MORNINGSIDE NEIGHBORHOOD TRAFFIC CALMING - 07-0038-EN - ADMINISTRATIVE CHANGE ORDER # 1 ADMINISTRATIVE CHANGE ORDER #I PROJECT: Morningside Traffic Calming DATE: October 26, 2010 PROJECT NUMBER: 07-0038-EN PO REFERENCE NO.: ST106342 CONTRAC'T'OR: COUNCIL AWARD: 3/18/2010 R.A.M Excavating, Inc. 569 Hammock Drive DATE OF CONTRACT: 4/2/2010 Palm Harbor, FL 34683 CODE: 0315-92259-.563700-541-000-0000 A 0315-%124-563700-539-000-0000 B SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT Administrative change order #1 is needed to decrease items for Summerlin Dr., the potable irrigation system and the crosswalk thermoplastic pattern and add items for the reclaimed water irrigation system, the revised crosswalk thermoplastic pattlrp`vtddvcl vrokcTfpr ' the speed-tables. STATEMENT OF CONTRACT AMOUNT ACCEPTED BY: LLi ORIGINAL CONTRACT AMOUNT $ 1,399,790.70 " CQ# 1- Admin - CM $ 95,128.54 BY. NEW CONTRACT AMOUNT $ 1,494,919.24 Richard Slack Date: - - (? ATTEST: • R.?'? ?OFTHEWitnesses: 0 k Rosemarie Call, City Clerk Date: (x/77 a 1D f Q ?? ® > CITY OF CLEARWATER, in mended By: PINELLAS C TY, FLORIDA ???/?A? City of er tJ,GCfi r: Willi B.Ho III ity Manage Paul Bertel , Traffic Operation Mgz AP ROVE Michael D. Quillen, P.E. Camillo Soto Assistant City Attorney City Engineer Page 2 co ntinued: RE: Adm inistrative Change Order # 1 ITEM DESCRIPTION Code A: -315-92259-563700-541-000-0000 Decrease: 14 PAVEMENT REMOVAL 18 EXCAVATION, ROADWAY 21 PLANTING SOIL BACKFILL (MEDIAN) 22 12" TYPE B STABILIZATION 23 8" CRUSHED CONCRETE BASE 26 6" CONCRETE PAVEMENT 27 2" ASPHALT PAVEMENT (TYPE S-1) 30 CONCRETE BRICK PAVERS 37 CURB AND GUTTER, TYPE 1 39 STRAIGHT CURB 40 STRAIGHT CURB (MODIFIED A OR B) 90 THERMOPLASTIC INLAY 95 LAGERSTROEMIA INDICA "MUSKOGEE" 14'-16' OA x 7-8' SPR, 100 GALLON MIN. STANDARD 97 QUERCUS VIGINIANA'BOARDWALK' 14-- 160A x 7'8" SPR, 3" CAL. MIN, 100 GALLON MIN. 102 SHEFFLERAARBORICOLA'VARTEGATA',3 GALLON 111 IRRIGATION SYSTEM Additions: 117 COMPLETE INSTALLATION OF OPERATIONAL. RECLAIMED IRRIGATION SYSTEM AS INDICATED ON REVISED DRAWINGS: 1-1, 1-2,1-3,1-4,1-5,1-6,1-7, T-8, 1-9,1-10,1-11,1-12,1-13, I-14, I-15, I-16 and I- 17 DATED 7-26-2010 118 SPEEDTABLE CHEVRONS, PREFORMED THERMOPLASTIC, WHITE WITH CONTRAST 119 REMOVE EXISTING CHEVRONS, PRESSURE WASH 120 THERMOPLASTIC INLAY, CROSSWALKS, YELLOW BRICK WITH BLACK LINES, "TRAFFIC PATTERNS" BY FLINT TRADING, 121 PREFORMED THERMOPLASTIC, 12" LINE, .AT CROSSWALKS QUANTITY UNIT UNIT COST TOTAL COST 422 SY $ 1.00 $ (422.00) 468 CY $ 1.00 $ (468.00) 37 CY $ 21.00 $ (777.00) 560 SY $ 3.00 $ (1,680.00) 462 SY $ 7.00 $ (1234.00) 454 SF $ 4.50 $ (2,043.00) 44 TN $ 136.00 $ (5,984.00) 454 SF $ 3.30 $ (1,498.20) 302 LF $ 13.50 $ (42077.00) 142 LF $ 1150 $ (1,917.00) 184 LF $ 14.00 $ (1576.00) 4406 SF $ 2.00 $ (8,81100) 2 EA $ 236.00 $ (472.00) 2 EA $ 270.00 $ (540.00) 39 EA $ 8.50 $ (331.50) 1 LS $ 27,000.00 $ (27,000.00) Total (Decreases): $ (61,831.70) 1 LS $ 86,918.84 $ 86,918.84 26 EA $ 133.81. $ 3,479.06 12 EA $ 157.50 $ 1,890.00 4406 SF $ 1339 $ 58,996.34 1200 LF $ 4.73 $ 5,676.00 Total Additions: $ 156,960.24 Total Net (Decreases)/Additions to Code A: $ 95,128.54 LL _° Clearwater U Interoffice Correspondence Sheet To: William B. Horne, II, City Manager From: Michael D. Quillen, PE, City Engineer, CC: Tina G. Wilson, Budget Director; Stephanie Sansom, Senior Accountant/Engineering; Alice Eckman, Construction Specialist Date: December 15, 2010 RE: Administrative Change Order No. 1 Morningside Traffic Claming Project (07-0038-EN) RECOMMENDED ACTION: Approve Administrative Change Order No. 1 to R.A.M. Excavators, Inc. of Palm Harbor, Florida, for the "Morningside Traffic Calming Project (07-0038-EN)". This change order increases the contract amount by $95,128.54 for a new contract total of $1,494,919.24. BACKGROUND: This change order is needed to decrease items for Summerlin Dr., the potable irrigation system and the crosswalk thermoplastic pattern and add items for the reclaimed water irrigation system, the revised crosswalk thermoplastic pattern and chevrons for the speed tables. OFFICE OF MANAGEMENT AND BUDGET DEPARTMENT REVIEW I recommend approval based on the administrative change order criteria: 1. Increases do not exceed 10% of the Council approved amount on a cumulative basis. 2. Change does not change the scope of the project. 3. Price increases do not require additional appropriation to the project. 4. Contract price decreases may be approved without limitation. 5. Completion date is not extended more than 60 days. 1 l5 l? Tina G. Wilson Date Adm. C0#1 Memo -- Morningside Traffic Calming - RAM Excavating