Loading...
WATER TREATMENT PLANTS 1 AND 3 WELLFIELD EXPANSION PHASE 1 - WELL INSTALLATION - PROJECT NO. 07-0037-UT - ADMINISTRATIVE CHANGE ORDER #2x: ` ADMINISTRATIVE CHANGE ORDER 2 DATE: Novvcmber 12, 2010 PROJECT: WATER TREATMENT PLANTS 1 & 3 WELLFIELD EXPANSION PROJECT NUMBER: 07AQ37-UT PROJECT PHASE I - WELL INSTALLATION PO REFERENCE NO.:r ST 105155 CONTRACTOR: COUNCIL AWARD:- JANUARY 15, 2009 SOUTHEAST DRILLING SERVICES, INC. P.O. Box 2764 DATE OF CONTRACT: JUNE 15, 2009 Lutz, Florida 33548 CODE: 0376-96764-563800-533-000-0000 A 0376-96763-563800-533-00_"900A 0376-9676 - 0376-9676 - 3 0-0000 D 0376- 3- - 0 E 0376-96763-563$DOi5=33-Q0Q _QQ00 F 0376-%764-563800-533-000-0000L_ 037(w 6 - 33- 0 -0000 H SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT This change order is to delete the remaining scope of work for Well 3-3 and add: the abandonment of Well No. 3-3 and monitor wells, material purchased for Well 3-3, upsizing pump and piping at Well 3-2, electrical and site work at Well 79, extra electrical work at Well 3-4. See Attached sheet for uantitites and addtional items. STATEMENT OF CONTRACT AMOUNT ACCEPTED BY: PO ST105155 3,329,62920 CO 1 - Admin - CM - 145,26333 CO 2 - Admin - CM - 42,743.85 New PO Amount 3,517=63838 By: ) PO ST105869 PO STI05868 New PO Amount ORIGINAL CONTRACT AMOUNT CO 1 - Admin - CM CO 2 - Admin - CM NEW CONTRACT AMOUNT ATTEST: Oauv ?7. Gattilea* ?* c w-Xity Clerk Date: QA?7K44 y y/ -Lo u CITY OF C TER, in PINE S WFLORIDA Willianf 13. Home, 11 ~City Manager PP / VED AS TO FORM- Attorney Page 2 continued: RE: Change Order 2 152,499.20 37,151.60 189,650.80 $ 3,519,280.00 $ 145,263.33 $ 42,743.85 $ 3,707 7.18 William C. Ziegler, V" r i et Date: u ` ?0 Witnesses: Recommended By: City of Clearwater Lan-Anh Nguyen, PE :Project Manager Michael D. Quillen, P.E. City Engineer TI'EM DESCRIPTION QUANTITY UNTr COST TOTAL COST Code: 0376-%763-563800-533-000-0000 Decreases: 3-3: 2C Drill 18-inch Diameter Borehole 5 VF $100.00 ($500.00) 3-3: 2E Drill 12-inch Diameter Borehole 26 VF $30.00 ($780.00) 3-3:3 Site Work 0.0769231 IS $13,000.00 ($1,000.00) 3-3: 4A Install well Pump, Piping, Valves, Meter, and 0.99741935483871 IS $93,000.00 ($92,760.00) Avvurtenances .S 4r 3-3 : 4B Verical Discharge Pipe 80 VF $90.00 ($7,200.00) 3-3 : 5 Production Well Pump and Motor 1 LS $9,000.00 ($9,000.00) Total Decreases Code E: ($111240.00) Additions 3-2: 8 Extra cost for upsize pump and piping at 1 LS $ 63,647.75 $63,647.75 well 3-2 XX 3-3: 8 Abandon Well 3-3 1 LS $11,181.08 $11,181.08 xx 3-3: 9 Miscellaneous Materials for Well No. 3-3 1 LS $ 47,297.17 $47,297.17 xx 34:9 Extra Electrcial Work at Well 3-4 1 LS $10,227.07 $10,227.07 79: 8 Electrcial and Site Work at Well 79 1 LS $21,630.78 $21,630.78 xx Total Increases Code F. $153,983.85 Total Net (Decreases ylncreasWAdditions to Contract $42,743.85 10227.07 2 LL d aria er U Interoffice Correspondence Sheet To: William B. Horne, II, City Manager From: Mike Quillen, Engineering Director CC: Tina G. Wilson, Budget Director; Rob Fahey, PE, Utilities Engineering Manager; Lan- Anh Nguyen, PE, Eng Specialist II; Stephanie Sansom, Senior Accountant, Engineering/Stormwater; Judith Crawford, Senior Accountant, Public Utilities Date: December 22, 2010 RE: Administrative Change Order No. #2 WTP 1 & 3 Wellfield Expansion Project Phase I - Well Installation RECOMMENDED ACTION: Approve Administrative Change Order No. 2 to Southeast Drilling Services, Inc., of Lutz, Fl. for WTP 1 & 3 Wellfield Expansion Project Phase I - Well Installation (07-0037-UT) increasing the contract amount by $42,743.85 for a new contract total of $3,707,287.18. BACKGROUND: This administrative change order #2 is needed to is to delete the remaining scope of work for Well 3-3 and add: the abandonment of Well No. 3-3 and monitor wells, material purchased for Well 3-3, upsizing pump and piping at Well 3-2, electrical and site work at Well 79, extra electrical work at Well 3-4. OFFICE OF MANAGEMENT AND BUDGET DEPARTMENT REVIEW I recommend approval based on the administrative change order criteria: 1. Increases do not exceed 10% of the Council approved amount on a cumulative basis. 2. Change does not change the scope of the project. 3. Price increases do not require additional appropriation to the project. 4. Contract price decreases may be approved without limitation. 5. Completion date is not extended more than 60 days. "\" 146-7'?o Tina G. Wilson Date