Type, AT 3 3 3 3 3 3 3 3 Unit Extension, UE 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Filtering/Metering, 1 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Initial Unmet Demand, Qb 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Ped / Bike / RTOR Volumes 0 0 50 0 0 0 0 0 0 0 0 0 Lane Width 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 Parking / Grade / Parking N 0 N N 0 N N 0 N N 0 N Parking Maneuvers, Nrn Buses Stopping, NB 0 0 0 0 0 0 0 0 Min. Time for Pedestrians, G P 3.2 3.2 3.2 1 3.2 -1 Phasing EW Perm 0 2 03 04 Excl. Left NS Perm 07 08 I G= 15.0 1 G= G= l G= I G= 9.0 G= 32.0 G= G= Timing Y= 4 Y= Y= y= Y= 5 Y= 5 Y= Y= Duration of Analysis, T = 0.25 Cycle Length, C = 70.0 Lane Group Capacity, Control Delay, an d LOS Determination EB WB NB SB LT TH RT LT TH RT LT TH RT LT TH RT Adjusted Flow Rate, v 14 31 55 11 90 260 15 299 Lane Group Capacity, c 381 339 319 339 734 1592 761 1607 v/c Ratio, X 0.04 0.09 0.17 0.03 0.12 0.16 0.02 0.19 Total Green Ratio, g/C 0.21 0.21 0.21 0.21 0.66 0.46 0.66 0.46 Uniform Delay, d1 21.8 22.0 22.4 21.8 4.4 11.1 4.2 11.3 Progression Factor, PF 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Delay Calibration, k 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 Incremental Delay, d2 0.0 0.1 0.3 0.0 0.1 0.0 0.0 0.1 Initial Queue Delay, d3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Delay 21.8 22.2 22.7 21.8 4.5 11.2 4.2 11.3 Lane Group LOS C C C C A B A B Approach Delay 22.1 22.5 9.5 11.0 Approach LOS C C A B Intersection Delay 11.9 Xc = 0.22 Intersection LOS B Copyright © 2007 University of Florida, All Rights Reserved HCS+TM Version 5.3 Generated: 3/15/2011 9:27 AM file://C:\Documents and Settings\rpergolizzi.GULFCOAST\Local Settings\Temp\s2k78.tmp 3/15/2011 M nnPthnd for determinina peak hour: Total Entering Volume I ypC ul IJCdn iivui -1 iy icNv-W. ... w..,........... .,..... LOCATION: Island Way -- Windward Passage QC JOB #: 10592901 DATE: 3/12/2011 CITY/STATE: Clearwater FL 328 0.92 254 Peak-Hour: 11:15 AM --12:15 PM 1.8 5.1 ? t I I 19 294 15 I Peak 15-Min: 11:15 AM --11:30 AM ? t 0.0 2.0 0.0 L L- - J 120 A? 4 „r t, 11 ? 68 0.0 ? 25.0 J L 0.0 t 0.0 0.85 10 +? 0.96 ? 10 0.74 0,0 0.0 101 ? 67 'k r 47 ? 58 h t P 93 239 33 ?? t a:Q LIa Ly Counts 1.0 .? 0.0 3 r 0.0 * 1.7 •t t P 0.0 5.0 3.0 ? ? 430 0.96 365 % z. i' ? t 1.4 3.6 5 L 0 4 0 J 48 5 4) ? L 0 0 0 ?? ?- 0 0 7 2 17 L 0 3 0 J L I f .? ? ,, t e r Z 7*1 t r? - * - RTOR R 15-Min Count Period Island Way (Northbound) Island Way (Southbound) Windward Passage (Eastbound) * Windward Passage (Westbound) U R* Total Hourly Totals Beginning At M Left Thru Right U R* 21 54 5 1 1 Left Thru Right U R* 4 64 4 0 0 Left Thru Right U 2 0 0 0 R 14 Left Thru Ri ht 10 1 0 0 1 183 11:00 A 0 - - _ G7_ _ _ _ _ 5 2 1 5 74 5 0 1 2 22 4 0 18 3 1 1 0 3 213 11:30 AM 11:45 AM 12:00 PM 18 as 25 49 3 0 2 26 60 9 0 5 4 79 4 0 2 6 62 3 0 0 0 3 9 0 2 2 6...- 0., 16 15. 8 5 0 0 2 13 .,. 3..._ ._0.- 0._ 1 211 . 213 832 862 1215 PM 12:30 PM 25 53 7 0 0 24 64 8 2 1 1 56 2 0 0 3 59 3 0 1 4 0 3 0 4 0 6 0 19 23 12 0 0 0 2 9 0 0 0 4 184 211 821 819 12:45 PM 33 59 6 0 2 3 39 3 0 0 1 1 9 0 13 5 1 0 0 4 179 787 4 ?? II ec Z70 ;v Peak 15-Min Northbound Southbound Eastbound Westbound Total Flowrates Left Thru Right U R* Left Thru Ri ht U R* Left Thru Right U R* Left Thru Right U w All Vehicles Heavy Trucks 88 268 24 0 8 0 20 0 0 316 12 0 4 0 4 0 0 12 20 0 0 0 0 56 72 4 8 0 8 0 0 0 900 24 Pedestrians Bicycles 8 0 2 0 0 0 2 0 32 0 0 0 4 1 0 0 44 5 Railroad Sto ed Buses I Comments: Report generated on 3/14/2011 3:57 PM SuuKut: uuauty uounis, LLU (ni[p:nwww.qudmycuunis.ncL) Two-Way Stop Control Page 1 of 1 TWO-WAY STOP CONTROL SUMMARY General Information Site Information WINDWARD/AQUARIUM Analyst RP Intersection DRIVE Agency/Co. GCC Jurisdiction CLEARWATER Date Performed 1/21/2011 Analysis Year 2011 EXISTING nal sis Time Period PM PEAK Project Description East/West Street: WINDWARD PASSAGE North/South Street: AQUARIUM DRIVEWAY Intersection Orientation: East-West Stud Period hrs : 0.25 Vehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R Volume veh/h 58 0 5 42 Peak-Hour Factor, PHF 1.00 0.92 0.92 0.92 0.92 1.00 Hourly Flow Rate, HFR veh/h 0 63 0 5 45 0 Percent Heavy Vehicles 0 -- -- 2 -- -- Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration TR LT Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R Volume veh/h 0 19 Peak-Hour Factor, PHF 0.92 1.00 0.92 1.00 1.00 1.00 Hourly Flow Rate, HFR veh/h 0 0 20 0 0 0 Percent Heavy Vehicles 2 0 2 0 0 0 Percent Grade (%) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length. and Level of Service Approach Eastbound Westbound Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR v (veh/h) 5 20 C (m) (veh/h) 1540 1002 v/c 0.00 0.02 95% queue length 0.01 0.06 Control Delay (s/veh) 7.3 8.7 LOS A A pproach Delay (s/veh) -- -- 8.7 pproach LOS -- -- A Copyright © 2007 University of Florida, All Rights Reserved HCS+TM Version 5.3 Generated: 1/21/2011 11:18 AM file://C:\Documents and Settings\rpergolizzi.GULFCOAST\Local Settings\Temp\u2k65.tmp 1/21/2011 PEAK HOUR / P.H.F. DATA PROJECT: CLEARWATER MARINE AQUARIUM PROJECT NO: 11-005 LOCATION: Aquarium Driveway & Windward Passage (E-W) DATE: January 20, 2011 LANE TYPE: SPEED LIMIT: SIGNAL TIMING: A G Y R (SECONDS) NB driviway NB NB SIB - SB SB EB 1 Lane EB 25 EB WB 1 Lane WB 25 WB PM PEAK HOUR COUNTS TIME NB NB NB SB SB SB EB EB EB WB WB WB PM L T R L T R L T R L T R 4:00-4:15 0 0 6 0 0 0 0 9 0 0 7 0 4:15-4:30 - 0' " 0 4 0 0 0 0 14 0 1 10 0 4:30-4:45 0 0 6 0 0 0 0 14 0 1 10 0 4:45-5:00 0 0 2 0 0 0 0 16 0 1 9 0 5:00-5:15 - 0 0 7 0 0 0 0 12 0 2 12 0 5:15-5:30 0. 0 1 0 0 0 0 5 0 1 7 0 5:30-5:45 0 0 5 0 0 0 0 3 0 0 8 0 5:45-6:00 0 0 5 0 0 0 0 14 0 6 14 0 0 0 36 0 0 0 0 87 0 12 77 0 PEAK HOUR TIME NB NB NB SB SB SB EB EB EB WB WB WB PM L T R L T R L T R L T R 4:15-4:30 0 0 4 0 0 0 0 14 0 1 10. 0 4:30-4:45 0 0< 6 0 0 0 0 14 0 1 10 0 4:45-5:00 0 0 2 0 0 0 0 16 0 1 9 0 5:00-5:15 0 0` 7 0 0 - 0 0 12 ` 0 2 12 0 0 0 19 0 0 0 0 56 0 5 41 0 INTERSECTION PEAK HOUR 4:15-5:15 INTERSECTION PHF 0.92 INTERSECTION PEAK HOUR VOLUME 121 PEAK HOUR VOLUME NB 19 PHF NB 0.68 PEAK HOUR VOLUME SB 0 PHF SB #DIV/0i PEAK HOUR VOLUME EB 56 PHF EB 0.88 PEAK HOUR VOLUME WB 46 PHF WB 0.82 TOTAL HOURLY VOLUME VOLUMES 22 29 31 28 110 33 121 14 106 16 91 HOURLY FLOW DIAGRAM 39 102 0 0 212 I i 1 TOTAL 0 0 0 VOLUME I I L 29 41 ? 0 A 46 0 31 56 -? ?- 41 28 56 0 5 -+ 75 33 121 0 0 19 1 1 5 19 t `; Two-Way Stop Control Page 1 of 1 TWO-WAY STOP CONTROL SUMMARY General Information Site Information WINDWARD /AQUARIUM Analyst RP Intersection DRIVE Agency/Co. GCC Jurisdiction CLEARWATER Date Performed 311412011 sis Year Anal 2011 EXISTING Analysis Time Period SATURDAY PEAK y Project Description East/West Street: WINDWARD PASSAGE North/South Street: AQUARIUM DRIVEWAY Intersection Orientation: East-West Stud Period hrs : 0.25 Vehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R Volume veh/h 55 3 38 50 Peak-Hour Factor, PHF 1.00 0.92 0.92 0.92 0.92 1.00 Hourly Flow Rate, HFR veh/h 0 59 3 41 54 0 Percent Heavy Vehicles 0 -- -- 2 -- - Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration TR LT Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R Volume veh/h 2 16 Peak-Hour Factor, PHF 0.92 1.00 0.92 1.00 1.00 1.00 Hourly Flow Rate, HFR veh/h 2 0 17 0 0 0 Percent Heavy Vehicles 2 0 2 0 0 0 Percent Grade (%) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, and Level of Service Approach Eastbound Westbound Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR v (veh/h) 41 19 C (m) (veh/h) 1541 974 v/c 0.03 0.02 95% queue length 0.08 0.06 Control Delay (s/veh) 7.4 8.8 LOS A A Approach Delay (s/veh) -- -- 8.8 JApproach LOS I -- T_ -- A Copyright @ 2007 University of Florida, All Rights Reserved HCS+TM Version 5.3 Generated: 3/14/2011 12:51 PM file://C:\Documents and Settings\rpergolizzi.GULFCOAST\Local Settings\Temp\u2kl7.tmp 3/14/2011 PEAK HOUR / P.H.F. DATA PROJECT: CLEARWATER MARINE AQUARIUM PROJECT NO: 11-005 LOCATION: Aquarium Driveway & Windward Passage (E-W) DATE: March 12, 2011- Saturday LANE TYPE: SPEED LIMIT: SIGNAL TIMING: A G Y R (SECONDS) NB driviway NB NB SIB SIB SIB EB 1 Lane EB 25 EB WB 1 Lane WB 25 WB PM PEAK HOUR COUNTS TIME NB NB NB SB SB SB EB EB EB WB WB WB TOTAL HOURLY PM L T R L T R L T R L T R VOLUME VOLUMES 11:00 -11.1: 0 0 ,2 0 0 0 1.0. 9, 0 5 16 0 34 11:15-11:30 0 0 .5 0 0 0' 0 14, 0 0> 12 0' 31 11:30-11:45 1 0 5 0 0 0 0 150 3` 17 0 41 11:45-12:00 0 0 5 0 0 0.: 0-! 12 0 7 13 0 37 143 12:00-12:15 2' 0 3' 0 0 0 0 • 13 0. 9 17 0 44 153 12:15-12:30 0' 0 0 0 0 0 16''1 1 10 13 0 43 165 12:30-12:45 0 0 5` 0 0 0Y 0 15s );2 12 0 43 167 HOURLY FLOW DIAGRAM 12:45-100 0 0 6 0 0 0 0 16' 0 13 ' 12 0 47 177 - -- 0 0 3 0 34 0 0 0 0 110 3 56 114 0 320 1 } PEAK HOUR TIME NB NB NB SIB SIB SIB EB EB EB WB WB WB TOTAL 0 0 0 PM L T R L T R L T R L T R VOLUME I i 12:00-12:15 2 0 3 0' - 0 0 0 13 0 917 a 44 56 - 0 0 ¢ 95 12:15-12:30 0 0 3 0 0 0 0 16" 1 10 13 0 43 60 ? ? 54 12:30-12:45 0 0 5, 0 0 0. 0 15 2 9 12 0 43 6:3 ? 3 41 77 12:45-1:00 0 0 6 0 0 0 0 16 0 13 12 0 47 - 2 0 17 0 0 0 0 60 3 41 54 0 177 2 O 17 1 1 INTERSECTION PEAK HOUR 12:00-1:00 INTERSECTION PHF 0.94 44 19 INTERSECTION PEAK HOUR VOLUME 177 PEAK HOUR VOLUME NB 19 PHF NB 0.79! av Z.l? PEAK HOUR VOLUME SB 0 PHF SB #DIV/O! _ PEAK HOUR VOLUME EB 63 PHF EB 0.93 _ PEAK HOUR VOLUME WB 95 PHF WB 0.91 E? ? I Cn Generalized Peak Hour Two-Way Volumes for Florida's TABLE Urbanized Areas' 10/4/10 STATE SIGNALIZED ARTERIALS Class I (>0.00 to 1.99 signalized intersections per mile) Lanes Median B C D E 2 Undivided 930 1,500 1,600 *** 4 Divided 2,840 3,440 43,560 *** 6 Divided 4,370 5,200 ' 5,360 ** 8 Divided 5,900 6,970 7,160 *** Class II (2.00 to 4.50 signalized intersections per mile) Lanes Median B C D E 2 Undivided ** 1,020 1,480 1,570 4 Divided mm 2,420 3,220 3,400 6 Divided ** 3,790 4,880 5,150 8 Divided Tm 5,150 6,530 6,880 Class HL TV (more than 4.50 signalized intersections per mile) Lanes Median B C D E 2 Undivided ** 500 1,150 1,440 4 Divided *T 1,220 2,730 ) VV 6 Divided ** 1,910 4,240 4,680 8 Divided ** 2,620 5,770 6,280 Non-State Signalized Roadway Adjustments (Alter corresponding state volumes by the indicated percent.) Major City/County Roadways -10% Other Signalized Roadways -35% State & Non-State Signalized Roadway Adjustments (Alter corresponding state volumes by the indicated percent.) Divided/Undivided & Turn Lane Adjustments Exclusive Exclusive Adjustment Lanes Median LeftLanes Right Lanes Factors 2 Divided Yes No 4-5% 2 Undivided No No -20% Multi Undivided Yes No -5% Multi Undivided No No -25% - - Yes +5% One-Way Facility Adjustment Multiply the corresponding two-directional volumes in this table by 0.6. FREEWAYS Lanes B C D E 4 4,000 5,500 6,770 7,300 6 6,000 8,320 10,150 11,290 8 8,000 11,050 13,480 15,270 10 10,000 13,960 16,930 19,250 12 13,730 18,600 21,950 23,230 Freeway Adjustments Auxiliary Ramp Lanes Metering + 1,800 +5% UNINTERRUPTED FLOW HIGHWAYS Lanes Median B C D E 2 Undivided 730 1,460 2,080 2,620 4 Divided 3,220 4,660 6,040 6,840 6 Divided 4,840 6,990. 9,060 10,280 Uninterrupted Flow Highway Adjustments Lanes Median Exclusive left lanes Adjustment factors 2 Divided Yes +5% Multi Undivided Yes -5% Multi Undivided No -25% BICYCLE MODE' (Multiply motorized vehicle volumes shown below by number of directional roadway lanes to determine two-way maximum service volumes.) Paved Shoulder/ Bicycle Lane Coverage B C D E 0-49% TT 310 1,180 >1,180 50-84% 240 360 >360 *** 95-100% 620 >620 *** *** PEDESTRIAN MODE' (Multiply motorized vehicle volumes shown below by number of directional roadway lanes to determine two-way maximum service volum es.) Sidewalk Coverage B C D E 0-49% ** ** 480 1,390 50-84% ** ** 1,100 1,820 85-100% ** 1,100 1,820 >1,820 BUS MODE (Scheduled Fixed Route)3 (Buses in peak hour in peak direction) Sidewalk Coverage B C D E 0-84% >5 >4 >3 >2 85-100% >4 >3 >2 >1 ' Values shown are presented as hourly two-way volumes for levels of service and are for the automobile/truck modes unless specifically stated. Although presented as peak hour two- way volumes, they actually represent peak hour peak direction conditions with an applicable D factor applied. This table does not constitute a standard and should be used only for general planning applications. The computer models from which this table is derived should be used for more specific planning applications. The table and deriving computer models should not be used for corridor or intersection design, where more refined techniques exist. Calculations are based on planning applications of the H ghway Capacity Manual, Bicycle LOS Model, Pedestrian LOS Model and Transit Capacity and Quality of Service Manual, respectively for the automobile/truck, bicycle, pedestrian and bus modes. z Level of service for the bicycle and pedestrian modes in this table is based on number of motorized vehicles, not number of bicyclists or pedestrians using the facility. 'Buses per hour shown are only for the peak hour in the single direction of the higher traffic flow. SOW'Ce: ** Cannot be achieved using table input value defaults, Florida Department of Transportation *** Not applicable for that level of service letter grade. For the automobile mode, volumes greater than level of service D Systems Planing Office become F because intersection capacities have been reached. For the bicycle mode, the level of service letter grade (including 605 Suwannee Street, MS 19 F) is not achievable because there is no maximum vehicle volume threshold using table input value defaults. Tallahassee, FL 32399-0450 www.dot.state.fl.us/planning/svstems/sm/los/default.shtm 2009 FDOT QUALITY/LEVEL OF SERVICE HANDBOOK APPENDIX B Land Use: 445 Multiplex Movie Theater Description A multiplex movie theater consists of audience seating, a minimum of 10 screens, a lobby and a refreshment area. The development generally has one or more of the following amenities: digital sound, tiered stadium seating and moveable or expandable walls. Theaters included in this category are primarily stand-alone facilities with separate parking and dedicated driveways. All theaters in the category show only first-run movies or movies not previously seen through any other media. They may also have matinee showings. Movie theater without matinee (Land Use 443) and movie theater with matinee (Land Use 444) are related uses. Additional Data Caution should be used when applying these data, as the peaking characteristics for this land use could have a significant impact on trip generation rates. Peaking at movie theaters typically occurred in time periods shorter than an hour. Movie theaters'start and end times may be staggered to reduce peak surging impacts. Friday trip generation was typically higher than other weekdays. Therefore, Friday's data have been excluded from the weekday analyses and have been independently studied. Trip generation data for movie theaters have also been found to vary by month. Refer to Table 2 in movie theater with matinee (Land Use 444) for additional information. Multiplex theaters typically house a smaller number of seats per screen than traditional theaters. Data were collected throughout the year, excluding holiday peak periods. The majority of the theaters studied were open between 1 and 5 years at the time of the study. In addition, 10 theaters indicated that the distance to the closest competitor ranged from 1.5 miles to 5 miles. Several of the study locations also had a game-room facility on site. The majority of the surveyed sites consisted of stand-alone parking areas with minimal pedestrian and transit accessibility. One study reported that the theater was located on a bus route. The peak hour of the generator for multiplex movie theaters occurred during Friday and Saturday evenings between 6:00 p.m. and 10:00 p.m. For additional information on multiplex movie theaters, refer to the ITE Informational Report, Trip Generation Characteristics of Traditional and Multiplex Movie Theaters.' The sites were surveyed in the 1990s and the 2000s throughout the United States. At least four of the studies were conducted near or in college towns. Source Numbers 418, 433, 443, 450, 451, 452, 453, 455, 456, 457, 458, 459, 513, 618 Trip Generation Characteristics of Traditional and Multiplex Movie Theaters. Washington, DC, USA: Institute of Transportation Engineers, March 2001. Trip Generation, 8th Edition 810 Institute of Transportation Engineers Multiplex Movie eater (445) Average Vehicle Trip Ends vs: Seats On a: Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. Number of Studies: 2 Average Number of Seats: 3,325 Directional Distribution: 36% entering, 64% exiting Trip Generation per Seat Average Rate Range of Rates Standard Deviation 0.08 0.06 - 0.09 Data Plot and Equation Caution - Use Carefully - Small Sample Size 400 0 c W' Q H N U L U N N Q 300 200 X 100 2400 2500 2600 2700 2800 2900 3000 3100 3200 3300 3400 3500 3600 3700 3800 3900 4000 4100 4200 4300 X = Number of Seats X Actual Data Points ------ Average Rate R2 = *** Fitted Curve Equation: Not given Trip Generation, 8th Edition 827 Institute of Transportation Engineers Multiplex Movie Theater (445) Average Vehicle Trip fi=nds vs: Seats On a: Saturday, Peak Hour of Adjacent Street Traffic, One Hour between 11 a.m. and 1 p.m. Number of Studies Average Number of Seats Directional Distribution 7 4,099 72% entering, 28% exiting Trip Generation per Seat Average Rate Range of Rates Standard Deviation 0.09 0.06 - 0.14 0.30 Data Plot and Equation 60C 50C W Q 400 U L N N ?i 300 Q F- 200 100 --- - -- ----- -- ------- --- - ---- - --- ' X -' X X ---- -' X -- -" --------- -- X ---- -- -- ---------- - -------- ---- -- 2000 X Actual Data Points Fitted Curve Equation: Not given 3000 X - Number of Seats 4000 5000 ------ Average Rate R2 = ***? Trip Generation, 8th Edition 830 Institute of Transportation Engineers Detailed Report Page 1 of 1 HCS+' DETAILED REPORT General Information Site Information Analyst RP Agency or Co. GCC Date Performed 31912011 Time Period PM PEAK Intersection CAUSEWAY/ISLAND WAY Area Type All other areas Jurisdiction CLEARWATER Analysis Year FUTURE WITH PROJECT Project ID Volume and Timing Input EB WB NB SB LT TH RT LT TH RT LT TH RT LT TH RT Number of Lanes, Ni 1 2 2 1 2 1 Lane Group L T T R L R Volume, V (vph) 137 832 719 393 346 171 % Heavy Vehicles, %HV 2 2 2 2 2 2 Peak-Hour Factor, PHF 0.96 0.96 0.96 0.96 0.96 0.96 Pretimed (P) or Actuated (A) A A A A A A Start-up Lost Time, 11 2.0 2.0 2.0 2.0 2.0 2.0 Extension of Effective Green, a 2.0 2.0 2.0 2.0 2.0 2.0 Arrival Type, AT 3 4 4 3 3 3 Unit Extension, UE 3.0 3.0 3.0 3.0 3.0 3.0 Filtering/Metering, I 1.000 1.000 1.000 1.000 1.000 1.000 Initial Unmet Demand, Qb 0.0 0.0 0.0 0.0 0.0 0.0 Ped / Bike / RTOR Volumes 0 0 0 0 80 0 0 0 0 40 Lane Width 12.0 12.0 12.0 12.0 12.0 12.0 Parking / Grade / Parking N 0 N N 0 N N 0 N N 0 N Parking Maneuvers, Nm Buses Stopping, Ns 0 0 0 0 0 0 Min. Time for Pedestrians, G p 3.2 3.2 3.2 3.2 Phasing EB Only EW Perm 03 04 SB Only 06 07 08 I G= 15.0 I G= 40.0 G= 1 G= I G= 20.0 G= 1 G= 1 G= Timing Y= 5 Y= 5 Y= Y= Y= 5 Y= Y= Y= Duration of Analysis, T = 0.25 Cycle Length, C = 90.0 Lane Group Ca aci , Control Delay, an d LOS Determination EB WB NB SB LT TH RT LT TH RT LT TH RT LT TH RT Adjusted Flow Rate, v 143 867 749 326 360 136 Lane Group Capacity, c 552 2365 1576 704 764 352 v/c Ratio, X 0.26 0.37 0.48 0.46 0.47 0.39 Total Green Ratio, g/C 0.67 0.67 0.44 0.44 0.22 0.22 Uniform Delay, d1 6.3 6.6 17.6 17.5 30.4 29.8 Progression Factor, PF 1.000 0.383 0.843 1.000 1.000 1.000 Delay Calibration, k 0.11 0.11 0.11 0.11 0.11 0.11 Incremental Delay, d2 0.3 0.1 0.2 0.5 0.5 0.7 Initial Queue Delay, d3 0.0 0.0 0.0 0.0 0.0 0.0 Control Delay 6.6 2.6 15.1 18.0 30.9 30.5 Lane Group LOS A A B B C C Approach Delay 3.2 16.0 30.8 Approach LOS A B C Intersection Delay 13.8 X = 0.48 Intersection LOS B Copyright © 2007 University of Florida, All Rights Reserved HCS+TM Version 5.3 Generated: 3/9/2011 1:41 PM file://C:\Documents and Settings\rpergolizzi.GULFCOAST\Local Settings\Temp\s2kA0.tmp 3/9/2011 Detailed Report Page 1 of 1 HCS+'M DETAILED REPORT General Information Site Information Analyst RP Agency or Co. GCC Date Performed 311512011 Time Period SATURDAY PEAK Intersection CAUSEWAY/ISLAND WAY Area Type All other areas Jurisdiction CLEARWATER Analysis Year FUTURE WITH PROJECT Project ID Volume and Timing Input EB WB NB SIB LT TH RT LT TH RT LT TH RT LT TH RT Number of Lanes, Ni 1 2 2 1 2 1 Lane Group L T T R L R Volume, V (vph) 129 856 1041 244 271 168 % Heavy Vehicles, %HV 2 2 2 2 2 2 Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 Pretimed (P) or Actuated (A) A A A A A A Start-up Lost Time, 11 2.0 2.0 2.0 2.0 2.0 2.0 Extension of Effective Green, a 2.0 2.0 2.0 2.0 2.0 2.0 Arrival Type, AT 3 4 4 3 3 3 Unit Extension, UE 3.0 3.0 3.0 3.0 3.0 3.0 Filtering/Metering, 1 1.000 1.000 1.000 1.000 1.000 1.000 Initial Unmet Demand, Qb 0.0 0.0 0.0 0.0 0.0 0.0 Ped / Bike / RTOR Volumes 0 0 0 0 0 0 0 0 0 0 Lane Width 12.0 12.0 12.0 12.0 12.0 12.0 Parking / Grade / Parking N 0 N N 0 N N 0 N N 0 N Parking Maneuvers, Nm Buses Stopping, NB 0 0 0 0 0 0 Min. Time for Pedestrians, G p 3.2 3.2 3.2 3.2 Phasing EB Only EW Perm 03 04 SIB Only 06 07 08 I G= 15.0 I G= 40.0 G= G= G= 20.0 G= G= G= Timing Y= 5 Y= 5 Y= Y= Y= 5 Y= Y= Y= Duration of Analysis, T = 0.25 Cycle Length, C = 90.0 Lane Group Capacity, Control Delay, an d LOS Determination EB WB NB SIB LT TH RT LT TH RT LT TH RT LT TH RT Adjusted Flow Rate, v 136 901 1096 257 285 177 Lane Group Capacity, c 428 2365 1576 704 764 352 v/c Ratio, X 0.32 0.38 0.70 0.37 0.37 0.50 Total Green Ratio, g/C 0.67 0.67 0.44 0.44 0.22 0.22 Uniform Delay, d1 8.6 6.7 20.1 16.6 29.7 30.6 Progression Factor, PF 1.000 0.383 0.843 1.000 1.000 1.000 Delay Calibration, k 0.11 0.11 0.26 0.11 0.11 0.11 Incremental Delay, d2 0.4 0.1 1.4 0.3 0.3 1.2 Initial Queue Delay, d3 0.0 0.0 0.0 0.0 0.0 0.0 Control Delay 9.1 2.7 18.3 16.9 30.0 31.8 Lane Group LOS A A B B C C Approach Delay 3.5 18.0 30.7 Approach LOS A B C Intersection Delay 14.8 Xc = 0.60 Intersection LOS B Copyright © 2007 University of Florida, All Rights Reserved HCS+TM Version 5.3 Generated: 3/15/2011 10:58 AM file://C:\Documents and Settings\rpergolizzi.GULFCOAST\Local Settings\Temp\s2k8F.tmp 3/15/2011 Detailed Report Page 1 of 1 HCS+- DETAILED REPORT General Information Site Information Analyst RP Agency or Co. GCC Date Performed 31912011 Time Period PM PEAK Intersection Area Type Jurisdiction Analysis Year Project ID ISLAND WAY/WINDWARD All other areas CLEARWATER FUTURE WITH PROJECT Volume and Timing Input EB WB NB SIB LT TH RT LT TH RT LT TH RT LT TH RT Number of Lanes, Ni 0 1 1 0 1 1 1 2 0 1 2 0 Lane Group LT R LT R L TR L TR Volume, V (vph) 6 2 112 35 2 8 107 341 64 20 243 12 % Heavy Vehicles, %HV 2 2 2 2 2 2 2 2 2 2 2 2 Peak-Hour Factor, PHF 0.97 0.97 0.97 0.97 0.97 1 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Pretimed (P) or Actuated (A) A A A A A A A A A A A A Start-up Lost Time, 11 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Extension of Effective Green, a 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Arrival Type, AT 3 3 3 3 3 3 3 3 Unit Extension, UE 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Filtering/Metering, 1 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Initial Unmet Demand, Qb 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Ped / Bike / RTOR Volumes 0 0 20 0 0 0 0 0 0 0 0 0 Lane Width 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 Parking / Grade / Parking N 0 N N 0 N N 0 N N 0 N Parking Maneuvers, Nrn Buses Stopping, NB 0 0 0 0 0 0 0 0 Min. Time for Pedestrians, G p 3.2 3.2 3.2 3.2 Phasing 02 03 04 Excl. Left NS Perm 07 08 M G= G= G= G= 9.0 G= 32.0 G= G= Timing 4 Y= Y= Y= Y= 5 Y= 5 Y= Y= Duration of Analysis, T = 0.25 Cycle Length, C = 70.0 Lane Group Ca aci , Control Delay, and LOS Determination EB WB NB SIB LT TH RT LT TH RT LT TH RT LT TH RT Adjusted Flow Rate, v 8 95 38 8 110 418 21 263 Lane Group Capacity, c 356 339 318 339 759 1583 657 1610 v/c Ratio, X 0.02 0.28 0.12 0.02 0.14 0.26 0.03 0.16 Total Green Ratio, g/C 0.21 0.21 0.21 0.21 0.66 0.46 0.66 0.46 Uniform Delay, d1 21.7 23.0 22.2 21.7 4.5 11.7 4.4 11.1 Progression Factor, PF 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Delay Calibration, k 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 Incremental Delay, d2 0.0 0.5 0.2 0.0 0.1 0.1 0.0 0.0 Initial Queue Delay, d3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Delay 21.7 23.4 22.3 21.7 4.6 11.8 4.4 11.2 Lane Group LOS C C C C A B A B Approach Delay 23.3 22.2 10.3 10.7 Approach LOS C C B B Intersection Delay 12.4 Xc = 0.30 Intersection LOS B Copyright @ 2007 University of Florida, All Rights Reserved HCS+TM Version 5.3 Generated: 3/9/2011 1:45 PM file://CADocuments and Settings\rpergolizzi.GULFCOAST\Local Settings\Temp\s2kB3.tmp 3/9/2011 Detailed Report Page 1 of 1 HCS+" DETAILED REPORT General Information Site Information Analyst RP Agency or Co. GCC Date Performed 311512011 Time Period SATURDAY PEAK Intersection Area Type Jurisdiction Analysis Year Project ID ISLAND WAY/ WINDWARD All other areas CLEARWATER FUTURE WITH PROJECT Volume and Timing Input EB WB NB SB LT TH RT LT TH RT LT TH RT LT TH RT Number of Lanes, Ni 0 1 1 0 1 1 1 2 0 1 2 0 Lane Group LT R LT R L TR L TR Volume, V (vph) 6 10 117 43 10 11 108 222 30 14 273 18 % Heavy Vehicles, %HV 2 2 2 2 2 2 2 2 2 2 2 2 Peak-Hour Factor, PHF 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Pretimed (P) or Actuated (A) A A A A A A A A A A A A Start-up Lost Time, 11 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Extension of Effective Green, a 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Arrival Type, AT 3 3 3 3 3 3 3 3 Unit Extension, UE 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Filtering/Metering, 1 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Initial Unmet Demand, Qb 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Ped / Bike / RTOR Volumes 0 0 50 0 0 0 0 0 0 0 0 0 Lane Width 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 Parking / Grade / Parking N 0 N N 0 N N 0 N N 0 N Parking Maneuvers, Nm Buses Stopping, NB 0 0 0 0 0 0 0 0 Min. Time for Pedestrians, G p 3.2 3.2 3.2 3.2 Phasing EW Perm 02 03 04 Excl. Left NS Perm 07 08 I G= 15.0 G= G= G= G= 9.0 G= 32.0 G= G= Timing Y= 4 Y= Y= Y= Y= 5 Y= 5 Y= Y= Duration of Analysis, T = 0.25 Cycle Length, C = 70.0 Lane Group Capacity, Control Delay, an d LOS Determination EB WB NB SB LT TH RT LT TH RT LT TH RT LT TH RT Adjusted Flow Rate, v 16 70 55 11 113 262 15 303 Lane Group Capacity, c 374 339 319 339 731 1593 760 1606 v/c Ratio, X 0.04 0.21 0.17 0.03 0.15 0.16 0.02 0.19 Total Green Ratio, g/C 0.21 0.21 0.21 0.21 0.66 0.46 0.66 0.46 Uniform Delay, d1 21.8 22.6 22.4 21.8 4.5 11.2 4.2 11.3 Progression Factor, PF 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Delay Calibration, k 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 Incremental Delay, d2 0.0 0.3 0.3 0.0 0.1 0.0 0.0 0.1 Initial Queue Delay, d3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Delay 21.9 22.9 22.7 21.8 4.6 11.2 4.2 11.3 Lane Group LOS C C C C A B A B Approach Delay 22.7 22.5 9.2 11.0 Approach LOS C C A B Intersection Delay 12.3 Xc = 0.24 Intersection LOS B Copyright © 2007 University of Florida, All Rights Reserved HCS+iM Version 5.3 Generated: 3/15/2011 11:02 AM file://C:\Documents and S ettings\rpergolizzi. GULFC OAS T\Local Settings\Temp\s2kAl.tmp 3/15/2011 Two-Way Stop Control Page 1 of 1 TWO-WAY STOP CONTROL SUMMARY General Information Site Information nal st RP Intersection WINDWARD/DRIVEA Agency/Co GCC Jurisdiction CLEARWATER . Date Performed 31912011 Analysis Year FUTURE WITH PROJECT Analysis Time Period PM PEAK Project Description East/West Street: WINDWARD PASSAGE North/South Street: DRIVEA Intersection Orientation: East-West Stud Period hrs : 0.25 Vehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R Volume veh/h 58 0 12 42 Peak-Hour Factor, PHF 1.00 0.92 0.92 0.92 0.92 1.00 Hourly Flow Rate, HFR veh/h 0 63 0 13 45 0 Percent Heavy Vehicles 0 -- -- 2 -- -- Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration TR LT Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R Volume veh/h 0 26 Peak-Hour Factor, PHF 0.92 1.00 0.92 1.00 1.00 1.00 Hourly Flow Rate, HFR veh/h 0 0 28 0 0 0 Percent Heavy Vehicles 2 0 2 0 0 0 Percent Grade (%) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, and Level of Service Approach Eastbound Westbound Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR v (veh/h) 13 28 C (m) (veh/h) 1540 1002 v/c 0.01 0.03 95% queue length 0.03 0.09 Control Delay (s/veh) 7.4 8.7 LOS A A Approach Delay (s/veh) -- -- 8.7 Approach LOS -- -- A Copyright @ 2007 University of Florida, All Rights Reserved HCS+TM Version 5.3 Generated: 3/9/2011 1:48 PM file://C:\Documents and Settings\rpergolizzi.GULFCOAST\Local Settings\Temp\u2kB8.tmp 3/9/2011 Two-Way Stop Control Page 1 of 1 TWO-WAY STOP CONTROL SUMMARY General Information Site Information Analyst RP Intersection WINDWARD/DRIVER Agency/Co. GCC Jurisdiction CLEARWATER Date Performed 311412011 Analysis Year FUTURE WITH PROJECT Analysis Time Period SATURDAY PEAK Project Description East/West Street: WINDWARD PASSAGE North/South Street: DRIVER Intersection Orientation: East-West Stud Period hrs : 0.25 Vehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R Volume veh/h 55 3 30 50 Peak-Hour Factor, PHF 1.00 0.92 0.92 0.92 0.92 1.00 Hourly Flow Rate, HFR veh/h 0 59 3 32 54 0 Percent Heavy Vehicles 0 -- -- 2 -- -- Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Confi uration TR LT U stream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R Volume veh/h 2 27 Peak-Hour Factor, PHF 0.92 1.00 0.92 1.00 1.00 1.00 Hourly Flow Rate, HFR veh/h 2 0 29 0 0 0 Percent Heavy Vehicles 2 0 2 0 0 0 Percent Grade (%) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, and Level of Service Approach Eastbound Westbound Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR v (veh/h) 32 31 C (m) (veh/h) 1541 988 v/c 0.02 0.03 95% queue length 0.06 0.10 Control Delay (s/veh) 7.4 8.8 LOS A A ,Approach Delay (s/veh) -- -- 8.8 [Approach LOS A Copyright © 2007 University of Florida, All Rights Reserved HCS+TM Version 5.3 Generated: 3/14/2011 1:03 PM file://C:\Documents and S ettings\rpergolizzi. GULFC OAS T\Local Settings\Temp\u2klB.tmp 3/14/2011 Two-Way Stop Control Page 1 of 1 TWO-WAY STOP CONTROL SUMMARY General Information Site Information Analyst RP Intersection WINDWARD /DRIVE B Agency/Co. GCC Jurisdiction CLEARWATER Date Performed 31912011 Analysis Year FUTURE WITH PROJECT Analysis Time Period PM PEAK Project Description East/West Street: WINDWARD PASSAGE North/South Street: DRIVE B Intersection Orientation: East-West Stud Period hrs : 0.25 Vehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R Volume veh/h 84 0 12 54 Peak-Hour Factor, PHF 1.00 0.92 0.92 0.92 0.92 1.00 Hourly Flow Rate, HFR veh/h 0 91 0 13 58 0 Percent Heavy Vehicles 0 -- -- 2 -- -- Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration TR LT Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R Volume veh/h 0 27 Peak-Hour Factor, PHF 0.92 1.00 0.92 1.00 1.00 1.00 Hourly Flow Rate, HFR veh/h 0 0 29 0 0 0 Percent Heavy Vehicles 2 0 2 0 0 0 Percent Grade (%) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, and Level of Service Approach Eastbound Westbound Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR v (veh/h) 13 29 C (m) (veh/h) 1504 967 v/c 0.01 0.03 95% queue length 0.03 0.09 Control Delay (s/veh) 7.4 8.8 LOS A A Approach Delay (s/veh) -- -- 8.8 pproach LOS -- -- A Copyright © 2007 University of Florida, All Rights Reserved HCS+TM Version 5.3 Generated: 3/9/2011 1:49 PM file://C:\Documents and Settings\rpergolizzi.GULFCOAST\Local Settings\Temp\u2kBC.tmp 3/9/2011 Two-Way Stop Control Page 1 of 1 TWO-WAY STOP CONTROL SUMMARY General Information Site Information Analyst RP Intersection WINDWARD/DRIVEB Agency/Co. GCC Jurisdiction CLEARWATER Date Performed 311412011 Analysis Year FUTURE WITH PROJECT Analysis Time Period SATURDAY PEAK Project Description East/West Street: WINDWARD PASSAGE North/South Street: DRIVE B Intersection Orientation: East-West Stud Period hrs : 0.25 Vehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R Volume veh/h 82 0 30 80 Peak-Hour Factor, PHF 1.00 0.92 0.92 0.92 0.92 1.00 Hourly Flow Rate, HFR veh/h 0 gg 0 32 86 0 Percent Heavy Vehicles 0 -- -- 2 -- -- Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration TR LT Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R Volume veh/h 0 27 Peak-Hour Factor, PHF 0.92 1.00 0.92 1.00 1.00 1.00 Hourly Flow Rate, HFR veh/h 0 0 29 0 0 0 Percent Heavy Vehicles 2 0 2 0 0 0 Percent Grade (%) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, and Level of Service Approach Eastbound Westbound Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR v (veh/h) 32 29 C (m) (veh/h) 1506 969 v/c 0.02 0.03 95% queue length 0.07 0.09 Control Delay (s/veh) 7.4 8.8 LOS A A pproach Delay (s/veh) -- -- 8.8 pproach LOS -- -- A Copyright © 2007 University of Florida, All Rights Reserved HCS+TM Version 5.3 Generated: 3/14/2011 1:06 PM file://C:\Documents and Settings\rpergolizzi.GULFCOAST\Local Settings\Temp\u2klF.tmp 3/14/2011 CLEARWATER MARINE AQUARIUM NARRATIVE General Applicability Criteria 1. The proposed development of the land will be in harmony with the scale, bulk, coverage, density and character of adjacent properties in which it is located. The aquarium has been a landmark at this location for approximately 33 years and has long been a good neighbor to the residents of Island Estates, the surrounding business owners and the community as a whole. The Aquarium is a redeveloped City water treatment plant. The proposed improvements seek to upgrade the facility, provide resources for heightened animal care, and response to increased public attendance due to the opening of the movie "Winter." The character of adjacent properties are mixed with residential townhomes to the west, a commercial parcel with a commercial building in the shape of an "outparcel" to the subject property, Residences at Windward Passage condominium to the north, as well as commercial retail closer to Island Way, and the Island Way Grill restaurant to the east. The area on which the aquarium facility is located is on a semi-circular shape which extends southerly into the water. The portions of the subject property adjacent to the neighboring parcels will be occupied by surface parking and the parking garage. The garage and surface parking lot are located to be convenient to the street so visitors can park quickly and efficiently. The parking garage provides a buffer to the viewing area from the street and the townhomes on the north side of Windward Passage. Island Estates is a mixture of residential, office and commercial parcels with varying heights as can be viewed across the causeway. The proposed height of the parking garage is 22- feet 6-inches from Base Flood Elevation (BFE) to the parking deck, and 31-feet 6-inches to the top of the parapet walls. This is actually 37-feet 6-inches above grade level and is reasonable as adjoining residential parcels would be allowed heights of up to 50' from BFE and 56-feet from grade level (through residential infill approval). The outdoor bleacher seating and its associated sunshade is located closest to the aquarium's proposed parking garage and is primarily shielded from view by the parking garage to minimize the impact to the nearby residential uses on the north side of Windward Passage. The restaurant to the east of the Aquarium will be buffered from the Aquarium by the proposed surface parking. With a proposed FAR of 0.26, as opposed to a maximum FAR of 0.55 permitted in a "C" zone with underlying "CG" land use, the property is much less intense than permitted. The original use of the building as a City Water Treatment Plant is still somewhat evident from the existing architecture of the exterior of the building. As shown on the architectural plans, the proposed improvements to the exterior will provide a more harmonious existence with the adjacent and surrounding properties. 2. The proposed development will not hinder or discourage the appropriate development and use of adjacent land and buildings or significantly impair the value thereof. Page 1 of 10 The adjacent properties are currently developed. The proposed improvements will not discourage the appropriate development and use of the adjacent land and buildings, which are already developed, and the value of adjacent and surrounding properties will not be compromised. The adjacent parcels have a Commercial zoning (C) category and a land use category of Commercial General (CG) and therefore can be development up to 50 ft. in height above BFE (greater than the proposed height of the bleachers sunshade). These properties can be developed with an FAR of 0.55 (significantly greater than the proposed 0.26 FAR). Properties across the Windward Passage right of way have a Residential Medium (RM) land use category and Medium Density Residential (MDR) zoning and can be development with up to 15 units per acre or an FAR of 0.50 and height of 30-50 feet. Adjacent and neighborhood parcels will be enhanced by the proposed upgrading of this facility in a number of ways, including: A. Lush landscaping is included in the redevelopment proposal that will visually enhance the neighborhood and the waterfront. B. New construction will meet current building codes and provide improved accessibility for those with disabilities and safety during storm events C. The proposed parking area and garage will have adequate stacking space and loading areas to eliminate traffic congestion on Windward Passage; accommodate staff and visitors to the aquarium; and provide parking areas for bus parking. D. The visitors of the aquarium will also provide support to the surrounding restaurants and retail businesses. E. The incorporation of the public pedestrian promenade around the site will enhance the waterfront and the neighborhood, providing waterfront access to adjacent properties. F. The Clearwater Marine Aquarium has long been a significant economic contributor to the City's economic base by diversifying the local economy and by creating jobs; 3. The proposed development will not adversely affect the health or safety of persons residing or working in the neighborhood of the proposed use. The aquarium has existed in this location for approximately 33 years and none of the planned improvements will change the use or operation of the facility in a manner that will adversely affect the health or safety of persons residing or working in the neighborhood. The proposed use is not problematic and does not impact the health of residents or visitors as it has coexisted in the neighborhood for years. The proposed parking on the site, including adequate loading area, will minimize traffic congestion on Windward Passage and not adversely affect the safety of neighboring residents. The detailed traffic analysis conducted for both weekdays and weekend traffic conditions confirmed LOS C or better operations for area intersections and roadways, and specifically noted minimal delays for motorists along Windward Passage. The promenade area leading to the city's docks will be lit making passage around the Aquarium safer. The proposed improvements to the building and site will comply as required with all applicable codes including the Florida Building Code, the Life Safety Code and the Florida Fire Prevention Code. Page 2 of 10 4. The proposed development is designed to minimize traffic congestion. The Applicant has included in this submittal a traffic assessment prepared by Gulf Coast Consulting, Inc. which determines that traffic impacts as a result of the proposed redevelopment will be minimal and further that nearby intersections and adjacent roadways will continue to operate at acceptable levels of service after the proposed improvements are completed. Special consideration has been given to the on site stacking ability to allow ample room for queuing and to not create a back up of traffic on to Windward Passage. Adequate parking will insure that guests to the aquarium will easily and quickly locate a parking space allowing for a smooth flow of traffic off of Windward Pasage. 5. The proposed development is consistent with the community character of the immediate vicinity of the parcel proposed for development. The community character of island Estates is an island of mixed uses, ranging from retail to residential. As the Aquarium has been at this location for over 30 years it has become a part of the community character of Island Estates. The industrial-like look of the existing facility, although consistent with the boat repair and sales uses nearby, will be upgraded and modernized, more reflective of the nearby residential and restaurant uses. The proposed comprehensive infill redevelopment project does not represent a "new" project or a "new" use for the land but makes improvements to the existing facility which will visually enhance the area. 6. The design of the proposed development minimizes adverse effects, including visual, acoustic and olfactory and hours of operation impacts, on adjacent properties. The existing development and proposed re-use of the site will not cause adverse effects on adjacent properties. The proposed redevelopment project will improve the visual appeal of the property as seen from the properties on Island Estates and from the Memorial Causeway. The architectural design of the project is appropriate and appealing. The outdoor viewing area and bleacher seating is located on the southern corner of the property, behind the proposed parking garage. Educational presentations in the outdoor area will be during Aquarium hours. Currently, these presentations/shows do not occur later than 6:00 PM except for on Friday and Saturday evenings when the presentations begin at 6:30 PM. The bleachers will be oriented towards the southeast away from the residential area to the north of Windward Passage. In addition, the proposed parking garage will shield spectator noise from the bleachers. The architectural components of the sunshade over the outdoor area will protect sound from penetrating the residential areas to the north of the site. Any amplified sound will comply with the provisions of sec. 3- 1508 of the Community Development Code. The presentations will not extend beyond 7 PM on Friday and Saturday evenings. Live presentations currently are limited between the hours of 10 AM. and 4 PM during the week, with the last Friday/Saturday presentation at 6:30 PM. It is not anticipated that show times or Aquarium hours will dramatically change as a result of this redevelopment. Please see attached letter from CMA Page 3 of 10 The hours of operation are primarily daylight and will remain the same: Monday - Thursday from 9 AM to 5 PM, Friday - Saturday 9 AM to 7 PM and Sunday 10 AM - 5 PM. The general operation of the facility will remain much the same as today so as not to impose any adverse effects. The placement of activities and proposed structures, together with the architectural and site design minimize impacts on adjacent properties. Page 4 of 10 COMPREHENSIVE INFILL REDEVELOPMENT Project Criteria 1. The development or redevelopment of the parcel proposed for development is otherwise impractical without deviations from the intensity and development standards. The deviations proposed below are necessary and minimal to provide the proposed improvements to this highly visible waterfront site. Certain deviations are necessary to meet the special laws and regulations associated with the marine aquatic life as the Aquarium strives to be accredited by the Association of Zoos and Aquariums. A copy of the AZA standards were included with a previous submittal. Additionally, the deviations improve accessibility to the waterfront for all including those with disabilities and to provide appropriate parking and vehicular accessibility. The Applicant has assembled land when possible to better meet the needs of the facility; however the land assembled is irregularly shaped which presents challenges to redevelopment and improvements in accordance with Code requirements. Height The Commercial District allows flexible height of between 25'-50'; the proposed garage and shade structure are within the allowable limits of the flexible standards. The proposed three story garage is appropriate for area; the height of the proposed shade structure is the minimum necessary to accomplish the shade required for the marine life. The shade structure has been specifically located to the rear of the site as far as possible from the residential uses on the north side of Windward Passage and is oriented toward the adjacent commercial restaurant site. Setbacks The Commercial District allows flexible setbacks for front yards of between 15'- 25'; the proposed garage is within the allowable limits of the flexible standards and is proposed at a 15' front setback at the northwest corner and over 25' setback at the northeast corner. Pavement is proposed at a 15' front setback leaving generous area for landscape treatment and required buffers. Side yard flexibility of between 0'-10' is allowed, the proposed 10' side setback of the garage structure is within the allowable limits of the flexible standard and will allow more than sufficient room for the required 5' landscape buffers. Pavement is proposed at a minimum of 5' along the side yards providing area to address the required 5' landscape buffers. Because the District's maximum flexibility of rear yard setbacks allows between 10'-20" the Applicant seeks approval through the Comprehensive Infill process. The proposed setbacks associated with the building, pools and proposed wall/fence are all within the flexible standards however the promenade would need to be located a minimum of 10' from the seawall to meet the allowable flexible standards. The proposed setbacks associated with the buildings, parking area Page 5 of 10 and pools are all within the flexible standards which would not require Comprehensive Infill approval. The use of the site as a marine aquarium beckons for direct access to the waterfront for the visitors of the Clearwater Marine Aquarium. Neither visibility nor use of land will be impeded on surrounding properties due to the proposed on grade promenade. This is a fantastic amenity! Buffer Wall The Applicant requests a 8' high buffer wall along the western property line adjacent to waterfront and along a portion of the southern property line adjacent to the waterfront to encompass the outdoor rehabilitation tanks located on the west side of the building. The AZA rules and regulations discussed above and previously provided to city staff requires a secure area and minimum heights for walls and fences. Two-Year Development Order The Applicant requests a two-year development order to allow some latitude to complete construction if necessary for the Non Profit organization. 2. The development or redevelopment will be consistent with the goals and policies of the Comprehensive Plan, as well as with the general purpose, intent and basic planning objectives of this code, and with the intent and purpose of this zoning district. The redevelopment will preserve a viable tourist/recreational use which contributes to the city economy; recreational uses are allowed in the "Commercial General" land use category and are consistent with the goals of the Comprehensive plan. Tourism is the major industry in the city and the commercial district is intended to provide access to goods and services in the community without adversely impacting the integrity of residential neighborhoods. The aquarium is not adversely impacting the integrity of the townhome complex north of Windward Passage as it is separated by an 80-foot right-of-way from this residential area. In addition the extensive landscape buffer and the location of the parking garage provide a large buffer from the proposed bleacher seating area. The availability of tourist activities is integral to the community - both locally to Clearwater Beach and the broad Clearwater community. Additionally, the application is consistent with the City's comprehensive plan as the redevelopment provides access to the public boat slips adjacent to the Aquarium property and provides access to tourism activities and educational opportunities. Applicable Comprehensive Plan Goals/Policies/Objectives include: A.6.6 Objective - Tourism is a substantial element of the City's economic base and as such the City shall continue to support the maintenance and enhancement of this important economic sector. A.6.7 Objective - Redevelopment activities shall be sensitive to the city's waterfront and promote appropriate public access to the city's waterfront resources. Page 6 of 10 The Aquarium itself is identified as a major activity center in the comprehensive plan and this renovation will allow it to accommodate the visitors expected to enjoy this facility. The new entrance lobby and expanded gift shop provide a much more defined entrance feature than what currently exists and will allow visitors to obtain a souvenir of their visit to the aquarium. 3. The development or redevelopment will not impede the normal and orderly development and improvement of surrounding properties. The proposed project is compatible with the neighborhood, as is more particularly discussed in General Applicability Criteria 1 and Comprehensive Infill Criteria 4 below, and will not impede other development. The proposed improvements will benefit the community as a whole and specifically this district. The improvements are limited to the Aquarium property, do not impact the traffic flow, and the major setback relief is limited to the waterfront portion of the site. 4. Adjoining properties will not suffer substantial detriment as a result of the proposed development. The adjoining properties will not suffer substantial detriment as a result of this proposal; the proposed renovation/improvements will improve the subject property by upgrading the look of the now institutional looking property, increasing the capacity for the facility to withstand storms as the new portions will be constructed to current building codes, and generally upgrading a tired site. These upgrades should not negatively impact adjoining properties. The site will be in harmony with the surrounding community in much the same manner as in the past 33 years, however, the proposed parking, access; landscape improvements and renovations to the building will improve the operation of the facility and its appearance. The building will no longer reflect its previous life as a water treatment facility and the upgrades will provide improved benefits to the community. The proposed bleacher seating is oriented away from the residential area that is north of Windward Passage which minimizes impact to adjoining properties. 5. The proposed use shall otherwise be permitted by the underlying future land use category, be compatible with adjacent land uses, will not substantially alter the essential use characteristics of the neighborhood; and shall demonstrate compliance with one or more of the following objectives: a. The proposed use is permitted in this zoning district as a minimum standard, flexible standard or flexible development use; b. The proposed use would be a significant economic contributor to the City's economic base by diversifying the local economy or by creating jobs; c. The development proposal accommodates the expansion or redevelopment of an existing economic contributor d. The proposed use provides for the provision of affordable housing Page 7 of 10 e. The proposed use provides for development or redevelopment in an area that is characterized by other similar development and where a land use plan amendment and rezoning would result in spot land use or zoning designation; f. The proposed use provides for the development of a new and/or preservation of a working waterfront use The development proposal represents an expansion and redevelopment of the Clearwater Aquarium, which is an existing economic contributor to the City and identified in the comprehensive plan as a activity center. Most recently, a major motion picture based on Winter the dolphin was filmed at the Aquarium and at other locations in the City. Tourism is the top industry in the city and the Aquarium not only provides a resource to tourists but with the debut of the movie will become an attractor in itself. 6. Flexibility with regard to use, lot width, required setbacks, height, and off-street parking are justified based on demonstrated compliance with all of the following design objectives: a. The proposed development will not impede the normal and orderly development and improvement of the surrounding properties for uses permitted in this zoning district; The proposed and existing use of the site as a recreational use is permitted in the Commercial General (CG) land use category. The Aquarium has coexisted with surrounding properties for over 33 years and has not impeded residential or commercial development in the area. The redevelopment of the Aquarium and the proposed bleacher seating should create a more attractive site and therefore will not impede the normal and orderly development of surrounding properties, particularly since the bleachers are oriented away from the residential area that is north of Windward Passage. b. The proposed development complies with applicable design guidelines adopted by the City; No specific design guidelines are adopted for this area of the City. c. The design, scale, and intensity of the proposed development supports the established or emerging character of an area; The area is comprised of varying uses, designs, scale and intensity; the proposed improvements will be compatible with the character of the area. There is no true "pattern" or "theme" of development. Designs range from coastal (Island Way Grill), Mediterranean (residential), and waterfront industrial-like designs (marine uses and two- story office complex). The addition of the bleacher viewing area will not be out of character with the area since the bleachers will be primarily shielded from the residential area by the parking garage and will be oriented away from the residential area north of Windward Passage. Please see Comp. Infill Criteria 4 for additional discussion of compatibility with the neighborhood. Page 8 of 10 d. In order to form a cohesive, visually interesting and attractive appearance, the proposed development incorporates a substantial number of the following design elements: Changes in horizontal building planes Use of architectural details such as columns, cornices, stringcourses, pilasters, porticos, balconies, railings, awnings, etc. Variety of materials and colors Distinctive fenestration patterns Building stepbacks; and Distinctive roof forms The proposed development utilizes massing of elements, fenestrations, colors and textures to minimize the scale of the structure and provide an attractive appearance. While the project makes a visual and bold statement from public areas like the causeway, it also has a toned down, secure and quiet atmosphere for neighboring residents. Architectural elements such as massing walls are used to obstruct direct vision of vehicular parking while maintaining an open natural cross ventilation system. Plush landscaping will be placed along the entire facade to soften the appearance of a hard exterior on the new structure. Colors play an important role characterizing the structures and portraying the excitement that has become part of the project as well as the community. In order to form a cohesive, visually interesting and attractive appearance, the proposed development incorporates a substantial number of the following design elements: changes in horizontal building planes; use of architectural details such as columns, cornices, stringcourses, pilasters, porticos, balconies, railings, awnings, etc; distinctive fenestration patters; building stepbacks; and distinctive roof forms. The proposed development utilizes a number of design elements in order to form a cohesive, visually interesting and attractive appearance. Each structure uses changes in horizontal building planes which is visible at the main structure entrance and stadium. Architectural columns, pilasters, porticos, and railings add interest on both structures which can be seen at the parking garage corners and decks surrounding the show tanks. The incorporation of a variety of materials and landscaping at both structures adds visual interest. Each structure's fenestration patterns are repetitive and rectilinear making it distinctive from surrounding projects and giving the project its own identity. Each structure has unique roof forms which will set it apart from the surrounding areas and make it a visual landmark to visitors. These elements make the aquarium unique, visually interesting, and distinctive from surrounding areas. e. The proposed development provides for appropriate buffers, enhances landscape design and appropriate distances between buildings. The proposed buffers and setbacks will provide appropriate buffers and distances between buildings; the proposed landscape buffers will meet or exceed the dimensional requirement of the code and will be professionally designed to offer a lush tropical Page 9 of 10 appearance. This redevelopment proposal includes the addition of new large landscape areas not currently present on the site. The Applicant has simultaneously submitted a comprehensive landscape application with this application. The proposed development provides buffers within the development itself and between the development and the adjacent properties. The current site includes little to no landscaping and the addition of a proposed 15-foot landscape buffer on the north side of the property not only exceeds requirements but is situated to enhance the appearance from the residential properties on the north side of Windward Passage. Page 10 of 10