Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
MORNINGSIDE NEIGHBORHOOD TRAFFIC CALMING - 07-0038-EN - ADMINISTRATIVE CHANGE ORDER # 3
Administrative Change Order # 3 PROJECT: Morningside Traffic Calming CONTRACTOR: R.A.M Excavating, Inc. 569 Hammock Drive Palm Harbor, FL 34683 DATE: March 22, 2011 PROJECT NUMBER: 07-0038-EN PO REFERENCE NO.: ST106342 COUNCIL AWARD: 3/18/2010 DATE OF CONTRACT: 4/2/2010 CODE: 0315-92259-563700-541-000-0000 A 0315-%124-563700-539-0004000 B 0376-%742-563800-533-000-0000 C 0315-92273-563700-5414000-0000 D SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT Engineering adjustments to increase and add items due to unanticipated field conditions - see detailed items below. 2 STATEMENT OF CONTRACT AMOUNT ACCEPTED BY.. r..••••••=,. ,. ORIGINAL CONTRACT AMOUNT $ 1,399,790.70 C)? s CO # 1- Admin - 12/22/2010 $ 95,128.54 By: 'Weil CO #2-RatifyConfirm - CC - 3/17/201.1 CO #3-Admin - CM - $ 87,565.98 NEW CONTRACT AMOUNT $ 1,582,485.22 •• Date: ATTEST: Witnesses: ,G44c?t1Llxr C'a?e? Rosemarie Call, City Cler Date: CITY OF CLEARWATER. in PINELLAS COUNTY, FLORIDA William . Horn 1.1 City Manager APP OVED AS TOI: Camillo Sam-----Assistant City Attorney C r om ended By: City o lea er Paul Bertels, )X7?j' Michael D. Quillen, P.E. City Engineer nti r Plige 2 Re: Administrative Change Order 3 ITEM DESCRIPTION Code A: 0315-92259-563700-541-000-0000 Increases: 7 Concrete curb removal 16 Mill asphalt pavement 17 Mailbox relocation 28 Asphalt Speed Table 39 Straight curb 41 Concrete Swale 42 Valley gutter 49 24" RCP Additions: 122 Summerlin oval median deletion survey 123 Modify private irrigation in ROW at Chinaberry 124 Asphalt subsidence repair on Ham 125 Water main replacement Harn/Stewart QUANTITY UNIT UNIT COST 245 LF $ 1.00 $ 24 SY $ 71.00 $ 8 EA $ 400.00 $ 30 TN $ 366.00 $ 132 LF $ 13.50 $ 2 LF $ 30.00 $ 12 LF $ 30.00 $ 1 LF $ 30.00 $ Total Increases Code A: $ I LS $ 892.50 1 LS $ 950.30 1 LS $ 650.00 0.50 LS $ 58,805.68 Total Additions Code A: TOTAL COST 245.00 1,704.00 3,200.00 10,980.00 1,782.00 60.00 360.00 30.00 18,361.00 $ 892.50 $ 950.30 $ 650.00 $ 29,402.84 $ 31,895.64 Total Increases/Additions Code A: $ 50,256.64 Addition Code C: 0376-%742-563800-533-000-0000 126 Water main replacement Ham/Stewart 0.50 LS $ 58,805.68 $ 29,402.84 Additions Code D: 0315-92273-563700-541-000-0000 127 Cap existing underdrain 1 LS $ 1,000.00 $ 1,000.00 128 Mobilization/Demonilization 1 LS $ 400.00 $ 400.00 129 Traffic Control 1 LS $ 600.00 $ 600.00 130 Clearing/Grubbibg, Erosion Control & Staking 1 LS $ 600.00 $ 600.00 131 Root Pruning 10 LF $ 5.00 $ 50.00 132 Concrete curb removal 75 LF $ 1.00 $ 75.00 133 Concrete driveway removal 56 SY $ 3.00 $ 168.00 134 Concrete sidewalk removal 14 SY $ 3.00 $ 42.00 135 Pavement removal 75 SY $ 3.00 $ 225.00 136 Fill, roadway 18 CY $ 20.00 $ 360.00 137 Unsuitable Material Removal 18 CY $ 10.00 $ 180.00 138 2" asphalt pavement (Type S-1) 1.5 TN $ 136.00 $ 204.00 139 Concrete driveway 56 SY $ 33.00 $ 1,848.00 140 Concrete sidewalk. 4" 14 SY $ 28.00 $ 392.00 141 Curb & gutter, Type 1 75 LF $ 13.50 $ 1,012.50 142 Sod I LS $ 750.00 $ 750.00 Total Additions Code D: $ 7,906.50 Total increases/Additions Contract: $ 87,565.98