Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
PSP96-15
PSP96-15 1850 MCMULLEN BOOTH RD COUNTRYSIDE CHRISTIAN CENTER CENTRAL PERMITTING DEPARTMENT ;~ ~; 100 SO. MYRTLE AVE, 2nd FLOOR -- ~ PHONE: 562-4567; FAX: 562-4576 99~y ~~~o~ INSPECTION LIlYE: 562-4580 APPLICATION FOR SITE PLAN REVIEW l (IP ('hri S licant (Owner of Record): ('f111T1tY A ti an CPntPr Phone:~ 813 ) 799-1618 ~ pp Address: 1850 McMu len Booth Road City: Clearwater State: FL Zip: 34619 Representative: Michael J Gaylor, P E. Telephone: (813 ) 785-8844 Address: 400 Douglas Avenue, Suite C _City: Dunedin State: FL Zip: 34698 Preparer of Plan: Gaylor Engineering Professional Title: Civil Eng ineer Address: 400 Douglas Avenue, Suite C City: Dunedin State: FL Zip: 34698 Telephone: ( 813 ! 785-8844 Title of Proposed Site Plan/Project: Countryside Christian Center _ Parcel Number. 04 / 29 / 16 / 00000 / 330 / 0300 _and 320 / 0500 General Location and Address(if known) of Property: 1850 McMullen Booth Road Clearwater. Location is west side of McMullen Booth Road between SR 590 and Sunset Point Road Zoning: Public / Semipublic Land Use Plan Classification: Institutional Existing Use of Property: Church Proposed Use of Property: hurch with ne~~ sancruar~ If variances and/or conditional uses are involved, explain (if more space required attach separate sheet): N/A YOU MAY BE SUBJECT TO A PARKS AND RECREATION FEE: City Code of Ordinances, Secs. 54.01 - 54.35 requires a parks and recreation impact fee to be paid for all nonresidential projects over 1 acre in size and all residential developments. Has this proporty complied with these ordinances) no If yes, explain how and when: N/A Assessed just value of property (attach verification): Attached Most recent sales price (attach verification): N/A As of (date): N/A Your Fee for this Site Plan Review is $ 1342.00 .Please submit that amount with this completed application. The applicant, by filing this application agrees to comply with Section 43.21 of the City's Land Development Code. THAT SECTION IS ATTACHED FOR YOUR INFORMATION AND COMPLIANCE. ~ ~ Signature': of •If the application is signed by an individual other thin the property owner (e.g. the representative, please attach a statement signed by the property owner authorizing .this individual to sign the application. 1) THE SITE PLANS MUST BE DRAWN WITH THE NORTH ARROW TO THE TOP OF THE PAGE. 2) THE SITE PLANS MUST BE FOLDED TO NO LARGER THAN 9" x 12". 3) SITE PLANS SUBMITTED SHOULD BE LIMITED TO ONE PAGE IF AT ALL POSSIBLE. 4) SUBMITXI~COPIES OF THE SITE PLAN FOR REVIEW WITH THIS APPLICATION. 12 Revised 9/95 To: Development Review Committee s~,~-~ ~ J !~ ~(~ ,~ ~~~~~~ Interoffice Correspondence Sheet From: Richard J. Baier, City Engineer/DRC Member CC: Mike Gust, Traffic Operations Engineer Date: September 16, 1996 RE: Clearwater Christian Center, McMullen Booth Road I have reviewed the official site plan as submitted by Michael Gaylor of Gaylor Engineers and I don't see the revisions necessary to accommodate the concerns as outlined at the meeting in August as remanded by the Committee to address the driveway and transportation issues. The northernmost driveway shown as one way/ingress-only has perpendicular parking and the two-way aisles abut the ingress and relegate this driveway to a motorist discretion and not a true right-in-only ingress. As for the proposed driveway, I have seen no substantiated need from the safety standpoint as well as from a capacity standpoint. I can only support an additional (5th) driveway having some demonstrable need based on capacity, overall motorist safety and volume of traffic. As three existing multi-lane driveways on McMullen Booth Road can adequately accommodate the ingress/egress needs of this Center, I cannot approve an additional access point at this time. I recommend that this committee approve the site plan only if the proposed southernmost driveway is deleted from the plan and the northernmost right-in-only is physically constructed to truly serve as an ingress-only access point. In attempting to accommodate Mr. Gaylor, my staff and I have met with him on numerous occasions and were unable to come to mutually acceptable terms of agreement within the acceptable elements of traffic engineering and access management. I am apologetic in that I understand the process has been difficult for Mr. Gaylor and he has been patient in meeting with the City to resolve these issues. mp .. ~, CITY OF CLEARWATER Interdepartmental Correspondence T0: Ream Wilson, Director, Parks & Recreation; Don Meerians, Assistant Traffic Engineer; Bob Maran,CE III; Mike Quillen, Environmental Engineer; James Goodloe, Fire Marshall; Steve Doherty, Central Permitting Specialist FROM: Allen V. Mahan, Coordinator, Central Permitting ,ice SUBJECT: Certification of Site Plan for Countryside Christian Center (PSP 96-15) COPIES: DATE: October 30, 1996 Attached is a copy of the amended site plan for the Clearwater Christian Center, submitted on October 29, 1996 for certification. Please refer to the attached DRC Summary Notes of the September 12, 1996 DRC meeting for reference in assuring that all DRC directed changes have been made to the plan. If you find the site plan addition to be acceptable, please initial and date. If you do have an objection and/or recommendation, please comment below or attach your comments to this memo. Comments: (by whom and with date, please) ~'' ~ /~ / Your assistance in preparing the plan for a November 6, 1996 certification will be appreciated, Than s. V avT m ~/ SPF9616CIearwalerChri stian CITY OF CLEARWATER Interdepartmental Correspondence T0: Ream Wilson, Director, Parks & Recreation; Don Meerians, Assistant Traffic Engineer; Bob Maran,CE III; Mike Quillen, Environmental Engineer; James Goodloe, Fire Marshall; Steve Doherty, Central Permitting Specialist FROM: Allen V. Mahan, Coordinator, Central Permitting SUBJECT: Certification of Site Plan for Countryside Christian Center (PSP 96-15) COPIES: DATE: November 4,1996 Attached is a copy of the amended site plan for the Clearwater Christian Center, submitted on October 29, 1996 for certification. Please refer to the attached DRC Summary Notes of the September 12,1996 DRC meeting for reference in assuring that all DRC directed changes have been made to the plan. If you find the site plan addition to be acceptable, please initial and date. If you do have an objection and/or recommendation, please comment below or attach your comments to this memo. Comments: (by whom and with date, please) Your assistance in preparing the plan for a November 6, 1996 certification will be appreciated. Thanks. AVMlavm SPF9615gearwaterCtwistian __ .may •*, - v~ 5~~ J ~~~ ' CITY OF CLEARWATER Literdepartmental Correspondence T0: Ream Wilson, Director, Parks & Recreation; Don Meerians, Assistant Traffic Engineer; Bob Maran,CE III; Mike Quillen, Environmental Engineer; James Goodloe, Fire Marshall; Steve Doherty, Central Permitting Specialist FROM: Allen V, Mahan, Coordinator, Central Permitting SUBJECT: Certification of Site Plan for Countryside Christian Center (PSP 96-15) COPIES: DATE: October 30, 1996 Attached is a copy of the amended site plan for the Clearwater Christian Center, submitted on October 29, 1996 for certification. Please refer to the attached DRC Summary Notes of the September 12, 1996 DRC meeting for reference in assuring that all DRC directed changes have been made to the plan. If you find the site plan addition to be acceptable, please initial and date. If you do have an objection and/or recommendation, please comment below or attach your comments to this memo. Comments: (by whom and with date, please) Your assistance in preparing the plan for a November 6, 1996 certification will be appreciated. Th ks. AVM a(vm' / SPF9615GearwalerChristian ...- DRM60912 Development Review Committee Summary Notes Thursday, September 12,1996 Central Permitting Conference Room Municipal Services Building, 100 80. Myrtle Ave. Five items were discussed: 1. Countryside Christian Center (PSP 96-15) 2. Luby's Cafeteria(96-18) 3. Wendy's at Wal-Mart(US 19)(PSP 96-20) 4. Clearwater Homeless Intervention Program(CHIPS)(PSP 96-21) 5. Time-Warner Cable Com Site(at 620 Druid Road)(PSP 96-19) Results of the discussions were: I.Countryside Christian Center (PSP 96-15): The DRC approved the site plan subject to the following conditions/discussion: A. Before the Site Plan can be certified, the applicant must complete the following action(s): 1. Show the following on the site plan: a. Perimeter landscape buffer of 5 feet along the City property. b. Minimum turning radii for designated drives and fire lanes as 42 feet on the plan. c. Height minimum of 13 ft.,6 in. for cat walk and porte- cochere. d. Plan view of McMullen Booth Road including driveways & medians along the length of the church property. e. Revised site data table to include and show that both P/SP and OL zoning requirements are met. 2. Locate a new Fire Hydrant at the southern entrance to the site. 3. Re-design the handicap parking to the satisfaction of the Traffic Engineer. 4. Indicate the location of lighting fixtures in the parking areas on the site plan. 5. Show dimensions on the plan for measurements of aisles, parking stalls and entrances. 6. Show on the site plan the installation and maintenance of uniform traffic control devices at appropriate locations in accordance with the standards set forth by the Manual on Uniform Traffic Control Devices as adopted by the Florida Department of Transportation under Rule 14-115.010, Florida Administrative Code. .. w 7. Show all striping, pavement markings, si na e control devices on the site plan conform~nggto FnD•OrTffic Standard Indices-1995 edition and F.A.C,14-110(no 4 in. striping is to be shown). 8. Either relocate the ten foot access easement to the area adjacent to the Jurisdictional Wetland area in coordination with Engineering and the Parks and Recreation Director OR retain the easement in place. 9. Legally record a Unity of Title for the project site and furnish proof of such action. lO.Delete the proposed southernmost additional drivewa onto McMullen-Booth Road from the plan. Y/curb cut l1.Re-design the northernmost driveway to serve as an ingress- only access point. 12.Remove the Conditional Use(CU) permit note from the plan as CU will now not be required. a 13.pay the required Open Space and Recreation Assessment Fee with review by the Clearwater Parks and Recreation Department. B. Before the City can issue building permits, the applicant must complete the following actions: 1. Obtain and furnish evidence of all a other governmental agencies includingpbutanot limited tom a. SWFWMD permit to Clearwater Environmental Management. 2• Acquire clearing and grubbin verification form from Environmentals Manag merit ee C. Before the City can issue a Certificate of Occupancy, the applicant must complete the following actions: 1• Pay the Transportation Impact Fee as called for by the Pinellas County determining the fee from the Clearwater Traffic Engineering Transportation Impact Fee Ordinance with assistance in Office. 2. Visually screen the dumpster and 12-foot clear opening to the frontrfordac~esssbylSolidmWastem vehicles. 3. Furnish as-builts and an engineer's certification to Engineering Services. 4. Submit an application to change the zoning/ Land Use Plan to Category P for the jurisdictional wetland area. 5. Bring all substandard sidewalks and sidewalk ramps adjacent or a part of the project up to standard including ADA, and to install sidewalk where none exists in the street right of wa Y• 2 f I f ~. .. DRM60912 Development Review Committee Summary Notes Thursday, September 12,1996 Central Permitting Conference Room Municipal Services Building, 100 so. Myrtle Ave. Five items were discussed: 1. Countryside Christian Center (PSP 96-15). 2. Luby's Cafeteria(96-18) 3. Wendy's at Wal-Mart(US 19)(PSP 96-20) 4. Clearwater Homeless Intervention Program(CHIPS)(PSP 96-21) 5. Time-Warner Cable Com Site(at 620 Druid Road)(PSP 96-19) Results of the discussions were: I.Countryside Christian Center (PSP 96-15): The DRC approved the site plan subject to the following conditions/discussion: A. Before the Site Plan can be certified, the applicant must complete the following action(s): 1. Show the following on the site plan: a. Perimeter landscape buffer of 5 feet along the City property. b. Minimum turning radii for designated drives and fire lanes as 42 feet on the plan. c. Height minimum of 13 ft.,6 in. for cat walk and porte- cochere. d. Plan view of McMullen Booth Road including driveways & medians along the length of the church property. e. Revised site data table to include and show that both P/SP and OL zoning requirements are met. 2. Locate a new Fire Hydrant at the southern entrance to the site. 3. Re-design the handicap parking to the satisfaction of the Traffic Engineer. 4. Indicate the location of lighting fixtures in the parking areas on the site plan. 5. Show dimensions on the plan for measurements of aisles, parking stalls and entrances. 6. Show on the site plan the installation and maintenance of uniform traffic control devices at appropriate locations in accordance with the standards set forth by the Manual on Uniform Traffic Control Devices as adopted by the Florida Department of Transportation under Rule 14-115.010, Florida Administrative Code. 7. Show all striping, pavement markings, signage, and traffic control devices on the site plan conforming to F.D.O.T. Standard Indices-1995 edition and F.A.C.14-110(no 4 in. striping is to be shown). 8. Either relocate the ten foot access easement to the area adjacent to the Jurisdictional Wetland area in coordination with Engineering and the Parks and Recreation Director OR retain the easement in place. 9. Legally record a Unity of Title for the project site and furnish proof of such action. lO.Delete the proposed southernmost additional driveway/curb cut onto McMullen-Booth Road from the plan. 11.Re-design the northernmost driveway to serve as an ingress- only access point. 12.Remove the Conditional Use(CU) Permit note from the plan as a CU will now not be required. 13.Pay the required Open Space and Recreation Assessment Fee with review by the Clearwater Parks and Recreation Department. B. Before the City can issue building permits, the applicant must complete the following actions: 1. Obtain and furnish evidence of all applicable permits from other governmental agencies including but not limited to: a. SWFWMD permit to Clearwater Environmental Management. 2. Acquire clearing and grubbing permits or a no tree verification form from Environmental Management. C. Before the City can issue a Certificate of Occupancy, the applicant must complete the following actions: 1. Pay the Transportation Impact Fee as called for by the Pinellas County determining the fee from the Clearwater Traffic Engineering Transportation Impact Fee Ordinance with assistance in Office. 2. Visually screen the dumpster and provide gates with a minimum 12-foot clear opening to the front for access by Solid Waste vehicles. 3. Furnish as-builts and an engineer's certification to Engineering Services. 4. Submit an application to change the zoning/ Land Use Plan to Category P for the jurisdictional wetland area. 5. Bring all substandard sidewalks and sidewalk ramps adjacent to or a part of the project up to standard including ADA, and install sidewalk where none exists in the street right of way. 2 w D. The applicant must complete the following actions as indicated: 1. Obtain the requisite building permits within one(1) year from the site plan certification date to prevent expiration of the site plan certification. 2. Obtain the requisite certificate(s) of occupancy within three (3) years of the site plan certification date to prevent expiration of the site plan. 3. Obtain review of and permits for signs and fencing/walls through separate review and permitting procedures. II.Luby's Cafeteria: The DRC approved the site plan subject to the following conditions/discussion: A. Before the Site Plan can be certified, the applicant must complete the following action(s): 1. Show the locations of all driveways, parking areas and curb cuts on the site plan. 2. Show all contiguous streets & roads. 3. Add a 12' by 35' loading zone. 4. Show all pavement markings, signage and traffic control devices on the site plan. 5. Show a perimeter landscape buffer of ten feet along Gulf- to-Bay & along U.S.19 and put this on the site data table/sheet. 6. Provide a 5 foot buffer on the West side of the Luby's site and on the East side of Sam's Club adjacent to the Luby's site.(Site boundary may be shifted to provide all buffering on Luby's site.) 7. Indicate a parking formula calculation of 4.5 spaces for each 1,000 SF of Gross Floor Area(GFA). 8. Show dimensions of aisles, parking stalls, entrances and measurements for like plan features on the plan. 9. Modify two interior islands directly south of the building to allow garbage trucks to negotiate turns. l0.Depict all required parking lot interior areas on the plan by shading or cross-hatching. 11.Reflect the use of raised curbs or protective timbers on the site plan where interior landscaped areas abut pavement. 12.Adjust handicap spaces to meet governmental standards. 13.Indicate the location of lighting fixtures in the parking areas on the site plan. 14.Show all on-site lighting with 90-degree cutoffs directed away from abutting streets right-of-way and residential properties. 3 15.Display the site address on the site plan, obtaining assistance as needed from the responsible Zoning Customer Service representative in establishing the correct address. 16.Obtain a Significant Change of Use Determination from the FDOT per Florida Statute 335 and submit as a part of the determination of transportation system concurrency. 17.Execute a cross-parking/access easement linking the Luby's site with the Sam's Club site site and specifying the exact number and location of the spaces that are to be jointly used by and between the sites after review and approval of the easement/agreement by the City Staff. 18.Perform a Traffic Impact Study and incorporate the FDOT Significant Change of Use Determination into it. B. Before the City can issue building permits, the applicant must complete the following actions: 1. Obtain and furnish evidence of all applicable permits from other governmental agencies including but not limited to: (a) FDOT permit for work within the Right-of-Way to Engineering Services; (b) Pinellas County Public Health Unit Permit, Ingress/ Egress, and a l0 foot Utility Easement over the proposed water mains up to and including meters, backflow prevention devices and hydrants. 2. Pay the sewer impact assessment fee, based on the size of the water meter with assistance in determining the fee from Central Permitting/Licensing specialists.(Show the water meter size on the site plan.) 3. Provide a blanket easement for new water lines up to and including meters and hydrants. 4. Obtain and provide an easement from Sam's Club for the sewer tie-in. 5. Coordinate with the Assistant Water Superintendent for use of any existing stub-outs on the 8 water line on Gulf-to-Bay for the building's potable water. C. Before the City can issue a Certificate of Occupancy, the applicant must complete the following actions: 1. Pay the Transportation Impact Fee as called for by the Pinellas County Transportation Impact Fee Ordinance with assistance in determining the fee from the Clearwater Traffic Engineering Office. 2. Visually screen the dumpster and provide gates with a minimum 12-foot clear opening to the front for access by Solid Waste vehicles. 3. Furnish as-builts and an engineer's certification to Engineering Services. D. The applicant must complete the following actions as indicated: 1. Obtain the requisite building permits within one(1) year from the site plan certification date to prevent expiration of the site plan certification. 2. Obtain the requisite certificate(s) of occupancy within three(3) years of the site plan certification date to prevent expiration of the site plan. 3. Obtain review of and permits for signs and fencing/walls through separate review and permitting procedures. III. Wendy's at Wal-Mart(US 19)(PSP 96-20): The DRC requested that: A. The site plan be brought back to the DRC for further review with the plan revised to: 1. Re-orient the building to minimize its screening effect on the Wal-Mart site; 2. Improve traffic ingress/egress at the entrance between the proposed Wendy's site and Kinko's; 3. Reflect the changed values in the site data table for the overall Wal-Mart site. B. A separate, detailed certifiable site plan be developed for the Wendy's site only, to be scheduled for review at the same time as the re-certifiable Wal-Mart site plan. C. A decision be obtained on the issue of concurrency prior to the re-scheduling of the site plans for a second DRC review. IV. Clearwater Homeless Intervention Program(CHIPS) (PSP 96-21):The DRC requested that the plan be returned for further review, subject to the following conditions/discussion: A. Before the Site Plan can be certified, the applicant must complete the following action(s): 1. Revise the site data table completely to reflect both zoning(CG & RM-12)classifications of the property and the three mixed-Police Substation, Residential Shelter and Office /Administrative) uses of the property as they are planned within each zone. 2. Display the site address on the site plan, obtaining assistance as needed from the responsible Zoning Customer Service representative in establishing the correct address. 3. Break-out & identify the parking requirement for each use in the site data table.( Police Substation-1 space per officer; Residential Shelter(1 per 6 residents) 5 4. Provide and show additional Right-of-Way for the existing cul- de-sac. 5. Identify the provision for overflow of drainage retention basin B-show where the water would go. 6. Show dimensions on the plan for measurements of aisles, parking stalls, entrances and like features. 7. Indicate the location of lighting fixtures in the parking areas on the site plan. 8. Show all on-site lighting with 90-degree cutoffs directed away from abutting streets right-of-way and residential properties. 9. Show on the site plan the installation and maintenance of uniform traffic control devices at appropriate locations in accordance with the standards set forth by the Manual on Uniform Traffic Control Devices as adopted by the Florida Department of Transportation under Rule 14-115.010, Florida Administrative Code. 10.Adjust parking stalls and/or driveways on the plan to the satisfaction of the Traffic Engineer. 11.Clarify/illustrate handicap access from the parking space to the building. 12.Adjust handicap spaces to meet governmental standards. 13.Show ADA ramps for sidewalks on the site plan. 14.Show required sidewalk on the site plan. 15.Provide a copy of the SWFWMD permit application and calculations to Environmental Management. 16.Delineate the 100 year flood elevation on the site plan. 17.Have the final site plan signed and sealed by a Professional Engineer registered in the State of Florida. B. Before the City can issue building permits, the applicant must complete the following actions: 1. Obtain and furnish evidence of all applicable permits from other governmental agencies including but not limited to: (a) Pinellas County Public Health Unit Permit, Ingress/ Egress, and a 10 foot Utility Easement over the proposed water mains up to and including meters, backflow prevention devices and hydrants. (b) SWFWMD permit to Clearwater Environmental Management. 2. Acquire clearing and grubbing permits or a no tree verification form from Environmental Management. C. Before the City can issue a Certificate of Occupancy, the applicant must complete the following actions: 1. Pay the Transportation Impact Fee as called for by the Pinellas County determining the fee from the Clearwater Traffic Engineering Transportation Impact Fee Ordinance with assistance in Office. 6 ~ J 'y • ~ ~ 2. Bring all substandard sidewalks and sidewalk ramps adjacent to or a part of the project up to standard including ADA, and install sidewalk where none exists in the street right of way. D. The applicant must complete the following actions as indicated: 1. Obtain the requisite building permits within one(1) year from the site plan certification date to prevent expiration of the site plan certification. 2. Obtain the requisite certificate(s) of occupancy within three (3) years of the site plan certification date to prevent expiration of the site plan. 3. Obtain review of and permits for signs and fencing/walls through separate review and permitting procedures. V. Time-Warner Cable Com Site(at 620 Druid Road)(PSP 96-19): The DRC requested that the site plan be returned in certifiable form for review, with Traffic Engineering and Environmental concerns addressed. Q~~~:/^ ~~~~^' `v len V. Mahan, Coordinator, Central Permitting September 16, 1996 7 ,~ :. DAEl6080B . DAC Development Review Committee summary Notes Thursday, August 8 ,1996 Central Permitting Conference Room Municipal Services Building, 100 SO. Myrtle Ave. Two items were discussed: 1. Countryside Christian Center (PSP 96-15), 2. Sam's Club Re-plat (96-0~ Results of the discussion were: I. Countryside Christian Center (PSP 96-1~): The DRC requested that the site plan be returned for further review subject to the following conditions/discussion: A. Before the Site Plan can be certified, the applicant must complete the following action(s): 1. Show the following on the site plan: a. Perimeter landscape buffer of 5 feet along the City property. b. Minimum turning radii for designated drives and fire lanes as 42 feet on the plan. c. Height minimum of 13 ft.,6 in. for cat walk and porte-cochere. d. Plan view of McMullen Booth Road including driveways & medians along the length of the church property. e. Revised site data table to include and show that both P/SP and OL zoning requirements are met. 2. Locate a new Fire Hydrant at the southern entrance to the site. 3. Re-design the handicap parking to the satisfaction of the Traffic Engineer. 4. Show on the site plan the installation and maintenance of uniform traffic control devices at appropriate locations in accordance with the standards set forth by the Manual on Uniform Traffic Control Devices as adopted by the Florida Department of Transportation under Rule 14-115.010, Florida Administrative Code. 5. Show all striping, pavement markings, signage, and traffic control devices on the site plan conforming to F.D.O.T. Standard Indices-1995 edition and F.A.C.14-110(no 4 in. striping is to be shown). 6. Retain the ten foot access easement in place as is or provide an equivalent easement and show this on the plan. 7. Obtain a Conditional Use Permit for parking in the OL zoned area. 1 8. Show the date and condition for approval of the Conditional Use permit by the Planning and Zoning Board on the plan. 9. Legally record a Unity of Title for the project site and furnish proof of such action. lO.Obtain a determination from the City Engineer on the status and use of the entrance onto Lawrence Drive and note such determination and any conditions on the site plan. ii.Obtain a determination from the City Engineer on the additional driveway/curb cut onto McMullen-Booth Road and, if approved, display the driveway on the plan. 12.Pay the required Open Space and Recreation Assessment Fee with review by the Clearwater Parks and Recreation Department. 13.Submit an application to change zoning/ Land Use Plan to Category P for the jurisdictional wetland area. B. Before the City can issue building permits, the applicant must complete the following actions: i 1. Obtain and furnish evidence of all applicable permits from other governmental agencies including but not limited to: a. SWFWMD permit to Clearwater Environmental Management. 2. Acquire clearing and grubbing permits or a no tree verification form from Environmental Management. C. Before the City can issue a Certificate of Occupancy, the applicant must complete the following actions: 1. Pay the Transportation Impact Fee as called for by the Pinellas County determining the fee from the Clearwater Traffic Engineering Transportation Impact Fee Ordinance with assistance in Office. 2. Visually screen the dumpster and provide gates with a minimum 12-foot clear opening to the front for access by Solid Waste vehicles. 3. Furnish as-builts and an engineer's certification to Engineering Services. D. The applicant must complete the following actions as indicated: 1. Obtain the requisite building permits within one(1) year from the site plan certification date to prevent expiration of the site plan certification. 2. Obtain the requisite certificate(s) of occupancy within three (3) years of the site plan certification date to prevent expiration of the site plan. 3. Obtain review of and permits for signs and fencing/walls through separate review and permitting procedures. 2 II. Sam's Club Re-plat (96-01): The DRC requested that the preliminary plat and supplementary drawing be returned for further review subject to the following conditions/discussion: A. Before the Final Preliminary Plat can be certified, the applicant must complete the following action(s): 1. Return the Supplementary Drawing to the Preliminary Plat as the Certified Site Plan for Sam's Club revised to show the impact of creating the outparcel, Lot 2. 2. Re-certify the Sam's Club site plan showing among other things:. a. Added landscape buffering; b. Traffic circulation; c. Revised site data table. 3. Show all easements on the Preliminary Plat. B. Before the City can issue a Certificate of Occupancy, the applicant must complete the following actions: 1. Pay the Transportation Impact Pinellas County Transportation assistance in determining the Traffic Engineering Office. llen V. Mahan, C rdinator, Central Permitting August 8, 1996 Fee as called for by the .Impact Fee Ordinance with fee from the Clearwater 3 ~S ~ ~~ /~ LL %Swt+~' ~ '%I. }~~~~~~ r :::::.:..:::tea e U To: Bob Perkins, Engineer II; Mike Quillen, Assistant Director, Engineering; Robert Guercia, Engineer III; Jeff Daniels Interim, Fire Marshall; James Magiio, Solid Waste Superintendent; Chuck Warrington, Managing Director Clearwater Gas System; Leslie Dougall-Sides, Assistant City Attorney; Tim Kurtz, City Landscape Architect, Debbie Richter, Parks and Recreation; Mike Gust, Engineering; Zoning Review (Ear)); Certified Site Plan File From: Mark Parry, Planner Subject: Certified Site Plan Extension- Countryside? Christian Center 1850 McMullen Booth Rd. Date: Friday, November 13, 1998 Agenda Date: December 10'", 1998 Your involvement in the DRC process is greatly appreciated; if you have any questions, please feel kee to call Sandra Glatthorn, Planning Administrator at 4586 or Mark Parry, Planner at 4558. r 11 v ~ 0 I/!1 /t'I ~N~ ~ ~ . .~ i. ..•~ LL ~~ ~. % ~A :.:z~~ aroma ~r U Planning and Development Services Interoffice Correspondence To: Bob Perkins, Engineer II; Mike Quillen, Assistant Director, Engineering; Robert Guercia, Engineer III; Jeff Daniels Interim, Fire Marshall; James Maglio, Solid Waste Superintendent; Chuck Wamngton, Managing Director Clearwater Gas System; Leslie Dougall-Sides, Assistant City Attorney; Tim Kurtz, City Landscape Architect, Debbie Richter, Parks and Recreation; Mike Gust; Engineering; Zoning Review (Earl); Certified Site Plan File From: Mark Parry, Planner Subject: Certified Site Plan Extension- Countryside Christian Center 1850 McMullen Booth Rd. Date: Friday, November 13, 1998 Agenda Date: December 10'",1998 Your involvement in the DRC pcocess is greatly appreciated; if you have any questions, please Eeel free to call Sandra Glacthorn, Planning Administrator at 4586 or Mark Parry, Planner at 4558. ~~~~ vED ~f ~~ l~Jn1~/ntf ~NniNCCtfiNil Civil Engineering Land Planning Recycling Systems Ethanol Plants Process Engineering Mark Perry City of Clearwater Dear Mark: 400 Douglas Avenue • Suite C • Dunedin, FL 34698 (727) 785-8844 FAX (727) 736-2953 E-Mail: gaylormg@aol.com November 1998 Re: Countryside Christian Center Site Plan In accordance with our discussions I am forwarding herewith 12 copies of the site plan for Countryside Christian Center. Please note that this plan was approved approximately two years ago and was certified. In that regard, we need to continue the certification in order to allow us to build under our existing conditions. Countryside Christian Center is a very active church with many functions happening throughout the year. We have not, however, been in a position to be able to start construction on the new church building and parking lot as soon as we had anticipated. In that regard, we need the site plan extension in order to allow us to have the flexibility of beginning construction as soon in 1999 as we can. Thank you for your attention in this matter. It is my understanding that we have a potential DRC meeting December 10tH Sincerely, MICHAEL J. GAYLOR, P.E. MJG/hjh cc: Pastor Lloyd ~ ~ Juy~~~ ~.,~y~~~.~~~~.y Civil Engineering Land Planning Recycling Systems Ethanol Plants Process Engineering Mr. Steve Doherty Central Permitting Supervisor City of Clearwater 100 S. Myrtle Ave. Clearwater, FL 34616-5520 400 Douglas Avenue - Suite C -Dunedin, FL 34698 (813) 785-8844 FAX (813) 736-2953 September 9, 1997 Re: Countryside Christian Center Site Plan Dear Steve: In accordance with our telephone conversation I am forwarding herewith our request to extend the site plan certification for Countryside Christian Center for a period of one year. ,~ . As you are aware, we went through site plan approval process last year and received our certification to construct all site work related to a new sanctuary and parking lot at the Church. In that regard we paid all fees required and are now set to go except for the final staking of tree barricades, and pulling of the habitat permit. Over.the,last year the Church has gone through a transition to the extent that a decision was made not to proceed with the sanctuary, on an immediate basis. The direction has been to proceed with the parking lot and site work, and ultimately the building construction to start in 1998. In that regard we, therefore, request an extension of the site plan certification to allow us to remain in current status with the City of Clearwater. It is my understanding that you will carry this request to the Development Review Committee and will advise us as to the concurrence of staff. Thanks for your help in this matter. Sincerely, MICHAEL J. GAYLOR, P.E. MJG/jag cc: Rev. John A. Lloyd .Countryside Christian Center .1850 McMullen Booth Road Clearwater,. EL 33759 , Stns\doherty.ltr ~~ SEP ,15 1997 CENTt~AL PERMtTt `~~~~ '~- ..y ~~r~st~~n ~¢nt¢r PASTOR REV. JOHN A. LLOYD July 18, 1996 City bf Clearwater To whom it may concern: We hereby appoint Gaylor Engineering to represent Countryside Christian Center, Inc. as it pertains to signing the application for Site Plan review and the submittal of the Surface Water permit. If you have any questions in this regard, please do not hesitate to contact the undersigned. S' a ely urs, ev. nn sen Vice President subscribed hpf~re me this 18th day of July, 19° ~~C fC- Gl~~~~ Public ~;lSll~ifJ K~JQ My commission expires: v P~ SUSS ~• vV~OD "~` s~ col~nnlsslat~ # cc ~~2~ ~ e ~;~ls~ oc~r ~ ~ 1 ss~ gONDEDTMRU c~pp ~~ /ITI.AAKRt% gOFii~lP1(3 CA.,lFiC. 1850 McMULLEN-BOOTH ROAD CLEARWATER, FL 34619 (813) 799-1618 DECLARATION OF UNITY OF T11'LE KNOW ALL MEN BY THESE PRESENTS, that pucsueu~l to fire ordinances of the City of Clearwater pertaining to fire Issuance o[ building permits and regulating innd development activities, the undersigned, being fire fee owner(s) of fire following described real. property situated in the City of Clearwater, County o[ Pinellas and State of Florida, to wit: SEE EXHIBIT A do hereby make the following declaration of conditions, limitations and restrictions on said lands, hereafter to be known and referred to as a DECLARATION OF UNITY OF TITLE, as to the following particulars: 1. That the aforesaid plot or combination of separate lots, plots, parcels, acreage or portions thereof, shall hereafter be regarded as and is Hereby declared to be unified under one title as an indivisible building site. 2. That fire said property shall henceforth be considered as one plot or parcel of land, and that no portion thereo[ shall be sold, assigned, transferred, conveyed or devLsed separately except in its entirety, as one plot or parcel of land. 3. That this Declaration o[ Unity of Title shall constitute a covenant to run with the land, as provided by law, and shall be binding upon file undersigned, and fire heirs, successors and assigns of t)re undersigned, and all parties claiming under tllern until such time as the same mey be released in wrlling uirder fire order of the City Manager of the City o[ Clearwater. The undersigned also agree(s) that this instrument shall be recorded in the public records of Pinellas County, Florida. Si , sealed witnessed and acknowledged this ~_ day of 19~, at Clearwater, Florida. ri~~%C.~ W11'NESS OWN S): Co t sid Chris Center, Inc. ~' ,~~ y STATE OF FLORIDA Rev. Tenney C. Olsen, Vice President COUNTY OF PIPIELLAS BEFp~~personally appeared ~ ~~- ~- and ~C22 , to me known to be the pe n(s described in and who executed fire foregoing Instrument, and wlro acknowledged to me fire execution thereof to be his, her or their free act and deed [or file uses and purpose herein mentioned. ITNESS my hand and official seal t ' day of 19 ~~,~ A My Commission Expires: ~'rl L; ,t O C T 2 9 1896 -~~" ' ' Rev; 2_-19-8-87 CF~!Tr~AL rr' ~:;1rti f 1 li\ 7 CITY (~; C! ~7r,;~~;'~',~T~~ ~4la~t+e IL.lfr~©?~ ~~Y ~L~eG Gc"At,A'.SS1Qht ;~ CO 4~g27ti z ~ a ~tPIRt: °+ OC? 12, 1999 BONDED ~NNU ING. ~~OF P~ ATLI~NTIC 80ND1Nt3 GA•~ ~s ~ . '~'^ ~ ~ t ~ iy J'l!1.4 ~ s y'~r~ 1 4 ' F't..Al J 1.7u } a ~l.f irTL ~~4:_ouCa ~ C!-iP~C] o U ~ ~~~GG,:,~ f yf ; ~..::=E1C1 ~~~.i'Y ~ ~7 l~`S'~:~'.. L~~ ` ~N~~t 1~~t~ a QC1 LIh~E 05 /2~ctJ LLB ~~y COM9615.DRC STANDARD DRC REVIEW COMMENTS DRC Meeting Date: August 8, 1996 Project Name: Countryside Christian Center Type of Action Requested: DRC review & approval. Document Name: COM9615.DRC A. Prior to re-submitting the site plan, the applicant must accomplish the following: 1. Show the following on the site plan: a. Legal description of the property. b. Gross and net site area expressed in square feet and acres. c. Number of dwelling units and hotel units proposed and the resulting net density. d. Floor area devoted to each category of use. e. The floor area ratio. ®f. The property owner's name, address and telephone number; and the designated project applicant or representative and authorization for such representation if other than the property owner. g. Perimeter landscape buffer of feet along Right-of-way. h. Parking formula calculation for each use. i. Locations of all driveways, parking areas and curb cuts. j. Existing alleys and the extent to which each must be vacated. k. Location and screening of all refuse containers. 1. A minimum of 10~ of the lot area as a ground level amenity area with the size of the area included in the site data table. m. The parking required for all proposed uses as per the Urban Center Core (UCC) allowances. n. Direction and coverage of luminaries and other side-lighting. o. Extent of the intrusion of the project into the air space of surrounding properties not a part of (the project). p. All protected trees by size, species and location. q. Total paved vehicular use area and total interior landscape areas expressed in square feet and as a percentage of the overall site in the site plan 1 a ata block. r. Proposed utilities, stormwater retention and 50' meter contour elevations. s. Truck delivery routes noted and addressed in ccordance with the Pinellas County Metropolitan Planning Organization Ordinances. 2. Calculate and re-verify the open space for the project in light of the apparent discrepancy of SF from that area required. 3. Identify and distinguish between the new and existing buildings and driveways as well as other features on the plan. 4. Identify changes to the site data table resulting from the expansion. 5. Show all contiguous streets & roads. 6. Show the front yard open space also as a percentage on the plan. 7. Show on the plan a fire department connection a minimum of 15 ft. from the structure, adjacent to a paved drive and within 30 ft. of a fire hydrant assembly to provide for sprinklers. 8. Locate on the plan minimum 20 Ft wide (a) FIRE LANE(S) on the N , E , S W , side of the structure beginning not closer to the structure than 10 feet. 9. Show minimum turning radii for designated drives and fire lanes as 42 feet on the plan. l0.Locate a FIRE HYDRANT ASSEMBLY on the plan not more than 300 feet from the structure at 11. Show on the site plan the installation and maintenance of uniform traffic control devices at appropriate locations in accordance with the standards set forth by the Manual on Uniform Traffic Control Devices as adopted by the Florida Department of Transportation under Rule 14- 115.010, Florida Administrative Code. 12.Show all pavement markings and signage on the site plan. 13.Obtain a perpetual parking lease to run with the land in order to obtain and ensure that the additional required parking is available to the site as its use is presently being proposed under the applicable land development code. ~f~14.show all striping, pavement markings, signage and traffic control devices on the site plan conforming to F.D.O.T. Standard Indices-1995 edition and F.A.C. 14-110 (no 4" striping is to be shown). 15.Show dimensions of aisles, parking stalls, entrances and measurements for like plan features 2 on the plan. 16.Depict all required parking lot interior areas on the plan by shading or cross-hatching. 17.Show all pavement markings,signage and traffic control devices on the site plan. 18.Adjust handicap spaces to meet governmental standards. 19.Indicate the location of lighting fixtures in the parking areas on the site plan. 20.Show all on-site lighting with 90-degree cutoffs directed away from abutting streets right-of-way and residential properties. 21.Reflect the use of raised curbs or protective timbers on the site plan where interior landscaped areas abut pavement. 22.Obtain and furnish evidence of air rights lease/ / agreements with the affected surrounding properties. Additional Sect'on A. Comments ~~ ~ ~,~'~ ~~~ ~~Z~~4~~ 5~ ~~~ ~~ ~~ ~~ B. Before the Site Plan can be certified, the applicant rtlust complete the following action(s): 1. Display the site address on the site plan, obtaining assistance as needed from the responsible Zoning Customer Service representative in establishing the correct address. 2. Limit the site plan to one page. 3. Legally record a Unity of Title for the project site and furnish proof of such action. 4. Show the date(s) and condition(s) for approval of variance(s)/conditional use approvals by the Planning & Zoning &/or the Development Code Adiustment Board(s), including, as appropriate, a variance from the Flood Board for construction within 18 feet of a seawall. 5. Adjust parking stalls and/or driveways on the plan to the satisfaction of the Traffic Engineer. 6. Show all pavement markings, signage and traffic control devices on the site plan. 7. Adjust handicap spaces on the plan to meet government standards. 8. Show on the site plan the installation and maintenance of uniform traffic control devices at Z'~ ~' ~J ~~ ~ ~ 3 c~5~~ ~ ~~ appropriate locations in accordance with the standards set forth by the Manual on IIniform Traffic Control Devices as adopted by the Florida Department of Transportation under Rule 14- 115.010, Florida Administrative Code. 9. Obtain a Significant Change of Use Determination from the FDOT per rr^lorida Statute 335. lO.Execute a cross-parking/access easement linking the site with the site and specifying the exact number and location of the spaces that are to be jointly used by and between the sites after review and approval of the easement/agreement by the City Staff. 11.Indicate the location of lighting fixtures in the parking areas on the site plan. 12.Show all on-site lighting with 90-degree cutoffs directed away from abutting streets right-of-way and residential properties. 13.Show all entrance driveways with radii and not tapers. 14.Show dimensions on the plan for measurements of aisles, parking stalls and entrances. 15.Address and resolve the need for right turn/left turn auxiliary lanes and the queuing for traffic related to the project. 16.Provide a copy of the SWFWMD permit application and calculations to Environmental Management. 17.Reflect the use of raised curbs or protective timbers on the site plan where interior landscaped areas abut pavement. 18.Depict all required parking lot interior areas on the plan by shading or cross-hatching. 19.Show ADA ramps for sidewalks on the site plan. 20.Complete the Dumpster Requirement Form and return it to the City Solid Waste Department. 21.State on the construction plan that the detector check should be DDCVA with the by-pass meter installed by the City with fee paid by contractor. 22.State on the plan that the 6" fire line tap to the 6" City water line is to state "6x6 tap" so that City Utility Accounts will know what fee to bill the contractor. 23.Show backflow device(s) on plans as RPD. 24.Show all proposed utilities, stormwater retention/detention systems and 50' perimeter contour elevations. 25.Have the final site plan signed and sealed by a Professional Engineer registered in the State of Florida. 26.Pay the required Open Space and Recreation Assessment Fee with review by the Clearwater Parks 4 and Recreation Department. 27.Note that the project is exempt from the City's Open Space and Recreation Assessment Fees. Additional Section B. Comments: C. Before the City can issue building permits, the applicant must complete the following actions: 1. Obtain and furnish evidence of all applicable permits from other governmental agencies including but not limited to: (a) FDOT permit for work within the Right-of-Way to Engineering Services; ~(b) SWFWMD permit to Clearwater Environmental Management; (c) Pinellas County Public Health Unit Permit, Ingress/Egress and a 10 foot Utility Easement over the proposed water mains up to and including meters, backflow prevention devices and hydrants. 2. Pay the sewer impact assessment fee, based on the size of the water meter with assistance in determining the fee from Central Permitting/ Additional Section C. Comments: Licensing specialists. 3. Acquire clearing and grubbing and tree removal permits or a no tree verification form from Environmental Management. D. Before the City can issue a Certificate of Occupancy, the applicant must complete the following actions: 1. Bring all substandard sidewalks and sidewalk ramps adjacent to or a part of the project up to standard, including ADA, and install sidewalk where none exists in the street right of way. 2. Have the City install backflow prevention devices with the owner/applicant paying all applicable fees. 3. Obtain appropriate signs, fencing and/or wall permits through separate permitting processes. 4. Pay the Transportation Impact Fee as called for by the Pinellas County Transportation Impact Fee Ordinance with assistance in determining the fee from the Clearwater Traffic Engineering Office. 5. Visually screen the dumpster and provide gates with a minimum 12-foot clear opening to the front for access by Solid Waste vehicles. 6. Direct lighting from parking lot luminaries and other sources downward and away from residential areas. 7. Furnish as-builts and an engineer's certification to Engineering Services. 8. Record the related final plat within one (1) year from the certification date of the final preliminary plat or prior to issuance of a certificate of occupancy for the site, whichever comes first to prevent expiration of the site plan certification. Additional Section D. Comments: 6 E. Complete the following actions as indicated: 1. 2. 3. Obtain the requisite building permits within one(1) year from the site plan certification date to prevent expiration of the site plan certification. Obtain the requisite certificate(s) of occupancy within three (3) years of the site plan certification date to prevent expiration of the site plan certification. Obtain review of and permits for signs and fencing/walls through separate review and permitting procedures. Additional Section E. Comments. 7 f certified as a trtra and correct coPY• On November 4, j 1996 the Development Review Committee approved a site plan fo>•.The Countryside Christlun Center. R Witness my hand and the seal of the Development Code Ad t ' titi }~'Ator of the City of Clearwater, Florida on this `~=-~.'` f Novetn ~,'°1996.' ,: ~ r/ oordinator, Central P~mtining Depa mint ; Certltlcatfon IsyubJ~ct to ~Jic follottitng; Before the Clt can tssuc bulldtne ner'mits fhe a Itcant must com lete the follot~in actions: 1) Furnish the SWFW~gD pemtit to Enviromnental Management. 2) Acquire clearing''and gntbbing and tree removal '! permits or a no tree verification Conn from Envirortntental i Management. Before the Ctf can Issue n Cer1lticaft of Occu anc the a Itcant must com lefe fhe follot~~in actions: 3) Bring alt substandard sidttvalks and sidewalk ramps adjacent to or a pari of the project up to standard, including ApA and install sidewalk where Wont exists in the street right of way. d) Visually s~~retn the dumpster and provide gates with a minimum 12-foot clear opening to the front for access by Solid Waste vehicles. 5) Pay the Transportation Impact Fee as called for by the Pinellas County Transportation Impact Fee Ordinance with assistance in determining the fee from the Cttarwvater Traffic Engineering Office. ~ Submit an application to change the Zoning/I,and Use Plan to Category P for the jurisdictional wetland area, 7) Fumish as-builts and an engineer's certification to Engineering Services. Annllcant must complete the follot-tfn n~ t ar ?led: 8) Obtain the requisite building pemtits within one(1) year from the site plan certification daft to prevent expiration oftlte sift plan certification. 9) Obtain the requisite certificate(s) of occupancy within tltrce Years of the site ptau certification date to prevent expiration of the site plan certification. 10) Obtain review and perntits for sigts and fencing! walls through separate prckedures.