12/17/1980 (2)12/17/1980 1241 GREENWOOD AVE S SUNSHINE VILLAS (SUNTREE APTS) /~y~ ~'~ CITY OF CLEARWA'~'L~t, Interdepartment Correspondence Shee; T0: Lucille Williams,. City Clerk FROM: ~ David P. Healey, Planning Director~L~~ COPIES: Roy Ayres, Building Director; Max Battle, Public Works Director; Keith Crawford, Traffic Engineering Director SUBJECT: preliminary Site Plan Certification _ DATE: December 17, 1980 The site plan for Suntree Apartments~Phase I, Dorian Housing Corportion-Champion Development Corporation was. approved by the City Commission on December 11, 1980 subject to conditions. The conditions of approval are set forth below. Attached are five copies of the site plan for your certification and distribution. Suntree Apartments Phase I 1. .Landscape plan for the area between Building #1 and Greenwood Avenue be submitted prior to issuance of a building permit. 2. Retention areas be re-configured consistent with the recommendation by the Engineering Department prior to issuance of a building permit 3. Building permit be issued within 6 months from the date of approval and the project completed in 2 years. DPH/PH/vmc Attachments .. . h ~ECEIVEf3 SEC 18 ;~80 ;CITY CLERK .~:. ~~~ ~~~ 4A~J P~aTdTti= S `~~~~~~ CITY OF CLEARWA~tER f ~-~~ ~ interdepartment Correspondence Sheet TO: City Manager Anthony L. Shoemaker FROM: David P. Healey, Planning Director -• COPIES: Listed Below SUBJECT: Minor Plan Change~Sunshine Villas DATE: April 9, 1982 RECEIYECX~ APR 12 1982 - 7 (AKA Suntree. Apts':) .~TY CI.F,~; The City Commission approved the preliminary site plan for Suntree Apartments on December 11, 1980 subject to conditions. The plan was certified by the City Clerk on December 18, 1980. -. The developer is now requesting permission to-reposition-the swimming? 'pool on the site and .act'd restroom facilities "tog"ether with -an equip ,4,ment bu~T`ding:_: The new pool and building location is delineated on the attached plans. I recommend we approve the requested modifications as a minor plan _change. If you concur, please initi'a1 t- ibis memo an3~orwarT'fFie ten attached copies of the plan to the-City Clerk so that she may certify them as a valid record of change and distribute them to the appropriate departments. Each department, in turn, should attach these revised pool plans to the original certified plan. DPH/JDR/cc attachment(s) List: ~~y Ayxes,-Building (1) Max Battle,_Public Works (2) Paul Rettig, Utilities (2) Keith Crawford, Traffic Engineering (1) Joe Molnar, Fire Dept. (1) David P. Healey, Planning (1) Developer/Project Sponsor (1) N V~ R~G OEP~ ,~~ a F ~~~~9~ k "; 3 ~ ~~r~l~ y .. ~; f _ ~ ~~~~ CITY OF CLEARWA,TE~~ ~ ~ - Interdepartment Correspondence Sheet TO; Lucille Williams, City Clerk FROM: David P. Healey, Planning Director~G~~ COPIES: VRo Ares Buildin Director; Max Battle, Public Keit Craw ord, Traffic Engineering Director SUBJECT: Preliminary Site Plan Certification DATE: December 17, 1980 Works Director; The site plan for Suntree Apartments Phase I, Dorian Housing Corportion-Champion Development Corporation was, approved by the City Commission vn December 11, 1980 subject.to conditions. The conditions of approval are set forth below. Attached are five copies of the site plan for your certification and distribution. Suntree Apartments Phase I 1. ..Landscape plan for the aroma between Building #1 and Greenwood Avenue be submitted prior to issuance of a building permit. 2. Retention areas be re-configured consistent with the recommendation by the Engineering Department prior to issuance of a building permit 3. Building permit be issued within 6 months from the date of approval and the project completed in 2 years. DPH/PII/vmc Attachments