ALLIGATOR CREEK CHANNEL F DRAINAGE IMRPOVEMENTS - 03-0028-EN - ADMINISTRATIVE CHANGE ORDER #2 & FINALADMINISTRATIVE CHANGE ORDER #2 & FINAL PROJECT: Alligator Creek Channel 'F' Drainage Improvements Project CONTRACTOR: Keystone Excavators, Inc. 371 Scarlet Blvd. Oldsmar, Florida 34677 Date: November 03, 2010 PROJECT NUMBER: 03-0028-EN PO REFERENCE NO.: ST 105713 COUNCIL AWARD: Au ust 06, 2009 DATE OF CONTRACT: August 25, 2009 CODE: 0315-96171-563700-539-000-0000 A CODE: 0376-96742-563800-533-000-0000 B CODE: 0327-96634-563800-535-000-0000 C SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT Decrease unused items, increase and add items4ue to unforseen conditions to close out the contract- see attached sheet for details STATEMENT OF CONTRACT AMOUNT ACCEPTED Y: ORIGINAL CONTRACT AMOUNT $1,432,233.00 Keystone Excavators, Inc. Adm. C0#1 _CM 5/18/10 $6,782.00 f Adm. CO # 2 - C - $ (130,644.00) NEW CONT T A " UNT $1,308,371.00 APPROVE S TO FOR . By: Robert C. Fornwalt, Preii?G Camilo Soto, Assistant City Attorney Date: Lori ??j? Witnesses: ATTEST: r v, T ra L. Kivet Rosemarie Call, city ?r ?I ?n ? Sue Tellier Date: Jl/.?hb[? -go, CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA William B. Horne, II City Manager Recommended By: f Clearwater City i 1 d/LP>l? Elliot ShobWE Project M ager Michael D. Quillen, PE City Engineer Page 2 of 3 Administrative Change Order #2 & Final Re: Alligator Creek Channel W Drainage Improvements Project (03-0028-EN) ITEM DESCRIPTION Stormwater Code A: 0315-96171-563700-539-000-0000 Decreases: 7 Remove & Replace Unsuitable Material 9 Gabions (Mattress & Baskets) 15 19" X 30" ERCP 16 18" RCP Culvert 18 36" RCP Culvert 19 24" X 36" Pipe through Gabion 20 12" X 24" Pipe through Gabion 22 6" PVC Roof Drain through Gabion, including manifold 25 Silt Fence 30 Limerock Base Replacement, 8" 34 Miscellaneous Concrete 35 10% Contingency Increases: 10 Geotextile Fabric for Gabions - Furnish and Install 17 24" RCP Culvert 21 4" PVC Roof Drain 23 6" PVC Storm Pipe 26 Sod 29 Asphalt Pavement Removal and Replacement, 1-112" Type S-1I I 32 Remove & Replace Concrete Sidewalk 33 Remove & Replace Valley Gutter Additions: 46 Split Rail Wood Fence 47 Add 1 'Height to Gabion Wall, Stall +00 48 Over Excavate Bottom l'-'of Trench Backfill w Gabion Stone 49 Remove 48" Multi Trunk Tree 50 Hand Fabricate Round Gabion Transitions @ bends in creek 52 Remove Add'I Trees, just w of Wetherinton Rd 53 Replace fence @ 2361 Wetherington Rd 54 Add'I Height Gabions @ STA 23+24 & STA 20+25 55 Grout under Box Culvert @ Wetherington Rd 56 Additional Handrail (add'I length @ Wetherington Rd 57 Adjust inlet, grading at Old Coachman Rd 58 Box Culvert Demo&Pour Concrete Slope Paving QUANTITY UNIT UNIT COST TOTAL COST 243 CY $ 25.00 $ (6,075.00) 652.90 CY $ 160.00 $ (104,464.00) 4 LF $ 67.00 $ (268.00) 3 LF $ 45.00 $ (135.00) 4 LF $ 108.00 $ (432.00) 1 EA $ 1,103.00 $ (1,103.00) 1 EA $ 844.00 $ (844.00) 9 EA $ 360.00 $ (3,240.00) 2,876.00 LF $ 1.00 $ (2,876.00) 39 SF $ 24.00 $ (936.00) 20 CY $ 425.00 $ (8,500.00) 1 LF $ 125,868.00 $ (125,868.00 Total (Decreas es) Code A: $ (254,741.00) 2406 SY $ 4.00 $ 9,624.00 2 LF $ 64.00 $ 128.00 13 EA $ 316.00 $ 4,108.00 103 LF $ 19.00 $ 1,957.00 14,532 SF $ 0.40 $ 5,812.80 131.5 SY $ 22.00 $ 2,893.00 16 SY $ 64.00 $ 1,024.00 84 LF $ 40.00 $ 3,360.00 Total Inc reases Code A: $ 28,906.80 100 LF $ 11,00 $ 1,100.00 1 LS $ 4,600.00 $ 4,600.00 450.7 CY $ 86.00 $ 38,760.20 1 LS $ 3,670.00 $ 3,670.00 8 EA $ 286.00 $ 2,288.00 1 LS $ 7,857.00 $ 7,857.00 1 LS $ 2,980.00 $ 2,980.00 1 LS $ 18,081.00 $ 18,081.00 1 LS $ 2,095.00 $ 2,095.00 25 LF $ 48.00 $ 1,200.00 1 LS $ 1,864.00 $ 1,864.00 1 LS $ 8,348.00 $ 8,348.00 59 Guardrail, Improvements to meet Code 1 LS $ 2,274.00 $ 2,274.00 60 Install Additional Roof Drain 1 LS $ 966.00 $ 966.00 Total Additions Code A: $ 96,083.20 Total Net (Decreases)llncreaseslAdditions Code A: $ (129,751.00) Page 3 of 3 Administrative Change Order #2 & Final Re: Alligator Creek Channel 'F' Drainage Improvements Project (03-0028-EN) ITEM DESCRIPTION QUANTITY UNIT UNIT COST TOTAL COST Water Code B: 0376-96742-563800-533-000-0000 Decreases: 37 16" Steel Casing for 8" Water Main 1 LF $ 69.00 $ 61 9.00) Sewer Code C: 0327-96634-563800-535-000-0000 Decreases: 42 10% Contingency 1 LS $ 1,648.00 $ (1,648.00) Additions: 61 Additional 24" Casing 1 LS $ 824.00 $ 824.00 Total Net (Decreases)/Increases Code C: $ (824.00 Total Net (Decreases)/lcceases/Additions: $ 130,644.00) LL } °_ Cleamater U Interoffice Correspondence Sheet To: William B. Horne, II, City Manager From: Michael D. Quillen, PE, City Engineer. CC: Tina G. Wilson, Budget Director; Elliot Sho erg, Stormwater Manager; Stephanie Sansom, Senior Accountant/Engineering; Alice Eckman, Construction Specialist Date: November 17, 2010 RE: Administrative Change Order No. 2 & Final Alligator Creek Channel `F' Improvements Project (03-0028-EN) RECOMMENDED ACTION: Approve Administrative Change Order No. 2 & Final to Keystone Excavators, Inc., 371 Scarlet Blvd, Oldsmar, FL 34677, for the "Alligator Creek Channel 'F' Improvements Project (03-0028-EN)." This change order decreases the contract amount by ($130,644.00) for a new contract total of $1,308,371.00. BACKGROUND: This change order is necessary to decrease unused items, increase and add items due to unforeseen conditions to close out the contract. OFFICE OF MANAGEMENT AND BUDGET DEPARTMENT REVIEW I recommend approval based on the administrative change order criteria: 1. Increases do not exceed 10% of the Council approved amount on a cumulative basis. 2. Change does not change the scope of the project. 3. Price increases do not require additional appropriation to the project. 4. Contract price decreases may be approved without limitation. 5. Completion date is not extended more than 60 days. \ kJk$/ to Tina G. Wilson Date Adm. CO# 2 & F Memo -Alligator Creek Channel 'F' Improvements Project (03-0028-EN)