Loading...
PSP94-25; CSP94-25PSP94-25; CSP94-25 1604 MISSOURI AVE S WALGREENS 16 ~„~ ~~ CS:'94 -25.APM CITY OF CLEARWATER lnterdepartment Correspondence 'I'O: Cyndie Goudeau, City Clerk FROM: Allen V. Mahan Co r ~ ~~~'~~~ o dmator, Central Permitting ~~~~~_- v l"`~ SUBJECT: Certified Site Plan for Walgreen's Drug Store at Missouri=& Belleair(CSP 9425) '; COPIES: See List Below ~~S ~ ~ y'"c~-~ llATE: September 1.1,1995 ~ b 6 '~ ~ ' (.~dd~-v'"u- The Development Review Committee at its meeting of February 2, 1995 approved the above described site plan subject to the following conditions: Before the City can certify the Site Plan, -the applicant is to accomplish the following actions: 1. File a cross access agreement between lots 1 and 2. 2. Show the date(s) and condition(s) for approval of variance(s) and conditional use approval(s) by the Planning and Zoning and/or the Development Code Adjustment Board(s). 3. Display on the plan two fire hydrants to service the building. 4. Have the site plan signed and sealed by a Professional Engineer registered in the State of Florida. ~. Show all striping, pavement markings, and signage on the site plan. 6. Indicate the location of the lighting fixtures in the parking areas on the site plan. 7. Show sidewalks adjacent to all streets right of way, including missing sections. 8. Pay the rerquiored recrea[ion/open space fee to Parks & Recretion. r Before the City can issue building permits, the applicant is to accomplish the following actions: 9. Submit a landscape plan to Environmental Management. lO.Obtain clearing and grubbing and tree removal permits from Environmental Management. Before the City can issue a Certificate of Occupancy, the applicant is to accomplish the following action: 11.Bring all new and e~dsting municipal sidewalks up to applicable standards, including the ADA standards. Complete the following actions as indicated: 12. Obtain review of and permits for signs and fencing/ walls through separate review nd permitting procedures. 13. Obtain the requisite building permits within one (1) year from the site plan certification d t to prevent expiration of P r~r ® (~ SEP 181995 CENTRAL PERIViiTTING CITY OF CLEARWATER ae RECEIVED SEP i 2 1995 CITY CIEtiJ( pppT~ ~, '` "' 14.Obtain the requisite Certificate(s) of Occupancy within three years of the site plan certification date to prevent expiration of the site plan certification. As conditions 1-10 above have been met, please certify the site plan subject to conditions 11 - 14 and distribute as indicated below. Thanks for your assistance. AVM/avm cc: CScott Shuford,~Diiector of Central Permitfing~ Bob Maran, Engineering Site Plan Review Michael Quillen, Water Resource Engineer Don Meerians, Assistant Traffic Engineer Cyndie Goudeau, City Clerk _ Lou Hilton, Senior Planner Steve Doherty, Zoning Section Supervisor Allen V. Mahan, Coordinator, Central Permitting Florida Department of Transportation District Utilities 112A1 McKinley Drive,M/S 7-280 Tampa, FL 33612 ATTN: Judy Smith Pinellas County Planning Department 314 So. Ft. Harrison Clearwater, FL. 34616 ATTN: Sarah Ward Developer/Project Sponsor (3): Please call Jeffrey Izzo, Northside Engineering, Tel. 725-3883 for disposition of plans when certified. r , _ i .. CITY OF CLEARWATER Interdepartment Correspondence TO: - Vic Chodora, Building Official; Don Meerians, Assistant Director/Public Works/Traffic . -. Engineer;, ,. •.Rich - Baier Engineering Director; Tom.-Miller, Assistant Director/Public _, _ --- ~ _. ._,-. ~Works/Environmental-Group;-; eam _ason„ector/1'arks and Recreation,. =James-Goodloe,-- .._ ' .. -- .Fire Marshall _ - .._ _. _ _. ~~ - • `FROM: Louis R. Hilton, Senior Planner ~, l~ ~.~, j ,sr: ~~ - . .`.~ _ _.~G~Fj °~ . . . ~- SUBJECT:. Certified Site Plan for Walgreens (PSP 94-25~~ .~~ ~ o ,~. DATE• December 28, 1994 • ~~ ~P;'~ Attached for your review is a copy of the above referenc ite plan .submitted on December 22, 1994 for certification. Please refer to the attached copy of conditions of approval required by the D.R.C. on December 8, 1994 for this site plan. If you find the revised site plan to be acceptable, please write your initials and date next to the applicable condition(s) on the attachment. If~you do have an objection and/or recommendation, your comments are required below (or please attached your comments to this memo). ~~_ ~tC Comments: (by whom and with date, please) Prior to Wednesday, January 4, 1995, please return this SITE PLAN and memorandum to Louis Hilton, Senior Planner, for final processing to the City Clerk for certification and distribution. LRH/lrh 12sp9425.1rh Environmental Manaoement 1. Prior to issuance of a building permit, a landscape plan shall be submitted to Environmental Management. 2. Prior to the issuance of a building permit, a clearing and grubbing permit and a tree removal ^_ _.__ permit for a no tree verification form) are required. - - - .~ _~-- ., -.~w ~~ 3 ~ - .Prior to certification, a copy of -the SWFWMD permit application and calculations -shall be `,X ~~ ~ -: provided to~ Environmental,: Management. _ _ -= °~. ~.__ 4 -~ ~~Prior to issuance~of a building permit, a copy of the approved SWFWMD permit shall be -submitted to Environmental Management: _ , --- - ~~-:-The motion was seconded by Mike Quillen and carried unanimously. ITEM # McDonald Corporation (PSP 94-27), Located on the north side of Gulf to Bay Blvd., between Pegasus Avenue and Corona Ave. The applicant proposes to raze the existing 3,445 sq: ft. restaurant and construct a new McDonalds prototype restaurant with associated parking, landscaping and a stormwater vault. MOTION: Lou Hilton moved to approve this item subject to the DRC conditions. Pertinent comments from the Department representatives are incorporated into the motion listed below. Central Permitfins~ 1. Signs and fencing/walls are subject to separate review and permitting processes. 2. The requisite building permits must be procured within one (1) year from the date of certification of the final site plan and all requisites certificates of occupancy must be obtained within .three (3) years of the date of certification of the site plan. Public Works/Enoineerins~ 1. ~ A triangular corner of r.o.w. will be required for city sidewalk at Gulf to Bay & Corona. Environmental Management 1. Prior to issuance of a building permit, a landscape plan shall be submitted to Environmental Management. 2. Prior to the issuance of a building permit, a clearing and grubbing permit and a tree removal permit (or a no tree verification form) are required. 3. Prior to issuance of a building permit, the site grading, vault and stormwater calculations must be revised to reflect treatment of the first 1 /2" of runoff from the entire site. The motion was seconded by Bob Maran and carried unanimously. ITEM #4 Walgreens Drug Store (PSP 94-25); Located at the southwest corner of Missouri Avenue and Belleau. The applicant proposes to construct a 15,525 sq. ft. Walgreen's Drug Store with atwo-lane drive through for prescription drop-off and pick-up, and an attached liquor store. The site is located within the City and currently has a Barnett Bank building which is proposed to be razed and replaced with this drug store. The property is owned by Barnett Bank and a plat will be required. D.R.C. Minutes 3 12/08/94 MOTION. Bob Maran moved to continue this to the January 19th meeting. Pertinent comments from the Department representatives are incorporated into the motion listed below. .._ _ --- .. - _---------- ---- -- - -.. -.._ - - --- -- ---. _. _.. -- --- - ---- --- T --- ----- -- ---~-~ent~a7--Permitting - __ -=.1. _~ -,:,Signs and fencing/walls are subject to separate review. and permitting processes. - ~~: ~2 "~ Thee-requisite building permits must be procured within one (1) year from the date of =~ ~_. -s, ..-~- ~""=~certification of the final site plan and all-requisites certificates of occupancy must be - --°r obtained within three 131 years of the date of certification of the site plan. -:~--~ ~;__~ "~- 3. ' The related final plat shall be recorded within one (1) year from the certification date of the - - ~ preliminary plat or prior to issuance of a certificate of occupancy, whichever comes first. 4. The dates and conditions for approval by the Planning and Zoning Board for conditional use approval and the Development Code Adjustment Board for variance approval shall be provided on the preliminary plat/site plan prior to certification. Fire Department 1. An additional FIRE HYDRANT ASSEMBLY shall be installed not more than 300 ft. from the structure. Public Works/Enaineerins~ 1. Prior to certification, the Dumpster Requirement Form must be completed and returned to the City Sanitation Department. 2. Prior to the issuance of a certificate of occupancy, the dumpster/compactor must be visually screened, and gates must be provided with a minimum 12-foot clear opening to the front for access by Sanitation trucks. 3. Prior to certification, a copy of the SWFWMD permit application is to be provided to Engineering Site Plan Review. 4. An easement for the sidewalk on Belleau Rd. needs to be granted to Pinellas County as it encroaches onto private property. Traffic Ens~ineerins~ 1. Parking stalls and/or driveways to be adjusted to the approval of the Traffic Engineer. Redesign spaces to angled parking was discussed. Environmental Management 1. Prior to certification, all protected trees shall be shown by size, species, and location. 2. Prior to certification, all required perimeter landscape buffers shall be dimensioned. 3. Prior to certification, the total paved vehicular use area and total interior landscape area calculations shall be expressed in square feet and as a percentage of the overall site in the site plan data block. 4. Prior to issuance of a building permit, a landscape plan shall be submitted to Environmental Management. 5. Prior to the issuance of a building permit, a clearing and grubbing permit and a tree removal permit for a no tree verification form) are required. D.R.C. Minutes 4 12/08/94 ti ~ ~ -'z 6. Prior to certificatio ,the arking lot layout shall be adjusted to preserve existing trees. Parks & Recreation 1. The applicant sh II contact Parks & Recreation for the required recreation/open space assessment fee,-.w ' shall be paid prior to certification. -_ _ -"The motion was seconded by Don Meerians and carried unanimously. -~~:=ITEM # _ _Grande Bay Apartments, Inc. -Shoreline Erosion Control Project; Located at 2909 °~~'"~._ _ - ' - ~ Gulf-To-Bay Boulevard. This item is scheduled for City Commission review January -_ ,_ _- ~' . - . 19, 1995. This item is for Environmental/Engineering comment and review. _.~~;iM TI N: Lou Hilton moved for continuance until the DEP permit is issued. The motion was seconded by Bob ~` -' Maran and carried unanimously. ITEM # Morton Plant Central Utility Plant (PSP 94-23); Located on South Ft. Harrison Avenue between Pinellas Street and Grand Central Avenue. This is continued from the canceled November 23rd DRC Meeting. The applicant proposes to construct a 18,121 sq. ft. Utility Plant to provide energy for the physical plant of the hospital. The building is comprised of an 5,016 sq. ft. engineering area; a 3,200 sq. ft. generator area; a 4,160 sq. ft. chillers area; and a 5,760 sq. ft. boiler area. Points of access are four: three on Grand Central Avenue and one on Pinellas Street. The perimeter landscaping and associated parking is provided.. MOTION: Lou Hilton moved to approve the preliminary site plan subject to the following conditions: Pertinent comments from the Department representatives are incorporated into the motion listed below. Central Permittins~ 1. Signs and fencing/walls are subject to separate review and permitting processes. 2. The requisite building permits must be procured within one 111 year from the date of certification of the final site plan and all requisite certificates of occupancy must be obtained within three l31 years of the date of certification of the site plan. 3. The dates and conditions for approval by the Planning and Zoning Board for conditional use approval and the Development Code Adjustment Board for variance approval shall be provided on the preliminary plat/site plan prior to certification. Fire Department 1. Show FIRE HYDRANT ASSEMBLY on Fort Harrison on site plan. Traffic Ens~ineerins~ 1. Sidewalks are required adjacent to all street rights-of-way. 5' on Ft. Harrison, 4' on Hamlet Drive. Environmental Manasaement 1. Prior to certification, the total paved vehicular use area and total interior landscape area calculations shall be expressed in square feet and as a percentage of the overall site in the site plan data block. D.R.C. Minutes 5 12/08/94 (/" d F`~~ ~ ~ ~g~5 ~~ Sy~~~~ ,@ CITY OF CLEARWATER~ TO: .. C~~s~.~EJI/~a~~~ ~11ZF ®~Pr. Interdepartmental Correspondencc Vic Chodora, Building Official, Lou Hilton, Senior Plaririer,4'~Boti~~l~faran, Engineering Work Group; Don Meerians, Assistant Traffic Engineer; Mike Quillen, Environmental Group; Ream Wilson, _. Director/Parks and Recreation; James Goodloe, Fire Marshall Allen V. Mahan Coordinator Central Permittin ~ 6~G~~~~- ' g Certified Site Plan for Walgreen's Drug Store, Missouri & Belleair;Rd. (PSP 94-25) February 14, 1995 Attached is a copy of the above described site plan submitted on February 14, 1995 for certification. Please refer to attached DRC final minutes addressing conditions of approval required by the D.R.C. on February 2, 1995 for this amended site plan. If you find the revised site plan to be acceptable, please initial and date next to the applicable condition(s) on the attachment. If you do have an objection and/or recommendation, please comment below or attach your comments to this memo. Note pazticulazly those conditions which have yet to be met. Comments: (by FEB. ~ 51995 The intent is to transmit this to the City Clerk for final processing -certification and distribution - by Tuesday, February 20. Thanks for your assistance. - . AVM/avm SP18425.avm (i~~ ("..~- /'~« ~~r.....~.~ ~~~~ D FEB 161995 CENTRAL PERMITTING CITY OF CLEARWATER and with date, please) i~ 1 ~ ~ , ~ _ ~ ~~ ~ ~ CSP94-25.AVM ~ CITY OF CLEARWATER (,,' ~~ , r Interdepartment Correspondence ~ / LJ~~ ~ ~ ~Q TO: Cyndie Goudeau, City Clerk / FROM: Allen V. Mahan, Coordinator, Central Permitting ~~~~ " . SUBJECT: Certified Site Plan for Walgreen's Drug Store at Missouri & Belleair(CSP 94-25) COPIES: See List Below DATE: September 1.1,1995 The Development Review Committee at its meeting of February 2, 1995 approved the above described site plan subject to the following conditions: Before the City can certify the Site Plan, the applicant is to accomplish the following actions: 1. File a cross access agreement between lots 1 and 2. 2. Show the date(s) and condition(s) for approval of variance(s) and conditional use approval(s) by the Planning and Zoning and/or the Development Code Adjustment Board(s). 3. Display on the plan two fire hydrants to service the building. 4. Have the site plan signed and sealed by a Professional Engineer registered in the State of Florida. 5. Show all striping, pavement markings, and signage on the site plan. 6. Indicate the location of the lighting fixtures in the parking areas on the site plan. 7. Show sidewalks adjacent to all streets right of way, including missing sections. 8. Pay the rerquiored recreation open space fee to Parks & Recretion. Before the City can issue building permits, the applicant is to accomplish the following actions: 9. Submit a landscape plan to Environmental Management. l0.Obtain clearing and grubbing and tree removal permits from Environmental Management. Before the City can issue a Certiticate of Occupancy, the applicant is to accomplish the following action: 11.Bring all new and existing municipal sidewalks up to applicable standards, including the ADA standards. Complete the following actions as indicated: 12. Obtain review of and permits for signs and fencing/ walls through separate review nd permitting procedures. 13. Obtain the requisite building permits within one (1) year from the site plan certification date to prevent expiration of the site plan certification. . '~ 14.Obtain the requisite Certificate(s) of Occupancy within three years of the site plan certification ._ date to prevent expiration of the site plan certification. As conditions 1-10 above have been met, please certify the site plan subject to conditions 11 - 14 and distribute as indicated below. Thanks for your assistance. AVM/avm cc: Scott Shuford, Director of Central Permitting Bob Maran, Engineering Site Plan Review Michael Quillen, Water Resource Engineer Don Meerians, Assistant Traffic Engineer Cyndie Goudeau, City Clerk Lou Hilton, Senior Planner Steve Doherty, Zoning Section Supervisor Allen V. Mahan, Coordinator, Central Permitting Florida Department of Transportation District Utilities 11201 McKinley Drive,M/S 7-280 Tampa, FL 33612 ATTN: Judy Smith , Pinellas County Planning Department 314 So. Ft. Harrison ,Clearwater, FL. 34616 ATTN: Sarah Ward Developer/Project Sponsor (3): Please call Jeffrey Izzo, Northside Engineering, Tel. 725-3883 for disposition of plans when certified. L\ ,, CITY .OF CLEARWATER Interdcparlmental Cormspondence TO: Vic Chodora, Building Official; Lou Hilton, Senior Planner; Bob Maran, Engineering Work Group; Don Meerians, Assistant Traffic Engineer; Mike Quillen, Environmental Group; Ream Wilson, Director/Parks and Recreation; Jarnes Goodloe, Fire Marshall FROM: Allen V. Mahan, Coordinator, Central Permitting ~ d~Gi~~ /I SUBJECT: Certified Site Plan for Walgreen's Drug Store, Missouri & Belleair Rd. (PSP 94-25) DATE: February ].4, 1995 Attached is a copy of the above described site plan submitted on February 14, 1995 for certification. Please refer to attached DRC fmal minutes addressing conditions of approval required by the D.R.C. on February 2, 1995 for this amended site plan. If you fmd the revised site plan to be acceptable, please initial and date next to the applicable condition(s) on the attachment. If you do have an objection and/or recommendation, please comment below or attach your comments to this memo. Note particularly those conditions which have yet to be met. ~ Comments: (by whom and with date, o%` ~~~~ The intent is to transmit this to the City Clerk for final processing -certification and distribution - by Tuesday, February 20. Thanks for your assistance. AVM/avm SPt9425.avm ~, '', ~ MINUTES DEVELOPMENT REVIEW COMMITTEE Thursday, February 2, 1995 - 9:00 A.M. I _ Annex DRC Conference Room, 10 South Missouri Avenue, Clearwater FL Members present: Scott Shuford Chairman, Director of Central Permitting Louis Hilton Central Permitting Ream Wilson Parks & Recreation Richard Baier City Engineer James Goodloe Fire Department Bob Maran Central Permitting/Engineering Mike Quillen Public Works/Environmental Donald Meerians Public Works/Transportation Group Walt McAleer Central Permitting Allen V. Mahan Central Permitting Others present: William Touloumis Olympia (item #2) Housh Ghovaee Northside Engineering (#2) Alex Plisko Architect (#3) Tom Hansen H & H Engineering (#3) Steve Lane Racetrac (#3) Donald Freeman Harrison Bennett (#4) Joe Kubicki King Engineering (#4) Paul Mazzillo King Engineering (#$) Sally Demarest Board Reporter, City Clerk Department The meeting was called to order by Chairman Shuford in the DRC Conference Room B at 9:11 a.m. In order to provide continuity, the items will be listed in agenda order although not necessarily discussed in that order. ITEM 1 -The minutes of the January 19, 1995 meeting were approved as submitted. ITEM 2 -Walgreens Drug Store (PSP 94-25); located at the southwest corner of Missouri Avenue and Belleair Road. The applicant proposes to construct a 15,525 sq. ft. Walgreens Drug Store with a two-lane drive through for prescription drop-off and pick-up, and an attached liquor store. The site is located within the City and currently has a Barnett Bank building which is proposed to be razed and replaced with this drug store. The property is owned by Barnett Bank and a plat will be required. minDR02a.95 1 02/02/95 Public Works/En ineering ..~. Prior to certification, the .final site plan must be signed and sealed by a Professional Engineer _ registered in the State of Florida. 2. All new and existing municipal sidewalks need to be brought up to ADA standards prior to issuance of a Certificate of Occupancy. Traffic En ineering ~` 1. Sidewalks are required adjacent to all street rights-of--way. Show missing piece of sidewalk. ..r2. Show any street light poles in lot. •s3. Site plan is to show pavement markings and stop signs. Environmental Management (t~ ~ rl~ Prior to issuance of a building permit, a landscape plan shall be submitted to Environmental ~,~ ~~~ ~ Management. ~rfi11-`- / 2. Prior to issuance of a building permit, a clearing and grubbing permit and a tree removal ~ permrt (or a no tree verification form) are required. ~^- -~l5 ~- ~~ Parks & Recreation 1. The applicant shall contact Parks & Recreation for the required recreation/open space assessment fee, which shall be paid prior to certification (increase of sq. ft. of footprint, adding more than 50% on-the-ground requires a 2% ofjust-value-only expansion fee). ITEM 3 -RCS Emergency Housing Project (1552 & 1558 S. Myrtle Avenue); The applicant proposes to construct a 14 dwelling unit apartment complex with a 1,100 sq. ft. administrative office, and a 1,000 sq. ft. future activity building designed for transitional individuals who are seeking employment, training and self sufficiency. The site plan has been designed to meet City Code off- street parking criteria, stormwater management criteria, and the landscaping requirements. The applicant or applicant's representative presented the site plan/plat and staff presented their comments in writing. Staff specifically indicated the conditions below, and in the ensuing discussion the applicant said the north portion of the property is zoned RM-16; south and the south portion, RM-8. Mr. Shuford said the DRC could not consider approval prior to the City Commission receipt and referral process and transfer of development rights. Mr. Quillen commented on the excellent tree survey. Mr. Shuford will present the application to the City Commission on March 2, 1995, after which it will return to DRC for approval. minDR02a.95 3 02/02/95 The applicant or applicant's representative presented the site plan/plat and staff presented their. comments in writing. Staff specifically indicated the conditions below,- and _in ..the ensuing .; ~~ -- discussion changes to drawing C-41.1, which will be considered by the City~Commission~this - . ~ -evening, were noted.- Particularly, the fire hydrant has been relocated and parking modified.. The _ • applicant indicated the property has not been subdivided as yet and it is anticipated that close to two r _ acres will be used. It was noted the wetlands are part of the Barnett Bank site and the Barnett Bank property line should be indicated. One single, signed and sealed plan showing the existing sidewalk, to be brought up to ADA standards, was requested. Across access easement will be recorded with the court and a certified site plan will be required at closing.. The need for stop signs and an ADA ramp at the Belleair driveway was noted. Planning requested indication of lighting poles in parking lot islands, shielded downward. It was suggested the applicant obtain the just value of the entire site from the County Appaiser's office and pro rate for the applicant's portion of the expansion fee. The entrance will be better defined prior to certification. The billboard shall be removed; site data shall be shown and submissions for certification after platting shall be signed and sealed. The preservation part of the premise will need PPC review. It is projected the proposed rezoning to CG will be set for the last meeting in March, and second reading scheduled for March 8, 1995. Mr. Mahan made a motion to approve Item 2 subject to the following conditions. The motion was duly seconded and carried unanimously. Planning & Development 1. Signs and fencing/walls are subject to separate review and permitting processes. 2. The requisite building permits must be procured within one (1) year from the date of certification of the final site plan and all requisites certificates of occupancy must be obtained within three (3) years of the date of certification of the site plan. 3. The related final plat shall be recorded within one (1) year from the certification date of the preliminary plat or prior to issuance of a certificate of occupancy, whichever comes first. - 4. The dates and conditions for approval by the Planning and Zoning Board for conditional use approval and the Development Code Adjustment Board for variance approval shall be provided on the preliminary platlsite plan prior to certification. „_.5. Prior to certification, a cross access agreement shall be filed between lots 1 and 2. Fire Department .~ 1. The actual site plan is to display two fire hydrants to service the building. minDR02a.95 2 02/02/95 _ ..~_..-.. -~ mow..-~,rr~- ~~ .~ NORTHSIDE ENGINEERING SERVICES, INC. " LAND DEVELOPMENT ~ 'I'R~NSROI~TA'I'ION • I:AI~TID Y G - September 8, 1995 - City of Clearwater Central Permitting - 10-South Missouri Ave. Clearwater, ,Florida . 34615 Attention: 'Allen Mahan ' Reference: Walgreen's Drug & Liquor Store . .' - " Subject: ~ Plan Submittal, . - ~ Dear Val: Enclosed: please find sixteen (16) copies of the above. referenced project submitted for site plan certification.. • Please do not hesitate to contact this ~ office ° should you have any questions or • comments : .regarding-this project. ' ~ Very truly yours, ~ . NORTHSIDEENGINEERINGSERVICES, INC. .~ • • Jeffrey`Izzo, Proj ger JI/ck Enclosures . - cc: , ' William Touloumis, ~ blympia Development ~ ~ ~ ~y file - - ~ , • - ~~~ " .. '"rtt'V~iER -. - - X907 STATE ROAD 590 • SUITE '7 :• CLEARWA'TER, FLORIDA 34619 - TELEPHONE C813~~ 7~5-3883 ' FAX • 0813? 7~5-3'78 February 14, 1995 City of Clearwater. ~ - Department of Central Permitting City Hall Annex 10 South Missouri Avenue P.O. Box 4748 ' . Clearwater, FL 3461.8. Attention: .Louis Hilton Reference:. Walgreen's Drug & Liquor Store Subject:. Plan Submittal Dear .Lou: - Enclosed please' find. twenty (20) copies of the 'above referenced project. This sheet has been revised .per your request for submittal ~of certified: site plan. Please do not hesitate-to contactoffice should.you have any further questions or comments regarding this project. - Very truly yours, NORTHSIDE ENGINEERING SERVICES, INC. Jeffrey I z , Proj~ a er ` ~.: enclosures cc: ~ file - Buu Tran; Olympia Development ~r _ ~. ~~~ X907 STATE ROAD 590 • SUITE 7 ~ CLEARWATER, FIARIDA • 34619 TELEPHOI~TE c81~~ 7~5-3883 FAX (813> 7~5'-378 ~. ~:-. , NORTHS ~ G ENGINES SERVICES, INC. t8>L~~ ~~ ~<<f f , FAX 'T2~-3782 / ~~ I1ii~ID ^ TRAI~ISPORTATION ^ LAI~ID Pi,ANN~Ki 2907 sTwzB Ra-D ~o svn s ~ cLa~xww>~e. >~>~ ~ LETTER OF TRANSNIlTTAL DATE: ~ O/~ 7 / g S T0: ..... ~c ~ aJ ~~~nvc,tfea^ WE TRANSMIT: b() ENCLOSED ( ) UNDER SEPARATE COVER ATTACHED VIA: ( ) MAIL () PICK-UP ()COURIER ()HAND DELIVERED ()COPY OF LETTER ()ORIGINALS () BLUELINES ()SHOP DRAWINGS () SPECIFlCATIONS COPIES DATE DESCRIPTION i /o a 9s ~.xe.. ( ) PER YOUR REQUEST (~ FOR YOUR USE ( ) FOR YOUR INFORMATION ( ) FOR REVIEW & COMMENT ( ) FOR APPROVAL _ ( ) FOR YOUR FILES .. ~~. .. COMMENTS: w.•- COPIES T0: _ BY: ~I©~h G~Ua~ e. ~ 1 I _ .• CITY OF CLEARWATER Interdepartmental Correspondence TO: Bob Maran, Engineering Work Group; Don Meerians, Assistant Traffic Engineer; Mike Quillen, Environmental Group; James Goodloe, Fire Marshall; Stephen Sarn/o/ff, Zoning, FROM: Allen V. Mahan, Coordinator, Central Permitting q~~~ ~/ ~~~~~ ~ ~~~ SUBJECT: Recertified Site Plan for Walgreen's Drug Store at Missouri & Belleair(CSP. 94-25)' DATE: October 4, 1995 Attached is a copy of the above described site plan submitted on September-29, -1995 -for recertification. Please refer to the originally certified site plan for comparison to recertify as a minor amendment to the site plan This amendment involves minor changes to: handicap parking on NE corner shifted eastward; loading area-platform added; sidewalk on south of building narrowed from 10' to 5'; deleted light fractures from south and west of building. If you fmd the revised site plan to be acceptable, please initial and date next to the applicable condition(s) on the attachment. If you do have an objection and/or recommendation, please comment below or attach your comments to this memo. c l 0 ` ~C.~.~~ The intent is to re-certify this plan by Wednesday, October 11, 1995. Thanks for your assistance. AVM/avm CSP425R13.avm Comments: (by whom and with date, please) PLATS 1~0.~ TSTL 1SO.Ut} sa.gs~15:465EF`,'~'~CHCi~ 1;0.~ LT~lE ~4 ~~ ~ ~ t v J ~~ 1 ~~ ~ ~- ~ ~- ~. ~ ~ ~ --~ CITY OF CLEARWATER Interdepartmental Correspondence TO: Bob Maran, Engineering Work Group; Don Meerians, Assistant Traffic Engineer; Mike Quillen, Environmental Group; James Goodloe, Fire Marshall; Stephen Sarnoff, Zoning FROM: Allen V. Mahan, Coordinator, Central Permitting SUBJECT: Recertified Site Plan for Walgreen's Drug Store at Missouri & Belleair(CSP 9425) DATE: October 4, 1995 Attached is a copy of the above described site plan submitted on Septembef-29, -1995 -for recertification. Please refer to' the originally certified site plan for comparison to recertify as a minor amendment to the site plan This amendment involves minor changes to: handicap parking on NE corner shifted eastward; loading area-platform added; sidewalk on south of building narrowed from 10' to 5'; deleted light fixtures from south and west of building. If you find the revised site plan to be acceptable, please initial and date next to the applicable condition(s) on the attachment. If you do have an objection and/or recommendation, please comment below or attach your comments to this memo. Comments: (by whom and with date, please) The intent is to re-certify this plan by Wednesday, October 11, 1995. Thanks for your assistance. AVM/avm CSP425R i 3.avm •,_ .: CSP94-25.AVM ~, SEP 181995 CENTRAL F~E~iMiTTiNG . CITY ~2F ~~.~As~UJATE~ CITY OF CLEARWATER Interdepartment Correspondence / / (~/`~'2~. FROM: Allen V. Mahan, Coordinator, Central Permitting ~~~ v ` _ SUBJECT: Certified Site Plan fo`r Walgreen's Drug~Siore at.Missouri & Belleair(CSP 94-2~~ TO: Cyndie COPIES: See List Below DATE: September 11,1995 The Development Review Committee at its meeting of February 2, 1995 approved the above described site plan subject to the following conditions: Before the City can certify the Site Plan, the applicant is to accomplish the following actions: 1. File a cross access agreement between lots 1 and 2. 2. Show the date(s) and condition(s) for approval of variance(s) and conditional use approval(s) by the Planning and Zoning and/or the Development Code Adjustment Board(s). 3. Display on the plan two fue hydrants to service the building. 4. Have the site plan signed and sealed by a Professional Engineer registered in the State of Florida. 5. Show all striping, pavement markings, end signage on the site plan. 6. Indicate the location of the lighting fixtures in the parking areas on the site plan. 7. Show sidewalks adjacent to all streets right of way, including missing sections. 8. Pay the rerquiored recrea[ion/open space fee to Parks & Recretion. r Before the City can issue building permits, the applicant is to accomplish the following actions: 9. Submit a landscape plan to Envirenmental Management. l0.Obtain clearing and grubbing and tree removal permits from Environmental Management. Before the City can issue a Certificate of Occupancy, the applicant is to accomplish the following action: 11.Bring all new and e>osting municipal sidewalks up to applicable standards, including the ADA standards. Complete the following actions as indicated: 12. Obtain review of and permits for signs and fencing/ walls through separate review nd permitting procedures. 13. Obtain the requisite building permits within one (1) year from the site plan certifcation date to prevent expiration of the site plan certification. RECEIVED SEP 1 2 1995 CITY CLERI( DEPT. +'' '~a 14.Obtain the requisite Certificate(s) of Occupancy within three years of the site plan certification _.~ '. date to prevent expiration of the site plan certification. As conditions 1-1.0 above have been met, please certify the site plan subject to conditions 11 - 14 and distribute as indicated below. Thanks for your assistance. AVM/avm cc: Scott Shuford, Director of Central Permitting Bob Mazan, Engineering Site Plan Review Michael Quillen, Water Resource Engineer Don Meerians, Assistant Traffic Engineer Cyndie Goudeau, City Clerk Lou Hilton, Senior Planner Steve Doherty, Zoning Section Supervisor ~A1fen~V-Mahan,_~Co~rdinator,:Central°Permitting Florida Department of Transportation District Utilities 11201 McKinley Drive,M/S 7-280 Tampa, FL 33612 ATTN: Judy Smith Pinellas County Planning Department 314 So. Ft. Harrison Clearwater, FL. 34C>16 ATTN: Sazah Ward Developer/Project Sponsor (3): Please call Jeffrey Izzo, Northside Engineering, Tel. 725-3883 for disposition of plans when certified. ,- d~ ." r Certified as a true and correctcbpy.; ~Orj ~ February 2, .1995, the Develop F~n~ ReJiew `' ` Committee approved a site plan fior 1Nalgreen~s~ • •, .~ ' - drug Store at Missouri & Belleair:~ ~ '- ~ . ~~ ~ •6 •• i l Witness my hand and the se I of the, City~oi~•~••• .~'~~ Clearwater,. Florida on this ~~` day~df~t~.,,,.,.~~~~ `~ September, 1995 .Deputy ity-Clerk As conditions 1-10 have been met, certification is subject to the following: 11) Prior to issuance of a Certificate of Occupancy, all new and existing municipal sidewalks must be brought up to applicable standards, including the ADA standards. 12) 'Obtain review of, -and permits for, signs and fencing/walls through separate revievv_ and permitting. procedures. 13) Obtain the requisite building permits vvithin one (1) year from the site plan certification date to prevent expiration of the site plan certification. 14) Obtain the requisite Certificate(s) of - Occupancy within three (3) years of the site plan certification date to prevent expiration of the site plan certification.