EAST AVENUE TRAIL CONNECTOR - FROM TURNER STREET TO DREW STREET - 09-0023-EN - ADMINISTRATIVE CHANGE ORDER # 5 & FINAL
ADMINISTRATIVE CHANGE ORDER #5 & FINAL DATE: Ntarch 7 2011
PROJECT: East Avenue Trail Connectli*, ,.Turner Sty to DreiV PROJECT NUMBER: 09-0023-EN
PO REFERENCE NO.: ST 105759
APR ? 2011
CONTRACTOR: APAC, Southeast, Inc. COUNCIL AWARDED: Se tember 3 2009
4636 Scarborough Drive
Lutz, FL 33559 DATE OF CONTRACT: Se tember 4 ,2009
CODE: 315-92343-563700-541-000-0000 (A)
CODE: 315-92273-563700-541-000-0000 B
SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT
To decrease contract by unused items to dose out the project. See attached sheet for decreases.
STATEMENT OF CONTRACT AMOUNT ACCEPTED BY:
ORIGINAL CONTRACT AMOUNT $289,029.25 APAC, Southeast Inc.
Change Order #I - CM Approved 3/11 /10 $420.00 Change Order #2 - CC Approved 512(1/ 10 $85,481.44
Change Order #3 - CC Approved 8/ 18/ 10 $38,463.30 3 w
Change Order #4 - CC Approved 2/3/ 11 $361,672.77., . I O
Change Order #5 - CM ($29,786.00) BY NEW CONTRACT AMOUNT $745,280.76 Gregor Baie
?,lAy. r',
!
Date: 1111, 1. I lilt"'
Witnesses:
ATTEST:
Carnilo Soto, % 4$)m Assistant City
i.I+, t 7 Q W l ip
Rosemarie Call, City Clerk Recommended By: City of Clearwater
Date: --?-
CITY OF CLEARWATER, in Tara Kivett, Project Manager
PINELLAS COUNTY, FLORIDA
00?fiwn B. Horne, II City Manager Michael D. Quillen. PE
City Engineer
Page 2 of 2
Administrative Change Order #5 & Final
Re: East Avenue Trail Connector - Turner St. to Drew St.
Item Description
Code A: 0315-92343-563700-541-000-0000
Decreases:
3 104-16, ROCK BAGS
7 425.5, MANHOLE, ADJUST
11 527-1, DETECTABLE WARNING ON
WALKING SURFACE, RETROFIT
711-11-111,4" SOLID TRAFFIC STRIPE
17 (WHITE)
20 711-11-1125, 24" SOLID TRAFFIC STRIPE
(WHITE)
21 711-11-160, PAVEMENT MESSAGE (BIKE
SYMBOL)
22 711-11-160, PAVEMENT MESSAGE (BIKE
"STOP")
23 711-11-170, DIRECTIONAL ARROW (BIKE
THRU)
24 711-11-170, DIRECTIONAL ARROW
(MOTOR VEHICLE THRU)
25 711 - I 1-170, DIRECTION ARROW (MOTOR
VEHICLE L+R)
26 711 - 11-21 1, 4" SOLID TRAFFICE STRIPE
(YELLOW)
27 711-11-170,6" SOLID TRAFFIC STRIPE
(YELLOW)
28 711-11-231, 4" (3797 SKIP TRAFFIC STRIPE
(YELLOW)
34 Contingency
46 711-11-231, 4" (3/9) Skip Traffic Stripe
_ftt Units Unit Price
920 EA $ 3.35 ($3,082.00)
9 EA $ 373.00 ($3,357.00)
2 EA $ 446.00 ($892.00)
0,48 LS $ 4,028,00 ($1,933.44)
12 LF $ 4.45 ($53.40)
16 EA $ 89.00 (:$1,424.00)
16 EA $ 156.00 ($2,496.00)
8 EA $ 89.00 ($712.00)
18 EA $ 89.00 ($1,602.00)
25 EA $ 112.00 ($2.800.00)
0.558 NM $ 4,025.00 ($2,245.95)
0.3349988 NM $ 4,025.00 ($1,348.37)
43 LF $ 0.80 ($34.40)
1 LS $ 7,771.04 ($7,771.04)
43 LF $ 0.80 ($34.40)
Total Additions: ($29,786.00)
Contract Price
Total (Decreases) to Contract: ($29,786.011)