PSP86-34PSP86-34
445 HAMDEN DR
SEA STONE HOTEL
V CITY OF CLEARWATER
1,~~-~/ ~ ~ .~ Interdepartment Correspondence Sheet
TO: Cyndie Goudeau, City Clerk
FROM: John D. Richter, Development Code Admini~~rator
,~,
COPIES: See Below `~
SIIBJ.EGT: Cert-ification-~of Final Site Plan for `S'ea Stone Hotel
Located East of the "T" Intersection of Hamden Drive and
Coronado Driv.~~A~i~?~+~`
DATE: June 19., 1987
i
The~City Commission at its meeting of 12-18-86, approved the
above described final site plan subject to the following
conditions:
i
1. A fire hydrant shall be provided at the entrance and a
;' Siamese connection shall be run out close to the
' hydrant, as stipulated by the Fire Department. (The
Fire Marshal finds the revised plan acceptable).
2. Retention area shall be designed to meet the standards
of the Public Works Department. (The Public Works Dept.
has no objection with the revised final plan).
3. The developer shall accept responsibility and provide
~ assurance that adequate parking has been provided on
site to accommodate all uses proposed in the building.
(Has been noted on the revised final plan).
`I 4. A note shall be provided on the plan stating that
' individual hotel units shall not exceed 500 square feet
of habitable floor area. ( Has been noted on the revised
~ final plan).
~~
5. Signs on the site shall be subject to separate review
and permitting.
't
6. A copy of the purchase contract for Lots 4 through 8
;shall be presented to the Parks and Recreation Director
in order to calculate the correct recreation/open space
impact fees. (The copy of the purchase contract has been
~ presented to Parks and Recreation. The rec./open space
' fees-were paid on June 17, 1987).
yy .9•y ~r^~ j F 7'' 71
i
f Q
8~
JUN <%s:, 19
CI`1'Y C;LLI,K
*....
Page 2
Certification of Final Site Plan for Sea Stone Hotel
i
I
f
~ 7. The existing dumpster site shall be subject to approval
prior ~to certification of the final site plan and either
an acceptable system of roll-out dumpsters be
established, or a properly screened dumpster site
provided as approved by the Utilities Department.
' (According to Utilities, a roll-out dumpster system is
acceptable for this site as shown on the site plan. It
is the responsibility of the owner to roll the dumpster
to a designated area at a scheduled time as approved by
' the Sanitation Superintendent).
~8. The requisite initial building permit shall be procured
within six (6) months from the date of certification of
the final site plan, and all certificates of occupancy
i shall be procured within two (2) years from the date of
issuance of the initial building permit.
Please certify the attached
listed above and distribute.
JDR/ ~f
List!
plans subject to the conditions
,,.,. ,--
~~ ,
F
4'~
Andy Onufer, Building (1)
Bill Baker, Public Works (1)
Ream Wilson, Parks and Recreation ( 1 ) ~ j~ '~.9a~.-
Cecil Henderson, Utilities (2) ~,v 2 _ „
Keith Crawford, Traffic Engineering (1) r
Nicholas Lewis, Fire Marshal (1)
_ tPQa ua1H ~ eve y .~:-a~°"_ri=riai~ng,(~1_y)
Ray Wyland, Zoning (1)
Cyndie Goudeau, City Clerk (1)
Developer/Pro3ect Sponsor (3) - Don Williams
Williams Architects Chartered
1445 Court Street
Clearwater, Fl 33516
,I
p
~f
Certifded ae a true and correct copy.. Final eit~ r` kne
City Commiesiont December 18, 1986. Witness my hand nLE;~}a,~`~t~`„~`e~f '
the City, of Clearwater, Florida this twenty-ee~~~ra:~l~~ of wJune~, E~F~'.'. ~ I
Susan Stfep!-er(eon, ~ pr~ly }~ e~k
® Y r .,. o
Conditioner , .®4 ~~'a~~~ ~ ~V~:'' :~,
1~ A fire h Brant shall be p~ .~ *~ ~~ `~` ~®
7 provllf@y~'!e'Ys~he ent~~rce_.e,lyd a
Siamese connection shall be ruts otp"t e1b'e°e+`~°~~ tji~,,°
hydrant, ea stipulated by the FLye~ii~epct~tmei~C.me+`(The
Firs Harehal finds the ravtsed p1eM.p,rg~e~p~Q~y,f®e).
2. Retention area shall be designed to meetw-the'"standards
of the Public Woeks Department. (The Public Works Dept.
has no objection xkth"~the revised Final plan).
3. The deveYaper shall accept tesponelbkllty and provide
assurance that adequate parking has been provided on
site to accommodate all uses proposed in the building.
(ites•been noted on the revised final plan).
4. A note shall be provided on the plan stating that
indivlduai hotel unite shall not exceed 500 equsre feet
of habitable floor area. ( Has been noted on the revised
kinai plan).
S. signs on the site shall be eub,ject to separate review
and permitting.
6. A copy of the purchase contract for Lots 4 through 8
shell be presented to the'Parks and Recreaklon DLrector
in order to calculate the correct recreation/open apnea
'' impact fees. (The copy of the purchase contract has been
presented to Parke end Recreation. The rec./open apace
fees sere paid on June iT, 1987).
7. The exteting dumpeter site shell be eubJect to npproval
prlor.,to certification of the finsi Bite plnn and either
an acceptable system of roll-out dumpsters be
eatabliehed, or a properly screened dumpeter Bite
provided ae approved by the Utilities Deportment.
(According to Utilities, a' rol.i-out dumpeter system is
acceptable for this site as shown on the sits plan. Lt
is the responsibility of the owner to roll the dumpeter
to a designated arse at a scheduled time ae approved by
the Sanitation Superintendent). '
' 8. The requisite initial building permit shall be procured
within six (6j months from khe date of certtfication of
the final site plan, and all certificetea of occupancy
shall be procured within two (2j years from the date of