Loading...
PSP95-01; SP95-18PSP95-01; SP95-18 510 GARDEN AVE N PACE TECH CITY OF CLEARWATER Interdepartmental Cornespondence TO: FROM: SUBJECT: Vic Chodora, Building Official; Lou Hilton, Senior Planner; Etim Udoh, Associate Planner; Bob Maran, CE III; Steve Sarnoff, Central Permitting Specialist; Don Meerians, Assistant Traffic Engineer; Mike Quillen, Environmental Engineer; Ream Wilson, Director/Parks and Recreation James Goodloe, Fire Marshall ~ _ I /i / // Allen V. Mahan, Coordinator, Central Permitting Certified Site Plan for PACETEC PSP 95-01 COPIES: Scott Shuford, Central Permitting DATE: April 25, 1995 ~l ~ /~ Attached is a copy of the above described amended site plan submitted on April 21, 1995 for certification. Please refer to the attached DRC final minutes addressing conditions of approval required by D.R.C. on March 16,1994 for this amended site plan. If you fmd the site plan to be acceptable, please initial and date next to the applicable condition(s) on the attachment. If you do have an objection and/or recommendation, please comment below or attach your comments to this memo. Your assistance in prepari--nryryg the plan by May 2 for certification by the City Clerk will be appreciated. Thanks. ~~lC ~ ~~.~AS~ C,171J~~~ A~ PAr~ ~~~ ~-ego ~,~ C~l~r~rl ~~ AS ~~: AVM/avm A Noi ~ is Nr,~,'r A~1~ i~~w~ ~ ~/-/~15K ~ U~+' ~~ l~ ~~v I l~fr ~ ZI~'t SPF9501.avm ~' l I'7~ C PA~~ ~N~ dE~~~ / s5~ ~ ~~ ' ' lTl' ,~ SA~~f~ r ~ ~ E~~ r ~. ~ ~ ~ ~~ ~ ~ ~ ~ ~ ~ Comments: (by whom and with date, please) = . =t~ttacnea .~s a copy_or the aoove aescnoea amenaea s~te_pian~~suonui~ea on ~.pru ~i, tyyo .ror ceruncauon :,~~ = wr,; ::; J ~ Please refer to the attached DRC final minutes addressing conditions of approval.required by D.R.C. on March 16,1994 ~~ `_for~this.amended site plan. If you find the site plan to be acceptable, please initial and date next to the applicable condition(s) on the attachment. If you do have an objection and/or recommendation, please comment below or attach your comments to this memo. Comments: (by whom and with date, please) Your assistance in preparing the plan by May 2 for certification by the City Clerk will be appreciated. Thanks. AVM/avm : ~~~: . - ~ .. SPF8507.avm . ~.',;. . MINUTES DEVELOPMENT REVIEW COMMITTEE Thursday, March 16, 1995 - 9:00 A.M. Central Permitting Conference Room, 10 South Missouri Avenue, Clearwater FL Members present: Scott Shuford Chairman, Director of Central Permitting Rich Baier City Engineer Louis Hilton Central Permitting Jeff Daniels Fire Department Mike Quillen Public Works/Environmental Donald Meerians Public Works/Transportation Group Ream Wilson Parks & Recreation Bob Perkins Central Permitting Allen V. Mahan Central Permitting Others present: Tom Hansen Steve Lane Alex Panik Ilhan Bilgutay Pat Sheppard ~- Jonathan Gotwald Sally Demarest Racetrac Petroleum (item #2) Racetrac Petroleum (#2) Panik Engineering (#2) Pace Tech (#3) H & G Structures (#3) King Engineering Assoc., Inc. (#5) Board Reporter, City Clerk Department The meeting was called to order by Chairman Shuford at 9:00 a.m. in the Central Permitting Conference Room. In order to provide continuity, the items will be listed in agenda order although not necessarily discussed in that order. ITEM 1 -The minutes of the March 2, 1995 meeting were approved as submitted. I 2 - Racetrac - (PSP 95-06); located at Gulf-to-Bay and David Avenue. The applic~ p poses onstruct a 2,989 sq. ft. gas station and convenience store with 12 fuel u s-a ap urtenant fixtures. as station site consists of 1.03 acres subdivide a arger parcel 5.9 cres. Applicant has submi e requested hydrolo i yses of the 10-year rated sto sew r, 25-year one hour detention pond an i e area. The pplicant or applica epresentative presented the site plan/plat ancl'St~ . •esented thei co ents in writ' taff specifically indicated the conditions below, and in the ensuing disc ~ Mr. S of said the City greatly appreciates the efforts of the applicants to save trees and th a nt acknowledged they tried to save every tree they could. `~__ minDR03b.95 1 03/16/95 /~~ ' 1 ~, ineer, attached). ~. 12.E Prior to ' ance of a building permit, a copy of the approved SWFWMD e,~ni~+ submitted to Env' ental Management. 13 ~ Prior to issuance of a bui enmit, the gradin ~ s all show finished grades soi the proposed trench drain sufficien Id /2" of runoff from .08 acres on site. 14.II The applicant shall contact P Recrea i the required 2% recreation open assessment fee, whic be paid prior to certification. '---_..~,^ 1 I ' Mr. ~ahan e a motion to approve the preliminary site plan with the above DRC sugg cond ti ,incorporating into the motion the comments made by staff. The motion was s nded and carried unanimously. ~~ ~ I I of ITEM 3 -Pace Tech - (PSP 95-01); located at 510 N. Garden Avenue. The applicant proposes to construct a 7,370 sq. ft. building expansion with associated parking, stormwater and landscaping. Stormwater drainage calculations and landscape plans have ben submitted for review. The applicant or applicant's representative presented the site plan/plat and staff presented their comments in writing. Staff specifically indicated the conditions below, and in the ensuing discussion it was noted that the project had been "on hold" until the applicant could resolve the parking lot, landscaping and sidewalks issue's. Mr. Perkins referenced memo dated February 13, 1995 from Rich Baier, City Engineer, to Mr. Bob Maran stating City requirement re the Use of Slotted Drain or Channel Pipe Along Driveways and the applicant agreed to install an asphalt hump to drain to the pond. Mr. Hilton asked if water would be held from the new parking lot; the applicant replied the water would be detained on site and throttled to have a positive outfall to the Pinellas Trail. Mr. Shuford noted that the retention ponds have been designed to be somewhat larger than usual to compensate for the longer retention period. The City Engineer stipulated an ADA ramp at the corner of Maple and Garden Avenues. The applicant will apply to the Planning & Zoning Board relative to the conditional use for non- commercial parking in the new residential zone parking lot. The applicant said they will continue to work closely with their architect and City staff on their Master Plan. It a oted that the applicant intends to access ' y se e. e pro d proje is sc uled f r rece ~ n fet ore th rty mission on pri120, 1 Listed below are conditions suggested for DRC approval: 1. Signs and fencing/walls are subject to separate review and permitting processes. 2. The dates and conditions for approval of the non-commercial parking lot in a residential zone by the Planning and Zoning Board for conditional use approval and the Development Code Adjustment Board for variance approval shall be provided on the preliminary plat/site plan prior to certification. 3. Prior to certification, a copy of the SWFWMb permit application is to be provided to `~-- V/ minDR03b.95 3 03/16/95 ~, Jyi . ~ t ~~ 'ft b~ Engineering Site Plan Review. 4. Prior to the issuance of a building permit, a copy of the approved SWFWMD permit is to be provided to Engineering Site Plan Review. 5. A reduced pressure backflow prevention devices must be installed by the City with applicable fees being paid by the owner. 6. The slotted trench drain must meet the requirements of the City Engineer (see copy of memo from Rich Baier, City Engineer, dated February 27, 1995, attached). 7. The detention ponds re to be designed fora 50 year storm per City of Clearwater Design Standards Manual. The existing storm system on Garden Avenue is very old and substandard by present City design standards. 8. Prior to certification, a copy of the SWFWMD permit application and calculations shall be provided to Environmental Management. 9. The applicant shall contact Parks & Recreation for the required 2% recreation/open space assessment fee, which shall be paid prior to certification. Mr. Mahan made a motion to approve the preliminary site plan with the above DRC suggested conditions, incorporating into the motion the comments made by staff. The motion was duly seconded and carried unanimously. ~ 4 -Trade Center - (PSP 95-07); located at Cleveland and Garden Streets. The applicant ose o construct a 547,000 sq. ft., 390 ft. tall multi-story mixed use office and ap ment ling tot ude an automated parking facility, gym, pool, and related facilities. The prof ct wil ire the vacati of an adjoining alley. ~~ It vas indicated by Mr. Ma~ia~that agenda item 4 had been postponed IT M 5 -Park Place Outparcel Plat~(iSt~JB _95-01); located Gulf-to-B at Park Place Blvd. The app icant proposes to create five parcels of they' k Place develop for the construction of hree restaurants, a retail building and a stormwater reten ond. ing the parcels will allow, ong othe benefits, the proper signage to be put in place for ea of the parcels as appropriate. Th final site lan for construction on the five parcels was appr ed by t City Commission on Septem er 1, 1994 ~ The a plicant or applicant's represe the presented the site plan/plat and sta resented comm nts in writing. Staffs tfically indicated the conditions below, and in t n discus 'on Mr. Mahan stres that cross access agreements and Unity of Title are required "in han "before final proval; the applicant replied that the attorneys have been notified. Unity o Title is r tred because of the lack of individual retentionand joint access require to utilitie , ill be noted on the plat. It was suggested that the applicant show the drive or cuts off r Place Boulevard. Listed below are conditions suggested for DRC approval: mnDR03b.95 4 03/16/95 s y;,.. ,~ CONSULTING ENGINEER CIVIL ENGINEERING • ENVIRONMENTAL • SITE DEVELOPMENT MUNICIPAL • SANITARY • HIGHWAYS • DRAINAGE • INSPECTION LAND SURVEYING ALEX J. PANIK, P.E. President April 19, 1995 #841-94 Mr. Lou Hilton Planning Department City of Clearwater City Hall Annex 10 South Missouri Avenue P.O. Box 4748 Clearwater, Florida 34618-4748 Re: PSP 95-01 Pace Tech, Inc. 510 North Garden Avenue Clearwater Dear Mr. Hilton: ,~ r~r APR 2 ~ 195 -: ,~~ c~rY of c~ ~ARw~~-ER REGISTERED: Florida New Jcrsey Pennsylvania Texas Pursuant to the Planning and Zoning Meeting of April 18, 1995, enclosed are twelve (12) copies of the revised site plan for your use. The revised site plan reflects the addition of Note No. 15 concerning approval of CU 95-28 on April 18, 1995. Thank you for your cooperation. Sincerely, s2~ ex J ~ , P.E. Presiden AJP : emi cc: Scott Shuford, City of Clearwater Ilhan Bilgutay, Pace Tech, Inc, John Gallant, H & G Structures John Hause, Hansen & Hause Architects Encl. 34068 U.S. Highway 19 North Palm Harbor, Florida 34684-9998 (813) 785-4366 .~~ ALEX J. PANIK, P.E. President April 19, 1995 Mr. Ipu Hilton Planning Department City of Clearwater City Hall Annex 10 Sou~`~h M,issoari Avenue P.O. Box 4748 Clearwater, Florida 34618-4748 Re; PSP 95-01 Pace Tech, Inc• 510 North Garden Avenue Clearwater #841-94 ~~~~. ~ ® ~ ~ 1~g`~ REGISI~f:RED: Florida \~cw Jcrsev Pennsylvania Tcxas ~~ ~~~ Dear Mr . Hilton : Q~ G~ ~t~~~~`) ~` Pursuant to the Planning and Zoning Meeting of Apri~'~~8, 1995, enclosed are twelve (12) copies of the revised site plan for your use. The revised site plan reflects the addition of Note No. 15 concerning approval of CU 95-28 on April 18, 1995. Thank you for your cooperation. Sincerely, ex J~ , P.E. Presiden ~. •f° ,:. ~~ r 0.g ~~~ ~ ~, ~,, ,., cc: CSbotf .SYiuford, City of Clearwater OF G~~' ~ ~~ ~~~'~ ~ ~: Ilhan Bilgutay, Pace Tech, Inc. G~~ John Gallant, H & G Structures APR ~ 1 1995 John Hause, Hansen & Hause Architects . CENTRAL PER3V1iT r'lt~G Encl. CITY OF CLEARWATER CONSULTING ENGINEER CIVIL ENGINEERING • ENVIRONMENTAL • SITE DEVELOPMENT MUNICIPAL • SANITARY • HIGHWAYS • DRAINAGE • INSPECTION LAND SURVEYING V~ 34068 U.S. Highway 19 North Palm Harbor, Florida 34684-9998 (813) 785-4366 -; CONSULTING ENGINEER CIVIL ENGINEERING • ENVIRONMENTAL • SITE DEVELOPMENT MUNICIPAL • SANITARY • HIGHWAYS • DRAINAGE • INSPECTION LAND SURVEYING ALEX J. PANIK, P.E. President March 24, 1995 #841-94 Mr. Lou Hilton Planning Department City of Clearwater City Hall Annex 10 South Missouri Avenue P.O. Box 4748 Clearwater, Florida 34618 - 4748 Re: PSP 95-01 Pace Tech, Inc. 510 North Garden Avenue Dear Mr. Hilton; REGISTERED: Florida New Jersey Pennsylvania Texas Pursuant to the DRC Meeting of March 16, 1995, enclosed are twenty-two (22) sets of revised plans for your use. In addition to the revised plans, we offer the following comments for your consideration: 1. Attached is one (1) copy of "Noticed General Permit No. 95-0042" for Pace Tech, Inc., dated March 17, 19.95. 2. Attached are two (2) copies of the drainage calculations reflecting a 50 year design storm (10 inches) for your use. 3. Please be advised that the slotted drain has been deleted due to the concern expressed by Richard J. Baier, City Engineer, and replaced with a yard drain (FOOT Index No. 282) behind landscape curb with discharge to the proposed pond. Thank you for your cooperation. .E. ~~~ Mpp'~ ~ 1995 AJP:emd cc: Scott Shuford, City of Clearwater Ilhan Bilgutay, Pace Tech, Inc. John Gallant, H & G Structures, Inc, John Hause, Hansen & Hause Architects Encl. CITY (~~ Cl~~~~1V~A~'~R 34068 U.S. Highway 19 North Palm Harbor, Florida 34684-9998 (813) 785-4366 ~"`~ n55C55tiL'Nx oC~orr,N 5rACC/Itrcili'.nxxoN LfiCACx ' i ~ ',~ ~:~ hnn.lon of ex.lot.ln non-teeidontinl Uy 5U7: o[ EJ.oot Wren of mort•) r ~ ;:.•.~' '~ (xo nr; coftrt,rxr•.v nY xNr vr:vrt,orr•.n) r ..... r~nrr;t. cnnss i.nim nnr•.n: ~ ~~s ~~• Nrx t,ANV nncn:.-1~,~ 5y_5..5~ _ .. ~'' ;iu .r vni,ur of t.nNn ofN,v ncccinu.tNC ~>,'o cuntt~,N'.c Yrnn' S n55t:55fti;NT: ~.._11~1.+d`1~. . ~ ~ {'Ivr:nir•irnrloN ~r xrtr; ~,novr•, J.s itritu.tnt:v) Sr~ ~~~.~~-,~,~ S`~~-- ~\a•r, vhi.u~ rF.n squnnr, Foox: ~_~ ~3 __~~ -~o~ ~-Q.~.d~.,~~~~~' (•.1115? Vn1.U(: U1.Vl.ni:b nY c;IOSS LAN[) nRl;n) VQ.~~~-- "-~~- ~--- t. nrrr-sr ~rnn'r rtnr•, iNFOrtftn~rloN t'ttt:srNxi;ti nnovr is conttr•.C'r, cormr.r:'rr:, niNt •luul:. n~ ~:: -~_ 1•(111.1 ~F:C'f linl Ilia ~q~-~.______lrc.~•~'`' .•~` ~"_ ~ ___- _ __ _-_ _.._. _.... _ _- - • -- - ........... . i '-- t.crnt.lOtl s ~~ - o ~.Sz o.~ d~-~_a~~ _______..___-------~----- • - - -- ..... _. *~~ r.~ t5ttitC. Fi.non nttr:n:~ 3J_~ty s'F~_ sr r>,.oott nltr.n xo nr•, nnnr:n 13x7 7 O.... 5f~ rrt~rr:nrv otnar:n/nurnontzt:n it r;rnr:.sr•,Nxnx.tvr s.tcNn~tunr; _ ___-.__ _ .. __ _ . ___ _ ........ __ . ' ' ~ 1fiCACx 1-J;> rnLCULn'rzvfa Zrort.ort-•ici; trsr, arir,Y) J ~, OCt`.N SrACI; n5SIi5SfiGNx I".lo~r. nr.en to lie nclrlec) 3 -l`i O _ ____ .-._........ 51 ~ ,l~___ .__ . •5r ~ rxlnt.lt,s F.t~nt: nt~n = g-~~y`~-.-- .-.._..... - -- • tt~t.ln of: ncltlc~l t:o rx..tntl.ng • t ____---••--.-_ •-. _.... _ 7 ~, ' ~ (['tocced OnJ.y_ J.f 507. of Grentr.t:) 1':trc:c.l Net l,nncl nt:e~____..---._.__..__ 'lb x`_15....__..------.... sr- ! ~ ttl,~n strrir.e t°ncl:or. x_, U?U ...--•-------__- • ---....--",r ' ~t,r•n 5(,nc:r., nnhcn7mcrrt L S3o•q-~--- •---..._ _..... f • iICCUfiMr,NhAxIONS • ___._----------t iS lilt' t)1' ,-%" .~ '". ~. . ~ '~~, !,I .. I ~G ., ,jNp • ~ `:j; .. ' ~;+~~. ~:~:, ~~,,; ~~,~::, :-, . ,.. ~,nJrn .~ uoLLntts 5 5r t~^a34~4`.y3. t ~ orr;N .,rnc:r r-rr; -~.t/ ~~__ ---•-~-~ t 1, nl',c:ltf:nT.tON rncl.i,t.'rv Lntty rrt;. ._~._ N/A r,5r ~, __ fl/A ____- t t t. nt:~ttrn7'.t.oN FnCJ.I..t't'Y CF:1; ~__~_ N/n ___-- t J. rnvirr:rr c . s.- j[--... @ ~,~r tl/~ N/n ~rornt.s sr` ~ ~_ ~..~3`_~.a.~y3 . , ,• . ~, . Itenm t ..loan --.----~--- •---+- - t)ir.ec~vr., l'~tlcn ~nci Itc:ct•.e~tJ.c,n ~Ivlc: All. lc~n rny7hlr. to "C.lly of; Ciettt:tanter". Oren Since nncl necteat:lan - Facility- i,nttcl teen nlwuld br. nulam~tEec~ to fire l'ctr.kn. nncl itr.Crent~na I)et,nrLment, city 11n11. ltnitez, ~.0 South tl.lndouxl, Iwenue, dlrcr.enl:lon i ~ 1'ncl.l.tty f ~cn altnttl.tl ho ttnbrnl.tl:ed ho llie ltu.ll.cllnp, hei~nt.tmr.nl: nl: llir '~' name nrltirr.nn• ' `. . - fti.linln~r .` I"nrm FLU ' r":; :1 ~ ~ - - --- - - ~ CONSULTING ENGINEER CIVIL ENGINEERING • ENVIRONMENTAL • SITE D$VELOPMENT MUNICIPAL • SANITARY • HIGHWAYS • DRAINAGE • INSPECTION LAND SURVEYING ALEX J. PANIK. P.E. President February 27, 1995 ~rt841-94 Mr. Lou Hilton Planning Department City of Clearwater City Hall Annex 10 South Missouri Avenue P.0. Box 4748 Clearwater., Florida 34618-4748 Re: PSP 95-01 Pace Tech, Inc. . - 510 North- Garden- Avenue Dear Mr. Hilton: ~'~1 C~J=°~~ REGISTERED: Florida New Jersey Pennsylvania Texas Pursuant to the DRC Meeting of January 19, 1995,.enclosed are .twenty-two (22) sets of revised plans for your use. In addition to the revised plans, we offer the following comments for your consideration: 1. The Dumpster Requirement Form will be submitted under separate cover to the City Sanitation Department. Dumpster to be fenced with 12-foot clear opening to the front for access by sanitation trucks. 2. Copy of SWFWMD permit application is attached for your use. 3. Old driveway adjacent to Pond No. 1 is to be removed as requested. 4. Sidewalk will be installed adjacent to all Gtreet rights-of-way, 5. 31 additional interior shrubs have been added to plans. 6. Raised curbs have been added to plans where interior landscaped areas abut pavement (west parcel). 7. Landscape buffer along Spruce Avenue has been revised to a three (3) foot minimum width. 8. Recreation/open assessment fee calculations are in process with Ream Wilson. 9. Four (4) parking spaces have been deleted to accommodate loop drive on east parcel. 10. Stop signs and traffic control have been added to plans. (Pg. 1 of 2) 34068 U.S. Highway 19 North Palm Harbor, Florida 34684-9998 (813) 785-4366 -~ , .~ Mr. Lou Hilton February 27, 1995 Page 2 (cont'd:) Thank you for your cooperation. Sincerely, Ale J. ~zk, P.E. Pr .si e AJP:emd cc:`ScottrShuford, City,of~Clearwater Ilhan Bilgutay, Pace Tech, Inc. John Gallant, H & G Structures, Inc. John Hause, Hansen & Hause Architects Encl. (Pg. 2 of 2) ~~~~ .~ ' MAR 0 21995 CENTRAL PE~ii'Vf1TTWG CITY OF CLEARWATER t ALEX J. PANIK, P.E. President CONSULTING ENGINEER CIVIL ENGINEERING • ENVIRONMENTAL • SITE DEVELOPMENT MUNICIPAL • SANITARY • HIGHWAYS • DRAINAGE • INSPECTION LAND SURVEYING February 27, 1995 Mr. Lou Hilton Planning Department City of Clearwater City Hall Annex 10 South Missouri Avenue P.0. Box 4748 Clearwater, Florida 34618-4748 Re: PSP 95-01 Pace Tech, Inc. 510 North Garden Avenue Dear Mr. Hilton: ~~841-94 ~~;~ ~ ~~ ~~~~~ ~!`t'`~ ~~ C~,~~~tW~7~1~ REGISTERED: Florida New Jersey Pennsylvania Texas Pursuant to the DRC Meeting of January 19, 1995,.enclosed are twenty-two (22) sets of revised plans for your use. In addition to the revised plans, we offer the following comments for your consideration; 1. The Dumpster Requirement Form will be submitted under separate cover to the City Sanitation Department. Dumpster. to be fenced with 12-foot clear opening to the front for access by sanitation trucks. 2. Copy of SWFWMD permit application is attached for your use, 3. Old driveway adjacent to Pond No. 1 is to be removed as requested. 4. Sidewalk will be installed adjacent to all street rights-of~-way. 5. 31 additional interior shrubs have been added to plans. 6. Raised curbs have been added to plans where interior landscaped areas abut pavement (west parcel). 7. Landscape buffer along Spruce Avenue has been revised to a three (3) foot minimum width. 8. Recreation/open assessment fee calculations are in process with Ream Wilson. 9. Four (4) parking spaces have been deleted to accommodate loop drive on east 4 parcel, 10, Stop signs and traffic control have been added to plans. (Pg. 1 of 2) 34068 U.S. Highway 19 North Palm Harbor, Florida 34684-9998 (813) 785-4366 Mr. Lou Hilton February 27, 1995 Page 2 (cont'd:) Thank you for your cooperation. Sincerely, Ale J. _ ik, P.E. Prsie AJP:emd cc: Scott Shuford, City of Clearwater Ilhan Bilgutay, Pace Tech, Inc. John Gallant, H & G Structures, Inc. John Hause, Hansen & Hause Architects Encl. (Pg. 2 of 2) I .. - ---- -~~~ ~. man-.;1~ ~ ~:, CONSULTING ENGINEER CIVIL ENGINEERING • ENVIRONMENTAL • SITE DEVELOPMENT MUNICIPAL • SANITARY • HIGHWAYS • DRAINAGE • INSPECTION LAND SURVEYING ALEX J. PANIK, P.E. President February 27, .1995 Pinellas County Zoning Department Processing and Records 440 Court Street Clearwater, Florida 34616 Re: Pace Tech, Inc. SWP 95-0042 City of Clearwater :Gentlemen: -..---- - .-.. ;r~841-94 REGIS~fERED: Florida New Jcrsey Pennsylvania Texas Reference is made to James E. Page's letter dated February 20, 1995 requesting additional information on the above. captioned project in the City of Clearwater. Att- ached are five (5) copies of the revised plans for your use. In addition, we offer the following comments in response to the item numbers in your. February 20., 1995 letter: 1. A letter from the City of Clearwater will be submitted under separate cover relative to acceptance of the project discharge. 2, "Note to Contractor" has been added to Sheet No. 3 of 5. 3. Silt screens-have been added to Sheet No. 3 of 5. 4. Roof gutters and downspouts have been added to Sheet 3 of 5. Also, a slotted drain is to be installed across the existing driveway to ensure diversion to the proposed detention Pond No. 1. 5. Project areas have been added to Sheet 3 of 5 and' to Page 1 of 5 of the application. Copies of revised Page 1 of 5 are enclosed. Thank you for your cooperation. Sincerely, e J. a k, P,E. Pre id n AJP:emd cc: Ilhan Bilgutay, Pace Tech., Inc. :I;oii ._Hltori, :City o"f ~Cl`earwater Pat Shepperd, H & G Structures Attachments 34068 U.S. Highway 19 North Palm Harbor, Florida 34684-9998 (813) 785-4366 CONSULTING ENGINEER CIVIL ENGINEERING • ENVIRONMENTAL • SITE DEVELOPMENT MUNICIPAL • SANITARY • HIGHWAYS • DRAINAGE • INSPECTION LAND SURVEYING ALEX J. PANIK, P.E. President May 3, 1995 Mr. Allen V. Mahan Central Permitting Coordinator City of Clearwater City Hall Annex 10 South Missouri Avenue P.O. Box 4748 Clearwater, Florida 34618-4748 Re: PSP 95-01 Pace Tech, Inc. 510 North Garden Avenue Clearwater Dear Mr. Mahan: REGISTERED: Florida New Jersey Pennsylvania # 8.41-94 Texas (p~~(r'~ilt~'I ~" MAY 0 3 1995 0 CITY 4F Cd,EARV4r/~T~R Pursuant to your request of MaX 2,. 1995, enclosed. are twelve (12) copies of the revised site plan for your. use. The revised site plan reflects the additional note concerning the twenty four (24) parking spaces. Thank you for your cooperation, Sincerely, ex a k, P,E. Presiden AJP;emd cc: Scott Shuford, City of Clearwater Ilhan Bilgutay, Pace Tech, Inc. John Gallant, H & G Structures John Hause, Hansen & Hause Architects Lou Hilton, City of Clearwater Encl. 34068 U.S. Highway 19 North Palm Harbor, Florida 34684-9998 (813) 785-4366 R; CITY OF CLEARWATER Intcrdeputmt~ Coet~pondeaoe TO: Ream Wilson, Director, Parks 8t Recreation; Don Meerians, Assistant Traffic Engineer; Bob Maran,CE III; Mike Quillen, Environmental Engineer; James Goodlce, Fire Marshall; Steve Sarno Central Permitting Specialist i C i~t%[.-~ FROM: Allen V. Mahan, Coordinator, Central Permitting j! SUBJECT: Final Site Plan for Pace Tech Pa_*king I.ot Addition(SP 95-18) ~ ~J ~ ~ ~"P COPIES: Scott Shuford, Central Permitting ~l ~ ~ ~~, DATE: January 29, 1996 , Attached is a copy of the above described amended site plan submitted on January 29, 1996 for re-certification. Please refer to the attached DRC suaunary meeting notes of September 28, 1995 addressing conditions of approval required by D.R.C. for this site plan. If you find the site plan to be acceptable, please initial and date neat to the applicable condition(s) on the attachment. ff you do have an objection and/or recommendation, please comment below or attach your comments to this memo. Comments: (by whom and with olgasel Your assistance in preparing the plan for a February 6 certification will be appreciated Thanks. AVM/avm SPFti6t8AV1A ~, 1 .~ ~ - ti oaMvM Development Review Committee Summary Notes Thursday, September 28, 1995 CP Conference Room, 10 South Missouri Avenue, Clearwater, FL Five items were discussed: 1. Pace Tech Perk Parking Lot Addition(PSP 95-18) 2. Jennifer Chiropractic Clinic(PSP 95-17) 3. Rome Tower, (PSP 95-07)(Courtesy Review only) 4. River Walk(aka One Kapok Terrace, YII)(Courtesy Review only) 5. Clearwater Free Clinic Expansion(Discussion only) Results of the discussions were: I. Pace Tech Parking Lot Addition(95-18): the DRC approved the site plan subject to the following discussion/ conditions: A. Before the Site Plan can be certified, the applicant must complete the following action(s): 1. Complete the Dumpster Requirement Form and return it to the City Solid Waste Department. 2. Show on the site plan the installation and-maintenance of uniform traffic control devices at appropriate locations in accordance with the standards set forth by the Manual on ~` Uniform Traffic Control Devices as adopted by the Florida Department of Transportation under Rule 14-115.010, Florida Administrative Code. 3. Legally record a Unity of Title for the project site and furnish proof of such action. 4. Depict all required parking lot interior areas on the plan by shading or cross-hatching. 5. Show the number and marking of handicap spaces designed to 1 meet governmental standards. 6. Depict all pavement markings, signage and traffic control devices on the site plan. 7. Denote dimensions/measurements for aisles, parking stalls, entrances and like features for the parking/ vehicle maneuvering areas. 8. Show all required perimeter landscape buffers and buffer dimensions on the site plan. 9. Change the depth of the landscape buffer on the North and East of the site to reflect the residential nature of the contiguous property. lO.Remove two parking spaces to make room for required landscape buffering. ll.limit the site plan to be certified to one sheet if at all possible. ~~.tj~ c~~ 12.Ca1culate the F.A.R. of the part of the project zoned IL. o~y ,~`,, t~~ B. Before the City can issue building permits, the applicant must coa~lete the following actions: 1. Obtain and provide a Pinellas County Public Health Unit Permit, Ingress/Egress and a 10 foot wide Utility Easement over the proposed water mains up to and including meters, backflow prevention devices and hydrants. 2. Submit a copy of the approved SWFWMD permit to Environmental Management. C. Before the City can issue a Certificate of Occupancy, the applicant must complete the following actions: 1. Bring all substandard sidewalks and sidewalk ramps adjacent ,T, to or a part of the project up to standard, including ADA. 2. Remove the existing sidewalk adjacent to the proposed driveway and replace it with a tactile surface. 3. Pay the Pinellas County Transportation Impact Fee due at ~ 1061 per 1,000 SF for General Industrial with assistance as needed in determining the amount of that fee from the Clearwater Traffic Engineering Office. ~ D. Complete the following actions as indicated: 1. Obtain the requisite building permits within one(1) year from the site plan certification date to prevent expiration of the site plan certification. 2. Obtain the requisite certificate(s) of occupancy within three (3) years of the site plan certification date to prevent expiration of the site plan certification. 3. Obtain review of and permits for signs and fencing/walls ~~ through separate review and permitting procedures. II. Jennifer Chiropractic Office (PSP 95-17): The DRC approved the site plan subject to the following discussion/ conditions: A. Before the Site Plan can be certified the applicant must complete the following action(s): 1. Execute a cross-parking/access easement linking the Jennifer Chiropractic Clinic site with the adjoining site to the east and specifying the exact number and location of the spaces that are to be jointly used by and between the sites after review and approval of the easement/agreement by the City Staff. 2. Adjust handicap spaces to meet government standards. 3. Adjust parking stalls and/or driveways on the plan to the satisfaction of the Traffic Engineer. 2 CITY OF CLEARWATER Interdepartment Correspondence Sheet REG02-02-OB-O1 TO: Scott Shuford, Director of Central Permitti g FROM: Michael Quillen, Water Resource Engineer COPIES: Richard J. Baier, City Engineer Tom Miller, Asst. Director of ENG/Environmental Donald A. Meerians, Assistant Traffic Engineer Val Mahan, Site Plan Coordinator I;ou 'Hil'ton?, Senior Planner ~_ __ _ SUBJECT: Pace Tech .Parking Lot 510 N. Garden Avenue DATE: April 24, 1995 This memorandum is to address tree concerns raised by the planning ,. and zoning board with regard to the subject site. The plan shows 16 oak trees and two citrus trees to be removed for construction of the parking lot. In actuality there are 13 oaks,~one Chickasaw plum, one red bay, one .red maple, two citrus and one ear tree (not shown on plans) proposed to be removed. Alan Mayberry and I have again inspected this site and have the following observations. The site has been cleared in the past and 6"-12" of topsoil removed. This work has resulted in root damage to most of the trees. All of the trees in question exhibit the following characteristics: 1. Significant mistletoe infestation, 2. Large amounts of dead wood, 3. Decay due to improper pruning cuts, 4. Poor structure/disfigured, and ~~ 5. Root and trunk wounds due to previous clearing/grading work. Due to all of the above, the ;trees are in a state of decline and it is doubtful any of them could withstand the construction process and survive in a parking lot setting. Once the dead wood and mistletoe are removed from these trees there would be very little canopy remaining. Consequently Environmental Management recommends that these trees be removed and replaced with required landscape trees which will provide a long term canopy on the site. However, if the applicant wishes to attempt to preserve any of these trees, we can provide suggestions to~i~c-~-ease the chances of ~' ' `leas.e call: '•ine at survival. If you need additional informat~i~ n, p ~ f , 6382 . ~~~ ~ ~ ~ ~ ~~ ~~ ~ ,~, -~ ~ ,~ ~k APR 2 51995 c1=1~T~AL P~~;r,~ITTIIV~ CITY c~F CLEAR',tIIATER I CITY OF CLEARWATER DEPARTMENT OF CENTRAL PERMITTING CITY HALL ANNEX 10 SO. MISSOURI AVE. P.O. BOX 4748 CLEARWATER, FL 34618 i' ~: FAX PHONE - (813) 462-6476 OFFICE PHONE - (813) 462-6567 May 2, 1995 - __ : ____~._..---_-_-- . -. - _ __:. i ;:.. , TO: Alex J. Panik, Panik Engineering ~~ FROM: Allen V. Mahan, Central Permitting Coordinator ~~ FAX PHONE: 786-6453 MESSAGE: Per telecon this date with your office, a note needs to be added to the Pace Tech Plan that states," Phase II development will require 24 additional- parking spaces above those now shown before building permits will be issued." With this note added, Zoning will approve the Final Site Plan for Certification. All other review departments/ City agencies have approved the plan for certification. If you concur, please furnish this office 12 copies of the final Pace Tech Site Plan with the above note added. Please address any questions concerning the note o Stephen Sarnoff, 4623-6567. Thank You. AVM i i cc: Shuford, Glatthorn, Hilton, Sarnoff ~~ TOTAL PAGES (INCLUDING THIS PAGE): Total No. of pages including cover page 2. i 19501fax.avm C ~~ r -. FIX I~ESSl~GE / ~ ~ CITY OF CLEARWATER (~~/~ DEPARTMENT OF CENTRAL PERMITTING ~~: /~ ` 1 CITY HALL ANNEX 10 SO. MISSOURI AVE. P.O. BOX 4748 CLEARWATER, FL 34618 FAX PHONE - (813) 462-6476 OFFICE PHONE - (813) 462-6567 May 2, 1995 --------- .._ ......... ....... TO: Alex J. Panik, Panik Engineering t v FROM: Allen V. Mahan, Central Permitting Coordinator FAX PHONE: 786-6453 MESSAGE: Per telecon this date with your office, a note needs to be added to the Pace Tech Plan that states," Phase II development will require 24 additional parking spaces above those now shown before building permits will be issued." With this note added, Zoning will approve the Final Site Plan for Cert~cation. All other review departments/ City agencies have approved the plan for certification., If you concur, please furnish this office 12 copies of the final Pace Tech Site Plan with the above note added. Please address any questions concerning the note o Stephen Sarnoff, 4623-6567. Thank You. AVM - ~; cc: Shuford, Glatthorn, Hilton, Sarnoff ~'! TOTAL PAGES (INCLUDING THIS PAGE): Total No. of pages including cover page~Z'. / ~:' .. 19501fax.avm \J CONSULTING ENGINEER CIVIL ENGINEERING • ENVIRONMENTAL • SITE DEVELOPMENT MUNICIPAL • SANITARY • HIGHWAYS • DRAINAGE • INSPECTION LAND SURVEYING ALEX J. PANIK, P.E. President March 17, 1995 Mr. Scott Shuford Director of Central Permitting City of Clearwater City Hall Annex 10 South Missouri Avenue P.O. Box 4748 Clearwater, Florida 34618-4748 Re: Building Addition Pace Tech, Inc. 510 North Garden Avenue Dear Mr . Shuford 4841-94 REGISTERED: Florida New Jersey Pennsylvania Texas Pursuant to a meeting held on March 16, 1995 with the City of Clearwater Building Committee, Ilhan Bilgutay, Pace Tech, Inc., and Pat Shepperd, HDA Structures, Inc., we are attaching the foYlowing~documents for your use relative to the requested conditional use to allow employee parking in a residential neighborhood. 1. Application 2. Check in the amount of $200.00 3. Copy of the Deed 4. 14 sets of Plans Thank you for your cooperation. Sincerely, ~'~ x J. a i P.E. Preside t AJP:emd cc: Lou Hilton, City of Clearwater Ilhan Bilgutay, Rae-e Tech, Inc. John Gallant, HGA Structur.es,.Inc. John Hause,.Hansen & Hause Architects ~~~ ~; ~~ Encl. 34068 U.S. Highway 19 North Palm Harbor, Florida 34684-9998 ~ (813) 785-4366 CONSULTING ENGINEER CIVIL ENGINEERING • ENVIRONMENTAL • SITE DEVELOPMENT MUNICIPAL • SANITARY • HIGHWAYS • DRAINAGE • INSPECTION LAND SURVEYING ALEX J. PA NI K, P.E. President May 3, 1995 Mr . Allen V . Mahain Central Permitting Coordinator City of Clearwater City Hall Annex 10 South Missouri Avenue P.O. Box 4748 Clearwater, Florida 34618-4748 Re: PSP 95-01 Pace Tech, Inc. 510 North Garden Avenue Clearwater `Dear Mr. Mahan: REGISTERED: Florida New Jersey Pennsylvania #8.41-94 Texas Pursuant to your request of.Ma:y 2,. 1995., enclosed are twelve (12) copies of the revised site plan for youx use. The revised site plan reflects the additional note concerning the twenty-roux` (24) parking spaces. Thank you for your cooperation. Sincerely, ex a Presiden AJP:emd ~'. P.E. cc: Scott Shuford, City of Clearwater Ilhan Bilgutay, Pace Tech, Iric. John Gallant, H & G Structures John Hause, Hansen & Hause Architects Lou Hilton, City of Clearwater Encl. 34068 U.S. Highway 19 North • Palm Harbor, Florida 34684-9998 (813) 785-4366 p ~~~ ~~ CCU ~~~~~ ~ ~ ~ ~~~"-'~ 3 t9~~ CITY OF CI.F,Ai~'JVATEA CONSULTING ENGINEER CIVIL ENGINEERING • ENVIRONMENTAL • SITE DEVELOPMENT MUNICIPAL • SANITARY • HIGHWAYS • DRAINAGE • INSPECTION LAND SURVEYING ALEX J. PANIK, P.E. President November 9, 1994 REGIS"~ERED: Florida New Jersey ;r~841-94 Pennsylvania Texas Mr. Scott Shuford. Director of Central ,Permitting City .of Clearwater City Hall Annex 10 South Missouri Avenue P,O. Box 4748 Clearwater, FL 34618-4748 Re; Building Addition Pace Tech, Inc. 510 North Garden Avenue Dear Mr, Shuford; Pursuant to a meeting held this date with the City of Clearwater Building Committee, Ilhan Bilgutay, Pace Tech,. Inc., John Gallant, HDA Structures, Inc, and John Hause; Archi- tect, please be advised of the following; 1. We are.in the process of developing a "Master Plan (Industrial Planned Development) for Pace Tech, Inc." 2, We will .be submitting a site plan for certification within the next sixty (b0) days. Site Plan will reflect a 7,370 square foot building addition with related parking (approx 44 spaces) and stormwater manage- ment facilities. 3. Please note that Pace Tech, Inc.. has. indicated that-they will come into full compliance with the City of Clearwater codes. The City of Clearwater staff has been extremely helpful and we look forward to being of service to both the City of Clearwater and Pace Tech, Inc. Thank you, ply, . .E. P AJP;emd cc; tLou Hilton, City of Clearwater: Ilhan Bilgutay, Pace. Tech, Inc. John Gallant, HGA Structures, Inc. John Hause, Hansen & Hause 34068 U.S. Highway 19 North • Palm Harbor, Florida 34684-9998 (813) 785-4366 ~i tiz+~. }~ ~'LA i J ~.C1U a UU TOTL 1~~a00 ~~~'~£~10= ;~~fAYQiO'~'tGHCF; 1~OoL1D ! T~:E ~4 CITY OF CLEARWATER Interdepartmental Correspondence T0: Ream Wilson, Director, Parks & Recreation; Don Meerians, Assistant Traffic Engineer; Bob Maran,CE III; Mike Quillen, Environmental Engineer; James Goodloe, Fire Marshall; Steve Sarnoff, Central Permitting Specialist FROM: Allen V. Mahan, Coordinator, Central Permitting SUBJECT: Pace Tech Expansion & Phasing (PSP 95-01) COPIES: Scott Shuford, Central Permitting DATE: May 10,1996 Attached is a copy of the above described amended site plan submitted on May 10, 1995 for re-certification as a major amendment. The applicant is expanding his building by 7,OOO+S.F. and is presenting a phased expansion of the present facility. This involves the addition of a second floor, the demolition of several buildings on-site and the acquisition of an additional parking lot. Please refer to the attached original Pace Tech certified site plan for comparison. If you find the site plan to be acceptable, please initial and date next to the applicable condition(s) on the attachment. If you do have an objection and/or recommendation, please comment below or attach your comments to this memo. Comments: (by whom and with date, please) ~ s~-~~ ~ ~~ ~~~ Your assistance in preparing the plan for a May 15 certification will be appreciated. Th nks. CSP9501 R.AVM C I T Y ~ ~' C L E A R ~fT A T ~~ R POST OFFICE BOX 4749 Office of Parks and Recreation (813) 462-6531 DEVELOPMENT REVIEW COMMITTEE DATE: ~ ~~/~~ PROJECT NAME: Pace Tech CLEARWATER, FLORIDA 34618-4748 ITEM NO: LOCATION: 510 North Garden Avenue REVIEWED BY: Ream Wilson Director Parks and Recreation COMMENTS: Site Plan - This non-residential project consists of an expansion of 7,370 square feet. Since this expansion is more than .fifty percent of the existing square footage on site (11,931 square feet) the project is .required to satisfy the City's open Space Assessment Ordinance. This would require a two percent dedication of land or money in lieu thereof as determined by the City Commission. The developer or his representative should complete the top portion of the attached worksheet and return same to the Parks and Recreation Department. A copy of the just value of the property must be attached ,to the worksheet. Conveyance of land or dollars must be received by the City prior to City certification of final site plan. Questions concerning this matter may be directed to either Ream Wilson or Art Kader at 462- 6531. RW/bgm ~i~ 'Equal Employment and Allirmative Action Employer" i c RECEIVE ~ ~.~ .:.~ ~ MAY 8 '95 ft"~~'~' ~`' ~g~5 CITY OF CLEARWATER Interdepartment Correspondence CITY i/L~~~r` DEPT. ~" R~ TO: Cyndie Goudeau, City Clerk // FROM: Allen V. Mahan, Coordinator, Central Permitting `' SUBJECT: Certified Site Plan for Pace.Tech (PSP 95-O1) COPIES: Scott Shuford; Sandy Glatthorn; Lou Hilton DATE: May 2, 1995 ~ ~ ~ ~ . ~ ~"~ ~. The Development Review Committee at its meeting of March 16, approved the above described site plan/amendment subject to the following conditions: 1. Prior to certification, a copy of the SWFWMD p rmit application is to be provided to Engineering Site Plan Keview. 2. Signs and fencing/walls are subject to separate review and permitting processes. 3. The dates and conditions for approval of the non-commercial parking lot in a residential zone by the Planning and Zoning Board for conditional use approval and the Development Code Adjustment Board for variance approval shall be provided on the preliminary plat/site plan prior to certification. 4. Prior to the issuance of a building permit, a copy of the approved SWFWMD permit is to be provided to Engineering Site Plan Review. 5. A reduced pressure backflow prevention device(s) must be installed by the City with applicable fees being paid by the owner. 6. The slotted trench drain must meet the requirements of the City Engineer (see copy of memo from Rich Baier, City Engineer, dated February 27, 1995. 7. The detention ponds are to be designed fora 50 year storm per City of Clearwater Design Standards Manual. The existing storm system on Garden Avenue is very old and substandard by present City design standards. 8. Prior to certification, a copy of the SWFWMD permit application and calculations shall be provided to Environmental Management. 9.The applicant shall contact Parks & Recreation for the required 2% recreation/open space assessment fee, which shall be paid prior to certification. ~' :~~ ~ i it ` ~ . .. ".." j ~' Fe 1 ff`t t~ ~ ~+''"~?++5~~` ~ , ~ 7 ~ E 4..e' .1 ad ./ !~ ' ~3 _. 3 a As conditions 1, 3, 4, 7, 8 & 9 have been met, please certify the attached plans subject to conditions 2, 5 and 6 and distribute as indicated below. Thanks for your assistance. AVM/avm SPFC9501.AVM cc: Scott Shuford, Director of Central Permitting Ream Wilson, Director,Parks & Recreation Don Meerians, Assistant Traffic Engineer Victor Chodora, Building Official Cyndie Goudeau, City Clerk Lou Hilton, Senior Planner Steve Doherty, Zoning Section Supervisor Bob Maran, Engineering Plan Review Michael Quillen, Environmental Management Developer/Project Sponsor (3). Please call Alex Panik, Panik Engineering 785-4366 for disposition when certified. Certified as a true and correct copy. On March 16, 1995, the Development Review Committee approved a site~aK'for• Pace~~~ -_ Tech. ~Et ~~ e ~ 6~ ~, Witness„rrry ha fid ~and~the seal•~of ~,. the City?'o~ CSle~arw~terp~Florida qn this 4tFi d~yAof MarQ`1~;,1995. o o Deputy City'Cl.erk '' , 4q p rep erh6 astlt44 .,.. ,.. As conditions 1,3,4,7,8 & 9 have been met, certification is subject to the following conditions: 2} Signs and fencing/walls are subject to separate review and permitting processes. 5} A reduced pressure backflow prevention devices} must be installed by the city with applicable fees being paid by the owner. 6} The slotted trench drain must meet the requirements of the City Engineer (see copy of memo from Rich Baier, City Engineer, dated February 27, 1995}. -