09/06/197809/06/1978
2179 GULF TO BAY BLVD
SANDLEWOOD
C I T Y O F C L E A R W A T E R
POST OFFICE BOX 4748
CLEARWATER. FLORIDA 33518
Segtember.6,. 1978
PLANNING DEPARTMENT
Mr. E.. R. Henderson -
Henderson Investment Corp.
215 E. Jackson Street
P.O. Box 2048
Orlando, Florida 32802.
Re: Sandalwood'
Dear Mr. Henderson:
The revised sheet L.-l you enclosed with your letter of
August 31, 1978 does make some of the corrections as
requested. However, we did specifically request "The
relocation of the-shuffleboard courts should be shown
in detail on the site plan".
This is essential because this preliminary plan becomes
the-final certified plan, and we cannot .certify a copy
which does not show the shuffleboard courts in the final
location. The notes are adequate but do not suffice for
drawing the courts in the correct location.
Upon receipt from you of the four (4) copies of the
corrected revised sheet C-1, the plans will be certified.
If you have any question, do not hesitate to call on us.
Sincere ,
t~.~iJ ~
vid P. Healey
Planning Director
DPH/GL/lb
Copy to: Michael J. Paroby, Assistant City Manager
/Ecl Blanton, Building Director
Lucille Williams, City Clerk
~µ ~
T'
.. ~~~
,~
i
~, .
C I T Y O F C L E A R W A T E R
POST OFFICE BOX 4748
CLEARWATER, FLORIDA 33518
August 21,.1978
PLANNING DEPARTMENT
Mr. E. R. Henderson
Henderson Investment Corp.
215 E. Jackson Street
P.O. Box 2048
Orlando, Florida 32802
Re: Sandalwood
Dear Mr. Henderson:
The revised sheet L-1 you enclosed with your letter of
August 16, 1978 to Lucille Williams, City Clerk, does provide
for a 6-foot hedge row between the parking area and the ad-
jacent mobile home park and appears to be in order.
However, the revisions made on sheet C-1 are not adequate
in the following respects:
1. The .relocation of the shuffleboard courts
should be shown in-.detail on the site plan
with the note that "no impervious surface .shall
_ be located within a minimum distance of 10 feet
from the stem of any existing tree".
2. The note on the easternmost portion of
parking area II which indicates the area to
receive a 6" shell base and sodding over should
be extended to include the driveway from parking
area I into parking area II.
As soon as we have received from you the four (4) copies of the
revised sheet C-l, the plans will be certified. If you have ariy
question, do not hesitate to call on us.
Sincerely,
.~~
David P. Healey
Acting Planning Di ector
DPH/GL/lb
Copy to: M~ichael J. Paroby, Assistant City Manager
~/Ed Blanton, Building Director-
Lucille Williams, City Clerk
..
~`
~) ~t
(~-~
'y16~ 'r1~'~-M, /I~C..e~-l-c w-~~ h 1~1i~...i 1/,n S'1 •~-~ cw,l~ ~f F.~ , C~.Q^~-~c '~.. pe ~ a.~.~
~,! I ~^'1 ~ SY-°`^-~ 1,5,......7 QaaeQ.~s..e. ~.~i / ~r
/_.~!%~\ ~~ C I T Y O F C L E A R ~1T A T E R
r
POST OFFICE BOX 4748
CLEARWATER, FLORIDA 33518
June 3, 1980
CITY MANAGER
Mr. John Banks
Southern Housing Partnership
2310 Whitesburg Drive
Suite 7
Huntsville, AL 35804.
Dear Mr. Banks:
This letter is in response to one sent to the City of Clearwater by
Charles E. Hughes on May 22, 1980.
The answers to the questions posed by Mr. Hughes are as follows:
1) Current zoning for this tract of land is RM-16 (Medium Density-
Multi-family). This zoning is consistent with the City's Land Use
Plan and we~do not anticipate that either will be changed in the
forseeable future.
You should be reminded that the site plan for Sand_ leood was
approved on July 6, 1978, with conditions that are still appli-
cable. Further, variances were granted by the Board of Adjust-
ment and Appeal on Zoning to allow for the plan as approved,
..The variances were originally authorized on June 23, 1977, and
continued for a period of six months. On April 10, 1980, the
now-expired variances were reapplied for in a different form
for building height and number of units in a row. The applica-
tion was approved. It is our understanding, therefore, that _
the site plan and its accompanying variances are valid through
October 10, 1980.
2) City of Clearwater water is available for the proposed project
by tapping into the main. It appears from looking at atlas sheets
that the most convenient tap would be made to the main on Belcher
Road.
3) Sanitary sewer service is available for 42 units as approved by .the
City Manager on February 10, 1978. Please refer to my letter of
April 24, 1980, which states that this allocation has never been
removed from this project.
EQUAL EMPLOYMENT AND AFFIFtMATiVE ACTION EMPLOYER"
..,
•~.
y,.:,- .
Page 2
Mr. John Banks
Southern Housing Partnership June 3, 1980
4) Regarding Mr. Hughes' request for the amount of fees which must
be paid, please be advised that the impact fee has been computed
at $10,500. We cannot tell from the letter, precisely how many
baths there will be per unit. However, if you intend to have
only one bathroom per unit, then the sewer tap fee required will
be $19,950. I caution you to realize that I do not have all the
information necessary to give you an absolute bottom line figure
for the fees that must be paid to the City of Clearwater as you
construct this project. The preceding is meant to assist you
only, and to give you a rough idea of what the fees may be.
Sincerely,
Elizabeth S. Haeseker
Assistant City Manager
cc: Mr. Charles E. Hughes
Vice President, Development
Southern Housing Partnerships
Max Battle, Public ~Iprks Director
David Healey, Planning Di.xectox'
Roy Ayres, Building Directpx
EDMOND R. HENDERSON
PeesioenT
PHONE ( 305 ) 894-0501
August 16, 1978
Ms. Lucille William
City Clerk
City of Clearwater
P. 0. Box 4748
Clearwater, Florida 33518
REALTOR"
• CONTRACTORS
• DEVELOPERS
• MORTGAGES
• INVESTMENTS
Dear Ms. William:
C
Enclosed please find a copy of a letter from Michael J. Paroby,
Assistant City Manager regarding our proposed project in Clearwater.
0 As per this letter, we have enclosed four copies of sheet T 1, which
complies with Mr. Paroby's item 3;,, providing a six foot hedge row between
the parking area and the adjacent mobile home park. Also enclosed are
p four copies of sheet C-1 which complies with items 1 and 2 of this same
letter.
y We would appreciate your certification of these copies so that we may
obtain our building permit. Thank you for your assistance in this
matter.
Sincerely,
HENDERSC)N INVESTMENT CORP.
-~
Edmond R. Henderson
President
ERH: j al
Encls.
cc: Michael J. Paroby,
Assistant City Manager
Ed Blanton, Building Director
W. D. Renando, Planning Director
HENDERSON INVESTMENT CORP.
215 E. JACKSON ST.
P. O. BOX 2048 ,
ORLANDO. FLORIDA 32802
~i~~~iG b~PAR3~i~d~C
t~ir. gad R. F~~nderaon
President
~"felld8x'fdOA ~21Vk~s4'~@Ilt GOL'~3.
2~ . $. ~ARSk~(iTl ~tr@E3t
4r1~.aAdo, p`iarida 32$32
Aer~x ~~. ~sndexson a .
'Edith re£exat-ae to your. letter r~~ 9u? y ~.~ ~ ~.~7~8, ~3.ty Ca.ss9 on
ap~pxoval off' the p~I#.r~.insry site ply ~'or the ~anda.~.w4od pro~eat
on J~.74.y nth was coA~iagent vn. ~vxlot~ingt _._-
I. Pxca:si~ of .rCy»thxea {33~ pav+ed parkfmg spaces
a.s sh~w~n ~ the plan wlC~ t~3~ {123 a'= the xema.~,ning
t:o+srt~y»x~ine {29~ a ae+~s to he ct~n.sCruc3~ed, t~~ aopp~a-end
cc~mc~te b3aci~ wit grass coast with. the st~,pta~.a~ian
that. i~ arsch sad. arf~ grass ar.~aas a~ later ~oucd tsa he
fi~tiada~t~te CY~iea t~II ~e f~pxc~ved aaactrding to rniai~
Code stAndsxds.
-~. ~'x~viexc~n that the. sht.~g~laboard cauxts be x+~lc~catad
£x~. an adette manner ~a ~ nt~t to Lrg in.~narious to
the trees 3.oeat~ad incR~'~osa""~sc~~i~.ty.
3. Px~sicm oi' a +six-moot he~i~e row to be located l~r~~r+~c~e
the perkiug ax'~a ~d tha ad~ace~at ffiobit$ horauea ~.
~ yc3u att~~4:a~+rledge in ydE~x ~.etter, tttass czhan-ges s~.d additions
should ~e named on a rev3~st~~i site pimA, roux {ta? Gc~pies v~
Whici:~ shc~u3.d b+s sut»aittvd r.,o G~'~ ~itp ~lexl~a o~~l~ce for
ca~r_ttiica'~i.ota prior. to tt:e xe~.~esse of ~y building permit.
3i~icerr~IYr
Michael J. ~`ax~esbp
A.saistent Ci~r Manager
cat ~~ dc~ i~ birectex
~_t,,d~ xea or
7.uc9~l~.e Wiliia~a, bity ez ~.
C I T Y O F C L E A R W A T E R
POST OFFICE BOX 4748
CLEARWATER, FLORIDA 33518
PLANNING DEPARTMENT
November 6, 1978
Mr. Edmond R. Henderson
President
Henderson Investment Corp.
215 E. Jackson Street
Orlando, Florida 32802.
Dear Mr, Henderson:
The revised preliminary plans you sent with your letter of
'October 25, 1978, have been certified by the City Clerk
and sent to the Building Department. It is therefore, appro-
priate for you to apply for a building permit, at this time
for the Sandalwood Apartments project.
Sincerely,
` David P. Hea ey
Planning Director
DPH/GL/cc
i
CITY OF CLEARWATER
Interdepsrtment Correspondence sheet
to: ~Ed Blanton, Building Department Director
FROM: David P. Healey, Planning Director ~~~~~~
coPlES: Max Battle, Public Works Department Director
sus~ECT: Certification oaf Preliminary Site Plans
oaTE: October 31, 1978
Please be advised that these preliminary site plans were pro-
cessed and approval granted. as follows:
I. Sandalwood
City Commission 7-6-78
a. Conditions
' 1. 12 of 29 parking spaces be open-end concrete
block with grass - if this proves inadequate-
developer will bring it up to minimum standards
2. Shuffleboard courts to be moved
3. Six-foot screen between parking lot and mobile
home court.
(The above conditions are shown on the revised prelimi-
nary site plan)
City Commission Meeting of 10-19-78
I. Tract 16 Countryside U.S. Home
It is appropriate at this-time, that consideration of the detailed
construction plans for the above preliminary-site plans proceed.
DPH/GL/cc
-~-.
.fir .1 f l V~~ drs 9~~!... u: ~.ewn4.~a•J 4 _
HENDERSON INVESTMENT CORP. ~`' ~~ ~ ~ ~~ "1r ~ J`~'~`~}.~~, . • 1°~s+
.,~
A 1
P. O. BOX 2048 v~~ ~~'~~ -~~ ~ ~
N !»y.~r ?r®r~
' Rf A U
ORLANDO, FLORIDA 32802' E6 AUG ~,,~ ;, , w
~~ (Q F os.w,
'~ a~
~.
-~ t
`: ~ :~
Mr. Ed Blanton
Building Director
City of Clearwater
P. 0. Box 4748
Clearwater, Florida 33518