2009 SIDEWALK PROJECT - 09-0039-EN - ADMINISTRATIVE CHANGE ORDER #4 & FINALADMINISTRATIVE CHANGE ORDER 4 & Final PROJECT: 2009 Sidewalk Contract DATE: October 6 2010 PROJECT NUMBER: 09-0039-EN PO REFERENCE NO.: ST106115 CONTRACTOR: Kilgore Construction, LLC 11697 Walsingham Rd. Largo, Florida 33778 COUNCIL AWARD: 12/17/2009 CODE: 0181-99628-590200-554-000-0000 A 0315-92273-563700-541-000-0000 B 0315-92339-563700-541-000-0000 C SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT _ This change order adjusts quantities as warranted by field conditions and adds unforseen items to complete the project - see attached for detail. STATEMENT OF CONTRACT AMOUNT ACCEPTED BY: ORIGINAL, CONTRACT AMOUNT COI CityCouncil - 4/15/2010 CO 2 City Mgr - 4/26/2010 CO 3 City Mgr - 7/14/2010 CO 4 & Final City Mgr - NEW CONTRACT AMOUNT ATTEST: 04A Rosemarie Call, City Clerk Date: 1011abo $ 293,503.93 a.? A ? w $119,715.75 Kilgore Construction, L. C? j =J 1- $0.00 f... _.,i r ?• i $31,696.35 By (SEAL) ($64,139.83) Harold Kilgore, esident $ 380,776.20 Z ke, CITY OF CLEARWATER, in PINELL S COUNTY, FLORIDA William B. ornF II City Manager AS TO Camilo Soto, Assistant City Attorney ?OF illy AGG W, esses: f Recommended By: City of Clearwater Perry M. pez Construction Manager C. ? Michael D. Quillen, City Engineer Page 2 of 2: RE: Administrative Change Order 4 & Final ITEM DESCRIPTION QUANTITY Code A:0181-99628-590200-554-000-0000 Decreases: 1 Construct 4" Concrete Sidewalk 3181 (3,000 PSI W/Fibermesh Reinforcing) 3 Root Pruning 490 4 Install Tactile Warning Surface 17 (Truncated Domes) 7 10 % Contingency 1 19 Remove Pavement & Replace 163.92308 with 4" Concrete Sidewalk (3,000 PSI W/Fibermesh Reinforcing) 20 Remove Pavement & Replace 4,208.215190 with 6" Concrete Sidewalk (3,000 PSI W/Fibermesh Reinforcing and 6/6 X 10/10 Welded Wire Mesh) Increases: 2 Construct 6" Concrete Sidewalk (3,000 PSI W/Fibermesh Reinforcing and 6/6x10/10 Welded Wire) Additions: 29 Remove Asphalt & Replace with 6" Concrete Sidewalk (3,000 PSI W/Fibermesh Reinforcing and 6/6x10/10 Welded Wire Mesh UNIT UNIT COST TOTAL COST SF $2.75 (8,747.75) LF $11.00 (5,390.00) LF $20.00 (340.00) LS $13,308.60 (13,308.60) SF $3.25 (532.75) SF $3.95 (16,622.45) (44,941.55) Total (Decreases) Code A: 869 SF $3.55 2,778 SF $3,084.95 $3.95 $10,973.10 Total net (decreases)/increases/additions Code A: ($30,883.50) Code B:0315-92273-563700-541-000-0000 Decreases: I I linstall Tactile Warning Surface 200 SF $20.00 (4,000.00) (Truncated Domes) 16 10% Contingency 1 LS $23,756.88 (23,756.88) Total (decreases) Code B: ($27,756.88) Code C:0315-92339-563700-541-000-0000 Decreases: 17 Construct 4" concrete sidewalk 1,818 SF $2.75 (4,999.50) (3,000 PSI w/fiber mesh reinforcing) 18 10% Contingency 1 LS $499.95 (499.95) Total (decreases) Code C: ($5,499.45) Total net (decreases)/increases/additions to PO: ($64,139.83)