Loading...
EAST AVENUE TRAIL CONNECTOR - FROM TURNER STREET TO DREW STREET - 09-0023-EN - RATIFY & CONFIRM CHANGE ORDER #4RECEIVED JAN 1 8 2011 RATIFY & CONFIRM CHANGE ORDER #4 PROJECT: East Avenue Trail Connector - Turner St. to Drew St: CONTRACTOR: APAC, Southeast, Inc. 4636 Scarborough Drive Lutz, FL 33559 r1o CODE: 315-92343-563700-541-000-0000 A CODE: 315-92273-563700-541-000-0000 B SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT Restore the East Avenue corridor due to CSX rail and tie replacement work, replace handicap curb ramps on East Avenue to meet current ADA standards, remove the southbound turn on Cleveland/East due to converting southbound East Avenue to a bicycle trail , and modify signage and extend contract by 342 calendar days due to CSX Railroad tie replacement. STATEMENT OF CONTRACT AMOUNT ACCEPTED BY: ORIGINAL CONTRACT AMOUNT $289,029.25 APAC, Soothe c. Change Order #1 - CM Approved 3/11/10 $420 00 . ? T f • ! v rt Change Order #2 - CC Approved 5/20/10 $85 44 > 481 `• `?' ' w , . Change Order #3 - CC Approved 8/18/10 $38 463 30 , . Change Order #4 - CC 2/3/11 $361 672.77 BY: '" , e-i NEW CONTRACT AMOUNT $775,066.76 ?? .. ? -•• } ?d a 4 , P , ?,• . .. ,, r? ? ?`?? y y ? J v'77C?I'1 Cry Date: Frank (-I I' ftfA " Assistant City Attorney ATTEST: Rosemarie Call, Date: City Clerk DATE: Janus 12 2011 PROJECT NUMBER: 09-0023-EN PO REFERENCE NO.: ST 105759 COUNCIL AWARDED: Se tember 3 2009 DATE OF CONTRACT: September 4, 2009 Witnesses: Recommended By: City of Clearwater CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA c•?-??...,,?- G?o??t?? Wi liam S. Horne, II City Manager Tara Kivett, Project Manager Michael D. Quillen, PE City Engineer Page 2 of 2 Ratify & Confirm Change Order #4 Re: East Avenue Trail Connector - Turner St. to Drew St. Item Description 2Y Units Unit Price C de :031 -92343-563700-541-000-0000 Increases. 29 Restore Drew Street Crossing 13.36 TN $ 180.00 32 Restore Laura to Park & Pierce Street 20.01 TN $ 215.00 Crossing Additions: 37 Restore Turner Street Crossing and East Avenue Corridore 38 Excavate and Grade East Avenue Corridore 39 Restore Druid Street Crossing 40 Remove Debris at Druid St Crossing 41 Replace ADA Ramps 42 Remove Cleveland Street Turn Lane and Widen Median 43 705-10-1, Object Marker, Type 1 44 711-11-111, 6" Solid Traffic Stripe (White) 45 711-11-123,12" Solid Traffic Stripe (White) 46 711-11-231, 4" (3/9) Skip Traffic Stripe (Yellow) 47 Restore Golf Cart Crossings 48 Remove & Replace Type F Curb 49 Relocate Sign Post 50 Replace Stop Sign 51 Replace One-Way Sign 52 Replace All-Way Sign 53 Install 18"x24" One-Way Sign & Post Contract Price $2,404.80 $4,302.15 Total Increases: $6,706.95 2016.31 TN $ 105.55 $212,821.52 1.00 LS $ 38,862.00 $38,862.00 57.44 TN $ 215.00 $12,349.60 1.00 LS $ 11500.00 $1,500.00 1.00 LS $ 58,000.00 $58,000.00 1.00 LS $ 12,630.00 $12,630.00 2 EA $ 134.00 $268.00 0.4323 NM $ 4,028.00 $1,741.30 784 LF $ 2.25 $1,764.00 43 LF $ 0.80 $34.40 1 LS $ 9,700.00 $9,700.00 120 LF $ 36.00 $4,320.00 5 EA $ 80.00 $400.00 3 EA $ 45.00 $135.00 2 EA $ 35.00 $70.00 2 EA $ 10.00 $20.00 2 EA $ 175.00 $350.00 Total Additions: $354,965.82 Total Net Increases/Additions to Contract: $361,672.77