07/08/1980 (2)07/08/1980
2990 GULF TO BAY BLVD
RED CARPET INN
Certified as a true and correct copy. Minas plan clxa:nge per attached memo,
approved by the City Manager: January 23, 1987. Witness my hand and the
seal of the City of Clearwater, Florida ,this twer~~,y~~sew,~}~th day of January,
19$7. `~Wp h ~ r~'`
.` ~ ~ ~~/
•, +1®' ~f
.R fi ~
`' i ~
~4, a
,s
i
De~taty Cv"°~.Zerl~
CONDITIONS : ~~ k'•. `
1. Required open space fees be paid pri~rs~;~;a;ec8'rtification of
the final site plan. (According to the Assistant Director of
Parks and Recreation, this property is exempt from paying
additional fees, in that it has previously satisfied the
City's policy for. parkland dedication.)
2. Prior~to certification, the site plan shall be reviewed to
designate the type and location of the visual screening for
the dumpsters and that there will be a 12 foot clear opening
in the screening. (Has been designated on the revised plan
8/8/86.)
3. The relocation of the retention ponds existing in public
rights-of-way shall be subject to approval by the Public
Works Department.
4. A 10 foot easement be provided over the water lines up to
and including. meters and hydrants prior to the issuance of a
building. permit.
5. The requisite initial building permit shall be procured
within six months from the date of certification (August 18,
1986) and all requisite Certificate(s) of Occupancy shall be
procured within two years of the date of issuance of the
.initial building permit.
', 6. A clear 24 ft. wide easement shall be provided to the Travel
Park property to the north. The applicant shall submit
revised plans showing this required clear easement. (The
Direcfor of Traffic Engineering ha, det r d that the
revised plan submitted on 8-8-86 c ie h this
condition.)
~~