PSP85-38PSP85-38
2838 GULF TO BAY BLVD
D'LITES
g C ~~-~ ~ ~~ ~~~d ~=
~~ CLEARI-'VATER
CITY OF
TO: City Manager Anthony L. Shoemaker Interde~-a~r~tmentCorrespondenceSheet
IF 4 ~~ tom.,, a C C'~,~7 ~' (~,,
FROM: John Richter, Development Code Administo~.~,~ . _ __,~ ~ ,,~
COPIES: ' See List ~~~ l ~ - --
i;iCiJ ' ~
SUBJECT: Approval and Certification of Final Site Plan ..,-,:.:..__ a~
D'Lites of America ~ S ~ ~ J,r-'Y~~ 4~:EI"Y fv~~tVgGEi'~
DATE: November 4, 1985 -
On October 24, 1985, .the Resource Development Committee recommended
approval of the final site plan for D'Lites of America subject to
conditions. It is the RDC recommendation to you that the attached
site plan be approved in accordance with the design guidelines subject
to the following conditions:
1. The 60" corrugated metal pipe located on the site either be
gunited according to Public Works requirements, or replaced with a
reinforced concrete pipe according to Public Works requirements.
2. A 20 foot drainage and utility easement be provided over the
storm line.
3. A 10 foot drainage and utility easement be provided along the
north property line.
4. An additional 10 feet of right-of-way be provided along
Gulf-to-Bay to provide a 60 foot half right-of-way.
5. The requisite initial building permit(s) be procured within
six (6) months from the date of the City Manager's approval
of the final site plan and all requisite certificate(s) of
occupancy be procured within two (2) years from the date of.
issuance of the initial building permit.
If you concur with this recommendation for approval, please initial
this memo and forward the twelve attached copies of the plan to the
City Clerk for certification and distribution. '~
RECEIVED
JDR/df
List n ~' NOV 8 1985
Edward Bethel, Building (2)
Bill Baker, Public Works (1) ~ J ~
Ream Wilson, Parks and Recreation (1) ~) '` CLERK
~~ CIS'
Cecil Henderson, Utilities (2) rj~~ ,~ J
Keith Crawford, Traffic Eng. (1) \\ ~~~
Nicholas W. Lewis, Fire Marshal (1) ~ ~
P~au~la Harvey , Planning (1) ~ ~
Cyndie Goudeau, City Clerk ~`
Developer/Project Sponsor (2)
~ ~`C~~~ .
(1) Mr. Gil Faucher (2) Carter Plumley E ~ ring `,_J, ~. ,
D'Lites of America 2433 Gulf-to-Bay vd. `'•~`~~,1
6075 Corners Pkwy.,Suite 200 Clearwater, FL 3357~~ ~ ~ ~~~:~
Norcross, Georgia 30092
P~An~n~-n~G
DERART~J;ENT
Certi.£ied as a i:rue and correct copy. Approved. ~ 1r~'i~el r s,L-ratively ~ 11 /h/$5.
t~itness my hand and the seal of the City of G,~ ~ at.~:~®. 1?Igrir:#~~, this eighth
a,.~ Rp.
dGiy af. November, 19$S. !' ~ ~ °.
CONDITT(7NS : _ `~ i' ~~ Ci t~-v ,~(_; i ~3-k
~l ~ ~~
1. The 60" eorruga~ted metal pipe loca~:ed on. th~d~~~sit~ either be
gunned according to Public Warl~~ rc~c~uire'rr~~t~~:sti~..mor replaced with a
reinforced concrete pipe according to I~ub7 i t; 'tdorks, requir. ements .
2. A 2Q foot drainage and utility eas,em~nt=Abo•'~~~ovi~ded aver the
storm line. E
3. A 1Q foot drainage and utility easement be provided along the
north property line.
4. An additional lQ feet of right-of-way be provided along
Gulf-to-Bay to provide a 60 foot half right-of-way.
5. The requisite initial building permits} be procured within
six (6} months from the date of the City Manager's approval
of the final site plan and all requisite certificate(s) of
occupancy be procured within two (2) years from the date of
.issuance of the initial building permit.