07/25/199607/25/1996
951 GULF BLVD
SAND KEY PARK S
/J~rv~~~~' 1
Coordinator, Central Permitting Dcp
Cer°tiRcadon is subject to the foltomr~6ng:
Rr£n are Cit~,~^.'ssuo ijdine Hermits the aonlicant muses
le}gthe following actiag:
1}Provide a copy of the Swk7dwWD permit to
Environmental Management.
2)Provide a copy cf .the Pinellas County
driveway oonnection permit to Traffic
Engineering.
~}Insure and show an the site plan that the
sidewalk location is in accordance with the
Pinellas county road widening project at that
location.
}Acquire clearing and grubbing permits or a
no tree verification form from Environmental
Management.
£ore the Cit oan issue a Certi£ioata
c Goon a~ can mum
5} Bring all substandard sidewalks and
sidewalk ramps adjacent to or a part of the
project up to .standard, including ADA, and
install sidewalk tfiere none exists in the
street right of way.
S)Eurnish as-builts and an engineer's
certification to Engineering Services.