Loading...
PSP89-09PSP89-09 1821 MONTCLAIR RD MONTCLAIR PARK . P` ~~ _ / r ,~`~i C 1 T Y O F C L E A R W A T E 1t`~" ~~ /~~ Interdepartment Correspondence TO: Cyndie Goudeau, City Clerk -~ / FROItit: John D. Richter, Development Code Administrator ~~ ~ ~~ Y'-' SUBJECT: Certification of Final Site Plan for City of Clearwater's Montclair Park Parking Lot Located on the South Side of Montclair Road, East of Keene Road. {PSP 89-09,)- COPIES: See List Below DATE: July 11, 1989 The Development Review Committee at its meeting of June 2Z, 1989 approved the above described final site plan subject to the following conditions: 1. The radii for the driveway to Montclair shall be increased to 12-15' and shall be reflected as such on the site plan prior to certification. (Approved by Traffic Engineering on 7/7/89) 2. if lights are proposed, they shall be designed in a manner so that they will not adversely affect nearby residential properties and the conduit shall be installed prior to construction of the parking lot. 3. The entrance shall be redesigned as required by Traffic Engineering and shown as such on the site plan prior to certification. (Approved by Traffic Engineering on 7/7/89) 4. The requisite initial building permits must be procured within six (6) months from the date of certification of the final site plan and all requisite certificates of occupancy must be obtained within three (3) years of date of certification of the final plan. Please certify the attached plans subject to conditions Z and 4 listed above and distribute. JDR/SEG/df cc: James M. Polatty, Jr., Director of Planning & Development Cecil Henderson, Engineering ~ Environmental (S) Ream Wilson, Parks & Recreation Director Keith Crawford. Traffic Engineer Victor Chodora, Building Official Robert Brumback. Utilities Cyndie Goudeau, City Clerk Ray Wyland, Zoning ~ ~ ±~ z ~~ gut: ~. ~ ~aQ C~~1•~. ~~:~~=~i~~ ~ Certified as a true and correctcopy. Final site plan-ap~,oved'June 22, 1989, ~ by the Development Review Comini`tteE. 4ditness my hand and the seal of the„G~,ty~ ', of Clearwater Florida this' twelfth .day of July 1989. .•• '~- ~ '~ 1 ,a^ p~ `~ i 'ry •,P j ~ Susan Stephenson D u'C~y;'City~ Clerk, a CONDITIONS: ~ ~ , F,,,, ~:, ~,, ~ 6~ l 1 P k ~ - _ _ __ i. The radii for the driveway to Montclair shall be increased t'o~~i4;~i,5e.~nd ,.° shall be reflected as such on_ the situ plan prior to~berti#ic~ttibnt~a"4 <:~ , (Approved by Traffic Engineering or- 7/7/89) '" ~~~"t'~t 2. If lights are proposed, they shall be designed in a manner so-that they will not adversely .affect nearby residential .properties and the conduit shall be installed prior. to construction of the parking lot. 3. The entrance shall be redesigned as required by Traffic Engineering and. shown as such on the site plan prior to certification. (Approved by Traffic Engineering on 7/7/89) 4. The requisite initial building permits must be procured within six (6l months from the date of certification of the final site plan and all requisite certificatesof occupancy must be obtained within. three t3l .years of date of certification of the final plan. ~i ~:~, ~,. ,,~- kSk'~