Loading...
06/10/199806/10/1998 601 BELCHER RD N BELCHER RD OFFICE DEVELOPMENT REVIEW COMMITTEE Central Permitting Department July 9, 1998 at 9:00 a.m. Conference Room 216 #6 ,, 6 , q ? I ek6t Standard review comments for 6 v / / BELCHER_ROAD -OFFICE". (Formal review) Reviewed by: Department name: le Please return comments to Steve Doherty DRCCOA MENTS070998 A. Before the SITE PLAN can be certified, the applicant must complete the following action(s)checked below: ZONING - L Show the.following on the site plan: ? Legal description of the property. D Site area (square feet and acres}. - ?North arrow. ? Number- of dwelling units and hotel units. proposed and-she resulting net density. ? Floor area ratio. ? Property owners name, address and telephone number and the designated project representative name, address and telephone number. (and. fax numbers). ?Perimeter landscape buffer ?Parking formula calculation for each use. ?Locations of all driveways, parking areas and curb cuts. ? Delineation in mapped form and computation of the area of the site devoted to building - coverage, open space for the lot, open. space forthe front yard and. building coverage expressed in sq. ft and as a percentage of the overall site. ?Location'and screening of all refuse containers/compactors. ?Zoning assigned to the subject property andsurrounding properties depicted on the plan. ?Identify and distinguish between the new and existing features on the site plan ?2. Identify changes to the site data table if this is a plan amendment. ?3. Submit a. completed.CONCURBE.NCY REVIEW application for-review with required fee .134.Show all contiguous streets & roads. ?5.Display the site address on the site plan, obtaining assistance as needed from the responsible Zoning Specialist in establishing the correct- address. ?6.11mit the site plan to one page. ?7.I.egally record a Unity of Title for the project site and furnish proof of such action. - 38Show the.date(s) and condition(s) for approval of (a) variance or-conditional use approvals by the Planning & Zoning Board or the Development Code Adjustment Board(s), or (b) a variance from the Flood Board for construction within 18 feet of a seawall. _ ?9.Other comments: - FIRE DEPARTMENT D1. Show an the flan a fire department connection a minimum of 25 ft. from the structure, adjacent to a paved drive and within 30 ft. of a fire hydrant assembly to provide for sprinklers. ?2. Locate on the plan minimum 20 Ft wide (a) FIRE LANE(S) on the N E. S W side of the structure beginning not closer to the structure than 10 feet. ?3. Show minimum turning radii for designated drives and fire lanes as 42 feet on the plan. 134. Locate a FIRE HYDRANT ASSEMBLY on-the plan not more than 300 feet from the ,Itructure-at. _ ?5. Other cc2rmPmtv-. -' TRAFFIC ENGINEERING 131. Show on the site plan the installation and maintenance of uniform traffic control devices at appropriate locations in accordance with the standards set forth by the Manual on Uniform Traffic Control Devices as. adopted by the Florida Department of Transportation under Rule 14.115.010, Florida Administrative Code. ?2. Show applicable Florida Statute number for handicapped parking spaces. ?M. Show all striping, pavement markings, signage and traffic control devices on the site plan conforming to F.D.O.T. Standard Indexs-1995 edition and F.A.C. 14- 110 (no 4" striping is to be shown). ?4. Show dimensions of aisles, parking stalls, entrances and measurements for like plan features on the plan. ?5. Show all pavement markings, signage and traffic control devices on the site plan. ?6. Adjust handicap spaces to meet governmental standards with the correct handicap signs. 137. Adjust parking stalls and/or driveways on the plan to the satisfaction of the Traffic.Engineer. ?8. Indicate the location of lighting fixtures in the parking areas on the site plan. ?9. Show all on-site lighting with 90-degree cutoffs directed away from abutting streets right-of- way and residential properties. ? 10. Obtain a Significant Change. of Use Determination from the FDOT per Florida Statute 335. ? 11. Execute a cross-parking/access easement linking the site with the site and specifying the exact number and location of the spaces that are to be jointly used by and between the sites after review and approval of the easement or agreement by the appropriate City Staff. .01Z Address and resolve the need for right turn /left turn auxiliary lanes and the queuing for traffic related to the project. ? 13.Other_comments: ENVIRONMENTAL MANAGEMENT .,.131. Provide a copy of the SWFWMD permit application and- calculations to Environmental Management. ?2. Show all protected trees by size, species and location. _ ?3. Show total paved vehicular use area and total interior landscape areas expressed in square feet md.as a percentage.of the. overall site-in the site plan data block. 134. Provide dimensions on the plan-for perimeter landscape buffers. ?5 Reflect the use of raised curbs or protective timbers on the site plan where interior landscaped areas abut pavement. ?6. Depict all required parking lot interior areas on the plan by shading or cross-hatching. _ t77, Other comments: ENGINEERING PLAN REVIEW 01. Show ADA ramps for sidewalks on the site plan. 02. Complete- the Dumpster Requirement Form and return it to the City Solid Waste Department. 133. Add a note to the site plan stating "It is the responsibility of the owner to mll the dumpster to a designated location at an assigned time as appmwd by the Solid Waste Superintendent. " . 04. State on the construction plan that the detector check should be DDCVA with the by-pass -..meter installed by the City with fee paid by contractor. 05. State on the plan that the 6" fire line tap to the 6" City water line is to state "6x6 tap" so that City Utility Accounts will know what fee to bill the contractor. 06. Show backflow device(s) on plans as RPD. 07. Show all proposed utilities, storm water retention /detention systems and 50' perimeter contour elevations. 08. Have the final site plan signed and sealed by a Professional Engineer registered in the State of Florida. 139. Other comments: PARKS AND RECREATION 131. Pay the required Open Space and Recreation Assessment Fee with review by the Clearwater _ Parks and Recreation Department. 02. Note that the project is exempt from the City's Open Space and Recreation Assessment Fees. 03.Other comments; B.. _ Before the City can issue BUILDING PERMITS, the applicant must complete the following actions: ENVIRONMENTAL MANAGEMENT 131. Furnish the SWFWMD permit to Clearwater Environmental Management. 132. Acquire clearing and grubbing and tree removal permits or a no tree verification form from Environmental Management. 03._Provide drainage calculations. C34. Other comments: ENGINEERING PLAN REVIEW 1.. Obtain and furnish evidence of all applicable permits • from other governmental agencies including but not limited to: (a) FDOT permit for work within the right-of--way to Engineering Services; (b) Pinellas County Public Health Unit Permit, Ingress /Egress and a 10 foot Utility Easement over the proposed water mains up to and including meters, backflow prevention and hydrants. 02. Pay the sewer impact assessment fee, based on the size of the water meter with assistance in determining the fee from Central Permitting/Licensing specialists. 0' 133. Other commcrits: C. Before the City can issue a CERTIFICATE OF OCCUPANCY, the applicant must complete the following actions: ZONING ? 1.Comments• TRAFFIC ENGINEERING 131. Pay the Transportation Impact Fee as called for by the Pinellas County Transportation Impact Fee Ordinance with assistance in. determining the fee from the Clearwater Traffic Engineering Office. _ C32. Other comments: "EN G PLANREVIEW ? 1. Bring all substandard sidewalks and sidewalk ramps adjacent to or a part of the project up to standard, including ADA, and install sidewalk where none exists in the street right of way. ?2 Have the City install backflow prevention devices with the owner/applicant paying all applicable fees. ?01 Visually screen the dumpster and provide gates with a minirnum 12-foot dear opening to the - front for access by. Solid Waste vehicles. 04. Furnish as-builts and an. engineers certification to Engineering Services. E35. Other comments: bella„A mitt ewelgsa4P /- n a of hack avail. htP?s,-?a?,, . _ D. -Complete the following actions as indicated: ZONING ?1.Obtain. the requisite building permits within one(1) year from the site plan certification date to prevent expiration of the site plan certification. [32. Obtain thezequisite certificate(s) -of occupancy within three (3) years of the site plan -certification date to prevent expiration of the site plan certification. - ?3.Obtain review of and permits for signs and'fencing/walls through separate review and . permitting procedures. 04.. Other comments: DRC -0AV El1Tr5052198 AVID ENGINEERING, INC. 2708 Alternate U.S. 19 North, Suite 604 Palm Harbor, FL 34683 Ph (813) 789-9500 / Fax (813) 784-6662 LETTER OF TRANSMITTAL TO: Bob Perkins City of Clearwater Central Permitting Department Manager 100 S. Myrtle Ave., 2ed Floor Clearwater, Florida 34616 FROM: Samer Ghafari, E.I. Project Engineer SUBJECT: r p/ Belcher Road Off- ice___4 Belcher Road and_N-E= Coachman-Road AEI JOB No: 277001.200 DATE: August 12, 1998 MEANS OF DELIVERY: Courier Dear Mr. Perkins: In review to DRC comments July 9, we revised the Certified plan for the above referenced project. Enclosed you will find 10 copies of the revised Certified Plan. Please process the above accordingly. if you have any questions or desire additional information, please call. Thanks! F.• I DOC 1277001 I Cry_ TR2. Doc Clearwater U Central Permitting Department Interoffice Correspondence To: Rich Baier, Public Works Administrator; Bo&tiAICx; Mike Quillen, Assistant Director, Engineering; Robert Guercia, Engineer III; Jeff Daniels Interim, Fire Marshall; James Maglio, Solid Waste Superintendent; Chuck Warrington, Managing Director Clearwater Gas System; Leslie Dougall-Sides, Assistant City Attorney; Tim Kurtz, City Landscape Architect; Debbie Richter, Parks and Recreation; Mike Gust, Engineering; Zoning Review (Earl); Certified Site Plan File From: Mark Parry, Central Permitting, Planner Subject: BELCHER-ROAD-OFFIGE Date: September 3, 1998 Please find attached the revised site plan for BELCHER ROAD OFFICE which has been submitted by the applicant for certification. Refer to the Summary Notes for the DRC meeting of JULY 9, 1999 for assurance in assuring that all DRC directed changes have been made to the plan. If you find the site plan acceptable , please initial and date. If you do have an objection and/or recommendation, please comment below or attach your comments in a memo: PLEASE DO NOT MARK PLAN AS IT HAS BEEN SUBMITTED FOR CERTIFICATION. DRUINALBELCHERROAD OFFICE Clearwater Central Permitting Department Interoffice Correspondence To: Rich Baier, Public Works Administrator; Bob Perkins, Engineer II; Mike Quillen, Assistant Director, Engineering; Robert Guercia, Engineer III; Jeff Daniels Interim, Fire Marshall; James Maglio, Solid Waste Superintendent; Chuck Warrington, Managing Director Clearwater Gas System; Leslie Dougall-Sides, Assistant City Attorney; Tim Kurtz, City Landscape Architect; Debbie Richter, Parks and Recreation; Mike Gust, Engineering; Zoning Review (Earl); Certified Site Plan File From: Mark Parry, Central Permitting, Planner Subject: BELCHER ROAD OFFICE Date: September 3, 1998 Please find attached the revised site plan for BELCHER ROAD OFFICE which has been submitted by the applicant for certification. Refer to the Summary Notes for the DRC meeting of JULY 9, 1999 for assurance in assuring that all DRC directed changes have been made to the plan. If you find the site plan acceptable , please initial and date. If you do have an objection and/or recommendation, please comment below or attach your comments in a memo. PLEASE DO NOT MARK PLAN AS IT HAS BEEN SUBMITTED FOR CERTIFICATION. DRCFINALBELCHERROADOFFICE Clearwater Central Permitting Department Interoffice Correspondence To: Rich Baier, Public Works Administrator; Bob Perkins, Engineer II; Mike Quillen, Assistant Director, Engineering; Robert Guercia, Engineer III; Jeff Daniels Interim, Fire Marshall; James Maglio, Solid Waste Superintendent Chuck Warrington, Managing Director Clearwater Gas System; Leslie Dougall-Sides, Assistant City Attorney; Tim Kurtz, City Landscape Architect; Debbie Richter, Parks and Recreation; Mike Gust, Engineering; Zoning Review (Earl); Certified Site Plan File From: Mark Parry, Central Permitting, Planner Subject: BELCHER ROAD OFFICE Date: September 3, 1998 Please find attached the revised site plan for BELCHER ROAD OFFICE which has been submitted by the applicant for certification. Refer to the Summary Notes for the DRC meeting of JULY 9, 1999 for assurance in assuring that all DRC directed changes have been made to the plan. If you find the site plan acceptable , please initial and date. If you do have an objection and/or recommendation, please comment below or attach your comments in a memo. PLEASE DO NOT MARK PLAN AS IT HAS BEEN SUBMITTED FOR CERTIFICA,WbJ4x o -5`f-%-4E ? ?s • ?' Lam, DRCFINALBELCHERROADOFFICE rm- Clearwater Central Permitting Department Interoffice Correspondence To: Rich Baier, Public Works Administrator; Bob Perkins, Engineer II; Mike Quillen, Assistant Director, Engineering; Robert Guercia, Engineer III; Jeff Daniels Interim, Fire Marshall; James Maglio, Solid Waste Superintendent, Chuck Warrington, Managing Director Clearwater Gas System; Leslie Dougall-Sides, Assistant City Attorney; Tim Kurtz, City Landscape Architect; Debbie Richter, Parks and Recreation; Mike Gust, Engineering; Zoning Review (Earl); Certified Site Plan File From: Mark Parry, Central Permitting, Planner Subject: BELCHER ROAD OFFICE Date: September 3, 1998 Please find attached the revised site plan for BELCHER ROAD OFFICE which has been submitted by the applicant for certification. Refer to the Summary Notes for the DRC meeting of JULY 9, 1999 for assurance in assuring that all DRC directed changes have been made to the plan. - DRCFINALBELCHERROADOFFICE If you find the site plan acceptable , please initial and date. If you do have an objection and/or recommendation, please comment below or attach your comments in a memo. PLEASE DO NOT MARK PLAN A.q TT NAS RF.F.N CTTRMTTTFT) FCIR ('FRTTFT(-ATT() \T Clearwater Central Permitting Department Interoffice Correspondence To: Rich Baier, Public Works Administrator; Bob Perkins, Engineer II; Mike Quillen, Assistant Director, Engineering; Robert Guercia, Engineer III; Jeff Daniels Interim, Fire Marshall; James Maglio, Solid Waste Superintendent; Chuck Warrington, Managing Director Clearwater Gas System; Leslie Dougall-Sides, Assistant City Attorney; Tim Kurtz, City Landscape Architect; Debbie Richter, Parks and Recreation; Mike Gust, Engineering; Zoning Review (Earl); Certified Site Plan File From: Mark Parry, Central Permitting, Planner Subject: BELCHER ROAD OFFICE Date: September 3, 1998 Please find attached the revised site plan for BELCHER ROAD OFFICE which has been submitted by the applicant for certification. Refer to the Summary Notes for the DRC meeting of JULY 9, 1999 for assurance in assuring that all DRC directed changes have been made to the plan. If you find the site plan acceptable , please initial and date. If you do have an objection and/or recommendation, please comment below or attach your comments in a memo. PLEASE DO NOT MARK PLAI)AS IT HAS BEEN SUBMITTED FOR CERTIFICATION. d,", d DRCFINALBELCHERROADOFFICE wx LL. Clearwater Central Permitting Department Interoffice Correspondence r ?. . Rich Baier, Public Works Administrator; Bob Perkins, Engineer II; Mike Quillen, Assistant Director, Engineering, Robert Guercia, Engineer III; Jeff Daniels Interim, Fire Marshall; James Maglio, Solid Waste Superintendent, Chuck Warrington, Managing Director Clearwater Gas System; Leslie Dougall-Sides, Assistant City Attorney; Tim Kurtz, City Landscape Architect; Debbie Richter, Parks and Recreation; Mike Gust, Engineering; Zoning Review (Earl); Certified Site Plan F? Mark Parry, Central Permitting, Planner S EP 0 3 1998 f'?W' r Sub'ect: BELCHER ROAD OFFICE CENTRAL PERMITTING 1 CITY OF CLEARWATER Date: September 3, 1998 Please find attached the revised site plan for BELCHER ROAD OFFICE which has been submitted by the applicant for certification. Refer to the Summary Notes for the DRC meeting of JULY 9, 1999 for assurance in assuring that all DRC directed changes have been made to the plan. If you find the site plan acceptable , please initial and date. If you do have an objection and/or recommendation, please comment below or attach your comments in a memo. PLEASE DO NOT MART{ PLAN AS IT HAS BEEN SUBMITTED FOR CERTIFICATION. DRUINALBELCHERROADOFFICE .r K 0 ?* 6 'I0 DEVELOPMENT REVIEW COMMITTEE Central Permitting Department July 9, 1998 at 9:00 a.m. Conference Room 216 Standard review comments for 8 i l? BELCHER ROAD OFFICE (Formal review) Reviewed by: 12AZI1, Department name: PA--t /-?f Please return comments to Steve Doherty DRCCOA MENTS070998 A i A. Before the SITE PLAN can be certified, the applicant must complete the following action(s)checked below: ZONING _ L Show the.following on the.site plan: ? Legal description of the property. ? Site area (square feet and acres}. - [North arrow. [ Number. of dwelling units and hotel units. proposed aadthe resulting net density. ? Floor area ratio. ? Property owners name, address and telephone number and the designated project representative name, address and telephone number. (and-fax numbers). [Perimeter landscape buffer [Parking formula calculation for each use. [Locations of all driveways, parking areas and curb cuts. ? Delineation in mapped form and computation of the area of the site devoted to building :+coverage, open space for the lot, open space for the front yard and building coverage expressed in sq. ft and as a percentage of the overall site. [Location -and screening of all refuse containers /compactors. [Zoning assigned to the subject property and 'surrounding properties depicted on the plan. [Identify and distinguish between the new and existing features on the site plan 02. Identify changes to the site data table if this is a plan amendment. [33. Submit a.completed.CONCURR NCY REVIEIIV.. application far-review with required fee M4.Show all contiguous streets & roads. ?511splay the site address on the site plan, obtaining assistance as needed from the responsible Zoning Specialist in establishing the correct- address. 13611mit the site plan to one page. ?71?ega11y record a Unity.of Title for the project site and famish proof of such action. - = D8 Show the.date(s) and condition(s) for approval of: (a) variance orzonditional use approvals by the Planning & Zoning Board or the Development Code Adjustment Board(s), or (b) a variance from the Flood Board for construction within 18 feet of a seawall. _ ?9. Other commFnts: -,..FIRE DEPARTMENT Di. Show an the flan a fire department connection a minimum of 15 h. from the structure, adjacent to a paved drive and within 30 ft. of a fire hydrant assembly to provide for sprinklers. 132. Locate on the plan minimum 20 Ft wide (a) FIRE LANE(S) on the N. E. S W side of the structure beginning not closer to the structure than 10 feet. 133. Show minimum turning radii for designated drives and fire lanes as 42 feet on the plan. M4. Locate a FIRE HYDRANT ASSEMBLY onthe plan not more than 300 feet from the -1tructure_at 135. Cher cgmmgntt. . - : TRAFFIC ENGINEERING D 1. Show on. the site plan the installation and maintenance of uniform traffic control devices at appropriate locations in accordance with the standards set forth by the Manual on Uniform Traffic Control Devices as_ adopted by the Florida Department of Transportation under Rule 14.115.010, Florida Administrative Code. [32. Show applicable Florida Statute number for handicapped parking spaces. ..03. Show all striping, pavement markings, signage and .traffic control devices on the site plan conforming to F.D.O.T. Standard Indexs-1995 edition and F.A.C. 14- 110 (no 4" striping is to be shown). ?4. Show dimensions of aisles, parking stalls, entrances and measurements for like plan features on the plan. ?5. Show all pavement markings, signage and traffic control devices on the site plan. E36. Adjust handicap spaces to meet governmental standards with the correct handicap signs. 137_ Adjust parking stalls and/or driveways on the plan to the satisfaction of the Traffic Engineer. ;:. _. EX Indicate the location of lighting f xtures in the parking areas on the site plan. ?9. Show all on-site lighting with 90-degree cutoffs directed away from abutting streets right-of- way and residential properties. [310. Obtain a Significant Change of Use Determination from the FDOT per Florida Statute 335. 11. Execute a cross-parking/access easement linking the site with the site and specifying the exact number and location of the spaces that are to be jointly used by and between the sites after review and approval of the easement or agreement by the appropriate City Staff. ? 12 Address and resolve the need for right turn /left tum 'auxiliary lanes and the queuing for traffic related to the project. 1313. Other comments: ENVIRONMENTAL MANAGEMENT .0i. Provide a copy of the SWFWMD permit application and calculations to Environmental Management. 13Z Show all protected trees by size, species and location. E33. Show total paved vehicular use area and total interior landscape areas expressed in square feet -end as a percentage of the. overall site -in the site plan data block. 134. Provide dimensions on the plan for perimeter landscape buffers. 05 Reflect the use of raised curbs or protective timbers on the site plan where interior landscaped areas abut pavement. 06. Depict all required parking lot interior areas on the plan by shading or cross-hatching. - 07, Other comments: { ENGINEERING PLAN REVIEW 31. Show ADA ramps for sidewalks on the site plan. 02. Complete the Dumpster Requirement Form and return it to the City Solid Waste Department. _.:33. Add a note to the site plan stating "It is the responsibility of the owner to mll the dumpster to a designated location at an assigned time ar approwd by the Solid Waste Superintendent. " 134. State on the construction plan that the detector check should be DDCVA with the by-pass _mieter installed by the City with fee paid by contractor. ?5. State on the plan that the 6" fire line tap to the 6" City water line is to state "6x6 tap" so that City Utility Accounts will know what fee to bill the contractor. ?6. Show backflow device(s) on plans as RPD. 137. Show all proposed utilities, storm water retention /detention systems and 50' perimeter contour elevations. ?S. Have the final site plan signed and sealed by a Professional Engineer registered in the State of Florida. ...139.0ther comments: PARKS AND RECREATION 1 ,l`• Pay the required Open Space and Recreation Assessment Fee with review by the Cle ater Parks and Recreation Department. 102. Note that the project is exempt from the City's Open Space and Recreation Assessment Fees. .:133.Other comments.. B.-..Before the City can issue BUILDING PERMITS, the applicant must complete the following actions: ENVIRONMENTAL MANAGEMENT 131: Furnish the SWFWMD permit to Clearwater Environmental Management. - 132. Acquire clearing and grubbing and tree removal permits or a no tree verification form from - Environmental Management. ?3...Provide drainage calculations. fl4. Other comments: ENGINEERING PLAN REVIEW __13 LObtain and furnish evidence of all applicable permits - from other governmental agencies including but not limited to: (a) FDOT permit for work within the right-of-way to Engineering Services; (b) Pinellas County Public Health Unit Permit, Ingress /Egress and a 10 foot Utility Easement over the proposed water mains up to and including meters, backflow prevention and hydrants. O2. Pay the sewer impact assessment fee, based on the size of the water meter with assistance in determining the fee from Central Permitting/Licensing specialists. r, ?3.Other comments: .C. Before the City can issue a CERTIFICATE OF OCCUPANCY, the applicant must complete the following actions: ZONING ? 1.Comments- TRAFFIC ENGINEERING O1. Pay the Transportation Impact Fee as called for by the Pinellas County Transportation Impact Fee Ordinance with assistance in determining the fee Irom the Clearwater Traffic Engineering Office. E32. Other comments: `EN G PLAN REVIEW/ ?1. Bring all substandard sidewalks and sidewalk ramps adjacent to or a part of the project up to standard, including ADA, and install sidewalk where none exists in the street right of way. ?2. Have the City install backflow prevention devices with the owner/applicant paying all -applicable fees. Visually screen the dumpster and provide gates with a minimum 12-foot dear opening to the - - front for access by Sofid Waste vehicles. ?4. Furnish as-builts and an. engineers certification to Engineering Services. ?5.Other comments: _ D. Complete the following actions as indicated: ZONING ? 1. Obtain the requisite building permits within one(1) year from the site plan certification date to .prevent expiration of the site plan certification. C72. Obtain the-requisite certificate(s) "of occupancy within three (3) years of the site plan .. ..:certification date to prevent-expiration of the site plan certification. 05. Obtain review of and permits for signs and fencing/walls through separate review and . permitting procedures. ?4..Other comments: DRCCOMWENTS052M DEVELOPMENT REVIEW COMMITTEE Central Permitting Department July 9, 1998 at 9:00 a.m. Conference Room 216 Standard review comments for BELCHER ROAD OFFICE (Formal review) 6? I Reviewed by:_? Department name: ja&-A G Nona Please return comments to Steve Doherty DRCC0MMEIVTS070998 ?410 A. Before the SITE PLAN can be certified, the applicant must complete the following action(s)checked below: ZONING L Show the.following on the-site plan: Q Legal description of the property. 0 Site area (square feet and acres). - ?North arrow. ? Number- of dwelling units and hotel units. proposed aad she resulting net density. ? boor area ratio. ? Property owners name, address and telephone number and the designated project representative name, address and telephone number. (and-fax numbers). ?Perimeter landscape buffer ?Parking formula calculation for each use. ?Locations of all driveways, parking areas and curb cuts. ? Delineation in mapped form and computation of the area of the site devoted to building coverage, -open space for the lot, open space f67 the front yard and. building coverage expressed in sq. & and as a percentage of the overall site. ?Location 'and screening of all refuse containers/compactors. ?Zoning assigned to the subject property and surrounding properties depicted on the plan. ?Identify and distinguish between the new and existing features on the site plan ?2. Identify changes to the site data table if this is a plan amendment. _ ?3. Submit a.completed.CONCURRENCY REVIEW application forxeview with required fee ZkShow all contiguous streets & roads. ?511splay the site address on the site plan, obtaining assistance as needed from the responsible Zoning Specialist in establishing the correct. address. ?6.J imit the site plan to one page. ?71egally record a Unity of Title for the project site and furnish proof of such action. -? .108Showthe.date(s)and condition(s) for approval of. (a) variance or.conditional use approvals by the Planning & Zoning Board or the Development Code Adjustment Board(s), or (b) a variance from the Flood Board for construction within 18 feet of a seawall. . ?9.Other comments: - FIRE DEPARTMENT D 1. Show on the flan a fire department connection a minimum of 15 ft. from the structure, adjacent to a paved drive and within 30 ft. of a fire hydrant assembly to provide for sprinklers. ?2. Locate on the plan minimum 20 Ft wide (a) FIRE LANE(S) on the N. E. S . W side of the structure beginning not closer to the structure than 10 feet. ?3. Show minimum turning radii for designated drives and fire lanes as 42 feet on the plan. .D4. Locate a FIRE HYDRANT ASSEMBLY on the plan not more than 300 feet from the :itructure_at. ?5. Other cgmm;nvr.• ,P TRAFFIC ENGINEERING 1. Show on the site plan the installation and maintenance of uniform traffic control devices at appropriate locations in accordance with the standards set forth by the Manual on Uniform Traffic Control Devices as. adopted by the Florida Department of Transportation under Rule 14.115.010, Florida Administrative Code. C32. Show applicable Florida Statute number for handicapped parking spaces. ?3. Show all striping, pavement markings, signage and traffic control devices on the site plan conforming to F.D.O.T. Standard Indexs-1995 edition and F.A.C. 14- 110 (no 4" striping is to be shown). C34. Show dimensions of aisles, parking stalls, entrances and measurements for like plan features on the plan. E35. Show all pavement markings, signage and traffic control devices on the site plan. ?6. Adjust handicap spaces to meet governmental standards with the correct handicap signs. M. Adjust parking stalls and/or driveways on the plan to the satisfaction of the Traffic Engineer. :. _.138. Indicate the location of lighting fixtures in the parking areas on the site plan. ' C19. Show A on-site lighting with 90-degree cutoffs directed away from abutting streets right-of- way and residential properties. D 10.Obtain a Significant Change of Use Determination from the FDOT per Florida Statute 335. 011. Execute a cross-parking/access easement linking the site with the site and specifying the exact number and location of the spaces that are to be jointly used by and between the sites after review and approval of the easement or - = agreement by the appropriate City Staff. 13 12 Address and resolve the need for right turn/left tum 'auxiliary lanes and the queuing for traffic related to the project. C313. Other-comments: EANVMCU MENTAL MANAGEMENT .131. Provide a copy of the SWFWMD permit application and calculations to Environmental ' Management. rZ Show all protected trees by size, species and location. I.a?T &g5 t ?POIT 6?l Ac t?cts L?a ?p KG0 Sw CoRat?c !!?S dkS?E G-cv?SEwl,?.re ?4- E33. Show total paved vehicular use area and total interior landscape areas expressed in square feet 2nnd as a Percentage of-the. overall site in the site plan data block. :¦ : Provide dimensions on the plan- for perimeter landscape buffers. (Excess Age-A. rs . sNaGSr.! Off cc Q6L.?> Reflect the use of raised curbs or protective timbers on the site plan where interior landscaped areas abut pavement. ;6. Depict all required parking lot interior areas on the plan by shading or cr ss-ha chin . ,?(co?I?aY ti?N - I??LNrorf ?c6.?Kuc ?x co? -- t?,,>ECcs¢Y? •(F?.MrnaL (? ( G21oR,. c.MtPS t C.+E.. (y R?4fR.F..O re oNe 04c4. 16 --r&Km Arop,•k @ fu W_ M S • 1?. [Qra"?4f"(t_ _ d7, Other comments: let ENGINEERING PLAN REVIEW 31. Show ADA ramps for sidewalks on the site plan. ?2. Complete-the Dumpster Requirement Form and return it to the City Solid Waste Department. D3. Add a note to the site plan stating "It is the rraponsibid y of the owner to mll the dumpster to a designated location at an assigned time as appmwd by the Solid Waste Supenntenden4 " . C34. State on the construction plan that the detector check should be DDCVA with the by-pass .-meter installed by the City with fee paid by contractor. ?5. State on the plan that the 6" fire line tap to the 6" City water line is to state "6x6 tap" so that City Utility Accounts will know what fee to bill the contractor. [36. Show backflow device(s) on plans as RPD. O7. Show all proposed utilities, storm water retention/detention systems and 50' perimeter contour elevations. [38. Have the final site plan signed and sealed by a Professional Engineer registered in the State of =. Florida. 139. Other comments: PARKS AND RECREATION 131. Pay the required Open Space and Recreation Assessment Fee with review by the Clearwater _ Parks and Recreation Department. 132. Note that the project is exempt from the City's Open Space and Recreation Assessment Fees. 133.Other comments: B..-._ Before the City can issue BUILDING. PERMITS, the applicant must complete the following actions: ENVIRONMENTAL MANAGEMENT O is Furnish the SWFWMD permit to Clearwater Environmental Management. 132. Acquire clearing and grubbing and tree removal permits or a no tree verification form from Environmental Management. D3..Provide drainage calculations. ?4. Other comments: ENGINEERING PLAN REVIEW L. Obtain and furnish evidence of all applicable permits-from other governmental agencies including but not limited to: (a) FDOT permit for work within the right-of-way to Engineering Services; (b) Pinellas County Public Health Unit Permit, Ingress/Egress and a 10 foot Utility Easement over the proposed water mains up to and including meters, backflow prevention and hydrants. 132. Pay the sewer impact assessment fee, based on the size of the water meter with assistance in determining the fee from Central Permitting/Licensing specialists. ?3.Other commcnts: C. Before the City can issue a CERTIFICATE OF OCCUPANCY, the applicant must complete the following actions: ZONING ? 1.Comments: TRAFFIC ENGINEERING • ? 1. Pay the Transportation Impact Fee as called for by the Pinellas County Transportation Impact Fee Ordinance with assistance in. determining the fee from the Clearwater Traffic Engineering Office. .132. Other comments: "ENGINEERING PLAN REVIEW ?1. Bring all substandard sidewalks and sidewalk ramps adjacent to or a part of the project up to standard, including ADA, and install sidewalk where none exists in the street right of way. ?2. Have the City install backflow prevention devices with the owner/applicant paying all applicable fees. ?iEl3. Visually screen the dumpster and provide gates with a minimum 12-foot dear opening to the - front for access by. Solid Waste vehicles. ?4. Furnish as-builts and an. engineers certification to Engineering Services. ?5.Other comments: D. complete the following actions as indicated: ZONING ? 1. Obtain the requisite building permits within one(1) year from the site plan certification date to .-prevent expiration of the site plan certification. ?2.Obtain the-requisite certificate(s) -of occupancy within three (3) years of the site plan certification date to prevent-expiration of the site plan certification. - ?3.Obtain review of and permits for signs and'fencing/walls through separate review and . permitting procedures. ?4..Other comments: MCCUMErM051198 1. r 4 )? 6 -10 -qq, a",* 131 DEVELOPMENT REVIEW COMMITTEE Central Permitting Department July 9, 1998 at 9:00 a.m. Conference Room 216 Standard review comments for v i BELCHER ROAD OFFICE (Formal review) Reviewed by: /?«T Department name: Please return comments to Steve Doherty DRCCOM14ENTS070998 A. Before the SITE PLAN can be certified, the applicant must complete the following action(s)checked below: j? ZONING (0 °70 G s I°o CC (?? << L?wv?Sc?4lrr? fG-?XI `o _ L 'Show the.following on the site plan: 2_ Q Legal description of the property. n Site area (square feet and acres}. '[North arrow. ? Number-of .dweUigunits and hotel units.propmed and she resulting net.density. ? Floor area ratio. [ Property owners name, address and telephone number and the designated project representative name, address and telephone number. (and. fax numbers). [Perimeter landscape buffer [Parking formula calculation. for each use. [Locations of all driveways, parking areas and curb cuts. [ Delineation in mapped form and computation of the area of the site devoted to building coverage, open space for the lot, open space for the front yard and building coverage expressed in sq. ft and as a percentage of the overall site. [Location *and screening of all refuse containers/compactors. [Zoning assigned to the subject property and -surrounding properties depicted on the plan. ?Identiand distinguish between the new and existing features on the site plan [2. Identify changes to the site data table if this is a plan amendment. ?3. Submit a completed .CONCURRENCY REVIEW application for.review with required fee M4.Shaw all contiguous streets & roads. _ y ?5.Display the site address on the site plan, obtaining assistance as needed from the responsible Zoning Specialist in establishing the correct- address. ?6.11mit the site plan to one page. ?71,egally record a Unity of Title for the project site and. furnish proof of such action. 08.5how the date(s) and condition(s) for approval of: (a) variance or conditional use approvals by the Planning & Zoning Board or the Development Code Adjustment Board(s), or (b) a variance from the Flood Board for construction within 18 feet of a seawall. .09. Other co.mmqnts: _ FIRE DEPARTMENT -131. Show an the' plan a fire department connection a minimum of 15 ft. from the structure, adjacent to a paved drive and within 30 ft. of a fire hydrant assembly to provide for sprinklers. ?2. Locate on the plan minimum 20 Ft wide (a) FIRE LANE(S) on the N__, E S___., W side of the structure beginning not closer to the structure than 10 feet. 133. Show minimum turning radii for designated drives and fire lanes as 42 feet on the plan. n4. Locate a FIRE HYDRANT ASSEMBLY on the plan not more than 300. feet from the ,1tructure-at ?5. 1her cgrnm4nt.. - r ?/ r V I TRAFFIC ENGINEERING 131. Show on the site plan the installation and maintenance of uniform traffic control devices at appropriate locations in accordance with the standards set forth by the Manual on Uniform Traffic Control Devices as. adopted by the Florida Department of Transportation under Rule 14.115.010, Florida Administrative Code. 02. Show applicable Florida Statute number for handicapped parking spaces. _03. Shaw all striping, pavement markings, signage and traffic control devices on the site plan conforming to - F.D.O.T. Standard Indexs-1995 edition and F.A.C. 14- 110 (no 4" striping is to be shown). [34. Show dimensions of aisles, parking stalls, entrances and measurements for like plan features on the plan. 135. Show all pavement markings, signage and traffic control devices on the site plan. 136. Adjust handicap spaces to meet governmental standards with the correct handicap signs. M Adjust parking stalls and/or driveways on the plan to the satisfaction of the Traffic Engineer. EX Indicate the location of lighting fixtures in the parking areas on the site plan. 09. Show all on-site lighting with 90-degree cutoffs directed away from abutting streets right-of- way and residential properties. C310. Obtain a Significant Change of Use Determination from the FDOT per Florida Statute 335. 0 11. Execute a cross-parking/access easement linking the site with the site and specifying the exact number and location of the spaces that are to be jointly used by and between the sites after review and approval of the easement or agreement by the appropriate City Staff. ..012. Address aad resolve the need for right turn/left tum auxiliary lanes and the queuing for traffic related to the project. 1313. Other-comments: E1ITYIR01WENTAL MANAGEMENT 1. Provide a copy of the SWFWMD permit application and calculations to Environmental Management. ?2 Show all protected trees by size, species and location. _ 133. Show total paved vehicular use area and total interior landscape areas expressed in square feet _-2nd as a percentage.of the overall site-in the site plan data block. -:34. Provide dimensions on the plan-for perimeter landscape buffers. ?5 Reflect the use of raised curbs or protective timbers on the site plan where interior landscaped areas abut pavement. D6. Depict all required parking lot interior areas on the plan by shading or cross-hatching. :. - 47, Other comments: P ENGINEERING PLAN REVIEW ? 1. Show ADA ramps for sidewalks on the site plan. 132. Complete the Dumpster Requirement Form and return it to the City Solid Waste Department. .03. Add a note to the site plan stating "It it the responsibihi i of the owner to mil the dumptter to a designated location at an assigned tune ar appmted by the Solid Waste Superintendent, " . ?4. State on the construction plan that the detector check should be DDCVA with the by-pass -meter installed by the City with fee paid by contractor. ?5. State on the plan that the 6'.' fire line tap to the 6" City water line is to state "6x6 tap" so that City Utility Accounts will know what fee to bill the contractor. ?6. Show backflow device(s) on plans as RPD. 137. Show all proposed utilities, storm water retention /detention systems and 50' perimeter contour elevations. ?8. Have the final site plan signed and sealed by a Professional Engineer registered in the State of Florida. .09. Other comments: PARKS AND RECREA TION 13 1. Pay the required Open Space and Recreation Assessment Fee with review by the Clearwater _ Parks and Recreation Department. D2. Note that the project is exempt from the City's Open Space and Recreation Assessment Fees. ?3.Other comments: B,- Before the City can issue BUILDING PERMITS, the applicant must complete the following actions: ENVIRONMENTAL MANAGEMENT 13 1. Furnish the SWFWMD permit to Clearwater Environmental Management. 132- Acquire clearing and grubbing and tree removal permits or a no tree verification form from Environmental Management. ?3...Provide drainage calculations. fl4. Other comments: ENGINEERING PLAN REVIEW _ 01..Obtain and furnish evidence of all applicable permits-from other governmental agencies including but not limited to: (a) FDOT permit for work within the right-of--way to Engineering Services; (b) Pinellas County Public Health Unit Permit, Ingress/Egress and a 10 foot Utility Easement over the proposed water mains up to and including meters, backflow prevention and hydrants. 02. Pay the sewer impact assessment fee, based on the size of the water meter with assistance in determining the fee from Central Permitting/Licensing specialists. F E33. Other corrimcrits: C. Before the City can issue a CERTIFICATE OF OCCUPANCY, the applicant must complete the following actions: ZONING CI1.Comments• TRAFFIC ENGINEERING E3 1. Pay the Transportation Impact Fee as called for by the Pinellas County Transportation Impact Fee Ordinance with assistance in. determining the fee from the Clearwater Traffic Engineering Office. 02. Other comments: -ENGINEERING PLAN REVIEW O1. Bring all substandard sidewalks and sidewalk ramps adjacent to or a part of the project up to -standard, including ADA, and install sidewalk where none exists in the street right of way. [32. Have the City install backflow prevention devices with the owner/applicant paying all applicable fees. Visually screen the dumpster and provide gates with a minimum 12-foot dear opening to the - - front for access by. Sofid Waste vehicles. [34. Furnish as-builts and an. engineers certification to Engineering Services. 135. Other comments: D. Complete the following actions as indicated: ZONING ?1.Obtain..the requisite building permits within one(1) year, from the site plan certification date to -. prevent expiration of the site plan certification. a2 Obtain the-requisite certificate(s)-of occupancy within three (3) years of the site plan .certification date to p=critexpiration of the site plan certification. ?3.Obtain review of and permits for signs and fencing/walls through separate review and . permitting procedures. [34, Other comments: DRCGOA41Er 13'052198 4} DEVELOPMENT REVIEW COMMITTEE Central Permitting Department July 9, 1998 at 9:00 a.m. Conference Room 216 Standard review comments for BELCHER ROAD OFFICE (Formal review) Reviewed by:.Iaip-? 9"A" Department name: Please return comments to Steve Doherty DRCCOA MENTS070998 f? .:? r A.. Before the SITE PLAN can be certified, the applicant must complete the following action(s)checked below: ZONING L Show the.fonowing on the site plan: ? Legal description of the property. 0 Site area (square feet and acres). - ONorth arrow. 0 Number. of dwelling units and hotel units.proposed aadshe resulting net density. ? boor area ratio. O Property owners name, address and telephone number and the designated project representative name, address and telephone number. (and. fax numbers). [Perimeter landscape buffer [Parking formula calculation for each use. [Locations of all driveways, parking areas and curb cuts. 0 Delineation in mapped form and computation of the area of the site devoted to building -.'coverage,-open space for the lot, open space fnrthe front yard and. building coverage expressed in sq. &.and as a percentage of the overall site. [Location *and screening of all refuse containers/compactors. [Zoning assigned to the subject property and surrounding properties depicted on the plan. [Identify and distinguish between the new and existing features on the site plan [2. Identify changes to the site data table if this is a plan amendment. 133. Submit a completed.CONCURRENCY REVIEW application for-review with required fee .134.Show all contiguous streets & roads. [S.Display the site address on the site plan, obtaining assistance as needed from the responsible Zoning Specialist in establishing the correct-address. 06 Imit the site plan to one page. 07 i-ily record a Unity of Title for the project site and famish proof of such action. DBShowe date(s) and condition(s) for approval of. (a) variance or conditional use approvals by the Planning & Zoning Board or the Development Code Adjustment Board(s), or (b) a variance from the Flood-.Board for construction within 18 feet of a seawall. E39. Other commqnts: FIRE DEPARTMENT n 1. Show on the elan a fire department connection a minimum of 15 ft. from the structure, adjacent to a paved drive and within 30 ft. of a fire hydrant assembly to provide for sprinklers. 02. Locate on the plan minimum 20 Ft wide (a) FIRE LANE(S) on the N E__, S___., W_ . side of the structure beginning not closer to the structure than 10 feet. 03. Show minimum turning radii for designated drives and fire lanes as 42 feet on the plan. L74. Locate a FIRE HYDRANT ASSEMBLY on the plan not more than 300 feet from the _ _ .. J"cture-at ?5.Other cgmmcnW. _J+ - : TRAFFIC ENGINEERING L _ ' . ?1. Show on the site plan the installation and maintenance of uniform traffic control devices at appropriate locations in accordance with the standards set forth by the Manual on Uniform Traffic Control Devices as. adopted by the Florida Department of Transportation under Rule 14.115.010, Florida Administrative Code. 132. Show applicable Florida Statute number for handicapped parking spaces. _03. Shaw all striping, pavement markings, signage and traffic control devices on the site plan conforming to F.D.O.T. Standard Indexs-1995 edition and F.A.C. 14- 110 (no 4" striping is to be shown). ?4. Show dimensions of aisles, parking stalls, entrances and measurements for like plan features on the plan. ?5. Show all pavement markings, signage and traffic control devices on the site plan. ?6. Adjust handicap spaces to meet governmental standards with the correct handicap signs. .07. Adjust parking stalls and/or driveways on the plan to the satisfaction of the Traffic Engineer. EX Indicate the location of lighting fixtures in the parking areas on the site plan. 139. Show all on-site lighting with 90-degree cutoffs directed away from abutting streets right-of- way and residential properties. D 10. Obtain a Significant Change. of Use Determination from the FDOT per Florida Statute 335. 1311. Execute a cross-parking/access easement linking the site with the site and specifying the exact number and location of the spaces that are to be jointly used by and between the sites after review and approval of the easement or agreement by the appropriate City Staff. ?12 Address aad resolve the need for right turn /lift tuxes ' auanriliary lanes and the queuing for traffic related to the project. P3. Other-comments: 51-mW cam- SZ&W_cA)?_ or.. S ke7 ?OaLa . ENVIRONMENTAL MANAGEMENT 01. Provide a copy of the SWFWMD permit application and calculations to Environmental Management. ?2. Show all protected trees by size, species and location. 03. Show total paved vehicular use area and total interior landscape areas expressed in square feet and as a percentage of the. ovrraB site in the site plan data block. 134. Provide dimensions on the plan-for perimeter landscape buffers. ?5 Reflect the use of raised curbs or protective timbers on the site plan where interior landscaped areas abut pavement. 06. Depict all required parking lot interior areas on the plan by shading or cross-hatching. :. _ 07, Other comments: .J ENGINEERING PLAN REVIEW 131. Show ADA ramps for sidewalks on the site plan. 132. Completethe Dumpster Requirement Form and return it to the City Solid Waste Department. M3. Add a note to the site plan stating "It it the responsibility of the owner to mll the dumptter to a designated location at an asrigned time as appmmd by the Solid Waste Superintendent. " . 134. State on the construction plan that the detector check should be DDCVA with the by-pass ....-meter installed by the City with fee paid by contractor. 135. State on the plan that the 6" fire line tap to the 6" City water line is to state "6x6 tap" so that City Utility Accounts will know what fee to bill the contractor. 136. Show backflow device(s) on plans as RPD. ?7. Show all proposed utilities, storm water retention /detention systems and 50' perimeter contour elevations. 138. Have the final site plan signed and sealed by a Professional Engineer registered in the State of Florida. 109 Other comments: KI.A a.us? ?? ,)err-a d1cc? , C?` S? ?r `e0tsi ?c°U?asac?. PARKS AND RECREATION ? 1. Pay the required Open Space and Recreation Assessment Fee with review by the Clearwater Parks and Recreation Department. 02. Note that the project is exempt from the City's Open Space and Recreation Assessment Fees. ?3.Other comments. _ . _. 8..._ Before the City can issue BUILDING PERMITS, the applicant must complete the . following actions: ENVIRONMENTAL MANAGEMENT O L Furnish the SWFWMD permit to Clearwater Environmental Management. _13Z Acquire clearing and grubbing and tree removal permits or a no tree verification form from Environmental Management. D3...Provide drainage calculations. fl4. Other comments: ENGINEERING PLAN REVIEW I., Obtain and finnish evidence of all. applicable permits • from other governmental agencies including but not limited to: (a) FDOT permit for work within the right-of-way to Engineering Services; (b) Pinellas County Public Health Unit Permit, Ingress/Egress and a 10 foot Utility Easement over the proposed water mains up to and including meters, backflow prevention and hydrants. ?2. Pay the sewer impact assessment fee, based on the size of the water meter with assistance in determining the fee from Central Permitting/Licensing specialists. ? 1;P •r 133.Other.commcnts: ?. Before the City can issue a CERTIFICATE OF OCCUPANCY, the applicant crust complete the following actions: ZONING 1.Comments: TRAFFIC ENGINEERING • E31. Pay the Transportation Impact Fee as called for by the Pinellas County Transportation Impact Fee Ordinance with assistance in. determining the fee from the Clearwater Traffic Engineering Office. _ 132. Other comments: "EN G PLAN REVIEW/ 13 1. Bring all substandard sidewalks and sidewalk ramps adjacent to or a part of the project up to standard, including ADA, and install sidewalk where none exists in the street right of way. [32. Have the City install backflow prevention devices with the owner/applicant paying all -applicable fees. ?M Visually screen the dumpster and provide gates with a minimum 12-foot dear opening to the - - front for access by Solid Waste vehicles. 04. Furnish as-builts and an. engineers certification to Engineering Services. O5.Other comments: D. complete the following actions as indicated: ZONING 01.Obtain, the requisite building permits within one(1) year from the site plan certification date to --'prevent expiration of the site plan certification. E12 Obtain the-requisite certificate(s) -of occupancy within three (3) years of the site plan -certification date to prevent-expiration of the site plan certification. - ?3.Obtain review of and permits for signs and'fencing/walls through separate review and . permitting procedures. 04.. Other comments: MCCOADWO S05?198 `i DEVELOPMENT REVIEW COMMITTEE Central Permitting Department July 9, 1998 at 9:00 a.m. Conference Room 216 Standard review comments for BELCHER ROAD OFFICE (Formal review) Reviewed by:?f? Department name: Please return comments to Steve Doherty DRCCOA MENTS070998 A. Before the SITE PLAN can be certified, the applicant must complete the following action(s)checked below: ZONING 1. ? Show the.following on the.site plan- 0 Legal description of the property. O Site area (square feet and acres).. ONorth avow. 0 Number- of dwelling units .and hotel units-proposed and-the resulting net density. O Floor area ratio. O Property owner's name, address and telephone number and the designated project representative name, address and telephone number. (and. fax numbers). OPerimeter landscape buffer OParking formula calculation for each use. OLocations of all driveways, parking areas and curb cuts. 0 Delineation in mapped form and computation of the area of the site devoted to building :coverage, -open space for the lot, open space for_the.front yard and building coverage expressed in sq. &.and as. a percentage of the overall site. OLocation *and screening of all refuse containers /compactors. OZoning assigned-to the subject property and surrounding properties depicted on the plan. OIdenti and distinguish between the new and existing features on the site plan O2. Identify changes to the site data table if this is a plan amendment. 03. Submit a completed d-CONCURRENCY REVIEW application for review with required fee n4.Shaw all contiguous streets & roads. 13 5.Display the site address on the site plan, obtaining assistance as needed from the responsible Zoning Specialist in establishing the correct-address. 13611mit the site plan to one page. 071;egally record a Unity of Title for the. projectsite and. furnish proof of such action. D8Show t3te-date(s) and condition(s) for approval of (a) variance or..conditional use approvals by the Planning & Zoning Board or the Development Code Adjustment Board(s), or (b) a variance from the Flood Board for construction within 18 feet of a seawall. _ .139. Other comments: - ---FIRE DEPARTMENT :Ili. Show on the-plan a fire department.connection aminimum of 15 ft. from the structure, adjacent to a paved drive and within 30 ft. of a fire hydrant assembly to provide for sprinklers. 02. Locate on the plan minimum 20 Ft wide (a) FIRE LANE(S) on the N. E____. S. W side of the structure beginning not closer to the structure than 10 feet. 133. Show minimum turning radii for designated drives and fire lanes as 42 feet on the plan. .04. Locate a FIRE HYDRANT ASSEMBLY on the plan not more than 300 feet from the _ Atructure_ 05. Other cgrmlm " .4 e TRAFFIC ENGINEERING 4 ?1. Show on the site plan -the installation and maintenance of uniform traffic control devices at appropriate locations in accordance with the standards set forth by the Manual on Uniform Traffic Control Devices as-adopted by the Florida Department of Transportation under Rule 14.115.010, Florida Administrative Code. ?2. Show applicable Florida Statute number for handicapped parking spaces. -M. Shaw all -striping, pavement markings, signage and traffic control devices on the site plan conforming to F.D.O.T. Standard Indexs-1995 edition and F.A.C. 14- 110 (no 4" striping is to be shown). ?4. Show dimensions of aisles, parking stalls, entrances and measurements for like plan features on the plan. ?5. Show all pavement markings, signage and traffic control devices on the site plan. ?6. Adjust handicap spaces to meet governmental standards with the correct handicap signs. 137 Adjust parking stalls and/or driveways on the plan to the satisfaction of.the Traffic-Engineer. ?8. Indicate the location of lighting fixtures in the-parking areas on the site plan. 09. Show all on-site lighting with 90-degree cutoffs directed away from abutting streets right-of- way and residential properties. ?10.Obtain a Significant Change of Use Determination from the FDOT per Florida Statute 335. ?11. Execute a cross-parking/access easement linking the site with the site and specifying the exact number and location of the spaces that are to be jointly used by and between the sites after review and approval of the easement or agreement by the appropriate City Staff. [312. Address and resolve the need for right turn/left tum ' auxiliary lanes and the queuing for traffic related to the project. ? 13.Other comments: ENVIRONMENTAL MANAGEMENT ?i..Provide a copy of the SWFWMD permit application and calculations to Environmental Management. ?Z Show all protected trees by size, species and location. ?3. Show total paved vehicular use area and total interior landscape areas expressed in-square feet -2nd as apercentage.of the overall site-in the site plan data.block. 34. Provide dimensions on the plan-for perimeter landscape buffers. ?5 Reflect the use of raised curbs or protective timbers on the site plan where interior landscaped areas abut pavement. 06. Depict all required parking lot interior areas on the plan by shading or cross-hatching. ?7, Qxher comments: _ J ENGINEERING PLAN REVIEW ? 1. Show ADA ramps for sidewalks on the site plan. ?2. Complete-the Dumpster Requirement Form and return it to the City Solid Waste Department. M. Add a note to the site plan stating "It is the responsibility of the owner to mll the dumpster to a designated location at an assigned time as appror ed by the Solid Waste Superintendent. " . ?4. State on the construction plan that the detector check should be DDCVA with the by-pass -.meter installed by the City with fee paid by contractor. _ ?5: State on the plan that the 6" fire line tap to the 6" City water line is to state "6x6 tap" so that City Utility Accounts will know what fee to bill the contractor. ?6. Show backflow device(s) on plans as RPD. ?7. Show all proposed utilities, storm water retention /detention systems and 50' perimeter contour elevations. ?8. Have the final site plan signed and sealed by a Professional Engineer registered in the State of Florida. D9 i0ther comments: PARKS AND RECREATION ? 1. Pay the required Open Space and Recreation Assessment Fee with review by the Clearwater Parks and Recreation Department. I32. Note that the project is exempt -from the City's Open Space and Recreation Assessment Fees. ?3.Other comments; : B,.-Before the City can issue BUILDING ARMITS, the applicant must complete the following actions: ENVIRONMENTAL MANAGEMENT ?i: Furnish the SWFWMD permit to Clearwater Environmental Management. 132. Acquire clearing and grubbing and tree removal permits or a no tree verification form from - Environmental Management. ?3...Provide drainage calculations. fl4. Other comments: ENGINEERING PLAN REVIEW -0I-Obtain and furnish. evidence of aff applicable permits-from other governmental agencies including but not limited to: _(a) FDOT permit for work within the right-of-way to Engineering Services; (b) Pinellas County Public Health Unit Permit, Ingress /Egress and a 10 foot Utility Easement over the proposed water mains up to and including meters, backflow prevention and hydrants. ?2. Pay the sewer impact assessment fee, based on the size of the water meter with assistance in determining the fee from Central Permitting/Licensing specialists. Y' ` V [33. Other comments: C. Before the City can issue a CERTIFICATE OF OCCUPANCY, the applicant must complete the following actions: ZONING 01.Comments: TRAFFIC ENGINEERING 13 1. Pay die Transportation Impact Fee as called for by the Pinellas County Transportation Impart Fee Ordinance with assistance in. determining the fee from the.Clearwater Traffic Engineering. Office. 02.Other comments: "ENGINEERING PLAN REVIEW 01. Bring al] substandard sidewalks and sidewalk ramps adjacent to or a part of the project up to standard, including ADA, and install sidewalk where none exists in the street right of way. 02. Have the City install backflow prevention devices with the owner/applicant paying all -applicable fees. ?£]3. Yisualiy screen the dumpster and provide gates with a minimum 12-foot clear opening to the front for access by. Sord Waste vehicles. .134' Furnish as-builts and an. engineers certification to Engineering Services. 135. Other comments: D. Complete the following actions as indicated: ZONING 131. Obtain. the requisite building permits within one(1) year from the site plan certification date to -prevent expiration of the site plan certification. 02 Obtain the-requisite certificate(s) -of occupancy within three (3) years of the site plan _ -certification date to prevent-expiration of the site plan certification. 01 Obtain review of and permits for signs and'fencing/walls through separate review and permitting procedures. E34, Other comments- DRM AIIIEMT052198 JUL-02-1998 08 02 f w ¦ AVID ENGINEERING, INC. 2708 Alternate US 19 North, Suite 604 Palm Harbor, FL 34683 Ph (8131789-9500/ Fax (813) 784-6662 TO: COMPANY: FAX NO: FROM: SUBJECT: AEI JOB NO.: P.01 FAX TRANSMITTAL Steve Doherty City of Clearwater (727) 562-4576 Samer Ghafari, E. i. Project Engineer Application and letter of Authorization J U L - 21998 CENTRAL PERMITTING CITY OF CLEARWATER 277001.00 R -0 DATE: y _ June 10, 1998 1 Number of pages, including this cover sheet : 2 MESSAGE: As requested. In case of problems receiving this transmission, please call sender at (813) 789-9500- W3 11SYM00027700110aarapp_00C JUL-02-1998 09:02 P.02 I T ?C?.Ip? Y OF CLMWATM s CEi aa?+++ pERMITMG DEPM i ME W 140 SO. MYRTLE AVE, Z"° BZAOR CLE"WATM FWRMA 34616 PHONE (813)4964567 FAX (813) 5624576 APPLICATI FOR 1TE R MAN SEW JUL-02-1999 09:03 X P.03 Your fiikp fee for this 5Re plan Review is i Please submit VM amounl v#A this completed apptieOOrl. The apPAc*K by %ng go Fpgc9uOn agrees to comply wdh Sections 43.21 Of title CWS Land DeWCpment Cade. THAT SECTION ATrACHM FOR YOUR INFORMOMON AND CONFLYOCE. SiOnMm10wner of Record- -If the b tion is signed by an individual other than the pmpe ff owner (e.g. Ins mMwnum e), please attvcf? ant signed by the PMP" Owner authoriting thus in"U61 w sign One apptics W, WITH THE NORTH Ap.RM TO THE TOP OF THE PAGE- 1) THE $tTE PLANS MUST BE DRAWN a) THE SITE PLANS MAT BE FOL TO NO LARGER THAN r x 3r. 3) SITE PLAN tt+ummrMD GWYJLO BE LIMITED. TO ONE PAGE w AT ALL POSSIBLE. 41 SUBMIT 15 COPIES OF THE SITE PLAN FOR REVIEW WITH THIS APPLICATION. E ?1oaosn SrFonn - Aogtc+aor? ror she P+N+ iicvir.+n • Zxis+?n 1 JUL-02-1998 08=03 P.04 rJuV,?.02-96 O3;PP_P ALVAREZ MOMES 8693433 P_pZ ... rJ-?.. lh•t:i J Monday. lime 29, 1998 To Whom h may Concern Ties 14rv &a auf um V,* ii m" w&* AKd F g+B. k- . to ect as oar 4801 for and with ril r. , eavaciet, dmmu= t and their paswuNA fox *9 Gty of Cleatwetar. P+ndlis lauUty. seu6wW Flatj& Waeot Mangy lama, Fl n& Daps of F.nvirasnMW Protection ae?d *9 Pianda DePOMMM of Tr. Pift9 t Cowry He*W URit. in 60 effort to r@mve "I mWm,vlf nesasiw lbr ** wwamcdon aid devdopmatt of a PMQ!crd site. profeetNaroe = Bever)Wa--OVksS!tE, Ckoweter,-a7eAda Signe : ? ...e.-- 'J? eZ Print NOW. Address - swam round NowibedWore Mg. Ms. ? day v1?V??---- 19?. Norwry Pwbier Swie oI ?7ortda my Conria sdim Edpres: ?i+a>sc aA41t TOli-L r-: TOTAL P.04 AVID ENGINEERING, INC. Civil Engineers - Planners Traffic Engineers - Environmental Engineers Key West Professional Center 2708 Alternate U.S. 19 North, Suite 604 Palm Harbor, Florida 34683 Phone (813) 789-9500 Fax (813) 784-6662 TO ?« 1 J O l? 4A ? Regular Mail (A Other off 'firallMOME (R DATE 4,7?-1 O 1 c7 JOBNO.z-77? 1`•2,00 L ATTENTION e e Ise RE Cc r f WE ARE SENDING YOU ? Attached ? Under separate cover via the following items: ? Shop drawings ? Prints Plans ? Samples i - ? Specifications ? Copy of letter ? Change order COPIES /` 6^ DATE iNO: DESCRIPTION i 1 r 2-? / C}>P/tLi / Jp 7 11 A T Y1// AJ THESE ARE TRANSMITTED as checked below: For approval 7 Approved as submitted Resubmit copies for approval 1 For your use Approved as noted Submit copies for distribution' E As requested ::. Returned for corrections Return corrected prints rl For'review 'and comment C FORBIDS DUE 19 IJ`PRINTS RETURNED AFTER LOAN TO US j ©ro ie-c-1 REMARKS jo ce6 i.sb O l < .?'?'"7c 1?w hf-411cl j o •?1 ??' C1r?'iCc 9 ++ d&*C' . ?? 'fofia rp f bul ?G is ti i's 160 0U 5I- 4/ /'4' 1, ILF/ ooo l E o:s C bl e et recce- ?g :51,4-e Q/a to D t l?[I?S MM -fGce- 6 li re4 P r k?"?A ??-sC? S- j ;; &v ne e d o Y' "a \ec vlm 'lce . V -j SIeilGi CA.fl 11-e Q +(,W- spoo as L4 R -- Ali 0 COPYTO SIGNED: erg Ca kluz If enclosures are not as noted, kindly notify us at once. PLATS 350.00 TOTE. 350.00 CHCK 350.00 Z-922 40:28J N.26 "9°CHNG .Oil LINE 05 el, CLEAn„vA i L R TGTL ti50.00 0790 10:2S A v . "I TY CLEAN uVP j ER v Llt?ln2 ww l ;; w1.i0„00 i j j.00 0 0, CIO t ri d::; n LA' ? rr 24 PLATS 100.00 TOTL 1CiC.00 CHCK 100.00 Liar 05 .4~.-,r.. . r R1-1 f~ LOCATION ~ ZONING MAP II ~ rA I I SOP SIGN r ii f l , II pl r r A f ICI I I ~r r li. II r ~ I I r r / ~ ~i` _ ~ ~ i ~ r~ \ II II r~ ~ r 1 1 I r f' r (Q q ~ ~ ~ ~ ~A~:1 ~ I I f I I I r r / rf~~,l ur I f i A4 I f'1 F, U ~ I I I I , f r r " ~ ~ n II , d r r r f w ~ a I I >II ,r r r ,r ti o ~ IQ ~ -t C? , tit R25' ? , ~ h a ~ ~ r' rs ~ 11 I I ~ r r ~ r . y' ~ ~ ~ z I I 1 ~ r r F,. 112,,,, i I / , , ~ !S! 1 I < \ \ r r r 2~ ~z.2o v, ~ i I ~ r ,r :.y ® I I it ° f ~ I , r ® I I ~ ..l / 4 , ~ ! C ~ r r r - ? ~ II ~ r ~2: ~ II ~ \ r 12: SCALE: 1" = 20' N G~ ~ L r r P ~ II fl ~ r ~0 a SHARKEY RD I ( i', r ~ II I ' . y ti p ' ~ EXTERIOR BUFFER ro r` ti• ~ I I ' ~ a ~ II r r r ~z.s4 , ~ ~w N,II v w I I I I r r ~ ~ Tz:'~ . I ~ r LEGAL DESCRIPTION o ~ I{ I r'' rf I I I r ~ r w I I I I n % ~ e r m I i I r r LEGAL DESCRIPTION : ~n * N ca Z I ~ ~ r / / 5~ zo a I I A I r` ~ r r 7a:• I I a r , ~ BOUNDARY SURVEY OF A PORTION OF THE TRINTY BAPTIST CHURCH ° N - o z N a I I ~ r~ r" ~ r u ,v r , 1 PROPERTY 1N THE NW 1/4 OF THE SW 1/4 OF SECTION 7, TOWNSHIP 29 S, a z s,;; ~1q RANGE 1fi E o ~ ~ I I I I I 1 S~LGR~D y. ~ ~ ~ a I R , r ~ ~ i I ,,r , ,r / 72.60 P ~~z `2?. COMMENCE AT THE SE CORNER OF THE NW 1/4 OF THE SW l/4 OF SEGTION 7, a a "'•~:~Ni HANDICAP PARKING I I ~ G ' TOWNSHIP 295, RANGE 18 E, AND RUN N 04' 12'32" E, 33.07 FEEL TO A POINT ~ w' ~ va~ !?;~~w .1 / • / / tx C~ r/ d ~ 1y 1~~ ON THE NORTHERLY RIGHT-OF-WAY LINE OF COUNTY ROAD 289 (SHARXEY ROAD); ~ ° r ~ RUN THENCE N 89'38'49" W, ALONG SAID NORTHERLY RIGHT-OF-WAY LINE m z r o " ` PROPOSED DRAINAGE INLET I I Il ~ I I ~ v ~ r i ~ 1~. R ~ 995.26 FEET FOR A POINT OF BEGINNING; -RUN THENCE N 89'38'49" W CONTINUING z' : ; r, ~ 2 r r ' ^ ; PROPOSED CURB I( n V r , R2_~_~ 1~ ALONG SAID NORTHERLY RIGHT-OF-WAY LINE 262.16 FEET TO A POINT ON THE z ~ ~y ~ ~;YJ EASTERLY RIGHT-OF-WAY UNE OF BELCHER ROAD; RUN THENCE N 00°01'19" E, ~ ~ o~~~.; , .~p~ c, r ~9 ~ < 1~., , 1 ~ ; , ~ Q, 1~~ ALONG SAID EASTERLY RIGHT-OF-WAY UNE 159.19 FEET TO A POINT ON THE ~ o f3', tl ~ ~ SITE BOUNDARY LINE ~ r ~ ~ ~ ` Q' ~ SOUTHERLY RIGHT OF-WAY LINE OF N.f COACHMAN ROAD (COUNTY ROAD N0, 2); cn ~ w ~ ~ ~ ts' I ' r;~'' ~ RUN THENCE N 53°53'23" E ALONG SAID SOUTHERLY RIGHT-OF-WAY UNE 230.00 ~ ® - 1ti1 W~ FEET; RUN THENCE S 2T00'16" E 168.49 FEET, RUNS 00°05'16" W 146,23 TO TH a ~ ~ ~ - CENTER LINE OF ROAD ~ 1 ~ , , ~ . a "c- POINT OF BEGINNING. ~ g . , ~ ~ ~ ~ a 1~. RIGHT--OF-WAY f ~ ~ CONTAINING 1,358 ACRES MORE OR LESS wo p v z Q / ,p~ ~ ~ J ~9. ~ m 72, 85 CP EXISTING EDGE OF PAVEMENT / O ; , ~ ~J 5F s. S 2 5" 4 ~ 1~ ~ NOTE.• ELEVATJONS ARE BASED ON 1929 DATUM. / / ~ , 7?.8 0 1 1"'' o ~ ~ , m .,.o 1 6 p.; PROPOSED CONCRETE PAVEMENT ; I a' : U ~ I ~ TYP TYPICAL ~ , , ~y, r I ~ 1 1 1 ~ 1g 4~, u ~ ~ a ti~ 73 ~ HC HANDICAP •r ~ o . ' r I , , r 8 Cry. , 07~ ~y U ~ ra ~ ~ b ~ ~H~aDp. r ~ / 1 ~ " ' ~ REOUIRED q ~ u ~ r' 10 10 PARKING SPACES ' > y O ~ SITE DATA PROPOSED (MIN. OR MAX.) w ~ m ~ w o s ~ ZONING DISTRICT: OL pL S/W SIDEWALK A, ,r~ ,.!r ~ i ~`L a G~ r I ~ p as a,~A~ Cn ~ ~ ~ A R5 0 RADIUS G I I ~ "'~1 ~ ~ USE. GENERAL OFFICE OFFICE ~ ~ v / ~'r , ~ f ~ % ~ ~ r.- I I ~ '~h ~s, / ~ ~ ' 3" LOT AREA (SO. FEET) 59,182 SF ~ ~ x w R ~ ,~;r ' ` r ,,;y a a LF LINEAR FEET r,~''~,r ~ ~V I I ~ ~a a<. `1 ~ ~ ~ 4 , ~ GROSS AREA (WITHIN PROPERTY LINES) 1.38 AC. 8,000 SF ~ ~ ~ ~ ~ r r/ r 1 1 ' ~ 1~ ~j ss NET AREA (GROSS MINUS 8% MAX. 54,447 SF ~ ~*'p ~ FOR VEHICULAR ACCESSWAYS) 1,25 AC. N/A ~ ~ ~ ~ SQUARE FEET r / ~ 73.7 . ' ~4, LOT WIDTH: 159 BO I a~ ~ F a I I e® e~ MITERED END SECTION f ` ~ir~ ~1 >0 ' ~ Yx~ m.~ I I LOT DEPTH: ~ 282. 85 ` n ~ DIRECTIONAL ARROW sir ~ ~ I F srppy R as DENSITY (B'ASED ON NET ACRES): N/A N/q I I y , 2 S TO R Y 1 3'7S~ BUILDING COVERAGE (SQ, FT. AND 7,99t, SF c h f,. _ _ ~ e' _ ~ . _ ~ 2 ~5 ~l 0 ~ ~ % OF GROSS SITE): 13.5% 30% q'1~?, v+ 1 ` 1`~ _ , ~ , , ~ ~ 19~ BUILDING ~ GROSS FLOOR AREA .AND F.A.R.: 0.27 FAR U.3 FAH Max ur a r` k SETBACKS: 1 6,0 0 0 S F ~ , ; .E ~ : '~f' ~ ~ FRONT: ~ 65,0' FROM RAW 25' FROM R/1Y ~ ~ o f r ' 1.~ ®e~ 1 4,4 0 0 S F LEASABLE ~ I F.F.EL 75.0 6 , ' 1 ~ ~ SIDEc ' ~ s5.o2' /65.0' 10' B,~.I ~ ~ ~ ~ ~ ~ p,'` ~ • r 11 1 1 1b' iw 1 1~, n~ , , 1 ~ , ~ REAR: 53.76' 15' a~i I 11 ° 1 ' I r~\ a ~ ~ ~ I~'`, ~ ~ ~ + N BETWEEN STRUCTURES: N/A 20' Min. ` j ~ I , ~ 13 ~ k~ ~ I i i I l i ~ C ;~~r ( I I o A,,r , ~ ~ i sn v, ~ r. HEIGHT: C) 4! g 30' 30' MAX R) ~ PAVED VEHICULAR AREAS 28,470 SF N/A a° ,r" I I I I l ~ g' ~ f s~ q ~ _ 'y ~ in (SO. FT. AND X OF SITE): 44.7% ~ ~ 1~' 1~' t~' 1A' ~ r. ~ ~ II ~ 1 ~ 1 ~'I 4 s~ Q.. 1~~ ~ OPEN SPACE 2Q740 SF d f ~ I TRASH .TOTAL FOR .THE LOT 35% 30X MiN ASH DRY BASIN GRASSED ~ (sQ. FT, ANa % of sITE) I d , ENCLOSUR OSURE ~ Q FOR THE FRONT YARD UTILITY COMPANI,E5 ~I a, F p C , lp', i I -•~U'llLr o e. e,. TDB. EL74.00 7903sf ® (SO. FT, AND % OF REO'D. FRONT YARD): 59% 55% MIN. ~ I z WATER AND SEWER TELEPHONE I ( n ti . w I h ~j~ h BQTT. EL. 70.00 3723sf Q CLEAR SPACE (WATERFRONT PROPERTY); N/A N/A ~ ~ EXTERIOR PERIMETER BUFFERS: 1 ' qTY OF CLEARWATER GENERAL TELEPHONE I I 1~. 1 ak ~~ti . I C» ~ 100 S. MYRTLE AVE. X224 126D E. CLEVELAND 5T. 2 FRONT 10' FRONT 1~~ 1~5 ~ o, 3' RE R 3' REAR I CLEARWATER, FLORIDA 34696-5520 CLEARWATER, FLORIDA 34695 ( ( ' CONTACT: MR. BOB PERKINS CONTACT: SID HORN i ~ r I I a PARKING l0T INTERIOR LAN05CAPING I I I , - ti~ ~ U (S0. FT. AND % OF PAVED VEHICULAR 2,254 SF 1,567 Sf AREAS): 6.52% B.00% cA5 E ~J I ~ ~ , ELECTRIC I i I I ~ ~ CLEARWATER GA5 COMPANY FLORIDA POWER CORP. ~ ~p ~ Q~ 4~ ~ FOUNDATION LANDSCAPING 1,579 SF 0.00 S'F' 400 N. MYRTLE AVE. 2166 PALMETTO ST. I J w I I 1 w ~ ~ ~ y~ CLEARWATER, FLORIDA 34615 CLEARWATER, FLORIDA 34625 ~ I ~ `1' , . r, 1B .RCP CONTACT: KELLY O'BRIEN CONTACT: KERRY CONVERSANO LLJ ~ 1 :`U 1~6 1 ~ PARKING: 85 65 (4.5/1000 SF OF GROS „ ,1~ ~'h I~• 3 H,C. SPACES LEASdBLE FLOOR AREA) I ~ I 1 1~. ~ 1y 1, i T ~ '4 - I I ~ CABLE I ( lyl q i r t,~. , TIME WARNER V ~ I I I 3 11504 9TH ST. N. I I I 10" xl ST. PETERSBURG FLORIDA 33716 W , I ( ~ .CONTACT. BOB WHITACAR i ~y Y, i ~ , ~ 1, ~ I , ~ *s ° . 1 a ~w ~n:~ 1~45~ ~ b1 I`~Q T E . +d ~ AS PART OF THE CONSTRUCTION PLANS OF THIS PRO~CT, SHARKEY ROAD I ( J1 .l, r'. s:, A.`c,p.• b 'y®°? j'.e; r 7S "®.r.r,. tim .te~ ~y ~ ( I 'I .0. a,t. a„® r ..F~ y ®i y ®®Y. t;. °R+b K.. ®tr.~',+/°. 24 r • ~ I ~ I . ~ o.. "JW 161?~, TO BE WIDENED TO 15 FT HALF OF R-O-W PAVEMENT WITH A RURAL SECTION, I . ~ ' t r N. ~9 39 16 'W. 262e 16 M I I ~P .,i:.~+ ° tit a I c PROPO 146 LF. PROPOSED 1-1 2° ~I GENERA I ~ ° ~ L NOTES ~ 4 WIDE C4N WATER METER & C} C, 2~r I 1 ~ `L SIDEWALK, 1° VALVE t. ALL ELEVATIONS REFER TO THE NATIONAL GEODERC VERTICAL DATUM. 9. WATER LINES ARE TO BE ADJUSTED IN ORDER TO RESOLVE I + R1 - 1 ~ PROPOSED 9S L,F. CONFLICTS WITH SANITARY SEWER, STORM SEWER AND UNDERDRAIN. INS-,5C G9r-- THE ROW. LINE . 2. LOCATIONS, ELEVATIONS, AND DIMENSIONS OF EXISTING UTILTlES, STOP SIGN 4' WIDE CONC. ~ STRUCTURES, ANp OTHER FEATURES ARE SHOWN AGOORDING TO THE t0. RAISEO CURBS ARE TO BE CONSTRUCTED WHERE PAVEMENT ABUTS ~ 6 6 BEST INFORMATION AVAILABLE AT THE 11ME OF PREPARATION OF TNESE INTERIOR LANDSCAPED AREAS. EX. H~~ WM 5 6 SIDEWALK ~ PLANS. THE CONTRACTOR SHALL VERIFY THE LOCATION, ELEVATIONS, ~ 4 = ~ ~~9 - 1 ~ EX. 8" WM~ - ti ~ fEANRESNAFFECTG THIS WQRKGPRTILITITS, STRUCTURES AND OTHER It. ALL EXISTING BUILDINGS AND STRUCTURES ARE TO 9E REMOVED O _O _ __O.._ .e.._; _ . _r _ 1._ OR 0 CONSTRUCTION. AS PER DEMOLIITON PLAN TO BE SUBMITTED SEPARATELY. 1q ,~h A~ a ~b hb ,Lk ry~. ry1. 11 EX SWALE TO BE REGRADED TO 1.5' DEEP 1 1 1 1ti• 1~• 1~. 1 1ti 1 1~. 1`l 7`~ 7 ~ ~Iti 1 ~ti• 1`~ ,~T~ a 3. 1HE CONTRACTOR MAIL CHECK PLANS FGR CONFLICTS AND 12. ALL UNDERGROUND U1TLTIES ARE TO BE CONSTRUCTED PRIOR ~ DISCREPANCIES PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL TO PAVEMENT CONSTRUCTTON, j NOTIFY THE OWNER'S ENGINEER OF ANY CONFLICT BEFORE PERFORMING h ~ ANY WORK IN THE AFFECTED AREA. 13. LANDSCAPING PLAN tMLL AE PREPARED AY A LICENSED LANDSCAPE 1~ 1,• T. y "--~~1 X20 ~-.°-.~~1•- krr-- I',~ ARCHITECT IN ACCORDANCE W1TH SECTION 42.27 OF THE CITY OF 1 1 1 rye' 1~ 1`~ 11 ~ 4. THE CONTRACTOR SHALL EXERgSE EXTREME CAUTION IN AREAS OF GLEARWATER LAND DEVELOPMENT CODE. ~ti. ~T. I~. ~ BURIED UTILITIES AND SHALL PROWIDE AT LEAST 46 HOURS NOTICE TO J ,Y A ' THE VARIOUS UTILITY COMPANIES IN ORDER TO PERMIT MARKING THE 14. A 5' MINIMUM BUFFER VAIL BE MAINTAINED BETWEEN PAVING LOCATIONS OF EXISTING UNDERGROUND UTILITIES IN ADVANCE 4F AND PROPERTY LINES. - - - - . - _ _ _ _ _ _ . GONSTRUCTiON, BY CALLING SUNSHINE AT i-BOO-432-4700. _ 15. EFFORT SHALL BE TAKEN DURING CONSTRUCRON 70 PREVENT ~ p W _ . _ _ . _ _ _ _ ~ 5. THE CONTRACTOR SHALL STABILIZE THE AFFECTED AREA USING AND CONTROL EROSION AND TRANSPORT Of SEDIMENT TO SURFACE INTERIOR LANDSCAPING S Y M B D L L E G E N SPRINKLING, IRRIGATION OR OTNER ACCEPTABLE METHOD TO CONTROL DRAINS AS SPECIFlED BY THE qTY OF CLEARWATER EROSON AND FUgTIVE DUST 4RIgNAl1NG FROM THIS PROJECT. SILTAITCN CONTROL POLICY. 6. ALL MATERIALS AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH 16. LUMINAIRES OF LIGHT POLES LOCATED IN LANDSCAPE AREAS PINE TR THE LA r EE TES CITY OF CLEARWATER STANDARDS AND SPEgFlCAT10N5. ARE TO BE POINTED DOWN, 57 u, nu ale „Hunan rn ue,r n,. e..-..,.,-> ........................e... CVTCDIIID DCDIIlr9'rn ni ~rrrnr+ r. ru.s. vi. wig uvn,nvV IV rrnvC aU UCWtCC WIUPPZI UIMUICU AWAT IGRIUR rr-mmr jr-R DurrCR7 7. BACKFILL MATERIAL SHALL BE SOLIDLY TAMPED AROUND PIPES IN 6° FROM ABUTTING STREETS RIGHT-OF-WAY AND RESIDENTIAL PROPERTIES. LAYERS UP TO A LEVEL OF AT LEAST ONE FOOT ABOVE THE TOP OF THE PIPE. IN AREAS TO BE PAVED, BACKFILL SHALL BE COMPACTED iB NO TREE REMOVAL OR LAND ALTERATION SHALL TAKE PLACE ® DUPLICATE COPY TO I00~ MAXIMUM DENSITY AS DETERMINED BY AASHTO T-99. UNTIL A PERMIT HAS BEEN ISSUED BY THE CITY OF CLEARWATER. OAK TREE ® PRELIMINARY S THE CONTRACTOR IS TO EXERCISE EXTREME CAUTION IN THE 8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PENALTIES AND/OR VICINITY OF TREES TO REMAIN AND IS RESPONSIBLE FOR ANY N FINES ARISING FROM WORK THAT IS NOT IN ACCORDANCE WITH DAMAGE RESULTING FROM HIS WORK OR ANY MOLA11ON OF FOUNDATION LANDSCAPING PERMIT CONDITIONS. CITY OF CLEARWATER CODES. ® FOR REVIEW ONLY E E TO BE REMOVED 19, SIGN PERMITS WILL BE OBTAINED SEPARATELY. TREES ® ISSUED FOR BIDDING: T N ISSUED FOR CONSTRUCTION: 0 S .,~1 .d :i @~~ ,a n, fit' Cerl Certified as a true am On Month Date, 1991 nvii 1998 the Development correct Jmmittee approved in Revie % review a site p)aq/prelimina' fe,{st for Belcher Road Ot1G Office Wito Witness m hand I I of the Development Coda 1~Odi Code Administrator of fs`rity of Clearwater, Florida on this y of September, 1998. >,qr s: > • C, COOII "a' ia. • Coocdi rtxa enati 'ng ITearlmeut [[akr, ro'. ~ Certification. to e felip , . ,..,.w~ A can rn co m H ;h folio actions . 1) 1 1) Obtain the requisite building permits within one (1) Year from the site plan certification date to prevent expiration of the site plan certification; - ' Zl ~ 2) Obtain the requisite certificate(,) of occupancy within three (3) Years of the site plan certification L . C to prevent expiration of the site plan 3) certification; and 3) Obtain review and permits for signs and f fencing/wall, through separate review ad permitting procedures. P &Pare Before the (Stu can ;seas acv ne,,ts the applicant must complete the following acdon/s: !P 11 A 1) A landscape plan must be prepared and submitted h: ' m by the City's Landscape Architect which must meet or exceed all landscape requirements of ec section 42.27 including interior landscape areas and all perimeter buffers; 1) A 2) A FDOT driveway access permit for NE G Coachman Rd. connection must be obtained; Before for the Before the City can Issues CaMR-ta a Oceupary v for the first buildrnt. the au icant roust complete We folio fhe folloactions' 1) Aa 1) As-builts must be provided that show and/or iod eoc indicate the points made above (Section I, 3,4 and Section II 1 and 2• _ i Certified as a true and correct copy. F the Development Review Committee on Decel correct copy. Final Site Plan as approved by ommittee on December 14, 1989. Witness my hand and the seal of the Cit seal of the City *of Clearwater, Florida this 4th da of Ma 1990.. , Y Y . - e ..Conditions 41,2,4,6,8,9 have bee mmet` , have bee r Met ..Conditions:. " , q 3. Prior to the issuance gf` a4 itig p~tt~- for e issuance of° a qu l ld driveway closures must'be bl osures must be db'kairtec~ by Q O.T. an4 e''County and/or instal14t,i.on•.gf detectgn' ~iieckF, water and 5. Relocation andlor instaila~, I gas meters must be done by, must be done by, the •C,~~ Y •gl•'the bwnt<r'/d,veloper's expense. 7. Prior to a C.O. dumpster an C.O. dumpster and/'or compactors''must be visually screened. Gates must 6e pr Gates must be provided with a minimum 12' clear_ opening to the front for ac 10. The driveways to be removed the front for access by Sanitation trucks. ys to be removed shall be replaced with curbing, sidewalks,' and. landscaping and.landscaping in accordance with City standards. 1L Signs and :fencing/walls. sha and permitting process. 'encing/walls shall be subject to separate review king process. 12. The requisite initial build to initial building permit must be procured within six (6) months from the dot site plan and all requisite the from the date of certification of the final ,nd all requisite certificates of occupancy must 6e obtained within three (3 of the final site plan. I within three (3) years of date of certification A site plan.