Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
PSP85-39
PSP85-39 OYSTER BAYOU WAY COOPER'S BAYOU ~.. .( COPIES: See Below ~~r'+_.--. ~: •~ ~_ ~~~.~4~~ s;.:.3 ~„~........> z~::. SUBJECT: Revalidation of Final Master RPD 5.8 Site Plan for Cooper's Bayou. Located Between Bayshore Blvd. and McMullen-Booth Road Approximately 800 Feet South of Drew Street (PSP 85--39). - d DATE: May 26, 1988 ~~ The Development Review Committee at its meeting of March 26, 1988 approved `~ the above described final site plan subject to the previous conditions of _' approval with an amended 4~6 to read as follows: ' C I T Y O F C L E A It W A T ,E R. Interdepartment Correspondence r~ e'° n ~ r:.. ., ~~::, ,. s T0. Cyndie Goudeau, City Clerk ~ ~'° c ~ `~~ ~~ G FROM: John D. Richter, Development Code Administrator ~ ~ ~ w~i.~f,l ~' ~. 1 _ ., ~,..~~i J 6. The requisite initial building permit must be procured prior to _ ry September 17, 1988, and all requisite certificates of occupancy shall ~J be procured within 3 years of the date of certification of the final site plan.(•cr"ttification date: September 16, 1987). ~ This memo should be attached to the final site plan certified by the City O Clerk on September 16, 1987. JDR/SEG/df List p Andy Onufer, Building (1) ~ ~~ Bill Baker, Public Works (1) Ream Wilson, Parks and Recreation (l;c~', Cecil Henderson, Utilities (2) Keith Crawford, Traffic Engineering (i) Paula Harvey, Planning (1) -~~ Terry Finch, Environmental Management (1) Ray Wyland, Zoning (1) Cyndie Goudeau, City Clerk (1) Developer/Project Sponsor (3) - Nabil Karmi -+ Bricks Management ~ Real Estate Development, Inc. 10008 North Dale Mabry, Suite 111 Tampa, FL 33618 ~~ ~a ~, ~,~~ ~19~a r~~:~ ..- /' ' ~ C I T Y O F C L E A R ~i A T E R Interdepartment Correspondence TOs Cyndie Goudeau, City Clerk FROM: John D. Richter, Development Code Administrator ~~ COPIES: See Below SOBJECT: Revalidation of Final Master RPD 5.8 Site Plan for Cooper's; Bayou`LocaEed' Between Bayshore Blvd. and McMullen-Booth Road Approximately 800 Feet South of Drew Street.(PSP 85'-39). DATE: March 15, 1988 The Development Review Committee at its meeting of March 10, 1988 approved the above described final site plan subject to the previous conditions of approval with an amended ~6 to read as follows: 6. The requisite initial building permit must be procured prior to May 17, 1988, and all requisite certificates of occupancy shall be procured within 3 years of the date of certification of the final site plan (certification date: September 16, 1987).. This memo should be attached to the final site plan certified by the City Clerk on September 16, 1987. JDR/SEG/df List Andy Onufer, Building (1) Bill Baker, Public Works (1) Ream Wilson, Parks and Recreation (1) Cecil Henderson, Utilities (2) Keith Crawford, Traffic Engineering (1) Paula Harvey, Planning (1),' Terry Finch, Environmental Management (1) Ray Wyland, Zoning (1) Cyndie Goudeau, City Clerk (1) Developer/Project Sponsor (3) - Nabil Karmi Bricks Management & Real Estate Development, Inc. 10008 North Dale Mabry, Suite 111 Tampa, FL 33618 ~, ' I: a ; PI./~NNfNG ~~PARTMEN~ k~L',~ ~~°~TraU MAR 1'7 1988 Cz~. cL~~~.~~ CITY OF CLEA,RWATER POST OFFICE BOX 4748 CLEARWATER,FLORIDA 33518-4748 DEPARTMENT OF PLANNING AND IIRBAN DEVELOPMENT Office of Development Code Administration Telephone: (813) 462-6840 March 15, 1988 Nabil Karmi Bricks Management & Real Estate Development, Inc. 10008 North Dale Mabry, Suite 111 Tampa, Florida 33618 RE: Revalidation of the Final Master RPD 5.8 Site Plan for Cooper=s;::Bayo Located Between Bayshore Blvd. and McMullen- Bootti~Road Approximately 800 Feet South of Drew Street (PSP 85-39). Dear Nabil: On March 10, 1988, the Development Review Committee approved the revalidation of the above referenced site plan for Cooper's Bayou subject to all original conditions of approvals. The revalida- tion, in effect, amends condition 4f6 as follows: The requisite initial building permit must be procured prior to May 17, 1988, and all requisite certificates of occupancy shall be procured within 3 years of the date of certification of the final site plan (certification date: September 16, 1987). If you have any questions, please feel free to contact me. Sincerely, Sandra E. Glatthorn Development Planner II SEG/df "F~qual Employment and Affirmatic+e Action Employer" CITY OF CLEARWATER Interdepartment Correspondence Sheet TO: Cyndie Goudeau, City Clerk ~I FROM: John D. Richter, Development Code Administrator L~~J i~/ J~ COPIES: See Below SUBJECT: Certification of Final Master RPD 5.8 Site Plan for Cooper's Bayou (PSP 85-39) • DATE: September 14, 1987 The Development Review Committee at its meeting of June 25, 1987 approved the above described final site plan subiect to the following conditions: 1. Signs shall be subiect to a separate review and permitking•process. 2. Driveway details must be coordinated with the Traffic Engineer prior to issuance of a building permit. 3. 0 en Space and recreational land fees must be paid prior to certifica- tion of the final site plan. (Paid on August 31, 1987) 4. Mitigation methods for filling the ditch on the site shall be subiect to approval of City Environmental staff prior to issuance of a building permit. 5. Property owner shall submit, prior to issuance of a building permit an application to rezone the property to the D.E.R. jurisdictional ~ine to AL/C (Aquatic Lands/Coastal). 6. The requisite initial building permit must be procured within six (6) months from the date of certification of the final plan and all certificates of occupancy shall be procured within three years of the date of certification of the final plan. 7. A 10' utility easement must be given over all water mains up to and including meters and hydrants. (According to Public Works, this easement is required prior to the issuance of a building permit) 8. Dumpster must be visually screened with a 12' wide clear opening and .located as required bq the Cityy Utilities Department. (Plan is accept- able by the Utilities Dept. 9-11-87) ,: 9. Sidewalks must be provided along all rights-of-way as required by the City. (Noted on the site plan) 10. Buffering must be provided along the north and south property lines by providing a wall or vegetation with 85~ opacity at maturity based on the desires of the ad3acent property owners. (Noted on the site plan) 11. Final water system design must be subiect to approval by the Utilities Dept. (According to the Utilities Dept., site plan is acceptabie for certification, 9-11-87) 12. The retention plan must be reworked to meet City requirements. (The site plan is acceptable for certification, according to the City Engineering Dept.) Please certify the attached plans subiect to the conditions listed above and distribute. JDR/SEG/df ~ ~ ~ ~ ~ I Y~ List ' yA~ Onufer, Building (1) ' Bill Baker, Public Works (1) ~ 198 Ream Wilson, Parks and Recreation (1) SEP ~ Cecil Henderson, Utilities (2) ~ Keith Crawford, Traffic Engineering (1) Nicholas Lewis Fire Marshal (1) Paula Harvey Tannin (1)- Ray Wyland Zoning (1 Clrl'Y CL~~iK Cyndie Gou~eau, City lerk ((1) Developer/Project Sponsor (3) - Mr. Nabil Karmi, Bricks Mgmt.~`-Real Estate Dev.Inc. 10008 North Dale Mabry, Suite III, Tampa, FL 33618 .. _ _ .....a~ .., .. ~ ~ ~.. fem. p,e. ~ CITY OF CLEARWATER ~, ~ ~' ~ `• ~ Interdepartment Corre~'pondence ~uil 2 ~ i~~1 TO: Cyndie Goudeau, City C1erTc FROM: James M. Polatty, Jr., Director Planning & Development SUBJECT: Revalidation of Final Master RPD 5.8 Site Plan for Cooper's Bayou; Located between Bayshore Blvd. and McMullen-Booth Road approximately 800 feet south of Drew Street. (PSP 85-39) COPIES: See List Below DATE: August 26, 1991 The Development Review Committee at its meeting of August 22, 1991 approved the above described revalidation subject to the previous conditions of approval with an amended #6 to read as follows: 6. The requisite initial building permit must be procured no later than February 22, 1992, and all requisite certificates of occupancy shall be procured by October 27, 1992. Also, the Development Review Committee deleted the existing condition # 15. Please distribute this memo to be attached to the certified final site plan last signed and sealed by the City Clerk on May 4, 1989. JMP/THC cc: James M. Polatty, Jr., Director of Planning & Development ~ ~ E ~ E' ~ E Cecil Henderson, Engineering J. Terry Neenan, Gas Department Tom Miller, Environmental ~ ~~,~ ~ j Z ~) ~~,~~, `~ Ream Wilson, Parks & Recreation Director Don Meerians, Traffic Engineer PLA:'VNI~1G $~ URBAN Victor Chodora, Building Official DEVELOPMENT DEPT. Cyndie Goudeau, City Clerk Ray Wyland, Zoning Lou Hilton, Planner II (Memo Only) Developer/Project Sponsor (3) - Mr. Nabil Karmi 10370 Carrollwood Lane Tampa, FL 33604 cert8539.tc _. _________.__ . _ -_-_-~ __.._. __ .____ . ~.. _ ... Certified as a true and correct copy. Revalidation of Final Master RPD Site Plan .:s approved by the Development Review Committee on August 22, 1991. Witness my hand aud.th~ seal of the City of Clearwater, Florida, this 27th da~ of .gust, 1991. ~~.~ Deputy City C rk Subject to previous conditions of approval 'th an amended _ #6 to read as follows: 6. The requisite initial building permit must be procured no later than February 22, 1992, and all'requisite certificates of occupancy shall be procured by October 27, 1992. The Development Review Committee deleted the existing condition #15. C I T Y O F C L E A R W A T E R Interdepartment Correspondence TO: .Cyndie Goudeau, City Clerk ~~~~ ~,~ FROIIt: John D. Richter. Development•'Code Administrator SUBJECT: Revalidation of Final Master RPD 5.8 Site Plan for Cooper's Bayou •Located Between Bayshore Blvd. and McMullen-Booth Road Approximately 800 Ft'. South of Drew Street.(PSP 85-39.). COPIES: See List Below DATE: May i, 1989 RECEl~/ED MAY 8 1y89 PLANNING & URBAN The Development Review Committee at its meeting of April 27, 1989 approv~ViE1+6PMFNT DEPT, above described revalidation subject to the previous conditions of approval carried forward from the site plan certified on September 16, 1987 (12 conditions) with an amended #6 to read as follows: 6. The requisite initial building permit must be procured no later than October 27, 1989 and all requisite certificates of occupancy shall be procured by October 27, 1992. 13. Conditions carried forward must include previous Condition #13 as follows: Revalidation has no effect on any impact fee requirements now in force or subsequently enacted. 14. With an additional Condition #14 to read as follows: Permit applications, plan review fees and all corresponding information shall be resubmitted. The applications will be reviewed with the current codes, which are the 1988 edition of Standard Building Code; Standard Plumbing Code; Standard Mechanical Code; Life Safety Code; the 1987 edition of National Electric Code; and the 1989 edition of the Energy Efficiency Code; or as determined otherwise by the Building Official. And an additional condition #iS to read as follows: 15. A !0' drainage and utility easement for the sanitary sewer collector must be dedicated to the City prior to May fS, 1989. Please distribute this memo to be attached to the final site plan certified on September 16, 1987. JDR/SEG/df cc: ~P-au~l~a~-Harvey, Acting Chairman, Acting Director of Planning & Development Cecil Henderson, Engineering 8 Environmental (2) Ream Wilson, Parks & Recreation Director Keith Crawford, Traffic Engineer Victor Chodora, Building OEficial Robert Brumback, Utilities Cyndie Goudeau, City Clerk Ray Wyland, Zoning ~; !:_", ~ ~ ~ ~• ~~ Developer/.Project Sponsor (i) - Mr. Nabil Karmi Bricks Management A Real Estate Certified as a true and correct copy. Approved Development, lnc. by DRC April 27, 1989. Witness my hand and the 1910 West Sligh Avenue, #E-107 s t(`~ ofe~ tYi~~9ity of Clearwater, Florida this Tampa , F 1 or i da 33604 ~~ ~! ~; f urth day of May 1989. eputy ity C.er. ~ ,~ L C I T Y O F C LEA RAW A T'E R Interdepartment Correspondence T0: Cyndie Goudeau, City Clerk ~ ~~ ~ N FROM: John D. Richter, Development Code Administrator ~ ~~~ ~~ `~ ~ _~ SIIBJECT: Revalidation of Final Master RPD 5.8 Site Plan for Cooper's Bayou Located Between Bayshore Blvd. and McMullen-Booth Road Approximately 800 Feet South of Drew Street:(PSP -85-39~. COPIES: See List Below DATE: November 16, 1989 The Development Review Committee at its meeting of November 9, 1989 approved the above described revalidation subject to the previous conditions of approval with an amended ~6 to read as follows: The requisite initial building permit must be procured no later than November 9, 1990 and all requisite certificates of occupancy shall be procured by October 27, 1993. Please distribute this memo to be attached to the certified final site plan last signed and sealed by the City Clerk on May 4, 1989. JDR/SEG/df cc: James M. Polatty, Jr., Director of Planning & Development / Cecil Henderson, Engineering & Environmental (2) Ream Wilson, Parks & Recreation Director Keith Crawford, Traffic Engineer Victor Chodora, Building Official Robert Brumback, Utilities Cyndie Goudeau, City Clerk Ray Wyland, Zoning Joan Moore, Staff Assistant III (Memo Only). Developer/Project Sponsor (1) - Mr. Nabil Karmi Bricks Management and Real Estate Development, Inc. 1910 West Sligh Avenue, $E107 ® Tampa, FL 33604 [~n~ ~ ~ X989 PL,~!~q~I~G & URBAN ~EUELOPNaENT ~~PT. ~ ~ ,~ y ,, .~q ~, NOV i r ,~ i..,~`I''~ ~, NOTICE OF PUBLIC HEARING CLEARWATER CITY COMMISSION Thursday, August 21, 1986 - after 6:30 p.m. - Commission Meeting Room Third Floor - City Hall - 112 South Osceola Avenue - Clearwater, F1. To consider request for removal of deed Restrictions executed on August 10, 1972 as recorded in Official Records Book 3863 Page 842, Public Records of Pinellas County, Florida and placed- ' on the following described property: MB's 21-08, 21-16, 21-17 and 21-18, NWQ Sec. 16-29S-16E Located North of John's Parkway between McMullen-Booth Road - and Bayshore Boulevard Citizens may appear to be heard or file written notice of approval or objection with the City Clerk prior to the Public Hearing City of Clearwater Cynthia Goudeau P.O. Box 4748 City Clerk Clearwater, F1. 33518 YOU ARE BEING SENT THIS NOTICE IF YOU ARE THE APPLICANT OR OWN PROPERTY WITHIN 200 FT. OF THE SUBJECT'S PROPERTY. C I T Y O F C L E A R W A T E R Interdepartment Correspondence TO: FROM: COPIES: Cyndie Goudeau, City Clerk ~q~ John D. Richter, Development Code Administrator ~~ 1v See Below SUBJECTS Revalidation of the Final Master RPD 5.8 Site Plan for Cooper's> Bayou/>Located between Dayshore Blvd. and McMullen-Booth Road Approximately 800 Feet South of Drew Street (PSP 85=39). _ DATE: October 19, 1988 The Development Review Committee at its meeting of October 13, 1988, approved the above described revalidation subject to the previous conditions of approval with an amended #6 to read as follows: "The requisite initial building permit must be procured no later than December 17, 1988, and all requisite certificates of occupancy shall be secured within 3 years of the date of certification of the final site plan." NOTE: "Revalidation has no affect on any impact fee requirements now in force or subsequently enacted." Please distribute this to be attached to the final site plan certified by the City Clerk on September 16, 1987. JDR/SEG/df ~ £ c ~ 1 v '~ p cc: Victor Chodora, Building Official (1) Bill Baker, Public Works (1) ~, Ream Wilson, Parks and Recreation (1) ~~ 1 9 19x8 Cecil Henderson, Utilities (2) Keith Crawford, Traffic Engineering (i) `Paula Harvey, Flaiining (1) ~- Terry Fir:ch, Environmental Management (1) CzTY CLFRIrti Ray Wyland, Zoning (1) Cyndie Goudeau, City Clerk (1) Developer/Project Sponsor (3) - Nabil Karmi Bricks Management & Real Estate Development, Inc. 10008 North Dale Mabry, Suite 111 ' Tampa, Florida 33618 Certified as a true and correct copy. Approved by the Development Review Committee October 13, 1988. Witness my hand and the seal of the City of Clearwater,.Florida this fourth day of November, 1988. Deputy City Clerk ~/ ~ECEI~iE® :1Afd 2 3 1988 PLA~AiNiNG ~ UR&AN c I T Y O F C L E A R W A T E R DEVELOPMENT DEPT. Interdepartment Correspondence TO: Cyndie Goudeau, City Clerk g `w FROM: John D. Richter, Development Code Administrator ',/~ G' ~ COPIES: See Below J/y SUBJECT: Revalidation 'of the Final Master RPD 5.8 Site Plan for Cooper's Bayou Located Between Bayshore Blvd. and McMullen-Booth Road Approximately 800 Feet South of Drew Street (PSP 65-39 )'. DATE: January 16, 1989 The Development Review Committee at its meeting of January 12, 1989 approved the above described revalidation subject to the previous conditions of approval with an amended #6 to read as follows: 6. The requisite initial building permit must be procured no later than April 17, 1989, and all requisite certificates of occupancy shall be secured within three (3) years of the date of certification of the final site plan. And a new #7 to read as follows: 7. Revalidation has no effect on any impact fee requirements now in force or .subsequently enacted. Flease distribute this to be attached to the final site plan certified by the City Clerk on September 16, 1987. cc: Victor Chodora, Building Official (1) Bill Baker, Public Works (1) Ream Wilson, Parks and Recreation (1) ~Jn~ N i ~.'lf~~ Cecil Henderson, Utilities (2) Keith.Crawford, Traffic Engineering (1) t"'•~ •Faula Harvey, Planning (1) ~~ ... Terry Finch, Environmental Management (1) Ray Wyland, Zoning (1) Cyndie Goudeau, City Clerk (1) Developer/Project Sponsor (1) - Nabil Karmi Bricks Management & Real Estate Development, Inc. 10008 North Dale Mabry, Suite 111 Tampa, Florida 33618 Certified as a true and correct copy. Approved by DRC Jan. 12, 1989. Witness my hand and the seal of the City of Clearwater, Florida this twentieth day of January 1989. Deputy City Cler T ~ J ~ Q T Q ~ T 'u ~ ~ ~ ~ ~ 41 ~' .4 O W 0 0 W O J 3i , ,. ~ o ~~ o ~~ O ~ r `v- ~~ II ~ ~ 1 W ~.-1 ~ !~''~ U ~ ~~ ,. ~ W r ~ !~ . . ]~ O - ~~ J ~U O~ ~~^I~ ~~ w° iZ ~~ ~~ l~.l ~ 011,1 ~ ~ ^^ M 1'7 ~T ~ r M en ,J ~~ns U -~ obdn3~noe 3210HS.1V8 (£65 ' ON ' 21 ' S) Od0?~ N1008 N37 ~n~Y~l'Y O Iv Z 0 NQ l ` 1 ~_~ t7 v :~ I ~\ 1 '' W` .~ I ! '\ ~ `, 'I '~ !y., u' I \` .,\ iM I I I ~, i y. ~~ to m ~~ 'll 'i m ~. I ~ I .\ I ll _. , ~~ I I I ~.~. n I I ~ 11 1 ~eC'~'ti' ~~ '6 ~ ~\' III ~ "<- ~ j N ~+ S ~ I ~/ I ~ N II I ~ .J ~_ • t a_-' > ~ n tale ~ ~ \ ..`1 8 '" t \' 1 I _ _~_ _~ _ 1 .. , I,1yr II1 ,I~` j ~ ~ ~ ~~ ~ ~'~'i .~ Y j i~~~ C~~ "~ ~~ ~I ~~ii ~i~ , l { •. ~I , ,.. ~ . .. © '~ \ c i• ' \J '-.'t .~ ~~ ~ sw_ ..:~3 - -~^~ I .~ ~ ~ >t~l~ ~.d ;,r3.cy jpp' ,i''sl •Itc• 2 / 7 /~ II .. ` C I.I. ll ~ I / ~~`. 11• /-~ -~ "'III :.~ 1` _ ~ ~ _ P') ~ ~'~'~..i _~ ~• II V'/~/~ ~.\ I ;II, \~ \\`~~Il. r+ `\ I I ~ ~IPI :r'(`,;, 1:. i \\ /~! ~ /r .. . p o ~ II u \~ I N ~ ,.I ~l~ I ~t ~~ _ _ ~ : f ,_ 4~ •II ~~ ~ ~~ ~ ~,:..II, A ~I I J - _ \ \ ~ ~ `n ~~ ~~ / ~ .~S2 ~i p\I ' .~ .,~°,~°I; -- ~ • I ~• ii Ili ~!~ `cv \ ~`~~1 ~; ~ <,•. ~o \' u ~~ n.~ / ~^, 1 I I(~,~ _ i it .: 1 ~ •. \~ .a/ O _ ~. I"" ~, I r (1~1 50 \ t.l') \~. \. `/J - 7r ' ii a IjU~ ,: ~ ;I\•• ~ , - • ~~ //// © ~O ~ ~ I I ~~ _ ~.-'= .', ,.. b •~ , 11 (~ ~~.~ '-~ iN\_.-`-!I II 1 II III 'l ,• ... .~ m _ ~ ~\ '\ ~ -~~ - ~- m \\` • uA ~L ~ ~ ~ •~ ~ I -_ p ~ I~•1• (! I Il jr \_/'Sl•_) ~ (,.I ~f- l~l i It % ly'~ ` ~ . • II NifVd~ F}~la~lJW',(W , ~ / I ~~~ G~~a•'•'h \~ )) y (~~~~~' l/ ~I~ i I \I _- ~ I- _ __ I 1 I~~II J I! ~ hl J ~~ ~I Ii 1~ l ~ ~ ~~ ~ ~h - ~ _ 1 1 -../ / ~ r V ) '~ I~ ~ ' I ; ' ~ ~ '\0. 1- I I I ~ -~ , z ,~~~„ ° •i I'::I ~: ~~'=~`'~ ~~ ~~ ~•/.; ~~ ~ r~'.~W) Iii I ~~1 I I~ ~.~ ~ .~__ ~,,_~ ~n ~ 7- i a, / I I u 1= it I . /' / . ~~ / I I i~ ~ I % 1 I 1 ~~ i; b 1 . 1 l.. ~ / `- _) 1 1, I11-Il._ ~ ..n•\ o•I• .. <`-"_fjl JI i ~I I I 111 /, I ~I I. n. J1 C l~~l I II II I YY I ~ ~ I J: l~;~l ' I(h/~~ 1 .1 II `! • O II 1 / II 11 1~ 1 I) 1 ~..,. ~1 . II II /~ Il ~ ~ ~ ~ ~ ~ ( ~ ~ I~ i ~ k ~ ~ ~ I ~ ~ I ~ ~~~ I~-1.~ 1,.._ ~ -I• • I •/ I i o ~Y v\ ~,Av ~ )• ~~_ ~ °II ~ I~ r ~ r7 ~ I ~ r f-' ~-' / ~ ~ I w ~ cd`\ ~~ ~ ii- ~ ~ ~ I 1 Cn ,_ ~ e X I/~ .~ ~ I I \ '~Y 0 -_ a-~ / / ~ ,~ .. 1C ~ q .....: 1 ...o I I ~ • II ~ ~.r,' -~'~-- 7 r~-~ 1 ~ ~ ~ ~'y _. ~ _. ~ ~' (~ 1~ ) i u I ~ \ 1 _ II it I ~ 1 ,, ./~ -- i~ I ~ _ \ ~~ -" n I ~~i O '' '~:or ii I,y 1 '~ ~ Z I _: y ~ / ;, I ~ / ~_~ J ,~ I /~ ., ~~ I `~ i° _ -~ ~.. CUi' d ~ 11 ~I..~~. . I - v`x ~./a \ 4 ~~' ~Iln' G l~~ -i ~ _.-I ,\ N ~ ... _ A r ~ • / II . ! \ -1 _ irk \ ~ ~~ Q o li;~ l 1 ~ i e ; r-II ~ I 1. ~ .~~~ -. ~ ~ ~ ,j r-+' .. I - =J ~ 1 ~_ ~ ~ O N ,g N 1 ~ i ~ 'lW 1'6 ('O'd/ U31 VMUd3 ~~ lW C ('D'dl tJ 31.VMNN3 ~~ ~~s`__O u0 ~Y~Q\~ N y- ~ F- tl ~J~ I '~ i? I' II II r II ~1;; ~ ./ „ ~ ~ ,o 1••~ ~ II- ~(! + II• ,~~:UI~: r 'I -- 11 ti 7 I ~~^ S2 II -~~~-.__ .. ~ ~~ \ i' •, • _ ` /. ]) ,\ J - / r t .I / ..I ..'' .i \ ~. ter. : ~( \ ~ (fir -_ (~, J I ~ ~c=• ~'_=~~~\\ ,..I . I • • . • - iii ~ •• •t 1•\~ ••,~i\ ••11= II 11 II ,.r. \' I• .~ //~) 'V~''• ~. /~ ' IC• II I~ ~ r • II GT r ~ i rp • II ~ ~ r r!, yr _ 1 .: ~ • • • • • . • • ~ ~-- • _ I •. ~ ~; I t 1 -.~\ .'~ II e •\• • •• \ o • ill ~ ~~~~ II•. 'e • • • .i ~T, u~ Y;~~ `, I ~ ~I ~ L • i~ III \~ • a • If ~ '\.../~ ~/~ ~ J) I) • I • • ~ ^r~ ~ • ! •il I i.••• j ~i '~p':~ 7~ - Ii~ 0 71~t(i ~~ ~' 1 y~{,~ • `~ `\ \ / / I r - -- ~ v~ V = 11~i Ij 1 : pY 0~~~~~ 'ty. _ 9aY~b a;•ry,J~~ o I ~. -~ O I~ ~ ~ ,~ tie '~%~ ~p~i• "OO' "1 D t r •{,f `d'ig ~~;,_~`~~ ~) ~ ,~ I.-. i i ,} ~- ~>,\ ~t .. ~ •; ~ ..... . , • _ \_ .. „%<<.~~°. •'',~°~.,::'.''..C~:S::ii':;e':~ ~`'~` :~ ~~ sir.. I I I ..ti~ •vf • ~:. I ..:, 1 i ~ :r:; ~ ! ~, n I ~,'~ 1 l~~ p ; 1 ~ i; O ~ ~~ ~ I `~. i ` ~ r -~ I II '~ C~~ ~~. ~ ~~i ~ CrrJl \~~. 1 ,~ I ~1 I ~ ~,I 1 '~ I I I ~ 11 ', '', ~f I 1, .. ,.\~•~~ ~ ~ I . -. 1 ~ _ - .......... 1 . - ........ i ; ~ n~ .I .+ ~ `~Ip, ~ -yC~ t ' .C , ~ ~~ ~ 1 ~m. ~ I ~! `,1C \ I 1 ~t ,~ ~~~ ~ 1 ~ !~ bdI ' ~ ~+:. t Sn $S-3`~ 0 Q SECzTION 16 TOWNSHIP 29 SOUTH RANGE 16 EAST S . ®USES ~ [CINIO aSiNOF. - ~ IN~,e1 NxmrvAxa _ Og fA[Sp1YAM1 l0i lMA (~ R, t AaDI YACAMr ~ Yµ Na:smAlNx Px:SEM'A1NIx p (uSiEYPO 4.10 (144161) mrAA,uxuYm a059 AK.A (YIMN PROPq}Y lx[f) a1 IO4 ' ,Irl~pp - ,40 (11000) ONNE] Is lexml NRSmvAxx x (n,IWI PNVAR a6s3w.xn 3: (um1 ~vercx aW Ie7xs1 xd NRSmrvArcN im OWAW1 xE. auONCs mi NoM an peIArO IR. EEOCAIm mmI mA¢ for YJM -- -.YEBIS__ M A oasn te4sa a IRr AaRSf '~ v 040° s~ AAamrrs .. rM4'surv na AEAE i ' artMRSxvAlpx Aare ~ Am rAA: I~a_egmru a n ur c uAatm x A s>:mAas (aw xaACC ao13as a s4R aA11 OMtNIt'1 __ N A - x/A molx AFN6 ~~ VAIdEe --'--- .-~- N A 0[TADI SlNlCNIRS ARNeat SO@ -- -~- N A T • ~ VA1E4 M A Maar Id01t N=ei 111yr NOOx M/A NiN C1h5 Ma#SYZl4 (i AvPavg¢ ~- ~ N A N A PALM 5a4aA.Vt APFAS Im R. A S 6 SIZE) Ix.OWX3xIr1 ROA09 OPOY SpACC ' __ (tLIWN1,4~ PPoVAIE ON1f3 x A miAL llE lOr (~ T7. J Z OF ~' b0]64 0.401[Pb) (3521 N A la rxoNr Yum (s¢ si. t 1 a AE0.iF0 mar rAmk "T" pLN ACE humaxar rdatel5= -- YJA N A NHIERZ NIrmL -~ , N A IAN01~ L01 Ndpa LV45f!/NO (~ R. ! 1 a' lKl 41] PU91C R/N' m ! OmYJ,iEe x A -- ~ -- y A N A X A N/A Ohm wuA,w AIS.If N50. avcr a vlE N.W XooO amt =2100 1411 4'AlE P35d N/A aux4le m 91AOr4:/dWS Il11aN10k ~~ N A M A PAAgIC (aE ARaCAHE 1p30.1A); __ m 9ACE4 8a5a' a 1 CNi CARAOE x A • s+o 4w aNWS Ilx IR00MP1 s' u4mv'.Pm e ~~ 068 ~! . I r LXmSCIPm ~ 89'J2_30_ E _ ~b ___ ___________ p b ~! m~ A' W~ _~.1; __L______ mtrro.l ___. j$ ~ S 89'31'32" E 169.0.5 ' ~ E aE.a m tAN.15ryPm arsm V W ~ - °^ & ulrt R n ° rum Ot°0 tS.W' z s a as ;a Z >+. W LW' N.W. 8..f; . ~ ~ lem' 06 W' AWESf [Vold( 11P/0k R]MAWCYkE tOT 10/A( LOT AREA 2J1g SF AREA LOCATION MAP o ~ ~~ F °m 4 4 _W J JENNS PAPo(WAT p v ~ m nor ro uuT BAYSITE2.DWC I ro x sam/m WOE f ~l!(0 I:C II e I 'a l..A l ~, ~ I I p 0 ~~=/I I e~ ~I I I ]/ V I I I -"1""*--~-'-~--'-- AOJAOENT Z041AG RSA STORMWATER tREATMENT ANO RELATED IMPROVEMENT TO BE LOCATED THIS AREA EXACT DESIGN AND (PF~ELIMINARY SITE PLAN) I ~~ I I ~ ~g ~ k ( I I ~' - 50 YS 0 50 sc® I i AAlACEYT Z0V1AC RS-B / ^e'@ to INm54Y`m eENrm // 1 MACOO~N ~ ORI4E ~io~ a w04°"m er~mna°w~Pxm m~"nc oPd1ic'~x~a wrEOmrA~ilaA~ 9 89'2708' E W' z a/AUGE ~ ~~ a nrs NAN n Wxasmla x xAlU1( rASac xlo / ` NccaNr 9R rAma Alm WlmroMrs As IxEY ANE aaxnmr NAOxx. u' _ o n'P'1 619.18' x0 elEm ears vuu xE NrNen m eE Nrc uam nux IO tmE r--_R__ ____________ 11 1 S1IC ZIES 9W3 MA5E OE 1laISR SxxNS ~ . II ___R_______ Z Ih- ..- - W N eye C) ~.._ ~ -.. \ f4 Cp .. 24 W ~" 9~ r a N ° ~'- ~j o O .~~. W' 1";~~ ~ I ~ l -~._ e, I¢adA1mN `~--J ~ ^ 6ussiw m eE xaam 1 + ~-11LJ va rn Wcc II r IAAmsewm euNg ~ I Not I > ~~ I 'r ~ I I aWn ~ I I -.L.-1.-1-. ~- 1 1 1 { 1 :1 ~ - .- .--. I ~ l~~s \ ~, o . •~® 1 lj' , _ !;" ' ~-' I :_ n t/' ~ --~---- - ~:.. ( ~ Ix - .. / ~ ®: ryT1 3 - I-'- 7. 7 16 16 SY z I .~~®Nhr s0.' •~~ts . __ N IN1$ NAmNtt m >xE an a R I ~~~" `~`1's~" • l , CEEARM6A I.YmSOAP[ Ofm41Ni2 EYAGi Ax0a1S t 9SS Y mGlmx Or SAq y 11dE5 i SIM.aS 91NL R a.YC Vm IIPWa IIE 91E PI/NMC Pf,UtE33 eE 111 CQxR/SM44mAMP f `l , / - I Ott 6 mfhYAYx 14II PmRC110x abwxR 9LVL H fpAUm h~,. ,.,1 / I -l NL NMIIAR TNVI eE 10' N NQM !Fa f00F 6 VANYaIf m a%E RYAMLdf. ~'4 I 1 . ~ ~ I ' 'I I 3 ALL SOMI WIAIxA 91N1 Carat m Ott [i ELEwrAml WOE Rem ~,1 I 50lid%Yr NCAM Z51FR YMAa]pt REQU1104 ORLON 6 ANY ~~'~ D ~ .. '~ ~ t . ~ ~ I NPNS]RAnas NILE a nc¢ NAx3 ~ _ v ^1 '. ~' :r' I 3 ttaaNr mrc O[ZaAtla a ae EMrs Nx AQS AENr#n0x Priam ra .-~a E ~ AYA ViR~...i ~ j a.Na N CFZmu0011 m u errs IFd AOR ro NLON fa n EMS aov 9R ~._. : #'Al1AQ?a.xPG.":.. N4EA 13z]ee SAME Imr a IQ]4 AaLS A UNT CaxT ai ]] WR Na3 PAyAi N 'N, ~ NYA.Ye!!x ~ ~. ' I A 14T OmISgY 612 U3rs P[R Apt- . ~ 1 ~ ' '' ~1 ~ '((. I 7, A Ma A12A V 1W SaNR IQT tql M U4p IOx fA01 m~r~4lg u(f m 1 ~ ~ : {, E I NI APrM'aAR c3aoal Of m M d l3 iFxi. eA9D tN'11~i , iH5 PNMIES~ ~-~ ~~. .L ~~ M,It I Imo A nxd AIRCMno a EIeK Ir,Ia•n1• 11 t+{. ~ i mo 5P'um~O104ea i< w~.a5'rct4tl1~ as na AS91M10 rw eM 0.w s No avEwAr ® 4.111' I .. ~I` _ 1 0. M ENIS N210GRD Na ]® AS a/AICNLY LOGISIl NO )MSS SIINl eE / •.'~,, •....•~ ~r 9 nom aEw z Ntr Aeac x Iasi 1\x91m 115VA.' nLa l '+ i 1 - ' ° / ..:PA[:QRVAT!=AY'2pV1AC.ii,;~...! I IQ mill PASm N6:A fa.W3 /0.e00 Sa1ME III( NO I3PF>SIIr 1446f a SSIE ~~ ' .'", ..:: 7Hk,~pt{.:.. ;. 1 i n. sE xu eE xwASm x a[ Nut n ~ _'i::.~,'., ,;".,y•,'A It o I txl,NascaE eurwmxaunm PUaAUammr me sLSa lxa r _ m `N 1 1 '1. Q r I to WMfiMCIM 9WL 0]rtldl m art Ci QFMNAiFA eNlV9 NU 91mIMSa1 ~I ~ff I' > < I PEIUMNS WI6a.CM1 9WL WSFaN m QtY K aF.MASFP OEila Nro t~f 1 1' ~4 ~ J Z I W161x1C11p1 SrN4Nm5 Mlm N0 NASIEYAIa rAwxs _ i £ ..~ ./{ ~.~ I - IA xIlON101ABIE S Ip . C. ` O.t r ~ e urm '1 ~ 1 ~~ 1~ ~ u I ~ e ~ r A n4 zal ; 6 I Si f .E ~ 1 ~^BI u _ e ] t e _ 'iy ~. ,~' n ~ m~ I m r __ I ___ I mrll aMUrrs ~( I ?;~1 "'- y} ! R ~ ' J ~ I 'a lTi IS x0 PEOEIEA NKE NmP3D Ar iNE K MIVI IPN1fA-aL - . I le. ul Eol3rxa4 ua11x4 pw4 xASC Eo-0Ea¢ anaN's dRCRc - , ANAT i3p1 AdRNN: SRff13 NON$-(i-MAY. Np NSLaAK II I~ Ngw4rti ~ 9 ® .; ( f _ 1 ; I' I n. sielaa m a oEtmeotD er lnrnml v NAN er mr Ws3tswl, 1 ~p. I ^ f I .. I IS SIR 6 WM1 Ar~IaZx 6 aft 6 CIFxtMm2 1E WN ' ~, ° , ca.pT mmaa Ax0 ssiw Oarxcrs .J1 a°1NIa1 WMIWM ^ + i I4 xN4FR N¢A m mNm PPxSfAVA1N/1 APFA alu AVWNR a m -- _.-. . • II 1 ' !S ' u AvT 51NkTRE RIENiIa PtlC WT BE M[WfAD N &FiER NEK z"' 1 ~F o t . c ~' '~% ~, d ° ~ I ~ N'11m w s°~ICn~mrs Tu e¢ N"~'wa~. I t Y W `I o $ ~T : . - :ti... .. ~~ C. .14ZA DAMN , 1 . ~ I \ - 1118,5 xZ1U 'I' I _ ~ ---. 1 • .I,, q I - ~I r I~t I ' -~ yy}} -- ---. ~~ ,iSS3tRt•AnwYdllNS,l. `( ~ ~ [NSrxR 3' Qn oan iI.N a.., ; y IN75avEA ;I j5 _ 1 I CONFlCURATION TO BE DETERMINED IN COOROINA710N -----Oi-A- > •--.~w~~«..) I WITH GTY OF CL6UtWATER AND SWFWMD. -- ""9M S 89'3023 E ~ I - - ----------€3oaY•12E!so_o_I'--'~- 619. ,. - I SWfMWO MAY 8E REWiRINC NO FORMAL AETENTICN I __-_---'" '-'~-'"-'-- I • POND SO THAT STORMWATER W1LL BE ALLOWED I LEGAL DESCRIPTION JOHNS PARKWAY "~'""~""`"" ~. TO FLOW FREELY WTO BRACKISN/MANGROVE AREAS. a raafc Nart-ar_rer AaAtENr Ztw/AC Rs-d la INOSarm u4ar ~ I aAxrnd roe[ saRElm aA p on n `{ PUN TO INCLUDE CREATION Cf TREATMENT AREA A P0P71LW ~ 14E Af071ElSi 1/< O' l4E Ag21fMEST t/t CF XCT /6, 1P 09 ~ ~ C¢E FOR GROWTH OF NEW TIDAL MARSH. VOLUMES 501lM RAncF Id FAST, P/Aa71AS LtNMY, 20P/M ATyJ<' PARTIpX~Y gEp ~ . , , STORAGE LEVELS ANO PLANTINGS TO BE DETERMINED, ~L~' OWNER ENCFNEER` ~ - CUMEAI-E Af 1{f' Afpx[A5! CIXd(N p' SA/0 Aq%IMEST 1/I p* SI/0 .SEC(/LW =d, ncuE s do•n•aT• Y, !710.57 IEEi, ALpC lA[ LY1N1LiI.lAE 0r SAID SEtl/pe 16, BRICKS MANAGEMENT NCKE N d977'Sg' N, 50. W FEET i0 Ilf HEST gfG/T,Y-YAY LIfE pr &=SI/AE P.O. BOX 8474 ea+-n'Am ao nc wtxT cr dECnwrAC; nwr x ds•Tg'~J• Y f ANCLOIE ENpNEERfNC INC. , d s.a FEET; FraSCE x ol•a•a• _. as.of FEET; nexE N gs•Javr r. too.J2 FEET: /ipq C(EARWATER, fC 34618 N 03'J7'01' E, 165.13 fFE7; RE).C'E N de'Jl']I' Y, 168.03 FEET; IAEi4Y N ao•n'oJ• w, eo o7 fFCT; npAt's d5•Ja'JO• E 5 P.O. BOX 6474 CEEARWATE'R, f1 34618 . , 68. I5 FEZr; r/6xcr N 00.10'58' E. 770.70 FE27; lNME S 48'17'05' C, dig.ld fEET; 7![ME 5 00'J7'OJ' Y, 678.67 TEE(ro TFE Po/N1 OF LLCIAN/AC. (8TJ) 447-44k4 .. AiVCL_®T'E ~NGIN~~~NG ~-~~ BAYSHORE TOWNHOUSES LAND "^A' /~° i~LANNING ~-ND ENGINEERING UTIL SHEET ..a„ P.O. BOX 6474 - CLEARWATER, FLORIDA 34618 PRELI ~ RY SITE PLAN o 007-2336 , ~ , `•_. ' i. . 5~ i THIS ;URVEY MADE w1TH0UT BE ~EFlT OF TITLE COMMITIAEN7 OR POIJCY FEDERAL FL000 DATA Flood Zone . "~C" Community No. :/25090 Pones No. : oo/B v Revised Aug • i9 /99/ ~~s o P;R,' ~/ATE 1 NGRESS-_GRESS AND UT i L !TY EASE"dEVT ~, " TRAC r A \\~~y-~.-- -- -- S 89°27'56' E__l8'.57--t----•~----- -y- -~- -t --~- -d"- %a~ian~ are 6asaa.' on NGvO /929 mean xa /evc/= o. vaff /Oro/ooaed f/cdr e%Ya t~o/13 Lot.~%. Gowr~f/ivin9 Z 3 5 6 7 SURVEY DATE: 28.00 ` 2733 ' 26.6 ' 26.00 ' 25.33 ' 24•~rv' 24.00' ,~ ~~ z~' DRAWN BY: Tf~S CHECKED BY: ~~~ SCALE: ~=x.30 ' JOB NUMBER: 99-G~ SFC 110N /~; LU f e. /~ 2,_3 5 ' LANDSCAPE BUFr E",~ TOWNSHIP 2 j S RAN~F /(o EAST BUiYEY CF nS P.~Clfpl)l~P 111 FrlnT AUUK //9 PnGE ~~ PUBLIC RECURU OF ,O.in~// ,~ CUUNIY, fLURIUn ~~ ~.1~ Oi~.Y NO~i' A PLAT OF 81~i1iEY PREPARED FoR: CA~IPSELL CONSUL TANTS Ry/and f~omes i ~ qy/ahd /~lorfya9e LAND SURVEYORS ~irsFAirae'ricar~ Tf~e --~ 5601 116th A ~/E~NUE NOR 1h' /naura~cc ~om/oan~/ // `, CLEARWA lFR, FLORIDA 33760 `r (7Z7) 573-4586 ~.Q. 377 INC. I ~~ . °' I L JUL 2 31999 PLANNING & DEVELOPMENT SERVICES 9ara9 c /B. OD ' /7.33 ' /6.6( ' /6. oo ' /5,33' /¢•6G ' /4.00 ' ,. ., s . uwP! A r r~a~ S 89 °27'So" E I •--------___`-~T 24.3.E-! 24.00_! 24.00_L24.00=! 24.OO~L24.00-! 24.OO;i-24..;3==----------~.. ~,rRACr F , ~ ~ COMMON , ti ~ j / G~ N ~ AREA ~. II * / "S ~ ` ~lorf~i. ---~~ ~ 1 ~ ICI WI WI W ~ W ~ W ~ ~ GiG~ ~~O 1 ~ /:~/o/oose¢ i Twnh~O~eC //'u~'/l~in9 ,</o; ~ I ~ 0 of ~. 6 ci ., of 7 of ~. of ~ of ~. of T ~ ~ ~ ~3 W W ~ ~ ~ +~ = ~ 1 ~I ~ 2 N. ' 3 NI ~ a ~I ' ,5 N' ~ 6 N~ ~ 7 NI ' 8 z = ~ I~ I r. ~i ~~im ~i~ ~^~~~ ~I~ ~~~ ~i~ o i~ `- U I ~ ~~ td ~C Di OI O CI ~ C~ ~ O~ ~ O~ ~ OI ~ O~ O ~ ~ I~*r i rn ~O OI;~ N Oi Oi OI OI OI Oi CI I ~ iN" ~~ I i I o -7~ N I° ° 21 o Z3.3 ~ 24.0 21 ZI 24.0 ~' 0 23.3 c I Z .o ~' ° ~Q'~ , o N ~~~ OI .24.3 0• 0 2a.9 o ti l 0 24. I m 10 O IO OI a ti ~ ~ H ~ ZO' ~2 ~~'°---- ---- ------I ---------------------------~ 1 _ ~~ ~ a ~Q ~~_ ( / ~1 ~~ ~ti ! 15' UTILITY EASc{~EVTI ~ C7-,,u"'I ~ \~ I ~~~. ~ 24 35 ' ~ 24.00 24.00 ' ~ 24.00 ' 24.00 ' 2_4.0_0 ' 24 .• 00 ' ' t 9.24 ' 1 ~~ v /3ear~r~9s 6asecf on 5. /one of /ors /-8 ~~-=--~----~-----~ S 89 °256 i=-+187.57' - ----s----~ _ s~ "E . \ ~' OysrF~ PiA ! OV WAY being 3,89-° 27' ~' • TRAFFIC ENGINEERING .~ v i ~'~ ~~ 3°/ SITE PLAN REVIEW CHECKLIST ~;r The following chec ist has been provided to assist in the efficient review of site plans submitted to the ~ City of Clearwater for Traffic Engineering approval. While care has been taken to include the most common items required for successful site plan review, this list should not be considered as all inclusive and all items may not be applicable to every site plan submitted. ~ vPg ~~,~'s PkWy -b c,~~y ~~.~.aa~.ds Show geometrics and lane configuration of all abutting roadways. Show adjoining property driveway accesses aril affected site areas. Show location and dimensions of driveways, aisles, parking stalls and all internal design features (including but not limited to; landscape islands, medians, lighting standards, cart corrals, bike racks, bollards, gates, dumpster enclosures, etc.). RQ ~~;Y.~ ~4r W; ~. ~, d ~,,,~ ve~S Show all pavement markings, signage and traffic control devices. Use must comply with '' \ standards set forth by the Manual on Uniform Traffic Control Devices (MUTCD). (~ Indicate the location of lighting fixtures and show with 90 degree cutoffs directed away from abutting streets and residential properties. Show required parking calculation and the number of spaces provided. ^ Provide handicap parking and access compliant with City, State & Federal Americans with Disabilities Act (ADA) standards. ^ Provide loading zone(s) per City Code. ^ Provide vehicle stacking area(s) per City Code. Provide new, upgraded or repaired sidewalks compliant with City Code and ADA standards. Determine site impact and subsequent roadway design changes needed. ^ Obtain a Significant Change of Use determination from Florida Department of Transportation (FOOT) per Florida Statute 335. ^ Obtain FOOT permit for driveway access or other work within the State Road right-of--way. Obtain Pinellas County permit for driveway access or other work within Pinellas County Road right-of--way. av- Execute access agreement between sites after review and approval by City Staff. Transportation Impact Fee (TIF) to be assessed per Pinellas County TIF ordinance. `; ., ~. .,~ ~~ ~, BSI c~~~~; ~~ n ,~ a C)-' : ~ i~ ~~~~ ~~y~'O ,: ~! ;~ ~~ ~: ~'N'kf 1 ~ __.~ L ~-a~f 1 ~ ~~s~t ~j 'c,a-iu.~c,~c2 ~iJV UI~IrS 2~-~~-- 1n~ ~//~Slv~- .S~p~i~.~s ~~ '~ , S ~ 4w s ~ 2~~,4.-~SN.o,~~,~- -r-o 3 ;:. -3~'-fSH~ 0 2~- -~-air..J i.~ t-f-or-, ~ s ~„~ ~~ ..Ja~N'S pKwY ~r- ~~~~.~ ~~c~~ SNo.-~ ~ (~ • Co«7hI C~c.'T/o`J -~ ~C.J I L v I IJ G..~ i ~~ „~, L.o~ J, 'Q~5GK1 ~ `'~ C.~-~GTC. ~ /Te..G.O.--~tsLf,,i (J.~~rj Ot~ ~c~•{-!Z ~i~Q~ "" 1"J~°c~s~ IJ~/~-T'c~ S~-SGL~Z.-''~.~ ~vcLat'~-~'~j /J/~. G~2 `z ~ ~ f as -s~(D~l : ~C.las• ~~ S `----~ ~t~JG1~~ C9- 'j~`~!/• ~c i ~ -fi'~ ~c%tc.~ ~; ~- ~ - ur ~ ~ , , l o ~ ~ ~ co ~. R~w ~ ~ Joy-1.~'s ~i~.,fY . ,~ T~ ~ `f 3~Co 2 Co. Druv~ w~9-~ ~~~~ r r ~a~9 ~ 12.x, {c~.•~Pv~,.~-~' ~Sc..~, 2agyS .~, ~~~• Z vJt-Ec~~ (-'~o'~LTC..~ c S ~ t Zo w L.~'' i u~ STS ~ ukt /,- l,E.o~ 119- N~~r" ~-~"~ ~ 'f .. .~ GF.//ZG-C~ u o1 n ~ r. i J~ (/ :. l DEVELOPMENT REVIEW COMMITTEE Central Permitting Department November 131997 at 10:00a.m. Conference Room 216 Standard tevlew comments for BAYSHORE TO`K~NHOMES INFORMAL COURTESY REVIEW ~G Reviewed by: Department name: ~/V!/~~aN~~N ?~/~ L Please return comments to Steve Doherty A. Before the Site Plan can be certified, the applicant must complete the following action(s)checked'befow: ZO G 1.Show the following on the site plan: _a. Legal description of the property. _b. Site area (square feet and acres). _e. Number of dwelling units and hotel units proposed and the resulting net density. _d. Floor area devoted to each category of use. _e. Floor area ratio. _f. Property owner's name, address and telephone number and the designated project representative name, address and telephone number. (and fax numbers). _g. Perimeter landscape buffer _h. Parking formula calculation for each use. i. Locations of all driveways, parking areas and curb cuts. _,_j. Delineation in mapped form and computation of the area of the sited devoted to building coverage, open space for the lot, open space Eor the Eront yard and building coverage expressed in sq. ft. and as a percentage of the overall site. _k. Location and screening of all refuse containers/compactors. _l. North arrow. _m. Zoning assigned to the subject property and surrounding properties depicted on the plan. _n. Identify and distinguish between the new and existing buildings and driveways as well as other features on the plan 3. Identify changes to the site data table if this is a plan amendment. 4. Submit a completed CONCURR.ANCY REVIEW application for review with required fee S.Show all contiguous streets & roads. 7.Display the site address on the site plan, obtaining assistance as needed from the responsible Zoning Specialist in establishing the correct address. 8.Limit the site plan to one page. 9.Legally record a Unity of Title for the project site and furnish proof of such action. lO.Show the date(s) and condition(s) for approval of _(a) variance(s)/conditional use approvals by the Planning & Zoning &/or the Development Code Adjustment Board(s); or, _(b) a variance from the Flood Board for construction within 18 feet of a seawall. FIRE DEPARTMEIV?' 12.Show on the plan a fire department connection a minimum of 15 ft. from the structure, adjacent to a paved drive and within 30 ft. of a fire hydrant assembly to provide for sprinklers. w 13.Locate on the plan minimum 20 Ft wide (a) FIRE LANE(S) on the N . E S . W ,side of the structure beginning not closer to the structure than 10 feet. 14.Show minimum turning radii for designated drives and fire lanes as 42 feet on the plan. 15.Locate a FIRE HYDRANT ASSEMBLY on the plan not more than -300 feet from the structure at TRAFFIC ENGINEERING 16. Show on the site plan the installation and maintenance of uniform traffic control devices at appropriate locations in accordance with the standards set forth by the Manual on Uniform Traffic control Devices as adopted by the Florida Department of Transportation under Rule 14-115.010, Florida Administrative Code. 19. Show applicable Florida Statute number for handicapped parking spaces. 20. Show all striping, pavement markings, signage and traffic control devices on the site plan conforming to F.D.O.T. Standard Indices-1995 edition and F.A.C. 14- 110 (no 4" striping is to be shown). 21. Show dimensions of aisles, parking stalls, entrances and measurements for like plan features on the plan. 22. Show all pavement markings, signage and traffic control devices on the site plan. 23. Adjust handicap spaces to meet governmental standards with the correct handicap signs. 24. Adjust parking stalls and/or driveways on the plan to the satisfaction of the Traffic Engineer. 25. Indicate the location of lighting futures in the parking areas on the site plan. 26. Show all on-site lighting with 90-degree cutoffs directed away from abutting streets right-of--way and residential properties. 27. Obtain a Significant Change of Use Determination from the FDOT per Florida Statute 335. 28. Execute across-parking access easement linking the site with the site and specifying the exact number and location of the spaces that are to be jointly used by and between the sites after review and approval of the easement/agreement by the appropriate City Staff. 29. Address and resolve the need for right turn/left turn auxtiliary lanes and the queuing for traffic related to the project. ENVIRONMENTAL MANAGEMENT 30. Provide a copy of the SWFWMD permit application and calculations to Environmental Management. ~ ~~~ S ~ sv „~~ , ~_31. Show all protected trees by size, species and location~~ ~~Q~ae-a~ ~' 32. Show total paved vehicular use area and total interior landscape areas expressed in square feet and as a percentage of the overall site in the site plan data block. 33. Provide dimensions on the plan for perimeter landscape buffers. 34. Reflect the use of raised curbs or protective timbers on the site plan where interior landscaped areas abut pavement. 35. Depict all required parking lot interior areas on the plan by shading or cross-hatching. ENGINEERING PLAN REYIE~ 36. Show ADA ramps for sidewalks on the site plan. 37. Complete the Dumpster Requirement Form and return it to the City Solid Waste Department. 38. Add a note to the site plan stating "It is the responsibility of the owner to roll the dumpster to a designated location at an assigned time as approved by the Solid [baste Superintendent." 39. State on the construction plan that the detector check should be DDCVA with the by-pass meter installed by the Ciry with fee paid by contractor. 40. State on the plan that the 6 fire line tap to the 6" Ciry water line is to state "6x6 tap" so that City Utility Accounts will know what Eee to bill the contractor. 41. Show backflow device(s) on plans as RPD. 42. Show all proposed utilities, storm water retention/detention systems and 50' perimeter contour elevations. 43. Have the final site plan signed and sealed by a Professional Engineer registered in the State of Florida. PARKS AND RECREATION 44. Pay the required Open Space and Recreation Assessment Fee with review by the Clearwater Parks and Recreation Department. 45. Note that the project is exempt from the City's Open Space and Recreation Assessment Fees. B. Before the City can issue building permits, the applicant must complete the following actions: '~ UENVIRONMENTAL MANAGEMENT ~ta~Py q-C0~ 1. Furnislrthe S~VF~UMli]Lperrr-it to Clearwater Environmental Management. 2. Acquire clearing and grubbing and tree removal permits or a no tree verification form from Environmental Management. 3.Provide drainage calculations ENGINEERING PLAN REVIE[l~ 3.Obtain and furnish evidence of all applicable permits from other governmental agencies including but not limited to: _(a) FDOT permit for work within the right-of--way to Engineering Services; ____(b) Pinellas County Public Health Unit Permit, Ingress/Egress and a 10 foot Utility Easement over the proposed water mains up to and including meters, backflow prevention and hydrants. _ 4.Pay the sewer impact assessment fee, based on the size of the water meter with ..;1 J assistance in determining the Eee Erom Central Permitting/Licensing specialists. C. Before the City can issue a Certificate of Occupancy, the applicant must complete the following actions: ZO G _ 1.Add note to plan: "t111 site lighting will be directed away from adjoining properties and street right-of-ways.. TRAFFIC ENGINEERING 2.Pay the Transportation Impact Fee as called for by the Pinellas County Transportation Impact Fee Ordinance with assistance in determining the fee from the Clearwater Traffic Engineering Office. ENGINEERING PLAN REVIEW 4.Bring all substandard sidewalks and sidewalk ramps adjacent to or a part of the project up to standard, including ADA, and install sidewalk where none exists in the street right of way. 5.Have the City install backflow prevention devices with the owner/applicant paying all applicable fees. 6.Visually screen the dumpster and provide gates with a minimum 12-Foot clear opening to the Front Eor access by Solid Waste vehicles. 7.Furnish as-builts and an engineer's certification to Engineering Services. D. Complete the following actions as indicated: ZONING l.Obrain the requisite building permits within one(1) year from the site plan certification date to prevent expiration of the site plan certification. 2.Obtain the requisite certificate(s) of occupanry within three (3) years of the site plan certification date to prevent expiration of the site plan certification. _ 3.Obtain review of and permits Eor signs and fencing/walls through separate review and permitting procedures. DRCCOMMENTS102397 DEVELOPMENT REVIEW COMMITTEE Central Permitting Department ~~ November 131997 at 10:00a.m. f ~` ~ °`~ L c~Z /"- Conference Room 216 2, Q cs'~, ~C~tw1J ~' Q cac~ ~~~ r' (~ ~ 5 , ~ Standard review comments for BAYSHORE TOWNHOMES INFORMAI. COURTESY REVIEW Reviewed by: S, ~a-~~~ Department name: ~ ~-- Please return comments to Steve Doherty w A. Before the Site Plan can be certified, the applicant must complete the following action(s)checked below: ZO G v~~ TS Q ~,,,pnS~IJ: L~ Z tr /w %t'" ~~~~~ ~~~~ 1.Show the following on the site plan: ~/ Legal description of the property. V b. Site area (square Eeet and acres). mac. umber of dwelling units and hotel units proposed and the resulting net density. ~oor area devoted to each category of use. Floor area ratio. _f. Property owner s name, address and telephone number and the designated project re~sentative name, address and telephone number. (and Eax numbers). - _g. Perimeter landscape buffer Parking formula calculation for each use. % i. cations of all driveways, parking areas and curb cuts. //;; ~~'' delineation in mapped form and computation of the area of the site~tevoted to building coverage, open space for the lot, open space for the front yard and building coverage expressed in ~q. and as a percentage of the overall site. Location and screening of all refuse containers/compactors. North arrow. . Zoning assigned to the subject property and surrounding properties depicted on the plan. _n. Identify and distinguish between the new and existing buildings and driveways as well as other features on the plan. / 3. Identify changes to the site data table iE this is a plan amendment. ~_4. Submit a completed CONCURR.t1NCY REVIEW application for review with / required fee ~/ S.Show all contiguous streets & roads. / 7.Display the site address on the site plan, obtaining assistance as needed from the / responsible Zoning Specialist in establishing the correct address. M~"Y.oa~` / 8.Limit the site plan to one page. 9.Legally record a Unity of Title for the project site and furnish proof of such action. l0.Show the date(s) and condition(s) for approval oF. _(a) variance(s)/conditional use approvals by the Planning & Zoning &/or the Development Code Adjustment Board(s); or, _(b) a variance from the Flood Board for construction within 18 feet of a seawall. - FIRE DEPARTMENT 12.Show on the plan a fire department connection a minimum of 15 ft. from the structure, adjacent to a paved drive and within 30 ft. of a Ere hydrant assembly to provide Eor sprinklers. 13.Locate on the plan minimum 20 Ft wide (a) FIRE LANE(S) on the N , E S . W .side of the structure beginning not closer to the structure than 10 feet. 14.Show minimum turning radii for designated drives and fire lanes as 42 Eeet on the plan. 15.Locate a FIRE HYDRANT ASSEMBLY on the plan not more than 300 feet from the structure at . TRAFFIC ENGINEERING 16. Show on the site plan the installation and maintenance of uniform traffic control devices at appropriate locations in accordance with the standazds set forth by the Manual on Uniform Traffic Control Devices as adopted by the Florida Department of Transportation under Rule 14-115.010, Florida Administrative Code. 19. Show applicable Florida Statute number for handicapped parking spaces. 20. Show all striping, pavement markings, signage and traffic control devices on the site plan conforming to F.D.O.T. Standard Indices-1995 edition and F.A.C. 14- 110 (no 4" striping is to be shown). 21. Show dimensions of aisles, parking stalls, entrances and measurements for like plan features on the plan. 22. Show all pavement markings, signage and traffic control devices on the site plan. 23. Adjust handicap spaces to meet governmental standards with the correct handicap signs. 24. Adjust parking stalls and/or driveways on the plan to the satisfaction of the Traffic Engineer. 25°. Indicate the location of lighting fixtures in the pazking areas on the site plan. 26. Show all on-site lighting with 90-degree cutoffs directed away Erom abutting streets right-of--way and residential properties. 27.Obtain a Significant Change of Use Determination from the FDOT per Florida Statute 335. 28. Execute across-parking/access easement linking the site with the site and specifying the exact number and location of the spaces that aze to be jointly used by and between the sites after review and approval of the easement/agreement by the appropriate City Staff 29. Address and resolve the need for right turn/left turn au~liary lanes and the queuing for traffic related to the project. ENVIRONMENTAL MANAGEMENT 30. Provide a copy of the SWFVI/MD permit application and calculations to Environmental Management. 31. Show all protected trees by size, species and location. 32. Show total paved vehiculaz use area and total interior landscape azeas expressed in square feet and as a percentage of the overall site in the site plan data block. 33. Provide dimensions on the plan Eor perimeter landscape buffers. 34. Reflect the use of raised curbs or protective timbers on the site plan where interior landscaped areas abut pavement. 35. Depict all required parking lot interior areas on the plan by shading or cross-hatching. ENGINEERING PLAN REVIE[l~ 36. Show ADA ramps for sidewalks on the site plan. _ 37. Complete the Dumpster Requirement Form and return it to the City Solid Waste Department. 38. Add a note to the site plan stating "It is the responsibility of the owner to roll the dumpstet to a designated location at an assigned time as approved by the Solid Tl~aste Superintendent." 39. State on the construction plan that the detector check should be DDCVA with the by-pass meter installed by the City with fee paid by contractor. 40. State on the plan. that the 6 Ere line tap to the 6" City water line is to state "6x6 tap" so that City Utility Accounts will know what fee to bill the contractor. 41. Show backflow device(s) on plans as RPD. 42. Show all proposed utilities, storm water retention/detention systems and 50' perimeter contour elevations. 43. Have the final site plan signed and sealed by a Professional Engineer registered in the State of Florida. PARKS AND REC,RF.ATION 44. Pay the required Open Space and Recreation Assessment Fee with review by the Clearwater Parks and Recreation Department. 45. Note that the project is exempt from the City's Open Space and Recreation Assessment Fees. B . Before the City can issue building permits, the applicant must complete the following actions: ENVIRONMENTAL MANAGEMENT 1. Furnish the SVUFVUMD permit to Clearwater Environmental Management. 2. Acquire clearing and grubbing and tree removal permits or a no tree verification form from Environmental Management. 3.Provide drainage calculations ENGINEERING PLAN REVIEtI~ 3.Obtain and furnish evidence of all applicable permits from other governmental agencies including but not limited to: _(a) FDOT permit for work within the right-of--way to Engineering Services; ,_(b) Pinellas County Public Health Unit Permit, Ingress/Egress and a 10 foot Utility Easement over the proposed water mains up to and including meters, backflow prevention and hydrants. 4.Pay the sewer impact assessment fee, based on the size of the water meter with +Y assistance in determining the fee Erom Central Permitting/Licensing specialists. C. Before the City can issue a Certificate of Occupancy, the applicant must complete the following actions: ZO I ~C 1.Add note to plan: "All site lighting will be directed away Erom adjoining properties and street right-of-ways.. TRAFFIC ENGINEERING 2.Pay the Transportation Impact Fee as called for by the Pinellas County Transportation Impact Fee Ordinance with assistance in determining the fee from the Clearwater Traffic Engineering Office. ENGINEERING PLAN REYIE[~ 4.Bring all substandard sidewalks and sidewalk ramps adjacent to or a part of the project up to standard, including ADA, and install sidewalk where none exists in the street right of way. S.Have the City install backflow prevention devices with the owner/applicant paying all applicable fees. 6.Visually screen the dumpster and provide gates with a minimum 12-foot clear opening to the Front For access by Solid Waste vehicles. 7.Furnish as-builts and an engineer's certification to Engineering Services. D. Complete the following actions as indicated: ZONING l.Obtain the requisite building permits within one(1) year from the site plan certification date to prevent expiration of the site plan certification. 2.Obtain the requisite certificate(s) of occupanry within three (3) years of the site plan certification date to prevent expiration of the site plan certification. 3.Obtain review of and permits for signs and Fencing/walls through separate review and permitting procedures. DRCCOMMENTS (02397 DEVELOPMENT REVIEW COMMITTEE Central Permitting Department October 23, 1997 at 10:00 a.m. Conference Room 216 Standard review comments fot BAYSHORE TOWNHOMES COURTESY REVIE~X1 Reviewed by. Deparanent name: ~/UVO/~!J/t>~ ~~~1 L Please return comments to Steve Doherty A. Before the Site Plan can be certified, the applicant must complete the following action(s)checked below: ZONING 1.Show the following on the site plan: a. Legal description of the property. _b. Site area (square feet and acres). _c. Number of dwelling units and hotel units proposed and the resulting net density. _d. Floor area devoted to each category of use. _e. Floor area ratio. _f. Property owner's name, address and telephone number and the designated project representative name, address and telephone number. (and Eax numbers). _g. Perimeter landscape buffer _h. Parking formula calculation for each use. _i. Locations of all driveways, parking areas and curb cuts. _j. Delineation in mapped form and computation of the area of the sited devoted to building coverage, open space for the lot, open space for the front yard and building coverage expressed in sq. ft. and as a percentage of the overall site. _k. Location and screening of all refuse containers/compactors. _l. North arrow. _m. Zoning assigned to the subject property and surrounding properties depicted on the plan. _n. Identify and distinguish between the new and existing buildings and driveways as well as other features on the plan. 3. Identify changes to the site data table if this is a plan amendment. S.Show all contiguous streets & roads. 7.Display the site address on the site plan, obtaining assistance as needed Erom the responsible Zoning Specialist in establishing the correct address. 8.Limit the site plan to one page. 9.Legally record a Unity oETitle Eor the project site and furnish proof of such action. l0.Show the date(s) and condition(s) Eor approval of: _(a) variance(s)/conditional use approvals by the Planning & Zoning &/or the Development Code Adjustment Board(s); or, _(b) a variance Erom the Flood Board for construction within 18 feet of a seawall. FIRE DEPARTMENT 12.Show on the plan a Ere department connection a minimum of 15 ft. Erom the structure, adjacent to a paved drive and within 30 ft. of a fire hydrant assembly to provide for sprinklers. 13.Locate on the plan minimum 20 Ft wide (a) FIRE LANE(S) on the N . E S . W ,side of the structure beginning not closer to the structure than 10 feet. 14.Show minimum turning radii for designated drives and fire lanes as 42 feet on the plan. 15.Locate a FIRE HYDRANT ASSEMBLY on the plan not more than 300 feet from the structure at .TRAFFIC ENGINEERING 16. Show on the site plan the installation and maintenance of uniform traffic control devices at appropriate locations in accordance with the standards set forth by the Manual on Uniform Traffic Control Devices as adopted by the Florida Department of Transportation under Rule 14-115.010, Florida Administrative Code. 19. Show applicable Florida Statute number for handicapped parking spaces. 20. Show all striping, pavement markings, signage and traEEc control devices on the site plan conforming to F.D.O.T. Standard Indices-1995 edition and F.A.C. 14- 110 (no 4" striping is to be shown). 21. Show dimensions of aisles, parking stalls, entrances and measurements for like plan features on the plan. 22. Show all pavement markings, signage and traffic control devices on the site plan. 23. Adjust handicap spaces to meet governmental standards with the correct handicap signs. 24. Adjust parking stalls and/or driveways on the plan to the satisfaction of the Traffic Engineer. 25. Indicate the location of lighting futures in the parking areas on the site plan. 26. Show all on-site lighting with 90-degree cutoffs directed away from abutting streets right-of--way and residential properties. 27. Obtain a Significant Change of Use Determination from the FDOT per Florida Statute 335. 28. Execute across-parking/access easement linking the site with the site and specifying the exact number and location of the spaces that are to be jointly used by and between the sites after review and approval of the easement/agreement by the appropriate Ciry StaEE 29. Address and resolve the need for right turn/left turn auxiliary lanes and the queuing Eor traffic related to the project. ENVIRONMENTAL MANAGEMENT 30. Provide a copy of the SWFWMD permit application and calculations to Environmental Management. ` 31. Show all protected trees by size, species and locatio~j. ®l~ 0. S~r~JC~c~~ `~ `~' 32. Show total paved vehicular use area and total interic5r landscape areas expressed in square feet and as a percentage of the overall site in the site plan data block. 33. Provide dimensions on the plan for perimeter landscape buffers. .~ . 34. Reflect the use of raised curbs or protective timbers on the site plan where interior landscaped areas abut pavement. 35. Depict all required parking lot interior areas on the plan by shading or cross-hatching. ~~c . ~ ~f C taa-~ s~ ~l- c.©~ ~-~ n`s d~^c~o r~,.l ~,~~e.s, ENGINEERING PLAN REVIEW 36. Show ADA ramps for sidewalks on the site plan. 37. Complete the Dumpster Requirement Form and return it to the City Solid Waste Department. 38. Add a note to the site plan stating "It is the responsibility of the oumet to roll the dumpstet to a designated location at an assigned time as approved by the Solid Waste Superintendent." 39. State on the construction plan that the detector check should be DDCVA with the by-pass meter installed by the City with fee paid by contractor. 40. State on the plan that the 6" Ere line tap to the 6" City water line is to state "6x6 tap" so that City Utility Accounts will know what fee to bill the contractor. 41. Show backflow device(s) on plans as RPD. 42. Show all proposed utilities, storm water retention/detention systems and 50' perimeter contour elevations. 43. Have the final site plan signed and sealed by a Professional Engineer registered in the State of Florida. PARKS AND RECREATION 44. Pay the required Open Space and Recreation Assessment Fee with review by the Clearwater Parks and Recreation Department. 45. Note that the project is exempt from the City's Open Space and Recreation Assessment Fees. B . Before the City can issue building permits, the applicant must complete the following actions: ENVIRONMENTAL MANAGEMENT ~1. Furnish the SWFWMD permit to Clearwater Environmental Management. _~2. Acquire clearing and grubbing and tree removal permits or a no tree verification form from Environmental Management. 3.Provide drainage calculations 4 ~ ~~ `~~ E. ~c~U ~ ~'~~ ENGINEERING PLAN REVIEW ~ S t w P=~~("14,~eD p S~ .~°`~ APL' C ~f 1'`I ~6Gi ~ .Sp~l`l Ord 3.Obtain and furnish evidence of all applicable permits from other governVmental agencies ~ ~~, including but not limited to: ~1 ~G ~ 1. ~` r= _(a) FDOT permit for work within the right-oE way to Engineering Services; _(b) Pinellas County Public Health Unit Permit, Ingress/Egress and a 10 foot Utility Easement over the proposed water mains up to and including meters, backflow prevention and hydrants. 4.Pay the sewer impact assessment fee, based on the size of the water meter with assistance in determining the fee from Central Permitting/Licensing specialists. C. Before the City can issue a Certificate of Occupancy, the applicant must complete the following actions: ZONING 1.Add note to plan: "All site lighting will be directed away from adjoining properties and street right-of-ways.. TRAFFIC ENGINEERING 2.Pay the Transportation Impact Fee as called for by the Pinellas County Transportation Impact Fee Ordinance with assistance in determining the fee from the Clearwater Traffic Engineering OfFce. ENGINEERING PLAN REVIEW 4.Bring all substandard sidewalks and sidewalk ramps adjacent to or a part of the project up to standard, including ADA, and install sidewalk where none exists in the street right of way. 5.Have the City install backflow prevention devices with the owner/applicant paying all applicable Eees. 6.Visually screen the dumpster and provide gates with a minimum 12-Foot clear opening to the front for access by Solid Waste vehicles. 7.Furnish as-builts and an engineer's certification to Engineering Services. D. Complete the following actions as indicated: ZONING l.Obtain the requisite building permits within one(1) year from the site plan certification date to prevent expiration of the site plan certification. 2.Obtain the requisite certificate(s) of occupancy within three (3) years of the site plan certification date to prevent expiration of the site plan certification. 3.Obtain review of and permits For signs and fencing/walls through separate review and permitting procedures. DRCCOMMENTS(02397 Residential Planned Development Project Includes: Site Plan Review, Plat Review, Variance Planning and Zoning Board r City Commission jst. Reading Development Code Adjustment Board Site Plan Certified DRC: Courtesy Review City Commission 2nd Reading DRC: Formal Review Building Plan Review BUII..DING PERMIT `BAYSHORE TOWNHOMES", A 68 UNIT MULTIPLE FAMILY DEVELOPMENT WITH A HEIGHT OF 35 FEET ABOVE THE FIRST FINISHED FLOOR, FOR A POTENTIAL OVERALL HEIGHT OF 47 FEET; ZONING PROPOSED IS ~D 7.5 (RESIDENTIAL PLANNED DEVELOPMENT, 7.5 UNITS PER ACREI. ,, I I v - ~ ~~ t-S ~ ? -- _ _ _ _ ~ - - _ • ~1~ ,~~ •i ~! - -{, ~ . Awe. _!_S ~oTSU („7w r r TRC.2c1Jt~/L. v_~? F~~e."c+rC~~/'~`I!~i,°_r- -/ /1/-oi[-- TO_ ~.--• - - - ~ ... :- - - -_~.~5 StJ.FwGcT - oil - !/`~ • ~. ~~_ ~. YS ©~ .li - - .2 I L.asvCsuA-G-c ~~.C. ~~"_i'~'ocJ<.Ueh Tea_ -/~C?s~•t~c.r-_.TjAc{c 7Y~a..e.v~ /-'~c~~~~ ~~ --- ~ Tv (~`°~:~ _~ G.c~-~sv- ~ ,S~°a2ce-.- _~3.~ C- `~' • _ ~o .1'L!~ G. S _- l~u. t-<a S ~. '~~ ~'I ~~~ _ ~ _ ' _-~ - - - - __ _ __ _ ~ - _~ _. _. -----_ _ -_ -- --- - -- _ - T _ -- 4 3' ~ , ' ~j hir}~ _ l C..~ T Sr-}rte-LG_-~~.. l2 ~Yc~.c o~ /~i'L f oil 'Tt~l 4 ~a~r~~ _ . ~' Z= 'z <-^' ` T' -'- - -- - - - - -_+~y- 1 •~ _-_. - - - - ----~4-t- --- - - - - - - - .~ ~ - _._ _ . _ _ _ ~ - _ -' _ _ _. -- _ Z1~gv,oo - - -;1?-- - - - ~ - - _ ---- - -__ _ - _ _ _ _ - - i `, 3 s ,~ `~: 'I ,•1 1~ ! - -- -- - --- - __° _ -- _ - - - - - - _ ~~ lU TOTAL OF 68 UNITS 15. ND PERIMETER FENCE PROPOSED AT TIME OF INITIAL APPLICATION. lb. ALL SITE LIGHTING SHALL ~ DIRECTED AWAY FROM ABUTTING STREETS, RIGHTS-OF-WAY, AND RESIDENTIAL PROPERTIES. 17. SETBACKS TO BE DETERMINED BY ADOPTION OF PLAN BY CITY COMMISSION. 18. SITE IS VITHIN JURISDICTION OF CITY OF CLEARWATER, PINELLAS COUNTY SCHOOLS, AND SWFWMD DISTRICTS. 19. BUFFER AREA TO ZONED PRESERVATION AREA SHALL AVERAGE 25' TO ANY STRUCTURE. RETENTION POND MAY BE INCLUDED IN BUFFER AREAS. 20. REAR LOTS WILL BE DEED RESTRICTED TO PROVIDE ONLY BUFFER AND RETENTION AND NO STRUCTURAL IMPROVEMENTS WILL BE ALLOWED. 21. INDICATED PERIMETER BUFFERS ARE PRELIMINARY. ACTUAL PERIMETER BUFFERS MAY BE LESS, BUT IN NO CASE LESS THAN 15 FEET. 22. ALL DUMPSTERS 70 BE A MINIMUM OF 3 FEET FROM ANY RIGHT-OF-WAY. 23. OWNER SHALL HAVE 1 YEAR FROM CONSTRUCTION PLAN CERTIFICATION TO ACQUIRE FIRST BUILDING PERMIT AND THREE YEARS FROM CONSTRUCTION PLAN CERTIFICATION TO RECEIVE LAST CERTIFICATE OF OCCUPANCY. 24. PRIOR TD THE ISSUANCE OF A BUILDING PERMIT, OWNER SHALL RECORD A CONSERVATIVE EASEMENT DYER ENVIRONMENTAL AREAS. SAID EASEMENT SHALL CONTAIN A PROVISION ALLOWING THE CITY DF CLEARWATER TO REZONE THE PROPERTY SUBJECT TO THE EASEMENT, TO PRESERVATION ZONING. ~Pr°t~c,,~N7' ~f/i9GG /~/'~ ~'" 25. NONE OF THE 15 FOOT REAR YARDS SHALL CONTAIN ANY STRUCTURES, LANAIS, ~ ~c2~~ IOS DR OTHER STRUCTURAL CHARACTERISTICS. P,~io,~ ro o t oTr~ F ~2 26. IDEWALt< SHALL BE CONSTRUCTED ALONG JOHNS PARKWAY AND MCMULLEN _ ~ w CF~TiFicA77o,V H ROAD. ~ A SIDEWALK FEE SHALL BE PAID TO THE CITY AT-THE TIME OF FIRST C.O. IN LIEU OF WALK ALONG . G 8" qTY WATER MAIN 'VG INC. 34618 T^WNHOUSES PLAN AND ~ INARY PLAT S .Da~,~-c 1 j ~j JAN 2 0 ~y~ CENTRAL PERPJlITTING CITY Or CLE;;i~`^~~ATER r~o.Fwsen sr. ~ ~0 ~~r ~sn $s-~9 zoo-~-~-'~--- ~~°"`'`~ EVELOPMENT REVIEW COMMITTEE Central Permitting Department January 9,1998 at 9:00 a.m. Conference Room 216 Standard review comments fot BAYSHORE TO`K~NHOMES (PRELIMINARY PLAT/PRELIMINARY SITE PLAN FORMAL REVIEW Reviewed by:, Department name: Please return comments to Steve Doherty DRCCOA~b1ENTS012998 ~- ~~- 1~. Before the SITE PLAN can be certified, the applicant must complete the following action(s)checked below: ZONING 1. Show the following on the site plan: ^ Legal description of the property. O Site area (square feet and acres). ^ Number of dwelling units and hotel units proposed and the resulting net density. ^ Floor area devoted to each category of use. ^ Floor area ratio. ^ Property owner s name, address and telephone number and the designated project representative name, address and telephone number. (and fax numbers). ^Perimeter landscape buffer ^Parking Formula calculation for each use. ^Locations of all driveways, parking areas and curb cuts. ^Delineation in mapped .form and computation of the area of the sited devoted to building coverage, open space for the lot, open space for the front yard and building coverage expressed in sq. ft. and as a percentage of the overall site. ^Location and screening of all refuse containers/compactors. ^North arrow. ^Zoning assigned to the subject property and surrounding properties depicted on the plan. ^Identify and distinguish between the new and existing buildings and driveways as well as other features on the plan. 02. Identify changes to the site data table if this is a plan amendment. ^3. Submit a completed CONCURRENCY REVIEW application for review with required fee ^4.Show all contiguous streets & roads. ^S.Display the site address on the site plan, obtaining assistance as needed from the responsible Zoning Specialist in establishing the correct address. ^6.Limit the site plan to one page. ^7.Legally record a Unity of Title for the project site and furnish proof of such action. ^8.Show the date(s) and condition(s) for approval of (a) variance or conditional use approvals by the Planning &Zoning Board or the Development Code Adjustment Board(s), or (b) a variance from the Flood Board for construction within 18 Eeet of a seawall. ^9. Other comments: FIRE DEAARTMENT ^ 1. Show on the plan a fire department connection a minimum of 15 ft. from the structure, adjacent to a paved drive and within 30 ft. of a fire hydrant assembly to provide for sprinklers. ^2. Locate on the plan minimum 20 Ft wide (a) FIRE LANE(S) on the N . E , S . W side of the structure beginning not closer to the structure than 10 feet. 03. Show minimum turning radii for designated drives and fire lanes as 42 feet on the plan. ^4. Locate a FIRE HYDRANT ASSEMBLY on the plan not more than 300 feet from the structure at ^5. Other comments: TRAFFIC ENGINEERING ^ 1. Show on the site plan the installation and maintenance of uniform traffic control devices at appropriate locations in accordance with the standards set forth by the Manual on Uniform . Traffic Control Devices as adopted by the Florida Department oETransportation under Rule 14.115.010, Florida Administrative Code. ^2. Show applicable Florida Statute number for handicapped parking spaces. ^3. Show all striping, pavement markings, signage and traffic control devices on the site plan conforming to F.D.O.T. Standard Indexs-1995 edition and F.A.C. 14- 110 (no 4" striping is to be shown). ^4. Show dimensions oEaisles, parking stalls, entrances and measurements for like plan features on the plan. ^5. Show all pavement markings, signage and traffic control devices on the site plan. ^6. Adjust handicap spaces to meet governmental standards with the correct handicap signs. ^7. Adjust parking stalls and/or driveways on the plan to the satisfaction of the Traffic Engineer. ^8. Indicate the location oElighting fixtures in the parking areas on the site plan. 09. Show all on-site lighting with 90-degree cutoffs directed away from abutting streets right-of- way and residential properties. ^10. Obtain a Significant Change of Use Determination from the FDOT per Florida Statute 335. 011. Execute across-parking/access easement linking the site with the site and specifying the exact number and location of the spaces that are to be jointly used by and between the sites after review and approval of the easement or agreement by the appropriate Ciry Staff. ^12. Address and resolve the need for right turn/left turn auxiliary lanes and the queuing for traffic related to the project. ^ 13. Other comments: ENVIRONMENTAL MANAGEMENT ^1. Provide a copy of the S~VF~YTMD permit application and calculations to Environmental Management. ^2. Show all protected trees by size, species and location. ^3. Show total paved vehicular use area and total interior landscape areas expressed in square feet and as a percentage of the overall site in the site plan data block. ^4. Provide dimensions on the plan for perimeter landscape buffers. ^5 Reflect the use of raised curbs or protective timbers on the site plan where interior landscaped areas abut pavement. . ^6. Depict all required parking lot interior areas on the plan by shading or cross-hatching. 07.Other comments: ENGINEERING PLAN REVIEW D 1. Show ADA ramps for sidewalks on the site plan. ^2. Complete the Dumpster Requirement Form and return it to the City Solid Waste Department. ^3. Add a note to the site plan stating "It it the rerpon.ribility of the owner to roll the dump.rter to a deri~nated location at an ar.rigned time ar appron°d by the Solid IY~arte Superintendent. " 04. State on the construction plan that the detector check should be DDCVA with the by-pass meter installed by the City with fee paid by contractor. D5. State on the plan that the 6" fire line tap to the 6" City water line is to state "6x6 tap" so that City Utility Accounts will know what fee to bill the contractor. ^6. Show backflow device(s) on'plans as RPD. ^7. Show all proposed utilities, storm water retention/detention systems and 50' perimeter contour elevations. ^8. Have the final site plan signed and sealed by a Professional Engineer registered in the State of Florida. D9.Other comments: PARKS AND RECREATION O1. Pay the required Open Space and Recreation Assessment Fee with review by the Clearwater Parks and Recreation Department. ^2. Note that the project is exempt from the City's Open Space and Recreation Assessment Fees. ^3. Other comments: B. Before the City can issue BUILDING PERMITS, the applicant must complete the following actions: ENVIRONMENTAL MANAGEMENT D1. Furnish the SWFWMD permit to Clearwater Environmental Management. ^2. Acquire clearing and grubbing and tree removal permits or a no tree verification form from Environmental Management. ^3. Provide drainage calculations. ^4. Other comments: ENGINEERING PLAN REVIEW ^1. Obtain and furnish evidence of all applicable permits from other governmental agencies including but not limited to: _(a) FDOT permit Eor work within the right-of--way to Engineering Services; _(b) Pinellas County Public Health Unit Permit, Ingress/Egress and a 10 foot Utility Easement over the proposed water mains up to and including meters, backflow prevention and hydrants. D2. Pay the sewer impact assessment Eee, based on the size of the water meter with assistance in determining the fee from Central Permitting/Licensing specialists. D3.Other comments: C. Before the Ciry can issue a CERTIFICATE OF OCCUPANCY, the applicant must complete the following actions: ZONING ^ I.Comments: TRAFFIC ENGINEERING ^ 1. Pay the Transportation Impact Fee as called Eor by the Pinellas County Transportation Impact Fee Ordinance with assistance in determining the fee from the Clearwater Traffic Engineering OFFice. 02.Other comments: ENGINEERING PLAN REVIEW ^ 1. Bring all substandard sidewalks and sidewalk ramps adjacent to or a part of the project up to standard, including ADA, and install sidewalk where none exists in the street right of way. 02. Have the City install backflow prevention devices with the owner/applicant paying all applicable fees. ^3. Visually screen the dumpster and provide gates with a minimum 12-foot clear opening to the front for access by Solid Waste vehicles. ^4. Furnish as-builts and an engineer's certification to Engineering Services. ^5.Other comments: D. Complete the following actions as indicated: ZONING ^1. Obtain the requisite building permits within one(1) year from the site plan certification date to prevent expiration of the site plan certification. ^2.Obtain the requisite certificate(s) of occupanry within three (3) years of the site plan certification date to prevent expiration of the site plan certification. ^3. Obtain review of and permits for signs and fencing/walls through separate review and permitting procedures. ^4.Other comments: DRCCOMMENIS010898 Before the PRELIMINARY PLAT can be recorded, the applicant must complete the following actions(s) checked below: A. Show the following on the plan: ^1. Title under which the proposed plat is to be recorded, ^2. Name, address, telephone and fax number of the applicant or property owner if other than the applicant, and the person preparing the plat, ^3. Identification clearly stating that the drawing is a preliminary plat, O4. Legal description of the property, U.S. Survey section, township and range, ^5. Existing and proposed rights-oE way and easements, ^6. Proposed street names, ^7. names, appropriately positioned, of adjoining plats; ^8. Approximate (to the nearest foot) dimensions and area of: The overall plat, Each lot, Street rights-of--way, including radii of cul-de-sacs, and Common open space or other land to be dedicated for a public purpose, O9. North arrow, scale and date. B. Show the following on the preliminary plat supplementary drawing: O1. Tide of the associated preliminary plat, ^2. Name, address, telephone and fax numbers of the applicant, property owner if other that the applicant, and person preparing the drawing, ^3. Sanitary sewer, public water supply, stormwater drainage, school or other identifiable service or taxing districts, ^4. nearest arterial or collector roadway intersection ^5. Buildings, watercourses, wetlands, tree masses, specimen trees and other existing features within the area to be platted and similar facts regarding existing conditions on land immediately adjacent thereto, ^G. inventory of existing natural resources and/or environmentally unique areas on the site, ^7. Existing sanitary and storm sewers, water mains, culverts and other underground structures within the plat or immediately adjacent thereto, including the location and size of the nearest water and sewer lines, ^8. existing and proposed spot elevations ^9. Proposed use of each lot and existing and proposed zoning of all property within the plat ^10. Zoning district classification for adjacent property ^11. Location of common open space, parks and other public or semi public areas or facilities within or immediately adjacent to the property to be platted ^ 12. location and size of sanitary sewers or other sewage disposal facilities planned, ^ 13. Land to be dedicated to the city, including. a. Street right-of--way, by functional classification, b. Recreation land, recreation Facilities and open space, c. Any other public use, 014. Preliminary site drainage system including. a. General surface drainage pattern, including proposed retention area, b. Floodplain definition and effect of applicable local ,state or federal flood standards or elevations. ,' . ~ ` ~ C. Ocher Department Comments: ^ 1. Zoning comments: ~ P ~ .. _ -ti -.~ Y r~ ... ,, ^2. Fire Department comments: .. - -. ~. ', ~. ..., .~. v .. ~ . ^3. Traffic Engineering comments: ~~ 4 e 1 r ^4. Environmental Management comments: .~ ^5. Engineering Plan Review comments: O6. Parks and Recreation comments: DRCCOMIvfENf5071998 ~"' r- ,---- ~~ ~- ~- ~ ~-~ ~ -T -~-~c ~ ~ ~~.~ -~ ~~-~ ~, ~~~ ~r DEVELOPMENT REVIEW COMMITTEE Central Permitting Department Januar~9, 1998 at 9:00 a.m. Conference Room 216 Standard review comments for BAYSHORE TO`KINHOMES (PRELIMINARY PLAT/PRELIMINARY SITE PLAN) FORMAL REVIEW Reviewed by:, Department name: Please return comments to Steve Doherty DRCCOMMENTS012998 A. Before the SITE PLAN can be certified, the applicant must complete the following action(s)checked below: ZONING 1. Show the following on the site plan: ^ Legal description of the property. Site area (square feet and acres). ^ Number of dwelling units and hotel units proposed and the resulting net density. Floor area devoted to each category of use. Floor area ratio. ^ Property owner's name, address and telephone number and the designated project representative name, address and telephone number. (and fax numbers). ^Perimeter landscape buffer ^Parking formula calculation for each use. ^Locations of all driveways, parking areas and curb cuts. ^Delineation in mapped Eorm and computation of the area of the sited devoted to building coverage, open space Eor the lot, open space for the front yard and building coverage expressed in sq. ft. and as a percentage of the overall site. ^Location and screening of all refuse containers/compactors. ^North arrow. OZoning assigned to the subject property and surrounding properties depicted on the plan. ^Identify and distinguish between the new and existing buildings and driveways as well as other features on the plan. ^2. Identify changes to the site data table iE this is a plan amendment. ^3. Submit a completed CONCURRENCY REVIEW application for review with required fee ^4.Show all contiguous streets & roads. ^S.Display the site address on the site plan, obtaining assistance as needed Erom the responsible Zoning Specialist in establishing the correct address. ^6.Limit the site plan to one page. ^7.Legally record a Unity of Title for the project site and furnish proof of such action. ^8.Show the date(s) and condition(s) for approval of (a) variance or conditional use approvals by the Planning & Zoning Board or the Development Code Adjustment Board(s), or (b) a variance from the Flood Board for construction within 18 feet of a seawall. ^9.Other comments: FIRE DEPARTMENT ^1. Show on the plan a Fire department connection a minimum of 15 ft. from the structure, adjacent to a paved drive and within 30 Et. of a fire hydrant assembly to provide Eor sprinklers. ^2. Locate on the plan minimum 20 Ft wide (a) FIRE LANE(S) on the N , E . S , W side of the structure beginning not closer to the structure than 10 feet. 03. Show minimum turning radii for designated drives and fire lanes as 42 feet on the plan. ^4. Locate a FIRE HYDRANT ASSEMBLY on the plan not more than 300 Eeet from the structure at O5.Other comments: TRAFFIC ENGINEERING ^1. Show on the site plan the installation and maintenance of uniform traffic control devices at appropriate locations in accordance with the standards set forth by the Manual on Uniform Tratl'ic Control Devices as adopted by the Florida Department oETransportation under Rule 14.115.010, Florida Administrative Code. ^2. Show applicable Florida Statute number Eor handicapped parking spaces. ^3. Show all striping, pavement markings, signage and traEEc control devices on the site plan conforming to F.D.O.T. Standard Indexs-1995 edition and F.A.C. 14- 110 (no 4" striping is to be shown). ^4. Show dimensions of aisles, parking stalls, entrances and measurements Eor like plan features on the plan. ^5. Show all pavement markings, signage and traffic control devices on the site plan. ^6. Adjust handicap spaces to meet governmental standards with the correct handicap signs. ^7. Adjust parking stalls and/or driveways on the plan to the satisfaction of the TrafEtc Engineer. ^8. Indicate the location of lighting fixtures in the parking areas on the site plan. ^9. Show all on-site lighting with 90-degree cutoffs directed away from abutting streets right-of- way and residential properties. ^10. Obtain a Significant Change of Use Determination Erom the FDOT per Florida Statute 335. ^ 11. Execute across-parking/access easement linking the site with the site and specifying the exact number and location of the spaces that are to be jointly used by and between the sites after review and approval of the easement or agreement by the appropriate Ciry StaEE. ^12. Address and resolve the need for right turn/left turn auxiliary lanes and the queuing for traEEc related to the project. ^ ] 3. Other comments: ENVIRONMENTAL MANAGEMENT 1. Provide a copy of the SV~FWMD permit application and calculations to Environmental Management. ~. Show all protected trees by size, species and location. 3. Show total paved vehicular use area and total interior landscape areas expressed in square feet and as a percentage of the overall site in the site plan data block. g/Provide dimensions on the plan for perimeter landscape buffers. Reflect the use of raised curbs or protective timbers on the site plan where interior landscaped areas abut pavement. 6. Depict all required parking lot interior areas on the plan by shading or cross-hatching. . Other comments: ENGINEERING PLAN REVIEW P~~~ S .Show ADA ramps Eor sidewalks on the site plan. ~. Complete the Dempster Requirement Form and return it to the City Solid Waste Department. ^ 3. Add a note to the site plan stating "It it the rer~on.ribility of the owner to mll the dur~rp.rter to a designated location at an ar.ri&ned time ar appmr,~d by the Solid IY/arte Ss~e>zntendent. " 04 State on the construction plan that the detector check should be DDCVA with the by-pass meter installed by the City with fee paid by contractor. 5. State on the plan that the 6" fire line tap to the 6" City water line is to state "6x6 tap" so that City Utility Accounts will know what fee to bill the contractor. 0~6. Show backflow device(s) on plans as RPD. 7. Show all proposed utilities, storm water retention/detention systems and 50' perimeter contour elevations. ^8 Have the final site plan signed and sealed by a Professional Engineer registered in the State of Florida. 9. Other comments: PARKS AND RECREATION ^ 1. Pay the required Open Space and Recreation Assessment Fee with review by the Clearwater Parks and Recreation Department. ^2. Note that the project is exempt from the City's Open Space and Recreation Assessment Fees. ^3. Other comments: B. Before the Ciry can issue BUILDING PERMITS, the applicant must complete the following actions: ENVIRONMENTAL MANAGEMENT ^ 1. Furnish the SWf1VMD permit to Clearwater Environmental Management. ^2. Acquire clearing and grubbing and tree removal permits or a no tree verification form from Environmental 1lianagement. ^3. Provide drainage calculations. ^4. Other comments: ENGINEERING PLAN REVIEW O 1. Obtain and furnish evidence of all applicable permits from other governmental agencies including but not limited to: _(a) FDOT permit Eor work within the right-of--way to Engineering Services; _(b) Pinellas County Public Health Unit Permit, Ingress/Egress and a 10 foot Utility Easement over the proposed water mains up to and including meters, backflow prevention and hydrants. 2. Pay the sewer impact assessment fee, based on the size of the water meter with assistance in determining the tee from Central Permitting/Licensing specialists. ^3. Other commen C. Before the City can issue a CERTIFICATE OF OCCUPANCY, the applicant must complete the following actions: ZONING ^ I .Comments: TRAFFIC ENGINEERING ^ 1. Pay the Transportation Impact Fee as called Eor by the Pinellas County Transportation Impact Fee Ordinance with assistance in determining the fee Erom the Clearwater Traffic Engineering Office. ^2.Other comments: ENGINEERING PLAN REVIEW ^1. Bring all substandard sidewalks and sidewalk ramps adjacent to or a part of the project up to standard, including ADA, and install sidewalk where none exists in the street right of way. ^2. Have the Ciry install backflow prevention devices with the owner/applicant paying all applicable fees. ^3. Visually screen the dumpster and provide gates with a minimum 12-foot clear opening to the front for access by Solid Waste vehicles. ^4. Furnish as-builts and an engineer's certif cation to Engineering Services. 05. Other comments: D. Complete the following actions as indicated: ZONING ^1. Obtain the requisite building permits within one(1) year Erom the site plan certification date to prevent expiration of the site plan certification. ^2. Obtain the requisite certiFcate(s) of occupancy within three (3) years of the site plan certification date to prevent expiration of the site plan certification. ^3. Obtain review of and permits for signs and fencing/walls through separate review and permitting procedures. ^4.Other comments: DRCCOMNfF.NI ~S0 f 0898 Before the PRELIMINARY PLAT can be recorded, the applicant must complete the following actions(s) checked below: A. Show the following on the plan: ^ 1. Title under which the proposed plat is to be recorded, ^2. Name, address, telephone and fax number of the applicant or property owner if other than the applicant, and the person preparing the plat, ^3. Identification clearly stating that the drawing is a preliminary plat, ^4. Legal description of the property, U.S. Survey section, township and range, ^5. Existing and proposed rights-oE way and easements, O6. Proposed street names, ^7. names, appropriately positioned, of adjoining plats; ^8. Approximate (to the nearest foot) dimensions and area of The overall plat, Each lot, Street rights-oE way, including radii of cul-de-sacs, and Common open space or other land to be dedicated Eor a public purpose, O9. North arrow, scale and date. B. Show the following on the preliminary plat supplementary drawing: ^1. Tide oEthe associated preliminary plat, ^2. Name, address, telephone and fax numbers of the applicant, property owner if other that the applicant, and person preparing the drawing, ^3. Sanitary sewer, public water supply, stormwater drainage, school or other identifiable service or taxing districts, ^4. nearest arterial or collector roadway intersection ^5. Buildings, watercourses, wetlands, tree masses, specimen trees and other existing features within the area to be platted and similar Facts regarding existing conditions on land immediately adjacent thereto, ^6. inventory of existing natural resources and/or environmentally unique areas on the site, ^7. Existing sanitary and storm sewers, water mains, culverts and other underground structures within the plat or immediately adjacent thereto, including the location and size of the nearest water and sewer lines, ^8. existing and proposed spot elevations ^9. Proposed use of each lot and existing and proposed zoning of all property within the plat ^10. Zoning district classification for adjacent property ^ 11. Location of common open space, parks and other public or semi public areas or Facilities within or immediately adjacent to the property to be platted ^ 12. location and size of sanitary sewers or other sewage disposal Facilities planned, ^ 13. Land to be dedicated to the city, including. a. Street right-oE way, by functional classification, b. Recreation land, recreation facilities and open space, c. Any other public use, ^14. Preliminary site drainage system including. a. General surface drainage pattern, including proposed retention area, b. Floodplain definition and eEEect of applicable local ,state or federal flood standards or elevations. C. Other Department Comments: ^ 1. Zoning comments: ^2. Fire Department comments: 03. Traffic Engineering comments: ^4. Environmental Management comments: D5. Engineering Plan Review comments: ^6. Parks and Recreation comments: DRCCO~NI'5012998 A. Before the SITE PLAN can be certified, the applicant must complete the following action(s)checked below: ZONING 1. Show the following on the site plan: C7~Lega1 description of the property. ^ ite area (square feet and acres). -~'' N°fC ~~ ~'~'/5/°'~NC ~ Number of dwelling units and hotel units proposed and the resulting net density. ~ Floor area devoted to each category of use. Q~ loor area ratio. ~roperty owner's name, address and telephone number and the designated project epresentative name, address and telephone number. (and fax numbers). rimeter landscape buffer ~arking formula calculation for each use. Locations of all driveways, parking areas and curb cuts. ^Delineation in mapped form and computation of the area of the sited devoted to building coverage, open space for the lot, open space for the Eront yard and building coverage expressed in sq. ft. and as a percentage of the overall site. ^Location and screening of all refuse containers/compactors. [North arrow. ning assigned to the subject property and surrounding properties depicted on the plan. Identify and distinguish between the new and existing buildings and driveways as well as other features on the plan. ~2. Identify changes to the site data table if this is a plan amendment. ~t ^313ubmit a completed CONCURRENCY REVIEW application for review with required Fee 4.Show all contiguous streets & roads. ^S.Display the site address on the site plan, obtaining assistance as needed from the responsible Zoning Specialist in establishing the correct address. /.Limit the site plan to one page. L17.Legally record a Unity of Title Eor the project site and furnish proof of such action. ^8.Show the date(s) and condition(s) for approval of (a) variance or conditional use approvals by the Planning & Zoning Board or the Development Code Adjustment Board(s), or (b) a variance Erom the Flood Board for construction within 18 feet of a seawall. ^9. Other comments: - ~ar2o~ ~ru~sta.~uc. /~J 'R~ S r'; 2. S'~.,,,a~w i•C s~ tti ~ uas~ 2~- FIRE DEPARTMENT ^1. Show on the plan a fire department connection a minimum of 15 ft. from the structure, adjacent to a paved drive and within 30 Et. of a Ere hydrant assembly to provide foc sprinklers. ^2. Locate on the plan minimum 20 Ft wide (a) FIRE LANE(S) on the N . E , S , W side of the structure beginning not closer to the structure than 10 feet. ^3. Show minimum turning radii Eor designated drives and Ere lanes as 42 feet on the plan. ^4. Locate a FIRE HYDRANT ASSEMBLY on the plan not more than 300 feet Erom the structure at L.,~ ~- ~ ~z~~- .~ti'u2~w r ~ v~/~,4~c ~._" ~'D/lr ~~ 7-'~ r'w ~ r~.r~ ~~ ^5.Other comments: u~ TRAFFIC ENGINEERING ^1. Show on the site plan the installation and maintenance of uniform traffic control devices at appropriate locations in accordance with the standards set forth by the Manual on Uniform Traffic Control Devices as adopted by the Florida Department of Transportation under Rule 14.115.010, Florida Administrative Code. ^2. Show applicable Florida Statute number for handicapped parking spaces. ^3. Show all striping, pavement markings, signage and traffic control devices on the site plan conforming to F.D.O.T. Standard Indexs-1995 edition and F.A.C. 14- 110 (no 4" sniping is to be shown). ~]4. Show dimensions of aisles, parking stalls, entrances and measurements for like plan features on the plan. WlArw ~-CCc~ t S 2 ~ ~ 05. Show all pavement markings, signage and trafEc control devices on the site plan. ~^,..//6. Adjust handicap spaces to meet governmental standards with the correct handicap signs. tiA7. Adjust parking stalls and/or driveways on the plan to the satisfaction of the Traffic Engineer. ^8. Indicate the location of lighting fixtures in the parking areas on the site plan. ^9. Show all on-site lighting with 90-degree cutoffs directed away from abutting streets right-oE way and residential properties. ^10. Obtain a Significant Change of Use Determination Erom the FDOT per Florida Statute 335. ^11. Execute across-parking/access easement linking the site with the site and specifying the exact number and location of the spaces that are to be jointly used by and between the sites after review and approval of the easement or ~/ agreement by the appropriate Ciry Staff 112. Address and resolve the need Eor right turn/left turn auxiliary lanes and the queuing for trafEc related to t~project. ~13.Other comments.' 1 •C. ARs~d~^'~`l ~}CG~S'S (~~~ ~ T~ yt CU1~ c~-~~`~ ~~T`~- `2. ) F'~LoJtt7~ I~t2.~C_Tf aWi1C ~dL.~F t~Fr C ~ e .~•drS f I ~-c/ACT /E1~~YS (S~ ENVIRONMENTAL MANAGEMENT ^1. Provide a copy of the SVUFWMD permit application and calculations to Environmental Management. ^2. Show all protected trees by size, species and location. ~3. Show total paved vehicular use area and total interior landscape areas expressed ins uare feet ~ and as a percentage of the overall site in the site plan data block.[t?.~~~~ a~ ~~tS~ N a'ro ~~ ^4. Provide dimensions on the plan Eor perimeter landscape buffers. ^5 Reflect the use of raised curbs or protective timbers on the site plan where interior landscaped areas abut pavement. ^6. Depict all required parking lot interior areas on the plan by shading or cross-hatching. 0~>~~ ENGINEERING PLAN REVIEt~ ~~v ~~" ^ 1. Show ADA ramps for sidewalks on the site plan. ^2. Complete the Dumpster Requirement Form and return it to the City Solid Waste Department. ^3. Add a note to the site plan stating "It is the re.rponribility of the owner to roll the dumprter to a de.ri~nated location at an arrigned time ar appro~d by the Solid Wane Superintendent. " ^4. State on the construction plan that the detector check should be DDCVA with the by-pass meter installed by the City with fee paid by contractor. ^5. State on the plan that the 6" fire line tap to the 6" City water line is to state "6xG tap" so that City Utility Accounts will know what fee to bill the contractor. ^6. Show backflow device(s) on plans as RPD. ^7. Show all proposed utilities, storm water retention/detention systems and 50' perimeter contour elevations. D8. Have the final site plan signed and sealed by a Professional Engineer registered in the State of Florida. ^9. Other comments: PARKS AND RECREATION D1. Pay the required Open Space and Recreation Assessment Fee with review by the Clearwater Parks and Recreation Department. D2. Note that the project is exempt Erom the City's Open Space and Recreation Assessment Fees. ^3. Other comments: B. Before the City can issue BUILDING PERMITS, the applicant must complete the following actions: ENVIRONMENTAL MANAGEMENT ^ 1. Furnish the SWFI7~MD permit to Clearwater Environmental Management. ^2. Acquire clearing and grubbing and tree removal permits or a no tree verification form from Environmental Management. ^3. Provide drainage calculations. ^4. Other comments: ENGINEERING PLAN REVIEW ^ 1. Obtain and furnish evidence of all applicable permits from other governmental agencies including but not limited to: _(a) FDOT permit Eor work within the right-of--way to Engineering Services; _(b) Pinellas County Public Health Unit Permit, Ingress/Egress and a 10 foot Utility Easement over the proposed water mains up to and including meters, backflow prevention and hydrants. ^2. Pay the sewer impact assessment fee, based on the size of the water meter with assistance in determining the fee from Central Permitting/Licensing specialists. ^3. Other comments: C. Before the Ciry can issue a CERTIFICATE OF OCCUPANCY, the applicant must complete the following actions: ZONING ^ I.Comments• TRAFFIC ENGINEERING ~71. Pay the Transportation Impact Fee as called for by the Pinellas County Transportation lI ~~ Impact Fee Ordinance with assistance in determining the Eee from the Clearwater Traffic Engineering Office. ~2. Other comments: ~4SS `1'. ~ • ~ ~•~ ~ ~u ~iPr^~Cc~i~,~ ENGINEERING PLAN REVIEW ^1. Bring all substandard sidewalks and sidewalk ramps adjacent to or a part of the project up to standard, including ADA, and install sidewalk where none exists in the street right of way. ^2. Have the Ciry install backflow prevention devices with the owner/applicant paying all applicable fees. ^3. Visually screen the dumpster and provide gates with a minimum 12-foot clear opening to the front for access by Solid ~X~aste vehicles. ^4. Furnish as-builts and an engineer's certification to Engineering Services. ^5.Other comments: D. Complete the following actions as indicated: ZONING ^1. Obtain the requisite building permits within one(1) year from the site plan certification date to prevent expiration of the site plan certification. ^2. Obtain the requisite certificate(s) of occupancy within three (3) years of the site plan certification date to prevent expiration of the site plan certification. 03. Obtain review of and permits Eor signs and fencing/walls through separate review and permitting procedures. ^4. Other comments: DR000~1VfS0f0898 Before the PRELIMINARY PLAT can be recorded, the applicant must complete the following acdons(s) checked below: A. Show the following on the plan: O1. Title under which the proposed plat is to be recorded, ^2. Name, address, telephone and fax number of the applicant or property owner if other than the applicant, and the person preparing the plat, ^3. Identification clearly stating that the drawing is a preliminary plat, ^4. Legal description of the property, U.S. Survey section, township and range, ^5. Existing and proposed rights-of--way and easements, ^6. Proposed street names, 07. names, appropriately positioned, of adjoining plats; ^8. Approximate (to the nearest Eoot) dimensions and area of The overall plat, Each lot, Street rights-of--way, including radii of cul-de-sacs, and Common open space or other land to be dedicated Eor a public purpose, ^9. North arrow, scale and date. B. Show the following on the preliminary plat supplementary drawing: ^1. Tide of the associated preliminary plat, ^2. Name, address, telephone and Fax numbers of the applicant, property owner if other that the applicant, and person preparing the drawing, ^3. Sanitary sewer, public water supply, stormwater drainage, school or other identifiable service or taxing districts, ^4. nearest arterial or collector roadway intersection ^5. Buildings, watercourses, wetlands, tree masses, specimen trees and other existing features within the area to be platted and similar facts regarding existing conditions on land immediately adjacent thereto, ^6. inventory of existing natural resources and/or environmentally unique areas on the site, ^7. Existing sanitary and storm sewers, water mains, culverts and other underground structures within the plat or immediately adjacent thereto, including the location and size of the nearest water and sewer lines, ^8. existing and proposed spot elevations O9. Proposed use of each lot and existing and proposed zoning of all property within the plat ^10. Zoning district classification for adjacent property ^ 11. Location of common open space, parks and other public or semi public areas or facilities within or immediately adjacent to the property to be platted ^12. location and size of sanitary sewers or other sewage disposal facilities planned, 013. Land to be dedicated to the city, including. a. Street right-of--way, by functional classification, b. Recreation land, recreation Facilities and open space, c. Any other public use, ^ 14. Preliminary site drainage system including. a. General surface drainage pattern, including proposed retention area, b. Floodplain definition and effect of applicable local ,state or federal Flood standards or elevations. C. Other Department Comments: ^ 1. Zoning comments: ^2. Fire Department comments: ^3. Traffic Engineering comments: ^4. Environmental Management comments: ^ 5. Engineering Plan Review comments: ^6. Parks and Recreation comments: DR0001~A~NI'SO12998 DEVELOPMENT REVIEW COMMITTEE Central Permitting Department JanuaryZ9, 1998 at 9:00 a.m. Conference Room 216 Standard review comments for BAYSHORE TO~KINHOMES (PRELIMINARY PLAT/PRELIMINARY SITE PLAN) FORMAL REVIEW Reviewed by: 1" 1 ~ k~ t~ v'~ Department name: (~~ ~~~ G~ Please return comments to Steve Doherty DRCCOMMENTS012998 A. Before the SITE PLAN can be certified, the applicant must complete the following action(s)checked below: ZONING 1. Show the following on the site plan: ^ Legal description of the property. ^ Site area (square feet and acres). ^ Number of dwelling units and hotel units proposed and the resulting net density. ^ Floor area devoted to each category of use. ^ Floor area ratio. ^ Property owner's name, address and telephone number and the designated project representative name, address and telephone number. (and Fax numbers). ^Perimeter landscape buffer ^Parking Formula calculation for each use. ^Locations of all driveways, parking areas and curb cuts. ODelineation in mapped Eorm and computation of the area of the sited devoted to building coverage, open space for the lot, open space Eor the front yard and building coverage expressed in sq. ft. and as a percentage of the overall site. ^Location and screening of all refuse containers/compactors. ^North arrow. ^Zoning assigned to the subject property and surrounding properties depicted on the plan. ^Identify and distinguish between the new and existing buildings and driveways as well as other features on the plan. ^2. Identify changes to the site data table iE this is a plan amendment. ^3. Submit a completed CONCURRENCY REVIEW application for review with required fee ^4.Show all contiguous streets & roads. ^S.Display the site address on the site plan, obtaining assistance as needed from the responsible Zoning Specialist in establishing the correct address. ^6.Limit the site plan to one page. ^7.Legally record a Unity of Title for the project site and furnish proof of such action. ^8.Show the date(s) and condition(s) for approval of (a) variance or conditional use approvals by the Planning &Zoning Board or the Development Code Adjustment Board(s), or (b) a variance from the Flood Board for construction within 18 feet of a seawall. ^9. Other comments: FIRE DEPARTMENT ^1. Show on the plan a Ere department connection a minimum of 15 ft. from the structure, adjacent to a paved drive and within 30 ft. of a Ere hydrant assembly to provide for sprinklers. ^2. Locate on the plan minimum 20 Ft wide (a) FIRE LANE(S) on the N . E . S . W side of the structure beginning not closer to the structure than 10 feet. ^3. Show minimum turning radii for designated drives and fire lanes as 42 feet on the plan. ^4. Locate a FIRE HYDRANT ASSEMBLY on the plan not more than 300 feet from the structure at O5.Other comments: TRAFFIC ENGINEERING ^1. Show on the site plan the installation and maintenance of uniform traffic control devices at appropriate locations in accordance with the standards set forth by the Manual on Uniform Traffic Control Devices as adopted by the Florida Department of Transportation under Rule 14.115.010, Florida Administrative Code. ^2. Show applicable Florida Statute number for handicapped parking spaces. ^3. Show all striping, pavement markings, signage and traffic control devices on the site plan conforming to F.D.O.T. Standard Indexs-1995 edition and F.A.C. 14- 110 (no 4" sniping is to be shown). !~ '~4. Show dimensions of aisles, parking stalls, entran~ es and measurements for like lan fea ~~r5 ~ L[-~ the ~~~~ ~Q,C t~eS S c~ r~ vLS re~ v t rt,. ~.~ W i l~~ , No'T~ ^5. Show all pavement markings, signage and traffic control devices on the site plan. ~~.. ^6. Adjust handicap spaces to meet governmental standards with the correct handicap signs. ~. Adjust parking stalls and/or driveways on the plan to the satisfaction of the Traffic Engineer. ^8. Indicate the location of lighting fixtures in the parking areas on the site plan. ^9. Show all on-site lighting with 90-degree cutoffs directed away from abutting streets right-of- way and residential properties. ^ 10. Obtain a Significant Change of Use Determination from the FDOT per Florida Statute 335. ^ 11. Execute across-parking/access easement linking the site with the site and specifying the exact number and location of the spaces that are to be jointly used by and between the sites after review and approval of the easement or agreement by the appropriate City Staff. ~12. Address and resolve the need for right turn/left turn auxiliary lanes and the queuing For traEEc related to the project. ~1 Othe comments: ' h t S 1''wl+ ~.r ~c NI u ! ~t~n _ tl°So o G~ a, ron n t t, ~ _ ~ b~vti~tb~ - • ENVIRONMENTAL MANAGEMENT ^ 1. Provide a copy of the SV~WMD permit application and calculations to Environmental Management. ^2. Show all protected trees by size, species and location. ^3. Show total paved vehicular use area. and total interior landscape areas expressed in square feet and as a percentage of the overall site in the site plan data block. ^4. Provide dimensions on the plan for perimeter landscape buffers. ^5 Reflect the use of raised curbs or protective timbers on the site plan where interior landscaped areas abut pavement. ^6. Depict all required parking lot interior areas on the plan by shading or cross-hatching. ^7. Other comments: ENGINEERING PLAN REVIEW ^ 1. Show ADA ramps for sidewalks on the site plan. ^2. Complete the Dumpster Requirement Form and return it to the City Solid Waste Department. ^3. Add a note to the site plan stating "It is the rerponribility of the owner to mll the dump.rter to a derignated location at an arrigned time as approved by the Solid IYlarte Superintendent. " ^4. State on the construction plan that the detector check should be DDCVA with the by-pass meter installed by the City with fee paid by contractor. ^5. State on the plan that the 6" fire line tap to the 6" City water line is to state "6x6 tap" so that City Utility Accounts will know what fee to bill the contractor. ^6. Show backflow device(s) on plans as RPD. ^7. Show all proposed utilities, storm water retention/detention systems and 50' perimeter contour elevations. ^8. Have the final site plan signed and sealed by a Professional Engineer registered in the State of Florida. ^9. Other comments: PARKS AND RECREATION ^ 1. Pay the required Open Space and Recreation Assessment Fee with review by the Clearwater Parks and Recreation Department. ^2. Note that the project is exempt from the City's Open Space and Recreation Assessment Fees. ^3. Other comments: B. Before the City can issue BUILDING PERMITS, the applicant must complete the following actions: ENVIRONMENTAL MANAGEMENT ^ 1. Furnish the SWFWMD permit to Clearwater Environmental Management. ^2. Acquire clearing and grubbing and tree removal permits or a no tree veriEcation Eorm from Environmental Management. ^3. Provide drainage calculations. ^4. Other comments: ENGINEERING PLAN REVIEW ^1.Obtain and furnish evidence of all applicable permits from other governmental agencies including but not limited to: _(a) FDOT permit for work within the right-of--way to Engineering Services; _(b) Pinellas County Public Health Unit Permit, Ingress/Egress and a 10 foot Utility Easement over the proposed water mains up to and including meters, backflow prevention and hydrants. ^2. Pay the sewer impact assessment fee, based on the size of the water meter with assistance in determining the fee from Central Permitting/Licensing specialists. ^3.Other comments: C. Before the City can issue a CERTIFICATE OF OCCUPANCY, the applicant must complete the following actions: ZONING ^ 1.Comments: TRAFFIC ENGINEERING ~,1. Pay the Transportation Impact Fee as called for by the Pinellas County Transportation Impact Fee Ordinance with assistance in determining the Fee from the Clearwater Traffic Engineering Office. II ~ _ ~. Other comments: Pass S ~tG /n$PG~td vl by /ra~c. ENGINEERING PLAN REVIEW ^1. Bring all substandard sidewalks and sidewalk ramps adjacent to or a part of the project up to standard, including ADA, and install sidewalk where none exists in the street right of way. ^2. Have the City install backflow prevention devices with the owner/applicant paying all applicable fees. ^3. Visually screen the dumpster and provide gates with a minimum 12-foot clear opening to the front for access by Solid Waste vehicles. ^4. Furnish as-builts and an engineer's certification to Engineering Services. 05.Other comments: D. Complete the following actions as indicated: ZONING ^1. Obtain the requisite building permits within one(1) year fcom the site plan certification date to prevent expiration of the site plan certification. 02. Obtain the requisite certificate(s) of occupancy within three (3) years of the site plan certification date to prevent expiration of the site plan certification. ^3.Obtain review of and permits Eor signs and fencing/walls through separate review and permitting procedures. ^4.Other comments: DRCCOMMF_NIS010898 Before the PRELIMINARY PLAT can be recorded, the applicant must complete the following actions(s) checked below: A. Show the following on the plan: Ol. Tide under which the proposed plat is to be recorded, ^2. Name, address, telephone and fax number of the applicant or property owner if other than the applicant, and the person preparing the plat, D3. Identification clearly stating that the drawing is a preliminary plat, ^4. Legal description of the property, U.S. Survey section, township and range, ^5. Existing and proposed rights-of--way and easements, D6. Proposed street names, ^7. names, appropriately positioned, of adjoining plats; D8. Approximate (to the nearest foot) dimensions and area of The overall plat, Each lot, Street rights-oE way, including radii of cul-de-sacs, and Common open space or other land to be dedicated for a public purpose, ^9. North arrow, scale and date. B. Show the following on the preliminary plat supplementary drawing: ^ 1. Title of the associated preliminary plat, D2. Name, address, telephone and Eax numbers of the applicant, property owner if other that the applicant, and person preparing the drawing, D3. Sanitary sewer, public water supply, stormwater drainage, school or other identifiable service or taxing districts, ^4. nearest arterial or collector roadway intersection D5. Buildings, watercourses, wetlands, tree masses, specimen trees and other existing features within the area to be platted and similar facts regarding existing conditions on land immediately adjacent thereto, ^6. inventory of existing natural resources and/or environmentally unique areas on the site, D7. Existing sanitary and storm sewers, water mains, culverts and other underground structures within the plat or immediately adjacent thereto, including the location and size of the nearest water and sewer lines, ^8. existing and proposed spot elevations D9. Proposed use of each lot and existing and proposed zoning of all property within the plat 010. Zoning district classification for adjacent property ^11. Location of common open space, parks and other public or semi public areas or facilities within or immediately adjacent to the property to be platted 012. location and size of sanitary sewers or other sewage disposal facilities planned, D 13. Land to be dedicated to the city, including. a. Street right-of--way, by functional classification, b. Recreation land, recreation facilities and open space, c. Any other public use, ^14. Preliminary site drainage system including. a. General surface drainage pattern, including proposed retention area, . b. Floodplain definition and effect of applicable local ,state or federal flood standards or elevations. ~.. Other Department Comments: ^ 1. Zoning comments: ^2. Fire Department comments: 03. TrafFtc Engineering comments: ^4. Environmental Management comments: ^5. Engineering Plan Review comments: ^6. Parks and Recreation comments: DRCCOMMENIS012998 DEVELOPMENT REVIEW COMMITTEE Central Permitting Department January, 1998 at 9:00 a.m. Conference Room 216 Standard review comments for BAYSHORE TOWNHOMES (PRELIMIl~TARY PLAT/PRELIMINARY SITE PLAN) FORMAL REVIEW Reviewed by: 1`-~~/~ ~-`v U Department name: ~' Please return comments to Steve Doherty DRCCOMMEN'TSO>2998 ~~~~ A. Before the SITE PLAN can be certified, the applicant must complete the following action(s)checked below: ZONING 1. Show the following on the site plan: ^ Legal description of the property. ^ Site area (square feet and acres). ^ Number of dwelling units and hotel units proposed and the resulting net density. ^ Floor area devoted to each category of use. ^ Floor area ratio, ^ Property owner's name, address and telephone number and the designated project representative name, address and telephone number. (and Fax numbers). ^Perimeter landscape buffer ^Parking formula calculation Eor each use. ^Locations of all driveways, parking areas and curb cuts. ^Delineation in mapped Eorm and computation of the area of the sited devoted to building coverage, open space for the lot, open space for the front yard and building coverage expressed in sq. ft. and as a percentage of the overall site. ^Location and screening of all refuse containers/compactors. ^North arrow. OZoning assigned to the subject property and surrounding properties depicted on the plan. ^Identify and distinguish between the new and existing buildings and driveways as well as other features on the plan. ^2. Identify changes to the site data table if this is a plan amendment. ^3. Submit a completed CONCURRENCY REVIEW application For review with required fee ^4.Show all contiguous streets & roads. ^S.Display the site address on the site plan, obtaining assistance as needed from the responsible Zoning Specialist in establishing the correct address. O6.Limit the site plan to one page. ^7.Legally record a Unity of Title for the project site and furnish proof of such action. ^8.Show the date(s) and condition(s) for approval of: (a) variance or conditional use approvals by the Planning & Zoning Board or the Development Code Adjustment Board(s), or (b) a variance Erom the Flood Board Eor construction within 18 feet of a seawall. ^9. Other comments: FIRE DEPARTMENT ^1. Show on the plan a Ere department connection a minimum of 15 ft. from the structure, adjacent to a paved drive and within 30 Et. of a fire hydrant assembly to provide for sprinklers. ^2. Locate on the plan minimum 20 Ft wide (a) FIRE LANE(S) on the N . E . S . W side of the structure beginning not closer to the structure than 10 feet. ^3. Show minimum turning radii Eor designated drives and fire lanes as 42 feet on the plan. ^4. Locate a FIRE HYDRANT ASSEMBLY on the plan not more than 300 feet from the structure at ^5.Other comments: TRAFFIC ENGINEERING ^ 1. Show on the site plan the installation and maintenance of uniform traffic control devices at appropriate locations in accordance with the standards set forth by the Manual on Uniform Tratlic Control Devices as adopted by the Florida Department oETransportation under Rule 14.115.010, Florida Administrative Code. 02. Show applicable Florida Statute number for handicapped parking spaces. 03. Show all striping, pavement markings, signage and traffic control devices on the site plan conforming to F.D.O.T. Standard Indexs-1995 edition and F.A.C. 14- 110 (no 4" striping is to be shown). ^4. Show dimensions oEaisles, parking stalls, entrances and measurements for like plan features on the plan. ^5. Show all pavement markings, signage and traffic control devices on the site plan. ^6. Adjust handicap spaces to meet governmental standards ~vith the correct handicap signs. 07. Adjust parking stalls and/or driveways on the plan to the satisfaction of the Traffic Engineer. ^8. Indicate the location of lighting fixtures in the parking areas on the site plan. ^9. Show all on-site lighting with 90-degree cutoffs directed away Erom abutting streets right-oE- way and residential properties. 010. Obtain a Significant Change of Use Determination from the FDOT per Florida Statute 335. ^ 11. Execute across-parking/access easement linking the site with the site and specifying the exact number and location of the spaces that are to be jointly used by and between the sites after review and approval of the easement or agreement by the appropriate Ciry Staff ^12. Address and resolve the need for right turn/left turn auxiliary lanes and the queuing for traff c related to the project. ^13. Other comments: ENVIRONMENTAL MANAGEMENT ^1. Provide a copy of the SVt/1~X/MD permit application and calculations to Environmental Management. D2. Show all protected trees by size, species and location. 3. Show total paved vehicular use area and total interior landscape areas expressed in square feet and as a percentage of the overall site in the site plan data block. ~e-he,~'z- 6~- c-ev i~~ rw~-~ ^4. Provide dimensions on the plan for perimeter landscape buffers. ^5 Reflect the use of raised curbs or protective timbers on the site plan where interior landscaped areas abut pavement. t~-h, o -~i 6 ~o~;d~ ENGINEERING PLAN REVIEW ~.~ ~~ ~~~ ~ l~~~t~b>-` ^G. Depict all required parking lot interior areas on the plan by shading or cross-hatching. ^1. Show ADA ramps for sidewalks on the site plan. ^2. Complete the Dumpster Requirement Form and return it to the City Solid Waste Department. ^3. Add a note to the site plan stating "It is the responsibility oJthe onmer to roll the dumpster to a designated location at an assigned time as approrrd by the Solid IYlarte Superintendent. " ^4. State on the construction plan that the detector check should be DDCVA with the by-pass meter installed by the City with fee paid by contractor. ^5. State on the plan that the 6" fire line tap to the 6" City water line is to state "6x6 tap" so that City Utility Accounts will know what fee to bill the contractor. ^6. Show backflow device(s) on plans as RPD. 07. Show all proposed utilities, storm water retention/detention systems and 50' perimeter contour elevations. ^8. Have the final site plan signed and sealed by a Professional Engineer registered in the State of Florida. ^9. Other comments: PARKS AND RECREATION ^1. Pay the required Open Space and Recreation Assessment Fee with review by the Clearwater Parks and Recreation Department. ^2. Note that the project is exempt From the City's Open Space and Recreation Assessment Fees. ^3. Other comments: B. Before the City can issue BUILDING PERMITS, the applicant must complete the following actions: ENVIRONMENTAL MANAGEMENT ~br~ ins ~~°~tS" ~. Furnish the SWFWMI~ermi~to Clearwater Environmental Management. T~2. Acquire clearing and grubbing and tree removal permits or a no tree verification form from Environmental Management. 03. Provide drainage c culations. ~4. Other comments: ~~ ,, !`~ ~ o~`~~ ~~ `L''e' ~ ~~e._ CC~ ~'~•, ~- ~~f ~~ t~ e<., off. ~a-^^ c r P2~~ ~ ~. ci I C~~(~?CGi~L~1' ~I11 kY9, r` '~~~ ~, (..,` s «~~ ~rc~ s ~~.~1~ ~Q-- 3'' c~~=F~-~~ l,Z- ~,~qq~~,~ ~(--S1~r-~.,I~s Z`f''' 1~.~~ ~~ pp ENGINEERING PLAN R~'VIE[1'! ~~~1«.~;1~~o S~ ~h 6--~ o ^~e- Pro v~Ul~ M~~~S'~c-Q ~ ,3 ~ p ~,~5~ t~C' . ~ (}~ G. 1G^~ ~ Ct~~'l~ (' 1L~ ~'~' ~. ` ^o~. S`e~ OBIS O n C7 ~ ` P c d ~ v t~~! ~~. O 1. Obtain and furnish evidence of all applicable permits from other g nmental agencies including but not limited to: _(a) FDOT permit Eor work within the right-of--way to Engineering Services; _(b) Pinellas County Public Health Unit Permit, Ingress/Egress and a 10 foot Utility Easement over the proposed water mains up to and including meters, backflow prevention and hydrants. ^2. Pay the sewer impact assessment fee, based on the size of the water meter with assistance in determining the fee from Central Permitting/Licensing specialists. 03. Other comments: ` y ~ ~~~ ~rc,d~ ~'e~'2V^~0`~.-~..re ~~ o,_~v lC)r1`'~~ ~c' ~r'~(`u~`~ J` ~} ~~~.5 ~~ ~"~-- ~ pup Q. ~~ `~ q ~ P r0 ~~~ S ,~ '~~CI '6~S~Z~,~ c~, rc~`~a9' 2 CR,~~~~~-t1o ~5. C. Before the City can issue a CERTIFICATE OF OCCUPANCY, the applicant must complete the following actions: ZONING ^ 1.Comments: TRAFFIC ENGINEERING ^1. Pay the Transportation Impact Fee as called for by the Pinellas County Transportation Impact Fee Ordinance with assistance in determining the fee from the Clearwater Traffic Engineering Office. O2.Other comments: ENGINEERING PLAN REVIEW ^1. Bring all substandard sidewalks and sidewalk ramps adjacent to or a part of the project up to standard, including ADA., and install sidewalk where none exists in the street right of way. ^2. Have the Ciry install backElow prevention devices with the owner/applicant paying all applicable fees. ^3. Visually screen the dumpster and provide gates with a minimum 12-Foot clear opening to the front for access by Solid Waste vehicles. ^4. Furnish as-builts and an engineer's certification to Engineering Services. D5.Other comments: D. Complete the following actions as indicated: ZONING ^1. Obtain the requisite building permits within one(1) year from the site plan certification date to prevent expiration of the site plan certification. ^2. Obtain the requisite certificate(s) of occupancy within three (3) years of the site plan certification date to prevent expiration of the site plan certification. 03. Obtain review of and permits for signs and fencing/walls through separate review and permitting procedures. ^4.Other comments: DRCCOMMF_N!'5010898 Before the PRELIMINARY PLAT can be recorded, the applicant must complete the following actions(s) checked below: A. Show the following on the plan: ^1. Title under which the proposed plat is to be recorded, ^2. Name, address, telephone and fax number of the applicant or property owner if other than the applicant, and the person preparing the plat, ^3. Identification clearly stating that the drawing is a preliminary plat, ^4. Legal description of the property, U.S. Survey section, township and range, ^5. Existing and proposed rights-of--way and easements, O6. Proposed street names, ^7. names, appropriately positioned, of adjoining plats; ^8. Approximate (to the nearest toot) dimensions and area oE: The overall plat, Each lot,_ Street rights-of-way, including radii of cul-de-sacs, and Common open space or other land to be dedicated for a public purpose, 09. North arrow, scale and -date. B. Show the following on the preliminary plat supplementary drawing: ^ 1. Title of the associated preliminary plat, ^2. Name, address, telephone and Eax numbers of the applicant, property owner iE other that the applicant, and person preparing the drawing, 03. Sanitary sewer, public water supply, storm~vater drainage, school or other identifiable service or taxing districts, ^4. nearest arterial or collector roadway intersection ^5. Buildings, watercourses, wetlands, tree masses, specimen trees and other existing features within the area to be platted and similar facts regarding existing conditions on land immediately adjacent thereto, ^6. inventory of existing natural resources and/or environmentally unique areas on the site, 07. Existing sanitary and storm sewers, water mains, culverts and other underground structures within the plat or immediately adjacent thereto, including the location and size of the nearest water and sewer lines, ^8. existing and proposed spot elevations ^9. Proposed use of each lot and existing and proposed zoning of all property within the plat ^ 10. Zoning district classification for adjacent property 011. Location of common open space, parks and other public or semi public areas or Facilities within or immediately adjacent to the property to be platted ^ 12. location and size of sanitary sewers or other sewage disposal Facilities planned, ^ 13. Land to be dedicated to the city, including a. Street right-oE--way, by functional classification, b. Recreation land, recreation Facilities and open space, c. Any other public use, 014. Preliminary site drainage system including a. General surface drainage pattern, including proposed retention area, b. Floodplain definition and effect of applicable local ,state or federal flood standards or elevations. ,, ~. ~.. Other Department Comments: ^ 1. Zoning commen ^2. Fire Department comments: D3. Traffic Engineering commen ^4. Environmental Management comments: D5. Engineering Plan Review comments: ^6. Parks and Recreation comments: DRCCOMNfENTS012998 f { J ~~ j DEVELOPMENT REVIEW COMMITTEE Central Permitting Department January 8,1998 at 9:00 a.m. Conference Room 216 Standard review comments for BAYSHORE TO~KINHOMES (PRELIMINARY SITE PLAN/PLAT) FORMAL REVIEW Reviewed by. 5 • Dot-Ic e- ~ ti' Department name: ~~ ~~ ~~2w~ ~ 'r' Please return comments to Steve Doherty DKCCOMMEIVTS010898 A. Before the SITE PLAN can be certified, the applicant must complete the following actioa(s)checked below: ZO 1. Show the following on the site plan: gal desorption of the property. [~f Site area (square Eeet and acres). umber of dwelling units and hotel units proposed and the resulting net density. ~oor area devoted to each category of use. ~oor area ratio. ® Property owner's name, address and telephone number and the designated project representative name, address and telephone number. (and fax numbers). [Perimeter landscape buffer C~Parking formula calculation for each use. [Locations of all driveways, parking areas and curb cuts. SNo`/, Delineation in mapped form and computation of the area of the sited devoted to building F0 2 ` ~ coverage, open space for the lot, open space Eor the front yard and building coverage expressed ~~ ~ in sq. ft. and as a percentage of the overall site. pvw„psr~ ~ ~o Lar~yo or/ 2 c ~~~(I OLocation and screening of all refuse containers/compactors._ w~`C wr.~ (Z ~orth arrow. ~~ing assigned to the subject property and surrounding properties depicted on the plan. Identify and distinguish between the new and existing buildings and driveways as well as other Features on the plan. _ Identify changes to the site d`a~ta~ta~bl'e if this is a plan amendment. . Submit a completed CONC ~ CY REVIEW application for review with required fee 4.Show all contiguous streets & roads. ^S.Display the site address on the site plan, obtaining assistance as needed from the responsible Z Wing Specialist in establishing the correct address. ~6 'mit the site plan to one page. Q7.Legally recocd a Unity of Title for the project site and furnish proof of such action. ^8.Show the date(s) and condition(s) for approval of a (a) variance or conditional use approvals by the Planning & Zoning Board or the ~~~`~¢~,~ Development Code Adjustment Board(s), or (b) a variance from the Flood Board for construction within 18 feet of a seawall. D9.Other comments: FIREFIRE DEPARTME~ O1. Show on the plan a Ere department connection a minimum of 15 ft. from the structure, adjacent to a paved drive and within 30 ft. of a fire hydrant assembly to provide for sprinklers. ^2. Locate on the plan minimum 20 Ft wide (a) FIRE LANE(S) on the N . E . S . W side of the structure beginning not closer to the structure than 10 feet. O3. Show minimum turning radii for designated drives and Ere lanes as 42 feet on the plan. ^4. Locate a FIRE HYDRANT ASSEMBLY on the plan not more than 300 feet from the structure at D5.Other comments: TRAFFIC ENGnVEERING ^1. Show on the site plan the installation and maintenance of uniform traffic control devices at appropriate locations in accordance with the standards set forth by the Manual on Uniform T.af~'ir ['ontrol Devices as adopted by the Florida Department oETranspoctation under Rule 14.115.010, Florida Administrative Code. O2. Show applicable Florida Statute number for handicapped parking spaces. ^3. Show all striping, pavement markings, signage and traffic control devices on the site plan conforming to F.D.O.T. Standard Indexs-1995 edition and F.A.C. 14- 11.0 (no 4" striping is to be shown). 04. Show dimensions of aisles, parking stalls, entrances and measurements for like plan features on the plan. D5. Show all pavement markings, signage and traffic control devices on the site plan. ^6. Adjust handicap spaces to meet governmental standards with the correct handicap signs. D7. Adjust parking stalls and/or driveways on the plan to the satisfaction of the Traffic Engineer. D8. Indicate the location of lighting fixtures in the parking areas on the site plan. ^9. Show all on-site lighting with 90-degree cutoffs directed away from abutting streets right-of- way and residential properties. O10.Obtain a SigniEtcant Change of Use Determination from the FDOT per Florida Statute 335. 011. Execute across-parking/access easement linking the site with the site and specifying the exact number and location of the spaces that are to be jointly used by and between the sites after review and approval of the easement or agreement by the appropriate City Staff. X12. Address and resolve the need for right turn/left turn auxiliary lanes and the queuing for traffic related to the project. ^ 13.Other comments: ENVIRONMENTAL MANAGEMENT O1. Provide a copy of the SWF'~X/MD permit application and calculations to Environmental Management. ^2. Show all protected trees by size, species and location. ^3. Show total paved vehicular usg area and total interior landscape areas expressed in square feet and as a percentage of the overall site in the site plan data block. D4. Provide dimensions on the plan for perimeter landscape buffers. ^5 Reflect the use of raised curbs or protective timbers on the site plan where interior landscaped areas abut pavement. ^6. Depict all required parking lot interior areas on the plan by shading or cross-hatching. ^7.Other comments: ~C]V!_r1VFFRlNl. PrANRFVIEL~' O1. Show ADA ramps for sidewalks on the site plan. O2. Complete the Dumpster Requirement Form and return it to the City Solid Waste Department. O3. Add a note to the site plan stating "It u the nrponribility of the owner to roll the dump,rter to a derignated location at an arrigned time ar apprn~ed by the Solid il7arte Su~inknden~ " D4. State on the construction plan that the detector check should be DDCVA with the by-pass meter installed by the City with fee paid by contractor. ^ 5. State on the plan that the 6" Fire line tap to the 6" City water line is to state "6x6 tap" so that City Utility Accounts will know what Eee to bill the contractor. ^6. Show backflow device(s) on plans as RPD. ^7. Show all proposed utilities, storm water retention/detention systems and 50' perimeter contour elevations. ^8. Have the final site plan signed and sealed by a Professional Engineer registered in the State of Florida. ^9.Other comments: PARKS AND RECREATION ^ 1. Pay the required Open Space and Recreation Assessment Fee with review by the Clearwater Parks and Recreation Department. D2. Note that the project is exempt from the City's Open Space and Recreation Assessment Fees. O3.Other comments• B. Before the City can issue BUILDING PERMITS, the applicant must complete the following actions: ENVIRONMENTAL MANAGEMENT ^ 1. Furnish the SWFWMD permit to Clearwater Environmental Management. O2. Acquire clearing and grubbing and tree removal permits or a no tree verification form from Environmental Management. ^3. Provide drainage calculations. ^4.Other comments• ENGINEERING PLAN REVIEW O 1.Obtain and furnish evidence of all applicable permits from other governmental agencies including but not limited to: _(a) FDOT permit for work within the right-of--way to Engineering Services; _(b) Pinellas County Public Health Unit Permit, Ingress/Egress and a 10 foot Utility Easement over the proposed water mains up to and including meters, backflow prevention and hydrants. O2. Pay the sewer impact assessment fee, based on the size of the water meter with assistance in deternmining the fee Erom Central Permitting/Licensingsperialists. ^3.Other comments• C. Before the City can issue a CERTIFICATE OF OCCUPANCY, the applicant must complete the following actions: ZO ^ I .Comments• TRAFFIC ENGINEERING ^ 1. Pay the Transportation Impact Fee as called for by the Pinellas County Transportation Impact Fee Ordinance with assistance in determining the fee from the Clearwater Traffic Engineering Office. ^2. Other comments: ENGINEERING PLAN REVIE [~ ^ 1. Bring all substandard sidewalks and sidewalk ramps adjacent to or a part of the project up to standard, including ADA, and install sidewalk where none exists in the street right of way. ^2. Have the Ciry install backflow prevention devices with the owner/applicant paying all applicable fees. ^3. Visually screen the dumpster and provide gates with a minimum 12-foot clear opening to the front for access by Solid Waste vehicles. ^4. Furnish as-builts and an engineer s certification to Engineering Services. ^5.Other comments: D. Complete the following actions as indicated: ZO G ~] 1. Obtain the requisite building permits within one(1) year from the site plan certification date to prevent expiration of the site plan certif cation. ~2: Obtain the requisite certificate(s) of occupanry within three (3) years of the site plan certification date to prevent expiration of the site plan certification. ~3.Obtain review of and permits for signs and fencing/walls through separate review and permitting procedures. ^4.Other comments: DRCCOA4I~TIS0f0898 Before the PRELIMINARY PLAT can be recorded, the applicant must complete the following actions(s) checked below: ~. Show the following on the plan: ^1. Title under which the proposed plat is to be recorded, O2. Name, address, telephone and fax number of the applicant or property owner if other than the applicant, and the person preparing the plat, ^3. Identification clearly stating that the drawing is a preliminary play, O4. Legal description of the property, U.S. Survey section, township and range, ^5. Existing and proposed rights-of--way and easements, ^6. Proposed street names, O7. names, appropriately positioned, of adjoining plats; ^8. Approximate (to the nearest foot) dimensions and area of: (1) The overall plat, (2) Each lot,_(3) Street rights-of--way, including radu of cul-de-sacs, and (4) Common open space or other land to be dedicated for a public purpose, O9. North arrow, scale and date. B. Show the following on the preliminary plat supplementary drawing. ^ 1. Title of the associated preliminary plat, ^2. Name, address, telephone and Eax numbers of the applicant, property owner if other that the applicant, and person preparing the drawing; O3. Sanitary sewer, public water supply, stormwater drainage, school or other identifiable service or taxing districts, ^4. nearest arterial or collector roadway intersection ^5. Buildings, watercourses, wetlands, tree masses, specimen trees and other existing features within the area to be platted and similar facts regarding existing conditions on land immediately adjacent thereto, O6. inventory of existing natural resources and/or environmentally unique areas on the site, ^7. Existing sanitary and storm sewers, water mains, culverts and other underground structures within the plat or immediately adjacent thereto, including the location and size of the nearest water and sewer lines, O8. existing and proposed spot elevations 09. Proposed use of each lot and existing and proposed zoning of all property within the plat ^10. Zoning district classification for adjacent property 011. Location of common open space, parks and other public or semi public areas or Facilities within or immediately adjacent to the property to be platted ^12. location and size of sanitary sewers or other sewage disposal facilities planned, ^ 13. Land to be dedicated to the city, including: a. Street right-of--way, by functional classification, b. Recreation land, recreation facilities and open space, c. Any other public use, ^ 14. Preliminary site drainage system including. a. General surface drainage pattern, including proposed retention area, b. Floodplain definition and effect of applicable local ,state or Federal flood standards or elevations. C. Other Department Comments: ^ 1. Zoning comments: O2. Fire Department comments: ^3. Traffic Engineering comments: ^4. Environmental Management comments: O5. Engineering Plan Review comments: O6. Parks and Recreation comments: DRCCOMMEPTI'Sf?1897 ,_ DEVELOPMENT REVIEW COMMITTEE Central Permitting Department January 8,1998 at 9:00 a.m. Conference Room 216 Standard review comments for BAYSHORE TO~K~NHOMES (PRELIMINARY SITE PLAN/PLAT) FORMAL REVIEW Reviewed by: °~" / Department name: Please return comments to Steve Doherty DRCCOMMENT,S010898 Pw~~ti ~ A. Before the SITE PLAN can be certified, the applicant must complete the following action(s)checked below: ZON/NG 1. Show the following on the site plan: ^ Legal description of the property. ^ Site area (square feet and acres). ^ Number of dwelling units and hotel units proposed and the resulting net density. ^ Floor area devoted to each category of use. ^ Floor area ratio. ^ Property owner s name, address and telephone number and the designated project representative name, address and telephone number. (and fax numbers). ^Perimeter landscape buffer ^Parking formula calculation for each use. ^Locations of all driveways, parking areas and curb cuts. ^Delineation in mapped form and computation of the area of the sited devoted to building coverage, open space for the lot, open space for the front yard and building coverage expressed in sq. ft. and as a percentage of the overall site. ^Location and screening of all refuse containers/compactors. ^North arrow. ^Zoning assigned to the subject property and surrounding properties depicted on the plan. ^Identify and distinguish between the new and existing buildings and driveways as well as other features on the plan. ^2. Identify changes to the site data table if this is a plan amendment. ^3. Submit a completed CONCURRANCY REVIEW application for review with required fee ^4.Show all contiguous streets & roads. ^S.Display the site address on the site plan, obtaining assistance as needed from the responsible Zoning Specialist in establishing the correct address. ^6.Limit the site plan to one page. ^7.Legally record a Unity of Title for the project site and furnish proof of such action. ^8.Show the date(s) and condition(s) for approval of (a) variance or conditional use approvals by the Planning & Zoning Board or the Development Code Adjustment Board(s), or (b) a variance from the Flood Board Eor construction within 18 feet of a seawall. ^9.Other comments: FIRE DEPARTMENT ^1. Show on the plan a Ere department connection a minimum of 15 h. from the structure, adjacent to a paved drive and within 30 ft. of a fire hydrant assembly to provide for sprinklers. ^2. Locate on the plan minimum 20 Ft wide (a) FIRE LANE(S) on the N . E . S . W side of the structure beginning not closer to the structure than 10 Eeet. ^3. Show minimum fuming radii for designated, drives and fire lanes as 42 feet on the plan. ^4. Locate a FIRE HYDRANT ASSEMBLY on the plan not more than 300 feet Erom the structure at ^5.Other comments: TRAFFIC ENGINEERING O1. Show on the site plan the installation and maintenance of uniform traffic control devices at appropriate locations in accordance with the standards set forth by the Manual on Uniform Tratl"ic Control Devices as adopted by the Florida Department of Transportation under Rule 14.115.010, Florida Administrative Code. O2. Show applicable Florida Statute number For handicapped parking spaces. O3. Show all striping, pavement markings, signage and traffic control devices on the site plan conforming to F.D.O.T. Standard Indexs-1995 edition and F.A.C. 14- 110 (no 4" striping is to be shown). ^4. Show dimensions of aisles, parking stalls, entrances and measurements Eor like plan features on the plan. O5. Show all pavement markings, signage and traffic control devices on the site plan. O6. Adjust handicap spaces to meet governmental standards with the correct handicap signs. D7. Adjust parking stalls and/or driveways on the plan to the satisfaction of the Traffic Engineer. O8. Indicate the location of lighting fixtures in the parking areas on the site plan. O9. Show all on-site lighting with 90-degree cutoffs directed away from abutting streets right-of- way and residential properties. ^10. Obtain a Significant Change of Use Determination from the FDOT per Florida Statute 335. 011. Execute across-parking/access easement linking the site with the site and specifying the exact number and location of the spaces that are to be jointly used by and between the sites after review and approval of the easement or agreement by the appropriate City Staff. ^12. Address and resolve the need for right turn/left turn auxiliary lanes and the queuing Eor traffic related to the project. 013. Other comments: ENVIRONMENTAL MANAGEMENT ®l. Provide a copy of the SV~/FWMD permit application and calculationsJ, te~virenme3rtal-- .~~~.~ e1JC~ ~ ~Gl~~ ~ cou~1~~~ s~.©w~~ r~ ~g~ ~s ~ R~s~~M ~~~~d ^2. Show all protected trees by size, species and location. ~ ~3. Show total paved vehicular usg area a:..~'~--~°"a°" ~~"~ expressed in square Eeet and as a percentage of the overall site in the site plan data block. 4. Provide dimensions on the plan for perimeter landscape buffers. ^5 Reflect the use of raised curbs or protective timbers on the site plan where interior landscaped areas abut pavement. ~6. Depict all required parking lot interior areas on the lan by shading or cross-hatching. ®7. Other comments: ~~ew* cx~l p~~a+`ed o~-~~~'~ ~lrb.~,~e ~ ~~ S I'W w ~ lJ Q1~ Q ~ ~ M 0. e- C wv ~ ar~c7e e~v~~l~r~e, f a o.~ Q r$6~ we.~- .t~ C.ro~S~~ S. ~ 3.S S4~aw ~ ~~r~~ L~.j.c~sCRpe ~-~''e~ ~.~p~"eSs ~`~ $~'e `1-- a. S a ~ e rc_e,~~g~e p`t-- `~ ~ ~o~.~ ~ a-~`~ v~hv`e.W~o.r- v S ~ c:~5'~q.. ~ `~. ~ ~ F~.s~' 0.~0~~ ~0~,,.s ~~rlcw wJ M.~~f- he Safi ~ a e~ ~~ lie-ash' S' m. ~d ~~, \ b • {V b~ l Z S ~.p .~ t ~ ('e `~-~S'Ca~c.-C c o c~ 2. ~c.~v~b •~ ~-1- a.. ~~. `L, i~~~cv.uv~ ld. Cbcc~e~~ CO~~vt' ~~n~g~ ~ro~~,e c~PcAa1e.~ ~b~'~~t'0~'hy . ' y"G,~ WlJ n..4 Co.~`C:~l ()t~~V`S ~" ~4W t~ f~0 `(~,~ ~SS ~~ V'b~.S +hr~ ~, ~ ~ ~~d ~ ~ ~~~ `~~ to 0 5~ ENGINEERING PLA11l REYIEL~ ~ b bd ~ ~a; '~ , ^ 1. Show ADA ramps Eor sidewalks on the site plan. ^2. Complete the Dumpster Requirement Form and return it to the City Solid Waste Department. ^3. Add a note to the site plan stating "It it the nrponribi~ty of t& oumcr to roll the dumprter to a derig~ated location at an arrigncd time ar appmard by the Sold il~afte .S'apaintcnden~ " ^4. State on the construction plan that the detector check should be DDCVA with the by-pass meter installed by the City with fee paid by contractor. ^5. State on the plan that the 6" Ere line tap to the 6" City water line is to state "6x6 tap" so that City Utility Accounts will know what fee to bill the contractor. ^6. Show backflow device(s) on plans as RPD. 07. Show all proposed utilities, storm water retention/detention systems and 50' perimeter contour elevations. ^8. Have the final site plan signed and sealed by a Professional Engineer registered in the State of Florida. ^9.Other comments: PARKS AND RECREATION ^ 1. Pay the required Open Space and Recreation Assessment Fee with review by the Clearwater Parks and Recreation Department. ^2. Note that the project is exempt from the City's Open Space and Recreation Assessment Fees. ^3.Other comments• B. Before the City can issue BUILDING PERMITS, the applicant must complete the following actions: ENVIRONMENTAL MANAGEMENT ~Co~ `~1. Furnish the SVV.FWMI~permit to Clearwater Environmental Management. Imo. Acquire clearing and grubbing and tree removal permits or a no tree verification form from Environmental Management. ^3. Provide drainage calculations. ~4.Other comments: ~'s'ou~Q ~~C~a~ ~-~ S ~mv ~e-~ . ENGINEERING PLANREVIE[V ^1.Obtain and furnish evidence of all applicable permits Erom other governmental agencies including but not limited to: _(a) FDOT permit Eor wock within the right-of--way to Engineering Services; _(b) Pinellas County Public Health Unit Permit, Ingress/Egress and a 10 Eoot Utility Easement over the proposed water mains up to and including meters, backflow prevention and hydrants. ^2. Pay the sewer impact assessment Eee, based on the size of the water meter with assistance in determining the fee from Central Permitting/Licensingspeculists. ^3.Other comments: C. Before the City can issue a CERTIFICATE OF OCCUPANCY, the applicant must complete the following actions: ZO G ^ I .Comments• TRAFFIC ENGINEERING ^1. Pay the Transportation Impact Fee as called Eor by the Pinellas County Transportation Impact Fee Ordinance with assistance in determining the fee from the Clearwater Traffic Engineering Office. ^2. Other comments: ENGINEERING PLAN REYIEf~ ^ 1. Bring all substandard sidewalks and sidewalk ramps adjacent to or a part o.E the project up to standard, including ADA, and install sidewalk where none exists in the street right of way. ^2. Have the City install backflow prevention devices with the owner/applicant paying all applicable fees. ^3. Visually screen the dumpster and provide gates with a minimum 12-foot clear opening to the front for access by Solid Waste vehicles. ^4. Furnish as-builts and an engineer's certification to Engineering Services. ^5.Other comments: D. Complete the following actions as indicated: ZO G ^1.Obtain the requisite building permits within one(1) year from the site plan certification date to prevent expiration of the site plan certification. ^2.Obtain the requisite certificate(s) of occupanry within three (3) years of the site plan certification date to prevent expiration of the site plan certification. ^3.Obtain review of and permits for signs and fencing/walls through separate review and permitting procedures. ^4.Other comments: DRCCOA~NI3~0f0898 Before the PRELIMINARY PLAT can be recorded, the applicant must complete the following actions(s) checked below: A. Show the following on the plan: ^ 1. Title under which the proposed plat is to be recorded, ^2. Name, address, telephone and Eax number of the applicant or property owner if other than the applicant, and the person preparing the plat, ^3. Identification clearly stating that the drawing is a preliminary play, 04. Legal description of the property, U.S. Survey section, township and range, 05. Existing and proposed rights-of--way and easements, ^6. Proposed street names, ^7. names, appropriately positioned, of adjoining plats; ^8. Approximate (to the nearest foot) dimensions and area of: (1) The overall plat, (2) Each lot,_(3) Street rights-oE--way, including radii of cul-de-sacs, and (4) Common open space or other land to be dedicated for a public purpose, ^9. North arrow, scale and date. B. Show the following oa the preliminary plat supplementary drawing. ^1. Title of the associated preliminary plat, 02. Name, address, telephone and Eax numbers of the applicant, property owner if other that the applicant, and person preparing the drawing; 03. Sanitary sewer, public water supply, stormwater drainage, school or other identifiable service or taxing districts, ^4. nearest arterial or collector roadway intersection O5. Buildings, watercourses, wetlands, tree masses, specimen trees and other existing Features within the area to be platted and similar facts regarding existing conditions on land immediately adjacent thereto, ^6. inventory of existing natural resources and/or environmentally unique areas on the site, ^7. Existing sanitary and storm sewers, water mains, culverts and other underground structures within the plat or immediately adjacent thereto, including the location and size of the nearest water and sewer lines, ^8. existing and proposed spot elevations ^9. Proposed use of each lot and existing and proposed zoning of all property within the plat 010. Zoning district classification for adjacent property 011. Location of common open space, parks and other public or semi public areas or facilities within or immediately adjacent to the property to be platted ^12. location and size of sanitary sewers or other sewage disposal facilities planned, 013. Land to be dedicated to the city, including. a. Street right-of--way, by functional classification, b. Recreation land, recreation facilities and open space, c. Any other public use, ^ 14. Preliminary site drainage system including. a. General surface drainage pattern, including proposed retention area, b. Floodplain definition and effect of applicable local ,state or federal flood standards or elevations. C. Other Department Commence: ^ 1. Zoning comments: ^2. Fire Department comments: D3. Traffic Engineering comments: ^4. Environmental Management comments: O5. Engineering Plan Review comments: ^6. Parks and Recreation comments: DRCCOMMEN13f2f897 DEVELOPMENT REVIEW COMMITTEE Central Permitting Department January 8, 1998 at 9:00 a.m. Conference Room 216 Standard review comments for BAYSHORE TOWNHOMES (PRELIMINARY SITE PLAN/PLAT) FORMAL REVIEW C~~~ ~R~~ ~r~s.~ ~ Reviewed by: ~~"~' Department name: i' i~~` Please return comments to Steve Doherty DRCCOMMENTS010898 A. Before the SITE PLAN can be cued, the applicant must complete the following action(s)checked below ~~~~ i. Show the following on the site plan: ^ Legal description of the property. O Site area (square Eeet and acres). ^ Number of dwelling units and hotel units proposed and the resulting net density. ^ Floor area devoted to each category of use. ^ Floor area ratio. ^ Property owner's name, address and telephone number and the designated project representative name, address and telephone number. (and Eax numbers). ^Perimeter landscape buffer ^Parking formula calculation for each use. ^Locations of all driveways, parking areas and curb cuts. ^Delineation in mapped form and computation of the area of the sited devoted to building coverage, open space Eor the lot, open space for the Eront yard and building coverage expressed in sq. ft. and as a percentage of the overall site. OLocation and screening of all refuse containers/compactors. ^North arrow. ^Zoning assigned to the subject property and surrounding properties depicted on the plan. ^Identify and distinguish between the new and existing buildings and driveways as well as other features on the plan. ^2. Identify changes to the site data table if this is a plan amendment. ^3. Submit a completed CONCURRANCY REVIEW application for review with required fee ^4.Show all contiguous streets & roads. ^S.Display the site address on the site plan, obtaining assistance as needed Erom the responsible Zoning Specialist in establishing the correct address. ^6.Limit the site plan to one page. ^7.Legally record a Unity of Title for the project site and furnish proof of such action. ^8.Show the date(s) and condition(s) for approval of (a) variance or conditional use approvals by the Planning &Zoning Board or the Development Code Adjustment Board(s), or (b) a variance from the Flood Board Eor construction within 18 feet of a seawall. 09. Other comments: FIRE DEPARTMENT ^1. Show on the plan a fire department connection a minimum of 15 h. from the structure, adjacent to a paved drive and within 30 ft. of a fire hydrant assembly to provide for sprinklers. ^2. Locate on the plan minimum 20 Ft wide (a) FIRE LANE(S) on the N . E _ S . W side of the structure beginning not closer to the structure than 10 feet. ^3. Show minimum turning radii for designated drives and Ere lanes as 42 Eeet on the plan. ^4. Locate a FIRE HYDRANT ASSEMBLY on the plan not more than 300 Feet from the structure at ^5.Other comments: ~~~~~ A-LC Zvi ~~ r ~ TRAFFICENGINEERING /~' ^1. Show on the site plan the installation and maintenance of uniform traffic control devices at appropriate locations in accordance with the standards set forth by the Manual on Uniform Tratl'ic ontrol Devices as adopted by the Florida Department oETransportation under Rule 14.115.010, Florida Administrative Code. ^2. Show applicable Florida Statute number for handicapped parking spaces. ^3. Show all striping, pavement markings, signage and traffic control devices on the site plan conforming to F.D.O.T. Standard Indexs-1995 edition and F.A.C. 14- 110 (no 4" striping is to be shown). ^4. Show dimensions of aisles, parking stalls, entrances and measurements for like plan Features on the plan. ^5. Show all pavement markings, signage and traffic control devices on the site plan. ^6. Adjust handicap spaces to meet governmental standards with the correct handicap signs. ^7. Adjust parking stalls and/or driveways on the plan to the satisfaction of the Traffic Engineer. ^8. Indicate the location of lighting fixtures in the parking areas on the site plan. ^9. Show all on-site lighting with 90-degree cutoffs directed away from abutting streets right-oE way and residential properties. ^10.Obtain a Significant Change of Use Determination from the FDOT per Florida Statute 335. ^11. Execute across-parking/access easement linking the site with the site and specifying the exact number and location of the spaces that are to be jointly used by and between the sites after review and approval of the easement or agreement by the appropriate City Staff. ^12. Address and resolve the need Eor right turn/left turn auxiliary lanes and the queuing for traffic related to the project. ^ 13.Other comments: ENVIRONMENTAL MANAGEMENT ^1. Provide a copy of the SWFVVMD permit application and calculations to Environmental Management. ^2. Show all protected trees by size, species and location. ^3. Show total paved vehicular use area and total interior landscape areas expressed in square feet and as a percentage of the overall site in the site plan data block. ^4. Provide dimensions on the plan for perimeter landscape buffers. ^5 Reflect the use of raised curbs or protective timbers on the site plan where interior landscaped areas abut pavement. ^6. Depict all required parking lot interior areas on the plan by shading or cross-hatching. ^7.Other comments: ^ 1. Show ADA ramps Eor sidewalks on the site plan. ^2. Complete the Dumpster Requirement Form and return it to the City Solid Waste Department. ^ 3. Add a note to the site plan stating "It it the nrponfibility of the owner to mll the drrmprkr to a derignakd location at an afrigned time ar q~ipmtrd by the Sohd 1T/atk Superinknden~ " ^4. State on the construction plan that the detector check should be DDCVA with the by-pass meter installed by the City with Eee paid by contractor. ^5. State on the plan that the 6" fire line tap to the 6" City water line is to state "6x6 tap" so that Ciry Utility Accounts will know what Eee to bill the contractor. ^6. Show backflow device(s) on plans as RPD. ^7. Show all proposed utilities, storm water retention/detention systems and 50' perimeter contour elevations. 08. Have the final site plan signed and sealed by a Professional Engineer registered in the State of Florida. ^9.Other comments: PARKS AND RECREATION ^ 1. Pay the required Open Space and Recreation Assessment Fee with review by the Clearwater Parks and Recreation Department. ^2. Note that the project is exempt from the City's Open Space and Recreation Assessment Fees. ^3.Other comments• B. Before the City can issue BUILDING PERMITS, the applicant must complete the following actions: ENVIRONMENTAL MANAGEMENT ^1. Furnish the SWFWMD permit to Clearwater Environmental Management. ^2. Acquire clearing and grubbing and tree removal permits or a no tree verification Eorm from Environmental Management. ^3. Provide drainage calculations. ^4.Other comments• ENGINEERING PLAN REVIEI~ ^ 1.Obtain and furnish evidence of all applicable permits from other governmental agencies including but not limited to: _(a) FDOT permit Eor work within the right-oE--way to Engineering Services; -___(b) Pinellas County Public Health Unit Permit, Ingress/Egress and a 10 Eoot Utility Easement over the proposed water mains up to and including meters, backflow prevention and hydrants. 02. Pay the sewer impact assessment fee, based on the size of the water meter with. assistance in determining the fee from Central Permitting/Licensing specialists. O3.Other comments: C. Before the City can issue a CERTIFICATE OF OCCUPANCY, the applicant must complete the following actions: ZO G O 1.Comments• TRAFFIC ENGINEERING ^ 1. Pay the Transportation Impact Fee as called for by the Pinellas County Transportation Impact Fee Ordinance with assistance in determining the fee from the Clearwater Traffic Engineering Office. ^2. Other comments: ENGINEERING PLAN REVIE[~ ^1. Bring all substandard sidewalks and sidewalk ramps adjacent to or a part of the project up to standard, including ADA, and install sidewalk where none exists in the street right of way. D2. Have the City install backAow prevention devices with the owner/applicant paying all applicable fees. ^3. Visually screen the dumpster and provide gates with a minimum 12-foot clear opening to the front for access by Solid Waste vehicles. 04. Furnish as-builts and an engineer s certification to Engineering Services. ^5.Other comments: D. Complete the following actions as indicated: ZONING ^1. Obtain the requisite building permits within one(1) year from the site plan certification date to prevent expiration of the site plan certification. O2.Obtain the requisite certificate(s) of occupanry within three (3) years of the site plan certification date to prevent expiration of the site plan certification. ^3.Obtain review of and permits for signs and fencing walls through separate review and permitting procedures. (74.Other comments: DRCCOMMENI50f0898 Before the PRELIMINARY PLAT can be recorded, the applicant must complete the following actions(s) checked below: A. Show the following on the plan: ^1. Title under which the proposed plat is to be recorded, O2. Name, address, telephone and fax number of the applicant or property owner if other than the applicant, and the person preparing the plat, ^3. Identification clearly stating that the drawing is a preliminary play, D4. Legal description of the property, U.S. Survey section, township and range, ^5. Existing and proposed rights-of--way and easements, ^6. Proposed street names, ^7. names, appropriately positioned, of adjoining plats; D8. Approximate (to the nearest Eoot) dimensions and area of (1) The overall plat, (2) Each lot,_(3) Street rights-oE--way, including radii of cul-de-sacs, and (4) Common open space or other land to be dedicated for a public purpose, p9. North arrow, scale and date. B. Show the following on the preliminary plat supplementary drawing: ^1. Title of the associated preliminary plat, O2. Name, address, telephone and Eax numbers of the applicant, property owner if other that the applicant, and person preparing the drawing; O3. Sanitary sewer, public water supply, stormwater drainage, school or other identifiable service or taxing districts, O4. nearest arterial or collector roadway intersection ^5. Buildings, watercourses, wetlands, tree masses, specimen trees and other existing features within the area to be platted and similar facts regarding existing conditions on land immediately adjacent thereto, O6. inventory of existing natural resources and/or environmentally unique areas on the site, D7. Existing sanitary and storm sewers, water mains, culverts and other underground structures witfiin the plat or immediately adjacent thereto, including the location and size of the nearest water and sewer lines, ^8. existing and proposed spot elevations ^9. Proposed use of each lot and existing and proposed zoning of all property within the plat ^ 10. Zoning district classification for adjacent property ^ 11. Location of common open space, parks and other public or semi public areas or facilities within or immediately adjacent to the property to be platted 012. location and size of sanitary sewers or other sewage disposal facilities planned, 013. Land to be dedicated to the city, including. a. Street right-of--way, by functional classification, b. Recreation land, recreation facilities and open space, c. Any other public use, ^ 14. Preliminary site drainage system including. a. General surface drainage pattern, including proposed retention area, b. Floodplain definition and effect of applicable local ,state or federal flood standards or elevations. C. Other Department Comments: ^ 1. Zoning comments: ^2. Fire Department comments: O3. TrafEc Engineering comments: ^4. Environmental Management comments: O5. Engineering Plan Review comments: ^6. Parks and Recreation comments: DEVELOPMENT REVIEW COMMITTEE Central Permitting Department January 8,1998 at 9:00 a.m. Conference Room 216 Standard review comments fot BAYSHORE TOWNHOMES (PRELIMINARY SITE PLAN/PLAT) FORMAL REVIEW Reviewed by. ' " ` ~ ~'~ V~,V S~ Department name: T~Y'a. "c~c~ t- Please return comments to Steve Doherty DRCCOMMENTS010898 L~.. Before the SITE PLAN can be cued, the applicant must complete the following action(s)checked below: • _ ~L~ i. Show the following on the site plan: ^ Legal description of the property. ^ Site area (square Feet and acres). ^ Number of dwelling units and hotel units proposed and the resulting net density. ^ Floor area devoted to each category of use. ^ Floor area ratio. ^ Property owner s name, address and telephone number and the designated project representative name, address and telephone number. (and fax numbers). ^Perimeter landscape buffer ^Parking formula calculation Eor each use. ^Locations of all driveways, parking areas and curb cuts. ^Delineation in mapped form and computation of the area of the sited devoted to building coverage, open space for the lot, open space Eor the front yard and building coverage expressed in sq. ft. and as a percentage of the overall site. ^Location and screening of all refuse containers/compactors. ^North arrow. ^Zoning assigned to the subject property and surrounding properties depicted on the plan. ^Identify and distinguish between the new and existing buildings and driveways as well as other features on the plan. ^2. Identify changes to the site data table if this is a plan amendment. ^3. Submit a completed CONCURR.ANCY REVIEW application for review with required fee ^4.Show all contiguous streets & roads. ^S.Display the site address on the site plan, obtaining assistance as needed from the responsible Zoning Specialist in establishing the correct address. ^6.Limit the site plan to one page. ^7.Legally record a Unity of Title for the project site and furnish proof of such action. 08.Show the date(s) and condition(s) for approval oF. (a) variance or conditional use approvals by the Planning &Zoning Board or the Development Code Adjustment Board(s), or (b) a variance from the Flood Board for construction within 18 Eeet of a seawall. ^9.Other comments: FIRE DEPARTMENT ^ 1. Show on the plan a fire department connection a minimum of 15 Et. from the structure, adjacent to a paved drive and within 30 ft. oEa fire hydrant assembly to provide for sprinklers. ^2. Locate on the plan minimum 20 Ft wide (a) FIRE LANE(S) on the N . E . S . W side of the structure beginning not closer to the structure than 10 feet. ^3. Show minimum turning radii Eor designated drives and fire lanes as 42 feet on the plan. ^4. Locate a FIRE HYDRANT ASSEMBLY on the plan not more than 300 feet Erom the structure at ^5.Other comments: ^ 1. Show on the site plan the installation and maintenance of uniform traffic control devices at appropriate locations in accordance with the standards set forth by the Manual on Uniforat Traf~'ic [~onuol Devices as adopted by the Florida Department of Transportation under Rule 14.115.010, Florida Administrative Code. ^2. Show applicable Florida Statute number for handicapped parking spaces. ^3. Show all striping, pavement markings, signage and traffic control devices on the site plan conforming to F.D.O.T. Standard Indexs-1995 edition and F.A.C. 14- 110 (no 4" striping is to be shown). ~4. Show dimensions of aisles, parking stalls, entrances and measurements for like plan features on the plan. ~5. Show all pavement markings, signage and traffic control devices on the site plan. ^6. Adjust handicap spaces to meet governmental standards with the correct handicap signs. . Adjust parking stalls and/or driveways on the plan to the satisfaction of the Traffic Engineer. 8. Indicate the location of lighting fixtures in the parking areas on the site plan. _ 9. Show all on-site lighting with 90-degree cutoffs directed away from abutting streets right-of- way and residential properties. ^10.Obtain a Significant Change of Use Determination from the FDOT~per Florida Statute 335. ^ i 1. Execute across-parking/access easement linking the site with the site and specifying the exact number and location of the spaces that are to be jointly used by and between the sites after review and approval of the easement or agreement by the appropriate Ciry Staff. , ^12. Address and resolve the need for right turn/left turn auxiliary lanes and the queuing for traffic related to the roject. ~1 .Other comments: ~ '~-'~ ~ as Cou dr~VC°- 11 't'- ~ ~-C-t~~ _ -~ ~ ~ ~- .\\.,. ~~_ .. ~ v+w.s,..2 ~ ~ '~ :r1 I ~o~l lC-- W 1 ~ ~ S ~ ~ W h t ^1. Provide a copy of the SV~~WMD permit application and calculations to Environmental Management. ^2. Show all protected trees by size, species and location. ^3. Show total paved vehicular use area and total interior landscape areas expressed in square Eeet and as a percentage of the overall site in the site plan data block. ^4. Provide dimensions on the plan for perimeter landscape buffers. ^5 Reflect the use of raised curbs or protective timbers on the site plan where interior landscaped areas abut pavement. ^6. Depict all required parking lot interior areas on the plan by shading or cross-hatching. 07. Other comments: O1. Show ADA ramps for sidewalks on the site plan. ^2. Complete the Dumpster Requirement Form and return it to the City Solid Waste Department. D3. Add a note to the site plan stating "It it the ~,rpo~ribility oJtlx ow~ttr to mll the dan~pfkr to a dclignated location at an arrigned time ar appmrxd by the Solid ll~ark Supcrinknden~ " D4. State on the construction plan that the detector check should be DDCVA with the by-pass meter installed by the City with fee paid by contractor. ^5. State on the plan that the 6" fire Gne tap to the 6" City water line is to state "6x6 tap" so that City Utility Accounts will know what fee to bill the contractor. ^6. Show backflow device(s) on plans as RPD. ^7. Show all proposed utilities, storm water retention/detention systems and 50' perimeter contour elevations. ^8. Have the final site plan signed and sealed by a Professional Engineer registered in the State of Florida. ^9. Other comments: PARKS AND RECREATION ^1. Pay the required Open Space and Recreation Assessment Fee with review by the Clearwater Parks and Recreation Department. D2. Note that the project is exempt from the City's Open Space and Recreation Assessment Fees. ^3.Other comments: B. Before the City can issue BUILDING PERMITS, the applicant must complete the following actions: ENVIRONMENTAL MANAGEMENT D 1. Furnish the SVVFVVMD permit to Clearwater Environmental Management. ^2. Acquire clearing and grubbing and tree removal permits or a no tree verification form from Environmental Management. ^3. Provide drainage calculations. ^4.Other comments: ENGINEER_I7~lG PI.ANREVIEII/ ^1.Obtain and furnish evidence of all applicable permits from other governmental agencies including but not limited to: _(a) FDOT permit for work within the right-of--way to Engineering Services; _(b) Pinellas County Public Health Unit Permit, Ingress/Egress and a 10 foot Urility Easement over the proposed water mains up to and including meters, backflow prevention and hydrants. ^2. Pay the sewer impact assessment Eee, based on the size of the water meter with assistance in determining the fee from Central Permitting/Licensingspeculists. O3.Other comments: (,. Before the City can issue a CERTIFICATE OF OCCUPANCY, the applicant must complete the following actions: ZO G O 1.Comments• TRAFFIC ENGINEERING ~1. Pay the Transportation Impact Fee as called for by the Pinellas County Transportation Impact Fee Ordinance with assistance in determining the fee from the Clearwater Traffic Engineering Office. nn 1 t r ' Other comments: !'atSS Ty'~-~`~ f~ ~+ t n~~ t''~-~ S' ~ 1 `'' ~ Q ~'o i ENGINEERING PLAN REVIE[~ O1. Bring all substandard sidewalks and sidewalk ramps adjacent to or a part of the project up to standard, including ADA, and install sidewalk where none exists in the street right of way. ^2. Have the City install backflow prevention devices with the owner/applicant paying all applicable fees. ^3. Visually screen the dumpster and provide gates with a minimum 12-foot clear opening to the front for access by Solid Waste vehicles. D4. Furnish as-builts and an engineer s certification to Engineering Services. ^5.Other comments• D. Complete the following actions as indicated: ZO G Ol. Obtain the requisite building permits within one(1) year from the site plan certification date to prevent expiration of the site plan certification. ^2.Obtain the requisite certificate(s) of occupanry within three (3) years of the site plan certification date to prevent expiration of the site plan certification. O3.Obtain review of and permits for signs and fencing/walls through separate review and permitting procedures. 04.Other comments: DRCCOA~1fIIV7S0f0898 Before the PRELIMINARY PLAT can be recorded, the applicant must complete the foIlowing actions(s) checked below: A. Show the following on the plan: O 1. Tide under which the proposed plat is to be recorded, ^2. Name, address, telephone and Fax number of the applicant or property owner iE other than the applicant, and the person preparing the plat, ^3. Identification clearly stating that the drawing is a preliminary play, p4. Legal description of the property, U.S. Survey section, township and range, ^5. Existing and proposed rights-oE way and easements, O6. Proposed street names, ^7. names, appropriately positioned, of adjoining plats; ^8. Approximate (to the nearest foot) dimensions and area of: (1) 'The overall plat, (2) Each lot,_(3) Street rights-of--way, including radii of cul-de-sacs, and (4) Common open space or other land to be dedicated for a public purpose, ^9. North arrow, scale and date. B. Show the following on the preliminary plat supplementary drawing. O1. Tide of the associated preliminary plat, ^2. Name, address, telephone and Eax numbers of the applicant, property owner if other that the applicant, and person preparing the drawing; ^3. Sanitary sewer, public water supply, stormwater drainage, school or other identifiable service or taxing districts, O4. nearest arterial or collector roadway intersection O5. Buildings, watercourses, wetlands, tree masses, specimen trees and other existing Features within the area to be platted and similar facts regarding existing conditions on land immediately adjacent thereto, ^6. inventory of existing natural resources and/or environmentally unique areas on the site, ^7. Existing sanitary and storm sewers, water mains, culverts and other underground structures within the plat or immediately adjacent thereto, including the location and size of the nearest water and sewer lines, ^8. existing and proposed spot elevations ^9. Proposed use of each lot and existing and proposed zoning of all property within the plat ^ 10. Zoning district classification for adjacent property ^ 11. Location of common open space, parks and other public or semi public areas or facilities within or immediately adjacent to the property to be platted ^12. location and size of sanitary sewers or other sewage disposal facilities planned, ^13. Land to be dedicated to the city, including. a. Street right-of--way, by functional classification, b. Recreation land, recreation facilities and open space, c. Any other public use, ^14. Preliminary site drainage system including. a. General surface drainage pattern, including proposed retention area, b. Floodplain definition and effect of applicable local ,state or Federal Flood standards or elevations. s C. Uther Department Comments: ^ 1. Zoning comments: ^2. Fire Department comments: ^3. Traffic Engineering comments: ^4. Environmental Management comments: O5. Engineering Plan Review comments: ^6. Parks and Recreation comments: ~ S~' 5--~ '~ 9 ~ t,Q. ~~ ~~~~ ~~n>Y ~: P. O. Bai 6474 CleAnvater, FL 34615 JAMES MARCUS VERNON Attorney at Law 577 South Duncan Avenue Clearwater, FL 34616 TeLNa (813) 447-4444 Faa No. (813)446.6E13 February 13, 1998 Mr. Stephen L. Doherty Central Permitting Supervisor CITY OF CLEARWATER 100 S. Myrtle Ave. P.O. Box 4748 Clearwater, FL 34618 RE: Bayshore Townhouses Dear Steve: Attached please find 15 sets of final revised site plans for Bayshore Townhouses. The site plans reflect those changes discussed at our meeting Wednesday. I have included two extra plans so that I will get five certified plans returned to me. As you know, I have a contractual obligation to have these plans certified by the end of next week so your immediate attention on this matter is greatly appreciated. Thank you for your help and cooperation and please let me know if I can help expedite this matter. ~ ~ FEB 13 199 GEN'1"RAh PERMiTTINQ CITY QF GI.EARWATER BY HAND DELIVERY ~. JAMES MARCUS VERNON Attorney at Law 577 South Duncan Avenue Clearwater, FL 34616 Reply to: P. O. Box 6474 Clearwater, FL 34618 January 5, 1998 Mr. Stephen L. Doherty Central Permitting Supervisor CITY OF CLEARWATER 100 S. Myrtle Ave. P.O. Box 4748 Clearwater, FL 34618 RE: Bayshore,Townhouses Dear Mr. Doherty: TeLNo. (813) 447-4444 Fax No. (813)446-6213 VIA: FACSIMILE THIS DATE As instructed by you last Monday, my office placed the sign notice on the above referenced site indicating the scheduling of the DRC meeting of January 8, 1998. A copy of the notice as approved by you is attached. I would like this letter to further document the resolution of three issues I discussed with you at that time. First, any changes to the site setbacks would be viewed as a minor modification and would not require city commission review. The setbacks along the site will be no less than 15 feet but may be less than that indicated on the plan due to engineering or other factors. Second, the unit sizes may change to be smaller or larger than indicated on the actual site plan. What cannot change are the number of units. Thirdly, the building height has been intended all along to be no higher than 35 feet above the first finished floor. As discussed months ago, the first finished floor is defined to be the lowest elevation at which the occupied portion of a structure is set irrespective of the flood plain or FEMA elevation requirements. Based on this definition it has been anticipated from the beguuung that the buildings may be as high as 47 feet since this height would accommodate a 12 foot garage upon which the first finished floor would be constructed. From that elevation the building would be no higher than 35 feet. • ~ Mr. Stephen L. Doherty Central Permitting Supervisor January 5, 1998 Page 2 These determinations were the result of reviewing the code and discussing these matters with you, Tony, Sandra, Lou and myself. If I am not correct as to any aspect of the above provisions, please let me know as soon as possible Thank you for your help and cooperation and I look forward to working with towards the completion ~~~ ~. - `ti t~~~ 14NCLOTE ENGINEERING November 17, 1997 Louis Hilton Senior Planner .City of Clearwater Economic Development P.O. Box 4748 Clearwater, FL 33758 RE:.Bayshore Townhouses Deaz Lou: This letter is intended to follow-up our conversations and meetings of last week and to finalize and hopefully put to rest any concerns regarding the traffic impacts resulting from the above referenced project. As you and I verified last week, the City of Clearwater's concurrency management ordinance provides that any traffic impacts to either McMullen Booth Road or Bayshore Boulevard cannot increase the traffic counts such that those roads would have an increased level of service beyond the adopted "D" level. That is to say, that when the trips generated by the above referenced project are added to the existing trips for those roadways, the level of service rating cannot become "E" for those roadways. If the level of service is maintained at a "D" or better, the roadway is deemed to be concurrent and in compliance with the concurrency management ordinance and no limitations can be placed on the project due to traffic impacts. The current traffic count for Bayshore Boulevazd is 6332 trips per day. For rural section two lane road a level of service of "E" is reached at 13,280 trips per day. This site will generate 415 trips per day. Therefore, even in the event that all trips which would be generated by this development were to be added only to Bayshore Boulevard the road would not remotely approach the level of service "E" rating. The current peak hour trips for this area is 576 where 1240 trips aze required to trigger the level of service "E" rating. Normally a percentage of 10 to 15-percent of the daily trips is used to calculate the peak hour. However, again, even in the event that all trips generated by this development for the entire day were to be added only to Bayshore Boulevard, and all trips occurred during the peak hour, the road would not remotely approach the level of service "E" rating even for the peak hour. The calculus for the impacts onto McMullen Booth is similaz and provides for a similaz conclusion. PO. Box 6474 • Clearwater, Florida 34618 • ~813~ 447-4444 • Fax X813) 446-b213 .~ ,,, .,~ Louis Hilton Senior Planner City Of Clearwater November 17, 1997 Page 2 I discussed with Pinellas County transportation officials the fact that traffic backs-up on Bayshore in the morning. They informed me that the queuing at Bayshore was strictly a result of the FDOT timing of the signal at State Road 60 and had little to do with the traffic counts on Bayshore. They went on to say that both McMullen Booth Road and Bayshore Boulevard were operating at a "C" or better rating during the day and a "C"/"D" rating at the peak hour and that the impact of 415 trips per day would be insignificant. Hopefully this letter addresses your concerns and the concerns of the planning staff. If I may be of further service or can answer any questions, please feel free to contact me at anytime. JMV:me 3AMES MARCUS VERN4N Attorney at Law 577 South Duncan Avenue Clearwater, FL 34616 Reply to: P. O. Boz 6474 Clearwater, FL 34618 Mr. Stephen L. Doherty Central Permitting Supervisor CITY OF CLEARWATER 100 S. Myrtle Ave. P.O. Box 4748 Clearwater, FL 34618 RE Bayshore Townhouses' Dear Mr. Doherty: TeLNo. (813) 447-4444 Faz No. (813)446.6213 January 20, 1998 BY HAND DELIVERY aD` ~ ~p~ ~~~~~P~ R As instructed by you on Thursday 8 January, attached please find 12 copies of the updated site plan and 12 copies ofthe proposed preliminary plat. I apparently failed to take the plat application from your office and do not have a record of the requested plat fee. I will complete the application and pay the fee when I see you on the 29th of this month. In that regard, please have this letter act as a formal request for a special DRC meeting for 29 January, 1998. I realize this meeting has been scheduled and is to occur, but you had asked me to formally request it in writing. For your further information, please be advised that I have submitted three sets of full engineering plans to Bob Perkins and one set to M17ce Quillen. I am hopeful that these plans can be routed at this time so that a construction plan certification can quickly follow the certification of the site plan. Thank you for your cooperation and I am looking forward to meeting with you again on the 29th. ;~ ^^:~ A - ~_' i~ d-lcp- 9 8 `~ ~--~ ~- r. Q~ PARKS AND RECREATION DEPARTMENT February 5, 1998 Marcus Vernon, Esq. 57? Duncan Ave. S. Clearwater, FL 33756 Dear Mr. Vernon: CITY OF CLEARWATER POST OFFICE BOX 4748, CLEARwATER, FLOwDA 34618-4748 MUNICIPAL $ERV[CES BUILDING, 100 SOUTH MYRTLE AVENUE, CLEARV7ATER, FLORIDA 34616 TELEPHONE (813) 56211800 Fax (813) 56211825 Attached is a copy of the Assessment of Open Space/Recreation Impact worksheet for Bayshore~ Tov~-nhomes noting the fees due for this project as well as a copy of the previous worksheet prepared for the former Cooper's Bayou project. Please note below the final amount due less the fees already paid for this location on 8/31/87. New Assessment Paid Previously Payment Due Open Space $13,280.82 $13,402.52 $ (121.70) Recreation Facility Land 10,506.00 7,896.00 2,610.00 Recreation Facility 13,600.00 0.00 13,600.00 Total $37,386.82 $21,298.52 $16,088.30 As discussed with Debbie Richter today, a balance of $2,488.30 is due at this time for Open Space/R,ecreation Facility Land Fees to be paid in the Parks and Recreation Department. The Recreation Facility Fee of $13,600 is due at building permit to be paid in the Central Permitting Department. Please contact Debbie Richter at 562-4817 if there are any further questions. Sincerely, Art Kader Acting Parks and Recreation Director Attachments cc: Debbie Richter, Administrative Support Manager I Don McCarty, Senior Design Planner, Central Permitting ~~EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPI.OYER~~ Maur-09-98 11:57P JAMES MARCUS V1wR,NON Attorney at Law 577 South Duncan Avenue Clearwater, FL 34616 Aryq to: F. O. 8oc 6174 Ckarwuor. FL 34616 March 9, I998 Mr. Jeff Kronschnabl, Airector Cemral Permitting CITY OF CLEARWATER l W S. Myrtle Ave. P.O. Box 4748 Clearwater, FL 34618 RE. Qakbrook MgdeLs Td1Vo. ~eu~ N7~444 FRilV0. i9i3iN4.A213 Dear Mr. Kronschnabl: ~~ This office has been attempting to have your department iss two ad itiona) builditlg permits for rixideLy at the above referenced subdivision. The development ates that only one permit can be issued until such time that. Lhe plat for the subdivision is recorded. I•iowever, there is a provision in your code, which has been veri~iied by the city attorney, that such a limitation can be varied upon the approval of the Development Review Committee. This letter ig intended to fotrnatly request such a variance and to request that my client and I be scheduled to appear before your next committee meeting of Thursday, March 12, 1998. At that meetir-g we will present the basis for our t+ecguesting a variance. EssetrtiaUy, my client needs to be able to constnact three models, each of which will contain different styling and living features. This will enable my client to snore closely tailor their product to the consumer and will result in a more successful project which 1 am sure we would all want. Please conftr~m as early as possible on Tuesday that we are in fact scheduled for this meeting. if possible, and since I do not think we will be very long, vve would very much like to be scheduled first. Thank you for your cooperation and I am looking forward to appearing before you on the 12th. ~'r ,t r ' ~~ ~~ ~ ~; - - `r ~~ ~` Marcus Vernon P.OZ M,ar-09-98 11:57P JAMES MARCUS VERNON Attorwy at Law S77 South Duncan Avenue Clearwater, FL 34616 Rs~ aw f. 0. bt 6171 Clerw~aR FL 3161• March 9, 1998 Mr. )eff Kronschnabl, Director Central Permitting CITY OF CLEARWATER 100 S. Myrtle Avc. P.O. Box 4748 Clearwater, FL 34618 RE: Oakbrook-Models Dear Mr. ICronschnabl: TdNa (YI~y N'1-IIN FAa Nw i~13)11~217 This office has been attemipting to have your department issue two additional building permits for modeLy at the above referenced subdivision. The development code states that oiily one permit c;an be isssucd until such time that the plat for the subdivision is recorded. However, there is a provision in your code, which has been verified by the city atturney, that such a limitation can be varied upon the approval of the Development Review Committee. This fetter ig intended to fomtally rec}uest such a variance and to request that my client and I be scheduled to appear before your next committee meeting of Thursday, March l2, 1998. At that trx;eting we will present the be~sis for our requesting a variance. Essentially, my client needs to be able to construct three models, each of which will contain dit~'erent styling and living features. This will enable my client to more closely tailor their product to the consumer and wiil result in a more successful project which 1 am sure we would all wane. Please confum as early as possible on Tuesday that we are in fact scheduled for this meeting. if possible, and since I do not think we will be very long, we would very much Like to be scheduled Srst. Thank you for your cooperation and I am looking forward to appearing befi~re you on the 12th. ,. -- ~~ y ~; - - ~~~~~r rr )~ Marcus Vernon P.02 Mar-09-98 11:57P JAMES MARCUS VERNON Attwa~y st Lnw 577 South Duncan Avenue Clearwater, FL 34616 As~Q m~ f. 0. ba 6i71 ClorwNOR FL )161 March 9, 1998 Mr. Jeff 1'Cronschnabl, Director Central Pernutting CITY OF CLEARWATER 1 W S. Myrtle Ave. P.O. Box 4748 Clearwater, FL 34618 RE: Oakbrook Models Dear Mr. Itronschnabl: 7dNo. (it)) N7.I/N FuNw (t1311Ki21) This office has been attempting to have your department issue two additional building permits for maiels ai the above referenced subdivixiott. The development code states that orily one permit c;an be issued until such time that the plat for the subdivision is recorded. However, there is a provision in your code, which has been verified by the city atturney, that such a limitation can be varied upon the approval of the Development Review Committee. This letter is intended to formally request such a variance and to request that my client and I be scheduled to appear before your next committee meeting of Thursday, March 12, 1998. At that meeting we will present the basis for our requesting a variance. Essentially, my client neods to be able to construct three models, each of which will contain different styling and living features. This will enable my client to more closely taibr their product to the consumer and will result in a tyre successful project which 1 am sure we would all want. Please confum as early as possible on Tuesday that we are in fact scheduled for this meeting. if possible, aiui since ! do not think we will be very bng, we would very much Iike to be scheduled first. Thank you for your cooperation and 1 am looking forward to appearing before yvu on the 12th. Sinai ,,~ ,. ~~~ ;; ~~ r . ~. `~ r )` Marcus Vernon P.02 #7'!t Sa-- .~~ ~~._...y -' '"!Y ~4R~ - - ~ ~---.er.-+. 1• r+-Trt~ +i4 ~p~ lc~~ _.. ..~} ~ ~. ~.x.._ .v._ '~ ~_ V .mss-~_ 1.Rr ~_ ~ ~.~.. .~. _ ~ .R_1:.L"i~l ==i ~ /i Q'IC! ~ OQ ~ ~,ll1 squaxe feet. (-ohyri~hL "Ihc Rplmul Group. Inc. 199fi .111 dour plans :uul ccLCrior rcudcrings me uriis~'s concrpts. _lll dimcnsiuus arc upprusinuric. Floor plans. room sins. csLCriurs uud standard fcanu'cs nr,Lc rare hasrd on the Aeration and options sch•eicd. IZrlaud ]hones rescrccs the righ~l~~to~y+nnxlifi~ all phms uud specifications ~rithuut notice ur ubli}¢uion. 10/fNi cOJ-0L i~;Ala'NG °P°0~9i0""Y ~ CB CO`~.~-1' 130 C~s~c~ a-l. as :..q~.. --~[:iR,~""'i' :Y""~` - r r ..6 '"^"^'MER.~ r Y ... ~ ,~.,~y, , ,y,a r ,,~„ ~.,;o,,,rn. . ~,.,,,.., . ~:~ a„M:.71f..~.~,. -:~.Y.~ •"~ .... ~?d ~. ~i~_........ .i ~....~ s.. ...,r.e.:.',~5/Y. a.'~;:"1C.'.th`.~' 'w+.~IBT I Elevation A Elevation B ~YtAND 'I~~o~ Elevation A _ /1 n ~YLAND Elevation B ~~o~ -~ ~ a ' , ti K a• , ~.~. Via.. .,....-...-...._~;.i.., .. t--' _ - - - _ „~ .: ~. ~..: ,.... _ .c. . _ 1.._: a...~Lf?'a:. ~ ~'. ' O O Lanai Master Suite 12'x13'-8" 15'-9"x12' Vault Vault - u ~ ~ Bedroom 2 11'x10'3" D~ Vault :~ - Family 17'x17'11" reakfas Vault '-8''x10'11"av O --' ~ ~_-- 7 V' I ~ ~' ' `t ' Bedroom 3 ~(----- 11'x10' Vault ~ • Ci tchen ~ Vault Dining ~~ a/r ----- 13'-9"x10'-3" ' Vault (vashe(ii dryer ~ Living 13'-9"x13'-9" Vault Entry Garage 20'x20'-8" ___+ i op ~ i eerviae ~ '~ -dr ' A s d A-1,68 square feet B-1,675 square feet Colryri~ht, Tl~e Ryland Grout, Inc. 1D~5 All Moor plm~s mid csl.erior rcnde~9ngs are artist's concepts. All dimensions are ty>proximul.e. floor plans, room sizes, exteriors and Sitvulurd features map vary based nn the elevation and options selected. RylandH,umes`re~srerves the right Lo nlodily all plans dud specifications without notice or obli}~ution. R~;..~ ~ ~ ._. "`'fN 'r t ~ ~ , ~„ " yPl t-, Y~~ a ~ ~ ~ .....,` _ `+ , T •~ ~ ~ .. ...~! ~ ... ~ ~_. ~. a}~f .:•. 'SF 2'L,~ ui/sxi EWAL~USING OPPORTUNITY ~ CB C024130 A~o~ ,., ,,, «~ e tt r ~'- z~ ~ F~ ~ ,. ~ ~ .,~-;.-" L".,,s~ •r ~- ;.._ .... --- .., ~' .:~ ~, sa_~.. .. _ - ~._, c, era., `l~r ~ rt° cY Elevation A ~: Elevation B :_ y-T ,. _. ~; As~o~ ,- a :~ ~i ry1 ., K .. r --, ~ t' ,' A•t x,316 square feet Cop~ri~ht, Tlic R~•laixl Crroup, Inc. 1996 x111 (loon plmis and c~tcrior renderings are artist's concepts. _lll dimensions arc approdmate. Floor plans, room sizes, exteriors cold stm~dard features mac Marc based on the elccation mid options selected. RchuLd Homes reserves th¢ right. to modili all plans and specifications willurut notice or obligation. mss, ~ r .; "_'~ j a:. ~ ~ ~„~s ~ ~~ ~ ~~"`,c ~ ':•e. F ... ~,~,~"~~~ '~ ___ ,~._ ~t~ s,..r..~.._ ~~ . _ .. ~ u~._ ._-fir:. ~:~~i ~ n/!x EWAL iOLISING OPPORTUNITY ~ /~U I~OG~ /r 130 °~ ~. JAMES MARCUS VERNON Attorney at Law 577 South Duncan Avenue Clearwater, FL 34616 g~ly. ~; TeLNo. (813) 447-4444 P. O. Boz 6474 Fu No. (813) 446-6213 Cleanvat~r, FL 34618 March 20, 1998 Mr. Jeff Kronschnabl, Director Central Permitting CITY OF CLEARWATER cG~'~~- - 3~~ 100 S. Myrtle Ave. P.O. Box 4748 ~~ SP.~1.~_, Clearwater, FL 34618 /~ ~ vLG~~~ RE: Lot 26?at he IVloorings a~ `fDG~"~. ~s~ -- ~ _ -- Dear Mr. Kronschnabl: As the representative of Ryland Homes, this letter is being presented to you today pursuant to certain items discussed yesterday with you and your staff regarding a patio constructed on the above referenced lot. Yesterday I met with your staff with the intent of persuading them to agree that the above referenced patio was not a violation of either the zoning code or the approved site plan and to have them authorize the issuance of a certificate of occupancy for the entire structure. After meeting and discussing various issues, the zoning staff disagreed with mY arguments and are of the opinion that the patio as constructed does in fact violate the site plan. In an effort to accommodate my client's needs, they were willing to expedite a DRC variance meeting and were willing to present the facts to the DRC committee as early as March 31. After discussing this matter with my client, we agree that the determination made by the zoning staff was a fair and reasoned conclusion. We believe our position could be supported; however, staffs position was also reasonable and supportable and we have elected not to pursue the variance. The patio will be removed and a new one will be constructed on the lot. This letter is also intended to confirm that based on the assurance contained in this letter, the certificate of occupancy for this house will be issued upon the completion of the necessary paperwork. As you know, we are attempting to close the house today to comply with the rigid time frames of an IRS code 1031 exchange. A representative from Ryland will be in later this morning to obtain the certificate. 'w J Mr. Jeff Kronschnabl Director Central Permitting March 20, 1998 Page 2 Finally, my client and I want to thank you and your staff for being so accessible and for being available to deal with this matter so quickly yesterday morning. As you know, the issue was presented to you and the zoning staff for the first time at B:OOam and a resolution was obtained by 10:30am. Although we would have preferred a different outcome, the fact that you and your senior staffwould defer other pressing matters and assist me on such short notice indicates that the central permitting department is working hard to accommodate the citizenry and speaks very highly of your department. The assistance is greatly appreciated. Doherty, Steve From: Richter, Debbie Sent: Tuesday, February 24, 1998 6:49 PM To: Doherty, Steve; McCarty, Don Cc: Kader, Art Subject: Impact Fee Paid Bayshore Townhome's paid the balance of the Open Space/R,ecreation Facility Land fee of $2,488.30 today. The Recreation Facility Impact Fee of $13,600 is due at building permit. Please let me know if any questions. O D~ 1:4~1?1 Page 1 . ,~ r ~i ~l0 ~S ~ ~ ~ ~ `~ October 15, 1997 ~~ ~. Mr. Stephen L. Doherty Central Permitting Supervisor CITY OF CLEARWATER 100 S. Myrtle Ave. P.O. Box 4748 Clearwater, FL 34618 RE: Rezoning Bayshore Townhouses Dear Mr. Doherty: VIA: HAND DELIVERY Attached please find a print of the most recent version of the preliminary site plan for the Bayshore Townhouses project. You had stated on Monday that if I were to provide a copy of this plan to you by noon on Thursday you would be able to review the plan for completeness. Said review would be completed by the end of the day Thursday and you were to inform me that the plan was either acceptable for the zoning process to proceed or you would provide me with the specific revisions which I would need to make. I am providing you the plan a day early so that you will be sure to have adequate time to perform such a review. I want to thank you again for providing me with this courtesy. Please note that the plan contains all the revisions we discussed at our meeting after reviewing four separate checklists and the plan further contains certain revisions you sought even though some requests did not appear on any checklist. In addition, I included the "worst case" plan revisions and notes we discussed since I did not hear back from you regarding the three or four issues you were going to clarify for me. I want to formally express my great concern that I am being required to provide information that other applicants have not been required to provide. Further, these requirements are apparently being subjectively reviewed with a perspective of how can the application be stopped as opposed to seeking how the project, which will add $10,000,000 to $20,000,000 to the tax base of the city, can be adjusted so that it can proceed. Since August I have desperately sought the assistance of your offices to help me find a way to proceed since we discussed that this project is on a very tight approval schedule. To make things easy for you, and so that I do not run the risk of not receiving a message from you, I will plan to be in your office on 4:00 Thursday afternoon. If you want me there sooner or later or prefer some alternate time, please contact me at 447-4444, 463-4444, or 438-3474 and please let me know. I need for you to meet your commitment of having your review completed by the end of the PO. Box 6474 • Clearwater, Florida 34618 • X813) 447-4444 • Fax X813) 446-6213 ~'A. Mr. Stephen L. Doherty Central Permitting Supervisor October 15, 1997 Page 2 day Thursday since later that day is the only time I can get any drafting revisions completed. I hope I am not being presumptuous, but based on the substance of our meeting, if I do not hear from you or when I appear Thursday afternoon, if you are not available and no comments are provided, I will interpret that as if the plan is acceptable for further processing. Regarding the schedule, it is critical that the current schedule is met since it is a full month behind the original planned schedule. My understanding is that I will appear before the planning and zoning board on November 18, 1997. The first reading for the zoning will occur on December 4, 1997, and the second reading will occur on January 15, 1998. You were going to determine if a variance to the preservation setback was going to be required or whether or not that could be modified as part of the master site plan approval by the commission. Assuming a variance is needed, we will apply by November 25, 1997; for a December 11, 1997, hearing. During this period you have agreed to coordinate with staff numerous meetings and informal reviews of the plan so that upon adoption of the concept plan by the commission, a final certified site plan can be approved quickly by the DRC. Please let me know immediately if any of the foregoing scheduling or hearing information is incorrect. Thank ypu for your help and cooperation and I look forward to working with towards the cgmpletion of this project. :: , . . . <t r Ax N1r;S.SA(~E CITY OF CLEARWATER DEPARTNIFIIVT OF CF1V'I'RAL PERMIITIIYG MUNICIPAL SERVICES BUII.DING - I00 S. MYRTLE AVE. P.O. BOX 4748 CLEARWATER, FL 34618748 OFFICE PHONE - (813) 562-4567 FAX PHONE - (813) 562.4576 TO; /V\,42C V S ~lc/z (JUN FAX A~: ~ ~{ C -' G Z 1 FROM: ~ "r~l~= U ° f-I~ I Z DATE: ~ ~- ~_ MESSAGE: NUMBER OF PAGES (Il~ICLUDING THIS PAGE): .~ DEVELOPMENT REVIEW COMMITTEE Central Permitting Department DecemUer 18 at 9:00 a.m. Conference Room 216 Standard review comments for PROJECT NAME (PRELIMINARY SITE PLAN) rORMAL REVIEW Reviewed by: Department name: Please return comments to Steve Doherty U RCCOll7~T FNT,S 7 2 7 897 r ~ ~ ~' A. Before the SITE PLAN can be certified, the applicant must complete the following action(s)checked below: ZONING 1. Show the following on the site plan: ^ Legal description of the property. ^ Site area. (square feet and acres). ^ Number of dwelling units and hotel units proposed and the resulting net density. ^ Floor area devoted to each category of use. ^ Floor area ratio. ^ Property owner's name, address and telephone number and the designated project representative name, address and telephone number. (and Ear numbers). ^Perimeter landscape buffer ^Parking Formula calculation Ear each use. OLocations of all driveways, parking areas and curb cuts. ^. Delineation in mapped form and computation of the area. of the sited devoted to building coverage, open space Eor the lot, open space for the front yard and building coverage expressed in sq. ft. and as a percentage of the overall site. ^Location and screening of all refuse containers/compactors. ^North arrow. ^Zoning assigned to the subject property and surrounding properties depicted on the plan. ^Identify and distinguish bet`veen the new and existing buildings and driveways as well as other features on the plan. ^2. Identify changes to the site data. table iE this is a plan amendment. ^3. Submit a completed CONCURRENCY REVIEW application for review with required Eee ^4.Show all contiguous streets & roads. ^S.Display the site address on t1~e site plan, obtaining assistance as needed from the responsible Zoning Specialist in establishing the correct address. ^6.Limit the site plan to one page. ^7.Legally record a. Unity of Title for the project site and furnish proof of such action. ^8.Show the date(s) and condition(s) for approval of: (a) variance or conditional use appro~~als by the Planning ~ Zoning Board or the Development Code Adjustment Board(s), or (b) a variance from the Flood Board for construction within 18 feet of a seawall. ^9. Other comments: FIRE DEPARTMENT ^l. Show on the plan a fre department connection a minimum of 15 ft. from the structure, adjacent to a paved drive and within 30 ft. of a fire hydrant assembly to provide for sprinklers. ^2. Locate on the plan minimum 20 Ft wide (a) FIRE LANF(S) on the N_, E_, S_, W_, side of the structure beginning not closer to the struch.~re than 10 feet. ^3. Show minimum turning radii for designated drives and fire lanes as 42 Eeet on the plan. ^4. Locate a FIRE I~YDRANT ASSEMBLY on the plan not more than 300 feet from the structure at ^5. Other comments: TRAFFIC ENGINEERING ^1. Show on the site plan the installation and maintenance of uniform traffic control devices at appropriate locations in accordance with the standards set forth by the Manual on Uniform Traffic Control Devices as adopted by the hlorida Department of Transportation under Rule 14.115.010, Florida Administrative Code. ^2. Show applicable Florida Statute number for handicapped parking spaces. ^3. Show all striping, pavement markings, signage and traffic control devices on the site plan as conforming to F.D.O.T. Standard Indexes-1995 edition and F.A.C. 14- 110 (no 4" striping is to be shown). ^4. Show dimensions of aisles, parking stalls, entrances and measurements for like plan features on the plan. ^5. Show all pavement markings, signage and traffic control devices on the site plan. ^6. Adjust handicap spaces to meet governmental standards with the correct handicap signs. ^7. Adjust parking stalls and/or driveways on the plan to the satisfaction of the Traffic Engineer. ^8. Indicate the location of lighting futures in the parking areas on the site plan. ^9. Show all on-site lighting with 90-degree cutoffs directed away from abutting streets right-of- way and residential properties. ^10. Obtain a Significant Change of Use Determination from the FDOT per Florida. Statute 335. ^11. E~:ecute a cross-parking/access easement linking the site with the site and specifying the enact number and location of the spaces that are to be jointly used by and behveen the sites after review and approval of the easement or agreement by the appropriate City Staff. ^12. Address and resolve the need for right turn/left turn auxiliary lanes and the queuing for traffic related to the project. ^13. Other comments: ENVIRONMENTAL MANAGEMENT ^1. Provide a copy of the S~X/FWMD permit application and calculations to Environmental Management. ^2. Show all protected trees by size, species and location. ^3. Show total paved vehicular use area. and total interior landscape areas expressed in square feet and as a percentage of the overall site in the site plan data block. ^4. Provide dimensions on the plan for perimeter landscape buffers. ^5 Reflect the use of raised curbs or protective timbers on the site plan where interior landscaped areas abut pavement. ^6. Depict all required parking lot interior areas on the plan by shading or cross-hatching. ^7. Other comments: ENGINEERING PLAN REVIEW ^1. Show ADA ramps Eor sidewalks on the site plan. ^2. Complete the Dumpster Requirement Form and return it to the City Solid Waste Department. ^3. Add a note to the site plan stating "It. is the ye.rpozzsibility of the ozz~zzer to yell the d~rnrpster to a designated location at, ayz assigzzed time as appybved by the Solzcl 1d''aste Sz~eyiyztendezzt.. " ^4. State on the construction plan that the detector check should. be DDCVA with the by-pass meter installed by the City with fee paid by contractor. ^5. State on the plan that the 6" fire line tap to the 6" City water line is to state "6~6 tap" so that City Utilit~~ Accounts will know what fee to bill the contractor. ^6. Show backflow device(s) on plans as R.PD. ^7. Show all proposed utilities, storm water retention/detention systems and 50' perimeter contour elevations. ^8. Have the final site plan signed and sealed by a Professional Engineer registered in the State of Florida. ^9.Other comments: PARKS AND RECREATION ^ 1. Pay the required Open Space and Recreation Assessment Fee with review by the Clearwater Parks and Recreation Department. ^2. Note drat the project is e~ernpt from the City's Open Space and Recreation Assessment Fees. ^3. Other comments: B. Before the City can issue BUILDING PERMITS, the applicant must complete the following actions: ENVIRONMENTAL MANAGEMENT ^1. Furnish the S~YrF'~\/MD permit to Clearwater Environmental Management. ^2. Acquire clearing and grubbing and tree removal permits or a no tree verification Eorm from Environmental Management. ^3. Provide drainage calculations. ^4. Other comments: ENGINEERING PLAN REVIEW ^ 1. Obtain and furnish evidence of all applicable permits from other governmental agencies including but not limited to: _(a) FDOT permit for work within the right-of--way to Engineering Services; _(b) Pinellas County Public Health Unit Permit, Ingress/Egress and a 10 foot Utility Easement over the proposed water mains up to and including meters, backflow prevention and hydrants. ^2. Pay the sewer impact assessment fee, based on the size of the «%ater meter with assistance in determining the fee from Central Permitting/Licensing specialists. ^3. Other comments: C. Before the City can issue a CERTIFICATE OF OCCUPANCY, the applicant must complete the following actions: ZONING ^ 1.Commen TRAFFIC ENGINEERING ^1. Pay the Transportation Impact Fee as called for by the Pinellas County Transportation Impact Fee Ordinance with assistance in determining the fee from the Clearwater Traffic Engineering Office. ^2. Other comments: ENGINEERING PLAN REVIEW ^1. Bring all substandard sidewalks and sidewalk ramps adjacent to or a part of the project up to standard, including ADA, and install sidewalk where hone exists in the street right of way. ^2. Have the City install bacl:flow prevention devices with the owner/applicant paying all applicable fees. ^3. Visually screen the dumpster and provide gates with a minimum 12-foot clear opening to the front for access by Solid \X/ante vehicles. ^4. Furnish as-builts and an engineer's certification to Engineering Services. ^5. Other comments: D. Complete the following actions as indicated: ZONING ^1. Obtain the requisite building permits within one(1) year from the site plan certification date to prevent expiration of the site plan certification. ^2. Obtain the requisite certificate(s) of occupancy within three (3) years of the site plan certification date to prevent expiration of the site plan certification. ^3. Obtain review of and permits for signs and fencing/walls through separate review and permitting procedures. ^4. Other comments: DRCCOA4A4ENTS12~S97 • DEVELOPMENT REVIEW COMMITTEE Central Permitting Department DecemUer 18, 1997 at 9:30 a.rn. Conference Room 216 Standard review comments for PROJECT NAME (PRELIMINARY PLA'1~ FORMAL REVIE`~/ Reviewed by: Department name: Please return comments to Steve Doherty DRCCOlI%(~1~ILNTS92>897 Before the PRELIMINARY PLAT can be recorded, the applicant must complete the following actions(s) checked below: A. Show the following on the plan: ^1. Title under which the proposed plat is to be recorded, ^2. Na.me, address, telephone and fax number of the applicant or propert~~ owner if other than t]Ze applicant, and the person preparing the plat, ^3. Identification clearly stating that the drawing is a preliminary play, ^4. Legal description of the properr)r, U.S. Survey section, township and range, ^5. Existing and proposed rights-of-way and easements, ^6. Proposed street names, ^7. names, appropriately positioned, of adjoining plats; ^8. Approximate (to the nearest foot) dimensions and area. of: (1) The overall plat, (2) Each lot, (3) Street rights-of-way, including radii of cul-de-sacs, and (4) Common open space or other land to be dedicated for a public purpose, ^9. North arrow, scale and date. B. Show the following on the preliminary plat supplementary drawing: ^1. Title of the associated preliminary plat, ^2. Name, address, telephone and fax numbers of the applicant, property owner if other that the applicant, and person preparing the drawing, ^3. Sanitary sewer, public water supply, stormwater drainage, school or other identifiable service or taxing districts, 04. nearest arterial or collector roadway intersection ^5. Buildings, watercourses, wetlands, tree masses, specimen trees and other existing features within the area to be platted and similar facts regarding existing conditions on land immediately adjacent thereto, ^6. inventory of existing natural resources and/or environmentally unique areas on the site, ^7. Existing sanitary and storm sewers, water mains, culverts and other underground structures within the plat or immediately adjacent thereto, including the location and size of the nearest water and sewer lines, ^8. existing and proposed spot elevations ^9. Proposed use of each lot and existing and proposed zoning of all property within the plat ^ 10. Toning district classification Eor adjacent property ^11. Location of common open space, parks and other public or semi public areas or facilities within or immediately adjacent to the property to be platted ^12. location and size oFsanitary sewers or other sewage disposal facilities planned, ^13. Land to be dedicated to the city, including: a. Street right-of-way, by functional classiticatiotl, b. Recreation land, recreation facilities and open space, c. Any other public use, ^14. Preliminary site drainage system including: a. General surface drainage pattern, including proposed retention area, b. Floodplain definition and effect of applicable local ,state or Federal Flood standards or elevations. J a j C. Other Department Comments: ^1. Zoning comments: ^2. Fire Department common ^3. Traffic Engineering comments: ^4. Environmental Management comments: ^5. Engineering Plan Review comments: ^6. Parks and Recreation comments: L ~-s r- DRCCOMMENTSi21s97 01-05-1998 03~30PM FROM TO 5624576 P.02 ~r~ P. Q Eo: 6f7f Ckaewtto, F4 31618 January S, 1998 Mr. Stephen L. Doherty Central Permitting Supervisor CITY OF CLBARWATER 100 S. Myrtle Ave. P.O. Box 4748 Clearwater, FL 34b I 8 tRE: Bayshore Townhouses) Dear Mr. Doherty: taro. t~3I fn-afa Fu No. (813j f4661t3 VIA: FACSIMII.E THIS DATE As instructed by you last Monday, my office placed the sign notice on the above referenced site indicating the scheduling of the DRC meeting of January 8, 1998. A copy of the notice as approved by you is attached. I would 111ce this letter to further document the resolution of three issues I discussed with you at that time. First, arty changes to the site setbacks would be viewed as a muYor modification and would not require city commission review. The setbacks along the site wdl be no less than 15 feet but may be less than that indicated on the ptatt due to engineering or other factors. Second, the unit sizes may change to be smaller or larger than indicated on the actual site plan What cannot change are the number of units. Thirdly, the building height has been intended all along to be no higher than 35 feet above the first finished floor. As discussed months ago, the first finished floor is defined to be the lowest elevation at which the occupied portion of a structure is set irrespective of the flood plain or FEMA elevation requiretr~ents. $ased on this definition it has been anticipated from the beginning that the buildings may be as high as 47 feet since this height would accommodate a 12 foot garage upon which the first finished floor would be constructed. From that elevation the building would be no higher than 35 feet. JAMES MARCUS VERNON Attorney at Law 577 South Duncan Aveaae Clearwater, lh'i. 34bib 01-05-1998 03~31PM FROM Mr. Stephen L.1?ol~rty Central Permitting Supervisor January 5, 1998 Page 2 TO 5624576 P.03 These determinations were the resuh of reviewing the code and discussing these matters with you, Tony, Sandra, Lou and myscl£ If I am not correct as to auy aspect of t}ie above provisions, please let me know as soon as possible 1~anlc you ~'or your help and cooperation and I bok forward to working with towazds the co~letion 01-05-1998 03~30PM FROM TO 5624576 P.01 Reply to: P. O. Boa 6474 Clearwater, FL 346!8 January 5, 1998 TO; STE~_ DOHERTY FROM: Marcus Vernon, ~ Si TF3J~"CT" Tel. No. (813) 447-4444 Fax 1Vo. (813) 446-6213 PHONE: 562-4576 PHA( ~N~g~~4444 TOT i. P Include Out ~+gc cotwNtFtsrc: JAMES MARCUS VERNON Attoracy at Law 577 Duncan Avenue Soutft Clearwater, FL 3461b ~,f~.M,II.E TRANSMISSION This infonrc-atioa is axifidential and has attomcy privilege status and should you receive this transmission in error, pease call 447-4444 immediately for instruuctions. Please mail ii bac;Ic to our company and we will gladly reimbtu5e your postage- 7'f:ank ~- JAN-07- - -- r~ Y COPIES TO: COMMlSSin~t Mayor Garvey, January 6, 1998 JAN 0 7 1998 Pnts5 CLERK/grTORNEY Allow me, if you will, a moment of your time. My name is Frances Williams and I live at 3118 Johns Pkwy. I was unable to be at the meeting regarding "Bayshore Townhomes" and the surrounding neighborhoods, so my voice was never heard. This letter is being sent to you and your committee well after. the fact because I wanted to calm down and not be as angry as I was the night I heard of the out come. Today, January 5th, I caught the replay of that meeting on Community Access Television. Frankly, Ms. __ Garvey, I've never been so embarrassed or disgusted at the manor in which my neighbors were treated. I saw the looks on each board members face, the absolute uncaring tone of voices and shamelESS chuckles, anytime on.e of my neighbors stood tv spcaY, ot~t. Your office should be ashamed! You personally, claim, to live in a home that is "forty some odd years old" and that, "new homES are being built in your neighborhood", and that, "you welcome them". So be it, I'm sure you or any member of office would not welcome a 46` Complex building into their backyards! Much less into the neighborhood. You see the difference is they're putting an apartment community on our neighborhoods back door step. NOT NOMES! we all would gladly accept another neighborhood. with Ht7ME5, not 4h' buildings towering over us, It is not sound. The same issues were rehashed over and over again, i.e, poor drainage, traffic, density, and I understand that this can make for a tiresome meeting. Allow me though to tell you that it has been well over 2 weeks since the last rains fell and some of us still have standing water in our back yards, that all of us still have incredibly saturated lawns, so much so that we still can not yet mow our grass. I'll go as far as to say, you or your board haven't these worries. Some of the boards members gave indications that they had been out here and had driven through this area, and hadn't really seen a problem. How thoughtless and insulting. One can not come to sound conclusion simply by a 15 second drive through our neighborhood.! We are a close nit community. we care about each other. I'd venture to say we are probably the last remaining of it's kind. I am sorry for you and the members of the board, you'll never understand what it is to have friends ;+s. t , ';/ . who happen to be neighbors. How many of your- neighbors do you actually know? Acid can you cw~lontha~ Your homendwould Real?_v? If something were to qo 4 they come to your aide? All of mine would! All because of the integrity and genuine concern we have for one another. The property you approved of, for the most part, is blindsidinq us. Anclote Enq., intends to put several of the tallest structures directly behind my home and three others. How can you justify this? No longer will any of us be able to go into our backyards and enjoy the privacy we can nvW., These buildings are intrusive. Are we no longer granted the right to privacy? One can not Experience privacy with a building looming over their home. Again, I doubt anyonE on this committee have these worries when they go home at night. We've never said don't develop the Land. We simply ask that it blend with the existing properties surrounding the location. Apartments do not blend, they invade. There is a lot more at stake here than was expressed at the meeting. You can not compare your living conditions to ours, by approving Anclote Eng. You told us you just didn't care. More often than not, T'm sure your mail is screened so that you won't be bothered `~.+ith the little things. I sincerely hope my letter does reach your desk. Although I must say, that even though I was b;~rn here in Clearwater, I've never been so ashamed. City of thieves. You and your committee have stolen our trust and our faith that there might be someone left to stand up fer the underdog. Isn`t time someone did the right thing":' Will it be your office? Or will you just chuckle once a~7ain and forget about us? Anclote is concerned about one thing- Money. Not the nEi.ghborhoods surrounding his site. And everyone Y,nows, the one with the most money wins- Everytime. I hope that you and the board members will do what's tight. Nvt what's mute profitable_ If he must build, build homes. Mr. Vernon claims that^he'll s~ll nowhI^don'~toknow aboute range of 5100,000 to ~Z50,000 , you. But I don't know anyone who'll pay that kind of money to look at my roof and back yard. There`s more going on here than meets the eye. R ~~ ~:' .~Pl~ass ro v h~per+a .:~ ~~s ~~8 =~g~,oturo. . tc: U p,.~omm s~ ~e ~~, ~,.~Q~ TOTAL P,02 w• ^" CITY COMMISSION January 12, 1998 Ms. Frances A. Williams 3118 Johns Parkway Clearwater, FL 33759 C ITY OF C _LEARWATER PosT OFFICE Box 4748, C1EnRWATER, FLORIDA 34618748 " 112 SOUTFI OsCEOLA AVENUE, CiFaxwn~, FtoRIDA 34616 T~a.EpHONE (813) 462-6700 Fix (813) 462-6720 Re: Proposed ~Bayshore Townhomes Dear GIs. Williams: I thank you for your -letter of interest dated January 6, 1998, and wish to take this opportunity to reply. I do recognize pour concerns about the. proposed development, Bayshore Townhomes on Bayshore Blvd. The City of Clearwater does appreciate and encourage input from interested residents concerning projects proposed in our City. " I want to outline several facts and, hopefully, clarify some misunderstandings concerning this proposed development project. • This subject property had previously been approved for a Residential Development Plan with 56 dwelling units in June of 1987. The new plan proposes a total of 68 units, maximum. • The previous zoning was RPD 5.8 and Preservation and the new proposed zoning is RPD 7.5 and Preservation, with increased dedicated open space and increased preservation lands in each category. • The adjacent properties around this site are zoned RS-8 (a compatible, same density, residential zoning) and P/SP (Public/Semi-Public -the Church property). • This proposal is for fee-simple, deeded home ownership parcels -not apartments. • Thls development proposal, in addition to all applicable City requirements, must receive approvals of other County and State agencies with regard to stormwater run-off, drainage, wetlands preservation and site access. 0 0 S/TS Letter - Williams ~.., COPIES TO: COMMlSSIAR! Mayor Garvey, January 6, 1998 JAN 0 7 ~ggg Pht~S CLERK / gnpRNEY Allow me, if you will, a moment of your time. My name is Frances Williams and I live at 3118 Johns Pkwy. I was unable to be at the meeting regarding "Bayshore Townhomes" and the surrounding neighborhoods, so my voice was never heard_ This letter is being sent to you and your co;nrtittee well after. ttie fact because I wanted to calm down and not be as angry as I was the night I heard of the out come. Today,. January 5th, I caught the replay of that meeting on Community Access Television_ Frankly, Ms. __ Garvey, I've never been so embarrassed or disgusted at the manor in which my neighbors were treated. I saw the looks on eac!~ board members face, the absolute uncaring tone of voices and shameless chuckles, anytime one of my neighbors stood to speaY, out. Your office should be ashamed! You personally, claim, to live in a home that is "forty some odd years old" and that, "new homes are being built in your neighborhood", and that, "you welcome them". So be i~, I'm sure you or any member of office would not welcome a 46` Complex building into their backyards! Much less into the neighborhood. Xou see the difference is they're putting an apartment community on our neighborhoods back door step. NOT HOMES! we all would gladly accept another neighborhood. With HOMES, not 4fi' buildings towering over us, It is not sound. The sa,~ne issues were rehashed ever and over again, i.e, poor drainage, traffic, density, and I understand that this car: make for a tiresome meec.inq. Allow me though to tell you that it has been well over 7 weeks since the Last rains fell and some of us still have standing water in our back yards, that all of us still have incredibly saturated iawris, so much so that we still can not yet mow our grass. I'll go as far as to say, you or your beard haven't these worries. Some of the boards members gave indications that they had been out here and had driven through this area, and hadn't really seen a problem. How thoughtless and insulting. One can not come to sound conclusion simply by a IS second drive through our neighborhood.! We are a close nit community. We care about each other_ I'd vcrture to say we are probably the last remaining of it's kind. I am sorry for you and the members of the board, you'll never understand what it is to have friends f ~ who happen to be neighbors. Now many of youz' neighbors do " you actually know? Aud can you call them your friends? Real1_y? If something were to qo wrong at your home, would they come to your aide? All of mine would! All because of the integrity and genuine concern we have for one another. The property you approved of, for the most part, is blindsidinq us. Anclote Eng., intends to put several of the tallest structures directly behind my home and three others. How can you justify this? No longer will any of us be able to go into our backyards and enjoy the privacy we can now., These buildings are intrusive. Are we no longer granted the right to privacy? One can not . experience privacy with a building looming over their home. Again, I doubt anyonE on this committee have these worries when they go home at night. We've never said don't develop the Land. We simply ask that it blend with the existing properties Surrounding the location. Apartments do not blend, they invade. There is a lot more at stake here than was expressed at the meeting. You can not compare your living conditions to ours, by approving Anclote Enq. You told us you just didn't care.. Mvre often than not, I'm sure your mail is screened so that you wvn't be bothered with the little things. I sincerely hope my letter does reach your desk. Although I must say, that even though I was born here in Clearwater, I've never been so ashamed. City of thieves. You and your committee have stolen our trust and our faith that there might be someone left to stand up for the underdog. Isn`t time someone did the right thing"? Will it be your office? Or will you just chuckle once again and forget about us? '~ Anclote is concerned about one thing- Money_ Not the nEighborhoods surrounding his site. And everyone knows, the one with the most money wins. Everytime. I hope that you and the board members will do what's right. Not Nhat's mvxe profitable. If he must build, build homes. Mr. Vernon claims that he`ll sell each °townhome" in the range of "5100,000 to 5250,000° now I don't know about you. But I don't know anyone who'll pay that kind of money to look at my roof and back yard. There`s more going on here than meets the eye. R ~~ Due dote, //.~4~~ TOTRL P.02 4 PN10-O1 CITY OF CLEARWATER ATTN: ENG PARCEL ID 16-29-16-00000-210-1600 PAZIP YRBLT/EFF FLRS 00000 OWNER'S NAME AND ADDRESS V P W G BLDGS == IMP] BICKS MGMT & REAL ESTATE V 00 SUITE 105 LEGAL DESCRIPTION 3705 CHAMPAGNE DR E 400 FT OF N 1/2 OF S TAMPA, FL 33618-2717 OF SW 1/4 OF NE 1/4 OF LOT SIZE __> ISC COUNTY 1/4 CONT 1.52 AC(C) TOT SQFT $/SQFT AVR 0 0.00 0.00 MOVEMENT == HEAT SQFT 0 CENSUS PBOOK/PG 1/2 268.09 NW NBHD YEAR IMPROVEMENT LAND ASSESSMENT AS/FT YEAR TAXES PD D TX/FT 1997 0 102,000 102,000 0.00 1996 1,166.30 Y N 0.00 SALE DATE AMOUNT BOOK/PAGE DT Q T SALE DATE AMOUNT BOOK/PAGE DT Q T SEP. 1994 100 8789 1583 D U OCT. 1986 430,000 6349 2022 M K MKT YR BLDG LAND TOT VALUE ____= LAND / PROPERTY USE ____= HOMESTD LP 97 102,000 102,000 00 233 VACANT PUD 0 N MORTGAGE COMPANY AMOUNT DATE MTG TYPE RATE NUMBER SELLER'S NAME GEN REVIEW DATE BLDG REVIEW DATE SEED INVESTMENT INC 05/05/1997 / / ENTER=FWD F1=DOGS F2=BLDG F4=TAX F5=LGL F7=DIM F8=XFEAT F13=SKTCH F6=COMP MENU PN10 RECENT DEED PRESENT - F1=VIEW ISC ~ i TAI ~-/ G ~, , ~~ ~ ~ ~ PN10-Ol CITY OF CLEARWATER ATTN: ENG PARCEL ID 16-29-16-00000-210-1700 PAZIP YRBLT/EFF FLRS TOT SQFT $/SQFT AVR 00000 0 0.00 0.00 OWNER'S NAME AND ADDRESS V P W G BLDGS == IMPROVEMENT == HEAT SQFT BICKS MGMT & REAL ESTATE V 00 0 SUITE 105 LEGAL DESCRIPTION CENSUS PBOOK/PG 3705 CHAMPAGNE DR W 619 FT (S) OF N 1/2 OF SE 268.09 TAMPA, FL 33618-2717 1/4 OF NE 1/4 OF NW 1/4 & NBHD LOT SIZE __> ISC COUNTY E 569 FT OF S 60.07 FT OF N 1/2 OF SW 1/4 OF NE 1/4 YEAR IMPROVEMENT LAND ASSESSMENT AS/FT YEAR TAXES PD D TX/FT 1997 0 204,000 204,000 0.00 1996 2,332.60 Y N 0.00 SALE DATE AMOUNT BOOK/PAGE DT Q T SALE DATE AMOUNT BOOK/PAGE DT Q T SEP. 1994 100 8789 1583 D U OCT. 1986 430,000 6349 2022 M K MKT YR BLDG LAND TOT VALUE ____= LAND / PROPERTY USE ____= HOMESTD LP 97 204,000 204,000 00 233 VACANT PUD 0 N MORTGAGE COMPANY AMOUNT DATE MTG TYPE RATE NUMBER SELLER'S NAME GEN REVIEW DATE BLDG REVIEW DATE SEED INVESTMENT INC 05/05/1997 / / ENTER=FWD F1=DOGS F2=BLDG F4=TAX F5=LGL F7=DIM F8=XFEAT F13=SKTCH F6=COMP MENU PN10 RECENT DEED PRESENT - F1=VIEW ISC PN10-01 CITY OF CLEARWATER ATTN: ENG PARCEL ID 16-29-16-00000-210-1800 PAZIP YRBLT/EFF FLRS TOT SQFT $/SQFT AVR 00000 0 0.00 0.00 OWNER'S NAME AND ADDRESS V P W G BLDGS == IMPROVEMENT == HEAT SQFT BICKS MGMT & REAL ESTATE V 00 0 SUITE 105 LEGAL DESCRIPTION CENSUS PBOOK/PG 3705 CHAMPAGNE DR S 1/2 OF SE 1/4 OF NE 1/4 268.09 TAMPA, FL 33618-2717 OF NW 1/4 LESS THAT PART NBHD LOT SIZE __> ISC COUNTY IN JOHNS PKWY SUB & LESS RD CONT 3.47 AC YEAR IMPROVEMENT LAND ASSESSMENT AS/FT YEAR TAXES PD D TX/FT 1997 0 170,000 170,000 0.00 1996 1,943.83 Y N 0.00 SALE DATE AMOUNT BOOK/PAGE DT Q T SALE DATE AMOUNT BOOK/PAGE DT Q T SEP. 1994 100 8789 1583 D U OCT. 1986 430,000 6349 2022 M K MKT YR BLDG LAND TOT VALUE ____= LAND / PROPERTY USE ____= HOMESTD LP 97 170,000 170,000 00 233 VACANT PUD 0 N MORTGAGE COMPANY AMOUNT DATE MTG TYPE RATE NUMBER SELLER'S NAME GEN REVIEW DATE BLDG REVIEW DATE SEED INVESTMENT INC 05/05/1997 / / ENTER=FWD F1=DOGS F2=BLDG F4=TAX F5=LGL F7=DIM F8=XFEAT F13=SKTCH F6=COMP MENU PN10 RECENT DEED PRESENT - F1=VIEW ISC Clearwater Central Permitting Department Interoffice Correspondence To: Art Kader, Interim Director, Parks & Recreation; Mike Gust, Traffic Operations Engineer, Bob Perkins, Engineer II; Mike Quillen, Environmental Engineer; James Goodloe, Fire Marshall; Don McCarty, Senior Design Planner; Steve Doherty, Central Permitting Supervisor. From: Don McCarty, Central Permitting, Senior Design Planner Subject: BAYSHORE TOWNHOMES', Date: February 6, 1998 Please find attached the revised site plan for BAYSHORE TOWNHOMES which has been submitted by the applicant for certification. Refer to the Summary Notes for the DRC meeting of January 29, 1998 for assurance in assuring that all DRC directed changes have been made to the plan. If you find the site plan acceptable ,please initial and date. If you do have an objection and/or recommendation, please comment below or attach your comments in a memo. PLEASE DO NOT MARK PLAN AS IT HAS BEEN SUBMITTED FOR CERTIFICATION. DRCFINALBAYSHORETO WNHOMES .:~ - DEVELOPMENT REVIEW COMMITTEE ~S ~ ~6 ~~3 ~ SUMMARY NOTES ~ ~ January 29, 1997 Meeting ITEM 1 Bayshote Townhomes Rich Baier Public Works Administrator 1. How project looks from main entrance off of Bayview -Landscaping -needs to be more detailed. Specifically, minimum size for shrubs is 24" on arterial thoroughfare, need elevation drawing depicting proposed landscaping, provide plant species information. Marcus Vernon to get with Rick Albee to do landscaping. Needs additional sheet to show landscape plan to get CSP. Tim Kurtz - Landscape Architect; 2. Drainage considerations: 30" reinforced concrete pipe with bell ends. Needs mitered ends GoW s~~ 5 on crossings; ~ ~' ~~~ ~ V'' CJ~ ~ 3. Left turn lane on McMullen Booth? Need operational analysis for turn lane; ~ ~ ~C, 4. Provide existing and proposed drainage and calculations ~' ~`S Q t S ~ ~ P~-~ I/L1 •~• Yl~d~°Y . James Maglio, Solid Waste Superintendent (not in attendance): Provide six 90 gallon recycling bins along with dumpsters. Mike Quillen, Assistant Director Engineering: ~. Prior to certification of the site plan, 1. Show total paved area and total interior landscaped areas expressed in sq. ft. and ~' as a percentage of the paved area of the site; Q 2. Provide complete tree survey to Environmental Management; S~~`'` ~ ~ rc~ 3. Remove trees from the site plan, ~ ~ ~ ~' /4. Show two 24" culverts under entrance drive J 5. Regrade road between buildings 9 and 10, and 6. Provide calculations showing no loss of storage volume within the 100 year floodplain. Prior to issuance of the requisite building permit, 1. Furnish the SWF\Y/MD and Army Corps of Engineers permits to Clearwater Environmenta] Management; 2. Acquire clearing and grubbing and tree removal permits (or no tree verification form) from Environmental Management; 3. Provide high point at the property line at the McMullen Booth Road driveway; 4. Provide a landscape elevation drawing at the main entrance; 5. Provide 3 copies of a landscape plan to Environmental Management and show provisions for irrigation; 6. Provide predevelopment drainage calculations for runoff to Bayshore Blvd. pipe and 7. Provide signed and sealed drainage calculations. Lou Hilton. Senior Planner: 1. No comments. Bob Perkins, Engineer II: Prior to certification of the site plan, ..l Show ADA ram s for sidewalks on the site lan; P P 2. Complete the Dumpster Requirement Form and return it to the City's Solid Waste Department; J3. State on the plan that the 6" fire line tap to the City water line is to state "6x6 / tap" so that City Utility Accounts will know what Eee to charge contractor; J 4. Address pedestrian access on Bayshore. Sidewalk Vs boardwalk. Sidewalk with dredge and ~~ fill won't work; and ./5. Show all proposed utilities, storm water retention/detention systems and 50 Et. perimeter contour elevations. (oEEsite contour is unacceptable -show spot elevations along center line of Johns Parkway. Prior to issuance of the requisite building permit, 1. Obtain and furnish evidence of all applicable permits from other governmental agencies including but not limited to: Pinellas County permit for work within the right-oE way to Engineering Services, and 2. Pay the sewer impact assessment fee, based on the size of the water meter with assistance in determining the tee Erom Central Permitting Customer Service Representatives. Prior to issuance of a Certificate of Occupancy, 1. Have the City install backElow prevention devices with the owner/applicant paying all applicable fees; 2. Visually screen the dumpster and provide gate with a minimum 12 ft. clear opening to the Front Eor access by Solid Waste vehicles; 3. Furnish as-builts and an engineer's certification to Engineering Services. Steve Doherty, Central Permitting Supervisor: Prior to certification of the site plan, 1. Indicate that entry wall will not exceed 6 Et. in height; 2. Indicate on the plan that entry signage will be limited to two 24 sq.Et. single- faced signs to be placed on either side of entry road; and 3. Indicate that entry wall will be located a minimum of 5 ft. from Bayshore Blvd. westerly right-oE-way line. Other action required,. 1. The requisite permits for the project shall be obtained within one (1) year of the date of certiEcation of the site plan to prevent expiration of the site plan, 2. The requisite certificate(s) of occupancy shall be obtained for the project within three (3) years from the date of certification of the site plan, and 3. Review of signs, Fences and walls is subject to separate review and permitting procedures. Mike Gust, Traffic Operations Engineer: Prior to certification of the site plan, - 1. Show all vehicular access dimensions. Main access drives shall have a minimum width of 24 Et. (Revise note 4); 2. Adjust parking stalls and/or driveways on the plan to the satisfaction of the TraEFic Engineer; 3. Address and resolve the need for right turn/left turn auxiliary lanes ant the queuing for traffic related to the project; o.l~ PE2 12~ cN' ~. ,~ Obtain Pinellas County driveway access permit for McMullen Booth Rd. connection, and ff~c-~S ~~'a'• ~°'~ "°~ To ~yT-~ P~~c .~„ T pcr o~c 5. Provide directional traffic counts and impact analysis. ~ ~ " ~• ~• r { ~~ Y O f I / ~~ ,~ ~~ /=ie.-.,~ Q~//~~~~ ~ ~ o.a c. r~.+w /~+..~ d~M~ic~- ~0. ~ M r~c~ G~~ R?od l'~ .t'r~v~ (~ _ ~+ - S - Z y Y ~F,p, _..._ _ ~~ ___ _ ~. - _~:_ . _ - - --... -_ _ _ _ ___ _ ._. -_. _ ___ __ __.~ U. ~' . i ~' D,~,,,,,,~a.~ - Gt-,~,-( Setts 1 T _ _-__ - . , . _ _ __ _,- _ - . _ _ _ t i r .. _ _ _ - -_._~T Kco.t_T-o. ~c~Kr'- - - _Sw~/MD ..~fp_t .DN6•-C,a-~~.-.._____ !!, _ ~, ,~ 70_, , _ - -- - --_ - -_ _ - _ __ --_ - - ~~~~ ~- -. s~- ~#, C•dc~ w~_-_,Q~"Qv~.c~ -~. Y~iC~,Ja./ _TJ ~.C°J~o ~ -~//i-Lr _-~d~,/G - _ I ,p -- ! - _ ., - ~- - - - ... _ . s1? .z-c c ~-_~- ~ Cam. ~ .`~ _. _ R 1. ~~ Sc_..1J1-c_;~-_CpK.._ 5.,_•-~• ~ wi.c~ Tv ~~cf!° . J~!~~i.J.9~G.E!_ f~cv~, S, F, - t. _~ ~ .S~ ~ ~,-~.,.i/,t~ic _ ~-sue./ _ ~.G~ o!.rl~~s2d } ~~ - _ __-------- - - _ _ - --- ~- ~~ o . - . -- - -Lov ,rtiyG~- __ t,. _ - _ _ _ _ ___. _. _ _ __ _ _ . _. r ..- ~~~~~~ ~~ ~ -~-~-- ~~~~~~ c> cwa.Q.~ ~~j- ~~' .~ o~~s ~~°'. C~R1 o t2- To t.s S .~~ ~ -_ ~'r ~ ~ ~- •. -- ~/`.~. L° ~t D Cc~c.J ~2 ~!"~'C l ~ tai ~~ _..- ~~~~~ .tea Sd~ -~~`- v, TOTAL OF 68 UNITS - S TOF SIGN i~ 15, NO PERIMETER FENCE PROPOSED AT TIME OF INITIAL APPLICATION. 16, ALL SITE LIGHTING SHALL B'E DIRECTED AVAY FROM ABUTTING STREETS, RIGHTS-Of'-WqY, AND RESIDENTIAL PROPERTIES, P~IDS DR OTHER STRUCTURAL CHARACTE ISTICSONTAIN ANY STRUCTURES, lAN IA S, ~ gE ;bf'SIDEWALK FjU BOOTH ROAD. SdS IDEWALKCFEET,~TC~i gSApE~RGSf~ARE FOOT SHALL gE CMULLEN ~O THE CITY AT THE TIME OF FIiittcT C 0 IN PAID I7, SETBACKS TO BE DETERMINED BY .ADOPTION OF PLAN BY CITY COMMISSION, 18, SITE IS VITHIN JURISDICTION OF CITY OF CLEARWATER, PINELLAS COUNTY SCHOOLS, AND SNF'WMD DISTRICTS. !9. BUFFER AREA TO ZONED PRESERVATION AREA SHALL AVERAGE 25' TO ANY STRUCTURE. RETENTION POND MAY BE INCLUDED IN BUFFER AREAS. 20. REAR LOTS WILL BE DEED RESTRICTED TO PROVIDE ONLY BUFFER AND RETENTION AND NO STRUCTURAL IMPROVEMENTS WILL BE ALCOVED. 21. INDICATED PERIMETER BUFFERS ARE PRELIMINARY, ACTUAL PERIMETER BUFFERS MAY BE LESS, BUT IN NQ CASE LESS THAN 15 FEET, 22, ALL DUMPSTERS TO BE A MINIMUM QF 3 FEET FROM ANY RIGHT-OF-WqY, 23, OWNER SHALL HAVE 1 YEAR FROM CONSTRUCTION PLAN CERTIFICATION TO ACQUIRE FIRST BUILDING PERMIT AND THREE YEARS FROM CONSTRUCTION PLAN CERTIFICATIDrI TO RECEIVE LAST CERTIFICATE OF OCCUPANCY, 24, PRIOR TO THE ISSUANCE OF A BUILDING PERMIT, OWNER SHALL RECORD A CONSERVATl~ EASEMENT OVER ENVIRONMENTAL AREAS, SAID EASEMENT SHALL CONTAIN A PROVISION ALLOWING THE CITY ~ CLEARWATER TO REZONE T PROP RTY S;BJECT TO THE EASEM~NT, TO PRESERVATION ZONING, ~-wv~ /~,• 25, NONE OF THE 15 FOOT REAR Y ~ ~~L~ ~~ ~'fi'PF' -C!}r, ~ Gn' WATER MAIN RING INC. 34618 • LIEU DF WALK ALONG BAYSHORE DRIVE ,d ~~ 1 '~ ~ t. L ~ /C j i~~ i ~[ r JAN 2 0 t9~ '' 8 CENTRAL PERMITTING CITY Ur` CLEARWATER EPLON NA DD SES _"°° ~ ~1INARY PLAT G~~" ~~ J ~ . . ~, ^ 1. Show ADA ramps for sidewalks on the site plan. ^2. Complete the Dumpster Requirement Form and return it to the City Solid Waste Department. ^3. Add a note to the site plan stating "It i.r the responsibility ojthe opener to mll the dump.rter to a designated location at an assigned time as approrxd by the Solid lY~arte Superintendent. " ^4. State on the construction plan that the detector check should be DDCVA with the by-pass meter installed by the City with fee paid by contractor. ^5. State on the plan that the 6" fire line tap to the 6" City watec line is to state "6x6 tap" so that City Utility Accounts will know what fee to bill the contractor. ^6. Show backflow device(s) on plans as RPD. 07. Show all proposed utilities, storm water retention/detention systems and 50' perimeter contour elevations. ^8. Have the final site plan signed and sealed by a Professional Engineer registered in the State of Florida. ^9.Other comments: PARKS AND RECREATION ^1. Pay the required Open Space and Recreation Assessment Fee with review by the Clearwater Parks and Recreation Department. ^2. Note that_ the project is exempt from the City's Open Space and Recreation Assessment Fees. ^3. Other comments: B. Before the City can issue BUILDING PERMITS, the applicant must complete the following actions: `, a ~ ~, P~ov~2 M~ `~~ .ecjloa.s o~3~" P~ ~~. vc~~ gn,~sl~nre. ~ G~~~ ~~~~o (' ~g ~~" ~. ^1.Obtain and furnish evidence of all applicable permits from other g mental agencies ENVIRONMENTAL MANAGEMENT ~ Co ~p~ ~ n5 ~l~.e.e. rs ~..t. Furnish the SWFWML~'lpermitsto Clearwater Environmental Management. ~. Acquire clearing and grubbing and tree removal permits or a no tree verification Eonn from Environmental Management. 03. Provide drainage c culations. \ ~. Other comments: J~ 1` `~ o ~°`fi ~~ ~ .~'' Vie. Q~ ~ ~- c.-l~o t\ e~ ~ a c ;~( ~, 1/, SGO~~~ ~rC~ ShG`~ ~-- c3r~ C.d~``Pe.~f ~,2..~ ~ ~~' °~-.S 1~r-v S Z-Y''~ ~`~`~ ~(~! ENGINEERING PLAN R~VIE ~. «n,~o ~ ~ 6-, O ^ e- including but not limited to: _(a) FDOT permit Eor work within the right-oE way to Engineering Services; _(b) Pinellas County Public Health Unit Permit, Ingress/Egress and a 10 foot Utility Easement over the proposed water mains up to and including meters, backflow prevention and hydrants. 02. Pay the sewer impact assessment fee, based on the size of the water meter with assistance in determining the Eee from Central Permitting/Licensing specialists. ^3. Other comments: .~ ~~~p_Q, ~ Clearwater Central Permitting Department Interoffice Correspondence To: Ream Wilson, Director, Parks & Recreation; Mike Gust, TrafFc Operations Engineer, Bob Perkins, Engineer II; Mike Quillen, Environmental Engineer; James Goodloe, Fire Marshall; Don McCarty, Senior Design Planner; Lou Hilton, Senior Planner; Steve Doherty, Central Permitting Supervisor; James Maglio, Solid Waste Superintendent; Chuck Warrington, Managing Director Clearwater Gas System From: Don McCarty, Central Permitting, Senior Design Planner Subject: October 23, 1997 Development Review Committee Meeting CC: Sandra Glatthorn, Planning Administrator Date: October 20, 1997 REVISED AGENDA DEVELOPMENT REVIEW COMMITTEE AGENDA Thursday, October 23, 1997 at 9:00 a.m. Item 1. CLEARWATER CHRISTIAN COLLEGE (courtesy review at 9:00) Item 2. BETHEL LUTHERAN CHURCH (courtesy review at 9:30) Item 3. BAYSHORE TOWNHOMES (courtesy review at 10:00) Please review and comment upon the documents attached for the third, additional item now scheduled for the meeting referenced above. Your comments in advance of this meeting will. be greatly appreciated; if you have any questions, please feel free to call Steve Doherty, Central Permitting Supervisor at ea+tension 4585. DRCDISTMEM0102397 CITY OF CLEARWATER PARKS AND RECREATION DEPARTMENT DRC COMMENTS -MEETING 1/29/98 1. Bayshore Townhomes This new residential development will require payment of Open Space and Recreation Land Impact Fees prior to certification of the final site plan/plat as well as payment of Recreation Facility Impact Fees prior to issuance of building permits. The net land area needs to be clearly noted on the site plan, less the existing preservation area. It appears numbers have been transposed in the table on the proposed lot area total upland 9.4 acres (490,464 s.£, should be 409,464 s.£). Correctly noted on existing gross area. \\ms1\msb\SHARE\PKR.EC\Debbie's Docs\DRC Comments\DRC Comments I-29-98.doc i~ --~ ~ ~w ~~ ~~ ~~ ~: ~,~,,~ Pc:.O. AGG~ SS ~} 1._o~J L 3,~,~ ~~ .' F J~-Yc_.~Ow b ~~-..ate I IN1F~ " ~Ej~. ~S ~2T'1 F(G19T10l~ S . o ~ B~~ . I 1• ~. E.~ ~i ~~~ - ~~ _ ~,.~ ~LAT' - ~Ja~NrerVarvc.or' b(% ~(h..c~a.J L CrCs•GaG ~vtS ~oN,f~s-~c.1.¢TicarJ ~~ t ~. . f2~ cry _ _ Ti N~ T~uRrZ a . ` ~ ~p t. ~U.,.~ ~-S ~/1~`f crGT- G~Do ~ - LA+~LaS•~9 P[ (J~r- -ro N1~'~'~- / 5~4~°~Crl~ ~. 2y " t. Sc-~.e.vr3 {~~,~~ rt~.~ G-S 2. 'Dr~~~w,a~ [[ °~ . M~-1-u~(~ -mod P[ n~ - -2cp~,,a~-- ~~ ~~~ S ~..~~n~i,r~c s 3...T -~.a~ws ~o2.r~-rz~ _ a.. ~rGO~s[OC LE'Ff Tvc[.~ j.,ptiJ~ (r,,FO. (~'.5'c..skCrr~ ^~o ~y~,Sl-toKtr, • ~- 1 .! ~ it ~ D'c'c~' ~ ~.1Go2~s-~''C.t' ~T'~ ~, '~._.~. Ga~~'SS /~~,ow ~..'1~ra-(SI-j~o~E' - ..~eA~~.~: ./1'r~sR,.~s - - - I ~ f. - - t - - - - - - ----- - - - ', _ - 2- . ~-~--r-~--~,s- - -r ~~.-. _ S~ r _ - _ _ ~~ - G~ l~iet~eswM{ ~osCc~Tto~ ~ ~ ~li4 ~~-~-~ ~DDTc-f- '6 / `r - -- ~Ir~G'~Gdh GA~c7 cj~`GTcacJS ©r' ~O _ ~_~~ _ _. -. _ .__ _ _ G~~~ -- _ __ _ ___ _ _ _- -- _ _ _- (~~s~,~ ~ - - ~ - - .._ _ - __ .- -- - - - - - - __ .T ,- • / ~ '! i~ Prniu~~+zy~~,.t Sr~~~ ~64 = pa~~ I ~~ ~ o f s ~ Gc•~ ArCr.~~- ~i4-Nc~ L 'f' !..)i}C.~.. ~c.-rj~} /N ` ~^XG.ac'~S O ~ ~Z o r= Z ~F ~ ~o ~, 7 ~..~,...~ ~J t If' ~ ~" ~ - ~ F - .,,~.~". ^,~ . -..,,w4~..r-:4y'.~ie'~'ti{i~/7'S'~!x"sP..~'?' r~~~ K.~ ".ax,w -yy .. __ -+•t~.y .s -..! va ~tt~. ^,it~??~ 1^a''r3'a• .• "" t$ r !' ~ ° •.Y. .. v. ....<W~ ~ ~_ /~' ~°`•£~`1 ~ 1 3 ~1[ a '.tf'-T ~'' XrI i~'fyt • t }eK ~'~he'tMltheeat t 7 " ~ 4 s.l ~ _ ; - J!20YUtr SAM 7` tetE, 9'lofelfaa ~'L,enlty '~rs7efs~t; X1'4 ti~ 1*n i~'.,~A~p~!~p. ~ a• C _ • ': :+~3r ~";~"'..~. -~'S` .a-....,. ti id~i~~ ~~pi?`„~.y .L pF ".~~"~ Sjl~ r~ +c',s § -~ `` 1Iq IQtt1t itfttte'lteettei~f t~aer M"~i!` ft!fic~t~- r~ ~ *' >.., v.-~ t ~ ., >~:>~~'ttwe+ !1 I7~fy'~~~e{t tt4i ~F` t t ~: ~} ~ -~'~°~ _ - - a1Rr ad! i~t~44w~iid:: [~t'~t"f,0,1 't~~ '` ,-~~ ~}~ ~jy~~ t6/ '~ rf . ~1brteYLaT7 +.raM°Y/j /+•.~}~' "R ~~~x ~O~East lK:07 1eet;r{Aauce f6rRi 9:i'tZf • 1~t. '"~t'~ m+s ^ , .k , ~,# . .teeth D'ItVT• feat ~S.Of fqt; Life+tca"'NorD6'fi•2T't+i''J1aRt it ~ ~,~' ~ '~~' .~ -` _ - - - . - :10lence bt4h>YJ7.OY,katt•;if.0l fiK: ~•ac-:•3atttE ff't7!5t',Esft ifl ~DS:>_:°,;r^s,.f, - „i,c° ,' t'Nt: tlRfKe lbrU O'37!~A1''~eFyt.1[5y.07~1.gf> '~a.ievtltjat ~ - ' i1a1911ta ilelt 2, "ea recor46 9e 1•letipot d'.6, 1ef'ia of{, 9't011R'1teCer~ ot~~i~y~r~. ~`.~ fs•tlety, 11ori6s; '[Nees ~vta i4.27'6i•;sat 614:04 '!ut 9o..lM1 Seet>,s-e , ' :~,. tCneor bi ~H lB tWDQ 7rta/N; taenca 3olrth'~'21f ~Y }fat !90 Yf tert-~ier~ i',,.- „ 'a p - ;rltht-M-tnY M it/nlton tirA: io t:As!' '` l0 f }= ~1~~i ~ - ~ ~- . ',r~gfi' ~ ~ ~•'tr ems' m- = s. Hest pirt~+:Mw~•d t'• G3gry apu t!6}s:~sreA. l~K~~~ 1ia~'it~' y ~ `~! b ~'r •~"~s~ ~~ i~ i"/~ y73~ t. ,{{{mJi•Y ^ Tyymi~~'• ~~'~ >. r f 1~~1~ •'L .o - -~attteace`u t6i ttorCRatat se~'ller of .~i!MrGfatat 2/tr~~iy/#,~;~- ~ " , ii _ "~,.~~`', (o~ ~o t~ ~i1T~ ~~ ~• tsat, .t+a ~ s.tau otrt7sta- ~atl._~t10.31 ~ ~- te.cerlttr,fi'salli6a9ai}/ t'et19f1aMer~tR~7.4.>w$i~~ 'r,. 60:00 fN; to "611s heat -r; fAt~/wee N >jlyf~'Z}fr/. tMKa Rlerli .. Y'e ifett, i19.OS feet, aipfre ~ itOrth lttli of JeAn'r ~-art t~!'T7`f1• _ - /Lt bol 2f, Mfe el! of tM h611e RtegNf N beetle Lwet~,eFtartt~oe ~'•~ _ - if tMnct eoKA 00'2t'D7_ Eatt, fE.01 (Ntl thaltco brth Rf'21.6f ttyrt, X06.06 '' " ', feet: Lhanu North 00'21'62` last, l6S.ET /ett: tlttept tpei6 iY•t1.36,• Wtt, 169:04 teat, Ko !M fart -S t-of f TReeCe t6.t6 40'f)r0Y ~. ih .w •r stsb ieai is test. 60.07 feet, a1~ sale last .t~~1111w/-tV•'t9ee bar a1,:0-t.t ;.e . Lwtteat! lofts 00.77.OY Eeat. 100.00 tact al6r se,f teat NjA. •~ '` t .tbnu.ioupiYYl'6i'.foftiH,Ot,~fsitti t^6fif rtaelw~ .d,4' ~~ i~a, . tNi: ihefxs MorUi 1Y27'fit sMrt,'ii9.>% 1~ tOwUts ~3' '~'~ ~a~ ~ i;~ 's a' "'~. AM tlf5 rthat 0t rt eume7ru Ye, rt{nt-ol way for 'SU to eNa ec 352 -;s i.e tnv.n, ~ ~ Y +~ u Ion.aootn ~R~9~aY1 in D. ~, boa `)Nl, yaps a7a, t+lwal tat tasety eaa ors.„` fvrtMr etK.Ieae of fC7 fort: - A to foot panel of lane 17t n{•, Wet of •~ sa}slant to iW let lo.inp~+fv tcrttalf ltne~ Start at tho NKMart .eortyr et tire. atOrtMfst~ t/{ of )eel teo 1f SS South, lynge le {att. see run SovM d•))'O2• volt ti0.ti tNti teefKa a+w etY r+ortR R9'27'SE• 14tt r99.Of lwL:, tM~cs rue iore* 0•J7~~i' abft YR4.P7 Teat,. ~ -.f r %F1j~~ shoats run ao rte of T7'S{• thlt-i1t.Di TNS Tr e.. I SOU[h 0'21'02• t4st itf:d7'7Nt .ta a.Mtet ~ ~,',.~-~te4'-~~ 4_usncay.ro r •- ~ ~ Sf tMt ~ ~ ` ' r'y' °~t -0a rt ~weq ~Q for rt~~twf-en, ~~rtOfuttao~loat• tt}~r,f7 Ta}e ,_ ;:' ~9 aeon u Stata Road Mo. '{927 fa'0. R. 6001 i ~o0e 't5ai. •t.ot ~0 GL T ~/; ~j ~-/7 bc0rea, further eetcrtpad at toilort. ~a'~'r"t~ yt" ~~! `%~ 1~ N"~ ~ ~")O F+/ ~~ irta Wtt SO Iett of • pa.cal o- ly At Ntcr1W6 a1 totla.t: )a twnl y eortlratt ternsr of tM hori~eM y%1 0t Sect ien q '~ at the f '~~' (, ~ 100 ~~ i6 Ettt. rue Sovtn u. terntnip ?{ louts„ R.nes 0'37'6)' Wit along tM sort6-touts petarlta of felt SacUon 16, eie.2t I«L for tVClnt Of Mp fens ~ ~~~{ lifft, eeD.DS feet; thonta run }ovth 077'W• ~~ tMwce 'rw` he rth iYT) lr' ~i''F't7y~'= ttortR.i9't7'ft` raft. 119.05 tNet aa+ets+w'Mulh1D~2/~21Ya1M-t., eit~~1?sat- TOrat, 8~~ 0,10 yr~ k: ;frae sun -.• . South N'T7 i6. 6au.'2;tii,10 feet ta'a gist en Ria w.>RL:tNtt y. ' ~"~ F,. ,+-~ ~ _ ~cetKtr~l ee Ot to SO Sef:atee 'K; .tytM~Cf t.rt :3'f6,ie y.t, - -Tip-~r}sy e. ~ee~~rttr_ ~p _ ~ ,, .,~• - ` . - 11.'4 ~0let~ •intly[;~ at6~,•: •:,o a r r ~~ r g~.e,gy'e'.`f" o- } 44 °~fip S 'ICSf Wt.M rtl06~!~ 9K ~14~M~ it ~'° ~ ~\ "~~ ~~.3~` ~~±1••tO AL• .. ~ fo11~`~t•../eft 4iI, ffnTtat~t4~M is~Nat~i ~~i ~ ~~ #.- 4~. t,-: - o~ + ~~~ 4L. . 1C feet ~ar<:, a 1.ae , 1 ~ ~ _ '--~ -= ~;. 11 M: Sort of tho RortMaftKtortyr it 'the M 2rtlatet;;1/i ~/ 3e~M t6,-s7r•,w:lniy , ~ 2S. South, Rafgo ii Eaft foE run South 0.71'0)' lfeat 1190.{1-LNtI tf+eftce s'ef! , j r ` ?,,'~ h.~ vF' x:183 L4G- ear:h H•2r•sa' wft sD.o Best to w r.it nMt-ot !tr ~r e - tor ^ ea et If N feel ~7 isl+sbr'e AS~9 ~ ~.. - ~'. ~5 - fofnt oflCeetfy. a M. tMncs towtstltw wusrit~a ttaar'6H oi"fset T! ~a, ' e E ~~:~^ :~'^G„• . v*Y~~F~"S ~ ~ •:` °i" } d~ tell, e~ ._ ... ____ _ _.___._~ _ ..~_________ __ __ v __ . __ ,_ ,. ' Certified as a true and .correct copy. ~4,~ir~ 1 '~;~~}-`t`dk,plan approved by the Development Review Committee: June ~;r;,,,~t~`~~~®®'~'~~..t~ea~s mfr hands and ~ the seal. of the City of Clearwater ~h„rs,>sxteeri~h;w'd~^y~<~:f September, 1987. 4` .„ .: Deputy ~3~ 'er ~.,~. ® , { h n a°' "ti.,.. r w . { n ~, ~ ~ onoo0®p a CONDITIONS: t ,, .oAd4!«---t~-~-®®~~~.. > 1. Signs shall be subject to a separate review and pertgit~~ina process. 2. Driveway details must be coordinated with the Traffic Engineer prior to issuance of a building permit. ,, ~T.,~~,. 3. 0pen S ace and recreational land fees must be paid prior to certi~fica- tion of~the final site plan. (Paid on August 31, 1987) 4. Mitigation methodsfor filling the ditch on the site staall be sub~eet to approyal of City Environmental staff prior to issuance of a bail ing permit. ,a 5. Proppertyy owner shall submit, prior to issuance of a building permit an application to rezone the property to the D.E.R. 3urisdictional pine to AL/C (Aquatic Lands/Coastal). 6. The requisite initial buildin~+ ppermit must be procured within s.ix (6~ months from the date of cert~.fication of the final plan and al .certificates of occupancy shall be procured within three years of the date of certification of the final plan. ` N 7. A 10° utility easement must be given over all water mains up to and.. including meters and hydrants. (According to Public Works, this .easement is required prior to the issuance. of a building permit) 8. 'Dumpster must be visually screened with a 12' wide clear opening and .located as re aired by the Cityy Utilities Department. (Plan is .accept- able by the~Utilities Dept. 9-11-87) ~. Sidewalks must be provided along all rights-of-way as required by the City. (Noted on the site plan) 10. Buffering must be provided alongg the north and south property lines by providing a wall or vegetation with 85X opacity at maturity based on the desires of the adjacent property owners. (Noted on the site plan) 11. Final water system design must be sub~jject to approval by the Utilities Dept. (According to the Utilities 6ept., site plan is acceptable for certification, 9-11-87) 12.~The retention plan must be reworked to meet City .requirements. (The ' -site plan is acceptable for certification, according to the City Engineering Dept.)