Loading...
PSP 95-26R95-26R + 1997 514, 515, 516, 518, 525 PARK ST ROME TOWER FAX MESSAGE OFFICE CITY OF CLEARWATER DEPARTMENT OF CENTRAL PERNIlTTING MUNICIPAL SERVICES BUILDING 100 SOUTH MYRTLE AVENUE P. O. BOX 4748 CLEARWATER, FL 34618-4748 FAX PHONE - (813) 562-4576 PHONE - (813) 562-4567 DATE: April 22, 1997 TO: James H. Shimberg, Jr., Holland & Knight FROM: Allen V. Mahan, Central Permitting Coordinator FAX PHONE:229-0134 The City of Clearwater Development Review Committee is scheduled to meet 9 A.M. Thursday, April 24`~ in the Central Permitting Conference Room, Room 216, 2"a Floor, Municipal Services Building, 100 South Myrtle Avenue. Items below will be reviewed in the order listed. Your item is asterisked. -. ~ 1. Rome Tower Re-validation(95-26R) This FAX is your official notification of the meeting. Please notify the other members of your team/clients as required. Do call if you have any questions. AVM CC: TOTAL PAGES (INCLUDING THIS PAGE):1 "'Cl -h 9526RFAXIRomeTower 1 z DEVELOPMENT REVIEW COMMITTEE DOCUMENT CONTROL SHEET PROJECT/LOCATION: Rome Tower ~PSP 95-26R) DRC Meeting Date: Apri124, 1997 1. SANDRA GLATTHORN, Planning Manager 2. RICHARD BAIER, City Engineer 3. REAM WILSON, Parks & Recreation Director 4. DON MERRIANS, Traffic Engineer 5. BOB PERKINS, Engineer II 6. MICHAEL QUILLEN, Water Resource Engineer 7. JAMES GOODLOE, Fire Marshall 8. ALLEN V. MAHAN, Central Permitting Coordinator 9. -STEVE DOHERTY,: Centra_I _Permitting Supervisor 10. ROBERT BRUMBACK, Solid Waste Director 11. CHUCK WARRINGTON, Gas System Managing Director 12. DON MCCARTY, Associate Planner 13. JOHN RICHTER, Senior Planner (E-Mail Control Sheet Only) 14. ETIM UDOH, Associate Planner (E-Mail Control Sheet Only) 15. SCOTT SHUFORD, Director, Central Permitting 16. PAM AKIN, City Attorney (FAX of Cover Sheet w. Letter) Date Received by Central Permitting Office: Al~ri1 14, 1997 Date of distribution: April 14, 1997 Remarks: Applicant is requesting re-validation of the Rome Tower site plan to extend the date by which building permits must be issued by eighteen months to November 1, 1998. Re-validation of the plan with the original building height of 38 floors is requested with the alley vacation granted by the City Commission on March 20, 1998 now shown on the site plan. Rationale for the re-validation and time ea~tension is set forth in the attached letter from the applicant's attorney. 1PSP9526RRomeTower a ava~a: sa ~ i+ v~ Aitepisteted limibd lnbifiy Partnership 100 Nordt AsAbp Orhe, Stile 2300 P.O. hoot 12N (2P 33801-1288) Tampa, Fbritb 33602-1300 813-?27-8500 FAX813-229-0134 April 14, 1997 VIA HAND DF1dVERY Allen V. Mahan Coordinator for Central Permitting City of Clearwater 100 South Myrtle Avenue Clearwater, Florida 34616-5520 Re: Rome Tower Project Dear Mr. Mahan: Mbrt1 Orlando Boa Rion St Pbtersbtr0 Fat lsuderdale Talt~ltassee .tadaarnr8le Tampa lalaehrrd WashinptarlO.C. MRarN YVbst P~Im Beach JAMS H. SHIl-~ERG, JA. air-22~~412 Intarod Addteo: phimbadhtlav.cam This letter is sent pursuant to our telephone conversation of last week and my meetings with Scott Shuford, Pam Akin, and Leslie Dougall-Sides. Our client, Haag Land & Building Development, Inc. ("the Developer") is requesting to appear before the City's Development Review Committee ("DRC'~ at the Apri124, 1997 DRC meeting to discuss a necessary adjustment in the time frames for obtaining a building permit and ultimately a certificate of occupancy for the approved site plan for the Rome Tower project. We understand that the meeting begins at 9:00 a.m. in the conference room at your offices. Enclosed with this letter is a check for $150.00 made payable to The City of Clearwater and 12 copies of the Rome Tower site plan which has been revised to reflect the now approved alley vacation. We are requesting that the time for obtaining a building permit be modified to reflect a deadline of November 1, 1998. The reasons for our request are as follows: When the Rome Tower site plan was certified by the City in 1996, all parties were acting under the belief that the alley vacation would be completed quickly, clearing the path ~r the design of the project. As reflected by the conditions on the site plan, the alley vacation was a critical step in the site design process. Despite efforts by both the City and the Developer, the alley vacation was not completed quickly, but, in fact, took over eleven months from the date that the site plan was certified by the City. The mutual mistake in the timing of the alley vacation has frustrated the original design time frame and the actual timing should be reflected in a modification to the time frame to obtain a building permit, indicated on the site plan. Until the Developer knew that the alley vacation was to be accomplished, it Ailvu ~ . luauua. Coordinator for Central Permitting , April 14, 1997 Page 2 was not reasonable for the Developer to begin the very ez~ensive process of actually designing the building. Additionally, while Section 43.03 of the City of Clearwater Code provides that site plans be approved with an identified time frame, no specific time frames are established by the Code. Without such specific time frames in the Code, the time frame applied should be a reasonable one, based on the type of development and the complexity of the issues. The time frame applied to the Rome Tower site plan should have been longer than the typical time frame, given the size of the building and the number and complexity of the design and site concerns. Therefore, we are requesting that the time frame be modified to reflect a more reasonable and realistic design and permitting time frame. As you are probably aware, to date the Developer has spent a great deal of time and money on this project, based on information from the City on what needed to be done to develop the project. The Developer has been proceeding in good faith on this project for over two years and has made substantial progress. We will show in detail at the DRC meeting the substantial progress made on this project to date. The modification of the permitting time frame is needed to complete these requirements. Please let me know as soon as possible if any additional information will be required prior to the meeting. Thank you for your assistance. Very truly yours, HOLLAND & KNIGHT LLP ~ .~, ; ,,~ James H. Shimberg, Jr. JHS:Id Enclosures cc: Gerhardt Haag Terry Tsafatinos TPA2-42111