Loading...
PSP85-32PSP85-32 2600, 2650 MCCORMICK DR MCCORMICK PROPERTIES / COUNTRYSIDE AKA PRESTIGE PLACE II January 8, 1986 ~ S~ g.~ ~ Ms. Paula Harvey, Planning Director City of Clearwater P.O. Box 4748 Clearwater, FL 33518 King Engineering Associates, Inc. 2145 U.S. 19 North Clearwater, Florida 33575 Phone (813) 791-1441 Re: .~MeCormick. Countrysde.;Tr_act (Prestige Place) Dear Paula: Pursuant to' your recent conversation with Ed Mazur of this office, enclosed are twelve copies of the revised Site Plan for the above referenced project. Also enclosed is a check payable to the City of Clearwater Commission in the amount of $50.00 to cover applicable review fees. The revision consists of creating a plaza area adjacent to the entry to Building B, in an area that was previously a portion of the parking lot. This revision was necessary to provide a general slope on the sidewalk approach to the building, as well as to improve the visual characteristics of the entry. The revised parking layout exceeds applicable City of Clearwater regulations; i. e. , 507 spaces required, 537 spaces proposed. As you are aware construction plans reflecting this revision are currently under review by the City of Clearwater. Your assistance:; in processing this revised Final Site Plan is most appreciated.• Very truly yours, :~~ Ed Farmer Project Manager :rp Encl. cc: File 20020.702 ~~ ~ h. - ~ -°--9 ~ ' 4 ~v"rUL ~ 6 fl ~ ~F ~~yi ~:;~• `J~ ,+ a ~ ~ 1~~6 '~~ 1/~ ~ ~ ~ " E A ~ 4111 l~1 Di=~'~° i ~~~~ 11T . ;r„ ,. ~. McCormick 1~ ~~'OO ~C~~'f~nC~~9~~C~o HAND DELIVERED March 7, 1988 City of Clearwater Building Dept. 10 Missouri Avenue South Clearwater,. FL Attn: Sandra Glatthron RE: PRESTIGE PLACE II", Clearwater FL Dear Ms. Glatthron: 4830 West Kennedy Boulevard Suite 500, Urban Centre Tampa, Florida 33609 (813) 286-4100 By this letter. McCormick Properties is requesting a two (2) year time extension to the developmental Site Plan apgroved November 5, 1987. No modifications have been made to the approved site plan. McCormick Properties began the organization and development of Prestige Phase II in February of 1987 and completed working drawings and financial arrangements in December of 1987. A general contractor then reviewed and submitted cost estimates. A contract was executed on January 15, 1988 and application for permit was completed on January 28, 1988. The site permit was issued February 12, 1988 and construction proceeded. Please find enclosed, a check in the amount of $50.00 as requested. Thank you for your cooperation. Respectfully W. Stan Prewitt Senior Project Manager WSP/eml Attachment cc: B. Behrle B. George R. Morgan, M.A.Mortenson '.. r /~~ (e% <~/ /~ C I T T Y O F C L E A R ,.;W---•A--~ ~~ Interdepartment ~orre~pb~c~~ T0: Interim City Manager Joseph R. McFate, II j , ~.i;~Il :, ~, ~ I 1988 FROM: John D. Richter, Development Code Administrator y~~' ~~~`,~' COPIES: See List Below ~ CITY MANAf3ER SUBJECT: Revalidation of the Final Site Plan for McCormick Prestige Place Located at~the Northeast Corner of U.S. 19 and McCormick (Koger) Drive (PSP 85-32). DATE: March 9., 1988:` The last final Site Plan for McCormick Prestige Place was certified on November 1U, 1987 (this plan involved a City Manager approved minor plan change). One of the conditions from the certified plan was as Follows (a carry-over condition from previous approvals for this plan): The requisite initial building permit must be procured within six (6) months from the date of City Manager .approval of the final plan and all certificates of occupancy must be obtained within two (2) years of the date of certification of the final site plan. It was determined from records at the Building'Department that the initial building permit was issued on February 3, 1986 (therefore, the expiration date was on February 3, 1988). According to the Building Department, the building shell and site work are now completed for Phase I of the two phase plan. The developer explains that it took almost one year for working drawings and financial arrangements to be completed for Phase II. A parking lot permit for site work for Phase II has now been issued (on February 12, 1988) and construction is progressing. The developer is requesting a two year extension to the site plan in order to complete the development. As one-half of the project has now been constructed and the developer is currently proceeding to construct the final phase in harmony with the approved plan, I recommend approval of the revalidation request sub'ect to: (Conditions ~1 and 1~2 are from the site plan certified on 11/10/87. 1. An ingress/egress easement be provided over the private drives. 2. A 10' easement be provided over the water mains up to and including meters and hydrants. 3. All certificates of occupancy must be obtained prior to February 4, 1990. If you concur with this recommendation, please initial this memo and forward it to the City Clerk for distribution to be attached to the final site plan For McCormick Prestige Place (PSP 85-32) certified on November 10, 1987. JDR/SEG/df' ~ ~~~~~_T R E C E I V E D List ~ ~o ~~ T(ndy Onufer, Building ('I ) Bill Baker, Public Works (1) __ Ream Wilson, Parks and Recreation (1) ~ i 1 1988 Cecil Henderson, Utilities (2) Keith Crawford, Traffic Engineering (1) Paula Harvey, Planning (1) Terryy Finch, Environmental Management (1) CITY CL~F~K Ray Wyland, Zoning (1)~ Cyndie Goudeau, City Clerk (1) Developer/Project Sponsor (1) - W. Stan Prewitt, Senior Project Manager McCormick Properties, Inc. 830 West Kennedy Blvd. ui a 500, Urban Centre Tampa, FL 33609 ` ~ ~ C I. T Y~ 0 F C L E A R W A T' E 8 ~ ~ Interdepartment Correapondenee~ Ji t~ T0: Interim City Manager Joseph R. McFate, II FROMs John D. Richter, Development Code Admin rator COPIES: See List Below SUBJECT: Minor Plan Change of the Final Site Plan for McCormick Prestige Place (PSP 85-32) DATgs November 5, 1987 The last site plan for this development was certified on January 9, 1987 subject to the following conditions: (Conditions from site plan certified on 1/14/86.) 1. An ingress/egress easement be provided over. the private drives. 2. A 10' easement be provided over the water mains up to and including meters and hydrants. 3. The requisite initial building permit(s) be procured within six (6) months from the date of City Manager approval of the final plan and all certificates of occupancy must be obtained within two (2) years of the date of certification of the initial building permit. (Note: According to records at the Building Department, the initial building permit was issued on February 3, 1986.) The applicant has made minor changes to the site plan including minor revisions to the building configuration and area, to the parking area, to the storm system configuration and sidewalks (interior). Traffic Engineering and Public Works Departments have reviewed the modified site plan and have no objections. I recommend a royal of the current re uested modification as a minor lan c ange su ect to t e con tons ste a ove w t ote . If you concur with this recommendation, please initial this memo, attached it to the copies of the revised plan and forward them to the City Clerk for certification and distribution. ~~,,~~~ ~~ ~~ JDR/SEG/df List Andy Onufer, Building (1) Bill Baker, Public Works (1) ~QV ~ 7 Ream Wilson, Parks and Recreation (1) Cecil Henderson, Utilities (2) Keith Crawford, Traffic Engineering (1) .~ . Nicholas Lewis, Fire Marshal (1) ,. Paula Harvey, Planning (1) ~T. ~.~ CZ Ray Wyland, Zoning (1) ~'' Cyndie Goudeau, City Clerk (1) Developer/Project Sponsor (3) - Richard Harris, P.E. King Engineering Associates, Inc. 2145 U.S. 19 North Clearwater, FL 34623 ~, , '~ °' CITY OF CLEAR`W~iTE Interdepartment Correspondence Sheet T0: Cyndie Goudesu, City Clerk y~ FROM: John D. Richter, Development Code Administrator ~Z+J COPIES: See Below SUBJECT: Simple Adjustment and Certification of Final Site Plan for McCormick Prestige Place DATE: January 6, 1987 On July 21, 1986, the City Manager approved a minor amendment to the site plan involving a change in the floor areas of Bldgs. A and B (but no change in total floor area of 152,000 sq. ft. on the site) and minor adjustments to the landscape islands in the parking area west of Bldg. B (as coordinated with the Forestry Inspector). The site plan was certified on July 22, 1986 subject to the following conditions (which were .required by the City Manager in approving the site plan on July 21, 1986):- 1. An ingress-egress easement be .provided over the private drives; 2. A 10 foot easement be provided over the water mains. up to and including meters and hydrants; and 3. The requisite initial building permit(s) be procured within six months ; from the date (July 21, 1986) of City Manager approval of the final site plan and all requisite certificate(s) of occupancy be procured within two (2) years from the date of issuance of the initial building permit. The applicant is now requesting approval of additional minor changes to the site plan involving the landscape islands, private sidewalks, and parking area near Bldg. B. These changes qualify as a simple adjustment to the r` plan. Please certify the attached plans subject to the conditions listed above (conditions on site plan certified on July 22, 1986) and distribute. ~t, ~.. • ...~ Andy Onufer, Building (1) ~" ~/ ~'` ~'_~~`~' ~::: rid Bill Baker, Public Works (1) i:~, ! ~~ ` ~~,f ~`,' Ream Wilson, Parks and Recreation (1 '~•;, -. ,;_,_y~,• ~J ~_'=~~ Cecil Henderson Utilities (2) ~"`` •'~°~~ `~-s:. -. ;~ ~~ JAfJ '~ 1987 ~ e., •. .: •: , . ~ Keith Crawford, Traffic Eng. (1) ``"R `• '• ~` Nicholas W. Lewis, Fire Marshal (1) ~~~~`~~~ %~ Paula Harvey, Planning (1) +'`-~`f r Ray Wyland, Zoning Enforcement Officer (1) CI_r~ Cj,,~j-~ Cyndie Goudeau, City Clerk (1) , Developer/Project Sponsor (3) - Please Call: Ed Farmer, Senior Project Mgr. 5440 Beaumont .Center Blvd., Suite 460 Tampa, FL 33634 Phone : (813)' 886-0111 . CITY OF "._ a'`._^.' • Interdepart Q ,r8 _ ~ '. i ,.r:.,_.. . I,~r,. ,t`~,, J U L I ~ 196 ; ; .' T0: City Manager Anthony L. Shoemaker ~ V "(,J FROM: John D. Richter, Development Code Admini CAN ~NAQER COPIES: See List SUBJECT: Approval of a Minor Amendment and Certification of Revised Final Site Plan - McCormick Prestige Place DATE: July 15, 1986 The site plan for the above described development was last certified subject to conditions on January 14, 1986. The applicant has revised the final plan.' The"-gross floor; area of Building "B", which is currently under construction, has been increased from 76,000 sq. ft. to 77,538 sq. ft. while:f the gross floor area of Building "A" has been reduced from 76,000 sq. ft. to 74,462 sq. ft. to maintain the total approved- gross` -f loo-r area of 152,000 sq. ft. on the situ. Minor. adjustments were also made to islands. in the parking area to t°ne west of building "b" which have-.been closely coordinated with Alan Mayberry., the City's Forestry Inspector .• Required parking has not been affected. Traffic Engineering and Public Works have reviewed the revised plan and have no objections. It is our recommendation to you that the attached revised final site plan be approved subject to the three previous conditions listed on the last certified plan which are as follows: 1. An ingress-egress easement be provided over the private drives; 2. A 10 ft. easement be provided over the water mains up to and including meters and hydrants; and 3. .The requisite initial building permit(s) be procured within. six months from. the da-te of City Manager approval of the f._n_al ~s:te. _plan -and all requisite certif.ieate(s) of occupancy be- -procured °withn_ =two (2) years -from the date of issuance of the .initial building permit. ..• Y ~ ~~~~ ~ ~' I / .. • Memorandum ` McCormick Prestige Place • ~ '• Page 2 If you concur with this recommendation for approval, please initial this memo and forward the attached copies of the revised site plan to the City Clerk for certification and distribution. Approved - -- ----------------- ---- City Manager Date JDR/SG/df Attachments List Andy Onufer, Building (1) Rill Balcer, Public Works (1 ) Ream Wilson, Parks and Recreation (1) Cecil Henderson, Utilities (2) Keith Crawford, Traffic Eng. (1) Nicholas tJ. Lewis, Fire Marshal (1) aula Harvey, Planning Director (1) ~ohn Richter, Development Code Administrator (1) City Clerk's Office (1) Developer/Project Sponsor (3) - Mr. Ed Farmer Senior Project Manager King Engineering Associates, Inc. 2145 U.S. 19 North Clearwater, FL 33575-2894 . ~ CITY OF CLEARWATER ~` ~ ~ Interdepartment Cotres~ondence Sheei T0: City Manager Anthony L. Shoemaker ~ ~ ~ ~ ~ ^~. FROM: John D. Richter, Development Code Administr r .j COPIES: See List SUBJECT: Approval and Certification of Revised Final MA(IIAIGER Plan/McCormick Properti~~eyys~~,,- Countryside ~ D- DATE: January 9, 1986 /C/(y(A~ t~L~-~!~.~''Pi -.s~e~.E ~'~~,~ On October 9, 1985, you approved the final site plan for McCormick Properties - Countryside subject to conditions. The developer is now requesting approval of a change to the certified plan consisting-of a revision which creates a plaza area adjacent to building B; in an area that was previously shown as parking. This revision was necessar~y~t'o provide a general slope on the sidewalk approach to the building, as well as to improve the visual characteristics of the entry. The ~ ' revise d. parking layout still exceeds the applicable City of Clearwater requirements. ' ' ~i It is our recommendation to you that the attached revised final site plan be approved subject to the following original conditions: 1. An ingress-egress easement be provided over the private 'drives; 2. A 10 foot easement be provided over the water mains up to ,and including meters and hydrants; and ' ~. 3. The requisite initial building permit(s) be procured within six° months from the date of City Manager approval of the final site plan and all requisite certificate(s)~of occupancy be procl~red within two (2) years from 'the date of issuance of; the initial building permit. ~ ' If you concur with this recommendation for approval,'please initial this memo and forward the twelve attached copies of the revised site plan to the City Clerk for certification and distribution. JDR/GL/df Attachments List Edward Bethel, Building (1) Bill Baker, Public Works (1) Ream Wilson, Parks and Recreation (1) Cecil Henderson, Utilities (2) Keith Crawford, Traffic Eng. (1) Nicholas W. Lewis, Fire Marshal (1) Paula Harvey, Planning (1) ~~~ ~. r (~~ f f ~~ '~/1 / ~ o ~ n .~ ~y John Richter Develo ment Code Administrator (1) `~ Cynd 8 ~„ ~ ~' rk (1) ~ Deve~ F c~~ ~ r (2) - Ed Farmer M I ~~~, King Engineering j,~ 4~~~ ~ ~, ~~~~ 3250 U.S. 19 No., Suite 105 Clearwater, FL 33575 z PLA~JNING [~EPARTP~~ENT .,; »~ ~!, - C ITY OF CLEARVI/AT"FR ~~ Interdepartment Correspondence Sheet TO: Cyndie Goudeau, City Clerk FROM: Paula Harvey, Planning Director~/,~.~ COPIES: See List N SUBJECT: Certification of Preliminary Plat/McCormick•Properties- Countryside DATE: October 8, 1985 On October 3, 1985, the City Commission approved the preliminary plat for McCormick Properties-Countryside subject to the following conditions: 1. An ingress-egress easement be provided over the private drives. 2. A 10 foot easement be provided over the water mains up to and. including meters and hydrants. 3. -The final plat be recorded no later than April 10, 1986. Attached are twelve copies of the approved preliminary plat for your certification and distribution. PH/cc attachment(s) List RECEIVED Edward Bethel, Building (2) Bill Baker, Public Works (.1) Ream Wilson, Parks and Recreation (1) OCT 10 14~1K . Cecil Henderson, Utilities (2) Keith Crawford, Traffic Eng. (1) Nicholas W. Lewis-, Fire Marshal (1) Paula Harvey, Planning Director (1) CITY. CLERK City Clerk's Office (1) Developer/Project Sponsor (2) -~ Ed Farmer King Engineering 3250 U.S. 19N., Suite 105 Clearwater, FL 33575 ~~C~IVED r3vli..DiNG DEPARTMENT G:TY fi'r' r! ~ A r-' ~;r ~ ~, ~ 1985 Q~ `ANE '~i~~9t'0$llgl2;l~~r3t4~5~5 . ,. ,ry ~. / ~ y-~ a Subject ~~~v ~ ~ ' -No.96 70 FOLD From ~~~~~~-- a 0 Speec9 ~e~tero ,r Message ~~r~~~ ~f'~'~o~~~ ° ~ .~/iiG G'%~~ .~~.•~i~~~s~l~ ~~~p~ Date~~Signed / Reply ~~~v! ~/(/L- "r ~ ~ ~`~%~I~~' " ~~ ~p/- ~~/ ~~i~. ~/ -NO.9FOl0 -No. 10 FOLD Date Signed Wilson Jones Company GRAVLINE FORM. t4-902P 3-PARj RECIPIENT-RETAIN WHITE COPY, RETURN PINK COPY. ~ 19]B • PRINTED IN U.Sa. ,~ _ •; •. d TO: FROM: COPIES: SUBJECT: DATE '' , C ITY OF CLEAR~VIi~~T'~R Interdepartment Correspondence Sheet ~`~~~~ iR E C E i V E D City Manager Anthony L. Shoemake~=~° p,R~'N'EN j:;~t` ~..~yG pP.P RwATC~ c ~ c+-F r Paula Harvey, Planning Director,Y.f~~ ~5 1 G~~~ ~ ry.19 p~ OCT 9 185 See List ~~ ~ n12~1E~~3°~`5~6 Approval and Certification of F.~~;=~E~~i~e Plan/McCormick Properties-Countryside Cif October 8 , 1985 ~~ "•` -• On September 26, 1985, the Resource Development Committee reviewed and recommended approval of the final site plan for McCormick Properties-Countryside subject to conditions. It is the RDC recommendation to you that the attached final site plan be approved subject to the following conditions: 1. An ingress-egress easement be provided over the private drives; 2. A 10 foot easement be provided over the water mains up to and ,including meters and hydrants; and 3. The requisite initial building permit(s),be procured within- six months-from the date of City Manager approval of the final site plan -and aTl requisite certificate(s) of occupancy be procured within two (2) years from the date of issuance'of the initial boil-ding permit. • If you concur with this recommendation for approval, please initial this memo and forward the twelve attached copies of the site plan to the City Clerk for certification and distribution. PH/cc attachment(s) List Edward Bethel, Building (2) Bill Baker, Public Works (1) Ream Wilson, Parks and Recreation. (1) Cecil Henderson, Utilities (2) Keith Crawford, Traffic Eng. (1) Nicholas W. Lewis, Fire Marshal (1) Paula Harvey, Planning Director (1) City Clerk's Office (1) ~~~~~~' Developer/Project Sponsor (2) - Ed Farmer King Engineering 3250 US. 19 N., Suite 105 Clearwater, FL 33575 Certified as a true and correct copy. Approved Admin~ra~tivel.y: 10/9/85. ' Witness my hand and and seal of the. City of Clearwa~`~r~ Dl'drd~a, this `tenth day of October, 1985. a~ **,,...., ~, ~ ~.# CONDITIONS: ~~ ~~ c~,tY r(,,lerd ..~ ~ • . N 4 p ~ t~ l . An ingress-egress easement be prov~.d~tl o ~r r,t,l~~ p~~;"vote drives; ,q ~ #. ,~~ ~ ~ ~ . ~ ~ ( '.• ••• 2. A 10 foot easement be .provided over ther~~t~r~'~n~,~`r~s up to and including meters and hydrants; and ~~'±~,*~R14 ,4G~~~~q_-4 3. The requisite initial building permit(s) be procured within - six months from the .date of City Manager approval of the ' final site plan and all requisite certi:ficate(s) of occupancy be procured within two (2) years from the date of. issuance of. the initial building_~_p~rmit.~__.w______~~.~~_,._ __..__ _ ._.__I ___. ~~ ~ ' a, ,~ rue and' correct copy... Ap"h'r4'Ve,~• .~dmin'str~tively Certified as a t 'of~~Cl~ar~~~ter, 7/2.1/86. tiaitness my hand and the seal of -~Yre, Ci~y~ Jul 19:4 6.. ,~,1 : . Florida, this twenty-second day of Y- ~ ~~~„, m ~f~ A ~ Deputy ~~t'~ ~ J~~~k ~,~~~ ,; _._.r--,. `~~~ rivate An ingress-egress easement be provided over t~1~e P 1. drives; to and A 10 ft. easement be provided over the water mains. up 2. ~ including meters and hydrants; and d within g ermit(s) be procure 3. The requisite initial buildin P er approval of the six months from the date of City Manag of occupancy uisite certificate(s) final site plan and all req 'thin two (2) y ,ars from the date of .issuance of be procured wi ermit•r' the initial building p ~ ______._., -- ~_____- !>i Certified as a true and correct copy. Approved Admin'i~t~°ativc~ly: 1/13/S6.'~ t~~itness my hand and the seal of the City of Clearw~tia~,,,,1xlor,~d,°i",d~ this fourteenth day of January, 1986. ~ ° ~, * ' ~" ~~ ~r ~ ~r -- --~ _~ ~ -,-r ~ _-~ ~C~ty ~let~~c ~« Original Conditions Carried Forward ~'® °f'~' ~ ~+ 1. An ingress-egress easement be Provided over f, ~~,~,~ riva -c driv,~ •~' P 2. A 10 foot basement be provided over the.water"a~KiM~,;,'•-,~;,o••.~t~~_' including meters and hydrants; rind ~+,~ •lI~ C,~~_`~. 3. The requisite initial. building permit(s) be procur4~kl+wi,Ghin six (6) months from the date of City Pianager approval' of the final site plan and all requisite certif:icate(s) of occupancy he pro- cured within two (2) years from tiie date oC issuance of the . . Y~ initial building permit. Certified as a true and correct copy. Approved by ~~~""""~~nmiss~,,on: 10/3/85. Witness my hand and the seal of the City of Clear~ate~4® orida,"~L~his eleventh day of October, 1985. ,•, ,• r ~ ~ - CONDITIONS: 'Uep ~\~ t%,yr rCle~'k 1. An ingress-egress easement be provid'~d o~~~~, ;~ drives. / ~` t~1e' pi,t~~,te ' « ; ,~~., s f! ®e - ~ 2 . A 10 foot easement be provided over pf'tk}e, Evate;z~•~~n~,~.,ris up to and including meters and hydrants. °''p,,,,,P411i",;,,t~' 3. The final plat be recorded no later than April 10, 1986. Certified as a true and correct copy. Approved Administ~a'fively,F '-,10/9/85. Witness my hand and and seal of the City of Clearwater;~~°.~'1o~r~id~., this ,tenth ° , y a --~. . day of October, 1985. ~` •° ~' « « ~. ~~ ~. G,° ,r., ~ , , - .. CONDITIONS : C ~.~' ~~rk'_ ~ ~, ,- 1 . An ingress-egress easement be provid~yc'ovezir die ` prate' drives; rr {,~' «. g a '7 'e 1 ° b ~B®.......o ~ ti'. 2. A 10 foot easement be provided.. over the ivq;tr ~m~~~,~r'~° up to and including meters and hydrants; and 3. The requisite initial building permit(s) be .procured within six months f~ram the date of City Manager approval of the final site plan and all requisite certificate(s) of occupancy be procured within two (2) years from the date of issuance of the initial building permit . ____- ---__ __._____.___~. _. _ -_ _ _ Certified as a true and correct copy. Minor Plan change approved by:the Interim City Manager 11/5/$7, subject to the. conditions listed (with note), Witness my hand and the seal of the City of Clearwater this tenth day of ,yyteiiiitit November, 19$7. ~ ~ . tr,r,~`a m n z` . ~ ~ " ,~ ,D~p~atT y~~-~~~le~k-; . ,~~, ~, Ow.. ~ ~~ r < !fi . ~ ~ "~ %! F .. ~ :; CONDITIONS CARRIED FORWARD: ".ppA~ ~ ~~®~®'~~. ~~` "" q ~~ .~ ,•` . ~,. 1. An ingress/egress easement be provided over the private drives. 2. A 10° easement be provided over the water mains up to and including 'meters and hydrants. 3. The requisite initial building permit(s) be procured within six (6) months from the date of City Manager approval of the final plan and all ~ certificates of occupancy must be obtained within two (2) years of the date of certification of the initial building permit. Note: According to records at the Building Department, the initial. building permit was issued on February 3, 1986. MINOR PLAN CHANGE 1. Minor revisions to the building configuration and area,. to the parking area, to the storm, system configuration and sidewalks (interior). '(Traffic Engineering and Public Works have reviewed the modified site 'plan and have no objections).