Loading...
PSP94-14PSP94-14 926 MYRTLE AVE S MAGNOLIA MANOR CENTRAL PERMITTING DEPARTMENT September 4, 1996 CITY OF C LEAR~ATER POST OFFICE BOX 4748, CLFARWATER~ FLOwoA 34618-4748 MUNICIPAL $ERVICES BUILDING, 100 $OU77i MYRTLE AvENUE, CLEARWATER, FIARIDA 34616. TEIEPNOPfE (813) 562-4567 C OO pal ~~ ~ ~~ ~ `~ Patrick Shaughnessey • PO Box 1773 Largo, FL 34649 Re: Magnolia Manor_ • 926 South Myrtle Avenue' . Dear Mr. Shaughnessey: .. ~ : In response ~to your letter of August Z8, .1996, please be advised that- Magnolia Manor; a ~ - congregate care facility located within the City of Clearwater, was approved for 64 beds ".~ - on August 31, 1995 as part of the site plan approval to expand the existing facility, , Very truly yours, ~ , - ' _ ~ Donald D. Melone ~ ~ : ..- Central Permitting Specialist ~. MAGNOLIA MANOR ~~ STATE OF FLORIDA AGENCY FOR HEALTH CARE ADMINISTRATION August 28, 1996 If you need further assistance, please call me at (904)487-2515. Consultant Patrick Shaughnessy, Administrator Magnolia Manor 926 South Myrtle Avenue P.O. Box 1773 Largo, Florida 34649 Dear Mr. Shaughnessy: c~OO [~~/ Your request for an increase in your facility's capacity from 32 to 64 residents has been accepted. However, your census must remain at 7~ or below tul:til the area uiice has completed their survey, made their recommendation, and we have issued a new license with the increased capacity. Zoning Have your local zoning official complete the enclosed form or its equivalent for the address and capacity of the facility. cc: Area Office Supervisor - 5 2727 MAHAN DRIVE • TALLAHASSEE, FLORIDA 32308 LA~~'TON CHIEFS, GO~'FR\OR Sincerely, ~. _~w TO: FROM: SUBJECT: COPIES: DATE: f CITY OF CLEARWATER Interdepartment Gr.Les~~ndence Cyndie Goudeau, City Clerk _,~ Louis R. Hilton, Senior Planner Certified Site Plan for"Magnolia Manor (PSP 94-14) apt z ~ ~ss~• ~~ See List Below ~~~~ ~ ~~6 ~.~ October 27, 1994 •- - The Development Review Committee at its meeting of September 8, 1994, approved the above described site plan subject to the following conditions: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. Signs and fencing/walls are subject to separate review and permitting processes. The rP,quisite building permits must be procured within one (1) year from the date of certification of the final site plan and all requisites certificates of occupancy must be obtained within three (3) years of the date of certification of the site plan. Prior to certification, presentation of a release letter holding the City harmless for demolition is required. A fire hydrant assembly shall be installed not more than 300 ft. from the structure. Suggested location fifteen (1~ feet from building. ~' If structure requires or has installed an automatic fire sprinkler system, a FIRE DEPARTMENT CONNECTION `' shall be installed a minimum of 15 ft. from the structure, adjacent .to a paved drive and within 40 ft. of a fire; hydrant assembly. 1~ Prior to certification, the Dumpster Requirement Form must be completed and returned to the City Sanitation Department. Prior to certificate of occupancy, replace curbing on Myrtle Avenue. Prior to certification, provide ten (10) to fifteen (1~ foot radius on Magnolia Avenue. Prior to certification, all required perimeter landscape buffers shall be dimensioned. Prior to certification, the landscape plan shall be submitted to Environmental Management revised to include twenty-eight (28) interior shrubs. As conditions #12,3,4,5,6,8,9 and 10 have been met, please certify the attached plans subject.to conditions.#l,~and 7 listed' above and distribute. LRH/lrh cc: Scott Shuford, Director of Central Permitting ~ ° -' Bob M:aran,Central Permitting/Engineering ~ y ~ Jim Lewin, Gas Department „~~' Novo 7 tss~ Tom Miller, Environmental Ream Wilson, Parks & Recreation Director ~ Don Meerians, Traffic Engineer ' CENTRAL PER~lIITTINQ Victor Chodora, Building Official ~ Cil"Y OF CLEARWATER Cyndie Goudeau, City Clerk ~'-Steve:Doherty, Zoning Section Supervisor- T Developer/Project Sponsor (3) - PLEASE CONTACT WALT McALEER AT 462-6567 FOR PICK-UP. Thank you.. ~~~. h~ ,~_; .~~ r.~ lOsp9414.1rh ~- -~ 3 s-.3 7 v ~~ ~ ~ ~~ S d~~,~`~~r~- lf~~, .. I { ! Certified as a true and correct co September 8, 1994, the Developm O t Review Committee approved a site plan fdr Magnolia Manor. I j Witness my hand and the seal of'the City f of Clearwater, Florid~.~o~°tFi~i~.2nd day of Nove-~n er, 1994.,;°`^ {,, ~~ -~ $/~~ ,, f 1~ ~~ ~ a ~F ~~, ~ , ~' `~ 0 i p ~q~ 1~ .. l~.'%~~ R :1: - 7~ 'll ~f - ~, ~; .,.~. ~.--....._ ..ate °~ "'r~k "~i ` ~- /. e _ __ ' i~~ut .:i;ry C:larl: ~~, ° , ~ : --. . Conditions. # ~~a ~°,' W~, 5 +6 8 ° ®~ ' °~,a rid 10 have been met: ~`+, ~" -.>: a'oF~=•_... ~ ' +'~ ',,'~~~11T""~~" a~ ~+ a~~ Subject to the fallowng'cond~tions: 1. Signs and. fencing/walls are subject to separate review and permitting. processes: 7. Prior to certificate of occupancy, ,' replace curbing on Myrtle Avenue. ,~ r ~. f