MARSHALL STREET APCF PROCESS AIR SYSTEM UPGRADE - 07-0003-UT - ADMINISTRATIVE CHANGE ORDER #1 & FINAL ADMINISTRATIVE CHANGE ORDER # 1 & FINAL PROJECT: Marshall Street AP(F Process Air System Uperadc Proicct Date: September 21, 2010 PROJECT NUMBER: 07-0003-UT PO REFERENCE NO.: ST 104466 CONTRACTOR: Wcstra Construction Corp PO Box 1149 Palmetto, Florida 34220-1149 DATE OF CONTRACT: May 28, 2008 CODE: 0376-96622-563800-535-000-0000,-k SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT To decrease contract by unused items; increase contract by overruns; add items lbr unlorseen conditions; and increase the contract days by 59 calendar days - see attached sheet for details. STATENIENT OF CONTRACT AMOUNT ACCEPTED BY: ORIGINAL CONTRACT ANIOUNT Administrative Change Order # 1 NEW CONTRACT AMOUNT 6T, ? OFT181,pYl53,361,600.00 '? 691,504.35) QS 70,095.65 ATTEST: Cp l Rosemarie Call, City C Ic Date: a--'140/0 CITY OF CLEARNVATER, in PINELLAS COUNTY, FLORIDA William R. Horne. 11 City Manager APPROVED AS TO FORM: ?i Leslie DOUgall-Sides F\ssistant City Attorney M 1= 7, 1 ?9'F, ?R) Westra Construction C'or By: Michael Beukema, President Recomwl?ldcd By: City of Clearwater /Woben Maue, P.F. Pro•°-t anagel?'- Michael D. Quillen. P.L. City Engineer Date' /O /S /o ?f Page 2 of 2 Administrative Change Order 2 and Final Marshall Street APCF Process Air System Upgrade Project Decreases: ITEM DESCRIPTION QUANTITY UN1'1' UNITCOST TOTAL COST 4b FABRICATE AND DELIVER MULTISTAGE I I.S $ 39,950.00 ($39.950.00) CENTRIFUGAL BLOWERS. CONTROL PANELS AND APPURTENANCES - Sales T'ax Savings 7b INSTALL, TEST AND WARRANTY FINE 1 LS $ 21,230.00 ($21,230.00) BUBBLE DIFFUSED AERATION LQUIPMENT- ODP Sales 'fax Savings 12A Concrete Repair (Exposed Rebar) 1360 SF $ 19.00 ($25.840,00) 12B Concrete Repair (Spilling) 4840 SF $ 15.00 ($71600.00) 13 10% Contingency 1 LS $ 305.600.00 ($305,600.00) T otal (decreases): ($465,220.00) Increases: 11 Grit Removal 235 CY $ 150.00 $ 35,250.00 Total increases: S 35,250.00 Additions: 14 Install 20" Check Valve on Temp. Blower #2 1 EA $ 6,065.00 $ 6,065.00 15 Install Stainless Steel in lieu of carbon on I LS $ 12.466.58 $ 12.466.58 aeration tank pipe supports 16 Control Strategy Modifications I LS $ 14.525.43 S 14,525.43 17 Aeration Tank #13 Sluice Gate Replacement 1 I.S $ 19.901.41 $ 19.901.41 Provide Electric to M-BFV is AT No. 4&5 18 LS $ 755.05 $ 755.05 Header 1 19 Provide SS Wall Support at Tanks 1, 2 and 3 1 LS $ 7.433.95 $ 7.433.95 20 Pipe Supportat 30" Tee 1 LS $ 4.074.47 $ 4,074.47 21 Removal & Replacement of 18" Couplings 1 LS $ 23.819.30 $ 23.81930 22 Removing Dead Legs at Aeration Tanks 6-13 1 l.S $ 6.513.29 $ 6,513.29 23 Repair Recycle Gate Actuators No. 3 1 LS $ 1,207.50 $ 1.20750 24 Removal of 12" Valve & Muffler I LS $ 1.518.78 $ 1-518.78 25 Remove & Replace 12" Valve at DOI I I.S S 2.595.41 $ 2,59141 26 Draining, Clcaing & Storing 6 Tanks I LS S 19.570.48 $ 19.170.48 27 Bulkhead at AT 1-5 Effluent Gates I I.S $ 9.269.00 $ 9.269.00 Total additions: S 129,715.65 Total net (decreases)/increases/additions to the PO: ($300,254.35) Decreaes for Owner Direct Purchase - ODP: 4a FABRICATE AND DELIVER MULTISTAGE CENTRIFUGAL BLOWERS, CONTROL PANELS AND APPURTFNANCFS - ODP 6 FABRICATE AND DELIVER FINE BUBBLE DIFFUSED AEERATION EQUIPMENT 7a INSTALL.. TEST AND WARRANTY FINE RUBBLE DIFFUSED AERATION EQUIPMENT - ODP 1 LS $ 702.000.00 $ (701000.00) 1 LS $ 324,250.00 $ (324,250.00) 1 LS $ 365.000.00 $ (3657000.00) Total (decreases) ODP: $ (1,391,250.00) Total net (decreases)/increases/additions to the contract ($1,691,504.35) Ll. r °_ Clearwater U Interoffice Correspondence Sheet To: William B. Horne, II, City Manager From: Michael D. Quillen, PE, City Engineer CC: Tina G. Wilson, Budget Director; Steph nie Sansom, Senior Accountant/Engineering/ ESM; Alice Eckman, Construction Specialist Date: November 23, 2010 RE: Administrative Change Order No. 1 & Final Marshall St. APCF Process Air System Upgrade Project (07-0003-UT) RECOMMENDED ACTION: Approve Administrative Change Order No. 1 & Final to Westra Construction Corporation of Palmetto, Florida, for the "Marshall St. APCF Process Air System Upgrade Project (07-0003-UT)". This change order decreases the contract amount by ($1,691,504.35) for a new contract total of $1,670,095.65 and also approves a time extension of fifty- nine calendar days. BACKGROUND: This change order is needed to adjust quantities to those actually used in the field and to close out this project. OFFICE OF MANAGEMENT AND BUDGET DEPARTMENT REVIEW I recommend approval based on the administrative change order criteria: 1. Increases do not exceed 10% of the Council approved amount on a cumulative basis. 2. Change does not change the scope of the project. 3. Price increases do not require additional appropriation to the project. 4. Contract price decreases may be approved without limitation. 5. Completion date is not extended more than 60 days. 11 ? to Tina G. Wilson D to Adm. C0#1 & Final Memo -Marshall St. APCF Process Air System Upgrade Project 11-23-10