Loading...
EAST AVENUE TRAIL CONNECTOR - FROM TURNER STREET TO DREW STREET - 09-0023-EN - ADMINISTRATIVE CHANGE ORDER # 5 & FINAL ADMINISTRATIVE CHANGE ORDER #5 & FINAL DATE: Ntarch 7 2011 PROJECT: East Avenue Trail Connectli*, ,.Turner Sty to DreiV PROJECT NUMBER: 09-0023-EN PO REFERENCE NO.: ST 105759 APR ? 2011 CONTRACTOR: APAC, Southeast, Inc. COUNCIL AWARDED: Se tember 3 2009 4636 Scarborough Drive Lutz, FL 33559 DATE OF CONTRACT: Se tember 4 ,2009 CODE: 315-92343-563700-541-000-0000 (A) CODE: 315-92273-563700-541-000-0000 B SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT To decrease contract by unused items to dose out the project. See attached sheet for decreases. STATEMENT OF CONTRACT AMOUNT ACCEPTED BY: ORIGINAL CONTRACT AMOUNT $289,029.25 APAC, Southeast Inc. Change Order #I - CM Approved 3/11 /10 $420.00 Change Order #2 - CC Approved 512(1/ 10 $85,481.44 Change Order #3 - CC Approved 8/ 18/ 10 $38,463.30 3 w Change Order #4 - CC Approved 2/3/ 11 $361,672.77., . I O Change Order #5 - CM ($29,786.00) BY NEW CONTRACT AMOUNT $745,280.76 Gregor Baie ?,lAy. r', ! Date: 1111, 1. I lilt"' Witnesses: ATTEST: Carnilo Soto, % 4$)m Assistant City i.I+, t 7 Q W l ip Rosemarie Call, City Clerk Recommended By: City of Clearwater Date: --?- CITY OF CLEARWATER, in Tara Kivett, Project Manager PINELLAS COUNTY, FLORIDA 00?fiwn B. Horne, II City Manager Michael D. Quillen. PE City Engineer Page 2 of 2 Administrative Change Order #5 & Final Re: East Avenue Trail Connector - Turner St. to Drew St. Item Description Code A: 0315-92343-563700-541-000-0000 Decreases: 3 104-16, ROCK BAGS 7 425.5, MANHOLE, ADJUST 11 527-1, DETECTABLE WARNING ON WALKING SURFACE, RETROFIT 711-11-111,4" SOLID TRAFFIC STRIPE 17 (WHITE) 20 711-11-1125, 24" SOLID TRAFFIC STRIPE (WHITE) 21 711-11-160, PAVEMENT MESSAGE (BIKE SYMBOL) 22 711-11-160, PAVEMENT MESSAGE (BIKE "STOP") 23 711-11-170, DIRECTIONAL ARROW (BIKE THRU) 24 711-11-170, DIRECTIONAL ARROW (MOTOR VEHICLE THRU) 25 711 - I 1-170, DIRECTION ARROW (MOTOR VEHICLE L+R) 26 711 - 11-21 1, 4" SOLID TRAFFICE STRIPE (YELLOW) 27 711-11-170,6" SOLID TRAFFIC STRIPE (YELLOW) 28 711-11-231, 4" (3797 SKIP TRAFFIC STRIPE (YELLOW) 34 Contingency 46 711-11-231, 4" (3/9) Skip Traffic Stripe _ftt Units Unit Price 920 EA $ 3.35 ($3,082.00) 9 EA $ 373.00 ($3,357.00) 2 EA $ 446.00 ($892.00) 0,48 LS $ 4,028,00 ($1,933.44) 12 LF $ 4.45 ($53.40) 16 EA $ 89.00 (:$1,424.00) 16 EA $ 156.00 ($2,496.00) 8 EA $ 89.00 ($712.00) 18 EA $ 89.00 ($1,602.00) 25 EA $ 112.00 ($2.800.00) 0.558 NM $ 4,025.00 ($2,245.95) 0.3349988 NM $ 4,025.00 ($1,348.37) 43 LF $ 0.80 ($34.40) 1 LS $ 7,771.04 ($7,771.04) 43 LF $ 0.80 ($34.40) Total Additions: ($29,786.00) Contract Price Total (Decreases) to Contract: ($29,786.011)