Loading...
PSP94-23; CSP94-23; 94-28PSP94-23; CSP94-23; 94-28 1233 FT HARRISON AVE S MORTON PLANT CENTRAL UTILITY PLANT lw ~ ~ 1a. w t '~K. i~ CITY OF CLEARWATER Interdepartmental Correspondence T0: Don Meerians, Assistant Traffic Engineer; Bob Maran,CE III; Mike Quillen, Environmental Engineer; James =. Goodloe, Fire Marshall; Steve Doherty, Central Permittin Supe isor f.. FROM: Allen V. Mahan, Coordinator, Central Permitting SUBJECT: Re-validation of Site Plan for Morton Plant Hospital Central Utility Plant SP 94-23)) n.. ~ s ~g~~~3 COPIES: DATE: August 5, 1996 ~ ~ - °2'~ Attached is a copy of the amended site plan for the Morton Plant Hospital Central Utility plant, submitted on July 25, 1996 for re-certification . The site plan is being revised to(1) increase the driveway onto Pinellas Street to 40.4FT to accommodate truck traffic;(2) reflect the reduction in open space for the site to 19, 413 from 749 S.F.;(3) increase the paved vehicular use area from 5,688 to 6,024 S.F.; and, (4) reduce the parking lot interior landscaping from 445 S.F. to 361 S.F. Please refer to the attached site plan, last certified on April 6, 1995, for comparison. If you find the site plan addition to be acceptable, please initial and date. If you do have an objection and/or recommendation, please comment below or attach your comments to this memo. Comments: (by whom an~ vrith,date,Qlease) ~n -, ~~ Your assistance in preparing the plan for an August 8, 1996 certification will be appreciated. Thanks. AVM/avm SPF9423R61AVM f ~. CITY OF CLEARWATER Interdepartmental Correspondence tr T0: Don Meerians, Assistant Traffic Engineer; Bob Maran,CE III; Mike Quillen, Environmental Engineer; James Goodloe, Fire Marshall; Steve Doherty, Central Permittin uperviso FROM: Allen V. Mahan, Coordinator, Central Permitting SUBJECT: Re-validation of Site Plan for Morton Plant Hospital Central Utility Plant (PSP 94-23)) COPIES: DATE: August 5, 1996 Attached is a copy of the amended site plan for the Morton Plant Hospital Central Utility plant, submitted on July 25, 1996 for re-certification . The site plan is being revised to(1) increase the driveway onto Pinellas Street to 40.4FT to accommodate truck traffic;(2) reflect the reduction in open space for the site to 19, 413 from 749 S.F.;(3) increase the paved vehicular use area from 5,688 to 6,024 S.F.; and, (4) reduce the parking lot interior landscaping from 445 S.F. to 361 S.F. Please refer to the attached site plan, last certified on April 6,1995, for comparison. If you find the site plan addition to be acceptable, please initial and date. If you do have an objection andlor recommendation, please comment below or attach your comments to this memo. Comments: (by whom and with date, please) Your assistance in preparing the plan for an August 8,1996 certification will be appreciated. Thanks. AVM/avm SPF9423R67AVM ~g• V \ i ~~ .^ 1J 1 ~'~~TS f50.'JQ T4?TL ? 5~ a QC1 S~Fjy-z32G/~. I', J13~.. oi1..}ry~t~? ~~L.1'~~J j. ~..~l1n V~ ~ ~GTL i~1:inL:C# ~ 4#"#~~~ .~.v~3o~li t~~t~84'~ ~l;~u;'~ e; King Engineering Ass®ciates, Inc. 24945 U.S. Highway 19 North • Clearwater, Florida 34623 • (813) 79i-1441 • FAX (813) 791-9228 July 24, 1996 Full-Service Planning, Engineering, Surveying & Environmental Consultants Mr. Allen V. (Val) Mahan City of Clearwater Central Permitting 100 South Myrtle Avenue, 2nd Floor Clearwater, Florida 34616 Re: Morton Plant Health System, Inc. Central Utility Plant Revised Final Site Plan Dear Mr. Mahan: Enclosed for your use are 12 sets of the revised Final Site Plan and a $150.00 check for the review fee for the project referenced above. The site plan was revised to accommodate a wider driveway required on Pinellas Street. Specifically, the plan was revised as follows: 1. The paved vehicular use area was increased from 5,688 s.f. to 6,024 s.f. 2. The open space for the site was reduced from 19,749 s.f. to 19,413 s.f. 3. The width of the driveway was increased to 40.4 feet to accommodate the truck traffic expected to utilize the entrance. 4. The parking lot interior landscaping was reduced from 445 s.f. to 361 s.f. Due to the minor effect of the above changes, the proposed revisions can be considered a minor site plan amendment. Please contact me or John Powell if you have any questions or comments concerning this. submittal. Sincerely Michael R. Steinback Project Engineer :fig L:~ADMINILETTERS~MAHAN.3 Enc. cc: Douglas Dahlhauser w/enclosure John Powell w/enclosure File: 1999-261-OOO.R355 Gerald Yates w/en Keith Appenzeller Serving Florida Since 1977 ~~ , /~ ~' CSPR9423.AVM ~~~ CITY OF CLEARWATER Interdepartment Correspondence TO: Cyndie Goudeau, City Clerk ~ a~ ~ ~~'~~ ~7.~~~ ~ FROM: Scott Shuford, Director, Central Permitting SUBJECT: Minor Amendment to the Certified Site Plan for Morton Plant Central Utility Plant(CSP 94 23) `' COPIES: See List Below j ~ ~ ~~ ~ 9 DATE: July 11, 1995 The applicant has submitted a request for a Minor Amendment to the subject certified site plan. The amendment is to reflect an intrusion of 8:'-1.2' of the building cladding into the setback area Conditions of approval are as follows: Display of changes to the setback area on the site plan. As those revisions have been made to the certified site plan, this change to the certified site plan for the Morton Plant Central Utility Plant, last certified on Apri16, 1995 is approved as a Minor Amendment as requested. Please certify the site plan and distribute as indicated below. Thanks for your assistance. SS/AVM/avm cc: Scott Shuford, Director of Central Permitting Bob Mazan, City Engineer Michael Quillen, Water Resource Engineer ~ . Don Meerians, Assistant Traffic Engineer Victor Chodora, Building Official Cyndie Goudeau, City Clerk Lou Hilton, Senior Planner Steve Doherty, Zoning Section Supervisor Allen V. Mahan, Coordinator, Central Permitting Developer/Project Sponsor (3) Please call John Powell, King Engineering, Tel. 791-1441, for disposition of their copies when re-certified. ~~ CITY OF CLEARWATER Interdepartmental Correspondence TO: Bob Maran, Engineering; Stephen Sarnoff, Zoning FROM: Allen V. Mahan, Coordinator, Central Permitting d~~~/ i SUBJECT: Recertified Site Plan for Morton Plant Central Utility Plant (CSP 94-23) DATE: June 2$, 1995 Attached is a copy of the above described site plan submitted on June 28, 1995 for re-certification as a minor change. Please refer to the Engineer's letter and mared up site plan for specifics on changes to be made to the Site Plan. This minor change to the site plan. These involve intrusion of the building covering into the setback area no more than 8". If you fmd the revised site plan to be acceptable, please initial and date next to the applicable condition(s) on the attachment. If you do have an objection and/or recommendation, please comment below or attach your comments to this memo. Comments: (by whom and with date, please) The intent is to transmit this to the City Clerk for final processing/ certification and distribution - by Tuesday, July 11, 1995. Thanks for your assistance. AVM/avm CSP8423R.avm ._ King Engineering Assacia~es, onc• 24945 U.S. Highway 19 North • Clearwater. Florida 34623 • (813) 791-1441 • FAX (813) 791-9228 Full-Service Planning, Engineering & Environmental Consu/tanfs June 28, 1995 Mr. Val Mahan City of Clearwater 10 South Missouri Avenue Clearwater, FL 34618 Re: Central Utility Plant Amended Final Site Plan Dear Val: ~ ~~~~ 0 ~I~~28 1~ cm of c~~+RVaa~ER Enclosed for your review and re-certification are sixteen (16) copies of the revised Final Site Plan and a check in the amount of $150.00 to cover the review processing fee. Should you have any questions, please call me or Barbara Ennis. Thank you for your assistance in this matter. Sincerely, G J hn E. Powell, P.E. enior Project Manager BE:ps G:\62\Mahan.21 Encl. cc: Douglas Dahlhauser William DiMarino Gerald Yates Russell Heiken Keith Appenzeller Barbara Ennis File: 1999-261-000. R3 5 5 Serving Florida Since 1977 e ~ /'+~ • N i. ~ • .^.. [[. ~,T \I PLATS l~a.f~l TaTL 1~a.a0 CHCk; 1~a.aa ~~~1a:4aJUN.;?S'~CNNG .aa LINE a5 ,~ ._.._., 24945 U.S. Highway 19 North • Clearwater, Florida 34623 • (813) 791-1441 • FAX (813} 791-9228 Full-Service Planning, Engineering & Environmental Consultants June 26, 1995 Mr. Val Mahan City of Clearwater Post Office Box 4748 ~~-~~ ~~ ),,1J~ Clearwater, FL 34618-4748 b~l~M Re: Central Utility Plant Amended Final Site Plan Dear Val: ~ ~ c Nnr d iwu~ ~ Enclosed for your review is a copy the Final Site Plan for the above referenced project with setbacks amended to reflect an architectural facade added to the north, west, and south sides of building, 1 " of stucco on the east side, and the latest dimensions of the building. Please review as soon as possible so we may provide you a formal submittal of the amended plan. Should you have any questions, please call. Sincerely, J hn E. Powell, P.E. enior Project Manager BE:ps G:\62\Mahan.21 Encl. cc: Douglas Dahlhauser William DiMarino Gerald Yates Russell Heiken Keith Appenzeller Barbara Ennis File: 1999-261-R355 ~~~~ T ~; ~R 6 ~1~~; Serving Florida Since 1977 v~~ TO: FROM: COP/ES: SUBJECT: ~~ C/TY OF CLEARWATEA' lnterdepartment Correspondence Sheet Vic Chodora; Assistant Director Central Permitting Richard J. Baier, City Engineer~l Scott Shuford, Director Central ermitting Morton Plant Hospital Sewer & Water lmpact Fees DATE: July 12, 1995 C~ cEr ~~~~ This memo is in reference to a letter from Keith Appenzeller of King Engineering to Terr Jennings dated April 12, 1995 (attached). Since then Bob Maran has reviewed the initial request for the credits on impact fees to the several buildings that were demolished by Morton Plant in the last year. For our files, Bob has documented the demolition permits applied for by Morton Plarit with Roberta and Bobbie in Central Permitting. Bob has obtained account numbers from Joyce Geisel in Utility Accounts to verify meter sizes. The original list of addreses and meter sizes provided by King Engineering has been corrected based on information provided by Central Permitting and Utility Accounts. King Engineering concurrs with Bob's records and on July 7, 1995, sent h;m a revised list of addresses and meter sizes (attached). To the best of our knowledge, this information is, accurate. The Powell Cancer Care Center has paid all water and sewer fees for new meters to tl~e building even though they had demolished eight (81 buildings. It is appropriate to treat Morton Plant Hospital as a Campus and to provide these credits to the two remaining buildings (Heart and Vascular, 303 Pinellas Street, and Central UtilityPlant, 1233 So. Ft. Harrison Avenue). The sum total of the credits are as follows: WATER IMPACT FEE CRED/T SEWER /MPACT FEE ~CRED/T RJB/RJM/np Attach. S 11,350.00 521,150.00 ~ t ~ ~~~~ .~ ¢ _ ~-y. , ... _ .~ ~- .i~+' t C d a O m d ~ ~. tT ~ ~= C ~C ep ~O~a a6 + y- ; '~ ~Q~~~ a-~~io~o ~ ~ .o r~~~ r- Oo S;~ ::: F' ~ ~ O a 3= _ a ~. ~~ W O . f" v ~ 1 . ;. l O i N ~O ~ I I N ~ ~~ ~ ~ M . .~ }~ M gyp. ~O ~ N M ~ • M ~Iw w O h 1 ~ ~ t}cgp0~ H G1 .~ U u z o W ~ ~ ~ ~ x ~ ~ w a 0 o w ,~ a S-~ N ~ o ~ Pal W . ~ .~ o ~ a V ~~ O ~ ~o w o ~ ~ ~ ~ C ~ a O '~ a v ~ A „ O u o e d a ~ F~+ H N JggJ 1a ~o `~ +U 1 CJ '~ rl a~ ~° a •a U ~~ A a~ ~ d a o ~ •~'. ~ x ~ ~ N W ~ ~ a.i 0 w 0 ~+ m (r" O u cd a~ x z° I ~- ~~ `~ c c p a c c P c C C 4 ~. n a :~ .,. r •r a a `~ z ~ W rn •i+ .o q .--~ r' ~ v~ ~ o ~ " Pal ~ I w O ~ ~,,~ ~Y •-~ C O C ~0 ~ ~ o ~ O Y7 ~ a N o, a o e a ~ o J N ~ h ~ w Z t v .. ~ o v o ~ u ~ d q lo- E= d C9 ,~ } 0 . , I~ t . f / . ~ L"+ O z A a 1 a - ~. c n e 'o ~ o N cd ,~,~ . U `~ .N ~ O U ~ yey .~ :~ ~ y ~ o p ~ v E x ~ ~ a ~ N ~ ~ cd ti > •~ a >, .5 ~ ~ e ~ ~ ~ ~ N A , A a ~ ••. ~ ~ '~ b" v a a _ N m o d n, O~ H ~ Ol •~ ~ o o a` w O „ .7 ~ N O d ~ .. ~ V 4 „ Cu ~) C ,; ~~ ~. g ~~ ~ I ~~ •. P ~ ~. _~ ~ ~~ •~ ~~ ~' g~ ~Qa d ~~ ~~ .. M .~ ~~ o •~ ~ ~ •o ~ . .~ 8 . b z° ~ 4 by ~ > o, ~ o a N '~ a ' o ~ b ~ V "', ~ ~ .Q h > V C „ ~ ~d •~ c ~ '~~' o u 0 .. ,,,Y : ~ ~ „ r ~. ~•b N v ~3oS q g i M ~. O o ~~~ ~ ? ~ ~ ~ • O . S . . • • • • „ . f . ~o . . . `~ . . . .- • H . . . . • ~ • • O . . . . • • N -- ... . ; . . • t . a . . . u . ~ . .. ; . . . e • ,r . . ac • M o e . ~ ~: . ~ ,~: •~ ~ ~ o M ~~V.~ ~ ' ( f ..._ r ~ ~ r»- O 4 o b •- c ~'~-.'~ a o w q O Fp ~ y~,_ p~ e q C ~ 'a { v q ! t o a LL 'a n ~, o w _O ' o .= tV r7 0 o LL :' 0 b C~ u OC `v c O M w L ~ ~ q e 0 ' a o ui a Q w ~ h r O Uf u ~ O a d W W y o ~ Z q ,O C •u ~^0 F va 3Kp 'a° oo~t ~$ ~ Z~ n d q ..i a~ •~FZ-m O ~ W W M ,^ dq ZdadV~ $v 7WCJ~ m ~° xZv~i o•M 3~z ~~ X03 c o °' '~:~ ~o~ •~ O O LL y~ ~ O m m = ~ o N N ~ ~ ~ »w ao. ~~o yy •M ~ Z Z r .o o g 3 0 •~, R W W (~ sV y v1 of °C O ~ W W y a ~, oa NFZ-tx-t ~ ~-Nt'1 i 'n Z ~~ ~` ~ CSP9423.AVM ~~"-'`-~ CITY OF CLEARWATER 3 ~ r,~ ~ Interdepartment Correspondence /~3 TO: Cyndie Goudeau, City Clerk `~ FROM: Allen V. Mahan Coordinator Central Permittin ~ V g ~i~" `ill SUBJECT: Certified Site Plan for the Morton Plant Central Utility Plant (94-28) ~ ~ S ~ / ~ Y Z.3 COPIES: See List Below ~ J ~ / I ~ ~ 3 DATE: April 5, 1995 The Development Review Committee at its meeting of December 8,1994 approved the above described site plan subject to the following conditions with one condition added by the Director of Central Permitting on the elevations (appearances) of the buildings: 1. Prior to issuance of a building permit, a landscape plan shall be submitted to Environmental Management. . 2. Prior to the issuance of a building permit, a clearing and grubbing permit and a tree removal permit {or a no tree verification form) are required. 3. Prior to certification, a copy of the SWFWIVID permit application and calculations shall be provided to Environmental Management. 4. Prior to issuance of a building permit, a copy of the approved SWFWMD permit shall be submitted to Environmental Management. 5. Prior to certification, the total paved vehicular use area and total interior landscape area calculations shall be expressed in square feet and as a percentage of the overall site in the site plan data block. 6. Signs and fencing/walls are subject to separate review and permitting processes. 7. The requisite building permits must be procured within one (1) year from the date of certification of the final site plan and all requisite certificates of occupancy must be obtained within three (3) years of the date of certification of the site plan. 8. The dates and conditions for approval by the Planning and Zoning Board for conditional use approval and the Development Code Adjustment Board for variance approval shall be provided on the preliminary plat/ site plan prior to certification. 9. All elevations of the building will be generally similar in appearance.. 10.Show Fire Hydrant Assembly on Fort Harrison on Site Plan. 11.Sidewalks are required adjacent to all street rights of way. 5'on Ft. Harrison, 4' on Hamlet Drive. >i As conditions 1,2,4,5,10 & 11 have been met, please certify the attached plans subject 'to conditions 3, & 6-9 listed above and distribute as indicated, attached. Thanks for your assistance. AVM/avm .~.~,s-%s,. ~•~~: cc: Scott Shuford, Director of Central Permitting Bob Maran, Engineering Site Plan Review Michael Quillen, Water Resource Engineer Don Meerians, Assistant Traffic Engineer Victor Chodora, Building Official Cyndie Goudeau, City Clerk Lou Hilton, Senior Planner Steve Doherty, Zoning Section Supervisor Developer/Project Sponsor (3): Please call John Powell, King Engineering, 791-1441, for certified plan pickup. ~ ~ , CSP9423.AVM TO: FROM: SUBJECT: COPIES: DATE: CITY OF CL,EARWATER Interdepartment Correspondence Cyndie Goudeau, City Clerk Y len V. Mahan, Coordinator, Central Permitting Ce ified Site Plan for the Morton Plant Central Utility Plant (94-28) See Li March 30, The Development Review Co ittee at its meeting of December 8, 1994 approved the above described site plan subject to the following conditio s with one condition added by the Director of Central Permitting on the elevations (appearances) of the bui ings: 1. Prior to issuance of a ilding permit, a landscape plan shall be submitted to Environmental Management. 2. Prior to the issuance of a b ilding permit, a clearing and grubbing permit and a tree removal permit (or a no tree verificatio orm) are required. 3. Prior to certification, a copy o the SWFWMD permit application and calculations shall be provided to Environmental Manag ent. 4. Prior to issuance of a building pe mit, a copy of the approved SWFWMD permit shall be submitted to Environmental Managem t. 5. Prior to certification, the total pave vehicular use area and total interior landscape area calculations shall be expressed in square et and as a percentage of the overall site in the site plan data block. 6. Signs and fencing/walls are subject to separ a review and permitting processes. 7. The requisite building permits must be procu ed within one (1) year from the date of certification of the final site plan and all requis a certificates of occupancy must be obtained within three (3) years of the date of certification o he site plan. S. The dates and conditions for approval by the Pla ing and Zoning Board for conditional use approval and the Development Code Adjustment Bo for variance approval shall be provided on the preliminary plat/ site plan prior to certification. 9. All elevations of the building will be generally similar i appearance. l0.Show Fire Hydrant Assembly on Fort Harrison on Site an. 11.Sidewalks are required adjacent to all street rights of wa 5'on Ft. Harrison, 4' on Hamlet Drive. As conditions 1,2,4,5,10 & 11 have been met, please certify the attached plans su 'ect to conditions 3, 6-8 listed above and distribute as indicated, attached. Thanks for your assistance. AVM/avm cc: Scott Shuford, Director of Central Permitting Bob Maran, Engineering Site Plan Review Michael Quillen, Water Resource Engineer Don Meerians, Assistant Traffic Engineer Victor Chodora, Building Official Cyndie Goudeau, City Clerk Lou Hilton, Senior Planner Steve Doherty, Zoning Section Supervisor Developer/Project Sponsor (3): Please for certified plan pickup. call John Powell, King Engineering, 791-1441, t~ r .~ r= , ~ ~'1 d.. r CITY OF CLEARWATER Interdepartmental Correspondence TO: Vic Chodora, Building Official; Lou Hilton, Senior Planner; Bob Maran, CE III; Don Meerians, Assistant Traffic Engineer; Mike Quillen, Environmental Engineer; Ream Wilson, Director/Parks and Recreation; James Goodloe, Fire Marshall (~ FROM: Allen V. Mahan, Coordinator, Central Permitting ~'" I SUBJECT: Certified Site Plan for Morton Plant Central Utility Plant (PSP 94-23) COPIES: Scott Shuford, Central Permitting DATE: March 23, 1995 Attached is a copy of the above described amended site plan submitted on March 23, 1995 for certification. Please refer to the attached Agenda memo/DRC final minutes addressing conditions of approval required by D.R.C. on December 8, 1994 for this amended site plan. An additional condition will be added to the conditions per the Director of Central Permitting to read: All elevations of the building will be generally similar in appearance. If you find the site plan to be acceptable, please initial and date next to the applicable condition(s) on the attachment. If you do have an objection and/or recommendation, please comment below or attach your comments to this memo. Comments: (by whom and with date, please) r~~ ~a ~~l~i.~ _ 3 %z3 /~c Your assistance in preparing the plan by April 3 for certification by the City Clerk will be appreciated. Thanks. AVM/avm SPF9423.avm .~ ~ `~ -.. a: ,: MINUTES DEVELOPMENT REVIEW COMMITTEE City of Clearwater, Florida December 8, 1994 Members Present: Scott Shuford - Chairman, Director of Central Permitting Louis Hilton - Representing Central Permitting Karl Whittleton - Representing Fire Department Bob Maran - Representing Central Permitting/Engineering Mike Quillen - Representing Public Works/Environmental Donald Meerians - Representing Public Works/Transportation Group Art Kader - Representing Parks & Recreation Bill Held - Representing Marine Department Sandra Glatthorn - Representing Central Permitting Ream Wilson - Representing Parks & Recreation (11:10 a.m.) Others present: John Scott - Scott Associates (Zeus Inn item) Angelo Markopoulos - Zeus Inn item Antonios Markopoulos - Zeus Inn item Rick Brown - Florida Coastal Engineering (Discount Auto item) Housh G. Hovaee - Northside Engineering (Walgreen item) Burr Tran - Touloumis, Touloumis & Assoc. (Walgreen item) George E. Touloumis - Olympia Development Group, Inc. (Walgreen item) William E. Touloumis - Olympia Development Group, Inc. (Walgreen item) Stathy Touloumis - Olympia Development Group, Inc. (Walgreen item) P.J. Shah - Cumbey & Fair, Inc. (McDonalds item) Andy Nicholson - Challenger Enterprises (Grande Bay Apts item) David Logan - Grande Bay Apartments Ltd. (Grande Bay Apts item) John Powell - King Engineering (Morton Plant item) Alberto Baraybar - King Engineering (Morton Plant item) Vickie Davenport - Recording Secretary The meeting was called to order at 9:05 a.m. by Chairman Shuford in the DRC Conference Room B. moved to approve the minutes c id passed unanimously. 10, 1994 meeting. Zeus Hote . cated at the northeast corner of Osceola Ave d Drew Street. The applicant propo a major redevelopment and an ada a reuse to the existing 118 dwelling units of the sceola Inn adult congrega are facility (ACLF) into a 214 room hotel, with a parking garage facility, a 5,02 . ft. restaurant, a 16,141 sq. ft. conference/meeting rooms, an 1 . ft. of retail area. The developer intends to raze southwest portions of the a irig~one story buildings located at the southwest quadrant the block, to construe six story hot uilding with 30 parking spaces beneath the buil~ on the ground fl ,and an in-grounds pool. The property is located in the Ur Center Co oriing district. the property owner, Mr. Markopoulos, due to the pro ed dock on the west end ~n was given to Mr. Markopoulos for the proper permitting ocess for this reque ITEM #2 ~iscoun -to-Parts Store-(P - oca e a 1 US Hwy. J D.R.C. Minutes 1 12/08/94 4~ 0 ~ ~` art fee, which shall be & Recreation for the required space assessment , The motion was seconded by Don Meeri carried unanimously. ITEM #5 Gra ay Apartments, Inc. -Shoreline Erosio ntrol Project; Located at 2909 Gulf- o-Bay Boulevard. This item is scheduled for City Co 'on review January 19, 1995. This item is for Environmental/Engineering comment and review. ~.,o o tinuance until the DEP permit is issued. The motion was seconded b Bob and carried unanimously. ITEM #6 Morton Plant Central Utility Plant (PSP 94-23); Located on South Ft. Harrison Avenue between Pinellas Street and Grand Central Avenue. This is continued from the canceled November 23rd DRC Meeting. The applicant proposes to construct a 18,121 sq. ft. Utility Plant to provide energy for the physical plant of the hospital. The building is comprised of an 5,016 sq. ft. engineering area; a 3,200 sq. ft. generator area; a 4,160 sq. ft. chillers area; . and a 5,760 sq. ft. boiler area. Points of access are four: three on Grand Central Avenue and one on Pinellas Street. The perimeter landscaping and associated parking is provided. MOTION: Lou Hilton moved to approve the preliminary site plan subject to the following conditions: Pertinent comments from the Department representatives are incorporated into the motion listed below. Central Permitting 1. Signs and fencing/walls are subject to separate review and permitting processes. 2. The requisite building permits must be procured within one (1) year from the date of certification of the final site plan and all requisite certificates of occupancy must be obtained within three (3) years of the date of certification of the site plan. 3. The dates and conditions for approval by the Planning and Zoning Board for conditional use approval and the Development Code Adjustment Board for variance approval shall be provided on the preliminary plat/site plan prior to certification. Fire Department 1. Show FIRE HYDRANT ASSEMBLY on Fort Harrison on site plan. Traffic Engineering 1. Sidewalks are required adjacent to all street rights-of-.way. 5' on Ft. Harrison, 4' on Hamlet Drive. Prior to certification, the total paved vehicular use area and total interior landscape area calculations shall be expressed in square feet and as a percentage of the overall site in the site plan data block. 2. Prior to issuance of a building permit, a landscape plan shall be submitted to Environmental Management. Prior to the issuance of a building permit, a clearing and grubbing permit and a tree removal permit (or a no tree verification form) are required. D.R.C. Minutes 12/08/94 .' ~ _ ~ ~' .J ~ r ~ ~ 4. Prior to certification, a copy of the SWFWMD permit application and calculations shall be provided ® CC to Environmental. Management. ' ~'~ `~ 5. Prior to issuance of a building permit, a copy of the approved SWFWMD permit shall be submitted ~t ~ to Environmental Management. The motion was seconded by Bob Maran and carried unanimously. The meeting adjourned at 11:45 a.m. Scott Shuford, Chairman ciZ,y~s ;~~~ ~c D.R.C. Minutes 6 12/08/94 " J ~' '~ Clearwater' City COmmT~slOn ...° K l~ ~, s A~ ~ • . ~ ,A.genda Cover Memorandum .~~, . . ~ F` I - _. _ _ _ .. v _.. ~~- -~Preliinmar-y StteY Plan~or 'Morton Flant Central=Utility Plant,~loc~ated`onSouth Ft Narrtson-Avenue .maxbetween Grand: Central Avenue and Pinellas Street, Morton Plant Health Systems; ~inc~owner); Emil "C. ~.. - -~. ~ '-- -- z ei 1 - ~ ~ t' Y--. ~ ~ ~..,. 3.11C-- .rs ..y ~.~, Y .T ---~.e1-- ..~.Marni'iai"rtt _tr=klrPnresentatwel-- - -;., ~'`-- ,.- . _ .._._'r°' ,.~... r'n ._ ~ ___.~' :~.,,~` ~. (PSP.94=23) ~RECOMMENDAT.ION/MOTION ~ r __ - _ `_ ~ _ ,~ ~ °~ °wApprove°Final;Site Plan for the Morton°Plant~Central Utility Plant subject to the conditions listed on pages ;two ~aradthree -- _ _ '' ~ _ - k C-D, end„that: the appropriate officials be~authorazed to~execute.same.~. M.. ,,~~ ..._. ~~ ... .: ~-- ._ ~;., .-.: -- t ~ ~ .~--.-_„"~: ~ --' -.....f, r...-rx .. ~.. --. - .. .. ..... .... .BACKGROUND: t ,-..ff ~ a ._,~,~ _ - ~- ... _._~"'-- ... _ - _~ .~ __ .. ... .. _ - .__. _ ._ "h __ ~~ The-applicant proposes to construct a Central Utility Plant facility which will serve as .the central location forz.mechanical and engineering facilities for the buildings of the Morton Plant Hospital Campus. The facility is to be located on South Ft. Harrison Avenue between Grand Central Avenue and Pinellas Street as depicted on the Hospital Master Plan. The subject property is a portion of the Morton Plant Master Plan which was adopted on second reading on January 5, 1995. This proposed facility will replace the existing Central Utility Plant located south of the Barnard Building, North of the Adler Building, and Eas; of the Witt and Roebling Buildings. The proposed facility has been revised from the first version provided to the Commission. The cooling towers have been relocated to ground level on the east side of the utility plant building, reducing noise substantially and necessitating the reduction in building setback from S. Ft. Harrison Avenue to 24 feet. The structure height has been considerably reduced from the initial submission. The maximum height on the revised site plan is~feet. The proposed facility willl'>Jn on electricity to be supplied by Florida Power Corporation. Back uF generators are currently proposed to be diesel units. The hospital representatives have indicated they are interested in using natural gas as an energy source if the cost benefit analysis results are favorable. City Gas Officials are negotiating with the hospital on this issue. .~• ~ ~--,- ~l ~ r ~ -- f Lam! i'_ ~v~( S »t~L~- ~~i ~ ---~/' ~ ~~ ,r c p ,.1 a~. f~ ~ s w ~ o ~ r! L ~ev~~i---t a~ /~-- J~µ ~ ,,t~~ l f Revie++ed by: Originatirlq Dept: Legal N/A CENTRAL TTING Budget N/A Purchasing N/A Risk Mgmt. N/A User Dept: CIS A ACM / / f ENGR ~ Other ' N Advertised: Date: Paper: ® Not Required St~mitted by: Affected Parties ^ Notified C' Man er ® Not Required Casts: S M/A Total Current Fiscal Yr. Funding Source: ^ Capital Imp. ^ Operating ^ Other Appropriation Code: Caamission Action: ~~ Approved 5 ^ Approved u/conditions ^ Denied ^ Continued to: Attachments: APPLICATION MAP SITE PLAN BLDG. ELEVATIONS ^ None ~..~ Printed on recycled paper LAC/[, ~ ~~/ ~--- ~ (w~ 1 `- 1 1A{~iV ~t-6, ~„J ~~ j ~ I11 / ding Engineering Associa~es9 inc. 24945 U. S. Highway 19 North • Clearwater.. Florida 34623 • (813) 791-1441 • FAX (813) 791-9228 I:ull-Service Planning, Engineering & Environmental Consultants March 27, 1995 Mr. Allen Mahan City of Clearwater Central Permitting Post Office Box 4748 Clearwater, FL 34618 Re: Morton Plant Health System -Central Utility Plant Dear Allen: Please find attached twelve signed and sealed copies of the Final Site Plan for the above referenced project submitted for certification. The enclosed has been revised to show a maximum building wall height of 30 feet. Should you have any questions please do not hesitate to call. Sincerely, ~~ J hn E. Powell, P.E. nior Project Manager :es G:\62\1999261.JP Att. cc: Doug Dahlhauser Russ Heiken Bill DiMarino Jerry Yates Alberto Baraybar Keith Appenzeller File 1999-261-OOO.R355 Permit ~` a~ ~L~RRL-ZB- ki.~ ~~ ~SS~U /2ti. Serving Florida Since 1977 'f ~~,~~ • iT = a 9,~ =- Q4 '~~ TES t~ Clearwater City Com_mi~sion _ (` Agenda Cover Memorandum ~J ~ Item # Meeting Date: ~ ~~.~~ SUBJECT: Preliminary Site Plan for Morton Plant Central Utility Plant; located on South Ft. Harrison Avenue between Grand Central Avenue and Pinellas Street; Morton Plant Health Systems, inc. (owner); Emil C. Marquardt, Jr. {representative) (PSP 94-23) RECOMMENDATION/MOTION: Approve Final Site Plan for the Morton Plant Central Utility Plant subject to the conditions listed on pages two and three. ^ and that the appropriate officials be authorized to execute same. BACKGROUND: The applicant proposes to construct a Central Utility Plant facility which will serve as the central location for mechanical and engineering facilities for the buildings of the Morton Plant Hospital Campus. The facility is to be located on South Ft. Harrison Avenue between Grand Central Avenue and Pinellas Street as depicted on the Hospital Master Plan. The subject property is a portion of the Morton Plant Master Plan which was adopted on second reading on January 5, 1995. This proposed facility will replace the existing Central Utility Plant located south of the Barnard Building, North of the Adler Building, and East of the Witt and Roebling Buildings. The proposed facility has been revised from the first version provided to the Commission. The cooling towers have been relocated to ground level on the east side of the utility plant building, reducing noise substantially and necessitating the reduction in building setback from S. Ft. Harrison Avenue to 24 feet. The structure height has been considerably reduced from the initial submission. The maximum height on the revised site plan is~$ feet. The proposed facility will'r~n on electricity to be supplied by Florida Power Corporation. Back up generators are currently proposed to be diesel units. The hospital representatives have indicated they are interested in using natural gas as an energy source if the cost benefit analysis results are favorable. City Gas Officials are negotiating with the hosp_iltal o~n/f this issJue. ~ ~ f ~- SX.~~...,..~T ~~ ~ e I~ ~ ~ev`r~j„"t a~ /- "'" ,((1~.r rjtr~~ w~l[ ~~ Reviewed by: Originatir~ Dept: Costs: S N/A Caamission Action: Legal N/A CENTRAL TTING Total ra~Approved Jr"-~ Budget N/A Purchasing N/A $ ^ Approved w/conditions Risk Mgmt. N/A User Dept: Current Fiscal Yr. ^ Denied CIS N A ^ Continued to: ACM / % Funding Source: ENGR ~` ~ ^ Capital Imp. Other ~ N Advertised: ^ Operating Attachments: Date: ^ Other APPLICATION Paper: MAP ® SITE PLAN Not Required Submitted by: Affected Parties BLDG. ELEVATIONS S~ ^ Notified Appropriation Code: ^ G. ® Not Required None Ci Man er Paa~ Printed on recycled paper ~ 1 ~! ~. ,>lZet ~. r f r b,.,,( Prom ~ ~r y ~' ' , ~ ~ PSP 94-23 ~ ~ PAGE 2 The applicant has submitted additional information on noise generation, addressing specific Commission concerns. The noise report indicates noise levels affecting nearby residential areas to be less than 45 decibels, an insignificant level. Staff visited the central utility plant for the Orlando Regional Medical Center (ORMC), which is similar. in size and equipment to that proposed for the Morton Plant Hospital. Staff's observations of this facility indicate that the level of noise and vibration transmission. can be adequately attenuated with appropriate acoustic design. The hospital's consultants stated that the proposed Morton Plant Central Utility Plant design incorporates more sound attenuating devices than the Orlando facility. The appearance of the proposed facility was an issue of importance to the City Commission. The revised elevation drawings indicate a significantly less "industrial" building appearance from the first submittal. SURROUNDING LAND USES NORTH: Restaurant SOUTH: ,Auxiliary Shop EAST: Clearwater Linen WEST: Morton Plant Hospital Main Campus ACCESS: Pinellas Street PARKING: Required off-street parking DRAINAGE: SWFWMD design standards and City of Clearwater stormwater management guidelines UTILITIES: All essential utilities shall be provided by the City of Clearwater. CONCURRENCY: A traffic impact study in conjunction with the Hospital Master Plan was submitted and approved by the City Traffic Engineer. FINAL RECOMMENDED CONDITIONS: _~.~-.-t-- -Signs and fencing/walls are subject to separate review and permitting processes. 2, The requisite building permits must be procured within one (1) year from the date of certification of the final site plan and all requisites certificates of occupancy must be obtained within three (3) years of the date of certification of the site plan. 3. A Unity of Title shall be recorded prior to certification of the site plan. 4. The minimum turning radius for designated drives and fire lanes shall be 42 ft. 5. Afire hydrant assembly shall be installed not more than 300 ft. from the structure. 6. If structure requires or has installed an automatic fire sprinkler system, afire department connection shall be installed a minimum of 15 ft. from the structure, adjacent to a paved drive and within 30 ft. of a fire hydrant assembly. 7. Prior to certification, the Dumpster Requirement Form must be completed and returned to the City Sanitation Department. 8. Prior to the issuance of a certificate of occupancy, the dumpster/compactor must be visually screened, and gates must be provided with a minimum 12-foot clear opening to the front for access by Sanitation trucks. 9. Prior to certification, a copy of the SWFWMD permit application is to be provided to Engineering Site Plan Review. • ~ ~ ~ PSP 94-23 1 ~ ~ ~ ~ PAGE 3 r .~ s 10. Prior to the issuance of a .building permit, a copy of the approved SWFWMD permit is to be provided to Engineering Site Plan Review. 11. Prior to certification, the final site plan must be signed and sealed by a Professional Engineer registered in the State of Florida. 12. Backflow prevention devices must be installed by the City with applicable fees being paid by the owner. 13. Sidewalks are required adjacent to all street rights-of-way. 14. Handicap spaces must be adjusted to meet government standards. 15. Parking stalls and/or driveways to be adjusted to the approval of the Traffic Engineer. 16. Dimensions to be shown on the plan to denote measurements for aisles, parking stalls, entrances, etc. 17. Prior to issuance of a building permit, a landscape plan shall be submitted to Environmental Management. 18. Prior to the issuance of a building permit, a clearing and grubbing permit and a tree removal permit (or a no tree verification form) are required. 19. Prior to certification, a copy of the SWFWMD permit application and calculations shall be provided to Environmental Management. 20. Prior to issuance of a building permit, a copy of the approved SWFWMD permit shall be submitted to Environmental Management. 21. Prior to certification, the site plan must reflect the use of raised curbs or protective timbers where interior landscaped areas abut pavement. ding engineering Ass®cia~es, Once 24945 U.S. Highway 19 North • Clearwater. Florida 34623 • (813) 791-1441 • FAX (813) 791-9228 Full-Service Planning, Engineering & Environmental Consultants Apri13, 1995 Mr. Allen Mahan City of Clearwater Central Permitting Post Office Box 4748 Clearwater, FL 34618 Re: Morton Plant Health System -Central Utility Plant Dear Allen: Please find attached twelve signed and sealed copies of the Final Site Plan for the above referenced project submitted for certification. The enclosed has been revised to address changes to the site data table, as requested. Should you have any questions please do not hesitate to call. Sincerely, ~r Jo n E. Powell, P.E. S 'or Project Manager Paps G:\62\Mahan.l0 Attachments cc: Doug Dahlhauser Russ Heiken Bill DiMarino Jerry Yates Alberto Baraybar Keith Appenzeller File 1999-261-OOO.R355 Permit ~~~n~a APR 0 41995 Cl71' 0~ G!..~f~RUt1A~"~R Serving Florida Since 1977