CITY OF CLEARWATER
Interdepartment Correspondence Sheet
TO: Lucille Wi iams, ity C rk
FROM: David P. Healey, Planning Director
COPIES: ~ Roy Ayres, Building Director; Max Battle, Public Works Director;
Keith Crawford, Traffic Engineering Director
SUBJECT:
:Major Plan Change, Site .Plan Certification?
DATE: _ __ -..,` '
January 12 , 1981
-The preliminary site plan for St. Petersburg Bank and Trust.
Company, ,Clearwater B"ranch Bank; St. Petersburg-Bank and
~` Trust Company was originally approved by the City Commission
on July 3, 1980 and certified by the City Clerk on July 15, 1980.
The developer submitted several major plan changes which were
approved by the City Commission on January 8, 1981 subject to
conditions. The conditions of approval are set forth below.
Attached are five copies of the newl-y approved site plan for
your certification and distribution.
St. Petersburg Bank ~ Trust Company, Clearwater Branch Bank
1. Subject to the conditions of the initial certification
dated July 15, 1980.
2. The Bank be responsible for and incur. any cost related
to correcting any hazard or nuisance to the adjoining
public street system as a result of the reflective glass
facade of the proposed building.
DPH/PH/ms
Attachment
~~~2 w f9'/~ r~
., ~/`
C EARWATE~~
~~ CITY OF. CL
Interdepartment Correspondence Sheet
TO: Lucille tiVilliams, City Clerk
FROM: David P. Healey, Planning Director .
COPIES: Listed Below
SUBJECT: Preliminary Site Plan Certification
DATE: July 15 , 19 80
The preliminary site plan for St.Petersburg Bank and Trust
Company, Clearwater Branch Bank, St.Petersburg Bank and
Trust Comp any was approved by the City Commission on July 3,
1980 subject to conditions. The conditions of approval are
set forth below. ~ '
St.Petersburg Bank F, Trust Company, Clearwater Branch Bank
Conditions:
1. Dedication of 40 ft. additional right-of=way at the inter-
section of Gulf-to-Bay Boulevard and Court Street.
2. Appropriate utility easements be granted
-- 3. Building permit be issued within six months from approval
date and total project be completed within two (2) years.
Attached are five copies of the site plan for your certification
and distribution.
DPH/PH/cc
attachment(s)
COPIES: /Roy Ayres, Building Director
Max Battle, Public Works Director
Keith Crawford, Traffic Engineering Director
-,.
TRI M M
CLARK architects/engineers/planners/inc.
7001 4th St. N./St.Petersburg, Florida 33702/(813) 527-6429
October 30, 1980
Mr. David T. Healey
Planning Director
City Hall
112 South Osceola
Clearwater, Florida 33516
Re: St. Petersburg Bank ~ Trust Company
Clearwater Branch
1499 Gulf-to-Bay Blvd.
Dear Sir:
T/C File No. 7237
Attached are seven (7) sets of revised site work drawings Sheets SW-1
thru SW-7 of the subject project.
We are herewith requesting a minor site plan change caused by the
acquisitions of Lots 21 and 22 Block "J", Boulevard Heights and the
subsequent 4th Floor addition,
Please call if we can provide any additional information on this
submittal.
Very truly ours,
~~ ~
enry 0. Trimm, ,
Architect
enc. Prints
HoT/s j s