PSP89-13; SUB89-07PSP89-13; SUB89-07
45 N GARDEN AVE
CLEARWATER TOWER
T0: ••
FROM:
C I T Y O F C L E A R YT ATE R
Interdepartment Cvrreapondence
Cyndie Goudeau, City Clerk
John D. Richter, Development Code Administrator
SUBJECT: Certification of Final Site Plan for Clearwater Tower Located at the
Southeast Corner of Garden Avenue and Hendricks Street (PSP 8~9-13)
COPIES: See List Below -f"' g ~ ~ ~ /
DATE: October 6, 1989 ~/ ~ ~ ~~~.~
The City Commission at its meeting of October 5, 1989, approved the above
described final site plan subject to conditions including the following:
1. Signs and fencing/walls shall be subject to separate review and permitting
processes.
2. Curbing and pavement of existing driveways to be deleted shall be removed
and landscaping, sidewalks and curbing parallel along the streets shall be
installed in accordance with City standards.
3. Afire department connection north of the hydrant shall be provided by the
Fire Marshal and shown as such on the site plan prior to certification.
4. The note "by the City of Clearwater" for the landscaped plaza shall be
removed from the site plan prior to certification.
5. The existing gas service and meter must be relocated by the City's Gas
Division.
6. The requisite initial building permits must be procured within six (6) months
from the date of certification of the final site plan and all requisite
certificates of occupancy must be obtained within three (3) years of date
of certification of the final plan.
As conditions #3 and #4 have been deleted/indicated on the site plan, please
certify the attached plans subject to conditions #1, 2, 5, and 6 listed above
and distribute.
JDR/SEG/df
cc: James M. Polatty, Jr., Director of Planning & Development
Cecil Eienderson, Engineering & Environmental (2)
Ream Wilson, Parks & Recreation Director
Keith Crawford, Traffic Engineer.
Victor Chodora, Building Official
Robert Brumback, Utilities
Cyndie Goudeau, City Clerk
Ray Wyland, Zoning
Joan Moore, Staff Assistant III (Memo Only)
Developer/Project Sponsor (3) - Howard Zoromsky
Opus South Corporation
4350 W~.Cypress Street, .Suite 700
P.O. Box 21327 r ~•• .'
Tampa, FL 33622-1327
~;. ~
,, ,
~''
C I T Y O F C L E A R W A T E R
Interdepartmental Correspondence Sheet
T0: ~ Cyndie Goudeau, City Clerk
FROM: John D. Richter. Development Code Administrator
SIIBJECT: Certified Final Site Plan for Clearwater Tower Located at the
Southeast Corner of Garden Avenue and Hendricks Street
(PSP 89-13)
DATE: October 17, 1989
On October 10, 1989, the above referenced final site plan was certified. On
October 13, 1989 a mistake in building configuration on Page 2 of the certified
site plan was identified.
The developer is requesting seven (7) additional certified plans.
Please certify these seven (7) additional site plans for the developer subject
to the conditions from the October 10, 1989 certified site plan and clarification
of the building configuration on October 13, 1989.
JDR/SEG/em
cc: Please Contact for Pickup:
Telephone (Tampa) 873-3600
George Smith
Opus South Corporation
4350 W. Cypress Street, Suite 700
P.O. Box 21327
Tampa, Florida 33622-1327
~~ .
~~
~~
a.~,~~
_u, ~ p? ~. ~:x:
'~-~. ~,
<,... R E C EsI~Vw~ . .
N OV 13 19~
PLANNING & URBAN
DEVELOPMENT DEPT,
STATE Of FLORIDA
DEPARTMENT Of COMMUNITY AFFAIRS
2 7 4 0 C E N T E R V I E W D R I V E T A L L A H A S S E E F L O R t D A 3 2 3 9 9
BOB MARTINEZ THOMAS G. PELHAM
Governor November 3 , 1989 Secretary
Mr. Dennis Dean
Sunbelt Development
Services, Inc.
Suite 900
600 Cleveland Street
Clearwater, Florida 33616
Re: Clearwater Tower; File No. BLIVR-890-001
Dear Mr. Dean:
We have evaluated your application for a Binding Letter
dated July 7, 1989, received July 13, 1989, with supplemental
information supplied July 7, 1989, August 10, 1989, October 24,
1989 and October 30, 1989. Based on the information contained in
the application and other information obtained from you during
the review of the development proposal, we enter the following
Findings of Fact, Conclusions of Law, and Order.
FINDINGS OF FACT
1. The applicant is Dennis Dean of Sunbelt Development
Services, Inc., who is the authorized representative of the
owner/developer, MAS ONE LIMITED.
2. The applicant is seeking a vested rights determination
pursuant to Subsection 380.06(20), Florida Statl.ztes (F.S.), to
establish whether the Clearwater Tower development (Figure 1) is
required to undergo DRI review. In addition, the applicant is
seeking a determination of DRI status on the proposed and
existing nonvested development.
3. The Clearwater Tower project will consist of two office
buildings (one existing and one proposed) containing a total of
256,379 gross square feet (GSF) with an existing 51-space parking
area. The existing 11-story building contains 146,335 GSF on
0.90 acre. The proposed 12-story building is proposed to contain
110,044 GSF on 0.98 acre. The existing parking lot contains 51
spaces and is located on 0.55 acre across the street from the 11-
story building. The parking lot is for the sole use of visitors
EMERGENCY MANAGEMENT • HOUSING ANU COMMUNITY DEVELUPMENi • RLSUURCE PLANNING AND MANAGEMENT
>s
L ~,
«i«~ ,
4"
r
:ti
Mr. Dennis Dean
November 3, 1989
Page Two
to the 11-story and proposed 12-story office buildings. The
existing and proposed office buildings are to be located together
on a 1.88-acre site (this number does not include the 0.55-acre
parking lot). The Clearwater Tower project is located on Lots~1-
7, of Block 8, of Gould & Ewing first and second Addition,
Clearwater Harbor in Section 16, Township 29 South, Range 15
East, in the City of Clearwater, Pinellas County.
4. A history of the project is as follows:
On December 30, 1970, the City of Clearwater and the Bank of
Clearwater entered into an agreement for the leasing of land for
a new office building at 600 Cleveland Street. The agreement
specified that construction of the multi-story office building
had to begin within three years of the date of the agreement
(commencement of construction to be deemed the pouring of the
facility's foundation), or the City could terminate the
agreement. The lease was executed on July 1, 1970.
On June 8, 1972, a demolition permit was issued by the City
to allow the demolishment of a previously existing building at
the northeast corner of Cleveland and Garden Streets. A boundary
and topographical survey was prepared for the Bank of Clearwater
on September 20, 1972. The demolition of the previous building
and capping of the existing sewer line commenced on October 26,
1972.
On January 22, 1973, a permit was issued by the City of
Clearwater to construct the $300,000 foundation on Lots 1 - 7,
Block 8 in the Gould & Ewing Subdivision. Drawings submitted
with the permit request indicated that a 15-story building would
be built on the requested site. The City of Clearwater did not
begin requiring site plan approval until the late 1970's.
In December of 7986, the applicant acquired the 11-story
office building and the 51-space parking lot (located north of
Cleveland Street and west of Garden Avenue, across from the
existing 11-story building). According to the applicant, this
11-story office building has been continuously occupied since its
construction.
On June 15, 1989, the Clearwater City Commission approved
the preliminary site plan for the proposed 12-story office
building on the site.
5. The applicant is seeking a vested rights determination
for the existing 11-story building and has provided the following
information in support of his claim of vested rights:
}
Mr. Dennis Dean
November 3, 1989
Page Three
December 30, 1970 - Agreement between City and Clearwater
Bank to lease land on which to build a multi-story office/bank
building. The Bank of Clearwater invested $36,000 in this
property and agreed to invest an additional $2,500 for
landscaping.
June 8, 1972 - Permit issued to demolish an existing
building located on the site of the 11-story office building.
September 20, 1972 - A Boundary and Topographical Survey
prepared for the Bank of Clearwater.
October 26, 1972 - Inspection certificate of sewer cap.
January 22, 1972 - Permit issued to erect a foundation on
the site.
August 17, 1973 - Inspection certificate of seven pile caps.
August 20, 1973 - Inspection certificate of construction
activities including foundation, footings, lintels, and walls.
August 22, 1973 - Inspection certificate of three pile caps.
August 24, 1973 - Inspection certificate of six pile caps.
August 28, 1973 - Inspection certificate of five pile caps.
August 31, 1973 - Issuance of electrical permit to approve
rough ceilings and five pile caps.
6. As further evidence of reliance and change of position
on the foundation permit issued on January 22, 1973, the
following information was submitted:
Mr. Victor Chodora, A.I.A., Building Director for the City
of Clearwater, provided a letter to the Department dated October
30, 1989, stating, in part, that, "based on the plans submitted
for [the] foundation permit, which show a fifteen story building
on a pile foundation, I would estimate it taking two to three
months to drive the piles. Depending on weather and site
conditions it could have taken even longer."
Mr. Joseph F. Cornelius, former Chairman of the Board of the
Bank of Clearwater during the construction of the Bank of
Clearwater building, provided a copy of a news article, dated
January 22, 1973, which reported the ground breaking for the
new Bank of Clearwater building and an affidavit which states,
~ .
Mr. Dennis Dean
November 3, 1989
Page Four
in part, that "to the best of his knowledge and belief,
construction in the form of digging for the foundation was
started within a very few days of the ground breaking, well in
advance of July 1, 1973."
King Engineering, on behalf of their client Sunbelt
Development Services, submitted a letter from Mr. Stephen G.
Helfer, P.E. (Florida Registration No. 35186), Vice President of
Construction for Opus South Corporation, which explained the
requirements of the Standard Building Code for pile foundations.
He stated that, ". the test pile procedure required
approximately 4 weeks, and the installation of the piling shown
on the drawings required approximately 16 weeks ."
7. The governing statute on vested rights determination is
Subsection 380.06(20), F.S. This section provides that nothing
in Section 380.06, F.S., shall:
..limit or modify the rights of any person to complete any
development that has been authorized by registration of a
subdivision pursuant to Chapter 498, F.S., or by recordation
pursuant to local subdivision law, or by a building permit
or other authorization to commence development on which
there has been reliance and change of position, and which
registration or recordation was accomplished, or which
permits or authorization was issued prior to July 1, 1973.
8. Any project which was constructed or which received
authorization to commence development on which there was reliance
and change of position prior to July 1, 1973, is vested for
purposes of DRI review pursuant to Section 380.06, F.S. The
applicant has provided the Department with information and
evidence to document that the Clearwater Bank Building had
received authorization to commence development on which there was
reliance and change of position prior to July 1, 1973. The City
issued a foundation permit for the proposed building, with the
knowledge that a 15-story building would be erected on the site,
on January 22, 1973. In reliance on that authorization, the
developer broke ground on January 22, 1973, and began
construction of the foundation prior to July 1, 1973.
9. No documentation or claim was presented by the applicant
that the proposed 12-story building or the existing 51-space
parking lot received authorization to commence development prior
to July 1, 1973. In December 1986, the applicant received local
government authorization to construct, and subsequently
constructed a 51-space parking lot that currently serves the 11-
story office building and will also serve the proposed 12-story
.~ .
~`
Mr. Dennis Dean
November 3, 1989
Page Five
office building. On June 15, 1989, the applicant received
preliminary site plan approval from the local government for the
proposed 12-story, 110,044 GSF office building. .
10. Paragraph 380.06(2)(d), F.S., provides that a
development which is at or below 80 percent of all numerical
thresholds in the applicable guidelines and standards shall not
be required to undergo DRI review; a development that is between
80-100 percent of a numerical threshold is presumed not to be
required to undergo DRI review; a development at 100-120 percent
of any numerical threshold is presumed to be required to undergo
DRI review; and a project which is at or above 120 percent of any
numerical threshold in the applicable guidelines and standards is
required to undergo DRI review.
Ruie 28-24.020, F.A.C., (Office Development), provides, in
part, that the DRI threshold for any proposed office building or
park operated under common ownership, development plan, or
management is 300,000 square feet of gross floor area or 30
acres. The proposed 12-story office building with 110,044 GSF of
proposed floor area on 0.98 acre, and the existing 51-space
parking lot of 0.55 acre is less than 80 percent of the DRI
office threshold.
11. All commitments made by the applicant, all materials
submitted by the applicant in the application, and all other
relevant written materials are incorporated herein by reference
and made a part hereof.
12. On August 4, 1989, notice of this request for a Binding
Letter of Interpretation was published in the Florida
Administrative Weekly. In addition, the Tampa Bay Regional
Planning Council and the City of Clearwater were notified.
CONCLUSIONS OF LAW
1. Based on the information supplied by Sunbelt Development
Services, Inc., on the behalf of the owner/developer, MAS ONE
LIMITED, which indicates that construction of the foundation was
authorized and begun prior to July 1, 1973, the Department
concludes that the 11-story, 146,335 GSF office building is
vested pursuant to Subsection 380.06(20), F.S.
2. The existing 51-space parking lot and the proposed 12-
story, 110,044 GSF office building is not vested. However, this
existing parking lot and proposed office development is below 80
percent of the DRI office threshold. Therefore, pursuant to
~~ ..
r_ .
..
Mr. Dennis Dean
November 3, 1989
Page Six
Paragraph 380.06(2)(d), F.S., the Department concludes that the
existing 51-space parking lot and the proposed 12-story, 110,044
GSF office building is not required to undergo DRI review.
ORDER
1. The Clearwater Tower development, consisting of an
existing 11-story, 146,335 GSF office building, a proposed 12-
story, 110,044 GSF office building and a 51-space parking lot, as
described above, is not required to comply with the review
requirements of Section 380.06, Florida Statutes.
2. Any proposed changes to the vested portion of this
project may require further review pursuant to Paragraphs 380.06
(4)(e) and (f), Florida Statutes.
3. The proposed, nonvested 12-story building and 51-space
parking lot development evaluated in this binding letter shall be
considered cumulatively with any future additional development
in terms of the guidelines and standards contained in Chapter
28-24, F.A.C., Section 380.0651, F.S., and its associated
regional impacts. Should any of the above representations made
by the applicant be substantially changed, further review of the
project may be required.
4. The determination in this binding letter specifically
regarding the development of regional impact status for the
nonvested development shall expire and become void as of November
3, 1992, unless the plan of development has been substantially
commenced by this date. This date may be extended by mutual
agreement of the Department, the local government of jurisdiction
and the developer.
5. This binding letter of interpretation of vested rights
has been issued pursuant to the procedural requirements of
Subsection 120.57(2), F.S., and constitutes final agency action
appealable within 30 days to a District Court of Appeals pursuant
to Section 120.68, F.S. If you wish to present oral or written
evidence, or a written statement in opposition to this agency
action, you must file with the Department a written request for
an opportunity to do so within 30 days from this date. Such a
request for a reconsideration shall be made in accordance with
Rule 9J-2.016, F.A.C., and will be responded to by the Department
pursuant to Paragraph 120.57(2)(a), F.S.
.~
4
Mr. Dennis Dean
November 3, 1989
Page Seven
This determination does not obviate the need to comply
with other applicable state or local permitting procedures. Any
questions regarding this determination may be directed to Tonya
Sue Johnson in the Bureau of State Planning at (904) 488-4925.
Sincerely,
J. Thomas Beck, Chief
Bureau of State Planning
JTB:tjp
cc: Ms. Suzanne Cooper (TBRPC)
Ms. Paula .Harvey (City of Clearwater)
Mr. Joe Kubicki (King Engineering Associates, Inc.)
Mr. Timothy A. Johnson, Jr. (Attorney)
Mr. Robert Pergolizzi (King Engineering Associates, Inc.)
e
~_ ..~,nd
/:~ ~.
~~'G/~r~. ~~it~' ~i ~~ s9
.,
--~ Date
"~_ ~arUr,~.nt Clerk
1 .~
o
..
:~
. ~..~
N
N.T.S.
CLEARWATER
GREW ST.
ENDRICKS ST.
AUK-AST.
111 IrLC V CLhwv h v ~.
Q
PROJECT LOCATION
COURT ST.
CHESNUT ST. _
w
z
O
~ w
~ J
~ ~
Q ~
_ }
1-
DRUID ROAD
w
a
0
PROJECT LOCATION MAP ~'
~~~0 8[~UMONTCENtER B~vO.
tnwP~ FL. D7e3•
FIG.1
°- = -- -- --- ---- t~,~_ . _ _ & JERNIGAN; .INC. ---- - - -- ....___ `~---- -- -- ~- ------- _.-- - --- - . _-
- ~ POST„BUCKLEY, SCI,_ --= _ _-- ____- __...
5300 W( CYPRESS SL 1 '--~"---- ~- -~.-~- 1 ---
SUITE 300 ., w. -y _.
TAMPA, FL 33607-1066 i
-'- -- (813) 877-7275 - ---- -.-------- ------
- October 13, 1989 ~ '
_ . ;""~,
Ms. Sandra E. Glatthorn _ y
Development Planner II
City of Clearwater
Department of Planning and Development
10 South Missouri Avenue - - ~ '
Clearwater, Florida 34616 •
Dear Ms. Glatthorn:
Enclosed herewith are ten (10) copies of Sheet C-2 Revision 1 of Clearwater Tower
Construction Plans.
Pursuant to your telephone conversation this morning with Jesse Adams of our office, it
was concluded that Drawing A2 of the Final Site Plan did not match Drawing A 1. As
explained, the CADD printout for A2 missed a corner point on the building footprint, but
the site calculation furnished was based on the footprint shown on Drawing A 1. We are
submitting Drawing C2, Revision 1, with the same site data information. The footprint on
Sheets C1 and C2 of the Construction Plans now match sheet Al of the Final Site Plans.
If you have any questions, please call.
V 1
i
Daniel M. St. John, P. E.. _
Vice President
10-415.10 ~.
Enclosures
cc: Ms. Julie Jeffers
Building Department -
'`~ ~ ~ ~ C I TY O F C L EARWAT•a~R
~~ Int,erdepartment Correspondence "'
T0: Cyndie Goudeau, City Clerk
FROM: John D. Richter, Development Code Administrator ~ ~/~ ~~
SUBJECT: , .Certification of .Final ...,Site... Plan,., for ..Clearwater, Tower Located. at the
Southeast Corner`~~of Garden Avenue and Hendricks Street (PSP 89-13)R ~ ~ E ~ V G
COPIES: See List Below
DATE: October 9, 1989
~ ~;T 1.1, 1989
Pl,~:°dNING ~ URE
Q~tVEIOPMENT DE
The City Commission at its meeting of October 5, 1989, approved the above
described final site plan subject to the following conditions:
1. Afire department connection north of the hydrant shall be provided by the
Fire Marshal and shown as such on the site plan prior to certification.
2. The note "by the City of Clearwater" for the landscaped plaza shall be
removed from the site plan prior to certification.
3. The existing gas service and meter must be relocated by the City's Gas
Division.
4. Signs and fencing/walls shall be subject to separate review and permitting
processes.
5. Curbing and pavement of existing driveways to be deleted shall be removed
and landscaping, sidewalks and curbing parallel along the streets shall be
installed in accordance with City standards.
6 . The requisite initial building permits must be procured within six (6 ) months 1
from the date of certification'of the final site plan and alI requisite '
certificates of occupancy must be obtained within three. (3) years of date
,of .,certification of the final plan.
`>: , ~ .
As conditions #1 and #2 have. been deleted/indicated on the site plan, please
certify the attached plans subject to conditions ~3, 4, 5, and 6 listed above
and distribute. ~~/~~~ ~ ~~~~ ~~~~~~~r
JDR/SEG/df ` /C
cc: James M. Polatty, Jr., Director of Planning & Development
Ce~•il c,enderson, Engineering & Environmental (2)
Ream Wilson, Parks & Recreation Director
Keith Crawford, Traffic Engineer OLi ~ 1959
Victor Chodora, Building Official
Robert Brumback, Utilities
Cyndie Goudeau, City Clerk
Ray Wyland, Zoning ~/ (~~ i' Y` CL.~,K
Joan Moore, Staff Assistant III (Memo Only) J
Developer/Project Sponsor (2), - Howard Zoromsky
Opus South Corporation
4350 W. Cypress Street, Suite 700
P.O. Box 21327
Tampa, FL 33622-1327
fi?-
y ~ CITY OF CLEARWATF_R .,
Int?rdepa.:tment Correspondence ,
T0: Cyndie Goudeau, City Clerk
FROM: John D. Richter, Development Code Administrator ~E~'' ~~~
SUBJECT: Certification of Preliminary Plat for Clearwater Tower Located at the
- Southeast Corner of Garden Avenue and Hendricks Street
(SUB 89-07).
COPIES: See List Below
DATE: September 12, 1989
The Development Review Committee at its meeting of August 10, 1989 approved the
above described preliminary plat subject to conditions including the-following:
• Signs and fencing/walls shall be subject to separate review and permitting
processes.
• The City will need to sign as co-applicant for the plat, pending transfer
of City-owned property.
• The final plat shall be recorded within 8 months from certification of the
preliminary plat.
Please certify the attached plats subject to the conditions listed above and
distribute.
JDR/SEG/df
cc: James M. Polatty, Jr., Director of Planning & Development
Cecil Henderson, Engineering & Environmental (2)
Ream Wilson, Parks & Recreation Director
Keith Crawford, Traffic Engineer
Victor Chodora, Building Official
Robert Brumback, Utilities
Cyndie Goudeau, City, Clerk ~ ~ ~~ J~ ~ ~ 3
Ray Wyland, Zoning 11
Developer/Project Sponsor (3) - Howard Zoromsky
Opus South Corporation
4350 W. Cypress Street, Suite 700
Tampa, FL 33622-1327
Haines, Angel
From: bruscam@gtlaw.com
Sent: Thursday, September 30, 2004 3:31 PM
To: Haines, Angel
Subject: RE: Land Use Map for Clearwater Tower
Thank you so much!!! I really appreciate it.
-----Original Message-----
From: Angel.Haines~myClearwater.com
[mailto:Angel.Haines@myClearwater.com]
Sent: Thursday, September 30, 2004 3:21 PM
To: Brusca, Mandy M. (Para-Orl-RE)
Subject: Land Use Map for Clearwater Tower
Good afternoon Mandy,
You requested the Land Use Map of this area from 1989. Unfortunately,
we do not have this in our records. You will need to contact Mike or
Michael (both can help) at the Pinellas Planning Council at (727)
464-8250 for this copy. I already had someone here call ahead to see if
they have it on file and they do but I do not know how they handle
getting it to you. Make sure to tell them it is on N. Garden Ave.
Thanks for your patience and understanding and if you have any questions
for me, feel free to call me.
Angel Haines
Senior Staff Assistant
Planning Department
City of Clearwater
(727) 562-4579
--------------------------------------------------------
The information contained in this transmission may contain privileged and confidential
information. It is intended only for the use of the person(s) named above. If you are not
the intended recipient, you are hereby notified that any review, dissemination,
distribution or duplication of this communication is strictly prohibited. If you are not
the intended recipient, please contact the sender by reply email and destroy all copies of
the original message. To reply to our email administrator directly, please send an email
to postmasterc~gtlaw.com.
1
SEP~22.2004 4:51PM GREENBERG TRAURIG N0. 957 P. 1
' T. ~
2
INDIJS~'1~IAL
Acquisition & Davelopment
. PARTNERS, LLC
Fag Tx~~nsmlf ttaI +~over Sleet ~ ~ ~ ~ ~--
To: Ms. Cynd:i Tarapani, Director
City of Clearwater
Fax Number: (727) SG2-48b5
Phone Number; (72'~ 532-4547
From: Industzial Panthers, LLC
Fzle No.; 68257.010000
No. o~'Pages:
Date: September 22, 2004
Comments: Please see attached.
ThanI~ you.
~~vC~
.,
SEP~23 2U~4 *,-
P~pEPARTME*'
~~T( OF CLEARWATE''
~~~
~~` ~-
~,,, ,~'
The infomlation oprttained In this transmission is grivilggetl anal Confidential. It is intendetl only for the us® of the
individual or entity named above. If the reader Of this message i5 hot the intended recip[ent, you are hereby not4$i:d that
any dissemination, distribution or copy of this COfnmuniCaliori is strictly prohibited. If you have received this
CornmuniCation In error, please notify us immediatety by telephon~ oolleCt and return the original message to us at the
address b6lowvia the U.S. Postal Service, We will reimburse you ~qr your postage. 'thank you.
~av ~. vxaiage avenue, suite 650, Orlando, k'loridn 32801
k'hone= 407.418-370 b's~: 4o7•t+50.64@3
E•nisiI= bruacamQetllAw rn,,,
is
v
- - --- -_
;r ~
C~!, ;.. .k .. ..
y ~
~ ~_
j.{
~~~ .•
~s~~9- ~ 3, S ~ ~ ~'~~ 7
~~~
l`6 ~`Co g"1~q~j
X32
SEA, 22. 2004 4:51 PM GREENBERG TRAURIG N0. 957. P. 2
l
r INDUS ~'iL~
Acquisition ~ A~~elopxneat
PARTNERS, LLC
Septeimber 2~, 2004
VYA FA,CSriV~,E ANA ~'.S. MAYL
(727) 562-4865
Ms. Cindy ~`arapani, Director
Plawtling Depaxtment
City of Clearwater
Muzlicipal Services Building, 2~'d Floor
100 S. Myrtle Ave.
Clearwater, FL 33756
Re: f,and Use Plan / Mastex plan / DevElopm~nt Plan ?
Dear Ms. Tarapaui:
T am attachixl~ a co~y of my letter to you dated; May 5, 2004. W ~ received no response
whatsoever in connection with this public records request. Accordingly, we request your
immediate attention to this maztex.
Please help us by getting this request in the hands of a planner ar other member of your
staff that has been around long enough to turn ttais request around promptly. Please Hate
that while this request pertains to local apprbvai~s from some tune aga, these approvals
are for a sizeable project in your jurisdiction acid therefore the requested items have no
doubt been referred to a number of times aver the years by members of youx staff.
In order to facilitate this request, I am enclosing,;a return Federal Express envelope with
our code affixed so that this cost will not be bore by your o, fJ"zce. }Zegatding the copying
charges of your office, please contact me with, tlile total of filxe copy charges and this wvill
co;~fi~ that you receive payment immediately. Alternatively, you may include aA
invoice for such copy charges ~ the Federal Expzess package with, your respo~ase.
450 S. Orange Avenue, Suite 650, ~, lsAdo, Florida 32$01
phone= 407.418-2870 Fax:; 4q7-650•$463
E-alail: bruscaoa~gttiaw.com
SEP 22,2004 4:51 PM GREENBERG TRAURIG N0. 957 P. 3
J .
,,
Ms. Cindy Tarapami, Director ;~
Page tvc~o
September 22, 2004
If your staffmember should locate other docuri~ents or maps w'luch znay be of interest to
us, we would greatXy appreciate copies of these items as vve1L This will cow ~~ we
'uvill be responsible i'or the payment of all such copy ehazges.
Thank you Very much.
Vey tnily yours,
~~'L~~
Mandy M. Brusca, Planning Assistant
450 S. Orange .A.oenue, Suite 650, Qrrando, Florida 32801
Phone: 407-418.2$70 Fax~~ 407-650-8483
E•~ail= bxuscam(o~agv.com
SEP.22.2004 4;51PM GREENBERG TRAURIG
INDI„TSTRIAL
Acquisition Ss Development
PAR'I'NER.S, LLB
IVlay 5, 2004
'VIA FACSIlVI~,E
Cindy Tarapani, pirector
Planning DepartUxent
City of C1ea¢~watex
Municzpat Services Building, 2n8 Floor
140 S. Myrtle Ave.
Cleasvvater, FL 33755
Re: Land ~J'se Plan / lvlastex Plan / Development Flan
Dear lv~s. Tarapani:
N0. 957 P. 4
We herEby request a copy of the locally approved land use plan (which may also be referred to as
the master plan or plan of development) showing tide approved 1 d uses,~or the following large
developments wzthin your jurisdiction. S
33 N
1. Clearwater Tower-O~xce $uilding ~ ~ ,
Please advise me inlmedi.ately, at 407I418~237b, if you are unable to provide these maps within.
the next 10 days, 'We will provide to you by overnight delivery any copy charges you may xequire
Thank you in advance fox your assistance.
Very truly yours,
l~~ ~,
Mandy $xusca, Planning ,Assistant
cc: Mr. Cb~arles Carrington
450 S. Orange Avet~.ue, Suite b50, ~xlando, k'lorida 3280 Z
Phone: 409-41$-2370 Faac, 407-650-$463
E-mail b~scam~gtlaw.com