LAKE BELLEVUE BRANCH 6A STORMWATER MANAGEMENT PROJECT - 03-0030-EN - ADMINISTRATIVE CHANGE ORDER #6 & FINAL RATIFY & CONFIRM CHANGE ORDER # 6 & FINAL PROJECT: Lake Bellevue Branch 6A Stormwater Treatment Project CONTRACTOR: Caladesi Construction Company 1390 Donegan Rd. Largo, Florida 33771 Date: December 29 2010 PROJECT NUMBER: 03-0030-EN PO REFERENCE NO.: ST 105380 COUNCIL AWARD: Aril 15 2009 DATE OF CONTRACT: May 1 2009 CODE: 0315-96152-563700-539-000-0000 A CODE: 0315-92273-563700-541-000-0000 B CODE: 0376-96742-563800-533-000-0000 C CODE: 0376-96634-563800-535-000-0000 D SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT This Change Order is necessary for additional work on Lakeview Road, excavation of the Lake and removal of additional of man made land causing decreases, increases and additions of items due to unforseen conditions. It also adds 107 days to the contract - see'attached sheet for details. STATEMENT OF CONTRACT AMOUNT ORIGINAL CONTRACT AMOUNT $1,662,525.45 Adm. CO # 1 - CM - 08/14/09 $14,375.00 Adm. CO # 2 - CM - 11/04/09 $5,260.00 Adm. CO # 3 - CM - 3/4/10 $40,040.00 Adm. CO # 4 - CM - 07/02/10 ($12,201.64) Adm. CO # 5 - CM - 11/4/10 $49,721.20 CO #6 (FINAL) Ratify&Confirm - CC 1/13/11 $128,153.16 NEW CONTRACT AMOUNT $1,887,873.17 ol/ Frank Hibb d, M yor ATTEST: y[ iA - eaA Rosemarie Call, City Date: QGtl4u4ya i! ?-?!1 CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA Willi . Hoge, II City Manager AP ROVED AS RM: Camilo Soto Assistant City Attorney ACC T D BY:+J' Cala esi C structi4,?President By: SEAL) Donald J. HinriDate: k-? -Wit? Melvin R. Maciolek Engineering Specialist/Pro' ct Manager ichael D. Quillen, P,E. City Engineer Recommended By: City of Clearwater Page 2 of 3 Change Order #6 & Final Re: Lake Bellevue Stormwater Management Project (03-0080-EN) ITEM DESCRIPTION QUANTITY Stormwater Code: 0315-96152-563700-539-000-0000 A Decreases: 1104 Tree Barricades 667 1105 Root Pruning 2009 1400 Contingency I UNIT UNIT COST TOTAL COST LF $2,25 ($1,500.75) LF $4,00 ($8,036.00) LS $114,663.60 ($114.663.00) Total (Decreases) Code A: ($124,200.35) Increases: 1102 Floating Turbidity Barrier 85 LF $9.40 $799.00 1103 Install Silt Fence 471.3 LF $1.00 $471.30 1107 Remove Concrete Pavement 321.6596859 SY $9.55 $3,071.85 1108 Remove Existing 2" Curb 805 LF $2.60 $2,09100 1109 Remove Existing 0.5' Curb 1950 LF $2.00 $3,900.00 1211 Adjust Curb Inlet 1 EA $800.00 $800.00 1216 Install Storm Sewer 24" RCP 20 LF $48.70 $97197 1224 Sodding (Bahia) 1504.38 SY $2.25 $3,384.86 1225 Excavation Regular 21798 CY $6.50 $141,687.00 1301 Plants 1 LS $589.00 $589.00 Total I ncreases Code A: $157,769.97 Additions: 1120 Remove slab & pipe in pond area I LS $3,713.00 $3,713.00 1121 Tree removal (Modified Lake Layout) I LS $550.00 $550.00 1122 Additional survey calcs and field I LS $2,250.00 $2,250.00 stakeout 1123 Removal of concrete encasement 13" x I LS $2,091,00 $2,091.00 22" CMP 1124 Remove Existing Trees (925 Dempsey I LS $1,060.00 $1,060.00 & in Island) 1229 Gas System Main Conflict Structure I EA $3,385.00 $3,385.00 1230 Relocate Utility for Storm ERCP 1 LS $32,707.00 $32,707.00 1231 Furnish & Install 16" DIP 1 LS $4,672.00 $4,672.00 1232 Conflict Box Installation S-1211 I LS $300.00 $300.00 1233 12" x 18" ERCP Storm Drainage Pipe 5 LF $32.20 $161.00 1234 Special Modified Precast JB @ NE I LS $4,000.00 $4,000.00 Corner Ewing Ave 1235 Replacement Catch Basin @ SW 1 LS $2,048.00 $2,048.00 Corner MLK Jr. Ave. 1236 Adjust Existing Storm MH # 2444 1 LS $250.00 $250.00 1237 Sodding (Floratam) 55.56 SY $2.88 $160.01 1238 8" Reclaim Water Main Relocation 182 LF $32.50 $5,915.00 Total Additions Code A: $63,262.01 Total Net (Decreases)/Increases/Additions Code A: $96,831.64 Roads Codes: 0315-92273-563700-541-000-0000 B Decreases: 2200 10 % Contingency I LS $28,483.08 $28,483.08 Increases: 2004 Install 2' Concrete Valley Gutter 174 LF $9.70 $1,687.83 2005 Surface Course - Asphalt Concrete Type 7 TN $110.00 $798.60 2007 Install Base Course - 8" 1,696 SY $10.00 $16,959.10 2009 Concrete Sidewalk 4" 2,783 SF $5.65 $15,724.20 2010 Concrete Driveways - 6" 1240.41 SF $6.50 $8,062.67 Total Increases Code B: $43,232.40 Page 3 of 3 Change Order #6 & Final Re: Lake Bellevue Stormwater Management Project (03-0080-EN) ITEM DESCRIPTION QUANTITY UNIT UNIT COST TOTAL COST Additions: 2013 6" Crushed Concrete Base Material 48 SY $7.50 $360.00 2014 ADA Truncated Domes @ School Cross 40 SF $28.50 $1,140.00 Total Additions Code B: $1,500.00 Total Net (Decreases)/Increases/Additions Code B: $16,249,32 Water Codes: 0376-96742-563800-533-000-0000 C Decreases: 3014 Contingency I LS $5,705.00 ($5.705.00) Total Decreases Code C: ($5,705.110) Increases: 3004 Install Gate Valve (6") 2 EA $800.00 $1,600,00 3007 Miscellaneous fittings & Appurtenances 0.4184 TN $7,875.00 $3,294.90 3009 Water Meters Relocation/Reconnection 5 EA $285.00 $1,425.00 Total Increases Code C:. $6,319.90 Additions: 3017 6"x6" Tapping Sleeve & Valve 1,0000 EA $2,280.00 $2,280.00 3018 Water system piping @ 6" PVC 11.0476 LF $10.50 $116.00 3019 Water system piping @ 4" DIP 8.8000 LF $18.50 $162.80 3020 12" Insta & Ez Valves 1.0000 LS $12,098.25 $12,098.25 Total Additions Code C: $14,657.05 Total Net (Decreases)/Increases/Additions Code C: $15,271.95 Sewer Codes: 0376-96634-563800-535-000-0000 (D1 Decreases: 3105 Contingency 1 LS $2,287.00 ($1287.00) Total Decreases Code D: ($2,287.110) Additions: 3107 Concrete encasement in lieu of 8" DIP 60.0000 LF $24.50 $1,470.00 3108 Sewer wye lateral connection 1 LS 617.25 $617.25 $2,087.25 Total Net (Decrease)/Additions Code D: ($199.7-5) Total Increases/Additions PO: $128,1'53.16