CONTRACT AMENDMENT
City of Clearwater, Florida, Parks and Recreation Department
Out of School Time Program- (OST)
CONTRACT AMENDMENT
THIS AMENDMENT entered into between Coordinated Child Care of Pinellas, Inc., and the City
of Clearwater, Florida, Parks and Recreation Department, amends the current 2010-2011
contract.
DELETE
Attachment 2, page 10 of 28 in the current FY 10 -11 contract: "Measurable Objective" page for
the Out of School Time Program- (OST).
ADD
Amended Attachment 2, dated 10/1/10, page 10 of 28, "Measurable Objectives" for the Out of
School Time Program- (OST).
This amendment incorporates the JWB SAMIS revised measurable objectives for the program
and is effective October 1, 2010.
All provisions not in conflict with this amendment remain in effect and are to be performed at the
level specified in the contract.
IN WITNESS WHEREOF, the parties hereto have caused this one-page amendment to be
executed by their officials thereunto duly authorized.
City of Clearwater, Florida. Coordinated Child Care of Pinellas, Inc.
Parks and Recreation Department
SIGNED SIGNED BY:
TITLE: ?) ? 'br. P,4-f_ ae a??
TITLE: D..%
DATE: ( 11 I ?J ?
DATE: Z' 6 D
ATTACHMENT2
City of Clearwater, Florida, Parks and Recreation Department
Out of School Time Program- (OST)
Amended 10/1/10
MEASURABLE OBJECTIVES & SERVICE LEVELS
FY 10-11
Participant Level Measurable Objectives (CDG)
All Primary Participants will be measured through the Measurable Objective reporting module in SAMIS within the
contract period. Measured is defined as each participant having all the appropriate administration points required
during the fiscal year based on the language of each Measurable Objective.
Service Component: Healthy Kids (648)
Objective ID Objective Description
Target Level %
3043 Increased Resiliency 100 %
One Hundred percent (100%) of primary youth (ages 9 and over) who are in the program at the beginning
of the Pinellas County School District academic year, will be administered the 2010-2011 Healthy Kids
Resiliency Assessment (HKRA) within the first fourteen (14) calendar days of the academic school year,
and within the first fourteen (14) calendar days of each subsequent academic school year, as long as the
youth is enrolled in the program. Staff will enter data into SAMIS within two (2) weeks of data
collection. (CDG Detail - Baseline)
Manual Measurable Objectives
Objective ID Objective Description
MMO-834 Seventy percent (70%) of primary youth will attend the program a minimum of seventy percent
(70%) of the time the child is enrolled in the program. Program staff are required to take
attendance when the participant arrives. All attendance must be entered into the SAMIS Units of
Service module. (Provider Manual Report)
Contracted Service Levels
Failure to meet one or more of the Contracted Service Levels identified below may result in a reduction in the
funding allocation and service levels.
Participant Contracted Service Levels Case Data Gatherer (CDG)
Primary Participants
Contracted Primary Youth: 60
Contracted Primary Adults: 0
Total Contracted Primary Participants: 60
Secondary Participants
Estimated Secondary Youth: 0
Estimated Secondary Adults: 0
Total Estimated Secondary Participants: 0
There are no Secondary Participants or Group Contracted Service Levels required in this agreement.
CDG (Case Data Gatherer): The module in SAMIS where information for the case, participant, episode, and the
measurable objective is entered and viewed.
Page 9 of 25