Loading...
CPA2008-03002; DCA08-RWSP1CPA 2008-03002 ORDINANCE NO. 7950-08 AN ORDII~TANCE OF THE CITY OF CLEARWATER, FLORIDA; MAKII~TG AlYiEI~rDMENTS TO THE COMPREHEiti Siti'E PL AN OF THE CITY AS ADOPTED ON MAY 18, 2C0~ :AND A~~1Ev"DED ON 1LJLY 12, 2001, OCTOBER 7; 2G'(;~, i'~i,'~1 OCTOBER 20, 205, DECEMBER 1~, Li!~5, ~v`JvTST 1~, 20C! ~_l~"C FEBRtJAR~ 21, 2008; B~ ~: li'it`.1vDfi~~G TIE ~~~~~~~~'~ ~.,Fi~.E~tiTi ~s . %"~~ 'cj ~~ /~ aJ i r ~~ ~~, ~ ~ E- ~~~~. •~; ~`~'~ r~ ` _.~ ~ r~ e I ~~ STATE OF FLORIDA -~~ QEPARTMENT C)F COMMUNITY AFFAIRS . "Dedicated to making Florida a better place to call home" , ,n CHARLIE CRIST THOMAS Q. PELHAM Ciovemor Secretary October 23, 2008 C?Rt6{~VL Ms. Gina Clayton, Assistant Director City of Clearwater Planning Department s "; C ~ 2?Q~ 100 South Myrtle Avenue PIANNING DEPARTMENT Clearwater, Florida 33756 cmroF ClEARWATER Dear Ms. Clayton: Thank you for submitting copies of the adopted City of Clearwater Comprehensive plan amendment DCA. 08-RWSPl adopted by Ordinance No(s). 7950-08 on September 18, 2008, for our review. We have conducted an inventory of the plan amendment package to verify the inclusion of all required miaterials: The submission package appears to be complete and your adopted plan amendment will be reviewed pursuarnt to Chapter 163, Florida Statutes. Once the review is underway, you may be asked to provide additional supporting documentation by the review team to ensure a thorough review. The Department will conduct a compliance review and issue a Notice of Intent regarding the adopted comprehensive plan amendment on or about December 4.2008. Please be advised that Section 163.3184(8)(c)2, Florida Statutes, requires a local government that has an intemet site to post a copy of the Department's Notice of Intent on the site within 5 days after receipt of the mailed copy of the agency's notice of intent. If you have any questions, please contact, Bernard Piawah Regional Planning Administrator for region 8, who will be assigning the adopted plan amendment for review at (850) 488-4925. Sincerely, D. Ray Eubanks, Administrator Plan Review and Processing DRE/dj cc: Manny Pumariega, Executive Director, Tampa BayRegional Planning Council 2555 SHUMARD OAK BOULEVARD • TALLAHASSEE, FL 32399-2100 850-488-8466 (p) • 850-921-07$1 (f) + Website: www.dca.state.fl.us . cbMMUNm PLaN~nNO ssa,aas-x~se ~) a5o~ea-a3os ~ . • 110USiN0 AND COMMUNItY DEVELOPMENT 85418&7958 (p) 85fL822~623 (Q 1 ~, ~~ r ~ Tampa 8ay,iTzglonal P/a~mm~Council LOCAL GOVERNMENT COMPREHENSIVE PLAN PROPOSED AMENDMENT REPORT CITY OF CLEARWATER DCA#08-1RWSP For Council meeting of July 14, 2008 Report prepared June 5, 2008 Agenda Item #3.H.5 07/14/08 Staff Contact: Jessica White, ext. 38 • • THIS PAGE INTENTIONALLY LEFT BLANK For Council meeting of July 14, 2008 Staff Contact: Report prepared June 5, 2008 Jessica White, ext. 38 • AMENDMENT #7950-08 Regional Water Supply Plan The City of Clearwater's summary of amendments follows: • Amendment to the Utilities Element Goals, Objectives and Policies: Potable Water and Natural Groundwater Aquifer Recharge Needs. The following are substantive changes that are being made to incorporate the City's 2004 Water Master Plan into the Utility Element and to ensure consistency with the regional water supply plan for our district (SWFWMD): ~ Policy 21.2.7: Add the following sentence: "The City's long range Water Master Plan completed in 2004 shall serve as the guiding document for water supply and treatment methods." Remove: "Various recommendations have recently been submitted in a study on long-range water supply treatment." Policy 21.2.8: Add the following sentence: "The City's long-range Water Master Plan completed in 2004 outlines a work plan for continued coordination with the Southwest Florida Water Management District's Regional Water Supply Plan adopted in December 2006." • Policy 21.6.5: Add as a new policy: "Ensure consistency with the actions defined within the Regional Water Supply Plan prepared by the Southwest Water Management District." The remaining amendments involve updates to years given for projects, minor text changes and typographical and/or grammatical corrections. Regionally Significant: No. Result in extra-jurisdictional impacts?: No. Effects of the amendment on the following issues: Compatibility among local plans including, but not limited to, land use and compatibility with military bases: The proposed amendments are compatible with the City's Comprehensive plan. Impactlprotect regional facilities/resources identified in the SRPP, including but not limited to, groundwater recharge and the availability of water supply: "Users of the City of Clearwater water system consume approximately 13 million gallons of potable water every day. Approximately 37 percent is pumped from City owned and operated groundwater wells; the remaining 63 percent of the daily demand is supplied by water purchased from Pinellas County. Pinellas County also receives water supplied by the For Council meeting of July 14, 2008 Staff Contact: Report prepared June 5, 2008 Jessica White, ext. 38 ?~I ~" regional water supplier, Tampa Bay Water, which in turn becomes part of the 63 percent supplied to the customers of Clearwater." "Potable water within the City of Clearwater is provided by 23 City-operated freshwater wells (19 active and 4 inactive) and seven interconnects with the Pinellas County water system. Although it is currently not used, the City has access to the water system of the City of St. Petersburg though an emergency interconnect." e Affordable housing issues and designation of adequate sites for affordable housing: Not applicable to the proposed amendment. Protection of natural resources of regional significance identified in the SRPP including, but not limited to, protection of spring and groundwater resources, and recharge potential: The City protects groundwater quality by enforcing a wellhead protection ordinance. The City will also require water conserving fixtures in newly constructed and remodeled buildings. ~ Effectiveness and enhancement of economic development within the region including, but not limited to, preservation of military bases: Not applicable to the proposed amendment. Compatibility with regional transportation corridors and facilities, including but not limited to, roadways, seaports, airports, public transportation systems, high speed rail facilities, and intermodal facilities: Not applicable to the proposed amendment. ~ Adequacy of and compatibility with emergency preparedness plans and local mitigation strategies (plans) including, but not limited to, the impacts on and availability of hurricane shelters, maintenance of county hurricane evacuation clearance times, and hazard mitigation: Not applicable to the proposed amendment. Regional Comments: None. Applicable SRPP Policies: Natural Resources: Policies 4.13, 4.22, 4.25, 4.26, 4.30 Consistency with SRPP: Consistent. For Council meeting of July 14, 2008 Report prepared June 5, 2008 Staff Contact: Jessica White, ext. 38 4 ~ O b "1 ~ O C b ~ N t7 ~ ~. b ~, d ~. ti ~ tr0 CJI .~+, O ~C-' ~ ~ ~ ~ N Q r--1 C9 ~~ ~ m ~~ M cg ~ w n 00^. y Mnw rnrwn, -~ ,.mod ~ ,; ° E ~~ f~ J e ~ (R ' It i_~ J ~ 't.~ ~ }~ ~ ~ .1 i ~ ,~ ~t7 ~ ~ i, 'f' wa .Ym~+ t c. ht y ` ~ ~ ~ ~~`r'N ~~ Q VrCln ' , ~ ~~. i ~ ` I/~/ ~r ~ r ~ t ~ ~ ' R hA9 I o m ~ ' ~ 'ti ~ /~ 7 ~ ' . I r -. ~ ~, ~. ~ g, "' ,~ t Is ~c, \ ~ ,~ f f T J q $ s Y.F ge L ~ ~ r Y • t ~~ ~ >{ II,T I - ( _ ` ~ - - ` t .. r A ~ " \ ~, t are raS Z- x • ~ _~' ~ ~ ,/.~' ~~ f ! ~ RG ctlay tS MG) ~ 9 -,`S, t, ~~ __ a~ k •Mwa sr ouwm .... :,< 7N fko Tint S ~cs~',,,'.y.-.. ~~ , Reswalr e2 ., n~, we ~ ~s (S MG) r7 ~ p ~ ~r ~~ ® j ~L~ e S ~ ~ ~ ~ y ~ : lt!( ~~ TirAt yy S .~ ~ ~ A F It tvG .x . ~ C ~ <.. L,i3 ~ ~ i~ _ q ~ 9 ~ ~ 1 0$ .-..h ~ ~ ~ ~ ~ A~ ') ~ ~J ~ ~ i ~ _ 4 ~ } ~ ~,~ .; C ~ _ ~ ~ ~ ~ . ~ I ~ r ~ 5 ~; ~ r. 3 1. ~ ~ ~ ~ / ..I N .S ~ r ~1~~.. }~ . Clearwater Map 3 Potable Water Supply Facilities Elave+.ed Potable Water Tank Potable WA:RI SIOrAQe REAaNUIr$ Water Wolls Status In SeN Ce Oul of Service ~ Plugged Fj Proposad Morolor Well - McJor Roeds J risdicllonal Bountlariea ' City of Qeanvater . %~; OIFer Cilles Unlncarparetod Pmeiles County ~~ 0 0.5 1 2 3 Miles soa~ae e ry al eman<am. wemr oeParmtem. ruGT; PI IHS County OIS,IMJ] P P red ny Wedn Trim h+c ,August 2007 b t..ty a(Csamatcr WaMr Soppy Elomanl. WADETRIM 0 ~ ~ ~~.~r V `b N Y„1e s • BEST FL ~~~ ~_ Southwest Florida 2379 Broad Str;:et, Brooksville, Florida 34604-6899 ~~ .~~ mater Management District (352) 796-7211 or 1-800-423-1476 (FL only) "nr ,; '' "-, ?~~ "~ °o~~' ~~,~y~ ~ `~ .~.~--; _~ TDD only 1-800-231-6103 (FL only) .,, _., ''~'AC~„c~` ,.., "- - ''= On the Internet at: WaterMatters.org M Equal Bartow Service Office Lecanto Service Office Sarasota Service Office Tampa Service Office ~Em°lo°erY 170 Century Boulevard Suite 226 6750 Fruitville Road 7601 Highway 301 North P Y Bartow, Florida 33830-7700 3600 West Sovereign Path Sarasota, Florida 34240-9711 Tampa, Florida 33637-6759 (863) 5341448 or Lecanto, Florida 34461-8070 (941) 377-3722 or (813) 985-7481 or 1-800-492-7862 (FL only) (352) 527-8131 1-800-320-3503 (FL only) 1-800-836-0797 (FL only) Neil Combee July 14, 2008 Chair, Polk Todd Pressman Ray Eubanks, Plan Review Administrator Vice Chair, Pinellas Florida Department of Community Affairs Jennifer E. Closshey secretary, Hillsborough Division of Community Planning Ronald E. Oakley 2555 Shumard Oak Boulevard Treasurer, Pas°° 'Tallahassee, FL 32399-2100 Bryan K. Beswick Desoto Patricia M. Glass Subject: City of Clearwater 08RWSP1 Manatee " "°g'' M. Gram''"g Dear Mr. Eubanks: Hillsborough Albert G. loerger Sarasota In accordance with Chapter 163, F.S., the staff of the Southwest Florida sonic Parke Water Management District (District) has 'reviewed the above referenced Pinellas Marit:a Rovira-Forin° 'Comprehensive Plan amendment and offers the following comments for your Hillsborough consideration. - . H. Paul Senft, Jr. Polk oor,glas B. Tharp As .part of the above referenced amendment package, the City of Clearwater sumter has submitted a Water Plan (Potable WaterSub Element) along with a ,udith c. whitenead schedule. of Capital Improvements to be incorporated into the Utilities Hernando Element of the Clearwater Comprehensive Plan. However, it is not clear if ' this amendment (08RWSP1) is meant to satisfy the requirements of adopting °avia `' M°ore: . a Water Supply Facilities Work Plan for a minimum Ten Year planning Executive Director wiuiams:Biienky horizon set forth in Chapter 163.3177(6)(c), F.S. The amendment does not General counsel specify a planning horizon; many of the data. tables -are for varying time periods, and several maps (Maps 5 and 6) were missing from the packet. The Level of Service outlined in the plan only goes through 2015 and some tables only project through 2010. Furthermore; the City's long range Water Supply. Master Plan that is referred to in the review materials was not included in the amendment packet and it is somewhat unclear what the difference is between the included Potable Water Sub Element and the Water Supply Master Plan. The City should clearly define responsibilities for planning, financing, construction, and operation of the water supply facilities by all entities providing service within its jurisdiction for a minimum 10 year period. Further documentation (at least by reference) should be included to illustrate the - City's potable water agreement and concurrency planning with Pinellas County, and the City's emergency potable water. agreement with the City of St. Petersburg to validate the terms of these relationships. Also, all District Water Use Permit information should be included in the Potable Water Sub Element including permit number(s), quantities, expiration dates, etc. It is important that future withdrawals of groundwater (fresh or brackish) are planned and operated in a manner that is environmentally responsible and ®Po cs {onsumer Waste * • Ray Eubanks July 14, 2008 Page 2 sustainable. Therefore, the District recommends additional wellhead protection policy language and an updated wellhead protection area map in the Work Plan. The City is located within the Northern Tampa Bay Water Use Caution Area, where groundwater resources are insufficient to provide for increases in potable water demand. Therefore, the District recommends further language to support conservation and alternative water sources, and the City should quantify conservation programs in more detail to reflect water savings and potable water offset. The Regional Water Supply Plan (RWSP) and associated Appendices provide important information regarding water resource constraints, potential sources (traditional and alternative), regional partnerships, demand projections, conservation options, and quantifiable conservation and reclaimed water data. To access the RWSP and the Appendices (4 and 5), please visit: http://www.swfwmd.state.fl.us/documents/plans/ RWSP. Finally, the District commends the City for conducting several water conservation programs, in-school education programs, and utilizing reclaimed water but further emphasis should be placed on public education and messaging campaigns (e:g., Water C.H.A.M.P.), land use ordinances, and complying with the District's year-round conservation measures as required by Chapter 40D-22, F.A.C. For more information on water conservation including many practical options, please visit the District's on-line library at www.conservationinfo.orq. The District appreciates the opportunity to participate in the review of comprehensive plan amendments. Please note that this review does not constitute permit approval under Chapter 373, Florida Statutes~(F'.S.), or any rules promulgated thereunder, nor does it stand in lieu of normal permitting procedures in accordance with Florida Statutes and District rules. If I may be of further assistance, please do not hesitate to contact me at (352) 796-7211, extension 4423. Sinc ely, >on M. Mickel nior Planner cc: Gina L. Clayton, Assistant Director of Planning,100 South Myrtle Ave., Clearwater, FL 33756 Ralph Lair, CLA-TPA Jim Quinn, Department of Environmental Protection (via e-mail) 1'r>S'a~ C)a~-~r;a; llrx ~i7=i#~, ;ar~a~~~,~r~a., l~a.~j,aaa_~~ 3378-47t~ts ~1~a~ar:F;~nt. ~S~aava: ~.s liaaraa:a;~bs, it)~.) ~ca~rru ilnar~~Asa=r~z.c,~;acan~r~~•at?,1'a.~~aaat?:~ 5756 1"s.C.~f=sat~~c t72'~ `j~i2-<'.5~ S'a~c X727) '~~2-'i~365 October 16, 2008 Mr. Ray Eubanks Florida Department of Community Affairs Bureau of Local Planning Division of Community Planning Plan Processing Team 2555 Shumard Oak Boulevard Tallahassee, FL 32399-2100 RE: Adopted Comprehensive Plan amendment package for the City of Clearwater's Water Plan to be incorporated into the City's Utility Element -Potable Water and Natural Ground Water Aquifer Recharge; DCA No. 08-RWSP-1 Dear Mr. Eubanks: Please find attached three copies of the City of Clearwater's adopted comprehensive plan amendment package to incorporate the water plan into the Utilities Element. The adopted amendment includes revisions as per the Department of Community Affairs Objections, Recommendations, and Comments (ORC) Report for CPA2008-03002/DCA No. 08- RWSP-1 (City Ordinance No. 7950-08). Attached is a summary of City's responses to the ORC report. This transmittal letter conforms to the requirements of Rule 9J-11.006(1)(a), F.A.C., "Submittal Requirements for Proposed Local Government Comprehensive Plan Amendments" as follows: • CPA2008-03002 -The adopted amendment to the Utility Element of the Clearwater Comprehensive Plan (Ordinance Number 7950-08). 93-11.006(1 (a)1: The Clearwater Community Development Board (CDB), as the Local Planning Agency, held a public meeting on April 15, 2008 for CPA2008-03002. The CDB recommended approval to the City Council. 9J-11.006 1 (a)2: The Clearwater City Council, as the local governing body, held a transmittal public hearing meeting on May 15, 2008 for CPA2008-03002 (Ordinance No. 7950- 08). ~.~ ~,i.,: { .4- ~ . ~..i 31'a1C:'vY A:ila f' 1I,~Y'Y7L'~.t~iZ:i ~t9~ A;~1 t'lSYiEaF" October 16, 2008 Ray Eubanks Page 2 of 5 e The City Council approved the transmittal of CPA2008-03002 to the Florida Department of Community Affairs. 9J-11.006(1 (Za)2: The Clearwater City Council,. as the local governing body, held an adoption public hearing meeting on September 18, 2008 for CPA2008-03002 (Ordinance No. 7950-08). The City Council approved the adoption of CPA2008-03002 (Ordinance No. 7950-08. There were no requests for information or objections raised by citizens at the adoption hearing. Attached are the Comprehensive Plan Citizen Courtesy Information List sheets that include "none" at the adoption hearing for this amendment package (Section 163.3184(15), F.S.). Contained within this Plan amendment package are the following: (1) Three copies of the LPA Review and Recommendation (LPA No. CPA2008-030002) for the Utilities Element. (2} Three copies of the adopted Utilities Element. (3) Three copies of the adopted amendment to the Utilities Element related to the Water Master Plan (Ordinance No. 7950-08). The above proposed plan amendment package and one copy of each item specified under paragraphs 9J-11.006(1)(a), (b) and (c), FAC, were sent to the Pinellas County Planning Department, the Tampa Bay Regional Planning Council, the Southwest Florida Management District, the Florida Department of Transportation, the Florida Department of State and Florida Department of Environmental Protection, as identified in 9J-11.009(6) under separate cover on same date. 9J-11.006(1)03: The following is the summary of the plan amendment package that the City of Clearwater requests the department to review: o CPA2008-03002 - The amendment to the Utilities Element of the Clearwater Comprehensive Plan (Ordinance Number 7950-08) Ordinance No. 7950-08 -The amendment was adopted on September 18, 2008, subsequent to the receipt of the Department's ORC Report. Included is a summary of the City's responses to the ORC report. 9J-11.006(1Z(a)5: The proposed plan amendment package does not pertain to an area of critical state concern. 9J-11.006(1Z(aL The plan amendment .package is not within Orange, Lake or Seminole Counties. October 16, 2008 Ray Eubanks Page 3 of 5 9J-11.006 l a 7n: The proposed plan amendment package is an exception to the twice-a-year limit of amendments (adopting an amendment to the Utilities Element to incorporate the water work plan consistent with the district's updated regional water supply plan pursuant to Section 163.3177(6) (c), F.S.). 9J-11.006(1)(a)8: Copies of the completed adopted Clearwater Comprehensive Plan, and any amendments to said plan, have been submitted to the following agencies: the Pinellas County Planning Department, the Tampa Bay Regional Planning Council, the Southwest Florida Management District, the Department of State, the Department of Transportation, and the Deparhnent of Environmental Protection. City Ordinance 1Vo. 7950-08 -Three copies of the amendment to the Clearwater Comprehensive Plan have been submitted with this letter. Copies have also been transmitted to the Tampa Bay Regional Planning Council, the Southwest Florida Water Management District, the Department of Transportation, and the Department of Environmental Protection under separate cover on same date. 9J-11.006(1)(a)9: The plan amendment package was not adopted under a joint planning agreement. 9J-11.006 1 (a~ )10: Sandra E. Herman Planner III P.O. Box 4748 Clearwater, FL 33758-4748 Telephone: 727-562-4586 Fax: 727-562-4865 sandra.herman@myclearwater.com If you need further assistance, please contact Sandra Herman. Thank you for you help in this matter. Sincerely, ~j . ~ ~ ~, ~~ ~ Gina Clayton Assistant Director of Planning City of Clearwater October 16, 2008 Ray Eubanks Page 4 of 5 October 16, 2008 Pinellas County Planning Department Attn: Brian Smith, AICP, Director 604 Cleveland Street, Suite 750 Clearwater, FL 33755 Tampa Bay Regional Planning Council Attn: Jessica White, Principal Planner 4000 Gateway Centre Boulevard, Suite 100 Pinellas Park, FL 33782 Southwest Florida Water Management District Attn: Ray Mazur, Executive Director 2379 Broad Street Brooksville, FL 34604-6899 Florida Department of State Bureau of Historic Preservation Attn: Ms. Susan Harp R.A. Gray Building 500 South Bronough Street Tallahassee, FL 32399-0250 Florida Department of Transportation District Seven Attn: Carol M. Collins, LGCP & CMS Coordinator 11201 North McKinley Drive Mail Station 7-500 Tampa, FL 33612-6456 Department of Environmental Protection Attn: Jim Quinn, Environmental Manager Office of Intergovernmental Programs 3900 Commonwealth Boulevard, Mail Station 47 Tallahassee, FL 32399-3000 Clearwater RE: Adopted Comprehensive Plan amendment package for the City of Clearwater's Water Plan to be incorporated into the City's Utility Element -Potable Water and Natural Ground Water Aquifer Recharge; DCA No. 08-RWSP-1 To whom it may concern: Pursuant to Rule 9J-11.009(b) of the Florida Administrative Code, the City of Clearwater is submitting this plan amendment adoption package to the aforementioned organizations. October 16, 2008 Ray Eubanks Page 5 of 5 Also, enclosed is a copy of the transmittal letter sent to the Department of Community Affairs. If you need further assistance, please contact Sandra Herman, Planner III at 727-562-4586. Thank you for your courtesy in this matter. mcerely, ~ ~j,(^ ~- Gina Clayton Assistant Director of Planning City of Clearwater Cc: David Healey, Pinellas Planning Council City of Clearwater Adopted Local Government Comprehensive Plan Amendment Exception to the Twice-A-Year Limit of Amendments For Adoption of the Amendment To the Utilities Element Incorporating the Water Master Plan Update Pursuant to Section 163.3177(6){c) CPA2008-03002 DCA 08-RWSP1 Transmittal October 16, 2008 City of Clearwater Adoption of the Amendment To the Utilities Element Responses to the ORC Report CPA2008-03002 DCA 08-RWSPl CITY OF CLEARWATER, FLORIDA RESPONSES TO OBJECTIONS, RECOMMENDATIONS AND COMMENTS (ORC) REPORT DCA No. 08-RWSP-1 This item was approved on first reading at the City Council meeting May 15, 2008 and was subsequently transmitted to the State Department of Community Affairs (DCA) for their review. On August 1, 2008, the City received from DCA their "ORC" report (objections, recommendations and comments) for this submittal. The Engineering and Planning Departments and Wade Trim, the City's consulting company for this project, worked with DCA, SWFWMD and the County to address the recommendations from the ORC report. The ordinance was amended as per the ORC report and adopted on September 18, 2008. The supporting documents are included with the submittal. The following summarizes the City's responses to the ORC report. A. Objections: 1. Lack of a Minimum Ten-year Planning Horizon. a. Response: Objective 21.1, changed year to "2098" to maintain adequate levels of service for existing and future populations. 2. Lack of Current Data and Analysis to support the Water Supply Plan. a. Response: Wade Trim has provided updated tables from Pinellas County to support the plan -reviewed by SWFWMD to be consistent with the Regional Water Supply Plan 2006 update. 3. Lack of Policies Guiding Coordination with Southwest Florida Water Management District. a. Response: Policy 21.2.9 and new Policies 21.6.5 and 21.6.6 address this objection. 4. Inadequate Policy No. 21.7.3 (to include an updated wellhead protection area map based on supporting data and analysis). a. Response: Policy 29.7.3 has been revised fo include the guidelines and criteria of the updated wellhead protection ordinance and a new Map D-2, Potable Water Wells and Wellhead Protection Zones, has been included. B. Comments: o The Department recommends that the City consider using the same per capita standard as the County. o Wade Trim has provided updated fables from Pinellas County to support the plan -has been approved by SWFMMD. e SWFWMD recommends that further language to support water conservation should be developed by the City giving the location of the City within the Northern Tampa Bay Water Use Caution Area where groundwater is insufficient. o New policies 21.5.8 and 21.5.9 have been prepared fo address this comment. The City should retain references to Tampa Bay Water (TBA) in Policies 21.2.1 (coordinate building code revisions) and 21.2.6 (assist efforts to augment existing water supplies and provide for future needs). o Policies 21.2.1 and 21.2.6 have been revised to retain TBA references as per the comment. The City should discuss in detail how the emergency interconnections operate with Pinellas County and the City of St. Petersburg and the amount of water committed to those interconnections. o The City h'as an Interlocal Agreement with Pinellas County and 15 MGD is committed from Pinellas County. This is truly an emergency connection. A copy of the agreement will be provided to DCA. There is apparently no agreement and no volume committed by the City of St. Petersburg. City of Clearwater Adoption of the Amendment To the Utilities Element LPA Review and Recommendation CPA2008-03002 DCA 08-RWSP1 CDB Meeting Date: Case # Ordinance #: Agenda Item: Api~l 15, 2008 CPA2008-03002 7950-08 F-1 CITY OF CLEARWATER PLANNING DEPARTMENT STAFF REPORT COMPREHENSIVE PLAN AMENDMENTS REQUEST: Clearwater Comprehensive Plan Text Amendments INITIATED BY: City of Clearwater P'~aa~nning Department BACKGROUND INFORMATION: This item involves an amendment to the Clearwater Comprehensive Plan to update the Utility Element related to the City's water supply plan as per Section 163.3177(6)(c), Florida State Statutes and Florida Administrative Code section 9J-5.011. The fundamental purpose of a water supply plan is to ensure that the community is able to supply quality drinking water of a sufficient quantity for current and future needs. The statutory requirements call for each local government in the planning region to adopt amendments to its comprehensive plan to incorporate their water supply plan within 18 months after the approval of the regional water supply plan. The City's regional district, the Southwest Florida Water Management District (SWFWMD), approved its plan on November 30, 2006. Therefore, the deadline for the City's amendment is May 34, 2008. This amendment is exempt from the twice a year limitation for large-scale amendments. The consulting firm of Wade Trim was retained by the City to draft an updated "Potable Water Element" (sub-element to the Utility Element) to the Clearwater Comprehensive Plan based on the City's 2004 Water Master Plan produced by Parsons Water and Infrastructure, Inc. According to the plan, based on population and density projections, the City will be functionally capable of providing water through the year 2025. The proposed text amendment meets state statutes and rules by amending current Goals, Objectives and Policies of the Water Sub-element of the Utility Element of Clearwater's Comprehensive Plan. ANALYSIS: One amendment is proposed to the text of the Clearwater Comprehensive Plan in Ordinance No. 7950-08. The summary of the amendment follows. Page - 1 CPA2008-03002 Amendment -UTILITY ELEMENT GOALS OBJECTIVES AND POLICIES: Potable Water and Natural Ground Water Aquifer Recharge Needs (pales are given from current Comprehensive Plan): The following are substantive changes that are being made to incorporate the City's 2004 Water Master Plan into the Utility Element and to ensure consistency with the regional water supply plan for our district (SWFWMD): Policy 21.2.7 (page D-17): Add the following sentence: "The City's long range Water Master Plan completed in 2004 shall serve as the guiding document for water supply and treatment methods." Remove: "Various recommendations have recently been submitted in a study on long range :~~af:~:r supply and treatment". Policy 21.2.8 (page D-17): Add the following sentence: "The City's long range Water Master Plan completed in 2004 outlines a work plan for continued coordination with the Southwest Florida Water Management District's Regional Water Supply Plan adopted in December 2006". Policy 21.6.5 (page D-19): Add as a new policy: "Ensure consistency with the actions defined within the Regional Water Supply Plan prepared by the Southwest Water Management District." The remaining amendments involve updates to years given for projects, minor text changes and typographical and/or grammatical corrections. STANDARDS FOR REVIEW Pursuant to Community Development Cade Section 4-603(F) no amendment to the Clearwater Comprehensive Plan shall be approved unless it complies with the following standards: 1. The amendment will further implementation of the comprehensive plan consistent with the goals, policies and objectives contained in the plan. The proposed amendment to the Utility Element: Potable Water and Natural Ground Water Aquifer Recharge Needs Sub-Element of the Clearwater Comprehensive Plan further refines the City's existing policies and objectives. The proposed amendment is consistent with the existing goals, objectives, and policies contained in the comprehensive plan and expands the city's long range planning policies related to the provisions for the City's water plan. 2. The amendment is not inconsistent with other provisions of the comprehensive lp an. The proposed amendment is consistent with the provisions of the Comprehensive Plan. It broadens the City's approach to providing continued coordination with the Page - 2 CPA2008-03002 Southwest Florida Water Management District (SWFWMD) and specifically to its Regional Water Supply Plan (RWSP). The available uses, if applicable, to which the property may be put are appropriate to the property in questions and compatible with existing and planned uses in the area. The proposed amendment is a text amendment that is not directly related to a specific property. 4. Sufficient public facilities are available to serve the property. T!:e prc~i~osed amendment is a text amendment that is not directly rela.red t+~ a specific property. 5. The amendment will not adversely affect the natural environment. The proposed amendment seeks to provide consistent and coordinated efforts for the processes and procedures for water management within the area governed by the Southwest Florida Water Management District (SWFWMD). 6. The amendment will not adversely impact the use of property in the immediate area. The proposed amendment is a text amendment that is not directly related to a specific property. SUMMARY AND RECOMMENDATION: The purpose of this amendment is to incorporate the City's 2004 Water Master Plan into the Utility Element of the Clearwater Comprehensive Plan and to ensure consistency with the regional water supply plan as required in Section 163.077(6)(c), F.S. The Planning Department Staff recommend APPROVAL of Ordinance No. 7950-08 that amends the Clearwater Comprehensive Plan. Prepared by Planning Department Staff: f~` Sandra E. Herman Planner III ATTACHMENT: Ordinance No. 7950-03 Page - 3 CPA2008-03002 ORDINANCE NO. 7950-08 AN ORDINANCE OF THE CITY OF CLEARWATER, FLORIDA, MAKING AMENDMENTS TO THE COMPREHENSIVE PLAN OF THE CITY AS ADOPTED ON MAY 18, 2000 AND AMENDED ON JULY 12, 2001, OCTOBER 7, 2004, OCTOBER 20, 2005, ' DECEMBER 15, 2005, AUGUST 14, 2007, AND FEBRUARY 21, 2008; BY AMENDING THE UTILITY ELEMENT; IN ACCORDANCE WITH SECTIONS 163.3177, 163.3184, 163.3187 OR 163.3189, FLORIDA STATUTES, TO UPDATE THE CITY OF CLEARWATER'S WATER WORK PLAN IN ACCORDANCE WITH THE UPDATED SOUTHWEST FLORIDA WATER s~~-!STRICT'S .~.:- GIONAL WATER SUPPLY PLAN; PROVII'~aNG FOR SEVERABILITY; AND PROVIDING AN EFFECTIVE DATE; WHEREAS, the Local Government Comprehensive Planning and Land Development Regulation Act of Florida empowers and requires the City Council of the City of Clearwater to plan for the future development and growth of the City, and to adopt and periodically amend the Comprehensive Plan, including elements and portions thereof; and WHEREAS, the City of Clearwater adopted a Comprehensive Plan on May 18, 2000 by Ordinance Number 6522-00; and WHEREAS, the City Council approved Ordinance Number 6794-01, which amended the Comprehensive Plan of the City on July 12, 2001; and WHEREAS, the City Council approved Ordinance Number 7295-04, which amended the comprehensive Plan of the City on October 7, 2004; and WHEREAS, the City Council approved Ordinance Number 7388-05, which amended the Comprehensive Plan of the City on October 20, 2005 and December 15, 2005; and WHEREAS, the City Council approved Ordinance Number 7782-07, which amended the Comprehensive Plan of the City on August 14, 2007; and WHEREAS, the City Council approved Ordinance Number 7870-07, which amended the Comprehensive Plan of the City on February 21, 2008; and WHEREAS, the City is making these changes to the Comprehensive Plan in accordance with statutory requirements; and WHEREAS, amendments to the Comprehensive Plan of the City have been prepared in accordance with the applicable requirements of law, after conducting the appropriate planning analysis, and public participation through public hearings, opportunity for written comments, open discussion and the consideration of public and official comments; and -1- Exhibit AOrdinance 7950-08 WHEREAS, the Community Development Board, serving as the designated Local Planning Agency for the City, has held a public hearing on the proposed amendments and has recommended adoption of the proposed Comprehensive Plan amendments; and WHEREAS, the proposed amendments have been transmitted to the Florida Department of Community Affairs for review and comments, and the objections, recommendations and comments received from the Florida Department of Community Affairs have been considered by the City Council, together with, all comments from local regional agencies and other persons, in preparing the final draft of the amendments; and WHEREAS, the City Council finds it necessary, desirable and proper to adopt the amendments to the objectives and policies of the Comprehensive Plan in order to reflect changing conditions; now; therefore, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CLEARWATER, FLORIDA: Section 1. Amendment to the Clearwater Comprehensive Plan attached hereto as Exhibit "A" is hereby adopted. Section 2. Severability. If any section, provision, clause, phrase, or application of this Ordinance shall be declared unconstitutional or invalid for any reason by a court of competent jurisdiction, the remaining provisions shall be deemed severable therefrom and shall remain in full force and effect. Section 3. This ordinance shall become effective when the Department of Community Affairs (DCA) issues a final order determining the adopted amendment to be in compliance, or the Administration Commission issues a final order determining the adopted amendments to be in compliance, in accordance with Section 163.3177, 163.3184, 163.3187 or 163.3189, F.S., as amended. PASSED ON FIRST READING PASSED ON SECOND AND FINAL READING AND ADOPTED Frank Hibbard Mayor-Councilmember Approved as to form: Attest: Leslie K. Dougall-Sides Cynthia E. Goudeau Assistant City Attorney City Clerk -2- Exhibit AOrdinance 7950-08 EXHIBIT A ATTACHMENT TO ORDINANCE 7950-08 AMENDMENT -UTILITY ELEMENT GOALS, OBJECTIVES AND POLICIES Amend Goal ZI of the Utility Element of the C'omprelrensive Plan, as follows: POTABLE WATER AND NATURAL GROUND WATER AQUIFER RECHARGE 21. GOAL -PROVIDE, DEVELOP, AND MAINTAIN A PERMANENT POTABLE WATER SUPPLY SYSTEM TO MEET ANTICIPATED DEMAND WHILE PROVIDING MAXIMUM PRACTICAL PROTECTION TO TAE ENVIl20NMENT AT A COST CONSISTENT WITH THE PUBLIC'S ABH ITY AND WILLINGNESS TO PAY. 21.1 Objective - To maintain adequate Levels of Service for existing and future populations through the year 2015 308. ~*~** 21.2 Objective -Provide adequate quantities and qualities of water service to all customers of the Clearwater service area. Current service level (July, 2007 X991) is 40,390 X3;438 customer accounts (potable, reclaimed and fire). Policies 21.2.1 Ensure that land development regulations, building codes and City ordinances adequately address water system provisions by performing a thorough evaluation of City codes and by coordinating proposed provisions with the Southwest Florida Water Management District and Florida Department of Environmental Protection T^m°^'~^•~ `x'^~°~ 21.2.2 ~ Engineering shall analyze the condition and adequacy of any water distribution system that the City may inherit through annexation and prepare cost estimates for upgrading those systems to meet City requirements. 21.2.3 When new subdivisions are being developed, it shall be the responsibility of the developer to provide internal potable water and reclaimed water systems which are constructed to City specifications. ~K*~*~ 21.2.5 Continue to dDevelop a system and construct improvements which will conserve energy, water, and other valuable resources. -3- Exhibit AOrdinance 7950-08 21.2.6 The City e€~~l~;atwat€r shall continue to participate and assist the Southwest Florida Water Management District `T'^•~~^ ~^•• `x'^~°•-, Pinellas County Health Department, and the U.S. Enviromnental Protection Agency in developing innovative techniques to augment existing water supplies to provide for future needs. 21.2.7 Continue to identify, acquire, and develop sources of water supply and methods of water treatment to meet existing and future needs. Some ways this can be accomplished are through well rehabilitation projects and/or exploration and drilling of new wells. Some type of water treatment may be initiated. Additional volumes of water may be acquired from the Pinellas County Water System through Clearwater's intergovernmental water service agreement. The City's long range YYater Master Plan completed in 2004 shall serve as the euidint? document for water supply and treatment methods. =V,a; iP::::..c9eaatiens ~^ ..~t, we ..t.....:..oa ~+,,,a, i„ ,rte ..t. .,a e e .~ 21.2.8 Ensure that water management projects are designed and operated to maintain and enhance natural systems as well as man made systems by working closely with the Southwest Florida Water Management District when proposing new projects and water management programs. The City's lons; range Water Master Plan completed in 2004 outlines a work plan for continued coordination with the Southwest Florida Water Management District's Regional Water Su~~ly Plan adopted in December 2006. *~*~~ 21.3 Objective -- Continue to maintain the water system in a safe, sound, and efficient manner on a daily basis. Policies 21.3.1 The Public Utilities Department D••r.',^ xxr,...~.^ n,a....:~:..._,.,:,,~~ Water Division, shall monitor water quality and the operation of the water distribution system with the intent of repairing and replacing deficient portions of the system within the framework of the capitalized budgeting process. ***** 21.4.5 The City shall continue to refine the inverted rate structure for residential water meters, lawn meters and all other water meters pen-nitted by the Water Division of the Public Utilities Department 21.5 Objective -Continue to develop a potable water system that is compatible with the environment and seeks to conserve and protect sensitive natural resources. -4- Eshibit AOrdinance 7950-08 Policies 21.5.1 Except for areas of the City where reclaimed water is available, shallow wells shall be recognized as a source of water for irrigation purposes. Establish a City permit for shallow well installation by the end of 2008. 21.5.2 The City's building code shall §~edi€i€~e include the requirement for water conserving fixtures in newly constructed or remodeled buildings. ***** 21.5.5 The City e€~~aeF shall maintain its current Water Restriction Ordinance. ***** 21.6 Objective -Continue to achieve effective coordination with other government agencies to solve problems of an extraterritorial nature with cooperation and in conjunction with the Southwest Florida Water Management District. ****~ 21.6.2 Continue to cooperate with the Southwest Florida Water Management District and Tampa Bay Water in developing environmental and hydrologic data that will identify safe and reliable potable water yields in existing and future well-fields. 21.6.3 Continue to cGoordinate with appropriate local, State, regional and Federal agencies in implementing the water system plan. *~*** 21.6.5 Ensure consistency with the actions defined within the Regional Water Supply Plan prepared by the Southwest Water Management District. 21.7 Objective -Continue to protect all natural recharge areas having functional hydrological characteristics. ***** 21.7.2 The City ef~~ shall include incentives in the Community Development Code for the protection of natural groundwater aquifer recharge areas as identified in the Conservation Element of the Clearwater Comprehensive Plan. 21.7.3 The City ^~^~ r'er- shall continue to protect groundwater quality by enforcing Wellhead Protection Ordinance. -5- Exhibit AOrdinance 7950-08 City of Clearwater Adoption of the Amendment To the Utilities Element Amended Utilities Element As Adopted CPA2008-03002 DCA 08-RWSP1 Goals. Objectives and Policies Utilities Utility Needs Summary The following summarizes the Utility Element: Sanitary Sewer • Rainfall during the rainy season exerts the greatest influence in producing peak wastewater flows or infiltration. The City has embarked on an extensive evaluation of the sanitary sewer system. The information for the evaluation will be included in a Master Plan which will direct the lining and replacement of the older sewer lines. • The Marshall Street treatment facility provides service at a rate of one hundred and twenty-four {124) gallons per capita per day (GPCPD). • The Clearwater East treatment facility provides service at a rate of one hundred and fourteen (114) gallons per capita per day (GPCPD). The East plant and Northeast plant are cortnected by a two-way force main. • The Northeast Regional Wastewater treatment facility provides service at a rate of one hundred and forty eight (148) gallons per capita per day (GPCPD). • Clearwater's projected peak population in 2010 will be 135,940 permanent and seasonal residents and guests. Sewage flow rates projected for 2010 will utilize seventy-four percent (74%) of the system capacity. • Clearwater has adequate sewage treatment, collection capacity and system redundancy to serve existing and planned development. Current total design capacity is twenty-eight and a half (28.5) MGD; with four MGD allocated to the City of Safety Harbor through interlocal agreement. • The City requires all new development to provide sanitary sewer systems to connect to appropriate sewage treatment districts. New septic tanks should not be permitted. Residents located in nearby unincorporated areas using septic tanks should connect to the City sewage system as sewer lines become available. Soil characteristics have moderate to severe limitations in areas where septic use has been identified. • Currently there are four (4} private treatment plants in areas adjacent to the City. As these "package treatment plants" become inoperable the City should encourage those needing sanitary sewer service to connect to the City sewage system. The City should continue to require annexation into the City when connecting to the City sewer system. • Clearwater has undertaken major pumping station replacement and upgrades for pumping stations located throughout the city. Betty Lane was replaced in 1997, Sand Key will be operational within the calendar year and Morton Plant shall be completed by 2000. Upgrades to twenty four (24) additional pumping stations will be completed based on the recommendations from the Pump Station Capital Improvement Report. The remaining stations will be evaluated and a scheduled renewal and replacement program will be developed. D-1 Goals. Objectives and Policies Utilities Solid Waste The Florida Solid Waste Management Act of 1988 (Chapter 88-130, Laws of Florida) required all local governments to reduce their solid waste stream by thirty percent (30%) by 1994. The reduction has been achieved and exceeded with the reduction in the 1999 waste stream at forty- five percent (45%). This end was achieved by the utilization of source separation and recycling of glass, newspaper, plastic, cardboard, office paper, other metals and aluminum containers. This effort includes cormercial, multi-family and single-family residential recyclables. Recovered materials from the commercial waste stream are available to registered private recovered materials dealers on an open competitive basis. • The City of Clearwater has entered into an interlocal agreement with Pinellas County to assist the County in accomplishing responsibilities emanating from the recycling program mandated by the State. • The City of Clearwater adopted an ordinance in April 1999 regarding the screening of all dumpsters and recycling containers which is estimated to be completed by 2005. This initiative, amongst other components includes an incentive program to complete the process by the schedule date. • Voluntary cooperation and participation in the residential curbside source separation program is imperative to the success of the program and will depend on the willingness of City residents. Public awareness and education programs are important elements to motivate the citizenry to maintain their support and participation in the residential curbside separation program. • The recycling of used office paper generated by City of Clearwater personnel will contribute to the preservation of natural resources and will continue to be a source of revenue for the City to help offset the cost of office paper. • The necessity to monitor market fluctuations for the price of recyclable materials should be reviewed. at all times; this should accompany a regular and continuous market evaluation to optimize revenue received. • The solid waste Level of Service is based on a demand of seven and twelve one hundredths (7.12) pounds per capita per day. • Clearwater residents should continue to partake in the utilization of the Pinellas County small quantity generator disposal site for hazardous/toxic waste materials for households and small generators of hazardous wastes. The City should also promote the Household Chemical Collection program that is held on an annual basis. D-2 Goals, Objectives and Policies Utilities Stormwater Management • The City of Clearwater needs to continue to monitor the stormwater management utility fee rate structure and amend it as required to remain competitive and maintain an adequate funding source to provide revenue for flood control, maintenance, retrofitting, and treatment of storrrtwater. In addition to the hydraulic improvements, this would improve the quality of Stormwater discharging into surface waters, and will complement the measures proposed in the Surface Water Improveme~tt and Management (SWIM) program and the Tampa Bay National Estuary Program to improve surface water quality standards. • The City of Clearwater needs to take advantage of any alternative funding opportunities that may become available from any State agency with regard to watershed management and/or general stormwater improvements. • T'he City of Clearwater needs to continue to reduce flooding problems and strive for abatement of flood damage to houses and streets. • The City of Clearwater needs to continue to coordinate Stormwater management improvement efforts with Pinellas County and other incorporated areas adjacent to Clearwater City limits for both water quality and attenuation. • The City of Clearwater needs to continue to maintain, correct deficiencies and improve, where necessary, current levels of service. Maintenance and improvement of the City stormwater management system must be recognized as a service provided by the City on a regular and continuous basis. • The City of Clearwater needs to continue to prepare stormwater management plans which will identify and prioritize the implementation of programs to improve and enhance stormwater quality and quantity. • Natural and man-made wetlands need to be utilized for Stormwater storage and protected as natural resources. Wetlands provide a natural wildlife habitat and groundwater recharge functions which are pivotal characteristics of the natural and urbanized environment. Such features are firmly established within Clearwater's quality of life values. • The City of Clearwater must continue to obtain appropriate permits from all environmental regulatory agencies prior to implementation of water resource projects. • The City of Clearwater needs to research and develop new methods that are technically, environmentally, and economically viable of treating Stormwater runoff before final discharge to improve and enhance local surface waters. • The city needs to proceed forward in its planning, design and engineering of the proposed downtown lake which has been included in the City's twenty year Downtown Redevelopment Plan. The proposed lake will serve as a basin for Stormwater attenuation and water quality management, as well as enhancing the aesthetic beauty of the downtown area. D-3 Goals Objectives and Policies Utilities The City of Clearwater needs to continue to participate in the National Flood Insurance Program's Community Rating System (NFIP/CRS). Clearwater has been an active participant siutce 1990. Potable Water and Natural Ground Water Aquifer Recharge Needs Clearwater has maintained an interlocal agreement with Pinellas County since 1955 with approximately eighty-percent (80%) of its water supply emanating from the County. The City also maintains a water use permit issued through the Southwest Florida Water Management District (SWFWMD) to pump a maximum of 8 million gallons daily (MGD) from its eighteen active wellheads. The decline in the ability to produce potable water from Clearwater wells is becoming evident. Clearwater cannot maintain its existing levels of service to meet the City's potable water demand without purchasing approximately eight to twelve MGD. The actual average pumpage from wells is approximately 3 MGD. In order to meet the city's future potable water supply needs, several alternative actions must be explored and initiated both individually or in combination with other water supply source alternatives. Cost benefit analysis will be necessary for each alternative in order of priority. • Conservation of potable water supplies is of paramount importance to the City. Clearwater will continue to support Pinellas County and participate in the immediate action to provide for new potable water supplies at a reasonable cost. • Clearwater must continue to utilize and provide efficient use of reclaimed water for irrigation purposes for both public and private use. Furthermore, it must constantly evaluate its approach to the desalination of marine water using reverse osmosis technology to provide a form of potable water backup for periods of drought, and when natural groundwater levels drop to critically low levels. . • Clearwater shall continue to explore and participate proportionately in the regionaVand or County desalination andl or reverse osmosis alternative strategies. • The City needs to continue to recognize potable water as a scarce resource and to continue to operate the water utility prudently in implementing both conservation and consumption objectives. The current water consumption rate is approximately one hundred and twenty (120) gallons gallons/person/day, which includes both the seasonal and permanent population of Clearwater and is inclusive of both City produced water and County purchased water. • The City needs to continue to coordinate with the Southwest Florida Management District (SWFWMD) in the study to determine surficial groundwater direction and flow at various depths. Groundwater data will continue to be needed to determine future well sites and conditions of subsurface transmissivity. This data will be an important tool for management of Clearwater's wellhead operation to determine the City's ability to continue to provide future water supplies. The City, in conjunction with the City's Water Use Permit, needs to continue to develop an ultimate well head plan including well configurations, pumping schedules and locations. This is needed to assure the continued supply of the City's water use permit, which is expected to be reduced to six (6) MGD from Clearwater wells. D-4 Goals, Objectives and Policies Utilities The City needs to continue to implement the recommendations from the A] ligator Creek study. The City needs to continue with its public education program to make the public aware of the value of reclaimed water use. D-5 Goals, Objectives and Policies Utilities GOALS, OBJECTIVES AND POLICIES SANITARY SEWER 17. GOAL - TO PROVIDE HIGH QUALITY, RELIABLE, AND EFFICIENT SANITARY SEWER SERVICE IN AN ENVIRONMENTALLY SOUND MANNER WHICH WILL PROTECT THE PUBLIC HEALTH AND SAFETY. 17.1 Objective - To maintain adequate Levels of Service for existing and future populations through the year 2010. Policies 17.1.1 The following Level of Service standard is established for the City of Clearwater and shall be used in determining the availability of facility capacity and the demand created by new development: Service District Level of Service Standards Marshall Street Plant 124 Gallons per capita per day (GPCPD) East Plant 114 Gallons per capita per day (GPCPD) Northeast Plant 148 Gallons per capita per day (GPCPD) 17.2 Objective -The City shall continue to produce advanced wastewater treatment (AWT) improvements at all water pollution control facilities in accordance with Florida Department of Environmental Protection (DEP) and U.S. Environmental Protection Agency (E.P.A.) requirements. Policies 17.2.1 Sewer services shall not be extended to properties outside the corporate limits of the City unless an agreement to annex or a petition to annex is filed and approved by the Clearwater City Commission. Suff cient capacity must exist to serve the areas committed to City service, as well as those proposed for service. 17.2.2 Septic tanks and package treatment plants which are determined by the Pinellas County Health Department or the Florida Department of Environmental Protection (DEP) to have an adverse impact on the environment, shall hook up to the City sewer system after complying with all applicable City requirements when such connection can be made. 17.2.3 Should it appear likely that additional development will exceed the treatment capacity of a plant, the City Manager shall institute a method for temporarily limiting sewer hookups in the area, while concurrently making provisions to expand plant capacity to permit development. 17.2.4 Continue to develop a sewage treatment system which will minimize energy, water, and other resource needs in order to preserve these valuable resources. 17.2.5 Clearwater shall coordinate and cooperate with appropriate local, State, regional, and Federal agencies in implementing the sewer system plan. D-6 Goals, Objectives and Po]icies Utilities 17.2.6 Clearwater shall continue to develop qualified plant operators who meet applicable standards and certification in order to maximize the efficiency and effectiveness of the treatment process. 17.3 Objective -Provide and maintain minimum demand of sewer service to all customers within the corporate limits of the City. Policies 17.3.1 Ensure that ordinances adequately address sewer provisions. 17.3.2 Annexation of developments which have deficient sewer systems is encouraged. Prior to annexation, a program for sewer system improvements shall be prepared by the City with estimated costs of these improvements to be submitted to the City Commission at the time of annexation. 17.3.3 When new subdivisions are being developed, the developer shall provide internal sewer systems which are constructed to City specifications. 17.3.4 Continue to Develop and maintain a system inventory, by location and condition of underground sewer lines, to provide information for estimates of repair and replacement needs. 17.3.5 Extend force mains and lift station capacity to serve new infill development. 17.3.6 Continue the cleaning and lining of major interceptors to protect the integrity of the sewer system. 17.3.7 Continue to supply sewage treatment capacity to Safety Harbor at a rate not to exceed four (4) MGD. 17.4 Objective - To maintaiu equitable charges to support fiscal and capital programs and to provide efficient financial management for all sewer system funds. Sewer rates structure shall be reviewed each fiscal year. Policies 17.4.1 The sewer system shall be aself-sustaining, utility enterprise, and rates should be based on sound engineering and economic principles. 17.4.2 Fees charged users of sewer services shall be adequate to cover system operating costs, repayment of capital costs, suitable coverage for payment of bonded indebtedness to maintain desirable bond rating and allow for repair and replacement of existing facilities. 17.4.3 Prioritization and scheduling of major sewer improvements should be done as a component of the capital improvements program. D-7 Goals Objectives and Policies Utilities 17.4.4 Charges for sewer system usage shall reflect all operation costs consistent with the amount of waste water generated by each system user. 17.4.5 Maintain sufficient revenues to fund a portion of the capital improvements for repair and replacement on apay-as-you-go basis. 17.4.6 Maintain periodic reevaluation of the sanitary sewer utility rate structure and annual notification to utility users of rate structure per requirements of the Florida Department of Environmental Protection (DEP) and U.S. Environmental Protection Agency (E.P.A.). 17.5 Objective -Continue current practices of effluent disposal, including outfall of tertiary-treated effluent, and spray irrigation on open spaces; establish amulti- modal approach to effluent disposal to insure that the most resource-efficient methods are used, consistent with environmental and economic considerations. Policies 17.5.1 Continue to encourage long-term agreements with golf course operators and other itidividuals or groups to use reclaimed water for irrigation by offering reclaimed water on an incentive-based fee schedule. 17.5.2 Continue to develop the use of reclaimed water for irrigation of City parks, golf courses, ball fields, soccer fields and other appropriate land uses in an effort to conserve potable water. 17.5.3 Continue to provide for the best, cost-effective means of sludge disposal, after re-evaluation of Clearwater's current land spreading program. 17.5.4 Continue to meet all E.P.A. and Florida (DEP) water quality standards for effluent discharge. 17.5.5 Expand the reclaimed water network to serve all areas to optimize potable water conservation efforts, while concurrently providing for optimum use for wastewater effluent. SOLID WASTE 18. GOAL - TO PROVIDE THE MOST RELIABLE, COST EFFECTIVE AND ENERGY EFFICIENT METHOD OF COLLECTING, RECYCLING, AND DISPOSING SOLID WASTES THROUGHOUT THE CITY OF CLEARWATER IN AN ENVIItONMENTALLY SOUND MANNER WHICH WILL PROTECT THE PUBLIC HEALTH AND SAFETY. 18.1 Objective -Continue To maintain adequate Levels of Service for existing and future populations through the year 2010. D-8 Goals, Objectives and Policies Utilities Policies 18.1.1 The following Level of Service standards have been established for the City of Clearwater and shall be used in determining the availability of facility capacity and the demand created by new development: Service Leve) of Service Standards Solid Waste Facility Average Solid Waste Generator Rate 7.12 pounds per capita per day. 18.2 Objective - On an ongoing basis, continue to develop collection and transport strategies which minimize costs and use optimally located waste transfer facilities. Policies 18.2.1 Collection services shall not be extended to properties outside the City limits unless sufficient capacity exists to serve the areas committed to City services, as well as the area proposed for service. 18.2.2 Collection services shall not be extended to properties outside the City limits except by interlocal or other type agreement. 18.2.3 Provide collection service to every residential and commercial location within the Clearwater City limits. 18.3 Objective -Continue to Provide sound fiscal management for solid waste collection, transport, disposal and recycling as it develops through State legislation. Policies 18.3.1 Fees charged subscribers shall be adequate to cover system operating costs, repayments of capital costs, and allow for repair and replacement of existing facilities. 18.3.2 Utilize a sound statistical methodology for quantifying the impact on the solid waste stream of recycling programs. 183.3 Charges to each subscriber shall reflect the average costs incurred to service that subscriber. 18.3.4 Funds set aside for repair and replacement shall not be diverted to other uses. 18.3.5 Replacement of equipment shall be scheduled on a basis that permits a uniform replacement rate and avoids irregular capital outlays of substantial amounts of revenue. D-9 Goals Objectives and Policies Utilities 18.4 Objective -Continue to conserve natural resources used in the collection, disposal, and resource recovery systems. Policies 18.4.1 Utilize recycling and disposal techniques to conserve resources and minimize adverse envirorimental impact by recycling aluminum and steel cans, newspapeX, glass, plastics, cardboard, office paper, other metals and yard waste. 18.4.2 Develop a solid waste collection, recycling disposal and recovery system that will, to the greatest degree possible, reduce the waste stream, conserve energy and minimize impact on natural resources. 18.4.3 Continue to Reduce the solid waste stream through the recycling of aluminum, glass, newspaper plastic, steel, cardboard, office paper, other metals and yard waste. 18.4.4 Voluntary residential curbside source separation for both single-family homes and multi-family shall be the method used in the Clearwater recycling effort. 18.4.5 Commercial source separation shall continue to be used on an open competitive basis with registered private recovered materials dealers. 18.5 Objective - Continue to Coordinate and cooperate with other governments to solve extraterritorial solid waste disposal problems. Policies 18.5.1 Participate in the Pinellas County Solid Waste Disposal Recycling and Resource Recovery Programs. 18.52 Coordinate with other municipalities and cooperate in recycling and resource recovery programs to reduce the solid waste stream and dispose of solid waste in an efficient and environmentally sound manner. 18.6 Objective -Employ the most efficient strategies in the city's continuous effort to reduce the residential waste stream through curb-side source separation and to reduce disposal costs by using available markets to return materials to use through recycling. Policies 18.6.1 Utilize available State grant funds to expand the processing capacity to provide a recycling center for residential, multi-family and commercial source separation; Furthermore, the City should on a continuous basis conduct studies and develop methods for the most cost effective collecting, processing and marketing of recyclable materials. D-10 Goals, Objectives and Policies Utilities 18.6.2 Direct Clearwater citizens to authorized sites for disposal and transfer/temporary storage facilities located in Pinellas County for hazardous, household wastes. 18.6.3 Support and encourage the Household Chemical Collection Program provided by Pinellas County by assisting in notifying citizens of drop-off sites through the utility billing process. 18.6.4 The Clearwater Engineering Department and Pinellas County shall coordinate and manage manifest procedures with all applicable regulatory agencies for all City generated hazardous/toxic wastes as required by Federal and State laws. 18.6.5 Provide education to inform citizens of the need and opporh-nities for recycling through the use of the Solid Waste Management Trust Fund grant program. 18.7 Objective -Continue the implementation of a dumpster and recycling container screening program to support the visual appearance objectives of the City. Policies 18.7.1 Where not impracticably constrained by site design features, all dumpster and recycling containers in the City shall continue to be screened. STORM WATER 19. GOAL -PROVIDE THE MOST COST EFFECTIVE AND EFFICIENT PROVISION OF STORMWATER MANAGEMENT INCLUDING THE IMPROVEMENT AND ENHANCEMENT OF STORMWATER QUALITY DISCHARGING INTO LOCAL RECEIVING WATERS, AND PROVIDE 1VZA~IVIIJM PRACTICAL PROTECTION TO PERSONS, PROPERTY, AND THE NATURAL ENVIIZONMENT. 19.1 Objective - To maintain adequate levels of service for existing and future populations through the year 2010. Policies 19.1.1 The following Level of Service standards have been established for the City of Clearwater and shall be used in determining the availability of facility capacity and the demand created by new development and shall be applied to all new development, redevelopment, and for all City facilities through 2010. Service Level of Service Standards Stotmwater Management Design storm Facilities 10 - year storm frequency for all new street development using the rational design method. 25 -year storm frequency with positive outfall for major stotm systems with basin time of intensities controlling the duration.* 50 -year storm frequency when no outfall and discharge is to street right-of-way.* D-11 Goals. Objectives and Policies Utilities 100 -year storm frequency when no outfall and discharge is across private property.* " Design standards for stormwater qualitytreatment/storage quantity shall conform to the current SWFWMD requirement [Presently being the SCS Unit Hydrograph design method, using the design storm frequency and atwenty-four (24) hour duration for sites ten (10) acres or more, and the rational design method for sites under ten (]0) acres]. 19.2 Objective -The • City of Clearwater shall continue to develop watershed management plans which should seek to identify, evaluate and implement the most cost effective and cost efficient programs for stormwater management, including stormwater quantity and quality. These plans should also address any projects included in the Pinellas County stormwater Management Plan (SWMP) for the implementation of all stormwater management, as well as recommended funding sources. Policies 19.2.1 Coordinate and cooperate with appropriate local, State, regional, and Federal agencies implementing the Pinellas County and City of Clearwater stormwater management plans. ] 9.2.2 Continue to Provide a stormwater management system throughout the City that will afford the most economically feasible protection to residents and property. 19.2.3 All stormwater management improvements should seek to meet applicable goals, guidelines, and regulations established to provide flood protection and pollution abatement. 19.2.4 Participate in interlocal agreements to study and evaluate stormwater quality and stormwater runoff management issues. 19.2.5 Coordinate and cooperate with Southwest Florida Water Management District policies and regulations. 19.2.6 Continue to require new development to detain water on site and control quantity, quality, and rate of flow being released into the receiving drainage systems. 19.3 Objective -Lower high water profiles during storm events, as necessary, to reduce house flooding occurrences and to lessen the resulting adverse effects on public health, the natural environment, public and private property. D-12 Goals, Objectives and Policies Utilities Policies 19.3.1 Continue to provide a program of regular maintenance to the. stormwater management system to ensure maximum efficiency and performance. Ensure that stormwater management plans include measures to remove trash, sedimentation and other debris which impede flow and incorporate structural and non-structural measures to reduce or eliminate the discharge of oil, grease, heavy metals, and other suspended particles into the stormwater management systems. 19.3.2 Natural and man-made wetlands shall be considered as a means to provide stornnwater management wherever possible and shall be maintained for hydrologic purposes. The efficiency of natural and man-made systems to convey stormwater runoff shall be protected through the provision of routine water quality maintenance schedules overseen by city inspections. 19.3.3 Continue to provide multiple use facilities, such as recreational open space uses, with open channel stormwater management systems, when appropriate. 19.3.4 Development and redevelopment activities shall comply with all stormwater management design standards and criteria. 19.3.5 Structural Development shall be prohibited where it is determined that such development will have an adverse impact on stormwater storage areas, increase flood prone areas, significantly increase rates of runoff, or cause other unfavorable drainage conditions. Both man-made and natural systems shall be treated on an equat basis as a sensitive preservation area; no distinction shall be made between a natural system and aman-made or man altered hydrologic system. 19.3.6 Prohibit new building, development or construction that will result in building(s) constructed within/or over stormwater retention/detention ponds, streams or channels. All wetlands, streams, channels, or other hydrologic features, whether wetlands, ponds or bodies of water having intrinsic hydrologic, biologic and zoological functions with no distinction made in regard to its status to whether it is man-made or natural shall be considered for a Preservation Land Use Plan classification to ensure protection from development. 19.3.7 Continue active participation and cooperation with the National Flood Insurance Program and the Florida Emergency Management Agency for the purpose of recognizing flood prone areas, and establishing abatement programs that endeavor toward a reduction in damages and losses due to flooding. 19.3.8 Continue the established requirement of a twenty-five foot setback from the tops of a bank from all wetlands whether natural or man-made, and require fmished floor elevations in areas adjacent to lakes, bays, creeks, the Gulf of Mexico, Tampa Bay and Old Tampa Bay, and other flood prone areas. D-13 Goals Objectives and Policies Utilities 19.4 Objective Continue the implementation of the most cost effective and efficient plan to reduce the occurrence of street flooding where safety issues and traffic problems exist as prioritized and set forth in the Capital Improvement Element, and listed in the stormwater management plans. Policies 19.4.1 Identify areas where inadequate stormwater management easements exist, and obtain proper access to stormwater management channels, structures and appurtenances for maintenance purposes. 19.4.2 , Improve all street stormwater management systems where deficiencies exist. 19.5 Objective -Protect and enhance the quality of receiving waters by the use of "Best Management Practices" in accordance with the adopted watershed management plans. Policies 19.5.1 The use of "Best Management Practices" shall be required before, during, and after construction activities to prevent water pollution resulting from erosion and siltation. 19.5.2 Vegetated swales, sodding, and appropriate landscaping will be required as components of the drainage system for natural filtration before final discharge into receiving waters. 19.5.3 Monitor major stormwater management outfalls and receiving water bodies to identify the quality of stormwater runoff and the impact on receiving bodies. 19.5.4 Maximize water recharge potential in designing stormwater management improvements by utilizing natural wetland areas for stormwater storage. 19.5.5 Coordinate stormwater management improvements with other local governments to assist in solving stormwater management problems of an extraterritorial nature. 19.5.6 Continue to Identify impaired bodies of water and prioritize them for improvement and enhancement. 19.5.7 Water resource projects shall be consistent with the policies of the Conservation Element and with adopted watershed management plans. 19.5.8 All stormwater management plan projects of the City of Clearwater shall comply with the Florida Surface Water Improvement and Management (SWIM) program and the National Estuary Program. 19.5.9 The City of Clearwater shall continue to upgrade and retrofit City-owned drainage system facilities and include stormwater treatment for water quality in accordance with the proposed stormwater management plan. D-14 Goals. Objectives and Policies Utilities 19.6 Objective -Continue to Provide sound fiscal management of the stormwater management systems to include maintenance, operation, and construction in accordance with the watershed management plans and concurrent with its implementation. Policies 19.6.1 Operation, and maintenance of the stormwater management systems may be financed through revenues supporting the City's general fund or as otherwise funded as a utility operation. 19.7 Objective -Provide economic development incentives that promote water resource protection and enhancement. Policies 19.7.1 Methods of financing stormwater management system improvements and new stormwater infrastructure construction should be evaluated to determine the most feasible and equitable arrangement, both city-wide and in local probeem areas. 19.7.2 The City of Clearwater shall continue to seek and be on notice of financial support for system improvements through grant programs administered by appropriate State and Federal agencies. 19.7.3 The City of Clearwater shall pursue a system of regional stormwater management which is both economically and environmentally sound. 20. GOAL -DISCHARGES OF STORMWATER SHALL BE MANAGED TO PROVIDE FLOOD PROTECTION FOR THE CITIZENS OF THE CITY OF CLEARWATER AND TO .PRESERVE, PROTECT, AND ENHANCE THE WATER QUALITY OF RECEIVING WATERBODIES. 20.1 Objective -The protection, restoration, and enhancement of water quality associated with stormwater runoff will be considered a function of the City's overall stormwater management plans. Policies 20.1.1 The City shall incorporate water quality protection and enhancement criteria into the City stormwater management plans. 20.1.2 The use of natural alternatives, the conservation of natural stormwater management systems, and the protection and improvement of the quality of receiving waters shall be a goal of the City's stormwater management plans. 20.1.3 Management plans shall continue to be developed on an ongoing basis for waterbodies with known or suspected water quality problems in the City to include Tampa Bay, Clearwater Harbor, Stevenson Creek, Allen's Creek, and Alligator Creek. D-15 Goals. Objectives and Policies Utilities 20.1.4 The City shall systematically and timely prepare watershed or waterbody specific management plans for waterbodies within the City. Such plans shall include both water quality and flood control considerations and recommended funding sources. 20.1.5 The City shall implement all City-approved watershed management plans. 20.1.6 All City stormwater management plan projects within watersheds of The City shall comply with applicable SWIM Plans for that waterbody or watershed. 20.1.7 The City shall continue to coordinate with and supplement the County's surface water monitoring program. POTABLE WATER AND NATURAL GROUND WATER AQUIFER RECHARGE 21. GOAL -PROVIDE, DEVELOP, AND MAINTAIN A PERMANENT POTABLE WATER SUPPLY SYSTEM TO MEET ANTICIPATED DEMAND WHILE PROVIDING MAXIMUM PRACTICAL PROTECTION TO THE ENVIItONMENT AT A COST CONSISTENT WITH THE PUBLIC'S ABILITY AND WILLINGNESS TO PAY. 21.1 Objective - To maintain adequate Levels of Service for existing and future populations through the year 2018. Policies 21.1.1 The following Level of Service standards have been established for the City of Clearwater and shall be used in determining the availability of facility capacity and demand created by new development: Service Area Level of Service Standards Potable Water Facilities Average Water Consumption Rate City and County Water City Service Area 120 gallons per capita per day at a pressure of 40-45 psi. *Continue to maintain water consumption of one hundred twenty (120) GPCPD or less as per the conditions set forth by Clearwater's Water Use Permit. 21.2 Objective -Provide adequate quantities and qualities of water service to all customers of the Clearwater service area. Current service level (July, 2007) is 40,390 customer accounts (potable, reclaimed and fire). Policies D-16 Goals, Objectives and Policies Utilities 21.2.1 Ensure that land development regulations, building codes and City ordinances adequately address water system provisions by performing a thorough evaluation of City codes and by coordinating proposed provisions with the Southwest Florida Water Management District, Florida Department of Environmental Protection, Pinellas County, and Tampa Bay Water. 21.2.2 Engineering shall analyze the condition and adequacy of any water distribution system that the City may inherit through annexation and prepare cost estimates for upgrading those systems to meet City requirements. 21.2.3 When new subdivisions are being developed, it shall be the responsibility of the developer to provide internal potable and reclaimed water systems which are constructed to City specifications. 21.2.4 Continue to construct water system improvements which will provide adequate quantity, pressure, and duration of fire flows while meeting system user needs. 21.2.5 Continue to develop a system and construct improvements which will conserve energy, water, and other valuable resources. 21.2.6 The City shall continue to participate with and assist Tampa Bay Water, the Southwest Florida Water Management District, Pinellas County Health Department, and the U.S. Environmental Protection Agency in developing innovative techniques to augment existing water supplies to provide for future needs. 21.2.7 Continue to identify, acquire, and develop sources of water supply and methods of water treatment to meet existing and future needs. Some ways this can be accomplished are through well rehabilitation projects and/or exploration and drilling of new wells. Some type of water treatment may be initiated. Additional volumes of water may be acquired from the Pinellas County Water System through Clearwater's intergovernmental water service agreement. The City's long range Water Master Plan updated in 2008 shall serve as the guiding document for water supply and treatment methods. 21.2.8 Ensure that water management projects are designed and operated to maintain and enhance natural systems as well as man made systems by working closely with the Southwest Florida Water Management District when proposing new projects and water management programs. The City's long term Water Supply Master Plan outlines a work plan for continued coordination with the Southwest Florida Water Management District's Regional Water Supply Plan adopted in December 2006. 21.2.9 Water service shall not be extended to properties outside the City's service area unless sufficient capacity and quality of water exists to serve the areas already committed to City service. 21.2.10 Water services shall not be extended except in those areas so designated for City of Clearwater by interlocal or other agreement. D-17 Goals Objectives and Policies Utilities 2].2.11 Encourage the development of local and regional water supplies within the jurisdiction of the Southwest Florida Water Management to avoid transporting surface water across other district boundaries. 21.3 Objective -Continue to maintain the water system in a safe, sound, and efficient manner on a daily basis. Policies 21.3.1 The Public Utilities Department, Water Division, shall monitor water quality and the operation of the water distribution system with the intent of repairing and replacing deficient portions of the system within the framework of the capitalized budgeting process. 21.3.2 Continue to provide a minimum operating pressure of 40-45 psi throughout the water distribution system. 21.3.3 Continue to provide adequate spacing of fire hydrants to provide optimum hose ' lays and fire flow. 21.3.4 Require at the time of application for connection to the public potable water system, that minimum fire flows and hydrant spacing be consistent with fire district standards. Also, require that proper size water pipes are installed to provide desired fire flow rates based on the most recent Insurance Service Office (ISO} Report. 21.4 Objective -Continue to Provide sound fiscal management for the operation and maintenance of potable water service in the City's service area Policies 21.4.1 Fees charged users of water services shall continue to be adequate to cover system operating costs, repayments of capital costs, and allow for repair and replacement of existing facilities. The City shall also continue to evaluate new rate structures as necessary. 21.4.2 Prioritization and scheduling of major improvements associated with the water system should be accomplished as a component of the capital improvement program. 21.4.3 Funds set aside for repair and replacement of the water system shall not be diverted to other uses. 21.4.4 The City should continue to seek financial support of the water system through grant programs administered by appropriate State and Federal agencies. 21.4.5 The City shall continue to refine the inverted rate structure for residential water meters, lawn meters and all other water meters permitted by the Water Division of the Public Utilities Department. D-18 Goals. Objectives and Policies Utilities 21.4.6 Encourage partnerships among federal, state, local governments, and the private sector that would identify and build needed potable water facilities and allocate such facilities costs among the partners in proportion to the benefits accruing to each of them. 21.5 Objective -Continue to develop a potable water system that is compatible with the environment and seeks to conserve and protect sensitive natural resources. Policies 21.5.1 Except for areas of the City where reclaimed water is available, shallow wells shall be recognized as a source of water for irrigation purposes. Establish a City permit for shallow well installation by the end of 2008. 21.5.2 The City's building code shall include the requirement for water conserving fixtures in newly constructed or remodeled buildings. 21.5.3 Manage the supply of water in quantities which would minimize significant adverse impacts on the natural system and protect the long term public interest. 21.5.4 Develop and modify rate structures and policies which encourage conservation of potable water. 21.5.5 The City shall maintain its current Water Restriction Ordinance. 21.5.6 Provide educational awareness to inform citizens of the need and opportunities for conserving potable water by visiting schools to speak with young children about water conservation practices. 21.5.7 Reclaimed water service will continue to be extended to private residences based on the Twenty (20) Year Reclaimed Master Plan. 21.5.8 The City will continue to develop strategies aimed at reducing potable water consumption by means such as water conservation rates, conservation codes, operational measures, rebate and plumbing retrofit programs, landscape and irrigation efficiency programs, research and evaluation, and re-use alternatives. 21.5.9 The City will expand, in coordination with other stakeholders, educational programs to promote water conservation measures. 21.6 Objective -Continue to achieve effective coordination with other government agencies to solve problems of an extraterritorial nature with cooperation and in conjunction with the Southwest Florida Water Management District. Policies 21.6.1 The City shall continue to participate in regional and County-wide studies which are or may be formed to seek solutions of problems of an extraterritorial nature. D-19 Goals Objectives and Policies Utilities 21.6.2 Continue to cooperate with the Southwest Florida Water Management District and Tampa Bay Water in developing environmental and hydrologic data that will identify safe and reliable potable water yields in existing and future well-fields. 21.6.3 Continue to coordinate with appropriate local, State, regional and Federal agencies in implementing the water system plan. 21.6.4 The City shall pursue a coordinated approach to interjurisdictional problems, by providing support of both staff and officials to participate in conservation efforts with Pinellas County and the Tampa Bay Regional Planning Council. 21.6.5 Ensure consistency with the actions defined within the Regional Water Supply Plan prepared by the Southwest Florida Water Management District. 2].6.6 The City will maintain a Water Supply Facilities Work Plan that is consistent with the Southwest Florida Water Management District's Water Supply Plan by updating the work Plan within 18 months of an update to the District's Regional Supply Plan that affects the City. 21.7 Objective -Continue to protect all natural recharge areas having functional hydrological characteristics. Policies 21.7.1 Recognize the importance of groundwater aquifer recharge in the hydrological process and the need for natural groundwater recharge as an integral component of the City's urban environment. 21.7.2 The City shall include incentives in the Community Development Code for the protection of natural groundwater aquifer recharge areas as identified in the Conservation Element of the Clearwater Comprehensive Plan. 21.7.3 The City shall continue to protect groundwater quality by enforcing the Wellhead Protection Ordinance within the area specified on Map D-2. Guidelines and criteria for protection of potable water wellfields include: 1. Issuance of a Permit (a) A wellhead protection permit shall be obtained from the engineering director for any new business, commercial, industrial or other nonresidential activity on property within the city if any portion of the subject property is within 1,000 feet of a potable water well. New residential construction on property located within the city should also obtain a permit if any portion of the subject property is within 100 feet of potable water well. 2. Permit Requirements: D-20 Goals, Objectives and Policies Utilities (a) Activities within a 1,000-foot radial distance around a potable water supply well shall conform to the requirements of Chapter 62-521, F.A.C., Wellhead Protection. (b) Activities defined as potentially high risk to ground water quality in Chapter 62-555.312, F.A.C. shall not be permitted within 100 feet of an existing potable water supply well. (c} Activities defined as a moderate risk to ground water quality in Chapter 62-555.312, F.A.C. shall not be permitted within SO feet of an existing potable water supply well. (d) If any contaminating material is proposed to be used or stored for any business, commercial, industrial or other nonresidential use within 1,000 feet of a potable water supply well, aprotection-containment plan shall be submitted. If any contaminating material is proposed to be used or stored for residential use within 100 feet of a potable water supply well, a protection-containment plan shall be submitted. (e) A wellhead protection permit application shall at a minimum include a location map of the potable water well and 1,000 feet surrounding the well, plans for the proposed development or expansion/change of an existing use (if applicable), the location and identification of existing uses in a ],000-foot zone for a commercial use application or a 100- foot zone for a residential use application, a listing of any contaminating material to be used or stored on the site and a protection-containment plan if necessary. 3. Permit Review (a) In reviewing aprotection-containment plan submitted by an applicant for a wellhead protection permit, the following factors shall be considered when determining the sufficiency of the plan: (1) The amount, character and intended use of the contaminating material involved; (2) Storage, conveyance and handling techniques to be employed by the applicant; (3} The extent of any propensity to spill, break, lose or discharge contaminating material; (4) The type of containment devices to be employed; (5) The extent of employee safety training and practices; and (6) Any other consideration appropriate to the protection of the wellhead. (b) No wellhead protection permit shall be issued unless the protection-containment plan and permit application fully D-2 ] Goals Objectives and Policies Utilities addresses all contamination and safety matters to the satisfaction of the engineering director. A wellhead protection permit may be issued subject to conditions related to the protection of the public potable water supply. D-22 City ~f ClearWater Comprehensive Rlen 20a~ CUR(EW RD. 1 .. q.,v ~. . .~ .. ~ $R so ~ ' , t ~uf ~ I ~~ ~ r' ~~;~~ .~ '~: - OLDSMAR , of MIGffWWBLVD & f dti• ~. r ~~ I + pa. ,, ~ , -. ~ ' ~~ ~ - ., a . 8 DUNEDIN~ j r ~ Sr)LGNAVE ~ ~ ~~ ~ ~ _ ~ { . ~~ .i sR- ~°'t SnN CHRISTOPHER OR It ~, . , s~aec ' ~ ~ ~ r ................... •, 51 ~`~ { `ft NtaY510~ 3_ w • ~ ' 1 . ~ coU ,. . . VIRGINIA ST ~ ^.. ~~ 1 .... Wo iVdob ~ . . . _ # ~ .: - f E~ 4 s,~ .' - ENrEkrbase ~ .~ ~ ~ ..6F ... .. .~ w ~ - . ' < ~ $ / ~ ~ ~ _ ...................... , UMO(VSr y v. m ~ gNK1N ST : ~ ?~ L,~u ~ q ~ ~ w ~ yivrcr~ta RRD... ~, t~~1 .. ,4 , ~ ff _ W ~. e ~ MAINST .. ;~ SUNSET i ppIN7 ; ~.4Ti -SUNSET 60fNT0^.Rq ~ ~ a '~y? : y ~I '.: . C~I C . - BAYMONT . ^p . 1 . , ~ ~: . l+A ~~' ST ~ +~ `0 EMEJTP { PALMETTO ,Y t ~ . I : " ' K . ' ~ `~ r ~ q)PEw ' T ~ I ' t' 1 . , , .. . .S U ~_: ; pRPW ST. ; f Stt~vcuNb . Isle • . : cDLMr SR J F S ~ ~~ ~RTSi; ~UIk~T>j ~4Y 04YD.i. i ~ ~ ~ ,I' ~, i ~hKRI ~, r,.' .. t J[ iE Jj , . 00 JV 0 2 {y ~ _ 1 ~ ; G .. ` ~ ~ I .. .` t ' ......~ ~ j ~ ~ 13 ~ ~ ~ :rc.' ~ } ~ , I ~ t Liti2EV1E I oi' ~i ~~ ~ ' Ilf _ y N4r O ~ ~ : ~ ti . ' Z Z ~.~ ~ : .. - a , n~ W _ ~ ! . ~ . .. y~~ yy Y y I.. ~ r III ' • ~ p ~. • C Y fi 1 ~ 2 ' _ L _ f1 it ~. NURSERY - ii^ . ,,. ,, BELLEAIR .... . *~~ ~ .r- ' ~ ~ ~'~ .. . s~uEArrt........ ~:....., r IF ... ........ ....... r ....................... c• . ~ : ,1. LARGO ti ~. ................. .............. ............... Potable Water Wells and Wellhead Protection Zones Map #: D-2 Date: 8129!2008 Source:ClearvvaterEnglneering DeptlJul; Lem ~ IN SERVICE WELL ;Wellhead Protection Zone ;~:; Clearwater Planning Area Outside Clearwater City Limits vrev+ne ev: ° C1earWater,o ,. ~ NlalAn OI~iLOmtl wFL]]10 ~;~ Pn: ({]TI//L/T60, Faa:lt3T16]NT66 mrw~ vmvrAlytlearwater.com pwfum+r wa~mam.•rrorr m.a nvam.N. •,amuua uaersnadrq roar IM a, av.IVVxv aavnk Mm m Mf n0 wamM4A a+{ CWnp41M1H. nL10.Vly Ws FurtMrmOn, IM CL a] Od/l/0 x,ln IM un 0 City of Clearwater Adoption of the. Amendment To the Utilities Element Adopted Ordinance No. 7950-08 Amendment to Utilities Element -Potable Water CPA2008-03002 DCA 08-RWSP1 ORDINANCE NO. 7950-08 AN ORDINANCE OF THE CITY OF CLEARWATER, FLORIDA, MAKING AMENDMENTS TO THE COMPREHENSIVE PLAN OF THE CITY AS ADOPTED ON MAY 18, 2000 AND AMENDED ON JULY 12, 2001, OCTOBER 7, 2004, OCTOBER 20, 2005, DECEMBER 15, .2005, AUGUST 14, 2007, AND FEBRUARY 21, 2008; BY AMENDING THE UTILITY ELEMENT; IN ACCORDANCE WITH SECTIONS 163.3177, 163.3184, 163.3187 OR 163.3189, FLORIDA STATUTES, TO UPDATE THE CITY OF CLEARWATER'S WATER WORK PLAN IN ACCORDANCE WITH THE UPDATED SOUTHWEST FLORIDA WATER DISTRICT'S REGIONAL WATER SUPPLY PLAN; PROVIDING FOR SEVERABILITY; AND PROVIDING AN EFFECTIVE DATE; WHEREAS, the Local Government Comprehensive Planning and Land Development Regulation Act of Florida empowers and requires the City Council of the City of Clearwater to plan for the future development and growth of the City, and to adopt and periodically amend the Comprehensive Plan, including elements and portions thereof; and WHEREAS, the City of Clearwater adopted a Comprehensive Plan on May 18, 2000 by Ordinance Number 6522-00; and WHEREAS, the City Council approved Ordinance Number 6794-01, which amended the Comprehensive Plan of the City on July 12, 2001; and WHEREAS, the City Council approved Ordinance Number 7295-04, which amended the Comprehensive Plan of the City on October 7, 2004; and WHEREAS, the City Council approved Ordinance Number 7388-05, which amended the Comprehensive Plan of the City on October 20, 2005 and December 15, 2005; and WHEREAS, the City Council approved Ordinance Number 7782-07, which amended the Comprehensive Plan of the City on August 14, 2007; and WHEREAS, the City Council approved Ordinance Number 7870-07, which amended the Comprehensive Plan of the City on February 21, 2008; and WHEREAS, the City is making these changes to the Comprehensive Plan in accordance with statutory requirements; and WHEREAS, amendments to the Comprehensive Plan of the City have been prepared in accordance with the applicable requirements of law, after conducting the Ordinance No.7950-08 appropriate planning analysis, and public participation through public hearings, opportunity for written comments, open discussion and the consideration of public and official comments; and WHEREAS, the Community Development Board, serving as the designated Local Planning Agency for the City, has held a public hearing on the proposed amendments and has recommended adoption of the proposed Comprehensive Plan amendments; and WHEREAS, the proposed amendments have been transmitted to the Florida Department of Community Affairs for review and comments, and the objections, recommendations and comments received from the Florida Department of Community Affairs have been considered by the City Council, together with all comments from local regional agencies and other persons, in preparing the final draft of the amendments; and WHEREAS, the City Council finds it necessary, desirable and proper to adopt the amendments to the objectives and policies of the Comprehensive Plan i.n order to reflect changing conditions; now, therefore, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CLEARWATER, FLORIDA: Section 1, Amendment to the Clearwater Comprehensive Plan attached hereto as Exhibit "A" is hereby adopted. Section 2. Severability. If any section, provision, clause, phrase, or application of this Ordinance shall be declared unconstitutional or invalid for any reason by a court of competent jurisdiction, the remaining provisions shall be deemed severable therefrom and shall remain in full force and effect. Section 3. This ordinance shall become effective when the Department of Community Affairs (DCA) issues a final order determining the adopted amendment to be in compliance, or the Administration Commission issues a final order determining the adopted amendments to be in compliance, in accordance with Section 163.3177, 163.3184, 163.3187 or 163.3189, F.S., as amended. PASSED ON FIRST READING May 15, 2008 Ordinance 7950-08 PASSED ON SECOND AND FINAL READING AND ADOPTED Approved as to form: Leslie K. Dougall-Si e Assistant City Attorn September 18, 2008 .--~e~ k Hibbard Mayor-Councilmember Attest: Cynt i E. Goudeau City rk Ordinance ?450-08 EXHIBIT A ATTACHMENT TO ORDINANCE 7950.08 AMENDMENT -UTILITY ELEMENT GOALS, OBJECTIVES AND POLICIES Amend Goal 29 of the Utilify Element of the Comprehensive Plan, as follows: POTABLE WATER AND NATURAL GROUND WATER AQUIFER RECHARGE 21. GOAL -PROVIDE, DEVELOP, AND MAINTAIN A PERMANENT POTABLE WATER SUPPLY SYSTEM TO MEET ANTICIPATED DEMAND WHILE PROVIDING MAXIMUM PRACTICAL PROTECTION TO THE ENVIRONMENT AT A COST CONSISTENT WITH THE PUBLIC'S ABILITY AND WILLINGNESS TO PAY. 21.1 Objective - To maintain adequate Levels of Service for existing and future populations through the year 2018 ~8. *~w~* 21.2 Objective -Provide adequate quantities and qualities of water service to all customers of the Clearwater service area. Current service level (July, 2007 x$98) is 40,390 ~43A customer accounts (potable, reclaimed and fire). Policies 21.2.1 Ensure that land development regulations, building codes and City ordinances adequately address water system provisions by performing a thorough evaluation of City codes and by coordinating proposed provisions with the Southwest Florida Water Management District, a+~ Florida Department of Environmental Protection, Pinellas County, and Tampa Bay Water. 21.2.2 The Engineering shall analyze the condition and adequacy of any water distribution system that the City may inherit through annexation and prepare cost estimates for upgrading those systems to meet City requirements. 21.2.3 When new subdivisions are being developed, it shall be the responsibility of the developer to provide internal potable water and reclaimed water systems which are constructed to City specifications. Ordinance ?950-08 ~~.~*. 21.2.5 Continue to d9evelop a system and construct improvements which will conserve energy, water, and other valuable resources. 21.2.6 The City e~G~eanwrater shall continue to participate with and assist Tampa 'Bay Water, the Southwest Florida Water Management District, Pinellas County Health Department, and the U.S. Environmental Protection Agency in developing innovative techniques to augment existing water supplies to provide for future needs. 21.2.7. Continue to identify, acquire, and develop sources of water supply and methods of water treatment to meet existing and future needs. Some ways this can be accomplished are through well rehabilitation projects and/or exploration and drilling of new we11s. Some type of water treatment may be initiated. Additional volumes of water may be acquired from the Pinellas County Water System through Clearwater's intergovernmental water service agreement. The City's long range Water Master Plan updated in 2008 shall serve as the guiding document for water supply and treatment methods. and-treateaer~ 21.2.8. Ensure that water management projects are designed and operated to maintain and enhance natural systems as well as man made systems by working closely with the Southwest Florida Water Management District when proposing new projects and water management programs. The City's long term Water Supply Master Plan outlines a work plan for continued coordination with the Southwest Florida Water Management District's Regional Water Supply-, Plan adopted in December 2006. 21.2.9. Water service shall not be extended to properties outside the City's service area unless sufficient capacity and quality of water exists to serve the areas already committed to City service. 21.2.10.Water service shall not be extended except in those areas so designated for City of Clearwater by interlocal or other agreement. Ordinance 7950-08 21.2.11. Encourage the development of local and regional water sup lies within the jurisdiction of the Southwest Florida Water Mang eq merit to avoid transporting surface water across other district boundaries. s tfeat+~er~resess: 21.3 Objective -Continue to maintain the water system in a safe, sound, and efficient manner on a daily basis. Policies 21.3.1 The Public Utilities Department , Water Division, shall monitor water quality and the operation of the water distribution system with the intent of repairing and replacing deficient portions of the system within the framework of the capitalized budgeting process. **.w* 21.4.5 The City shall continue to refine the inverted rate structure for residential water meters, lawn meters and all other water meters permitted by the Water Division of the Public Utilities Department 21.4.6 Encourage partnerships among federal, state, local governments, and the private sector that would identify and build needed potable water facilities and allocate such facilities costs among the partners in proportion to the benefits accruing to each of them. 21.5 Objective -Continue to dl~evelop a potable water system that is compatible with the environment and seeks to conserve and protect sensitive natural resources. Policies 21.5.1 Except for areas of the City where reclaimed water is available, shallow wells shall be recognized as a source of water for irrigation purposes. Establish a City permit for shallow well installation by the end of 2008. 21.5.2 The City's building code shall include the requirement for water conserving fixtures in newly constructed or remodeled buildings. **,~** Ordinance 7950-OS 21.5.5 The City e#-Olearvvate~ shall maintain its current Water Restriction Ordinance. ***** 21.5.7 Reclaimed water service will continue to be extended to private residences based on the Twenty (20) Year Reclaimed Water Master Plan. 21.5.8 The Citv will continue to develop strategies aimed at reducin potable water consumption by means such as water conservation rates, conservation codes, operational measures, rebate and plumbing retrofit programs, landscape and irrigation efr:tciency programs, research and evaluation, and re-use alternatives. 21.5.9 The City will expand, in coordination with other stakeholders. educational programs to promote water conservation measures. 21.6 Objective -Continue to aAchieve effective coordination with other government agencies to solve problems of an extraterritorial nature with cooperation and in conjunction with the Southwest Florida Water Management District. ..*** 21.6.2 Continue to cooperate with the Southwest Florida Water Management District and Tampa Bay Water in developing environmental and hydrologic data that will identify safe and reliable potable water yields in existing and future well-fields. 21.6.3 Continue to c6oordinate with appropriate local, State, regional and Federal agencies in implementing the water system plan. *..** 21.6.5 Ensure consistency with the actions defined within the Regional Water Supply Plan prepared by the Southwest Florida Water Management District. 21.6.6 The City will maintain a Water Supply Facilities Work Plan that is consistent with the Southwest Florida Water Management District's Water Supply Plan by updating the work Plan within 18 months of an update to the District's Regional Supply Plan that affects the City. 21.7 Objective -Continue to protect all natural recharge areas having functional hydrological characteristics. **.** Ordinance 7950-08 21.7.2 The City ef-C{eanaratef shall include incentives in the Community Development Code for the protection of natural groundwater aquifer recharge areas as identified in the Conservation Element of the Clearwater Comprehensive Plan. 21.7.3 The City e~-Sieawv~ater shall continue to protect groundwater quality by enforcing the Wellhead Protection Ordinance within the area specified on Map D-2. Guidelines and criteria for protection of potable water wellfields include: 1. Issuance of a Permit (a) A wellhead protection permit shall be obtained from the engineering director for and new business, commercial, industrial or other nonresidential activity on property within the city if anv portion of the subject property is within 1,000 feet of a potable water well. New residential construction on property located within the city should also obtain a permit if anv portion of the subject property is within 100 feet of potable water well. 2. Permit Requirements: (a) Activities within a 1,000-foot radial distance around a potable water supply well shall conform to the requirements of Chapter 62-521, F.A.C., Wellhead Protection. fib) Activities defined as potentially high risk to ground water quality in Chapter 62-555.312, F.A.C. shall not be permitted within 100 feet of an existing potable water supply well. c) Activities defined as a moderate risk to around water auality in Chapter 62-555.312. F.A.C. shall not be permitted within 50 feet of an existing potable water supply well. (d) If any contaminating material is proposed to be used or stored for any business, commercial, industrial or other nonresidential use within 1,000 feet of a potable water supply well, aprotection- containment plan shall be submitted. If any contaminating material is proposed to be used or stored for residential use within 100 feet of a potable water supply well, aprotection-containment plan shall be submitted. Ordinance 7950-08 fie) A wellhead protection permit application shall at a minimum include a location map of the potable water well and 1,000 feet surrounding the well. plans for the proposed development or expansionlchange of an existing use 1if applicable), the location and identification of existing uses in a 1,000-foot zone for a commercial use application or a 100-foot zone for a residential use application, a listing of any contaminating material to be used or stored on the site and a protection-containment plan if necessary. 3. Permit Review (a) In reviewing,. a protection-containment plan submitted by an applicant for a wellhead~rotection permit, the following factors shall be considered when determining the sufficienc~of the plan: (1) The amount, character and intended use of the contaminatinq_material involved: (2) Storage, conveyance and handling techniques to be employed by the applicant: (3) The extent of anY propensity to spill, break, lose or discharge contaminating material; ~) .The type of containment devices to be employed; ~) The extent of empl~ee safety training and practices; and i6) Any other consideration appropriate to the protection of the wellhead. b) No wellhead protection permit shall be issued unless the protection-containment plan and permit application fully addresses all contamination and safety matters to the satisfaction of the engineering director. A wellhead protection permit maY be issued subject to conditions related to the protection of the public potable water supply. Ordinance 7950-OS e, _. . ~ _~ ~ ~ a • ~ !~' _ m.~ ---_ Rn. ..., Potable Water Wells R S ~. and Wellhead ~- ~ ~ , , ,- ~ d.08MAR Protection Zones rurr MICHIGAN BLVD C i OH ~:. Map #: D 2 i4r3X7i:C3, ' ~ ~ _ _ ¢~ i ...__..... ... __ ~ _ ~ . m o ••, .....• Date 812912008 ouNEO1N ~ ~. ~ _ ~ _.- _ - _- - - - soLONAVE ~ g g ~ Source: Clearwater En ineerin De 1Ju12008 y • `: s ...; sR~aeB ,.., Les~end Y - SANCHRIS7oiHEROR ?3 IN SERVICE WELL ~ ~' sr+-6°p 'Wellhead Protection Zone _..•.•_•.••.•,••. ... 5 ••• ::.. ; ~y~~ ~~,a+~°E 3 ; :Clearwater Planning Area • oo '••, waclNrA sr '$~ MHO wooo ~ .. . . Outside Clearwater City Limits E ~'`' ~~ RD EN7ERPRlSE ,.C ~e~ J t ~ .8F• .J l~% $ . fjfj Id ................ ...... ... ....... .........JF.'roNSr....t •• ~• • _ ~: ~ uNroHSr, ~ a ~ ~ ~ : 7CiAlR RD a W a .... . .. ~ ~ MAIN 3T • C SVNSEi PolN7 ' ~'"~' ' SUNSE . T PoINT RO • 5 H ~y !y . • 666 Nu 9 • ' l N : ~~ ~ Y ] ~ ~ ~ i ~ BAYMONT 'f}~ l ~ !' ~ SR390 t D J f Z~ ~ ~ N Q ' PAlMET70 ~ ~~ . ~ .. }1 ." ~ MLMETTO 0{' .~ .... . ........ ....... 8 ~ Y a 9P 'm, ~~ e a ~ GREW ST ~~. ~ B h u ~ GREW SL CLEVElANO ~ ~ g7 ~ :. ~ l~ ~ ~ ~.. 4 ' CI@E3'fil'9IErf. SR-OBRT COURT ST. CUiF TO BAY BLVD. .`~' ' ~~ SR~60' • , ^ CHESTNUT i farb, ,r ......... . ~ ~ a t P.wwM er: ~ : ... 8 . - ~ ~ ~ ~ `: uxEVrEw w ~ . 'a ~ RO ° at Enpha.,MB ap.NmM _ o.op•wm•r••n d pr orNnon e learw ~ O ~• ~ ~• ; f ~y y e. - i W . _ ~ `Y~, - ,~~' w BLVD. ~ ~ ...._.... _.... .... N 11p08. Mrnl•AV•. CI rfL a116. U~'=~/~\i ~~/~rn: R=11tuJ18o.r ;1f1jt1F+T66 • ~ CYI ~ , ~ + ~ A .... ......... _www MYClu ...m.. .... .... • ~ BELLEV~W "IV a $ ~ ~ ..: ~: ~ - ~ ~ ~i r ~ N ~ .. R . ~~ _ /' W_/ LE Psd xna. Pvnikl roml•ran QlN /f Nmnnw DYIM C1ryoICb•rwN• E/prne0nnp $ iiii III U SERY ~' ... ii11 X Lbgn M,•nEmutr ae aRwpeOaM VfW OY IM rtO'phN M1a 1M • • , - 'i i ~ Y m•oemre~wnv marrn•ansr.crn'aa wsa mueclearonns wrooee or • ' • • BELLEAIR •' ~ 7 ....... ; ; - c !P(J ... . •. \ y•.~.,y ~FFiA1B.. \ ...... .......RB.. ......~.. ...... ~ 5 a mn•nmaunmva Ae urn fM Gil IG•en•ne. •norng •a•+vno nlwr. ro m•a•e no wsnMYa; e.proaaaUpfmNHd, comv/m/N rns saw•ry ' t ... ...................... ... .t .. ... LARGO .°•..• ... .................. ..................... Swle: NT.S. ... MarM ana Nr a•YWnergrtbvbr aw•WanMae.•erNWJY. w;u0a01 ura FUrtnrm~o•a,m•Cnraraaa•w.nrax•merrro MaaY w*arsuro. ; -' --._ uaoaarea wnnlM •a•or mrmmaawr earn City of Clearwater Adoption of the Amendment To the Utilities Element Citizen Courtesy Information Lists CPA2008-03002 DCA 08-RWSP1 Comprehensive Plan Citizen Courtesy Information List CPA2008-03002 (Ordinance No. 7950-08) Local Government: City of Clearwater Hearing Date: April 15, 2008 Type Hearing: Community Development Board DCA Amendment Number: Please Print Clearly (DCA Official Use) By providing your name and address you will receive information concerning the date of publication of the Notice of Intent by the Department of Community Affairs. Check Appropriate Citizen Name r i E Address, City, State, Zip Code Box Identify Amendment i Written Spoken ~ Comment ! Comment !NONE i i I ±NONE N i i Over for more spaces which is of Interest ONE Comprehensive Plan Citizen Courtesy Information List CPA2008-03002 (Ordinance No. 7950-08) Local Government: City of Clearwater Hearing Date: May 15, 2008 Type Hearing: City Council Transmittal Hearing DCA Amendment Number: Please Print Clearly (DCA Official Use) By providing your name and address you will receive information concerning the date of publication of the Notice of Intent by the Department of Community Affairs. .. 3 ...... _........ _..~ 3 ~ Check Appropriate Address, City, State, ~ Box Citizen Name ` I Zip Code ~ _ ~._.~ _ _ .____. ~ Written ~ Spoken Comment ~ Comment .NONE INONE ;NONE 'NONE Identify Amendment which is of Interest ;NONE Over for more spaces Comprehensive Plan Citizen Courtesy Information List CPA2008-03002 (Ordinance No. 7950-08) Local Government: City of Clearwater Hearing Date: September 18, 2008 Type Hearing: City Council Adoption Hearing DCA Amendment Number: DCA 08=RWSP1 ~~cAO~r~~aiuse~ Please Print Clearly By providing your name and address you will receive information concerning the date of publication of the Notice of Intent by the Department of Community Affairs. t _ ..~. _ ~. ~. .._ .. _.......... r .__ _ - ._..._... __....___._ .~ _.. , .._._ . Over for more spaces City of Clearwater Adoption of the Amendment To the Utilities Element Data and Analysis: City of Clearwater 2008 Potable Water Supply Facilities Master Plan Update CPA2008-03002 DCA 08-RWSP1 2008 Potable Water Supply Facilities Master Plan Update Capital Improvements Implementation Master Plan ~.~t,, ~, ,,, ,K ~ " ~ ,~ f ~ c ~ ~ '~'~~ ~ ~ ~ rt"k. ~ ~i ~!^!i! _ ~_ a~. fi ~x {,• ~~ _=' des" ,e ~~.~ ~ «b ~,~~ • "LX Y '} ~ ~ t ~, ~ ~ 3Qr5~ , p ~ :~ , 1 ... ~ ~ ; j r -~ ~ . i . < <~, w t '~ ~-l+y,; ~ ,rc "` ,~ .~~" ~ era t, ,, >. ~. _. ~4. ~. - ~: :~ ~ ~ } 4 ~, ~ ~ . ~ ,- .. i ~ ~~ ., ~ ~ w ~~ - t ~ ~: ° le ater arw October 2008 Robert S. Fahey, P.E. Utilities Engineering Manager City of Clearwater 100 South Myrtle Avenue, Suite 200 Clearwater, Florida 33756 2 Table of Contents F~ECUTIVE SUMMAttY 13ACl~GItOUND I. Historical 2. WellGeld 3. Water Treatment Plants 4. Interlocal Agreements 5. Population Projections and Water Demand 2008 EXIST'INC COiYt31`Y'I01~4 I. Wellfields 2. Water Treatment Plants f itlrVIOUS ANAI.YSI~..~i r1i"°VI) AI)OI'TEi> f'1s.1,NS I. 2000 Water Supply Source Alternatives 2. 2004 Water Supply Master Plan 2007 c1lriNt:;lrS TC) CAI'1'1'A.l, tMP120Vtt:M;f~'I~ 1>LAiv TIaEA~I'iti1LN'I' 1?AC1L1.7'l[ S 1. Wellfield Expansion -Water Treatment Plant Nos.l & 3 2. Reverse Osmosis Plant No.l 3. Reverse Osmosis Plant No.2 4. Indirect Potable Re-use ,1t.TC•.1t1VATl~, fl'1t1~,r1"1' ll~,iVT Ol'`I`lO.tis t1lVt)Ilt Cc)~1~11)1•,t2,'t1'lt~~ ]. Option lA -Brackish Water Reverse Osmosis Plant No. 2 2. Option 2A -Hybrid Reverse Osmosis Plant No.2 3. Option 2B -High Pressure Reverse Osmosis Plant No.2 1:1N:~NCIAI. I:Y~II,HATIC)N O:F t)PTIOfi+S OVli2 TIME I. "Do Nothing" Option 2. Current Plan 3. Implement Option lA 4. Implement Option 2A 5. Implement Option 2B CONCLUSIt7i~i5 ANI) 12CCOMMEI*iDIlT1C>NS EXECUTIVE SUMMARY The City of Clearwater is an incorporated municipality in Pinellas County, located on the central west coast of Florida between the Gulf of Mexico and Tampa Bay. The City of Clearwater is permitted through the Florida Department of Environmental Protection to own and operate a Public Water System providing potable water service to the population within its service area. The City holds a Water Use Permit (WUP) from the Southwest Florida Water Management District to withdraw groundwater from the Floridan aquifer. Historic and current local production of potable water by the City is insufficient to meet the demand of the consumers within the service area. The City entered into an interlocal agreement with Pinellas County dating back to 1955 to meet this additional demand through wholesale purchase of potable water. As of 2008, the City is experiencing an annual average demand of 13.5 millions gallons per day (MGD). The City is locally producing an average of 3.7 MGD and purchasing 9.8 MGD from Pinellas County. The current Water Supply Master Plan (Parsons, 2004) includes three major capital improvements projects that are in various phases of implementation. Acceptance of these projects were based upon an analysis that indicated that the additional water locally produced would have a cost per unit volume that is less than the future year purchase price from the regional supplier (Pinellas County). Those options that were found to be more expensive were eliminated fi•om consideration. The first and most cost effective project involved an expansion of the current well field owned and operated by the City of Clearwater. Ten new wells, four relocated (out of service} wells and three rehabilitations of existing wells are included in this project that is intended to initially bring the City up to its permitted withdrawal amount of 6.25 MGD and subsequently seek additional capacity through a modification of its water use pe-•mit of an additional 1.25 MGD. The second project will involve an expansion to the existing reverse osmosis (RO) plant at Water Treatment Plant (WTP) 1 increasing production by I.0 MGD to a total capacity of 4.0 MGD. The third project includes a new reverse osmosis plant at WTP No. 2 that will provide 3.5 MGD of treatment capacity bringing the City's total production to 10 MGD (after treatment losses), reducing the reliance upon purchased water from the regional supplier. While the City is continuing to move forward with the three identified capital improvements projects, there are other options that continue to be analyzed as the data becomes available and as emerging technologies are brought forward in the water supply industry. The first of the two major options currently under consideration involve the R/O Plant at Reservoir #2 - a cost benefit over time financial analysis will be conducted to weigh treatment of groundwater from zone A of the Floridan aquifer versus a higher level of treatment of groundwater from zone B. The second option under consideration involves a financial analysis of indirect potable re-use. It is believed that this option could be permitted under current state regulations but would involve significant capital expenditures and a significant public education campaign. 4 BACKGROUND Historical The City of Clearwater is a incorporated municipality in Pinellas County, located on the central west coast of Florida between the Gulf of Mexico and Tampa Bay. The City was settled in l 830, incorporated in 1915 as the County Seat and currently has a permanent population near 110,000 persons. The climate and location near beaches and other destinations contributes to a healthy tourist population and when coupled with seasonal residents, the functional population totals 140,000 for 2008. Wellfield The City has endeavored to serve the public needs for water and sewer utilities dating back to the 1920's when the first wells were put into service for public supply. Over the years and as the City's population grew, more wells were drilled near the most densely populated areas, mainly near downtown and the bluff area. By the 1960's however, many of the early wells had started to fail with increased chloride, iron, and total dissolved solids (TDS) levels beyond what was deemed acceptable for public consumption and the wellfield expanded to the northeast where most of the wellfield is currently located. The topography and hydrogeology of the region has proved that the best quality groundwater is located between "central" Clearwater and the countryside area as indicated in Figure 2.1. The City continued to be limited to the withdrawal of fresh groundwater requiring minimal treatment and purchasing treated potable water from Pinellas County. With the advent ofcost-effective membrane technologies, the City implemented a capital improvements project constructing the Reverse Osmosis Plant at Reservoir #1 and brought the facility into service in 2003. This facility enabled the City to utilize available resources that previously would have been unacceptable and was produced at a rate that is beneficial to the City and its customers long term. Treatment Plants a) RO Plant No.l -This facility is located at 1657 Palmetto just west of Saturn Drive. The plant includes a pretreatment process train, reverse osmosis process skids, a five million gallon finished water storage reservoir and a high service pumping station. b) WTP No. 2 is located at 21133 US Highway 19 North. The facility has minimal chemical treatment, a five million gallon finished water storage reservoir and a high service pumping station. c) WTP No. 3 is located at 2775 State Road 580 just east of Countryside Boulevard. This facility has minimal chemical treatment capabilities, two (2) five million gallon finished water storage reservoirs and a high service pump station. Interlocal Agreements a) Pinellas County -the most recent agreement was executed by both parties in 2004 and has a term of 35 years. Currently, 8.1 MGD of water from Pinellas County is retreated at WTP Nos. 2 and 3 (1.5 and 6.6 MGD respectively at WTP Nos 2 and 3) on average. The balance of the water demand needed to serve the City of Clearwater is met through the interconnects located on Sand Key and along the southern boundary of Clearwater directly entering the distribution system (2.0 MGD). b) St. Petersburg - an emergency connection between Clearwater's and St. Petersburg's water systems is located on SR 60 east of US ] 9 North. The 5 connection was installed for the mutual benefit of both municipalities. Exchange of water through this connection has never been used. Population Projections and Water Demands Based upon the analysis and projections derived in the 2004 Water Supply Master Plan, the functional populations and corresponding projected demands have been updated as shown in the table below: s..n.~nf lfr cvvdl M l:T~1 .'1%. ,4 3:f• .. .~~ ! s}a0~ r5§{IS >~ !.Slay ;'e;l ~ ;. . ..., nr,r...re. e.. -x..n. ...+ .qix X la.NUar Allmnt n'.rnleurf n>Jga:!::r ulh a fA P: 9'i:rc:-fn:hh ;Lrf:~..Xf %P n•':. aeh ae~rfanhMlrf/ba- ST.fI'IMMt9r:!A'>rr.I~ r.~w. ~.,. ae ar.a ~ :en t r aaa-e,f n rt •> e adf+lttncm»n n l amen a n:.r:n leaf n N p o-a: r nYa s r ,1 %.: x~..n:frwoz: krtur. rnr...•ar: K aAe:r r".ti uH a.Y:m:nKr•tNn+Vh. rw'rr a0 r>.Mnls ~f ewN>•^.a p) h!e1 .tanla E:~sn1Y.i'wnle Yf! .,u!ta,r..+fJxrr *Table 7 generated by Wade-Trim (September 2008) For consistency, the City of Clearwater will continue to plan utilizing Scenario No.l for demand projects through the next 10 year planning horizon and assume 13 MGD as an anticipated annual average daily flow. f~c-xurnaf ~:+et ~:mnaf o: ;rw a.n>..! anR •[eMn tf N{onpn ]:a. r n Y.~ n+n'ii+;rr:-.~t :•am!fr•raae+eN.r.r~rr.~~ t•4Aifnryr 4YTn'ft'>:aP]t]I~a[~t.MnM1gf ,a-a.men,ya•. oe~. r 9!ujenef innuai.r.raSe Drfy Oam fnd S:fnl.ria 1 If] SYSyJ!610,Cft1) S:nr.xru t (38 faf f r610,000~ 6 2008 EXISTING CONDTfIONS Wellfield At the time of this report the City owns and operates a wellfield that produces water meeting only 27% of the City's demand. There are l9 active wells that are currently producing a total of 3.7 million gallons per day (MGD). The locations of the existing production wells are illustrated in Figure 3.1 on the following page. Treatment Plants a) RO Plant No. 1 -receives water from 10 active and existing .production wells. The wells provided an average of 1.8 MGD of raw water for the year 2007. 1.3 MGD are run through the R/O plant to produce 1.0 MGD of permeate that is blended with the remaining 0.5 MGD for a total of 1.5 MGD of potable water delivered to the distribution system. There is no Pinellas County interconnect serving this facility. The raw water is pretreated through multi-media filters to remove iron, arsenic, and other solids. In addition to pre-treatment and RO processes the facility has a 5.0 MG above ground storage tank, chloramination facilities for disinfection, a polyphosphate storage and feed system and a high service pumping station. b) WTP No. 2 -receives raw water from three active wells requiring minimal treatment and blending with potable water from Pinellas County's interconnect located west of WTP No.2. The wells typically provide 0.6 MGD that mix with 1.5 MGD from the County for a total of 2.1 MGD. The facility has a 5.0 MG above ground storage tank, chloramination facilities for disinfection, a polyphosphate storage and feed system and a high service pumping station. c) WTP No. 3 -receives raw water from six active wells requiring minimal treatment and blending with potable water from Pinellas County's interconnect. On an average daily basis, the wells currently provide 1.3 MGD that mix with 6.6 MGD from the County for a total of 7.9 MGD. The facility has two 5.0 MG above ground storage tanks, chloramination facilities for disinfection, a polyphosphate storage and feed system and a high service pumping station. ** As noted in the previous section, the remaining quantity of water required to meet the City's overall water demand is met through interconnects with the Pinellas County Water system. PREVIOUS ANALYSES AND ACCEPTED PLANS WATER SUPPLY SOURCE ALTERNATIVES (March 2000, McKim & Creed) At the time of this report, the City of Clearwater was entertaining sale of its water supply production facilities and becoming a customer of Tampa Bay Water. Various options were evaluated as listed below: 1. Scenario 1 -Tampa Bay Water (TBW) develops 5.0 MGD brackish water treatment facility and City sells its water supply facilities 2. Scenario 2 -City implements treatment improvements to produce 4.0 MGD of ground water supply; TBW project is not implemented 3. Scenario 3 -This option includes the creation of a new water supply source to combine the scenarios outlined above. The options are outlined in three variations: a. Scenario 3a -City develops 3.0 MGD of surface water from Alligator Creek to combine with 1.0 MGD of groundwater. TBW develops the 5.0 MGD brackish water facility b. Scenario 3b -City develops 3.0 MGD surface water from Alligator Creek to combine with 1.0 MGD of groundwater. An additiona13.0 MGD of groundwater is developed in central Clearwater. The TBW facility is not constructed. c. Scenario 3c -City develops 3.0 MGD surface water from Alligator Creek to combine with 1.0 MGD of groundwater. No other supplies are developed in the City. After receipt of this report, it was decided by City staff and City Management that the City would retain its water supply system ownership and seek to increase local production of potable water utilizing groundwater. This decision lead to the design and construction of the wellfield rehabilitation and the Reverse Osmosis Plant at Reservoir #1. WATER MASTER PLAN -CAPITAL IMPROVEMENTS IMPLEMENTATION MASTER PLAN (October 2004, Parsons Engineering Science) This effort analyzed the existing hydrologic conditions of City and other available resources to identify capital improvements projects that would enable the City of Clearwater to locally produce water at a cost less than anticipated purchase rates through the purchasing agreement with Pinellas County. The results of the analysis resulted in the current plan and as listed below: 1. Welifield expansion for WTP No. 3 adding 1.0 MGD 2. Wellfield expansion forl and expansion of RO Plant No.l adding 1.0 MGD 3. Additional wells and a new RO Facility at WTP No. 2 adding 3.5 MGD 8 2007 CHANGES TO CAPTITAL IMPROVEMENT PLAN TREATMENT FACILITIES 1. Wellfield Exaansion -WTP Nos.l & 3 The City initiated design of this critical project once staff had confidence that Chloride Cap Study was going to be successful in modifying the constraints of the old Water Use Permit. Chloride Monitoring had been being performed at the production wellsand had a "cap" of 250 mg/l. If any production well was observed to have chlorides that exceeded this trigger level, the City was required to rest the well (take it out of service). The modification to the permit requested that the monitoring locations be relocated to the monitoring well network to more accurately reflect the intent of the permit constraint. The issue of elevated chlorides is a potential impact to other permitted well users and not necessarily a constraint of water quality, particularly when you consider that City's treatment facility is designed to remove just these types of constituents from the raw water. After the permit was modified, the City moved forward with the expansion project, which originally was conceived to include nine new wells, five for WTP No.l and four serving WTP No.3. After reviewing the preliminary data and hydraulic analysis of the existing raw water network, staff decided to modify the project intending to construct ten new wells, five each for WTP Nos. 1 and 3, as well as drill four new wells that had been permitted in the past but were either not drilled or had become inoperative, and rehabilitate three existing wells that were underperforming. This represents a combined effort of expansion and a final phase of the wellfield maximization effort that staff had been performing in-house for the last four years. 2. Reverse Osmosis Plant No.l - An additional 1.0 MGD of treatment capacity of low quality "fresh" groundwater from Lower Zone A of the Floridan Aquifer will increase the total production capacity of this facility to 4.0 MGD. The City of Clearwater owns and operates an existing reverse osmosis plant at WTP No. 1 with two skids designed to produce 1.0 MGD of permeate (filtered) water per skid. The wellfield that serves this facility has been unable to reliably deliver the necessary raw water to run both skids on a regular basis due to a variety of reasons. The City has taken numerous steps over the past decade to increase its productions levels, but have experienced limited success as described below. To reinforce the complexities of producing sustainable volumes of water, consider that dating back to 1998, the City was entertaining giving up its water production rights to join a regional water supply entity. After much deliberation, the decision was made by staff and approved by City Management to retain our ability to produce and supply water. At that time, a comprehensive effort to rehabilitate the well field ensued in the anticipation of design and construction of the now existing treatment facility. Although the design considered the existing well field and its production limitations, it was felt that through rehabilitation, upgrades and minor modifications to the City Water Use Permit, there would be sufficient water delivered to the then proposed plant for it to be fully functional. However, operation of both skids of the plant require 3.6 MGD of raw water 9 on a consistent basis. Electrical, mechanical, hydrogeological and permit constraints have severely limited operations staff from maximizing production. In 2007, the plant ran for most of the year at half capacity. The Wellfield Expansion Project for WTP Nos.l & 3 will go to bid in October of 2008 and is intended to add the needed volume of raw feed water to allow the R/O Plant to operate at design capacity. Assuming similar operating conditions, only when the wellfield can reliably deliver 5.2 MGD of raw feed water, will it be prudent to expand the existing plant. This is determined by the 3.0 MGD of filtered permeate that three skids would produce, the 1.3 MGD of blend water required to maintain water quality consistency for the health of the transmission and distribution system, and the 0.9 MGD of brine/discharge/waste from the treatment process. It should also be noted that the expansion that increases the waste discharge stream will cause further stress upon the wastewater treatment facilities that currently receive the waste product. This has the effect of potentially disrupting the wastewater treatment process and impacting the quality of the reclaimed water that is produced after APCF treatment. It has always been considered that the expansion of the existing plant would include a discharge piping connection to a alternative discharge point rather than entering the wastewater stream. The most recent plan includes deep well injection yet to be designed but prelirrrinarily proposed to be located at or near the East APCF and/or Northeast APCF that would also serve the discharge from the future RO Plant No.2. 3. Reverse Osmosis Plant No. 2 -Will provide an additional 3.5 MGD of treatment capacity for low quality fresh groundwater from Upper Zone A of the Floridan Aquifer. The first phase of this project has been designed to include three test production wells in the southern portion of Clearwater, each including a monitoring well cluster (2 deep and one shallow for a total of twelve wells). During the design of the test wells, staff recommended that an analysis be performed with real data comparing a plant designed to treat "fresh" water from upper Zone A of the Floridan aquifer versus a plant designed to treat brackish water from the deeper Zone B. The tabletop discussion centers around the varying water quality of Zone A water over time and the presumed additional costs associated with treating lower quality water with higher chlorides and TDS. The pending analysis will include projections of water quality over time based upon actual water quality data retrieved from the test wells. The pilot test (phase two) will be performed to determine necessary treatment levels based on the selected option. 4. Indirect Potable Re-use -The City of Clearwater owns and operates three advanced Pollution Control Facilities providing tertiary treatment of wastewater. The effluent water produced as a result of this advanced treatment supplies the current reclaimed water system that offsets irrigation and other non-potable needs. Regulations (Florida Administrative Code, Ch 62-610) allow for water supply agencies to permit aquifer recharge through a process called indirect potable re-use. The intent of the process is to significantly supplement natural recharge of the groundwater system negating any potential impact that could be caused by permitted withdrawal, protecting the groundwater source from degradation over time due to saltwater intrusion, and/or allowing for greater permitted withdrawal after receiving "credits" for the recharge volumes. The reclaimed water must be purified with greater levels of treatment to meet drinking water quality standards before injection into the Floridan aquifer. Elsewhere 10 and though the City's existing production wellfield, more groundwater could be withdrawn for potable water treatment considering the net impact to aquifer water levels, aquifer water quality characteristics and less potential impact to other permitted water users. Implementation of this process would require close coordination between the wastewater treatment facilities that produce the reclaimed water product, the Operations personnel that are responsible for the reclaimed water system, Operators of the new treatment facilities located at the Northeast APCF and the existing Water Treatment Plant Operations Group. A potential configuration for the City of Clearwater would involve similar post-tertiary treatment facilities at the NE and MS APCF's. The East Plant would either pump 100% into the RCW system, or discharge to the current outfall in Tampa Bay. Pressure set valves at NE and MS would either feed RCW demand or divert effluent flow to the new treatment trains. A second alternative that could be implemented would involve a transfer of surplus reclaimed water produced by the existing wastewater treatment process to Pasco County. The intent of this potential transfer would be to let the reclaimed water percolate through the ground and recharge the Floridan aquifer. The City would receive "paper credits" for the recharge that benefits the Pinellas peninsula allowing for a greater withdrawal allowance as part of the City's Water Use Permit. Capital improvements associated with this alternative would involve paying for a portion of the transmission pipeline, pumping facilities, power costs and potentially land right costs prior to construction. 11 Different Treatment Alternatives under Consideration 1. Option lA -Brackish Water Reverse Osmosis Plant at WTP No. 2 -Additional 6.0 MGD This option is a variation on the currently planned new groundwater plant to be located at WTP No.2. It would involve a wellfield in the same geographic area for the planned project, but have deeper wells providing more consistent brackish raw water for treatment. Deeper wells, higher but more consistent chloride levels, more expensive initial capital investment, longer life span, more available raw water, higher O&M cost due to higher treatment pressures required. 2. Option 2A -Hybrid Plant (fresh/brackish) Reverse Osmosis Plant at WTP No. 2 - Additional 4.5 MGD initially and ultimately 6.0 MGD - This option is a variation on the currently planned new groundwater plant to be located at WTP No.2. It would involve a wellfield in the same geographic area for the planned project, with wells that start out as freshwater but degrade over time to a high chloride raw water source. The Reverse Osmosis plant, wells and raw water system would be designed to maximize the cost-effective low-pressure water production while the available raw water lasted, but have elements included that would enable a transition to treatment with higher pressures of a more saline water source later on. This option may involve more capital costs on the front-end of the project as well as involve a significant upgrade in the future as the water quality degrades from fresh to brackish.. 3. Option 2B -High Pressure Reverse Osmosis Plant No.2 - a high volume brackish water RO Plant (~6-7 MGD) treating 8.0 MGD raw water based upon additional withdrawal allowances due to Indirect Potable Reuse (IPR} supplementing the permitted withdrawal for water supply. This option was brought about after elected officials tasked City staff with exploring IPR. The option as outlined in this document would involve additional treatment at the wastewater treatment effluent point, injection wells, and a larger RO plant to treat greater volumes of water. 12 FINANCIAL EVALUATION OF OPTIONS OVER TIME Figure 1-Cost Comparison of Options over time Figure 2- Actual costs for current production at Water Treatment Plant #1 Figure 3- Actual costs for current production at Water Treatment Plant #2 Figure 4- Actual costs for current production at Water Treatment Plant #3 Figure 5- Actual costs for current production at all Plants combined Figure 6 -Estimated future costs with build-out of CIP at WTP # 1 Figure 7 -Estimated future costs with build-out of CIP at WTP #2 Figure 8 -Estimated future costs with build-out of CIP at WTP #3 Figure 9 -Estimated future costs with build-out of CIP at all Plants combined Figure 10 -Estimated future costs for Option lA -Brackish WTP #2 Figure 11 -Estimated future costs for Option 2A -Hybrid WTP #2 Figure 12 -Estimated future costs for Option 2B -IPR and expanded WTP # 1 Figure 13 -Estimated future costs for Option 2B -IPR and expanded WTP #2 Figure 14 -Estimated future costs for Option lA -Total All Plants Figure 15 -Estimated future costs for Option 2A -Total All Plants Figure 16 -Estimated future costs for Option 2B -Total All Plants 13 CONCLUSIONS ANll RECOMMENDATIONS The City of Clearwater realizes its responsibility to provide a high quality, safe, healthy and aesthetically pleasing drinking water to its residents and customers within its service area. It also understands that it is a civic duty to provide this critical service in the most fiscally responsible way possible. Having considered the options and variables affecting the viability of each, it is staff's recommendation to proceed with the Capital Impxovements Program as outlined below: 1- Continue the current expansion of the City's wellfield serving WTP Nos. 1 and 3. This is immediately the most cost effective solution to increasing local production. 2- Initiate a cost benefit analysis considering financial feasibility implementing a system of Indirect Potable Reuse conceptually described in this document, also considering a SWFWMD backed transfer of surplus Reclaimed water to Pasco County. Either scenario would provide the City with "paper credits" for recharge allowing for a greater volume of raw water withdrawal as part of the future City's Water Use Permit. The preliminary cost data and budget values can assist City Management in determining whether or not to implement. This will effect withdrawal quantities in the next step - expanding the Water Treatment Plants 3- Continue the construction of test wells for the future RO plant at WTP No. 2. Obtain water quality and aquifer performance data from the different zones of the Floridan aquifer. Perform a financial analysis based on availability of raw water and associated water quality to determine plant size and level of treatment. Plant configurations likely to be analyzed include: a. a low pressure groundwater RO plant at ~3.5 MGD b. a higher pressure low quality fresh water source (groundwater) plant with brackish water raw water collection system designed to be upgraded as water quality changes (~4.0 MGD) c. a high volume brackish water RO plant (~6-7 MGD) Future Capital and O & M Cost Comparison IPR Water Treatment Plant No. 2 After Plant Construction (Post 2014) Operating Supplies Process Chemicals $ 394,048 Cleaning Chemicals $ 98,066 Carnidge Filters $ 9,710 Laboratory Expenses $ 9,078 Other eratina Ex enses $ 198,130 nergy Electrical $ 308,968 Labor Operating Labor $ 224,465 Mechanical Labor $ 19,503 Training $ 23,220 Contract Maintenance $ 8,500 Project Capital Costs $70,000,000 Current Water Production (1,000 gallons) 6,500 Cost Per 1,000 Gallons with Capital Cost Recovery* ~ 2.69 Cost Per 1,000 Gallons without Capital Cost Recovery $ 0.55 MGD 6.5 1000 gaUday 6500 2 $ 197,024 2 $ 49,033 2 $ 4,855 2 $ 4,539 2 $ 99,065 2 $ 154,484 34000000 36000000 #2 Wells permitted withdraw limit (MGD) future pumnei #2 RAW Cumulative Plant Tot. to distribution 45 0.5 500000 500000 4500000 6500000 46 0.5 500000 1000000 R/O Feed 53 0.5 500000 1500000 6000000 2-1 O.S 500000 2000000 % of design 2-2 0.5 500000 2500000 Brine Waste 100% 2-3 0.5 500000 3000000 1500000 2-4 0.5 500000 3500000 % of WUP Hermit 2-5 0.5 500000 4000000 City/County Blend 100% 2-6 0.5 500000 4500000 2000000 2-7 0.5 500000 5000000 2-8 0.5 500000 5500000 . 2-9 0.5 500000 ~ 6000000 2-10 0.5 500000 6500000 2-11 0.5 500000 7000000 2-12 0.5 500000 7500000 2-13 0.5 500000 8000000 8 City of Clearwater Adoption of the Amendment To the Utilities Element Data and Analysis: City of Clearwater "Potable Water Element" Document CPA2008-03002 DCA 08-RWSP1 Parable VV~~~r E~ert~r~~ x City of Clearwater Comprehensive Plan ~. -.`. ~. ~'° ~' t .;~ ~,. ~~~~~~~ ~~~~~ ~D~~rn~~a~ city ~~ clealr~rat~r With the assistance of G~ WnnETiuM at~~e VlJater ~I~n~~nt ~. City of Clearwater Comprehensive Plan I. 1f~TRC~C3l~~T1~3f~ ..r.•r,rr.r...rr.,.,.r..rrr.r.r,,.r..,r....r.r....r..r....rr,..r.........,..r..rr,... ll: ~~JA~, C~JCTIVS ANd Pfl~l~1~S ...rr.rr,...r........r..,r...r....r ..................... S ll. itNV'E1~7C}RY ~,~iD ~A~.YI ................r... r..r,...rrr.r.r..r rr.r..r,..rr..r., r 14 3.1 Operational Responsibility ...................................................................................................14 3.2 Geographic Service Area and Predominant Land Uses ................................................14 3.3 Design Capacity and Current Demand on Existing Facilities ....................................18 3.4 Water Conservation Measures ..........................:..................................................................32 3.5 Level of Service ........................................................................................................................33 3.6 Facility Capacity Anaiysis ......................................................................................................33 3.7 Performance and Condition of Existing Facilities ..........................................................36 3.8 Issues and Opportunities for Expansion and New Facilities ......................................38 3.9 Natural Drainage and Groundwater Recharge ................................................................40 3.10 Existing Regulations and Programs Relating to Natural Drainage and Groundwater Recharge ..................................................................................................................42 3.1 1 Capital Improvement Projects ...........................................................................................43 17 ~: il~~"~IY ~~~..? r:rr. r.r.« rrr..r..rs..rrr.rrr.rrr•.r...rrrr••.r..rr..•r..erra.e•.r rr ra r•««...«.arr«. «..«. ""T"1` Pa~l~le i~`t~r ~~I~~In~t `~ City of Clearwater Comprehensive Plan I, INTR~D1j~fiICIN According to Florida Administrative Code section 9j-5.011, the purpose of the Potable Water Element is to assure that necessary public facilities and services correlate to future land' use projections. Furthermore, the purpose of the Potable Water Element is to identify capital improvements and establish goals, objectives and policies that will ensure the City of Clearwater is able to supply quality drinking water of a sufficient quantity for current and future needs. The Potable Water Element focuses on the existing systems and facilities and projected system needs based on projected population growth and future land use in the City of Clearwater. This is accomplished through an inventory and analysis of existing data, identification of present and potential problems and their solutions, and projection of future potable water needs for specific planning periods. The City of Clearwater prepared the Water Master Plan in 2004. The plan was developed in two volumes: Volume I- Water System Assessment, and Volume II, Capital Improvements Implementation. These documents served as the primary basis to guide actions and capital improvements to expand, upgrade and maintain the system.' In 2008, the City prepared an update to the Capital Improvements Implementation Master Plan to address population and demand projections until 2018 and ensure consistency with the recommendations of the 2006 Regional Supply Master Plan prepared by the Southwest Florida Water Management District. Capital improvements scheduled within the 2004 document remained the same throughout 2012, taking into consideration that additional capacity required after the implementation of these projects is available from Pinellas County. The Potable Water Element has two functions: a) It complements the 2008 Water Master Plan update by providing the policy framework. Boih reports were prepared by Parsons Corporation ~fl~~l~ ~1~t~r ~~~~n~ ~ City of Cleartuater Cs~mpretsensie~e Plan b) It serves as the City comprehensive plan's Potable. Water Element of the Comprehensive Plan. The content of the Potable Water Element follows the minimum data requirements outlined in Section 9j~5.01 1, F.A.C. For ease of reference, the Potable Water Element is organized into two major sections; the first outlines the Goals, Objectives and Policies relating to potable water and the second includes an Inventory and Analysis of the water system. The element also includes a variety of support documents in the Appendix section P+~t~i~l~ ~IUat~r Ei~l~~nt City of Clearwater Comprehensive Plait !l. ~~ALS, C3~~ECTIVES ANC PC7LI~1E5 21. GOAL PRC3VIt~~, bE~ELflP, AND MAINTAIN A PERMARIENT PC)TAI3LE WATER SUPPLY SYSTEM TC) MI~ET ANTICIPATI=D DIwN1ANl~ ;NHIL,~ I~O~tII~ING I~rIAX1MUM PRACTICAL PROTECTIfJN Tfl TI-lf~ f~NVIRt?NIuIENfi AT A CAST CQN5ISTENT WITM TI-IE PUBLIC'S ABILITY AND I~iL!_INGNESS T~} PAY. 2i,i (7bjective - "I`ia maintain adequate Levels of Service for existing and future populations through the year 20I 8. Policies 21.1.1 The following Level of Service standards have been established for the City of Clearwater and shall be used in determining the availability of facility capacity and demand created by new development: Service Area Level of Service Standards Potable Water Facilities Average Water Consumption Rate City and County Water City Service Area 120 gallons per capita per day at a pressure of 40-45 psi. *Continue to maintain water consumption of one hundred twenty (120) GPCPD or less as per the conditions set forth by Clearwater's Water Use Permit. 2~.2 t~bjective -Provide adequate quantities anal qualities of water service co all customers of the Clearwater service area. Current service level {duly, 2007} is 40,890 customer accounts potable, reclaimed and fire). Policies 21.2.1 Ensure that land development regulations, building codes and City ordinances adequately address water system provisions by performing a thorough evaluation of City codes and by coordinating proposed provisions with the Southwest Florida Water Management District, Florida Department of Environmental Protection, Pinellas County and Tampa Bay Water. P~~al~ ~U~t~r Eerr~ent City oi" Clearuuater Comprehensive Dian 21.2.2 Engineering shall analyze the condition and adequacy of any water distribution system that the City may inherit through annexation and prepare cost estimates for upgrading those systems to meet City requirements. 21.2.3 When new subdivisions are being developed, it shall be the responsibility of the developer to provide internal potable water and reclaimed water systems which are constructed to City specifications. 21.2.4 Continue to construct water system improvements which will provide adequate quantity, pressure, and duration of fire flows while meeting system user needs. 21.2.5 Continue to develop a system and construct improvements which will conserve energy, water, and other valuable resources. 21.2.6 The City shall continue to participate with and assist Tampa Bay Water, the Southwest Florida Water Management District, Pinellas County Health Department, and the U.S. Environmental Protection Agency in developing innovative techniques to augment existing water supplies to provide for future needs. 21.2.7 Continue to identify, acquire, and develop sources of water supply and methods of water treatment to meet existing and future needs. Some ways this can be accomplished are through well rehabilitation projects and/or exploration and drilling of new wells. Some type of water treatment may be initiated. Additional volumes of water may be acquired from the Pinellas County Water System through Clearwater's intergovernmental water service agreement. The City's long range Water Master P/an updated in 2008 shall serve as the guiding document for water supply and treatment methods. ~at~ble 1lV~t~r El~mis~nt ? City of Clearwater Comprehensive Plan 21.2.8 Ensure that water management projects are designed and operated to maintain and enhance natural systems as well as man made systems by working closely with the Southwest Florida Water Management District when proposing new projects and water management programs. The City's long term Water Supply Master Plan outlines a work plan for continued coordination with the Southwest Florida Water Management District's Regional Water Supply Plan adopted in December 2006. 21.2.9 Water service shall not be extended to properties outside the City's service area unless sufficient capacity and quality of water exists to serve the areas already committed to City service. 21.2.10 Water services shall not be extended except in those areas so designated for City of Clearwater by interlocal or other agreement. 21.2.11 Encourage the development of local and regional water supplies within the jurisdiction of the Southwest Florida Water Management District to avoid transporting surface water across other district boundaries. 21.3 t~bjective -Continue to maintain the water system in a safe, sound, and efficient manner on a daily basis. Policies 21.3.1 The Public Utilities Department, Water Division, shall monitor water quality and the operation of the water distribution system with the intent of repairing and replacing deficient portions of the system within the framework of the capitalized budgeting process. 21.3.2 Continue to provide a minimum operating pressure of 40-45 psi throughout the water distribution system. 21.3.3 Continue to provide adequate spacing of fire hydrants to provide optimum hose lays and fire flow. City of Clearwater Corr-prehensive plan 21.3.4 Require at the time of application for connection to the public potable water system, that minimum fire flows and hydrant spacing be consistent with fire district standards. Also, require that proper size water pipes are installed to provide desired fire flow rates based on the most recent Insurance Service Office (ISO) Report. 2 ~ .4 Objective - Cr~ntiraue to provide souatd fiscal manazdement for the operation and rnainteriance of potable water service in the City's service area Policies 21 .4.1 Fees charged to users of water services shall continue to be adequate to cover system operating costs, repayments of capital costs, and allow for repair and replacement of existing facilities. The City shall also continue to evaluate new rate structures as necessary. 21.4.2 Prioritization and scheduling of major improvements associated with the water system should be accomplished as a component of the capital improvement program. 21.4.3 Funds set aside for repair and replacement of the water system shall not be diverted to other uses. 21.4.4 The City should continue to seek financial support of the water system through grant programs administered by appropriate State and Federal agencies. 21.4.5 The City shall continue to refine the inverted rate structure for residential water meters, lawn meters and all other water meters permitted by the Water Division of the Public Utilities Department. 21.4.6 Encourage partnerships among federal, state, local governments, and the private sector that would identify and build needed potable water facilities and allocate such facilities costs among the partners in proportion to the benefits accruing to each of them. P~t~bl~ iat~r El~m+~~ City of Clearwater Comprehensive Plan 21.5 Objective -Continue to develop a potable water system that is compatible with the environment and seeks to conserve and protect sensitive natural resources, Policies 21.5.1 Except for areas of the City where reclaimed water is available, shallow wells shall be recognized as a source of water for irrigation purposes. Establish a City permit for shallow well installation by the end of 2008. 21.5.2 The City's building code shall include the requirement for water conserving fixtures in newly constructed or remodeled buildings. 21.5.3 Manage the supply of water in quantities which would minimize significant adverse impacts on the natural system and protect the long term public interest. 21.5.4 Develop and modify rate structures and policies which encourage conservation of potable water. 21.5.5 The City shall maintain its current Water Restriction Ordinance. 21.5.6 Provide educational awareness to inform citizens of the need and opportunities for conserving potable water by visiting schools to speak with young children about water conservation practices. 21.5.7 Reclaimed water service will continue to be extended to private residences based on the Twenty (20) Year Reclaimed Master Plan. 21.5.8 The City will continue to develop strategies aimed at reducing potable water consumption by means such as water conservation rates, conservation codes, operational measures, rebate and plumbing retrofit programs, landscape and irrigation efficiency programs, research and evaluation, and re-use alternatives. -~ t~ City ~f Clearwater Comprehensive Plan 21.5.9 The City will expand, in coordination with other stakeholders, educational programs to promote water conservation measures. Z 1.1~ 1;?bjectiese _ Continue to achieve effective coordination with other government agencies to solve problems of an extraterritorial nature with cooperation and in con~unetion with the Southwest Florida Water Management District. Policies 21.6.1 The City shall continue to participate in regional and County-wide studies which are or may be formed to seek solutions of problems of an extraterritorial nature. 21.6.2 Continue to cooperate with the Southwest Florida Water Management District in developing environmental and hydrologic data that will identify safe and reliable potable water yields in existing and future well-fields. 21.6.3 Continue to coordinate with appropriate local, State, regional and Federal agencies in implementing the water system plan. 21.6.4 The City shall pursue a coordinated approach to interjurisdictional problems, by providing support of both staff and officials to participate in conservation efforts with Pinellas County and the Tampa Bay Regional Planning Council. 21.6.5 Ensure consistency with the actions defined within the Regional Water Supply Plan prepared by the Southwest Florida Water Management District. 21.6.6 The City will maintain a Water Supply Facilities Work Plan, that is consistent with the Southwest Florida Water Management District's Water Supply Plan by updating the work plan within 18 months of an update to the District's Regional Supply Plan that affects the City. ~'Ota~le 1~dater E~r~~nt ~`~ City of Clearwater Comprehensive Plan 21.7 Objective -Continue to protect ail natural recharge areas having functional hydrological characteristics. Policies 21.7.1 Recognize the importance of groundwater aquifer recharge in the hydrological process and the need for natural groundwater recharge as an integral component of the City's urban environment. 21.7.2 The City shall include incentives in the Community Development Code for the protection of natural groundwater aquifer recharge areas as identified in the Conservation Element of the Clearwater Comprehensive Plan. 21.7.3 The City shall continue to protect groundwater quality by enforcing the Wellhead Protection Ordinance within the area specified on Map D-2 (Appendix D). Guidelines and criteria for protection of potable water wellfields include: 1. Issuance of a Permit (a) A wellhead protection permit shall be obtained from the engineering director for any new business, commercial, industrial or other nonresidential activity on property within the city if any portion of the subject property is within 1,000 feet of a potable water well. New residential construction on property located within the city should also obtain a permit if any portion of the subject property is within 100 feet of potable water well. 2. Permit Requirements: (a) Activities within a 1,000-foot radial distance around a potable water supply well shall conform to the requirements of Chapter 62-521, F.A.C., Wellhead Protection. ~~al~ ~'~~t~r ~em~nt ~z City of Clearwater Caprel~enxive Pl~t~ (b) Activities defined as potentially high risk to ground water quality in Chapter 62-555.312, F.A.C. shall not be permitted within 100 feet of an existing potable water supply well. (c) ~ Activities defined as a moderate risk to ground water quality in Chapter 62-555.312, F.A.C. shall not be permitted within 50 feet of an existing potable water supply well. (d) If any contaminating material is proposed to be used or stored for any business, commercial, industrial or other nonresidential use within 1000 feet of a potable water supply well, aprotection-containment plan shall be submitted. If any contaminating material is proposed to be used or stored for residential use within 100 feet of a potable water supply well, aprotection-containment plan shall be submitted: (e) A wellhead protection permit application shall at a minimum include a location map of the potable water well and 1,000 feet surrounding the well, plans for the proposed development or expansion/change of an existing use (if applicable), the location and identification of existing uses in a 1,000-foot zone for a commercial use application or a 100-foot zone for a residential use application, a listing of any contaminating material to be used or stored on the site and aprotection-containment plan if necessary. 3. Permit Review (a) In reviewing aprotection-containment plan submitted by an applicant for a wellhead protection permit, the following factors shall be considered when determining the sufficiency of the plan: (1) The amount, character and intended use of the contaminating material involved; (2) Storage, conveyance and handling techniques to be employed by the applicant; Pot~bl~ 1~Il~te~' El~r~t~r~t ~:~ City of Clearwater Compre#~ensiue Plan (3) The extent of any propensity to spill, break, lose or discharge contaminating material; (4) The type of containment devices to be employed; (5) The extent of employee safety training and practices; and (6) Any other consideration appropriate to the protection of the wellhead. (b) No wellhead protection permit shall be issued unless the protection-containment plan and permit application fully addresses all contamination and safety matters to the satisfaction of the engineering director. A wellhead protection permit may be issued subject to conditions related to the protection of the public potable water supply. P'c~~~le ~Va~t~r ~emen~ ~~ City of Ctearv+rater Cz~m~rehensive Plan Section 9J-5.003, F.A.C. defines a potable water facility as a system of structures designed to collect, treat, or distribute potable water, and includes water wells, treatment plants, reservoirs, and distribution mains. The following section details the existing conditions of the City of Clearwater's water system, with the purpose of identifying future water system needs. 3.1 Operational Responsibility The City of Clearwater Water Division is a municipally operated water supplier, charged with the responsibility of administering the City's water utility. In 2007, the City of Clearwater Water Division supplied water to more than 140,000 customers. The division maintains 4,036 fire hydrants, 8,329 valves and 588 miles of water main in service.2 Users of the City of Clearwater water system consumed approximately 12.65 million gallons of potable water every day. Approximately 26 percent (3.3 million gallons) is pumped from City owned and operated groundwater wells3; the remaining 74 percent of the daily demand is supplied by water purchased from Pinellas County. Pinellas County also receives water supplied by the regional water supplier, Tampa Bay Water, which in turn becomes part of the 74 percent supplied to the customers of Clearwater. 3.2 Geographic Service Area and predominant Land Uses The geographic service area for the City's water system extends beyond the City limits and represents an area of approximatley 54 square miles in size. The majority of the customers beyond the City limits are located within unincorporated Pinellas County enclaves within the City of Clearwater. The boundaries of the water service area generally extend from the Gulf of Mexico to the west, the City of Dunedin to the north, the City of Safety Harbor and Tampa Bay to the east, and the cities of Largo, Bellair, and Bellair Beach to the south. Map 1 shows the geographic service area of the City of Clearwater potable water system. z Public Utilities -Water Division. City of Clearwater Website. Accessed August 2008. Htip://www.clearwater- tl.com/gov/depts/pwa/public_utilsldivisions!water/index.asp. 3 Currently the City pumps water from 15 groundwells. Pr~t~:b1e '~l~ter Elelmer~~ 1~a City of Clearwater Comprehensive Plait According to the Bureau of Economic and Business Research (BERB) of the University of Florida, the City of Clearwater is estimated to have a total population of 1 10,602 as of April 1, 2006.4 However, the City's water service area extends beyond the City limits to include numerous unincorporated Pinellas County enclaves. Thus, to determine the population of the City's water service area, a broader figure that includes both the City population and enclave population must be utilized. Because it includes the City of Clearwater in addition to all interior county enclaves, the Pinellas County Planning Sector 6 closely matches the City of Clearwater's water service area. Therefore, population projections for Planning Sector 6, which were calculated by the Pinellas County Planning Department in February 2007, will be utilized for this Potable Water Element. Using the projections from Pinellas County for permanent, seasonal, and tourist populations, the functional population of the water service area can be determined based on the following formula: Functional Population = ((permanent + seasonal) x 4~ + (permanent x 81 + tourist 12 2 This formula is based on Water Use Caution Area (WUCA) rules with the purpose of making adjustments for seasonal residents and tourists.s Once calculated, the functional population figure represents the value utilized to calculate the gross per capita water consumption for the City. Table 1 details the projected population served by the City of Clearwater's water system through the year 2025. In 2007, the total functional population for the City was 152,1 1 7 inhabitants. 4 Bureau of Economic and Bossiness Research (2007). Florida Statistical Abstract 2007. s City of Clearwater Water Master Plan, Capital Improvements Implementation Master Plan Update 2008 1C ~r~~be later EI~~~~~ City of Ciearurater Camprehe~sive ~'iarl Map 1 Water Service Area Clearwater u 4~..~~'"y",'*,:~r`~'. ~~``"~...%~-- ~.A/-yam r 1 •.R{l~ 6 Wafer ~erV1Ce .Area City of Clearwater Water Service Area - Major Roads Jurisdictional Boundaries 'City of Clearwater !.~ ,'~fi ~ Other Cities ~ - -~ Unincorporated Pinellas County 7. rA~ u 0 0.5 1 2 3 Miles Source: City of Clearwater Water Department, 2007; Pinellas County GIS, 2007. Prepared by Wade Tdm, Inc., August 2007 for City of Clearwater Water Supply Element. WADETRIM Pile a~~r~ ~le~~n '! 7' City cif Cleatvvater Cornprel~enslve Flan Table 1 Clearwater Water Service Area Population ca> 2007 138,791 k 11,893 • ~ • i 18,724 ~ 169,407 152,117 2008 139,200 11,936 18,745 169,882 152,552 2009 139,610 11,980 1.8,767 170,356 152, 987 2010 140, 603 12, 093 18, 8,18 171. , 514 154, 043 2011 140,895 12,124 18,833 171,852 154,353 2012 141,188 12,155 18,848 172,191 154,664 2013 141,480 12,185 18,864 172,529 154,974 2014 141,773 12,216 18,879 172,868 155,284 2015 142,483 12,444 18, 916 173,843 156,089 2016 142, 691 12, 274 18, 927 173, 892 156, 246 2017 ~ i 2019 142, 899 1 143, 315 12, 274 i 12, 274 18,938 ,°~~ 18, 959 174,111 s 174, 548 156,459 ~, ~. 156, 886 2020- - 143,819 12,444 18,986 175,249 157,460 2021 143, 967 12,460 18, 994 175,420 157, 617 2022 144,114 12, 476 19, 001 175, 591 157, 773 2023 144 , 262 12, 491 19, 009 175, 762 157, 930 2024 144, 409 12, 507 19, 016 175, 933 158, 087 2025 144, 767 12, 547 19, 036 176, 350 15 $, 467 (a) For the purpose of this analysis, the population projection for Pinellas County Planning Sector 6 (Greater Clearwater Area), which closely represents the Clearwater water service area, is utilized. (b) Seasonal population is defined as persons who reside in Pinellas County for less than six months and declare their permanent home elsewhere. (c) Tourist population is the impact that tourists have on public services and facilities that are comparable to the impact of permanent residents. (d) Functional population is calculated by Water Use Caution Area (WUCA) rules (see text). Source for years 2005, 2010, 2015, 2020, and 2025: Pinellas County Population Projections by Planning Sector, 2005-2030, Pinellas County Planning Department, February 2007 Source for all other years: Data extrapolated from Pinellas County Planning Department. Within the next ten years (2018), the City of Clearwater is projected to have a functional population of 156,673 inhabitants to be served. This figure represents 4,121 new inhabitants and approximately 0.452-mgd considering the current level of service of 120 gallons per person per day within the next ten years. Table 1 (proposed) Population Projections Service Area Annual Population Estimates Year Permanent Seasonal (b) Tourist (c Total Functional d 2005 1.37,971 11,806 18,681 168,458 151,247 2006 138,381 11,849 18,702 168,933 151,682 2007 138,791 1 ] ,893 18,724 169,407 152,1 l7 2008 139,200 l 1,936 18,745 169,882 152, 552 2009 139,610 l 1,980 18,767 170,356 152,987 2010 140,603 12,093 18,818 171,514 (54,043 2011 140,895 12,124 18,833 171,852 154,353 2012 141,188 12,155 18,848 172,191 154,664 2013 141,480 12,185 18,864 172,529 154,974 2014 141,773 12,216 18,879 172,868 155,284 2015 142,483 12,444 18,916 173,843 156,089 2016 (42,691 12,274 18,927 173,892 156,246 2017 142,899 12,274 18,938 174, 111 156,459 2018 143,107 12,274 18,948 174,329 156,673 20 l 9 143,315 12,274 18,959 174, 548 156, 886 2020 143,819 12,444 18,986 175,249 157,460 2021 143,967 12,460 18,994 175,420 157,617 2022 144,114 12,476 19,001 175, 591 157,773 2023 144,262 12,491 19,009 175,762 157,930 2024 144,409 12,507 19,016 175,933 158,087 2025 144,767 12,547 19,036 176,350 158,461 (a) For the purpose of this an»lysis, the population projection Cor Pinellas County Planning Sector 6 (Greater Clearwater Area), which closely represents the Clearwater water service area, is utilized. (b) Seasonal population is defined as persons who reside in Pinellas County for less than six months and declare their permanent home elsewhere. (c) Tourist population is the impact that tourists have on public services and facilities that are comparable to Utc impact of permanent residents. SWFWMD Master Plan 2006 153,539 155,977 157,654 158,639 159,632 (d) Functional population is calculated by Water Use Caution Area (\WCA) rules (see text). Source for yeazs 2005, 2010, 2015, 2020, and 2025: Pinellas County Popularion Projections by Planning Sector, 2005-2030, Pinellas County Planning Deparoneot, February 2007 Source for all other years: Date extrapolated from Pinellas County Planning Departrnent. PINELLAS COUNTY, FL POPULATION PROJECTIONS BY PLANNING SECTOR PLANNING YEAR SECTOR 2if~S .... x'{31} 2t3'{.~ 2~2A ~(~x5. Permanent 28,131 30,033 31,487 32,582 33,401 SECTOR 1 Seasonal 2,842 3,059 3,224 3,348 3,442 Greater Tarpon Springs Tourist 2,453 2,542 2,610 2,661 2,700 Total 33,426 35,634 37,321 38,591 39,543 Permanent 33,361 34,416 34,980 35,278 35,434 SECTOR 2 Seasonal 1,750 1,807 1,836 1,852 1,860 East Lake Tarpon Tourist 1,254 1,294 1,316 1,327 1,333 Total 36,365 37,517 38,132 38,457 36,627 Permanent 62,162 63,726 64,567 65,014 65,251 SECTOR 3 Seasonal 2,812 2,903 2,951 2,977 2,992 Palm Harbor Tourist 4,288 4,360 4,399 _ _ 4,420 4,431 Total 69,262 70,989 71,917 72,411 72,674 Permanent 43,468 44,254 44,805 45,188 45,453 SECTOR 4 Seasonal 3,200 3,258 3,298 3,325 3,345 Greater Dunedin Tourist 2,826 2,870 2,901 2,922 2,936 Total 49,494 50,382 51,004 51,435 51,734 Permanent 34,153 36,335 37,741 38,643 39,223 SECTOR 5 Seasonal 1,029 1,111 1,159 1,187 1,203 GreaterSatetyHarborlOldsmar Tourist 1,761 1,849 1,905 1,940 1,962 Total 36,943 39,295 40,805 41,770 42,388 Permanent 137,971 140,603 142,483 143,819 144,767 SECTOR 6 Seasonal 11,806 12,093 12,298 12,444 12,547 Greater Clearwater Tourist 18,681 18,818 18,916 18,986 19,036 Total 168,458 171,514 173,697 176,249 176,350 Permanent 94,859 95,650 96,239 96,683 97,015 SECTOR 7 Seasonal 8,409 8,473 8,523 8,560 8,589 Greater Largo Tourist„ 7,543 7,583 7,813 7,635 7,652 Tote I 110,811 111,706 112,375 112,876 113,256 Permanent 24,646 25,833 26,668 27,246 27,643 SECTORB Seasonal 1,138 1,171 1,194 1,210 1,221 Greater HighpoinflFeather Sound Tourist 4,105 4,143 4,170 4,188 4,200 Total 29,889 31,147 32,032 32,644 33,064 Permanent 81,226 82,493 83,632 84,656 85,573 SECTOR 9 Seasonal 5,254 5,356 5,439 5,512 5,576 Greater Seminole Tourist 5,046 5,113 5,170 5,227 5,275 Total 91,526 92,962 94,241 95,395 96,424 Permanent 52,370 54,237 55,766 57,014 58,033 SECTOR 10 Seasonal 2,407 . 2,538 2,653 2,737 2,802 Greater Pinellas Park Tourist 5,822 5,905 5,973 6,028 6,074 Total 60,599 62,680 64,392 65,779 66,909 Permanent 273,666 277,379 281,005 283,987 287,135 SECTOR 11 Seasonal 17,019 17,276 17,514 17,713 17,907 Greater St. Petersburg Tourist 19,286 19,506 19,684 19,831 19,949 Total 309,971 314,161 318,203 321,531 324,991 Permanent 21,009 21,146 21,225 21,268 21,292 SECTOR 12 Seasonal 7,378 7,472 7,525 7,554 7,571 South County Beaches Tourist 10,591 10,606 10,614 10,619 10,621 Total 38,978 _ 39,224 39,364 39,441 39,484 Permanent 18,144 18,242 18,337 18,426 18,512 SECTOR 13 Seasonal 9,497 9,563 9,626 9,687 9,745 Mid-County Beaches Tourist 4,429 4,439 4,448 4,457 4,466 Total 32,070 32,244 32,411 32,570 32,723 Permanent 39,606 40,130 40,554 40,899 41,179 SECTOR 14 Seasonal 3,565 3,628 3,679 3,718 3,750 Greater Lealman Tourist 2,934 2,962 2,984 3,003 3,017 Total 46,105 46,720 47,217 47,620 47,946 Permanent 944,772 964,477 979,489 990,703 .999;911 PIIVELLAS COUNTY Seasonal 78,106 79,708 80 919 $1,824 82,550 TOTAL Toutist 91,019 91;990 92,703 .93,244 93;652 Total. 1 113,897 1 136175 .1,153111 ;1,165,771 .1.,176,113 Note: 1. Seasonal Population is defined as persons who reside in Pinellas Count' for less than siz months and declare their permanent home elsewhere. 2. Tourist Population is the impact Thal loudsls have on public services and facilities That are comparable to the impaG of permanent residents. Source: Pinellas County Planning Depl., 07/04, Rev. 02107 Projection Methadology/Updaled Pop Proj by Sector final 082604 P+~tabl~ 1~'at~r Elell~~nt 18 Ctty of Clearwater Comprehensive Plan The City of Clearwater is an urban and predominantly built-out city and features a diverse mix of land uses. Within downtown Clearwater, a dense mix of institutional, commercial, office, recreational and high density residential land uses are found. !n addition to downtown, the Clearwater Beach area features a dense mix of land uses that include major commercial/resort destinations, high density residential developments, and recreational uses. Intensive commercial land uses, including regional commercial shopping centers are scattered along the City's major transportation arteries, particularly Gulf-to-Bay Boulevard and U.S. Highway 19. The majority of the rest of the City is dominated by well-established single- family neighborhoods, intermixed with supportive institutional and recreational uses. Map 2 shows the existing land uses found within the City of Clearwater water service area. 3,3 Design Capacity and Current ©emand on Existing Facilities. Water Wells and Treatment Facilities Potable water within the City of Clearwater is provided by 23 City-operated fresh water wells (19 active and 4 inactive) and seven interconnects with the Pinellas County water system. Although it is currently not used, the City has access to the water system of the City of St. Petersburg though an emergency interconnect. The City's water wells are located in close proximity to three treatment and storage facilities: Reservoirs Nos. 1, 2, and 3. The interconnects to the Pinellas County system are found at various locations in the City: Reservoir No. 2; Reservoir No. 3; along Belcher Road near the intersections with Drew Street, Gulf-to-Bay (SR 60), and Belleair Road; and at South Sand Key. The locations of the various water supply facilities within Clearwater are illustrated on Map 3. Pinellas County water is purchased by the City of Clearwater through an intergovernmental agreement as a means to augment the City's groundwater sources and to meet the City's water demands (See Appendix A). From 2005 to 2007, the average amount of water purchased by the City from Pinellas County was 9.3 MGD.6 s In the Fall of 2003, after a reverse osmosis treatment facility was implemented at Reservoir No. 1, the City was able to reduce the amount of water purchased from the County by a net of 2-mgd ~~~~le V~~t~~ ~I~~~~ ,~ pity ~f Ci~an~ater ~amprehensive Dian Map 2. Existing Land Use map Clearwater Map 2 existing I...and Uses Jurlsdidtlonal Boundaries Existing Land Use 2005 ~jOther Cities Category ~~-~ Pinellas Counly S(ngle Family - Major Roads Mobile Home Duplex or Triplex Multi-Family ~~ Commercial Industrial PubliclSemi-Public ~ Recreation/Open Space Vacant ~] ConsenationlProservetion Marinas Surtace Water C 0 0.5 1 2 3 Miles Source: Pinellas Ccunty GIS, 2005. Prepared by Wade Trlm, Inc., August 2007 for City of Clearwater Water Supply Element. WADETRIM ot~-~ 'mar ~~l~rat ~~ City of Clearwater Comprehensive Flan Map 3. Water Supply Facilities / ~~ // {'_ y/%C~ \ CRgfA1V M q C q ///. / /. /'fi`r ~: t~ / i / , : /:'/// / / ~'',,. e~usewAti "rf / / '. / ~ / ,i //// / ef)~ "i/ , lT :~ ~~Y"J / : _ % DRLe+~ RD 4 , ~ ' /' ~f /g ( 'i/ Q~7 M'~ f , ./' / Y/' RDRrH~IDE OR ~ % I •, / /~ ',i / t, ' i ~, `~; ~ / ,~ % / r,/ 1. M f- ~ y-,t~ / / , ' I ~~ , : ~ 'X~ x~'~ E ~~ ~} ~~`?~ ~ '. so h ~ .'fir' / ~~. / e~ ~. / i, / ~ ~ ~ i / /' / / ~ ~~ ~ pal 6 ~ .~ ~ / i ~-~` ] ~ Resevolr MJ / a ~ ~ ~i 11 ,(11 1 ~ ~/:~ ~ J / •'i ~tia } / /, ~` I Q /. j ~ '.", / k / ~ {i :jR 6 (70 MG / c / F y ~:i O / / / //litTld ~tT ~ ~ ~~'3 qN 37~ ~.~. / ~ ' ~ / . ,.e RD 5UN]ET POMT D f. ~ / pp i ei / %/' "a~ ° ~ ~7e 7 GII7 MG) k k €.i ., ~ ~ L- P Y ` ~ 'tyr 1 ..r 3R (i~ „ 4./L r '.~ ~ s C Resevalrai/' ~' ~ ~ ii V .,. ~ ia-^'--' ,, ~j'° `{;..,." aY ". Q ~ .~ ~ s MLMEV RO Facklty E, < t i ~~ •~ "t ~~ tD ~ e, .~ g (5 MG) ,. ~.k .e,....H ,'"w"'..'.^•-..._......~.r~r I r . ` ,~ rite ° i i ~ ,}~ Ua 4c : ~ ~ ~~"~ ~ a3 eT ~ ~ (~ ,._I DREWn y '"' .Del Oro Tank c]Ylr cL EuxD]T (p }} >, ~ t__S« ~~ _. (t MO) courm±ercwP]ELL - ouR sr ~T Y°L z Rewvolr p2 - ~~ i' < ~ (5 MG) . - < eJ DR ono _~ _ .. ' ~~ ff. Greenwootl/MLK Tank ~ 1 i. '; ' -JLTr // r'~ J ,~ // , ~ ~'t ~~({ ~ - /. / /S ~a V r / ~'~ FAlll eGCN CIwY-- ~ ~Wk Y ~ ~ / / /•~/ . 'p( }!A1/ /. ~ % '{,kods ~ ~iL6 g, 8 - ~2. Clearwater Map ~ Ft?~d~~~ ~c~L~T ~1:lpp~'~" ~'c~C111C1e5 Elevated Potable Water Tank Potable Water Storage Reservoirs Water We11s Status In Service Out of Service ~ Plugged ~ Proposed Monitor Well - MaJor Roads Jurrsdiclional Boundaries City of Clearwater C ~~ Other Cities ~~m Unincorporated Pinellas County 0 0.5 1 2 3 Miles SDUree: Ciry of Clearwater Water Department, 2007; Pinellas County GIS, 2007. Prepared by Wade Trlm, Inc., August 2007 for City of Clearwater Water Supply Element. WADETRIM 2'1 ~~~~~e !'ater El~~~r~t City Qf Ciearuvater Comprehensive Pian In general, the groundwater source for both Clearwater and Pinellas County comes from a groundwater supply called the Floridan Aquifer. More specifically, the City water sources are 23 groundwater wells, while Pinellas County potable water is obtained from two different sources: Tampa Bay Water's regional water system; and fresh water from Eldridge Wilde wellfields. Tampa Bay Water is a local wholesaler providing water to six local governments in the Tampa Bay metropolitan area. Multiple sources contribute to Tampa Bay Water's regional water supply; these include groundwater and surface water from around the Tampa Bay metropolitan area and saline water from Tampa Bay. A summary of the daily production rates for the three reservoirs is provided in Table 2. The table also details the relative production provided by the City and the production provided by Pinellas County. Table 2 Summary of daily Production by Source, 2t7g~ Source: City of Clearwater's Annual Water Report, 2007 'Value listed represents finished blended water capacity. In order to produce this blended finished water capacity, it is required to pump an additional 14 to 16% of well water. "Water provided by Pinellas County interconnects located on-site with existing Cily of Clearwater facilities. The values reflect the addition of a reverse osmosis facility at Reservoir No. 1, which, at the time of the preparation of the Water System Assessment (Clearwater Water Master Plan), was expected to reduce the amount of water purchased from Pinellas County by a net of 2-million gallons per day (mgd} on a long term basis. The average daily demand for potable water within the City of Clearwater's water service area totals-12.65-mgd, of which 74 percent is provided by Pinellas County and 26 percent is provided by the City's wells. POtale VUat~c ~erll~er~t ?2 troy of Clearwater Cc~mprehertsive Plate According to the City's water use permit issued through the Southwest Florida Water Management District (SWFWMD), the City is allowed to pump a maximum of 6.25-mgd from its wells (See Appendix B). The City is using approximately 52.8 percent of its pumping capabilities. Reservoir No. 1 is located on Palmetto Street near Saturn Avenue and consists of a reverse osmosis water treatment plant, a single 5 million gallon (mg) storage tank, chloramination facilities for disinfection, and a high service pumping station. Reservoir 1 utilizes 2.08-mgd of raw groundwater to produce 1.8-mgd of treated potable water. The Reverse osmosis plant uses 2.6-mgd of water to produce 2.0- mgd of permeate which is blended with 1.0-mgd of pre-treated by-passed water, attaining a total of 3-mgd of potable drinking water. Feed water to the plant comes from 10 active wells (Well Nos. 23, 31, 48, 65, 66, 73, 74, 75, 78 and 81). Production from Well 81 is limited due to the need for a sand pack to prevent sand from entering the well.8 Reservoir No. 2 is located near the intersection of US 19 and Drew Street and consists of a single 5-mg storage tank, chloramination facilities, and a high service pumping station. Feed water to the plant comes from 3 active wells (Well Nos. 45, 46 and 53). Two additional inactive wells are also connected (Well Nos. 51 and 52). Water from the wells can vary but typically provide on average 0.8 mgd. Also on- site is an interconnect with Pinellas County that provides on average 1.2-mgd. Water from both the wells and interconnect are blended in the 5-mg storage tank. Chlorine and ammonia are added to boost the chloramine concentration of the incoming water. The high service pumps then deliver the finished water to the distribution system.9 Reservoir No. 3, located near the intersection of Countryside Blvd. and State Road 580, consists of two 5-mg storage tanks, chloramination facilities, and a high service pumping station. Feed water to the plant comes from 6 active wells (Well Nos. 56, 58, 63, 68, 69, and 77). Two inactive wells are also connected (wells 79 and 80). Water from the wells can vary but typically provide on average 0.7=mgd. Also on site is an interconnect with Pinellas County that provides on average 8.15 mgd. Water from both the wells and interconnect are blended in the S-mg storage tank. Chlorine and ammonia are added to boost the chloramine concentration of ~ Based upon 2007 consumption of 3.3MGD a City of Clearwater Water Master Plan, Water System Assessment Update, 2008 s City of Clearwater Water Master Plan, Water System Assessment, Update, 2008 P~t~e 'ter ~M~Ir~e~lt ~~ City caf Clearwater Ccrrnpreher~sve Ptah the incoming water. The high service pumps then deliver the finished water to the distribution system.~o Elevated Storage Tanks The City of Clearwater operates three 1 million gallon (mg) elevated storage tanks to provide additional storage capacity, consistent distribution system pressure, and to respond to emergency demands such as fire. The three elevated storage tanks are identified and located as follows: Del Oro, located near the intersection of McMullen-Booth Road and Drew; Martin Luther King, located near the intersection of Bellevue Blvd. and Martin Luther King; and Otten Street, located near the intersection of Otten Street and Highland Ave. At the time of the preparation of the Clearwater Water Master Plan Water System Assessment (June 2004), the three elevated storage tanks were valved-off due to water stagnatian issues and degradation of water quality. However, the City has since placed the Martin Luther King and Otten Street tanks back into service in order to maintain an adequate level of service and for additional emergency storage capabilities.>> With regard to the total capacity of drinking water sources and treatment facilities, Chapter 62-555(6) of the Florida Administrative Code states that: The total capacity of al/ water sources and treatment.faci/ities connected to a water system sha// at /east equal the water system's design maximum-day water demand (inc/udiny design fire-f/ow demand if fire protection is being provided). In total, the City has a storage capacity of 23-mgd provided by the four 5-mgd storage tanks at Reservoirs 1, 2 and 3 and the three 1-mgd elevated storage tanks. However, at the time of the Clearwater Water Master Plan Water System Assessment ,the City's total storage capacity was estimated at 20-mgd, not calculating the capacity of the elevated storage tanks because of their stagnation and water quality issues. In addition to the City's own storage capacity, Pinellas County provides the City with some storage capacity through the interconnections. However, the exact amount of storage capacity available to the City through Pinellas County is unknown.12 ~~ City of Clearwater Water Master Plan, Water System Assessment Update, 2008 ~~ City of Clearwater Water Master Plan, Water System Assessment Update, 2008 12 City of Clearwater Water Master Plan, Water System Assessment Update, 2008 Potable ~4l~t~t` El~mlen-t z~ City of Clearwater Cornprehei~sive Plan Based on the Water System Assessment report, the City's design maximum-day potable water demand is estimated at 19-mgd. At 20-mgd, the City's current storage tank capacity is sufficient to achieve potable water design maximum-day demand according to Chapter 62-555 F.A.C. However, the Water System Assessment noted that .this total capacity may be inadequate to achieve fire-flow demand. For this reason, and as noted above, two of the three 1-mgd elevated storage tanks were put back into service, but several modifications to the distribution system were recommended in the assessment to increase overall capacity, including distribution system pipe modifications, addition of booster pump stations, and addition of inter-distribution system storage tanks.13 Pumping Facilities High-service pumps are found at each of the City's three reservoirs to ensure distribution system capacity and pressure. These pumps ensure that water under sufficient pressure is delivered from the wellheads to the various storage and treatment facilities and then into the distribution system. Additionally, system capacity and pressure is supplemented through the six direct interconnections with the Pinellas County water system. With regard to required pumping capacity, Chapter 62-555.320(15) of the Florida Administrative Code states that: (a) Un/ess elevated finished-drinking-water storage is provided, the total capacity of a// high-service pumping stations connected to a water system, or the capacity of a booster pumping station, sha/l be sufficient to: 1. Meet at /east the water system's, or the booster station service area's, peak- hour water demand (and if fire protection is being provided, meet at least the water system's, or the booster station service area's, design fire-flow rate p/us a background water demand equiva/ent to the maximum-day demand other than fire-flow demand); and 2. Maintain a minimum gauge pressure of 20 pounds per square inch throughout the water system's, or the booster station service area's, distribution system up to each customer's point of connection to the distribution system. is City of Clearwater Water Master Plan, Water System Assessment Update, 2008 ~c~t~b~~ at~r E~r"at x~ City of Clearwater ~~rntsreher-stve Plan (b) Where elevated finished-drinking-water storage is provided, the total capacity of a// high-service pumping stations connected to a water system, or the capacity of a booster pumping station, sha!/ be sufficient to at least meet the water system's, or the booster station service area's, maximum-day water demand (including design fire-flow demand if fire protection is being provided) and to maintain distribution system pressure as specified in subparagraph 62- 555.320(1 S)(a)2., F.A. C. /n addition, the total capacity of the high-service pumping stations, or the capacity of the booster pumping station, combined with the useful elevated finished-water storage capacity sha/l be sufficient to meet the water system's, or the booster station service area's, peak-hour water demand for at /east four consecutive hours (and if fire protection is being provided, sha// be sufficient to meet the water system's, or the booster station service area's, design fire-f/ow rate plus a background water demand equivalent to the maximum-day demand other than fire-f/ow demand for the design fire-f/ow duration). As noted above, the City's total water storage capacity may be inadequate to achieve fire-flow demand. Because pumping capacity is related to achieving sufficient storage capacity, improvements to the City's pumping capacity is warranted. The Clearwater Water Master Plan Water System Assessment notes that possible solutions include distribution system pipe modifications, addition of booster pump stations, and addition of inter-distribution system storage tanks.14 Distribution System The City of Clearwater's water distribution system includes 574.6 miles of water main, 40,000 water meters, 4,050 fire hydrants, 8,330 valves and 7,500 backflow devices. Approximately 48% of the water mains of the City are 6 inches in diameter while almost 20% are 8 inches. Table 3 displays the distribution of water mains in the system. In 2006, the City of Clearwater completed the implementation of 17 phases of a 20-Year Plan to upgrade the pipes of the distribution system. With this 14 City of Clearwater Water Master Plan, Water System Assessment Update, 2008 P~t~b1~ ~Vat~r Elrrt~l~lt 2b city of Clearwater Comprehensive Ptah implementation, the City eliminated "cast iron" and undersize lines improving the system to satisfy future demand. Table 4 displays these improvements by year. Table 3 Inventory of City's System Water lain, 2fl0$ .. - ~ - . 2 90,076 17:1 3.0% 3 32,188 6.1 1.1% 4 394,359 74.7 13.0% 6 1,439,799 272.7 47.5% 8 597,113 113.1 19.7% 10 42,697 8.1 1.4% 12 254,904 48.3 8.4% 14 280 0.1 0.0% 16 117,591 22.3 3.9% 18 1,915 0.4 0.1% 20 61,422 11.6 2.0% 24 1,363 0.3 0.0% 45 45 0.0 0.0% Total 3,033,752 574.6 100.0% Source: City of Clearwater, 2008 Table 4 2Q -Year Improvement of Water lutains 1 2,180 2,750 2,150 1985 2 5,850 14,820 17,900 1986 3 14,000 5,950 11,900 1986 4 10,600 7,750 9,900 1987 5 5,700 17,300 14,500 1987 6 20,700 11,100 18,650 1987 7 10,439 13, 021 5, 500 1988 8 14,828 32,490 26,750 1992 9&10 11,150 9,180 7 800 1993 11&12 37,000 53,000 62,000 1994 13&14 36,500 58,150 65,900 1995 15,16,17 19,500 16,000 30,000 2006 Source: City of Clearwater, 2008 In addition to these improvements, the City of Clearwater will complete this year a Distribution System Water Quality Optimization Plan {DSOP). The objectives of developing the City's DSOP are as follows: ~~~~ at~ir E~~~~r~~ ~~ City of Clearwater Carnprehensive plan • Evaluate how the City's operating, maintenance, monitoring, treatment, and other practices that can impact distribution system water quality compare to current industry best management practices; • Provide a summary of the City's existing practices and protocols; • Provide a prioritised list of practices and potential projects that will enhance system operations; and • Develop a road map for developing and implementing recommended improvements. As shown in Map 4, the water distribution system effectively covers all lands within the City of Clearwater, including the unincorporated Pinellas County enclaves. pr~ta~ale 1~Uater Element ~$ pity of ~~earwater Comprehensive Plan Map 4 Clearwater iYlt~~ 'Y ~4~~~~~ '~c~~~T' 1.)is~~~il~utan ~~in . City of Clearwater Potable Water Service Area Distribution Mains Owner ---- City of Clearwater -- St. Petersburg ------ Pinellas County Private -- No Data Jurisdictional Boundaries City of Clearwater ~-~~ _~ Other Cities (`~''"'' Unincorporated Pinellas County - Majar Roads CAS 0 0.5 1 2 3 Miles Source: City of Clearvoater Watar Department, 2007; Pinellas County GIS, 2007. Prepared by Wade Trim, Inc., August 2007 for City of Clearwater Water Supply Element. WADETRIM P ca ~t ~ b ~ ~U ~. 't l~ it ~ I ~ lt~ ~ lit t z~ City t3f Clearwater Comprehensive Pfau Reclaimed Water System The City of Clearwater currently operates a reclaimed water system to ensure that adequate water is available today and in the future and that the City's residents have high quality water at an affordable price. The use of reclaimed water helps the City to preserve high quality potable water sources by providing a reliable and economical alternative source for irrigation water. Use of reclaimed water for irrigation can benefit the City because every gallon of potable water not used for irrigation is one less gallon of water purchased from Pinellas County. This has the potential of significant potable water savings .given the escalating casts of purchasing water from Pinellas County.~s The City's reclaimed water system is the result of cooperative funding by the Southwest Florida Water Management District and the City of Clearwater.16 The City's reclaimed water system is shown on Map 5 and includes 51 miles of reclaimed water main. At present, reclaimed water service extends to the Countryside Country Club Golf Course and driving range, Chi Chi Rodriguez Golf Course and the soccer fields on McMullen Booth Road in the Countryside area, which are fed from the Northeast Treatment Plant. The Northeast Treatment Plant will also serve the reclaimed projects on the east side of Clearwater: Drew Union, Del Oro, Morningside, and Skycrest. The Marshall Street Plant feeds jack Russell Stadium, Pier 60 Park, Coachman Park as well as 1,400 customers on Island Estates and Clearwater Beach. In 2004, reclaimed water became available to the Harbor Oaks Area of Clearwater. This area also receives it supply from the Marshall Street Plant. 15 City of Clearwater Water Master Plan, Capital Improvements Implementation Master Plan Update. 2008 ~s City of Clearwater Reclaimed Waler Master Plan. City of Clearwater Website. Http;l/wvuw.clearwater- fl.com/govldepts/pwalpublic_utils/divisions/reclaimedlrcwater_plan.asy. Pt~tI~ ~~~~ l~~l~ ~~ pity ~F ~~e~rwater Cr~mprehensive Stan Map 5. Reclaimed Water System Clearwater Map 5 Reclaimed ~VVat-e~• I~'acilities • Reclamed Water Fixtures •- Reclaimed Water Llnes --- Major Roads Jurisdictional Boundaries City of Clearwater I•,-,~,: -~ Other Cities ~m_ j Unincorporated Pinellas County 0 0 0.5 1 2 3 Miles Source: City of Clearvrater Water Department, 2007; Pinellas County GIS, 20W. Prepared by Wade Trim, Inc., August 2007 for City of Cloarwater Water Supply Element. WADETRIM 31 City of Cleaz~ater Cornprehensive Plan In 2008, approximately 2,200 customers are now provided with reclaimed water. According to the 2007 City's Annual Water Report, reclaimed water demand increased from 2.i4-mgd in 2005 to 3.16 mgd in 2007. These figures represent approximately 47.6 percent increase in the last two years, a significant impact on the city's water savings.• The City of Clearwater is currently designing the Skycrest Reclaimed Water Project which will include an east/west interconnection, pumping and storage facility. This interconnection will complete the loop within the City, resulting in both sides of the City being connected for future expansion of our reclaimed program.~~ Future extensions are based on several factors, including lawn Irrigation usage/potential offset, proximity to existing reclaim sources, and infrastructure cost. In December 2007, the City of Clearwater re-evaluated its Reclaimed Water Master Plan (2001) that includes a 20-year schedule for reclaimed water extensions. Table 5 provides a summary of the reclaimed water projects prioritized in this study for the next 13 years: Table 5 Reclaimed Water Master Plan, l(~ecember 2007 2007 Sk crest ~: .- 0.46 2008 Chautauqua- Coachman Ride 0.17 2008 Morningside 0.20 2009 Palmetto-Glen Oaks 0.34 2010 Clearwater Harbor 0.50 2011-2020 Resident Initiated/Lar a Users/Wholesale Costumers* .. Source: City of Clearwater. Reclaimed Water Master Plan Re-Evaluation, 2007 "Unknown at this time. '~ City of Clearwater Reclaimed Water Master Plan. City of Clearwater Website. Hitp:l/www.clearwater- fl.comlgov/depts/pwa/public_utils/divisionslreclaimedlrcwater_plan.asp. ~ata~~~' ~~lt~~ El~~~nt ~z City cif Clearwater Camprehensive Plan According to the Regional Water Supply Plan prepared by the Southwest Florida Water Management District in 2006, the expansion of the reclaimed water system in the City of Clearwater is one of the most important projects within the NTB Planning Area. It is projected that the system expansion (201 1- 2020) will bring savings of 5.23 MGD. . 3.4 Water Conservation Measures The City of Clearwater is a co signer of the U.S. Conference of Mayors Climate Protection Agreement leading the City to a program call "Green Clearwater". As part of this program, the City has compromised to expand water conservation efforts through the following methods: • Expanding the Reclaimed Water System and promoting its use. • Enforcing water use restrictions ordinances • Promoting xeriscape planting • Promoting and facilitating to the public the use of water conservation devices such as low flow shower heads, faucet accelerators, toilet tummies,etc. • Reducing leakages on transmission mains • Providing information through its website regarding water conservation The City is looking to expand the water conservation programs as it collaborates with Pinellas County and the Southwest Florida Water Management District. a~bl~ ~~~~r E~il~~int ~~ City cif Clearater Corr€prehensive Plan 3.5 Level of Service The existing Clearwater Comprehensive Plan has established the following Level of Service standards to be used in determining the availability of facility capacity and demand created by new development: 120 gallons per capita per day at a pressure of 40-45 psi. Potable water level of service is measured based on the rate of potable water consumption on a per person basis. This method of measurement provides an indicator of the demand placed on the potable water system and allows for tracking improvements in potable water conservation measures. As the rate of consumption decreases, the rate of success of potable water conservation measures increases. Based on the water service area's 2007 functional population of 152,117, the demand for potable water per capita per day at the 2007 level of service is 18.25 out of 21.25 MGD available from City and Pinellas County sources. If the same level of service is maintained through 2025, the City will still have enough capacity. 3.6 Facility Capacity Analysis. As highlighted in Table 2, the City of Clearwater's production is limited to 6.25 mgd from local potable water resources and is supplemented by purchase of potable water through an interlocal agreement with Pinellas County to meet demands in excess of what is locally produced by the City. Rated/permitted capacity at the City of Clearwater three Water Reservoirs /High Service Pump Stations is 25 mgd with pumping capable of meeting instantaneous peaks in excess of 31 mgd. The current inter-local agreement between Pinellas County and the City of Clearwater was signed on September 2005 and it is valid through September 2030. The agreement states that the County agrees to furnish up to 15 mgd yearly average of water (treated) for its use and for distribution in its water service area.~$ In 2007, the City of Clearwater's water system was estimated to have an average daily demand of 12.65-mgd. This is based on a functional population estimate of 18 Interlocal Agreement Water Service Delivery. City of Clearwater and Pinellas County. September 2005. Pc~t~ble Utl~t~r Elell~tel~t s~ City of Ctearwater Comprehensive Plan 152,117 for the water service area, and assumes a demand of 90.5 gallons per capita in addition to 610,000 gallons per day for significant water users.19 The estimated average daily demand of 12.65-mgd also takes into account the planned future land uses of the City of Clearwater. Taking into consideration these figures, the City is using approximately 53 percent of its permitted pumping capabilities from City's wells from SWFWMD and approximately 62 percent of its available capacity to water purchases from Pinellas County. The estimated demand of 12.65-mgd does not account for the reduction in potable water demand resulting from the City's reclaimed water system. Therefore, 15 and 25 percent water reuse offsets have been applied to the total demand, resulting in an average daily demand of 10.72-mgd or 9.47-mgd, respectively.20 Given that the City is almost completely built-out, significant population growth and the conversion of large undeveloped lands to urban use is not expected. The City's population is expected to increase only slightly, while the City's current distribution of land use is planned to be maintained generally in its present state. Rather, the Future Land Use Element of the Comprehensive Plan focuses on redevelopment efforts throughout the City, particularly within downtown Clearwater and the Clearwater Beach area. Table 6 provides the projected annual average daily demand for the City of Clearwater water system for the planning period, 2008 through 2025. 19 City of Clearwater Water Master Plan, Capital Improvements Implementation Master Plan Update, 2008 ~ City of Clearwater Water Master Plan, Capital Improvements Implementation Master Plan Update, 2008 3 lily of Clearwater Comprehensive Plan Table 6 Water System Average C7aily demand: 2008 through 2025 008 s s 152 , 552 ~. f b 14.4 t. ~ r !i ! 12.3 ~ *. E a • 10.8 2009 152 , 987 14.5 12.3 10.8 2010 154, 043 14.6 12.4. 10.9 2011 154, 353 14.6 12.4 10.9 2012 154, 664 14.6 12.4 11.0 2013 154, 974 14.6 12.4 11.0 2014 155, 284 14.7 12.5 11.0 2015 156, 089 14.7 12.5 11.1 2016 156,246 14.8 12.5 11.1 2017 +~ R 2019 156,459 156, 886 14.8 a 14.8 12.6 12.6 11.1 11.1 2020 157, 460 14.9 12.6 11.1 2021 157,617 14.9 12.6 11.2 2022 157, 773 14.9 12.7 11.2 2023 157, 930 14.9 12.7 11.2 2024 158,087 14.9 12.7 11.2 2025 158,467 15.0 12...7 11.2 (a) Functional Population is taken from Table 1. (b) Annual average daily demand is calculated based on 90.5 gallons per capita per day plus 610,000 gallons per day for significant users other than hotels. (c) Average annual daily demand considering a 15 percent offset due to the use of reclaimed water for irrigation. (d) Average annual daily demand considering a 25 percent offset due to the use of reclaimed water for irrigation. By 2018, the water system service area is projected to have a functional population of 156,673, resulting in an annual average daily demand of 14.8-mgd. However, considering a conservative 15 percent offset for water reuse, the average daily demand would actually decline to 12.6-mgd by 2018. A 25 percent offset results in an average daily demand of 1 1.1-mgd by 2018. ~~tabl~ ~el~~ir ~~rnent ~~ City of Clearwater Comprehensive Plan Taking into consideration the City's permitted capacity to pump from its wells of 6.25-mgd, the governance agreement with Pinellas County that allows purchases of treated water up to 15mgd, and the projected reuse offset (15-25%), it could be concluded that the City of Clearwater has sufficient quantity of treated water available to the City to support the projected growth beyond 2025. The City's water demand projections are slightly below what the 2006 Regional Water Supply Plan establishes due to several factors: a) Population projections were adjusted to the most recent data provided by Pinellas County (February 2007) b) Demand projections were prepared using most recent data related to average daily consumption rates (per capita water use) c) Scheduled reclaimed water projects in 2005 are now contributing to the overall water savings. 3.7 Performance and Condition of Ixisting Facilities An assessment of the performance and condition of existing facilities was conducted as part of the City of Clearwater Water Master Plan, Water System Assessment, prepared in 2004. The assessment revealed that a variety of corrective measures are necessary to maintain existing levels of service. These recommended corrective measures are outlined below. Well Pump Corrosion Currently, corrosion in the vertical turbine pumps used at each raw water production well requires the periodic replacement and maintenance of the pump shaft and pump bowl assembly. Because this maintenance process is difficult and labor intensive,. it is recommended that stainless steel submersible pumps be utilized instead. The stainless steel construction of the submersible pumps helps to minimize corrosion, extending the useful life of the pumps.21 zt City of Clearwater Water Master Plan, Water System Assessment Update, 2008 t~~le 'U~lat~r E~rl~~n~t ~~ City of Clearwater Comprehensive t'lan Standb~Power Requirements Chapter No. 62-555 F.A.C. states that each community water system shall provide standby power for operation of the water source, treatment, and pumping facilities necessary to deliver drinking water meeting all primary and secondary standards to meet the average daily demand for the system. The raw water production wells feeding Reservoir 1 are not currently provided with an auxiliary power source as needed to achieve compliance with Chapter 62-555, F.A.C. Two alternative corrective measures were evaluated: installation of a permanent generator or the purchase of portable generators. In the end, portable generators to serve the production wells were chosen as the preferred alternative given the cost savings. According to the Water System Assessment, backup generators with sufficient capacity are available to serve the treatment and storage facilities at Reservoirs l and 2, but not Reservoir 3. Therefore, the study recommended that the existing generator be replaced with a larger generator to handle the current load. Control and Monitoring Improvements In order to make control and monitoring of the City's water system centralized, it is recommended the City install the necessary Supervisory Control and Data Acquisition (SCADA) equipment at existing facilities to allow communications with the new network installed at Reservoir No. 1. This includes control and monitoring of Reservoirs Nos. 2 and 3, raw water wells and Pinellas County interconnections. For Reservoir Nos. 2 and 3, the raw water wells, and county interconnects, the Water System Assessment recommended that a radio telemetry system be established to enable effective communications between system facilities. At the county interconnects, it was recommended to add a remotely operated valve to open or close the interconnects. Storage Improvements As stated previously, the City's three elevated storage tanks face water stagnation issues with the potential result of degradation to water quality. At the time of the Water System Assessment, the storage tanks were valved-off. Additionally, the Water System Assessment noted that the City's storage tank capacity may be inadequate to achieve fire-flow demand. Therefore, the study recommended the elevated storage tanks to be placed back into service, restoring sufficient fire- P c~ t a b l a U41 ~ ~c e r E l e lrlrlw a ll~ ~t ss ~lxy flf CJearwater Comprehensive Plan flows to certain areas of the City. To alleviate the water stagnation issues at the storage tanks, recommendations were outlined that included the installation of a mixing system, an altitude valve, isolation valve and small booster pump station to force water out of the storage tanks. To increase fire-flow capacity, the Water System Assessment recommended the addition of inter-distribution system storage tanks in combination with distribution system pipe modifications. Pumping Improvements Improvements to the City's pumping facilities are also necessary to improve fire- flows. The Water System Assessment indicates that the current high service pumps are deficient in meeting fire-flow levels in some areas of the City. Therefore, additional booster pump stations are recommended in conjunction with distribution system pipe modifications. 3.8 Issues and Opportunities for Cxpansion and thew facilities One of the major goals of the City is to increase self sufficiency in water supply to control future costs. Presently, the City purchases approximately 8 million gallons of water from Pinellas County at a cost of approximately 7 million dollars per year. Over the years, wholesale water rates have increased and are projected to continually rise. To accomplish increased self sufficiency, the Capital Improvement Plan portion of the Water Master Pian outlines numerous projects involving the expansion of existing water production facilities or the construction of new water production facilities. Limited Source Water Opportunities The City of Clearwater is uniquely located between the Gulf of Mexico and Tampa Bay in an area that has relatively low rates of aquifer recharge. This results in limited quantities of fresh groundwater, and subsequently, limited opportunities to expand source water production. Source water quality continues to degrade due to increased chloride levels caused by pumping of wells in excess of long term safe yield capacities, but within existing water use permitted quantities.22 Chloride Cap Restriction sz Cily of Clearwater Water Master Plan, Capital Improvements Implementation Master Plan Update, 2008 ~~ Pt~t;~b~ ~lU~.t~lr El~r~~nt City of Clearwater Comprei~ensive Plan One of the greatest challenges in increasing capacity for existing production wells and the construction of new production wells is the Southwest Florida Water Management District's chloride cap of 250 mg/L. This chloride cap level is intended to serve as a guideline in evaluating trends and controlling the effects of wellfield withdraws on groundwater quality. In order for the City to proceed with new and sustainable water resources as outlined in their Capital Improvement Plan, the chloride cap must be increased. To provide the necessary evidence to support an increase in the chloride cap, the City is planning to undertake a Chloride Monitoring Well Study. The first phase of this study will. examine the effects in the vicinity of Reservoir Nos. 1 and 3, as the impact of this cap will limit the water production from these facilities first. In a later phase, a similar study will be initiated in the vicinity of Reservoir 2 and south of Gulf-to-Bay to support the development of a new reverse osmosis facility at Reservoir No. 2.23 Feasible New Groundwater Sources As part of the Capital Improvements Plan, the Water Master Plan identifies three improvement projects aimed at increasing water supply that are economically viable as well as technically feasible during the planning period. These three projects include: • Development of an additional 1-mgd of fresh groundwater supply and associated wells and transmission mains to connect to Reservoir No. 3; • Development of an additional 1-mgd of production capacity at Reservoir No. 1 by means of adding an additional 1.25-mgd of raw groundwater supply and expansion of the reverse osmosis facility; and, • Development of an additional 3.5-mgd of production capacity at Reservoir No. 2 by adding an additional 4.25-mgd of raw groundwater supply, transmission mains and a new, low-pressure reverse osmosis facility. s3 City of Clearwater Water Master Plan, Capital Improvements Implementation Master Plan Update 2008 Potable VV~t~r ~I~:Ifn~r~t ~~~ City of Clearwater Comprehensive Plan As stated previously, these projects are partially dependent upon an increase to the SWFWMD's imposed chloride cap. However, even if the effort to raise the cap is unsuccessful, the proposed new production wells for Reservoir Nos. 1 and 3 are still recommended to be developed and permitted. The development of these wells would increase the rotational capacity, maximize production, rest existing wells, and allow for chloride levels to subside. 3.g Natural Drainage and Groundwater Recharge The natural drainage features within the City of Clearwater water system are shown on Map 6. As can be seen, the City is located between the seawater bodies of the Gulf of Mexico and Tampa Bay. Freshwater water bodies within the City include Lake Bellevue, Crest Lake, Alligator Lake, Beckett Lake, Lake Chautauqua, and various creeks and drainageways. To the north of the City, Lake Tarpon is a large freshwater resource. According to the Southwest Florida Water Management District over 84 percent of all water used within the District's boundaries emanates from groundwater resources. The deepest and most productive aquifer within the District is the Upper Floridan, which also is found underneath the City of Clearwater.24 In the Clearwater area, the Upper Floridan aquifer contains a relatively thin layer of fresh groundwater underlain by a transition zone of brackish water, which increases in chloride and dissolved solids concentrations with depth until seawater concentrations are reached.25 The Upper Floridan is a productive aquifer, supplying more than ten times the amount of water pumped from the two other aquifer systems found in the Water Management District. In the northern portion of the District, the Floridan aquifer is readily recharged by rainfall (greater than 10 inches per year), and is most highly productive. In central Pinellas County, the Floridan aquifer features a recharge rate of 1 to 10 inches per year.zs sa Southwest Florida Water Management District. Regional Water Supply Plan. December 2005 is Technical Memorandum. Evaluation of City of Clearwater Existing Production Wells. SDI Environmental Services, Inc. zs Generalized Recharge to the Floridan Aquifer (Map). District Water Management Plan, Southwest Florida Water Management District. July 2000. ~~a~ale V~~~r ~l~~nt clcy ~~ Clearwater Corr~prel3ensive Plan Map 6. Natural Drainage Features °_ Clearwater U ~. ~ ... Ma~~ C~ Surface Cr~u~lriwater Disc~arge,/Recharge R(vers and Streams Lakes Floridan Aquifer DischargelRecharge Discharge ~W>_ Recharge - Major Roads Jurisdictional Boundaries City of Clearwater ~~ Other Cities ~„___.~ Unincorporated Pinellas County ^A 0 0.5 1 2 3 Miles Source: Southwest Fbrida Water Management District, 2002-2007; Pinellas County GIS, 2007. Prepared by Wade Trim, Inc., August 2007 for C(ry of Clearwater Water Supply Element. WADETRIM ~ot~.le ~~t~r E~~i~r~~ ~z City of Clearwater Camprehensi~e Plan 3.10 Existing Regulations and Programs Relating to Natural Drainage and Groundwater Recharge Future protection and use of water resources is a public service for which long- range comprehensive planning is mandatory. The primary threats to groundwater in the Clearwater area are saltwater intrusion via overdraft and contamination. When groundwater recharge exceeds withdrawal, there is a potential for saltwater to move inward from coastal areas, ultimately affecting the quality of the available groundwater. Additionally, contamination from injection and drainage wells, fertilizers, storage tanks, and other sources affect the quality of groundwater. Both overdraft and contamination are risks that can be reduced via careful regulation. The Southwest Florida Water Management District is the primary regulator and program administrator relating to natural drainage and groundwater recharge. The City of Clearwater is contained within the boundaries of several SWFWMD water supply programs, including:27 Northern Tampa Bay Water Resource Assessment Project (WRAP) The Northern Tampa Bay Water Resource Assessment Project (WRAP) was initiated by the district to assess water availability, including minimum flows and levels, in order to support water resource recover, water use permitting, and environmental resource permitting. Both the City of Clearwater and Pinellas County provide input to the technical projects performed by the District. Northern Tampa Bay Water Use Caution Area (WUCA) The Northern Tampa Bay Water Use Caution Area sets water use permit (VI/UP) for the area, including additional conservation requirements such as reuse. Public supply permits within the WUCA limit per capita water use demands to 1 50 gallons per person per day. Any utility not meeting these numbers has strict timeframes and guidelines to implement this limit. The City of Clearwater is not using its entire permitted allocation of groundwater from the Upper Floridan aquifer although it is anticipated that its utility will eventually grow into its unused 27 Southwest Florida Water Management District, 2005 District Water Management Plan P~ta~l~ t~~~er E~~Imen City of Clearwater Comprehensive Flan quantity to meet future demand. For example, the City of Clearwater's brackish R.O. facility is permitted to withdraw 6.3 mgd of brackish groundwater, although the City has been withdrawing an average of 3 mgd~s. The City of Clearwater has been and is actively participating in SWFWMD's efforts to prioritize recharge areas within the Upper Floridan aquifer recharge area. Tampa Bay/Anc%te River Comprehensive Watershed Management (CWM) Project As part of SWFWMD's continuing efforts to ensure the coordination of local governments' planning practices regarding water supply management, SWFWMD has developed the Comprehensive Watershed Management (CWM) Program in coordination with local governments to conduct water resource assessments and planning on a watershed rather than district-wide basis. The City of Clearwater is in the Tampa Bay/Anclote River Comprehensive Watershed Management (CWM) Area. This area encompasses all of Pinellas County and parts of Hillsborough and Pasco Counties or approximately 566 square miles. The Tampa Bay/Anclote River CWM Plan was last adopted in 2002. The 2006 SWFWMD Regional Water Supply Plan requires updates to the CWM Plan in which Pinellas County and the City of Clearwater will be invited to participate. 3.1 1 Capital Irrtprnvement Projects Appendix C presents the list and budget for several potable water projects to be completed from FY 2008-2009 to FY 2013-2014. The total of capital facility improvements is about $84,438,510 millions dollars. za Southwest Florida Water Management District, 2005 District Water Management Plan P a t ~ l ~ ~ ~ t ~ r~ ~ l e r~l°>t ~ r°~ City of ~learrvater Com~r~het~sive plan Pot~~l~ Water Element City of Clearusrrater Comprehensive Plan Appendix A: Inter-local Agreement Pinellas County for Water Supply AGREEMENT THIS AGREEMENT, made and entered into as of the ~_ day of ~ %~ 2005, by and between PINELLAS COUNTY, a political subdivision of the State of Florida, acting by and through its Board of County Commissioners (hereinafter referred to as "COUNTY") and the CITY OF CLEARWATER, FLORIDA, a municipal corporation within said Pinellas County, acting by and through its CITY Commission (hereinafter referred to as "CITY"}. WITNESSETH: WHEREAS, COUNTY and CITY have previously contracted for the sale and purchase of potable water to serve customers in CITY's water service area; and WHEREAS, CITY, to insure an adequate supply of potable water for distribution to its citizens, desires to continue to purchase from COUNTY, a supply of potable water which COUNTY is able to furnish from and through its water supply transmission system; and NOW, THEREFORE, in consideration of the monies hereinafter agreed to be paid and the mutual covenants contained herein, the parties hereby mutually agree as follows: COUNTY agrees to furnish CITY up to 15 MGD yearly average of water for its use and for redistribution in its water service area, as shown on the attached sketch and marked as Exhibit "B" and incorporated herein by reference. 2. CITY shall have the exclusive right to distribute and make available water service to the customers within its water service area, as described in Exhibit "B", and may purchase from COUNTY potable water required to serve the customers within the designated area. At any point during the term of the Agreement, that the CITY determines to provide water for themselves or otherwise obtains a portion of their potable water needs from sources other than the COUNTY and the COUNTY remains on a standby status to the CITY, far that portion obtained elsewhere, the CITY will be charged a standby fee, that will be determined at the time the CITY obtains water from other sources. 3. The CITY will utilize the connections located as noted in Exhibit "A" or other locations mutually agreed to by COUNTY and CITY. 4. The CITY and the COUNTY agree to maintain an effective cross connection control program in accordance with Federal, State and Local regulations, Safe Drinking Water Acts, FAC62-555.360 and patterned of COUNTY's Cross Connection Ordinance No.. 77-11 and Pinellas County Code, Division 3, Cross Connection Control, Sec. 126-231 thru Sec. I26-244. Should any contamination or possibility of contamination occur in either party's water system, or should any other situation occur in either party's system that would in any manner contaminate the other party's water supply, the causing party will be responsible for any damage to the other party's water system which occurs from such conditions and shall immediately correct the cause of such contamination, take all necessary precautions to insure the protection of the other party's water supply and water system, and shall, if possible, within thirty (30) minutes of knowledge of such occurrence, notify the office of the other's party's Director of Utilities. If the CITY does not provide an ongoing cross connection control program, the COUNTY may require the installation of backflow devices at the meter connection. 5. The quantity of water delivered to CITY shall be quantified by a measuring device of standard make and sufficient size, selected and maintained by COUNTY. The measuring device shall be equipped with an indicating and recording register and a transmitter for telemetering remote readout. In the event future relocation is required 2 by either party, such party shall pay for all relocation costs. 6. The ownership of the flow measuring and backflow devices will remain with CITY. CITY will not change, alter, add to, or take away any part of any flow measuring or backflow device without prior approval of COUNTY. COUNTY will, at its expense, install and retain ownership of the telemetering line from the measuring device to the point of readout. 7. To assure accuracy, the flow-measuring devices shall be tested yearly by COUNTY with results delivered to CITY's Utilities Director within 30 days of test. At other intervals of Time, should any question arise as to the accuracy of any flow measuring device, CITY may require any or all of the flow measuring devices to be tested. Should the tests show the flow measuring device to be registering within an accuracy of two and one half (2-1/2) percent, CITY shall bear all the expense incurred in the testing. If the tests show the flow measuring device not to be registering within two and one half (2-1/2) percent accuracy, COUNTY will pay all the expense incurred in the testing and will immediately repair the flow measuring device. For any meter found inaccurate, COUNTY will adjust the previous month's or months bills, as appropriate, to reflect the result of the test. COUNTY agrees that the supply of water to be delivered hereunder shall be at all times continuous, except that temporary cessation of delivery of water at any time by an Act of God, fires, strikes, casualties, accidents, breakdowns of or injuries to machinery, pumps or pipelines, civil or military authority, insurrection, riot or any other cause beyond the control of COUNTY shall not constitute a breach of this Agreement on the part of COUNTY, and COUNTY shall not in such case be liable to CITY or its inhabitants for any damage resulting from an unavoidable cessation of delivery related to one of the causes stated in this paragraph. 9. It is recognized by both parties hereto that COUNTY supplies water to other municipalities on a whaIesaie basis, and also to many thousands ofretail users, and it is agreed that at any time when the total demand for water by all of the users, including CITY, exceeds the capacity of COUNTY's water supply and distribution system, both wholesale and retail customers will receive equal priority for the supply of water; and in such event, the inability of the COUNTY to supply either the wholesale or retail customers' full requirements and needs shall not constitute a breach of this Agreement on the part of COUNTY. CITY agrees that should the Director of Pinellas County Utilities declare an emergency to exist in the supply of water for COUNTY'S water system, the Director shall have the right and complete authority to allocate or pro-rate water supply to CITY based upon existing needs of the system, past and presex-t demands on the system by CITY, and all other reasonable circumstances then existing at the time of the emergency. 10. In the event that COUNTY is unable to furnish the amount of water CITY needs to supply its service area, CITY shall be entitled to purchase water from other sources for such supply until such time as COUNTY can again furnish CITY's water needs. 11. All water delivered under this Agreement shall conform to applicable State and Federal laws and regulations and the standards of the State of Florida Department of Health and the Florida Department of Environmental Protection. COUNTY will notify the CITY if water provided to the CITY fails to meet any ofthe above Federal or State of Florida regulations or standards. 12. COUNTY will bill CITY for water used on a monthly billing cycle. Each month COUNTY will read and record the reading on the register of each of the flow 4 measuring devices.and compute the volume of water that has been quantified by the measuring device during the billing cycle. CITY will, within thirty (30) days from the receipt of the bill, make payment to COUNTY of the amount shown on the bill. Failure of CITY to pay when due any amounts billed,- under the terms of this Agreement, shall constitute breach of this Agreement and COUNTY'S obligation to furnish water may then be voided at COUNTY's option. Prior to voiding the agreement, City shall provide written notice of any disputed amounts billed within ten (10) days of receipt of such billing. The parties shall resolve said disputed amount within thirty (30) days of the date of City's notice of dispute or submit the controversy to arbitration, to be settled in accordance with the commercial arbitration rules of the American Arbitration Association. However, either party may reject the arbitration award by commencing legal action on the dispute within thirty (30) days after the rendering of the award. If rejected by the commencement of a legal action as provided in this paragraph, the award shall be deemed void and shall not be admissible for any purpose in the legal action. Unless the award .is rejected as provided in this paragraph, the circuit court of the county in which the award is made may enter judgment confirming the award. If payment is not made within~the time provided in Section 218.335, Florida Statutes, the CITY will pay to the COUNTY interest at the rate established by Section 55.03, Florida Statutes. 13. CITY will be billed for the water recorded by the flow measuring device at the wholesale rate established by the Board of County Commissioners. The wholesale rate will be based on a pro-rata share of revenue requirements of the COUNTY'S water system to include only those reasonable treatment and transmission costs that can be shown to be required for the supply of water to COUNTY wholesale water 5 users. The rate will become effective October 1 of the. same fiscal year as the budget, and may then be revised at any time by the Board as necessary to meet the revenue requirements of the COUNTY'S water system. However, revisions after October 1st which result in increased rates will not be effective until at least sixty (60) days after adoption by the County Commission. Adequate notice, of not less than thirty (30) days, will be given to CITY before any proposed rate increase is adopted. The following factors shall be used in determining the municipal rate referred to herein: A. Operation, maintenance, renewal and administrative costs. B. Payment obligations of annual principal and interest payments on COUNTY'S water system bonded indebtedness. C. Collection ofcoverage or other reserves as required byBond Resolutions and Ordinances D. Pro-rata share of the costs of providing treatment, transmission and storage facilities for expansion through revenues of water sales. E. Payment of the cost of the water to COUNTY purchased from other agencies, plus other costs to COUNTY required to furnish water to CITY as described in A through D of this paragraph. 14. On or before March ]each year during the term of this Agreement, CITY will notify COUNTY on form provided by COUNTY of CITY's projected requirement by the month for forthcoming yeaz, together with a five (5) year projection of usage. 15. CITY will accept the potable water at the pressure in COUNTY's transmission mains. Not withstanding paragraph 8 above, COUNTY will make every effort to maintain a minimum of 35 psi static pressure or greater at all points of delivery to CITY. 6 16. CITY will operate its system in such a manner so as to prevent peaking of flow rates that would place an unequal burden on COUNTY's facilities and be out ofproportion to other customers of COUNTY's water system. Storage to accommodate peak flow demands will be included by CITY in the design and installation of the distribution system in CITY's water service area. "Peaking" is recognized to be the rate of flow which for any period of time exceeds a rate one and fifty five hundredths (1.55) times the average gallons per day on a yearly average. 17. All parties agreed that the area described in Exhibit "B" herein will be the farthest extension of retail water service by CITY into COUNTY'S water service area, regardless of future annexation by CITY. Any encroachment by CITY beyond this service area boundary into COUNTY's water service area, without written agreement from COUNTY, shall constitute breach of this Agreement and COUNTY'S obligation to furnish water beyond the established COUNTY service area boundary shall be void. It is the intent of both parties by adopting and observing this service area to avoid duplication of capital investment and maintenance costs and to render water service to the public as efficiently as possible. CITY recognizes the right of the Pinellas County Board of County Commissioners to designate water service areas for all municipalities in Pinellas County, and accordingly, CITY agrees not to extend any water line into COUNTY's water service area without approval of the Pinellas County Board of County Commissioners. In the event CITY shall wish to extend its water service area, CITY shall make appropriate application to the Pinellas County Board of County Commissioners for the passage of a resolution extending CITY's 7 service area as requested. CITY agrees to strictly abide by all decisions of the Board of County Commissioners in regard to applications or requests for extensions of the CITY water service area. 18. Nothing contained herein shall prevent the CITY from obtaining some or all of the water necessary to serve to its customers from any other source. 19. .This Agreement shall be for a period of thirty (30) years commencing on the date of October 1, 2005 and terminating on September 30, 2035. 20. Both parties represent that the execution of this Ageement has been approved by the governing bodies of both parties in accordance with taw and that both parties have the legal authority to execute this Agreement. 21. This Agreement replaces and supersedes all previous Agreements between COi1NTY and CITY regarding water service. 22. This Agreement may be amended or terminated upon the mutual agreement of both parties, in writing. IN WITNESS WHEREOF, the parties herein to have caused this Agreement to be executed by their respective authorized officers and it shall be effective on the day and year first above written. •: V 0 ('..• •' S .~ \? ; ~. :: ,, ' . ti e . By:; ~ ~':. ~~ ~. .. ~+" .~Depu Clerk ~~=' ~ . ~~ Y•" { . 0 1 ~~•• PINELLAS COUNTY, FLORIDA By a~Throu~h its Board of County By: 8 APPROVED AS TO FORM OFFICE OF COUNTY ATTORNEY Countersigned: v ~1" `T CITY OF CLEARWATER, FLORIDA By: r V. Hibbard . illiam B. Horne II w Mayor City Manager Approved as to form: Leslie K. Doug II-Si e Assistant City Attorney Attest: Cy t is E. Goudeau ,. _ Cit Jerk EXHIBIT "A" METER LOCATIONS & SIZE METER LOCATION SIZE Belleair and Belcher 10" Druid & Belcher i0" Gulf to Bay Blvd, & Belcher 10" SR580 Treatment Plant 06" Coun side Mall #1 10" Coun side Mall #2 10" Sand Ke 8" U.S. 19 #1 Mazda 12" U.S. 19 #2 Mazda 12" .,. J , ~~ EXHIBIT "B" P~~a~l+e Water dement 46 City of Clearwater ~amprehenstve Ptah Appendix B: City of Clearwater's Water Use Permit issued by the Southwest Florida Water Management District (SWFWMD} 4 w~ i ... ~4~.. .... • ,~ ~~, oy "h•+ebaseF ~cP ~v~' ~D~K~ Ronald C. Johnson Chair, Polk Monroe "A!" Coogler ~ Vice Chair, Citrus SaJfy 7Jtompson Secretary, Hillsborough Ronnie E. Duncan Treasurer, Pinellas Edward w. Chsnee Manatee Thomas Q. Dabney,ll Sarasota Pamela L Fantrou Highlands Watson L Haynes,ll Pinellas Janet D. Kovach Hillsborough Heidi B. McCrea Hillsborough John K. Rsnks,111 Pasco E. D. "Sonny" VerQaro EzecuUve Director 4ene A. Heath Assistant Executive Director William 8. Bllenlq General Counsel southwest Florida U~ater Management District Tampa Service QfBce 7602 Highway 301 North Tampa, Flodda 33637.6759 (813) 985.7481 or 1300-836-0797 (R Dory) SUNCOM 578-2070 Bartow Service Offlca 170 Century Boulevard Bartow, Florida 338347700 (863) 5341448 or 1-800-492.7882 (FL only) SUNCOM 572.6200 November 28, 2000 City of Clearwater Water Division 1650 N. Arcturas Avenue Clearwater, FL 33765 2379 Broad Street, Brooksville, Florida 346046899 (352) 796-7211 or 1-800.423-1476 {FL only) SUNCOM 62&4150 TDD only 1-800.2311103 (fL on{y) World Wide Web: http://www.swfwmd.state.fl.us Venice Service lJlflce 115 Corporation Way Venice, Florida 342923524 (941) 486.1212 or 1-800-3203503 (rL only) SUNCOM 526-6900 Subject: Permit Transmittal Letter Individual'JVater Use Permit No(s). 20002981.010 Dear Permittee: ~~.;t~ `N.;~~I~~~~.) DEC -• ~ 2000 (~ BY: ~.,_....I Your Water Use Permit(s) was/were approved by the District Governing Board subject to all terms and conditions set forth in the approved Permit(s). - Please be advised that the Governing Board has formulated a water shortage plan as referenced in Condition 4 ofthe Standard Water Use Permit Conditions and will implementsuch a plan during periods of watershortage. You will be notified during a declared watershortage of any change inthe conditions of your Permit(s) or any suspension of your Permit(s), or of any restriction on your use of water for the duration of any declared water shortage. The ID tags} for yourwfthdrawal(s) shall be installed by a District representative. This representative will attempt to contact you within 30 days to discuss placement of yourtags. If you have any questions or concerns regarding your tags, please contact Billy Permenter at extension 20ti4 in the Tampa Regulation Department. If you have any questions or concerns regarding your permit or any other information, please contact this office at extension 4344. Sincerely, Cw W~ Adeline Wood, Supervisor Records and Data Department AW:dkh Enclosure: Approved Permit Lecanto Service Office 3600 West Sovereign Path Suite 226 lecanto, Florida 34461-8070 (352) 5278131 SUNCOM 667.3271 cc: Bill Horne, City Manager Protecting Y~C Water Resources SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT WATER USE INDIVIDUAL PERMIT NO. 20002981.010 EXPIRATION DATE: November 28, 2010 PERMIT ISSUE DATE: November 28, 2000 THE PERMITTEE lS RESPONSIBLE FOR APPLYING FOR A RENEWAL OF THIS PERMIT PRIORTO THE EXPIRATION DATE WHETHER OR NOT THE PERM{TTEE RECE=IVES PRIOR NOTIFICATION BY MAIL. FAILURE TO DO SO AND CONTINUED USE OF WATER AFTER EXPIRATION DATE IS A VIOLATION OF DISTRICT RULES AND MAY RESULT IN A MONETARY PENALTY AND/OR LOSS OF WATER. APPLICATION FOR RENEWAL PRIOR TO THE EXPIRATION DATE IS SUBJECT TO DISTRICT EVALUATION AND APPROVAL. This permit, issued underthe provision of Chapter373,Florida Statutes and Florida Administrative Code 40D- 2, authorizes the Permittee to withdraw the quantities outlined herein, arid may require various activities to be performed by the Permittes.as outlined by the Special Conditions. This permit, subject to all terms and conditions, meets all District permitting criteria. GRANTED T0: ~ City of Clearwater Water Division 1650 N. Arcturas Avenue Clearwater, FL 33765 PROJECT NAME: Not Specified ABSTRACT: This is a renewal of an existing Public Supply Use permft with a decrease in permitted quantities. The previously permitted quantities were 8,000,000 gpd AnnualAverage; no specified Peak Month; and 9,200,000 gpd Maximum Daily. The currently permitted quantities are 6,250,000 gpd Annual Average (a decrease of 1,750,000 gpd); 7,500,000 gpd Peak Monthly; and no specified Maximum Daily quantity. The decrease in the Annual Average quantity was requested by the Permittee. The proposed use for the permit is public water supply for a projected population of 165,655 people at a finished per capita water use rate of 103.9 gpd/person (the compliance per capita water use rate is 88.9 gpd/person). The City of Clearwater intends to construct a membrane softening facility to improve the quality of water from the wellfield. At the permitted capacity, the City of Clearwaterwill produce 5 MG D of finished water, which represents 29%of the projected Public Supply demand for the City of Clearwater. The remaining demand wilt be serviced by the Pinellas County Water System. The reject water will be sent to the wastewater treatment plats for disposal and will be incorporated into the reclaimed water system. Twenty-one existing and two proposed production wells are open to the Floridan aquifer. Nine existing monitor wells are open to the Floridan aquifer. Special Conditions require the Permittee to maintain existing meters on withdrawals; record and report monthly meter readings; cap wells not in use; construct two proposed wells according to District specifications; caliper or video log six wells; investigate well complaints; sample and.report forwater quality; measure and report wafer level elevations in wells; manage the wellfield to avoid adverse water qual"rty changes; and comply with Northam Tampa Bay (NTB) WUCA Public Supply conditions. Permit No.: 20002981.010 Permittee: City of Clearwater Page 2 TYPE OF APPLICATION: Renewal WATER USE CAUTION AREA: Northam Tampa Bay APPLICATION FILED: May 28, 1999 APPLICATION AMENDED: July 5, 2000 ACRES: 37.6 Owned 21,000.0 Serviced • 21,037.6 Total PROPERTY LOCATION: Pinellas County, within the city of Clearwater. TOTAL QUANTITIES AUTHORIZED UNDER THIS PERMIT (in gpd) AVERAGE: 6;250,000 PEAK MONTHLY: 7,500,000 Use Averas~e Peak Monthly Public Supply: 6,250,000 gpd 7,500,000 gpd See Withdrawal Table for quantities permitted for each withdrawal point. WATER USE: PUBLIC SUPPLY SERVICE AREA NAME City of Cleawater POPULATION PER CAPITA USE TYPE SERVED RATE Residential Single Family Gross 103.9 gpd/person Total Public Supply 165,fi55 Compliance 88.9 gpd/person Permit No.: 20002981.010 Permittee: City of Clearwater Page 3 I.D. NO. GALLONS PER DAY PERMITTEE! DIAM. DEPTH PEAK DISTRICT IN. TTL./CSD. USE AVERAGE MONTHLY 23 ! 8 10 157 / 65 B 310,000 320,000 31~/ 12 10 152 / 76 B 500,000 540,000 45 / 18 10 198 / 67 B 400,000 425,000 46 / 19 10 195164 B 400,000 .405,000 48 / 20 10 250 / 67 B 205,000 220,000 51 / 23 12 166 / 69 B 200,000 250,000 52 / 24 12 100 / 73 B 500,000 550,000 53 / 25 12 170 / 74 B 200,000 250,000 56 / 28 12 199 / 88 B 240,000 ~ 250,000 5B ! 30 12 276 / 91 B 205,000 220,000 63 / 32 12 220 / 74 B 210,000 245,000 65 / 34 12 300 / 65 B 280,000 300,000 66 / 35 12 224 / 78 B 260,000 275,000 68137 12 182 / 90 B 300,000 300,000 69 / 38 12 305 / 100 B 255,000 275,000 73 ! 42 12 201 / 83 B 380,000 425,000 74 / 43 12 185 / 83 B 200,000 225,000 75 144 12 114 / 87 B 680,000 725,000 77 / 46 12 260 / 111 B 380,000 400,000 78 / 49 14 150 / 65 B 450,000 500,000 79 / 50 12 150 / 75 B 441,000 500,000 80 / 51 12 150 / 75 B 441,000 500,000 81 / 52 14 225 / 80 B 450,000 500,000 B=Pu61ic Supply Permit No.: 20002981.010 Permittee: City of Clearwater Page 4 DISTRICT LOCATION I.D. NO. LAT.ILONG. SECTION/TOWNSHIPIRANGE 8 275819.52/824632.83 11/29/15 12 275829.03/824600.22 11/29/15 18 275752.78/824344.49 17/29/16 19 275755.161824333.11 17/29/16 20 275832.19/824520.52 12/29/15 23 275752.64/824359.61 18129/16 24 275747.201824359.32 18129/16 25 275742.92/824400.24 18129/16 28 280041.98/824431.50 31/28/16 30 280041.19/824419.63 31/28/16 32 280104.04/824431.96 30/28/16 34 275935.22/824510.99 01/29/15 35 275930.99/824515.81 01/29!15 37 280018.881824256.09 32/28/16 38 280023.63/824306.18 32!28/16 42 275925.15/824512.35 01/29/15 43 275941.37/824514.69 01/29/15 44 275933.47/824455.87 01/29/15 46 280001.99/824333.25 32/18/16 49 275921.851824428.63 06/29/16 50 280030.65/824333.40 32/28/16 51 275849.06/824401.35 31/28/16 52 275845.07/824429.33 07/29/16 SPECIAL CONDITIONS: All conditions referringto approval bythe Regulation Department Director, Resoun~ Regulation, shall refer to the Director, Tampa Regulation Department, Resource Regulation. SUBMISSION OF REPORTS A!I reports required by the permit shall be submitted to the District.on or before the tenth day of the. month following data collection and shall be addressed to: Permit Data Section, Resource Regulation Southwest Florida Water Management District 2379 Broad Street Brooksville, Flor'~da 34604-6899 Unless otherwise indicated, three copies of each plan or report, with the exception of pumpage, rainfall, evapotranspiration, water level orwater quality data which require one copy, are required by the permit. Permit No.: 20002981.010 Permittee: City of Clearwater Page 5 PUMPAGE REPORTING a. The Permittee shall continue to maintain and operate the existing non-resettable, totalizing flow meter(s), or other flow measuring device(s) as approved by the Director, Tampa Regulation Department, for District ID No(s). 8,12,18,19, 20, 23, 24, 25, 28, 3D, 32, 34, 35, 37, 38, 42, 43, 44, 46, 49, and 52, Permittee ID No(s). 23, 31,45, 4ti, 48, 51, 52, 53, 56, 5B, 63, 65, 66, 68, fig, 73, 74, 75, 77, 78, and 81, respectively. Such device(s) shall maintain an accuracywithin five percent of the actual flow as installed. Total withdrawal and meter readings from each metered withdrawal shall be recorded on a monthly basis and reported to the Permit Data Section (using District forms) on or before the tenth day of the following month. If a metered withdrawal is not utilized during a given month, a report shall be submitted to the Permit Data Section indicating zero gallons. The Permittee shall, upon issuance of this permit, maintain records of daily pumpage from each indivf~iual well meter and, upon request; shall provide this data to the District within 15 days of such request. b. Within90days ofcompletionofconstruction,District ID No(s). 50 and 51, Permittee ID No(s). 79 and 80, respectively, shall be equipped with non-resettable, totaliizing flow meter(s), or other measuring device(s) as approved inwriting bytheDirector, Tampa Regulation Department, unless an extension is granted bythe Director, Tampa Regulation Department. Such device(s)shall maintain an accuracy within five percent of the actual flow as installed. Total withdrawal and meter readings from each metered withdrawal shall be recorded on a monthty basis and reported to the Permit Data Section (using District forms) on or before the tenth day of the following month. If a metered withdrawal is not utilized during a given month, a report shall be submitted to the Permit Data Section indicating zero gallons. The Pennittee shall, upon installation of meters, maintain records of daily pumpage from each individual well meter and, upon request, shall provide this data to the District within 15 days of such request. c. The Permitter shall compile monthly data on the total quantity of water received by the Permittee's system from the Pennittee's wellfeld and other sources and submit the data with the Annual Report, as described in the WELLF(ELt) ANNUAL REPORT condition of this permit. The District shall be notified in writing of the addition or mod cation of contracts for additional water supply or for water services. The Permittee's well pumpage and service-area water use data recorded during the Annual Reporting period shall be summarized in the Annual Report, as .described in the WELLFIELD ANNUAL REPORT condition of this permit. Permit No.: 20002981.010 Permittee: City of Clearwater Page 6 3. WATER DUALITY SAMPLING a. PRODUCTION WELLS Water quality samples shall be collected and analyzed, for the parameter(s), and frequency(ies) spedfied below. Water quality samples from production wells shall be collected whether or not the well is being used, unless infeasible. If sampling is infeasible, the Permittee shall indicatethe reason for not sampling on the water quality data form. Water quality samples shall be analyzed by a Department of Health and Rehabilitative Services {DHRS) certified laboratory under Environmental Laboratory Certification General Category"1". At a minimum, water qualitysamples shall be collected after pumping the well at its normal rate for a pumping time specified in the table below, or to a constant temperature, pH, and conductivity. In addition, the Permittee's sampling procedure shall followthe handling and chain of custody procedures designated by the certified laboratory which will undertakethe analysis. Any variance in sampling and/oranalytical methods shall have prior approval of the Director; Tampa Regulation Department. Reports of the analyses shall be submitted to the Permit Data Section {using District forms) on or before the tenth day of the following month, and shall include the signature of an authorized representative and certifcation number of the certified laboratory which undertook the analysis. The parameters and frequency of sampling and analysis may be modified by the Director, Tampa Regulation Department, as necessary to ensure the protection of the resource. District Permittee Minimum Pumping Sampling 1D No. !D No. Time fminutesl Parameters FreQUency 8' 23' 30 CI', SO,, TDS monthly 12' 31' 10 Ch, SO4, TDS monthly 18 45 10 CI', SO4, TDS monthly 19 46 15 CI', SO„ TDS monthly 20 48 50 CI', SO,, TDS monthly 23' 51' 20 CI', SO,, TDS monthly 24' S2' 10 CI', SO,, TDS monthly 25 53 50 CI-, SO,, TDS monthly 28 56 15 Cr, SO,, TDS monthly 30 58 80 CC, SO,, TDS monthly 32 63 20 CI', SO,, TDS monthly 34 65 45 Cf , SO4, TDS monthly 35 66 40 CY, SO,, TDS monthly 37 68 35 CI', SO,, TDS monthly 38 69 60 Ch, SO,, TDS monthly 42 73 45 Ct, SO„ TDS monthly 43 74 45 CI', SO,, TDS monthly . 44 75 10 CI', SO,, TDS monthly 46 77 30 CC, SO4, TDS monthly 49' 78' 20 Ct', SO,, TDS monthly 50' 79' 15 Ch, SO4, TDS monthly 51' 80' 15 CC, SO4, TDS monthly 52' 81' 30 CI', SO,, TDS .monthly ' Water quality samples for these we(Is are only required if and when the inactive or proposed sources are activated. Permit No.: 20002981.010 Permittee: City of Clearwater Page 7 b. MONITOR WELLS Water quality samples from monitor wells shall be collected and analyzed for the District ID No(s)., parameter{s), and frequency(ies) specified in the table below. Water quality samples shall be collected after pumping the monftor wells(s) to a constant temperature, pH, and conductivity. Sampling method(s) shall be designed to collect water qualify samples that are chemically representative of the zone to be sampled. Water quality samples shall be analyzed by a Department of Health and Rehabilitative Services (DHRS) certified laboratory under Environmental Laboratory Certification General Category "1". The Permittee's sampling procedure(s) shall followthe handling and chain of custody procedures designated by the certified laboratory which will undertake the analysis. A report describing the sampling and chain of custody procedures shall be included with the first data submitted afterthe date this permit is granted, and upon any change in sampling and/or analytical method(s). Any varfance in sampling and/or analytical methods shall have prior approval of the Director, Tampa Regulation Department. Reports of the analyses shall be submitted to the Permit Data Section using District forms on or before the tenth day of the following month, and shall include the signature of an authorized representative and certification number of the certified laboratory that undertookthe analysis. The parameters and frequency of sampling and aralysis may be modified by the District as necessary to ensure the protection of the resource. District Permittee Sampling ID No. ID No Parameters Freauencv 36 67 CI', SO4r TDS monthly 114 E2-A CI', SO4, TDS monthly 115 E2-B Cf', SO4, TDS monthly 116 CAPA CI-, SO„ TDS monthly 117 CAPB Ch, SO,, TDS monthly 118 19/60 CI-, SO4, TDS monthly 119 CCC CI', SO4, TDS monthly 125 68-M Shallow Ch, SO4, TDS' monthly 126 68-M Deep CI', SOS, TDS monthly c. Water quality samples shall be collected on the same week of each month. d. Analyses shall be performed according to procedures outlined in the current edftlon of Standard Methods forthe Examination of Water and Wastewater bythe American Public HeaRhAssociation- American Water Works Association-Water Pollution Control Federation (APHA-AWWA-WPCF) or Methods for Chemical Analyses of Water and Wastes by the U.S. Environmental Protection Agency (EPA). e. Overall water quality and analyses of water quality changes and trends during the period of record and the annual reporting period shall be summarized in the Annual Report, as described in the WELLFIELD ANNUAL REPORT condition of this permit. Changes to the sampling or analytical methods during the annual reporting period shall also be summarized in the Annual Report. 4. WATER LEVEL MONITORING a. The Permittee shall monitor water levels in the monitor well(s) as specified In the table below. Reports of the data shall be submitted to the Permit Data Section (using District forms) on or before the tenth day ofihe following month. All data shall be referenced to National GeodeticVertical Datum (NGVD). Thefrequencyofwater-level recording may be modified by the Director, Tampa Regulation Department, as necessary to ensure the protection of the resource. Permit No.: 20002981.010 Permittee: City of Clearwater Page 8 District Permittee Recording ID No. ID No. Aquifer Freauency 11 30 Floridan Weakly 36 67 ~ Floridan Weekly 114 E2A Floridan Weekly 115 E26 Floridah Weekly 116 CAPA Floridan Weekly 117 CAPE Floridan Weekly 118 19/60 Floridan Weekly 119 CCC Floridan Weekly 125 68-M Shallow Floridan Weekly 126 68-M Deep Floridan Weekly Water levels shall be recorded on the same day of each week. b. Water level data and changes to recording frequency during the annual reporting period shall be summarized in the Annual Report, as described in the WELLFIELD ANNUAL REPORT wndition of this permit. 5. WATER QUALITY CONCENTRATION TRIGGER LEVEL a. WELLFIELDOPERATIONANDMANAGEMENTTOAVOIDEXCEEDINGTHETRIGGERLEVEL The Permittee shall operate and manage the wellfield in a manner to avoid exceeding the chloride concentration trigger level of 250 mg/liter in each of the production wells. Such operation and management of the wellfield shall include regular evaluation of water level and water quality data, rotation of production among wells, quantity reductions at specific water quality problem wells, pumpage dispersion, rotation to otherwater supplysources outside thewellfield, a combination of the abovr.activities, or other methods deemed appropriate to control chloride concentrations. The trigger level is intended to serve as a guideline in evaluating trends and controlling the effects of wellfield withdrawals on groundwater quality. Single water qualit}r sample concentration readings In excess of 250 mglliter may occur, provided long-term upward trends (sustained increases) or other significant water quality changes do not occur. At such time as the chloride concentration in any water sample reaches the designated concentration trigger level of 250 mg/liter, the Permitter shall review the data, examine the cause and consequences of the elevated concentrations acid take appropriate action to reduce concentrations below the trigger level set for the particular well. WELLFIELD OPERATION AND MANAGEMENT IF UPWARD TRENDS IDENTIFIED If the chloride concentrations from any single well over any six (6}month period show an increasing trend (sustained increasds) above the trigger level, or if the average of all chloride samples over any consecutivethree (3}month period exceeds the trigger level, then the Permitter shall rotate that well out of service for 30 days. After the 30th day has passed, the Permittee shall sample the well to determine if chloride concentrations have recededto belowthetriggerlevel. If chloride concentration levels have receded below the trigger Irvel, theri the well can be placed back into regular service. If chloride concentration levels remain above the trigger level, then the well shall be further evaluated as identified below. Permit No.: 20002981.010 Permittee: City of Clearwater Page 9 c. DETAILED EVALUATION OF WELLS WHICH REMAIN ABOVE TRIGGER LEVEL If, after taking the actions described in Sections (a) and (b) of this condition, chloride concentration levels remain above the trigger level, a further and more detailed evaluation of the well shall be undertaken to determine ifth@re are any other feasible and more effective options to avoid exceeding the trigger level. An evaluation of such options shall be undertaken and submitted to the District within 90 days of the determination that chloride concentration levels remain above the trigger level (as per Section (b) above). The evaluation shall include geophysically logging the well with appropriate geophysical logs as agreed to bythe Director, Tampa Regulafwn Department. Options to be evaluated shall include the following: enhanced rotation of production among wells. further quantity reductions from the we(I, further pumpage d(spersbn (through construction of additional production wells through permit modification), backplugging the well, plugging the well, rotation to other sources outside of the wellfreld, a combination of the above activities, or other methods to control chloride concentrations. d. TRIGGER LEVEL MODIFICATIONS If the Permittee has evaluated and implemented all feasible options to avoid exceeding the trigger level for a particularwell (as described in (a)thru (c) above), and the chloride levels still remain above the trigger level, the Permlttee may request modification of the respective trigger level to the lowest feasible chloride concentration, as described below. Such requests shall be submitted in writing, and shall require the written approval of the Director, Tampa Regulation Department. The request for modification of the choride concentration trigger level shall include documentation regarding all wellfield management measures that have been implemented and evaluated to attain compliance with the trigger level specified in this permit. The Permittee's request for modification of the trigger lave{ must also include a proposal of the lowest feasible concentration trigger level for the specificwell (based on a review of observed field data) for consideration. This proposed trigger level shall be based upon a comprehensive evaluation of water level and water quality data from production and monitor wells in order to predict lateral and vertical changes to the location of the saline water interface in the Floridan aquifer which may result from the proposed increased trigger level. The request shall include an evaluation ofthe effects ofwithdrawals from the specificwell and thewelifleld as a whole on other existing legal users, the Permttttee, and public health, safety and welfare. The District will allow chloride concentration trigger modifications if the District determines that the proposed modified chloride concentration trigger level will cause only limited saline water intrusion, and that such salinewater intrusion will not adversely effect other existing legal users. the Pemtittee, and public health, safety and welfare. If new trigger levels are specified by the Director, Tampa Regulation Department, they shall supersede the trigger level listed in this permit. If the District determines that reasonable assurance has not been provided that the proposed modified chloride concentration trigger level will cause only limited saline water intrusion, or that such that saline water intrusion will not adversely effect other existing legal users, the Permittee, and public health, safety and welfare, the chlorfde concentration trigger level will not be mod~ed. if the District reaches such a determination, the Permttttee shall be required to implement other effective measures to-remain below the chloride concentration trigger level or remove the well from service. If the District determines that long-term upward trends or otherslgniflcantwaterquality changes are occurring, and such trends or changes have not been effectively addressed by the Permttttee, then the District may reconsider the quantities permitted. Permit No.: 20002981.010 Permittee: City of Clearwater Page 10 e. ANNUAL REPORT The City's efforts to manage its wellfield to avoid exceeding the trigger level for the City's wells shall besummarized in theAnnual Report, as described in the WELLFIELD ANNUAL REPORT condition of this permit. 6. WATER USE CAUTION AREA CONDITIONS a. PER CAPITA USE The Permittee shall maintain a per capita water rate equal to or less than 150 gpd. This standard shall remain in effect until modified by rule. • Forplanning purposes, listed below are per-capita goals forfuture management periods. These goals may be established as requirements through future rulemaking by the District: 1. By January 1, 1997, the pistrict may establish a new per capita water use standard. Based on current information, the par capita water use goal may be established by rule at 140 gpd; 2. By January 1, 2001, the District may establish a new per capita water use standards. Based on current information, the per capita water use goal may be established by rule at 130 gpd; and, 3. By January 1, 2011, the District may establish a new per capita water use standard. Based on current information, the per capita water use goal may be established by rule at 130 gpd. By July 1 of each year for the preceding fscal year {October 1 through September 30), the Permittee shall submit a report detailing: a. The population served; b. Significant deducted uses, the associated quantrty, and conservation measures applied to these uses; c. Total withdrawals; d. Treatment losses; e. Environmental mitigation quantities; f. Sources and quantities of incoming and outgoing transfers of waterand wholesale purchases and sales of water, with quantities determined at the supplier's departure point; and g. Documentation of reuse and desalination credits, if taken. If the Permittee does not achieve the specified per capita rates, the report steal! document why these rates and requirements were not achievable, measurestakento attempt meeting them, and a plan to bring the permit into compliance. This report is subject to District approval. If the report is not approved, the Permittee is in violation of the Water Use Permit. The Dtstrid will evaluate information submitted by Permittees who do not achieve these requirements to determine whether the lack of achievement is justifiable and a variance is warranted. Permittees may justify lack of achievement by documenting unusual water needs, such as largerthan average lot sizes with greater water irrigat(on needs than normal-sized lots. However, even with such documented justification, phased reductions in water use shall be required unless the District determines thatwater usagewas reasonable underthe arcumstances reported and that further reductions are not feasible. For such Permittees, on a case-by-case basis, individual water conservation requirements may be developed for each management period, Permit No.: 20002981.010 Permiee: City of Clearwater Page 11 Prior to the 1997, 2001, and 2011 management periods, the District will reassess the per-capita and other uses conservation goals. As a result of this reassessment, these goals may be adjusted upward or downward through rulemaking and will become requirements. b. WATER CONSERVING RATE STRUCTURE The Permittee shall maintain a water conservation oriented rate structure as specified in the Basis of Review for Water Use Permitting. c. WATER AUDITS The Permittee shall conduct water audits of the water supply system during each management period. Water audits which identify a greaterthan 12 percent unaccounted forwatershall befollowed by appropriate remedial actions. Audits shall be completed and reports documenting the results of the audit shall be :submitted as an element of the report required in the per capita condition to the District by the following dates: July 1, 2001 and July 1, 2011. Water audit reports shall include a schedule for remedial action if needed. d. RESIDENTIAL WATER USE REPORT By July 1 of each yearfor the preceding fiscal year (October 1 through September 30), the Permittee shall submit a residential water use report detailing: 1. The number of single family dwelling units served and their total water use; 2. The number of multi-famity dwelling units served and their total water use; and 3. The number of mobile homes served and their total water use. Residential water use quantities shall include both the indoor and outdoorwater uses associated with the dwelling units, including irrigation water. e. RECLAIMED WATER USE REPORT ByJuly 1 of each yearforthe preceding fiscal year(October 1 through September30), the Permittee shall submit a report detailing: 1. The total annual average daily and monthly quantity of effluent supplied as reuse; 2. For all individual customer reuse connections with line sizes of 4 inches or greater, list: a. line size; b. location of connection; c. account name and address; d. indication of meter, if present; and e. metered quantities, If metered. 3. The annual average daily quantities, monthly quantities, locations, and methods of disposal for effluent that is not reused. 4. A map or plan depicting the area of reuse service; this map should include any areas projected to be added within the next year, if possible. Permit No.: 20002981.010 Permittee: City of Clearwater Page 12 7. DESALINATION REPORT Prior to submission of a formal application to increase quantities, the Permittee shall investigate the feasibility of desalination to provide all or a portion of the requested quantities, and to implement desalination if feasible. This report shall include a detailed economic analysis of desalination, including disposal costs, versus development of fresh watersupplies, including land acquisition and transmission costs. 8. ENVIRONMENTAL IMPACTS AND MONITORING a. By July 1, 2001, the Permittee shall submit an Environmental Management Plan (EMP) for District review. The plan shall explain in detail the monitoring methods necessary to implement the EMP. Lakes, wetlands, otherwater bodies and streams identified inthe EMP shall be monitored. This plan shall include the location of all monitoring stations, designation of adequate reference sites, control Suss; and affected or potentially affected sites representative of lakes, categories of wetlands, other water bodies and streams within the vlcin'rty of Harbor Lake and Lake Chautauqua. The plan shall also include methods for monitoring vegetation, water levels, and hydroperiods. District approved revisions and additions to monitoring methods shall be Incorporated into the EMP upon notification of approval by the District. An updated revised EMP, incorporating all the required revisions .and additions, shall be submitted to the District within 60 days of such notification. The District may require revisions to the monitoring aspects ofthe EMP as necessaryto ensure protection of the water resource and environmental systems. Implementation ofthe monitoring elements of the District-approved EMP and any revised EMP shall commence immediately upon District approval. The first monitoring report shall be submitted within 180 days of District approval of the EMP. The Permittee may arrange semi-annual meetings with District staff to discuss each years monitoring report prior to submittal. Three copies of the annual monitoring report shall be submitted to the Director, Tampa Regulation Department, byJuly 1 of each year. This report may be provided as part of the required Annual Report. 9. WELLFIELD ANNUAL REPORT The Permittee shall prepare a comprehensive but concise Annual Report to the District which describes the operation of the facility covered under this permit. Information collected through the folbwing conditions of this permit shall be included in the Annual Report: a. Pumpage Reporting b. Water Quality Sampling c. Water Level Monitoring d. Water Gtuality Concentration Trigger Level e. Water Use Caution Area Conditions f. Environmental Impacts and Monitoring g. Investlgatlon of Complaints h. Well Depth Documentatron Data sources shat! be referenced, but no raw data shall be included in the report. Only essential text, graphs, and tables should be included in the report. Four copies of the report shall be submitted to the Director, Tampa Regulation Department by July 1 of each year. The report shall coverall activities and oonditions perta(ning to the Cityof Clearwaterwel~eld and service area forthe preceding water year (October 1 to September 30). Any changes to the service area boundaries shall be described and plotted on a map. Permit No.: 20002981.010 Permittee: City of Clearwater Page 13 Included withthe Annual.Report, the Permittee shall submit linear regression analyses ofihe chloride concentrations versus time for each individual production and monitor well for the entire period of record and forthe previous five-year period. The Annual Report shall provide graphical depictions of the data and analysis for each well and include correlation coefficients and plots ofthe residuals for each analysis. For the Annual Reporting period, a summary of completed system improvements shall be provided. In addition, an update to any documented system weaknesses or anticipated system improvements shall be described. 10. INVESTIGATION OF COMPLAINTS The Permittee shall investigate complaints related to wfthdrawals at the Clearwater Wellfield. This shall be an ongoing effort for the life of the permit. Ail complainants will make application to the Permittee and must receive an investigative report from the Permittee, including any action to be taken within a reasonable time by the Permittee, in response to the complaint. The Permittee shall file a report of the complaint, the findings of fact, and any mitigating action taken orto be taken by the Permittee, to the Director, Tampa Regulation Department, for reviewand approval within fifteen (15j days of the receipt of any complaint. The report shall include the following specifrc ftems: a. The name and address of each complainant. b. The date and nature of the complaint. c. A summary of the Permittees' investigation. d. A summary of the Permittees' determination, including details on any mitigation activities. e. Cost of mitigation activity for each complaint. The Permittee shall, within a reasonable time after approval of the report by the District, implement the mitigating action, if any, to be taken by the Permittee. 11. DISTRICT RESERVES RIGHT TO MODIFY PERMIT Should the District Governing Board determine based on impacts to the water resource that a modification of this permit is necessary in orderto implement changes to permitted withdrawals within the Northam Tampa Bay Water Use Caution Area, upon notice and hearing the District Governing Board may modify this permit to implement such changes. 12. WELL CONSTRUCTION The Permittse shall construct the proposed well according to the surface diameter, casing depth, and total depth specifications listed bebw. The casing depth specified Fs to prevent the unauthorized interchange of water between different water bearing zones. The surface diameter and total depth specified are those proposed by the Permittee in the application process. However, ft is the Permittee's responsibility to have the water in the well sampled during well coristruction before reaching the estimated minimum total depth. Such sampling is necessary to ensure that the well does not encounter water quality that cannot be utilized by the Permittee, and to ensure that withdrawals from the well will not cause salt-water intrusion. Minimum Estimated District Permittee Surtace Casing Total ID No. ID No. Diameter Depth Depth 50 79 12" 75' 150' 51 80 12" 75' 150' Permit No.: 20002981.010 Permittee: City of Clearwater Page 14 a. The casing shall be continuous from sand surface to the minimum depth stated above. b. AI} well casing (including liners and/or pipe) must be sealed with neat cement to the depth specified above. c. The proposed well(s) shall be constructed of materials that are resistant to degradation of the casing/grout due to interaction with the water of lesser qual'dy. A minimum grout thickness of two (2) inches is required on wells four (4) inches or more in diameter. . d. A minimum of twenty (20) feet overlap and two (2) centralizers is required for Public Supply wells, and for all wells six (6) inches or more in diameter. e. The finished well casing depth and total depth shall not vary from these specifications by greater than ten (10) percent unless advance approval is granted by the Director,~Tampa Regulation Department or the Supervisor of the Well Construction Permitting Section in Brooksville. A proposal to significantly decrease total depth may require permit modification, if the District determines that such a change would result in significantly greaterwrithdrawal impacts than those considered for this Permit. f. Advance approval from the Director, Tampa Regulation Department, is necessary should the Permittee propose to change the well location or casing diameter. 13. CAPPING WELLS Any wells not in use, and in which pumping equipment is not installed shall be capped or valved in a water tight manner in accordance with Chapter 17-532.500(3)(ax4), F.A.C. 14. WELL DEPTH DOCUMENTATION The Permittee shall geophysically (caliper) or video log District ID Nos. 8, 20, 30, 34, 38, and 42, Penmittee ID Nos. 23, 48, 58, 65, 69, and 73, respectively, if the pump assembly for the wells is removed for maintenance or replacement within.the term of this permit. If the wells are not logged during the term of this permit, the Permittee shall notify the District in writing upon submittal of an application to renew or modify this water use permft (WUP). Such notiflcation will not prejudice the Permittee's application. The District does not require the Permlttee to remove the well assembly for the single purpose of logging the well. Until all the above-referenced wells are bgged, logging activities shall be summarized in the Annual Report. The geophysical or video log must clearly show the diameter and total depth of each well, and the casing depth and casing continuity in each well. If a video log is made ofthewell, it shall clearly show the WUP number, Permittee name, and well identification number on the tape itself. One copy of the log shall be submitted to the District within 30 days of the bgging event. STANDARb CONDITIONS: 1. The Permittee shall comply with the Standard Conditions attached hereto, incorporated herein by reference as'Exhibit "A" and made a part hereof. Authortz Sig ure SOUTH ST ORIDA WATER MANAGEMENT DISTRICT Permit No.: 20002981.010 Permittee: City of Clearwater Page 15 40D-2 Exhibft "A" WATER USE PERMIT CONDITIONS STANDARD CONDITIONS 1. If any of the statements in the application and in the supporting data are found to be untrue and inaccurate, or if the Permittee fails to comply with all of the provisions of Chapter 373, F.S., Chapter40D, or the conditions set forth herein, the Goveming Board shall revoke this permit in accordance with Rule 40D-2.341, following notice and hearing. 2. This permit Is issued based on information provided by the Permittee demonstrating that the use of water is reasonable and .beneficial, consistent with the public interest, and will not interfere with any existing legal use of water. If, during the term of the permit, it is determined by the Distrid that the use is not reasonable and benefcial, in the public interest, or does impact an existing legal use of water, the Goveming Board shall modify this permit or shall revoke this permit following notice and hearing. 3. The Permittee shall not deviate from any of the terms or conditions of this permit without written approval by the Distrid. 4. In the event the District declares that a Water Shortage exists pursuant to Chapter 40D-21, the District shall alter, modify, or declare inadive all or parts of this permit as necessary to address the water shortage. 5. The District shall tolled water samples from any withdrawal point listed in the permit or shall require the Permittee to submit water samples when the District determines there is a potential for adverse impacts to water quality. 6. The Permittee shall provide access to an authorized Distrid representative to enter the property at any reasonabletimetoinspedthefacilityandmakeenvironmentalorhydrologicassessments. ThePermittee shall either accompany Distrid staff onto the property or make provision for access onto the property. 7. Issuance of this permit does not exempt the Permittee from any other District permitting requirements. 8. The Permittee shall cease or reduce surface water withdrawal as direded by the Distrid if water levels in lakes fall belowapplicabfemtnimum water level established in Chapter40D-8 or rates offlow in streams fall below the minimum levels established in Chapter 40D-8. 9. The Permittee shall cease or reduce withdrawal as direded by the District if water levels In aquifers fall below the minimum levels established by the Governing Board. 10. The Pemtittee shall pradice water conservation to increase the efficiency of transport, application, and use, as well as to decrease waste and to minimize runoff from the property. At such time as the Goveming Board adopts speciftc conservation requirements forthe Permittee'swateruse classification, this permit shall be subject to those requirements upon notice and after a reasonable period for compliance. 11. The Distrid may establish special regulations for Water Use Caution Areas. At such time as the Goveming Board adopts such provisions., this permit shall be subjed to them upon notice and aRer a reasonable period for compliance. Permit No.: 20002981.010 Permittee: City of Clearwater Page 16 12. When necessary to analyze impacts to the water resource or existing users, the District shall require the Permittee to install flow metering. or other measuring devices to record wfthdrawal quantities and submit the data to the District. 13. A District identification tag shall be prominently displayed at eachwithdrawal point by permanently affixing the tag to the withdrawal facility. 14. The Permittee shall notify the District within 30 days of the sale or conveyance of permitted water withdrawal facilities or the land on which the facilities are located. 15. All permits issued pursuant to these Rules are contingent upon continued ownership or legal control of all property on which pumps, wells, diversions or other water withdrawal facilities are located. R.02/2A/2000 ~~r~~~. Southwest Florida ~ ~aterManagement District nn Egwr Oppa4nrry ~^~M'~. Tampa Service Of11ce 7601 Highway 301 North Tampa. Florida 336376759 (813) 965.7481 or 1.80P836-0797 (R onty) SUNCOM 578.2070 Bartow Service oHlce 170 Century Boulevard BeROw, Florida 33830.7700 (863) 534]448 or 1-8D0-092-7862 (FL onty) SUNCOM 5726200 Ronald C. lohRea Chair, Poll Monroe "AI" Coogtei Vice Chair, Cilru: Sally 7tantpsa Secretary, Hlllsborougl Roanle E Duncan Treasurer, Plnella: tlydw~,d w. cn.na Manatee ilroeMe>r,~ patriey, ~ SarasoL Parpla L ire>iwa Hlghlendt Wateotr V rtayaee, 71 Plnella: Janet D. Kovach Hi1lsDorougt Held) B. McCna HIItsDOrough John K. Renk~, rN Pescc E D. °Sonny" VerKera Fxecudve Director 8ene A. rtoatl+ Assistant Executive Director tNllllam S. D-Iwlgr General Counsel February 28, 2001 Mr. William B. Horne II Interim City Manager City of Clearwater 112 South Osceola Avenue Clearwater, Florida 33756 2379 Broad Street. Brooksville, Florida 346046899 (352) 796.7211 or 1.800-4231476 (R only) SUNCOM 628-4150 TDD ony 1500.231.6103 (R only) World Wide Web: http://www.swfwmd.state.rl.us Venice Service Office 115 Corporation Way Venice, Florida 34292-3524 (941) 486.1212 or i-8003203503 (FL only) SUNCOM 52rr6900 Lecanto Service OfOca 3600 West Sovereign Path Suite 226 lecanto, Florida 34461070 (352) 527131 SUNCOM 6673271 I ~~.....:~. ..~..,.~ s~.r.-, t MAR - 6 2001 Subject: Firia! Agency Action Transmittal Letter -Approval Modification of Permit by Letter Project Name: City of Clearwater Water Use Permit Appl. No. 20002981.011 County: Pinellas Reference: Chapter 40D-2, Florida Administrative Code (F.A.C.) Section 40D-2.331 {2)(b), F.A.C. ' Dear Mr. Horne: This fetter constitutes Final Agency Action on the request received by the District on December 7, 2000 to modify Water Use Permit (WUP) No. 2002981.011 by letter. The specific modifications are listed in Attachment A and are considered part of your water use permit. You, or any person whose substantial interests are affected by the Districts action regarding your application may object to this Final Agency Action by requesting an administrative hearing in_ accordance with Sections 120.569 and 120.57, Florida Statutes (F.S.), and Chapter28-106, F.A.C. of the Uniform Rules of Procedure. Your request for hearing must be received by the Agency Clerk of the District at its Brooksville address within 21 days of the receipt of this letter, Receipt is deemed to be the fifth day after the date on which this letter is deposited in the United States mail. Other persons may request a hearing within 21 days of the publication of a notice that this letter modification has been issued. Anv reouest for hearinq must (1) explain how each petitioner's substanfial interest will be affected by the District's action, or proposed action: (2) state all material facts disputed by the petitioner or state that there are no disputed facts; and (3) otherwise comply with Chapter 28-106. F.A.C. Failure to file a request for hearing within the appropriate time period shall constitute a waiver of any right you or anyone has to request a hearing under Sections 120.569 and 120.57, F.S. Enclosed is a °Noticing Packet" that explains the procedures for providing, notice to persons having substantial interests that may be affected by the District's action regarding your permit. The packet contains information and guidelines on the noticing procedure and a form that you may use. Mediation pursuant to Section 120.573, F.S. to settle an administrative dispute regarding the Districts action in this matter Is not available prior to the filing of a request for hearing. Protecting Your Water Resources City of Clearwater WUP No. 20002981.011 Page 3 Attachment A MODIFICATIONS The following constitutes modifications to the terms and conditions of Water Use Permit 20002981.011, effective February 28, 2001. The temporary, emergency augmentation of the reclaimed water system with potable water is hereby added to this Water Use Permit as a new water use. 2. The permitted quantities in gallons per day (gpd) for each withdrawal point authorized under this permit remain unchanged, and the total permitted quantities in gpd authorized underthis pem'rit remain unchanged. 3. Special Condition No. 15 is hereby added: The reclaimed water system can be augmented with potable water on an emergency basis only. Each augmentation event may last at most three weeks. The maximum augmentation quantity is 3 million gallons per day. There may be at most four augmentation events in any calendar year. 4. Special Condition No. 16 is hereby added: The Permittee shalt notify the District in writing at least 3 business days prior to augmenting the reclaimed water system with potable water. 'In the notification, the Permittee shall indicated the date augmentation is projected to commence, ttre date it is expected to stop, and the average quantities needed on a daily basis. The Permittee shalt also indicate the steps to be taken to ensure that its customers follow the required watering restrictions for potable water. 5_ Special Condition No. 17 is hereby.added: Within fifteen days of each augmentation event, the Permittee shall submit a report indicating the quantities used and the dates the augmentation started and ended. Additionally, in the Annual Reports submitted to the District, the Permittee shall summarize the information listed above for each augmentation event, and the Permittee shall indicate the steps taken to reduce or eliminate the necessity of augmenting the reclaimed water system. All other terms and conditions of this permit shall remain the same as stated on WUP No. 20002981.010, and this permit will still expire on November 28, 2010. PART II HEARIlVGS l1WOLVWG DISPUTED ISSUES OF MATERIAL FACT 28-106.201 Initiation of Proceedings. (1) Unless otherwise provided by statute, initiation of proceedings shall be made by written petition to the agency responsible for rendering final agency action. The term "petition"includes any document that ttgtrests an evidentiary proceeding and asserts the existence of a disputed issue of material fact. Each petition shall be legible anti on 8'fi by 1 l inch white paper. Unless printed, the impression shall be on one side of the paper only and lines shall be doublo-spaced. (2) All petitions filed under these rules shall contain: (a) The name and address of each agency affected and each agarcy's file or identification number, if /mown; (b) Tha name, address, and telephone number of the petitioner. the name, addr+eas, and telephone number of the petitioner's representative, if any, which shall be the address for service purposes during the course of the proceeding; sad aaexplanatioa ofhowthepetitioner's substantial iatcszsts wi(1 be affected by the agency determination; (c) A statement of when sad how the petitioner received notice of the agent}' decision; (d) A statement of all disputed issues of material fact If there arc none, the petition must so indicate; (e) A concise statement of the ultimate facts alleged, including the specific facts the petitioner contends warrant reversal or modification of the agency's proposed action; (f) A statement of the specific rules or statutes the petitioner contends require reversal or modification of the agency's proposed action; and (g) A statement of the relief sought by the petitioner, stating precisely the action petitioner wishes the agency to take with respect to the agency's proposed action. (3) Upon receipt of a petition involving disputed issues of material fact, the agency shalt grant or deny the petition, and if granted shall, unless otherwise provided by law, refer the matter to the Division of Administrative Hearings with a request that as administrative law judge be assigned to conduct the hearing. The request shall be accompanied by a copy of the petition and a copy of the notice of agency action. (4) A petition shall be dismissed if it is not in substantial compliance with subsection (2) of this rule or it leas been untimely filed. Dismissal of a petition shall, at least once, be without prejudice to petitioner's filing a timely amended petition curing the defect, unless it conchrsively appears from the face of the petition that the defect cannot be cued. (S) The agency shall promptly give written notice to all parties of the cation taken oa the petition, shall state with particularity its reasons if the petition is not granted, and shall state the deadline for filing as amended petition if applicable. Specific Authority 120.54(3), (S) F.S. law Implemented 120.54(5), 120.569, 120.57 F.S History-New 4-1-97, Amended 9-17-98. PART III PROCEEDINGS AND HEARINGS NOT W VOLVIlVG DISPUTID ISSUES OF MATERIAL FACT Z8-106.301 Initiation of Proceedings (1) Initiation of a proceeding shall be mach by written petition to the agency responsble for rendering final agency action. The term "petition" includes say document which requests a proceeding. Each petition shall be Legible and on g :4 by 11 inch white paper or on a form provided by the agency. Unless printed, the impression shall be oa one side of the paper only anti lints shall be double-spaced. (2) All petitions filed under these rules shall contain: (a) The name and address of each agency affected and each agency's file or idartifieation number, if known; (b) The traaae, address, and telephone number of the petitioner, the arme, address, and telephone number of the petitioner's representative, if any, which shall be the address for service purposes during the cotrrso of the proceeding; end an explanation ofhow the petitioner's substantial interests will be affected by the agency determination; (c) A statement of when and how the petitioner received notice of We agency decision; (d) A concise statement of the ultimate facto alleged, including the specific facts the petitioner contends warrant reversal or modification of the agency's proposed action; (e) A statement of the specific rules or statutes the petitioner contends require reversal or modifioation of the agoncy's proposed action; and (f) A statement of the relief sought by the petitiontr, stating piceiaely the action petitioner wishes the agency to take with respxt to the agency's proposed action. (3) if the petition does not set forth disputed issues of material feat, the agency shall refer the matter to the presiding officer designated by the agency with a request that the matter be scheduled for a proceeding not involving disputed issues of material fact The request shall be accompanied by a copy of the petition end a copy of the notice of agency action. (4) A petition shall be dismissed if it is not in substantial compliance with subsection (2) of this Rule or it has been untimely filed. Dismissal of a petition shall, at least once, be without prejudice to petitioner's filing a timely amended petition curing the defect, unless it conchrsively appears from the face of We petition that the defect cannot be cured. (5) The agency shall promptly give written notice to all parties of the action taken on the petition, shall state with particularity its masons if the petition is not granted, and shall state the deadline for filing an amended petition if applicable. Sped Authority 120.54(5) F.S. Law Implemented 120.54(5), 120.569, 120.57 F.S History-New 4-1-97, Amended 9-17-98. 42.00-028 (10/99) V$(,~ ~~LRI(t~ ~..: r'i•v~e eenf~' O An Evu:l GoG~unTr ETObrer Thomas G. Dabney, 11 Chair, Sarasota Watson L. Naynes, 11 Vice Chair, Pinellas Janet D. Kovach secretary, Hillsborough Maggie N. Dominguez Treasurer, Hillsborough Edward W. Chanee Manatee Ronnie E. Duncan Pineuas Pamela L ientress Highlands Ronald C.lohnson Polk Heidi H. McCree HI Ilsborough 7. G. "Jerry" Rice Pasco Judith C. Whitehead Hernando David L Moore F~cecutive Director Gene A. Heath Assistant Executive Director William S. Hilanky General Counsel -t~-1 f i~ ~,,, -: ~• , `~, . . ,,~ :y .. ~~ - - ~ •, ~ f13 ~ ~~'~ T~~~ ~ I f1~11-'t ~ ' 111 V ' L 9 111 l~ V 2379 Broad Street, Brooksville, Florida 34604.689 9 ~ t~ ~. t ~~ -ct D '( y'~ ter 1111. VYa n agemen (352) 796-7211 or 1-800.423.1476 (FL only) -,~,~w~ -.~,,,~,;;;,,,,~ ~<+r+~' .3~+''' ~r~~~.. SUNCOM 628-4150 TDD only 1-800-231-6103 (FL only) ' - .- - On the Internet at: dVaterMatters.org Tampa Service OHlee Bartow service Office Sarasota Service Office Leeanto Service OHtce 7601 Higtriray 301 North 170 Century Boulevard 6750 Fruitville Road 3600 Wes[ Sovereign Path Tampa, Florida 33637.6759 Bartow, Florida 33630.7700 Sarasota, Floritla 342449711 Suite 226 (813) 9657481 or (863) 5341448 or (941) 377-3722 or Lecanto, Florida 34461-8070 2.804836-0797 (FL only) 1-800-492-7862 (FL only) 1.8043243503 (FL only) (352) 527.8131 SUNCOM 57&2070 SUNCOM 572.6200 SUNCOM 531-6900 L~C~C~D~IC~ 2003 b 16 O D cto er , ocT 2 a ~::} Andrew Neff, P.E. Public Utilities Director 1650 North Arcturas Avenue, Suite C Clearwater, FL 33765 Subject: Final 1rgency Ac4ion Transmi :al LeYer-Approval ttlotiification of Permtt by Letfer Project Name: City of Clearwater Water Use Permit No.: 20002981.012 . County: Pinefias - Section/TownshiplRange: 8,29,30,31,32128/16 1, 2, 3, 9,.10,11,12,14,15,16,22,23/29/15 5, 6, 7, 8,17,18, 32/29/16 Reference: Chapter 40D-2, Florida Adminis trative Code (F.A.C.) Section 40D-2.331(2)(b), F.A.C. Dear Mr. Neff: - This letter constitutes Final Agency Action..(FAA) on the request received by. the District on August 7,2003 fo modify Water Use PermiY(VVUP) No. 20002981.011 by letter. The specific modifications are listed in Attachment A, and are considered a part of your water use permit. You, or any person whose substantial interests are effected by the District's action regarding your application may object to this Final Agency Action by requesting an administrative hearing in accordance with Sections 120.569 and 120.57, Florida Statutes (F. S.), and Chapter 28-106, F:A.C. of the Uniform Rules of Procedure. Your request for hearing must be received by the Agency Clerk of the District at its Brooksville address within 21 days of the receipt of this letter. Receipt is deemed to be the ffth day after the date on which this letter is deposited in the United States mail. Other persons may request a hearing within 21 days of the publication ota notice that this letter modification has been issued. Any request for hearing must f 1) explain how each uetitioner's substantial interest will be affectedbv the District's action, or proposed action: f2) state all material facts disputed by the petitioner or state that there are no disputed facts: and (3) otherwise comply with Chapter 28-106, F.A.C. Failure to file a request for hearing within the appropriate time period shall constitute a waiver of any right you or anyone has to request a hearing under Sections 120.$69 and 120.57, F.S. Enclosed is a "Noticing Packet" that explains the procedures for providing notice to persons having substantial interests that may be affected by the District's action regarding your permit. The packet contains information and guidelines on the noticing procedure and a form that you may use. ~:~ Mediation pursuant to Sectior. 120.573, F.S. to settle an administrative dispute regarding the ~'~:District's action in this matter is not available prior to the filing of a request for hearing. •~ :_ i '.Protecting Your ' ~Nater Resources . ~. ' ~ :~. Andrew NeFf, P.E. October 16, 2003 Page 2 of 3 If you have any questions regarding this permit modification, please contact Darrin Herbst at the Tampa Regulation Service Office. If you have any questions regarding the Noticing Packet, please contact Michelle Maxey at the Tampa Regulation Departmen[ . Sincerely, ~;~C~~~ %~u~~ Alba E. Mas, P.E. Director Tampa Regulation Department AEM:yvv Attachment: Attachment A Enclosure: Noticing Packet cc: _ Data Room, Records and Data File of Record Dacrin Herbst, P.G. Andrew Neff, P.E. October 16, 2003 Page 3 of 3 Attachment A MODIFICATIONS The following constitutes modifications to the terms and conditions of Water Use Permit 20002981.012, effective October 16, 2003. 1. The total permitted quantities under this permit remain unchanged. 2. The following withdrawal point(s) are modified, with the following specifications: ID No. ' Permittee/ District Diam. (in) Depth . I Total/Cased (ft) Use G2!Ions Per Day Annua! Peak Averse Month 23/8 10 157/65 PS 320,000 384,000 48/20 10 250/67 PS 450,000 540,000 65/34. 12 300/65 PS 590,000 70.8,000 73!42 1.2 201/83x....:; : PS . .. 650;000: 780,000 ~.'°~ . 74143' . 1.2 185/83• .' PS .460;000. ' : :540;.000 75/44 12 t14l87.. PS. •~ 880,.000. ..1,056,000 77/46 ~ . 12 260/1?1: PS . ..: 450;000. ; : . • ~: 540 000' ... All other terms and conditions of your previous water usepermit, including the expiration date, shall remain in effect as stated, unless changed above. ma f- y• [UUO ~~, - > ~~ iw . ~e>m rR -tea.e CAair, Nillcborough Talmsdge0. "Jerry" Atce t{ta Cttelr, Patco P{!ey C.9yalerK srt,~ry, oosem ~ a wl,mnnd Tieawrar, Homando sdwerd,tic othaxe Manaloo leepf/u E C1oasDry Hllit¢orou~A IVe1l ConSM Polk ' Tae+me o. Dabney .• saraeow • • Wat~or L Heyaee it • Piriel~ ' Janet D. KarsSA . - ` Hillaboroli~ . Told Proaaaua~. . ~ Pirgllis y:y7++m JnrriMU Ittt~DHIH i71-74U-DU17 N0. t17Y f t'. I Sout~.~est F~oxzda 2379 Broad Street, Brooksville, Fioride 34604.6899 '~aterMana ement U~strict t3li2) 7967211 or 1-800~i.23-1476 (Fl. ony) g . ~ SUNCOM 628.4150 TDD only iSO4231-6103 (FL only) ~ a -'-~~~~" ~ On Ure Internet at: VWaGar141attete.org sariow iefrlca Otfioa ~ [eeantn b~+vk~ OtGsa r+e-asoto fervlw Ofrlu ~ T~Pa S~rrtcr Olflw . ~ ~ 170 G+~+-y Boulauard SuRa 226 '6750 ttYlMib Road 7605 H~~ 30i Norio 6artoa, flolfda 3389x7700 5600 west Sovercl(n Pala Serasola, Ronda 342409731 Tartpq Ro+ide 93837.8759 (B83) b341148 or lecant0, FlorSda 344815070 (943) 3773722 or (819) 989.7481 or 1.800492.7862 in. onM i~2) 571-8131 1003'203503 (FL ony) 1.8408300797 (R. only) SUNCOM 8726200 SUNCOM 6673271 SUNCCM 531.6'flOD St1NCOM 878.2070 ' November 18, 2065 Andrew M. Nall, P.E. ~ ' City of Clearwater .. .. .. ~ • .Post t'Jfflce BOX 4748 •_ ' ' • • _' ~ ' - . Clearwater, !=L 33758 ' ~ ~ ~ - ~• Subject: Final Agency Action 7'ransmhtaf Letter -Approval Madit7cation of Permit by letter Water Use Permit Nv.: 20(102981.013 • P(oject~Namec ~CttyfofCleanrrater • County: ~ Pinell>~s . . §eCtl'wp/IZge: 07/29S/1t3E • f{eferenc$: ~ F2ute 40D-2.331{2)(b), Fiotida AdrnirilslratNe Code • Dear Mr. Neff: Dmld L MSQe . Fasauliue oinictor • oin~ w,. ir~ae . _ nssi~ar+t Erzeeutsvo olrvtla ' . '' 1 ~. ~ . W11Aar~ 9. BDet~ '• • GsnrhH Com6il ThIS letter cohsiltuteB.FJnal Agency Acttoti ~FAA)~Qn the request received by tiie Dlatriet on . • • November 16, 2006; to mgdify Water Use Permit (Wt1P) No. 20002981.012 by letter. The .. specific modtfls~tf6n§ are ilsts~ in Attachttietit A acid are considered a pert of your yVUP. You ar,anypei5ori Wliose•stibstantial interests,• are affected by thebigtrli~°s action ~ ~ • . . ~ . ~egarding a petYriit may lequest an~adminisft'a(fve hearing lri atxoidance vVith Set~lons ~ . 120.5t39 and 120.57.~~oflde $tatiites { F.~..);~and;Chapte~,28-106: F.A:E.: aF the Uniform • : ~ .Fides of proce~l~re,. •, iggNestlorhe~ai~riy(itus~'(1)'eX,otairi howthe sulufantiar!lntet'ests :~:~ ;'.•~: • ; ~• • '~ : ofeachp9HSOn req;resting t}ia h~arirx,~,iviJl,tie•a~cted by the District's acd'o[i; or proposed : .. melon, ~i) state'ail jiTatgiT'ar facts tl/spud Dy the p9isgn i?equestinl the•llearing or state • . • that them are ire d(sputoa /~¢(s, and {3) gtl)erwf~se, eoinplX,witlt Chaptgr 2&108, F.A:C. . . • .' .Copies of SectioAS 2&1Qt3.20i ani~~$-?06:~'f;~ F.A.C:; are•'eticiosed'fo~you~ reference. •. ~. , • ~ = A request for Aaar17t~• must ba•tited With {r'iiicgh'teii 6y) the Agency Gtbrit of the District at . .tale Distrkt's i3rgeikszrHfe Address within•21_r~•0ils of'recefpt of this notice. E~eceipt is . ::~ • • ; ifeamed tq !1e thQ t`ift~il.'da~iaft9r the date liri'W, filch tt11s noHcs !s depo§ited fri the United .• _ . ;'`teta9:maU. t"afNfe.'to'flle~a request.fdr~hearirigvititliin this time peHod shell ~on$titute a .' • •' •' waiver of any HQht ypli.ijl•s(icfi gersori•riiay 11Qve.to.request a hearing unQer 3eCdons ~ • . •12t7.~t9 and 120.67, F.~: filladjation gurs){~nt•~q:~etiti0n 120.573;`F.§.; to settle an "•' adrtiJnlstrative dlsputa:~garding the DistricYe avh`on in this matter is riot avaFli~bie prior to ~~ :'.: •• ' • • .fhe filing of a requsg't for hearijlg: ~ ' . ~ ~ ~ . • • ~ncloged is a."Not<cing Packet"• that provirie~ irifoririation Fegarding the Dishict Role 4001.1010,: ~ ••. F.A.G.; which addte~~es.the notiflcafion bf AerAtins.whose substantial interests may be affec{ed~•:~ : • • • by the.Distdct's action I•n this matte. The pac(ceE wntains guidelines on•tiow to provide notice of. the DisWct's action, and a notice •that you may use. ... .... . , ~r • ......Y .!!..., ~• . mat. Y. ~vvu Y:44HIYI anrnmu nc~duHin s~t-~4u-oui~ roo. a~yt r. t , . 7 , , • PermR No.:20002981.013 Page 2 November 18, 2005 • ff }rou have questions regarding this permit modrffcatton, pi~se contact 13arrfn W. Herbst, P.G. at the Tampa " Service t?PBce, extension ZD14. If you have any questions regarding the Noticing Packet, pfesse contact Myra • Hoien, at extension 4338, to the Recorcis and Data Department at the Brooksville office. SI rely. . Alba E. Mas, P.E., Dfreator • Tampa Regulation Department • - ~ AEM:DWH:eib_ ~ ~~ Enclosure: Attachment A .. ~ - fVottcing Packet (42.OD-039) ~ ' Sections 28-106.201 and 28-108.301, F.A.C. , cc: I drl"Ftec'd~tt>~~QOD2~ 1;01•;3;; ' ,' ~ - . •~ROORi, R'eoo~as D~a~ .. .. . ' ' ,' • . . ' ~~ • t' r a •:r•. • '+i!!lt. '4'i - /~a •rY-•Y~f~ ~~ ~,'i.i.:.. Iri _'Y'''r~i.• :/;~• •,,•... + .''Y,.rJ .. • • ..i''! ..~:i; .'.i.r:. f:' . .. ~.['~^ ':~'is~Yx\r::4L':.•,'V:(':~i~",}`'`jv,-:Lti : . , , • + • •4: L.t. .. /~ir.~~°:,': 'rY•~~~w .. :, ..r •t ~: •~ ~ . •a •:•`'':' .. ... ';.I'i: r F,?r ~~~•' ~~~ __ ~ . •1. t:~'••Csd• C3:i •!t.v rl ^`.d', •`.- _ ~ Nt1 :t.:A:' ly .F•' - .. + • a ~ ' ~ t .. .t .. Y :~ri•'. : (.~:+: t j•. ~; <:. ;! . .tik•:~c :<y<.,r_~' ' .: a •'r:: t~ o ~' p.: ~' •7' .. ~ ~ • • 7. ~ : , ,. .~ '.::, •'• t .~+~.•:> _ is ~ r•:. .a`:. .. ~.?•• •, t.':r + , • 4t. {' .. ~ ~~'+$17~":;'tI•~'7;,i~j{•;n~Mj:;'i'~ :'~: , ~-~I?•S ~i ~Ar~> ~i .;''`~ • .. ,/t~. i'1 :. .F. +l'.:r: +~~•-t. ~; ~l ~.j•.l :~:'•.s ±>.':,;tiw:: 1. '+ . it ~5 •i: ~;~~, ~ - .j::. ~j..: ~ ~it_kr:~-.:~: +r: }fit. ... . . ... - .. -.. _ :1 +~-.•t.'.:~•=~.~ • .._.. 'ti•i~+'~.`:~• . mar. r. ~uvo y:~4Hm arlrrrmu t1tb6URIH j~l-94U-bUl9 No. Nh9/ ~, 3 ~. - .< - Permmit No.: 20002881.013 November 18, 2005 Page 3 ATTACHMENT A MODI~C9TibNS The follovring constitutes modifications to the terms and conditions of WateP Usa Peorift 2000298.1.012,, affective •Novenib'ei18.2D05: ••• • ... .. ... ~ . .... . . ~.~'• .. - 1:~ :• ~ The total'peifiitted annual average snd'peak month quanjittes euthonYed upderthis permit have not . , ._ . 'changed. _. , ... - ... :v:• ,. •; ,~_• :~:.:: ' .. . .r' e'er 1. .•l:~ J.~ a ~,r~•- .. , ` 2: • • ••DISfT1nt •ID tVo: 5?JPetrriittee 1D No: 8! ~6ad bi;eii'dafeted artd replgced with•the •folfowirigvglthtiraw2h i. `.. r.. Dfb ~ o1P!ei4n e'ID;No. ~%•~:%~'=• (e•...•ter.~~>. • ~`St`andarc) Ad •~r~. s~f•A`!ar,~gT` `'''~'+::'P ; ~Aak Mond •`• • '127/81_q r,.: ~ : ,r_ • 10 in :,'•=~•:450,fjQt)'g`15d.^r: ,>,~;, ~:S.OO,OOD gpd 3 `, •.$pec!a. tG~~on`dRibn•~fQ~ 2 of Wat2i•ljse•PdirtiN ~visfoii~IVd: 2dDD2&81:A10;fias 6een:rerlsedas folbws: • ,7: _i'+ °t,L', -•%~'=•'•ei.,{, a.1,J--~akt ~,.+.; y.: :c5>:..;.Y,C •. ~;1. .!.• i'~ti;2 ~.:~<. :i'r~.R:`: . i(-.•~PUiTI~. .Re!,^•. =' ..2Y%~.. ,i. :i.-,r r:':~~. ~•=•i~t .C-r•~.:'• :~•:~V6;^:i.`.y 4i1-_ ,,.,, : ,,(\ . a' Th pemutteo shad continue fo ma(rltate'en`d`opeiaie'the e~dslirig'non=reset~lsle; tot~1izbfg fioNi instat(e), or -~. `• ~,ofheF _ b~eg}~anggda~~v~~s~_rov~~ ~~y' Director' • •bgu~~g " rd, frx District ID .. . • • - `Niit's)~3~12`~1~'18;~~~~23~Z.4~•i1~$~30i3Z 34:~3537r .::4~4f#,~36~~iihittes iD Nods).. ' " - ~2~~'f;•45,41~,6f,u3;¢ ,83,8S,t38,Q8;69,73,7,4'75;Ti,78;~aitdBlR.les 'ilei~°~ciid4VtcesshpllRia~Rtdlrfan' . P~t1 Y•.. ' , • • ~ aceut Within frv8 ~ef~~trof ~ achral flpw as'Irislalled :Tptal•inr'~itid'f~l and meter [eaditigs from'oach • ' tiiefa~riYi artthdreWaf st(al(,b$:re~o'r`dea qrf A,liRonthy ba31s aria repoitec~•~v.lhe Periitit C~ata Sec~aii (ustny Dwlrie~.: .. . . f,.,;4..•. ,.., •• ~ ~uriiifi)~p~ditJ9fon3ttr$`teii}fi'da)!btthefojlowiiL4>riorith.,•tf8-itjCtQr~slrifhdre1~4a1is,nbt'tiNltzeddur-nga'given .. .. ' iri{iFifh•,'••~ repot! ahall:tie sulii~ fn'tba PeitnR 1?a!a Sscdgr-•Inilki3t&xi zero gsllona:. • r: •'` : • •,-.. '. 7liepeirnitteesFial~`upbnlssuarjc',gbf2iiisparmlt,rpalntelhit~doi'dsofdeif~pumpegefrom•eectiittdividu'etweli •. • ~,.. - ~rneterand,iiponrequesi''bf-a1~`~tDvtdot'hi'>l:dststojfie,Dlsbicf~ritt+[n:i5da 'aFsuch~request.'c'~~••: ' .. . • - f,~. tir`yVith~h 9t) dam of cotnpls3tidj>Qf„~n, Diehict ID~ . o{s). 50; $ •i ai!d Z~PPClinlttee ILA K4~s~ 79r 80, , .. z ~~.~ n.- :. . . ,~j 'anti_~1~ii`iespecpvety:•etl.~li,b~ _',~ciCA(Sep;w;chnoirresair~le-jtot~itzln~,ijo ',etaB; cr~ottier'meas~rmg.. • • .. •'dgv~esj$) as~aPPtoved~.cL~. p~.4Y w!z!~~+iecto'r•: T$!i-paFt rtit'a41ori 4epax,,: ,1i'~i~i~ an~a~er~3?4ii,l~, . . • ' . '•granjeii1 ry''!the [~ifeolcjlzai ~;n~~9U,~~ r~neirt.; SucR~e n min ~ih ~(1,;axu~eg~:'i/1,ftve ~ .•. .' .' '- ,. p~tpfthe~~.dtu~Iflaw,es,~, 9sd~To~ wi~ti¢(#}n~alar`idifii~iieadjo a'f;ea"Ft(.t~Tet~e'~whhhdra+~l• il•. "•. . • bA7eukded~oria Qtl~Af~i eifd4~Epottlth~pgrirut'CSaita9ed~ap~us`Il~•bist~c)f8+riitj'orlo~tietoie B. . . 'tet~r,~~Y.of(tiA•(ol~b-Mi~g~n',•.~b~,q~N( at~at~tedwHhdcav~9,IlgPgtiu~I~ftAd'dur(n§~gtten-riifohtil~arepOns}iali~e-;°• ''•,• •~:• •. ,s,:,.. ' l~f~r}ted.(A C`~Qonrt,F)ata~eo-~giilr~j+~~Tn9~ro-~alfohs::~,:. ,~; '',:,,,• . .. •i- - q~e,-~.~.e ;;• -.}•r; i~ ' :: i :.•~:.~J jar: .. ~,f.y . ~:- . •~~ : a -- ~;'Rjep~rmite~6trah::Opotta~~~olthaitl_e~ar~,'iT-~irt~ak!{:i~oidROtt~(i~iPyniPetie~arrie8chip{~yf'dualyJsN. °;; r.• f w+.•+ •1•~ . tti~~}4t:drld} uPbri'•re~u~Qt. shal~pr~viB~thl9 Bata tq ~he• DlsEij@t th'1S daj/e o{~u%}f re~ti '.~::, .: . `. . .. :q~7he~Eseim>tte~shall;cb p~le'mQiiUllyl~ataonflie,tbiatqu'. tltyaf,..•.:.receN~db}~the~-ir{fifel~'8~sy~tem. . - .. ftoin~'t~eP.ermit2e'~`s.Yye~uLel(I~. ,q~.h.~~:~$.a~esand9utirnltth:r;~~~-dAtiixral~poR.:agde~crikrEtllhlhe . WErI',L•`.FIELQANNC)AL): ~do.~ifionQf~ltLs'perinlt,:T:Ii~DJsdFlcts7ial)•beft4tifiadlRyirrittng'D.f~li~additlon •. . . • • - . qr mgdifiCatbn of, cbrl~'fof'~.t(c~l~o''i;af water JUppiy o; wietQ setvlces:: `;:' ~ <r, ~: . .?s,y.::>• :}f.~.::.;,i:. i-i:i: d:~ri,#.Y:•a~'.i' •t`i.`'.1~ti~1•'.~ '.i:.' .1.` :!~'• .:5`.' . .. •• d. `th'e Pa1t'rtlftee s waiF"'~iii' an ~e a=areA v9at'er~usibd'eC~"fao¢td~ t!'dun 'Utei• ual t2 n period ' ,•~ ~ P. P.~O, tf . rv'iG.:... , 9 ~?. 8f39RN. g ':., •; . • 'shell be sufimgrtzedm #ie AnAUaI R6~tf, esdestt)tied ir-t!'ie'WEti:~IELbANlVUAi: R~.OR;~~gdnditlbP oitftis : `I ,' .. , ... ~ .. t .. 1 'nhy:a t:`;^:~~~' :•Sa:: 1:J'.' 'y~S l.l: t•• ~w;.:.. F..a r. adv.. aie sealno • ~ ' .. uOneint'ie~ ~d~i`jq~istid•e{A~q•ae~!Po~eq ,'~lx etti?lo~pt;nkV~!t-~+a1 p4~!It?get~ld.'itaQ~u ..::.. pua aUV3W . da! p~N . ~(l~ .9~ atryeu6ts ~~ j~~~ n~vs pup'~4.t1 B~il»ctipl e~~!teP w~j a ~o te4 ~~-~ J~kl•~ltt~n) uoA~a3 t:• wea >t~d eta ~ p?;<u+~ ad ueys sls~eu~.tay~so suod0a ~ueul{}edeQ;uopalABPa ~.C'~~!o ~n~ . le++otddp~ol}de;!e4lt~~ss;PQ!~}S! i.••~,• .leusi~ofP~p 6uf{d!lfes ut 0olt8ur~ s~al(I~Stg a spun ltW!yo}~:: •': Ittoielo4q ~ •a~'!^t Pe~$!~P ~~p~PiQ'itpo'asnd Jo utotp pile' .iijjpueV•al~`J+~hgi l1e49 ~P?~d •` :':: Bul!dw~s soe~uuad a4i'-uog~pe W, '1t~:tnP.ttoa pue'Hd ~etrtl>ateduie~•~uejsuoa a ol.ab'1-tioieQ ®i4~1•~Vi w paybeds euip 6utduntd a 1ai!3gdtlg'tlitotf-~'ie paM t3t~ Su!dtLrid ~ege~ sq~li~ilg•S?Idliteslyijei-b{a~,u • . 'wnul!uw ~ 3v ~~ 1. ~4o6e3e~ lateus~ uorj~ypteJ /GOl~oge7 (e{uatituatNu3 ~aptm ~t,oieraQ~t p~~~.. ISbHa~ aeauueS ~4~lIi4eVati qUB 4iI8AH to ~veurµedaa a ~q periSieue aq:lleyc sslGwes /t}t!enb ta39M '~4! ~eP iCpjenb~s;ea'ay} uo Builduiec'~ou ~a} itdspa1 et(i e3e~lpu! II~Us ~I~~ ~ "~10.! ~l ~(IdW~{i 'alq(see}ul ssQtun•'pesn 6u!aq e! tlann 84i l~ ~o ~atpslyr~ Pei~all~ ~I liguY slle"1+ ao{i~npaQ tuay seidwes ~Ierib leq~/yi '~I?C payr~eds {safJ~uanbay pue'ale;awet0d ey{ ~oj'pazitleu~ pue P~II~ eq U~ seldwesdAlettblaagl~ ' u I eS ~} ~M ? ' ~ ~Ilo1 se pasutal uaaq sey 01.o'L96Z000Z'oN uasynea ~uuad esn ~eleMdo £'oN uo{~puo~ le1~e4S1Q 1/+t~S .~ • y ebLd SOOZ '96 ~aqutanoN 6 ~0' ~96Z000Z ~'oN ~uttad `,'yku::vi. '~t~•'i?.t.'t ~:i: i'~:` ~*~~i~.~~~f•~5.~~'~ Jp: ~'~. :~,::.p~ ~)h i~r :~: ~';. !. 5t}~~y'P~tpbdi .It(bo s~alin ~u~ col s~(dui~s'~(Nlgriti•?e;e ~~r_;~ ~,~:>.:. . ~M~.s. <. is ' . )~''I C~:y.' ti?`:.. ~~>!.. .•:~ii!' s•" aclia: _i .4'` ~-' ~•.',.ri; ~ F -i<t r•:. ' .. i2:i+:,;{. . ~•. r n: ,. r.' . ,~ : {;.~~-;; a, V ~i 4.: ; Yy,;. :~s'"'~•',t, 11 . ~Sc~`,tis''j:I ;:r t;•:' ::3?'b ~'~~:. „tii%'cr a:e.7`::f~yZ='Y.~ ltd ;~,, ia'' ~ •. • ' ~:' ~ . 4Fk~~',?f;~. j;'d~7~l;~a~i.'~°%~l7, T'ti.:~''.,i.I:I' ~ ~~~:.•~.~.. :^~.: ~.. ~! .i ~. d, r is r L . 1+:r.; ~+~ft: Y, v::.. ,. ,+ , r :.~: v7tJ. ~;•1 i,•,y;, r %it'~.;Yt ~~'~ =SYr, Y• i%J : ~ ;'ia~ ~.~ 88 `,c..:1•: ~ ~ ~4 ;<%~:'~'?c,'' .r~r."p. Q~=~lC`~..M.`a ~ Y*..a :~•~<<i'v`>fi E! L~ %3:•:Jt tFi,•~{a(`i..v`{L2'4:'JF 5- '~. i :i,: '{l.. ~3'Fi~~i~a1vN :~' fib, /, VAl:7'. ". >:a~l.. 't Y:.•:.:." ' 1y . ! . Fli'+~'~:':..~{i ~ '.ft''~.'~ tr`f':}.; '•2a}.~' i t: 'i ~c; " vt. ~~: M• ~ . •,.• '° , • t . ~•~a, r Sri!; ~..,~ •.. '3.1~.E?.. ~~ ..: ,~: r~-`..~: r:.l•'.~ai•• + ~:ii`"ryA~i~r.~c'.-• ;f ..~, ~yr..t~h;.!:.`~`: .. -~ir~!!T~. I, •.Jf ~i .E-~' .•~^~QAI•'~li_: is ••,1i:rs:• ~, fs,._j;iS !;~~ ~y`'• :'~' .,~y~ .'; , . •.. .• •Qr':: ~~'~ ~ • :~ ~ ti:. Vii. ~~~ .. •(i• rl ~-`~~4. ~',.. Ii ryV1 p{,•~i'?!,•: ,y;,I~L~,..•• ~y8~ •'..:r ~~ f,.l ~:i;t.tii .. 'I,t.; i.'r., ~,Yh:"~,~j~'av'?7~'~'`~f~~1`~Y''}~!: ~~'•ts41•a'''r .' r~7i?'~~ ` . rn)~ r is 7(~.y... .~Y! `~~.' yTfxi~~•.n~.. ~iY•~~•6 ~:: Vii ~'~YT'' ~:. "'}!!=v!:' zi;YSlf"~Y><:4%a'Y{~~''~• :.~••w~''%'~'.•:"•~~•i~:•:.::'a+',:•:~..Cs:i. ~~~::_..2(.:• :~ ll ~si•: ~ js..?~~I~) Q4~1;~ • •1, ;_ N ail ..: ` ~ '6H'gj'?.:,:..,•., . - .: ...:'`Bu{dtun;~'a-tu4NU~Glt`;~;~,~.Qo~~~~ '. ~`.:`,~Y}s1Q•' ;a.~;;~:;ar.• ~'<~i~~:•;.:. y ..~~titr', .•~:~:or"rte„;~_::af;;y>_.~c.:~` •~t.;>w,:; ~':.ri':'•=~'~ . 'Oct~lo'uoit;?.a1wi(•g4jaiieire•a4~ie``~~u.ce"ltiaiu~leds0: ,' . stew cl~?~ pue Bpjldw->!~~o lC~u~baij pue sta~eUleled att. . nit asau o ' e u o , b 'd 164R •aN 41AQ-ObG-TGC HIH(19'1ZYI nwulauc utNC-,:~ nnn~ •c •A•nit7 ,; may. y. ~uvo y:~tUnm a-rrrrMV Itt6tiVHiH 17L'h4U-bUlh No. ahyl l'. 5 •, Perm>< No.: 20002981.013 November 78, 2005 _. Page 5 • 6. ~ ~ The Permitter shall construct the proposed wells according to the surface diameter and casing depth specifications below. The casing depth specked Is to prevent the unauthorized interohange of water between different water bearing zones. ff a total depth is listed below, this is an estimate, based on best available irdormation, of the depth at which high producing zones are encountered. However, it is the Permittee's responslbtlftytohave thewaterln thatvelisamp~ed during well construction, before reaching the estimated total depth. Such sampling (s necessary to ensure that the well does not encounter waterquatityrthat cannot be utilized bythe Rennittee, and to ensure thatvYthdrawals from flit well will not causr saltrwater Intrusion. / 1)lstrlct Permittee - Surface Minimum Estimated ID IVo. ID No. t)iarr-eter Casino Depth Total Depth. r~;~ ~ 127 81 R ~ 10 . 63 150' - ~ • A. The easing shag be continuous from land surface to the minimum depth stated above. B. All well aa9irig (inrludiri8 liners andlor pipe) must be seated to the depth speatierl above. ' C. Thta proposed wbti(ff) aAatl tte~ constnicted of materials that are resistant m degradation of the ~ • • casing/grout dt~rtolntaractiphwiih•thewaterpfiesserqualit~r.Aminimumgrout~hidknessoftwo (2) piches is required on wells foul.{4) in~hgs or inot® tri diameter. , • D. A minimum of twenty (20) feet overlap and two (2j centralizers is rQqulred for PubiicSu~plywells, . ' ' ~ ` ' - • ' ''~ . ` . and all ~4elis six (8) Giches'•ot• more in diarrt~ter. .: • .. .: .. ~ ~ . ' ' E. -7lie fi~oishedweltcasjng+S>'epfft'sfiafl'iiotYary't`rom these'specfi(icatiQns bygreat~ uteri teh (10) ' ~ . ~ • . - percent unless act`ianc'~e approval to granted bjiYhe Regulption Departmeht Direatot, Resource ~ • . • - ~ - ~ RegGla~ion, orthe Sc}pi3riiisor Pf ffie Well Construo8ori Perr~tttirtg Section in Brooksville. ' F. ' Advanbu atlproval irprr~ the RegQlath>7i Depa'rtrrierit Director, Ra~ourc~r Regitlatkn (s necessary . .. / should the Peilttittee propope to,i:tiange the wall location or basing'dlaijteter. ~ ' ... •. ~,' ~ ,$y May'31rZOt~'Dlstrlct IDNd. 52< pairoittea 10!~No. t31~, shah be~properly,abattdoned (piu99ed•- _ ~ •• .. ~ ~, bottom in top) ey a licej>$e~ vati3r well Cori,~tr~6gr iri dccorifance with Chap.Zer 62-632:500(.4). FA.C:; ••, • : - . • . • ~ udder' a 11VeR At~artdonmeYit Pe~rilit isgued by the DisErtd yri(~.sg'ari eztensloh of time is granted Dy, •, , : •. . floe Regulation bepajtmetit D1reL•,tor, f~esduioe. }Z~iilatlon: ~ ~ ~ ~ ~ ~ • ' :. - • . ;,~i4lj other~rtns and conditions •bt jrotfl pnsvldus water tise perrtiit; irtiduding ths'szpiFaNch date; shat) retrieln in stied • - • ~ • , ~• ~ •• ~~ • :;,-. `'a$~ B,tFi!tQd, Unle9s ohang2d abdVe: .. ~. :. .. • . ` _ .. .. .. • - ,' ~~ 2379 Broad Street,.Brooksville, Florida 346046699 t ~ V V ~S 1 F~OI 1< SOU l Gl • f ' •~ >, ~~ it :~;:;; ; .:. ~u' ~ . . . . . .. mater Management District (352) 796-7211 or 1-800-423-1476 (FL on{y) ~ Y:l ~-Y , " ~ SUNCOM 6284150 TDD only 1-800.231-6103 (FL only) ~ ''~'k:EM~t ,,,~,~ :;t„r''•~y::" `~" ` ,r~ .~':.: '~- ~ '" On the lntemet at: WaterMatters.org nn Ewal 'o°''~'""'r 9artow SeMce Office lecanto Service Offike Sarasota Service Office Tampa service Office ~ 170 Century Boulevard Suite 226 6750 FrultNlle Road 7601 Hlghvray 301 North ~~" Bartow, Florida 33830.7700 3600 Wesl Sovereign Path Sarasota, Florida 34240-9711 Tampa, Aorida 33637.6759 (863) 5341448 or Lecanto, Florida 34x61-8070 (941) 377-3722 or (813} 9857481 or 100-092-7862 (FL only) (352) 527.6131 1-800.32d35o3 (FL only) 1-800.836-0797 (FL Dory) SUNCOM 5725200 SUNCOM 531.6900 SU COM 5782070 February 13, 2007 ~ . Talmadge O. "Jerry" R-ce • -~.~ Chair. Pasco JudMft C. Whitehead Vita Chair, Hernando NeilComhee gndrew M. Neff, P.E. Secretary, Polk City of Clearwater Public Works JennMer H. Ctosshey Treasurer, Hlllslwrough 1650 North Arcturas Avenue, Buildin C g Thomas a. Dabrrsy Clearwater, FL 33785-1945 Sarasota Nelda i3. McCrve Subject: Final Agency Action Transmittal Letter -Approval HiIISn010Ug7r Modification of Permit by Letter saNie Pen`s Pinellas Water Use Permit No.: 20002981.014 Todd Proa~rMalr Project Name: City of Clearwater Pinellas County: Pinellas Marra aevtraFwtno SeclTwp/Rge: 23/29S/15E Hillsoorough Patsy c. syinens Reference: Rule 40D-2.331(2)(b) Florida Administrative Code Desoto , Dear Mr. Neff: .. David L Mowv Executive Director Tliis letter constitutes Final Agency Action (FAA) on the.requesf received by the District on May 5, 1MI~Narn s. 8lteniry 2006, to modify Water Use Permit (VVUP) No. 20002989.013 by.letter.: The specific modifications ' General Counsel ar e fisted in Attachment A and are considered a part of your WUP. You or any person whose substantial interests are affected by the District's action regarding a permit may request an administrative hearirig in accordance with Sections 120.569 and 120.57, Florida Statutes, (F.S.), and Chapter 28-106, F.A.C., of the Uniform Rules of Procedure. A request forhearing musf.~ (1) explain how the substantial interests of each person.requesting the hearing will be affected by the Districts action, ar proposed action, (2) state all material facts disputed by the person requesting the hearing or state that there are na disputed facts, and (3) otherwise comply with Chapter 28-906, F.A.C. Copies of Sections 28-106.201 and 28-106.301, F.A.C., are enclosed for your reference. A request for hearing must be filed with. (received by) the Agency Clerk of the District at the District's Brooksville address within 21 days of receipt of this notice. Receipt is deemed to be the fifth day after the date on which this notice is deposited in the United States mail. Failure to file a request forhearing within this time period shall constitute a waiver of any right you or such person may have to request a hearing under Sections 120.569 and 120.57, F.S. Mediation pursuant to Section 120.573, F.S., to settle an;administrative dispute regarding the District's action in this matter is not available prior to the filing of a request for hearing. Enclosed is a "Noticing Packet" that provides information regarding the District Rule 40D-1.1010, ~ be affected F;A.C., which addresses the.notificatiori of persons.whose substantial interests may e District's action in this matter. The packet contains guidelines on how to provide notice of ~ ~ ~ ~ ~ istrict's action, and a notice that you may use. 3 FEB 1 6 Permit No.: 20002981.014 Page 2 February 13, 2007 If you have questions regarding this permit modification, please contact Darrin W. Herbst, P.G. at the Tampa Service Office, extension 2014. If you have any questions regarding the Noticing Packet, please contact Debra Webster, at extension 4360, in the Regulation Performance Management Department at the Brooksville office. Sincerely, Alba E. Mks, P.E., Director Tampa Regulation Department AEM:DWH:eIb Enclosure: Attachment A Noticing Packet (42.00-039) Sections 28-106.201 and 28-106.301, F.A.C. cc: File of Record 20002981.014 Data Room, Regulation Performance Management Department Darrin Herbst, P.G., Southwest Florida Water Management District Permit No. 20002981.014 February 13, 2007 Page 3 ATTACHMENT A MODIFICATIONS The specific modifications are listed below, and are considered a part of your water use permit. This modification revises Special Condition No. 5 of WUP No. 20002981.10 which addresses chloride trigger levels at the production wells. The Special Condition replaces the chloride trigger levels on the production wells with chloride action levels on the specifred monitoring wells. This modification also revises a Special Condition to require water quality monitoring from three proposed monitoring wells. The Special Condition requiring the investigatidn/mitigation of water quality well complaints has also been revised. The following constitutes modif+cations.to the terms and conditions of Water Use Permit 20002981.013, effective February 13.2007. The total permitted annual average and peak month quantities authorized under this permit have not changed. 2. ~:~ Special Condition No. 5 of Water Use Permit Revision No. 20002981.010 has been revised as follows: Water Quality Action Levels Ai such time as the chloride concentration in any water sample reaches the Action Levels designated below, the Permittee shall take appropriate action to reduce concentrations to below those set for the particular well. These measures may include, but shall not necessarily be limited to those listed in the Water Quality Action Plan City for the City of Clearwater Wellfield submitted on June 30, 2006, in support of the permit application for the water use permit. Sample concentration readings in excess of the concentrations designated below may occur, provided long-term upward trends or other significant water quality changes do not occur. If the District determines that long-term upward trends or other significant water quality changes are occurring, the District may reconsider the quantities permitted. District ID No. 114 115 119 11 X118 • 125 126 ...128....._....._.. lll/ 129 ~ 130 Chloride Permittee Action ID No. Level (mall) `,,.} 3 0 Eta ~ 250 °' ~' ,~; ...~ ~ • ~ Jn s Y '' (o E2b 250 -- f}'' -`~ CCC 250 - 2 30a . 250 -- p v 1 1960 250 ... 1 ~'p 5~ 68Mshallow 250 ~ ~~~ (p 68Mdeep r -'~' ,T ~ - +' 250 _ ....._.__.._...581Vt-...._ ...._.... _..... -_.. __ .. 250 .... ~ 77M 250 E 78M 250 • Subsequent to permit issuance, the Permittee may request in writing, a review of the water quality concentration limits by the Regulation Department Director, Resource Regulation, on the basis that the limits are not feasible io attain. Prior to the request for concentration limits review, the Permittee shall document in writing to the District that all feasible wellfield management measures have been explored within reasonable limits to attain compliance with the concentration limits specified in this permit. ,M :;: " y~ ~ . 4 / _ „_ , ~~:~ ~~ r,~ t . ~; _~ .~,''S.. Permit No. 20002981.014 February 13, 2007 Page 4 The Permittee's written request for review of the limits must include a proposal (well by well) of the Lowest feasible concentration Limits (based on a review of observed field data) to the Director for consideration. This proposal shall Include predictions of changes to the location of the saltwater interface, both laterally and vertically, which may result from the proposed increased limits. If the Director accepts, in writing, that the Permittee has explored all feasible wellfield management measures within reasonable limits, that the Permittee cannot attain compliance with the concentration limits, and increasing the limits will not cause adverse impacts, the Director may consider modifying concentration limits for each well. If new limits are specified by the District, these shall supersede the limits listed in this permit. Si-Annual Water Quality Conditions Re ort Chloride concentration data from the City's. production and monitor wells will be evaluated on a bi- annual basis. The results will be summarized in bi-annual reports to the District with the first report due by April 1, 2009. Statistical analysis of chloride concentration, water level, and production data will be conducted to verify trends. If upward chloride trends are identified then the appropriate actions outlined in the June 2006 City of Clearwater Water Quality Action Plan will be implemented. 3. The following condition is added to this permit: Reserve Rights To Set Water Quality Concentration Limits The District reserves the right to set chloride, sulfate, andlor total dissolved solids concentration limits on any production well in the future, based on data collected and after a sufficient data base has been established to determine limits. These limits shall be required after discussions with the Permittee. At such time as the concentration in any water sample reaches or exceeds the designated concentration limits, the Permittee shall take appropriate action to reduce concentrations to below those set for the particular well. if the District determines that long-term upward trends or other significant water quality changes are occurring, the District. may reconsider the quantities permitted. 4. Special Condition No. 3 of Water Use Permit Revision No. 20002981.010 has been revised as follows: A. Production Wells Water quality samples shalt be collected and analyzed, for parameter(s), and frequency(ies) specified below. Water quality samples from production wells shall be collected whether or not the well is being used, unless infeasible. If sampling is infeasible the Permittee shall indicate the reason for not sampling on the water quality;data form. Water quality samples shall be analyzed by a laboratory certified by the Florida Department of Health utilizing the standards and methods applicable to the parameters analyzed and to the water use pursuant to Chapter 64E-1, Florida Administrative Code, "Certification of Environmental Testing Laboratories". At a minimum, water quality samples shall be collected after pumping the well at its normal rate for a pumping time specified in the table below, or to a constant temperature, pH, and conductivity. In addition, the Permittee's sampling procedure shall follow the handling and chain of custody procedures designated by the certified Laboratory which will undertake the anatysis. Any variance in sampling and/or analytical methods shall have prior approval of the Regulation Department Director, Resource Regulation. Reports of the analyses shall be submitted to the Permit Data Section, Records and Data Department, (using District forms) on or before the tenth day of the following month, and shall include the signature of an authorized representative and certification number of the certified laboratory which undertook the analysis. The parameters and frequency of sampling and analysis may be modified by the Regulation Deparlrnent Director, Resource Regulation, as necessary to ensure the protection of the resource. . Permit No. 20002981.014 February 13, 2007 Page 5 District ID No. 8" 12' 18 19 20 23" 24' 25 28 30 32 34 35 37 Permittee I D No. 23' 31' 45 46 48 51" 52' 53 56 58 63 65 66 68 Minimum Pumping Time (minutest 30 10 10 15 50 20 10 50 15 80 20 45 40 35 38 69 60 42 73 45 Parameters Chlorides, Sulfates, and TDS Chlorides, Sulfates, and TDS Chlorides, Sulfates, and TDS Chlorides, Sulfates, and TDS Chlorides, Sulfates, and TDS Chlorides, Sulfates, and TDS Chlorides, Sulfates, and TDS Chlorides, Sulfates, and TDS Chlorides, Sulfates, and TDS Chlorides, Sulfates, and TDS Chlorides, Sulfates, and TDS Chlorides, Sulfates, and TDS Chlorides, Sulfates, and TDS Chlorides, Sulfates, and TDS Chlorides, Sulfates, and TDS Chlorides, Sulfates, and TDS Sampling Frequency monthly monthly monthly monthly monthly monthly monthly monthly monthly monthly monthly monthly monthly monthly monthly monthly Permit No. 20002981.014 February 13, 2007 Page 6 District Permittee Minimum Pumping Sampling ID No. ID No. Time fminute~ Parameters Frequency 43 74 45 Chlorides, monthly . Sulfates, and TDS 44 75~ 10 Chlorides, monthly Sulfates, and TDS 46 77 30 Chlorides, monthly Sulfates, and TDS 49~ 78~ 20 Chlorides, monthly Sulfates, and TDS 50` 79` 15 Chlorides, monthly Sulfates; and TDS 51' 80` 15 Chlorides, monthly Sulfates, and TDS 127' 81 R` 30 ~ Chlorides, monthly Sulfates, and TDS ' Water quality samples for these wells are only req uired if and when the in active or proposed sources are activated. B. Monitor Wells District Permittee Minimum Pumping Sampling ID No. ID No. Time (minutes) Parameters Frequency 36 67 ~ 10 Chlorides, monthly Sulfates, and TDS 114 E2-A 10 Chlorides, monthly Sulfates, and TDS 115 E2-B 10 Chlorides, monthly Sulfates, and TDS 116 CAPA 10 Chlorides, monthly Sulfates, and TDS ~ 117 49 ~ ~ ~,Q, f 10 Chlorides, monthly C~ Sulfates, and TDS l f ~v ~~ Permit No. 20002981.014 February 13, 2007 Page 7 ~`: .~ B. Monitor Wells (continued) District Permittee Minimum Pumping Sampling ID No. ID No. Time (minutes) Parameters Frequency 118. ~~$f4f~0 10 Chlorides, monthly I Sulfates, and TDS 119 ~ C ~~ 10 Chlorides, monthly Sulfates, and TDS ~/ ~ J/ 124 81 M 10 Chlorides, monthiy ~ 7 '7~ Sulfates, and TDS 125 ~ l(~ "r 10 Chlorides, monthly Jn ~ Sulfates, and TDS ~!~/~ 126 5 ~ ~/ ~ 10 Chlorides, monthty !, Sulfates, and TDS 128 58M 6 .Chlorides, monthly Sulfates, and TDS 129 77M 6 Chlorides, monthly Sulfates, and TDS 130 78M 6 Chlorides, monthly Sulfates, and TDS 5. The fol{owing condition is added to this permit: The Permittee shall construct the proposed wells according to the surface diameter and casing depth specifications below. The casing depth specified is to prevent the unauthorized interchange of water between different water bearing zones. if a total depth is listed below, this is an estimate, based on best available information, of the depth at which high producing zones are encountered. However, it is the Permittee's responsibility to have the water in the wel! sampled during well construction, before reaching the estimated total depth. Such sampling is necessary to ensure that the well does not encounterwater quality that cannot be utilized by the Permittee, and to ensure that withdrawals from the well will not cause salt-water intrusion. District Permittee Surface Minimum Estimated ID No. ID No. Diameter Casino Depth Total Depth 128 58M 6 60 150 129 77M 6 60 150 130 78M 6 60 150 A. The casing shall be continuous from land surface to the minimum depth stated above. B. All well casing {including liners andlor pipe) must be sealed to the depth specified above. Permit No. 20002981.014 February 13, 2007 Page 8 C..7he proposed well(s) shall be constructed of materials that are resistant to degradation of the casinglgrout due to interaction with the water of lesser quality. A minimum grout thickness of two (2) inches is required on wells four (4) inches or more in diameter. D. A minimum of twenty (20}feet overlap and two (2) centralizers is required for Public Supply wells, and all wells six (6) inches or more in diameter. E. The frnished well casing depth shall not vary from these specifications by greater than ten (10) percent unless advance approval is granted by the Regulation Department Director, Resource Regulation, or the Supervisor of the Well Construction Permitting Section in Brooksville. F. Advance approval from the Regulation Department Director, Resource Regulation is necessary should the Permittee propose to change the well location or casing diameter. 6. Special Condition No. 10 of Water Use Permit Revision No. 20002981.010 has been revised as follows: The Permittee shall investigate complaints related to withdrawals at the City of Clearwater's well field. The complaint handlinglmitigation procedures shall be as follows: a. Within 48 hours of complaint receipt by the Permittee, the Permittee shall perform a preliminary investigation and determine whether the Permittee's withdrawals may have caused the problem. b. If this preliminary assessment indicates that the Permittee may be responsible, the Permittee shall, within 72 hours of complaint receipt, supply the complainant with any necessary drinking water: c. If the detailed investigation confirms that the complainant's problem was caused by the Permittee's withdrawals, the Permittee shall act in accordance with the procedures mandated by City of Clearwater Well Mitigation Plan (Ordinance 7764-07, Division 4, January 18, 2006). d. If the fesulting investigation determines that the Permittee was not responsible for the well problem, the Permittee shat) document the reasons for this determination. e. The Permittee shall file a report of the complaint, the findings of facts, appropriate technical data, and any mitigating action taken or to be taken by the Permittee, to the Regulation Department Director, Resource Regulation, for review and approval within 20 days of the receipt of any complaint. The report shall include: 1. The name and address of each complainant; 2. The date and nature of the complaint; 3. A summary of the Permittee's investigation; 4. A summary of the Permittee's determination, including details of any mitigation activities; and 5. Cost of mitigation activity for each complaint. 7. The following condition is added to this permit: Over-aumoa4e . Compliance with the allocated standard annual average quantity and drought annual average quantities is f,ased on a rolling 12-month calculation where the current pumpage is added to the pumpage for the previous 11 months, and the total is then divided by the number of days in those 12 months for gallons per day. If the Permittee exceeds the apocated standard annual average quantity or drought annual average quantities during any month, within 30 days the Permittee must submit a report to the District that includes reasons why the allocated quantities were exceeded, efforts already taken to attempt meeting the allocated quantities, and a.plan to bring the permit into compliance. Reports for Permittees not achieving the allocated quantifies are subject to District approval. Justification for exceeding the allocated quantities does not constitute a waiver of the District's authority to enforce the terms and conditions of the permit. All other terms and conditions of your previous water use permit, including the expiration date of November 28, 2010, shall remain in effect as stated, unless changed above. P~t~.~1e UV~~er El~r~en~ ~~ ~isy Q# ~l~~r~uater Ct~mprehensive i'i~n Appendix C: Capital Improvements Projects CAPITAL IMPROVEMENT PROGRAM WATER SYSTEM The Water System section includes projects that support the Water System operations for the City. All projects, except the projects funded with Lease Purchase, are included either in the current Rate Study or a future Rate Study. Projects in this section support the "Clearwater Provides the Infrastructure to Support all its Attributes" element of the City Counci{'s Vision and the following related priorities: .• Well Maintained Infrastructure Efficient Responsive Ciiy Servides Project Funding 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 Total 96721 System R8,R -Main1 Utility R&R 25,000 25,000 25,000 75,000 Water 25,000 25,000 25,000 75,000 96739 Reclaimed Water FY '09 Bond Issue 863,400 863,400 Dislribuiion System Sewer Revenue 3,847,100 985,670 4,832,770 Future Bond Issue 2,921,470 1,649,150 81,020 3,189,390 6,000,000 13,841,030 Utility R & R 368,980 1,160,610 1,529,590 96740 Water Supply 8. ~ Utility R&R 300,000 300,000 325,000 325,750 376,530 378,820 2,006,100 Treatment 96741 System R&R - Utility R&R 250,000 850,000 239,300 250,000 250,000 850,000 2,689,300 Copitalized 96742 Line Relocation - Ulility R&R 550,000 234,340 954,570 250,000 250,000 },000,000 3,238,910 Capitalized Future Bond Issue 165,660 1,145,430 1,311,090 96743 Meter/Backflow Repl Ulility R&R 650,000 650,000 650,000 650,000 650,000 650,000 3,900,000 /Change Out 96744 System Expansion Water Impact 250,000 250,000 250,000 250,000 119,210 81,910 1,201,120 Wafer 130,790 168,090 298,880 continued on next page CAPITAL IMPROVEMENT PROGRAM WATER SYSTEM (continued) Project Funding 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 Total 96752 Water Service Lines FY '09 Bond Issue ~,~ 500.000 Future Bond Issue 500,000 500,000 500,000 500,000 500,000 2,500,000 Q6757 Water Pick-up Trucks L/P-Water 33,780 96758 Fluoride in Water Sys Future Bond Issue 96760 Elevated Water Tks FY'09 Bond Issue 250,000 96764 Reverse Osmosis FY '09 Bond Issue 4,562,600 Expansion -Res # 1 Future Bond Issue 96767 Reverse Osmosis FY '09 Bond Issue 2,552,300 @ Reservoir #2 Future Bond Issue Water Revenue 96768 Rebate-WeII,Lake, Water 50,000 Pond Trig Abd Utility R&R 96770 Hydra Stop System L/P-Water 36,000 967xx RO Pick-up Trucks L/P-Water 34,770 2,236,250 4,987,000 1,516,830 1,117,230 15,178,160 7,852,040 3,571,770 50,000 50,000 50,000 68,550 1,307,590 1,307,590 250,000 4,562,600 7,223,250 2,552,300 25,664,260 3,571,770 50,000 50,000 150,000 150,000 36,000 40,000 40,000 Total Water System 14,720,180 9,699,550 12,913,120 17,928,910 18,125,340 11,051,410 84,438,510 96721 System R&R -Maintenance This is an on-going program relating to maintenance, repair or replacement of water mains, service lines, valves, fire hydrants, miscellaneous equipment, and damaged facilities. Work involves maintenance, repair and replacement of facilities that do not involve upgrading. Comprehensive Plan Objective: (21.3) Continue to mainlain the water system in a safe, sound and efficient manner on a daily basis. 2 CAPITAL IMPROVEMENT PROGRAM WATER SYSTEM (continued) 96739 Reclaimed Water Distribution System This project provides for the continued expansion of the City's Reciaimed water System based on the Reciaimed Water Master Plan. Comprehensive Plan Objective: (21.2) To provide adequate quantities and qualities of wafer services to all customers in the Clearwater service area; for the City's water system to be compatible with the environment; and also seek to conserve and protect sensitive natural resources. 96740 Water Sup~(y and Treatment This project provides funding for maintenance, replacement, and upgrade of supply facilities. Comprehensive Plan Objective: (21.2) To provide adequate quantities and qualities of wafer services to all customers in the Clearwater service area; for the City's water system to be compatible with the environment; and also seek to conserve and protect sensitive natural resources. 96741 System R8,R -Capitalized This project involves the repair and replacement of water mains, service lines, valves, fire hydrants, and facilities equipment, etc. that are upgraded during the repair/replacement process. funding for capitalized labor, equipment and material for in-house work is included. Comprehensive Plan Objective: (21.3) Continue io maintain the water system in a safe, sound and efficient manner on a daily basis. 96742 Line Relocation -Capitalized This is an on-going project to relocate water mains and related facilities conflicting with public works projects of various governmental entities and which are upgraded during relocation. Funding for capitalized labor, equipment and material for in-house work is included. Planned work includes US 19 (Sunset to Countryside), US 19 (Whitney to Seville), US 19 (Seville to SR 60), US 19 @ SR 60 Sunset Point (Alt US 19A to Keene}, McMullen Booth at Drew Street, Nursery Road (Belcher to US 19), Belleair Road ai Keene Road, Progress Energy Trail, Pinellas Trail, Druid Trail, SR 60/Memorial Causeway (east of Island Way to Ft. Harrison), Beach Walk, Osceola Streelscape and Pinellas County railroad crossing improvements at Hercules Avenue and Belleair Road. Comprehensive Plan Objective: (18.4) To provide sound fiscal management for the operation and maintenance for potable water service in the City's service area. 96743 Meter/Backflow Replacement/Change Out This is an on-going project to repair/replace water meters, backflow prevention devices, and accessories 1o assure accurate flow measurement, maximum revenues, and proper operation. Comprehensive Plan Objective: (21.3) Continue to maintain the water system in a safe, sound and efficient manner on a daily basis. 96744 System Expansion This project provides funding and capitalizes Water Division labor, equipment and material expenses relating to additions to Clearwater's distribution system, including new meters, backflow prevention devices, main extensions, etc. Location of work areas is determined by customer demand. Comprehensive Plan Objective: (21.1) To maintain adequate levels of service for existing and future populations. 96752 Water Service Lines This project is to upgrade the City's existing galvanized water service lines that are in poor condition. Comprehensive Plan Objective (21.1) To maintain adequate levels of service for existing and future populations. 96757 Water Pick u Tp rucks This project provides funding for the purchase of two (2) additional 1-ton pick up trucks. The vehicles will be used 1o perform required annual inspections of the Reclaimed Water System as contained in the Reclaimed Water Master Plan in years 2006-2012. CAPITAL IMPROVEMENT PROGRAM WATER SYSTEM (continued) 96758 Fluoride in Water System This project provides funding for the City of Clearwater treatment ad distribution system to be modified to include fluoride injection at each of the City's reservoirs. Co~rehensive Plan Objective: (21.3) Continue to maintain the water system in a safe, sound and efficient manner on a daily basis. 96760 Elevated water Tanks Upgrade This project provides funding for •ihe renovation and related distribution system work for wafer and Fire protection concerns and the removal of the Del Oro tank in 2009. Comprehensive Plan Objective: (21.3) Continue to maintain the water system in a safe, sound and efficient manner on a daily basis. 96764 Reverse Osmosis PIan1 Expansion -Reservoir # 1 This project provides funding for the expansion of the City's existing RO Plant potentially adding one (1) MGD in water production. This includes wells, raw water piping and plant equipment. Comprehensive Plan Objective: (21.2) To provide adequate quantities and qualities of water services to all customers in the Clearwater service area. 96767 Reverse Osmosis Plant at Reservoir #2 This project provides funding for brackish wells, raw water pipelines, 3.5 MGD brackish RO Plan with brine disposal to injection well. Additional operating costs for this project will not begin until 2014. Comprehensive Plan Objective: (21.2) To provide adequate quantities and qualities of water services to all customers in the Clearwater service area. 96768 Rebate-Well, Lake, Pond Irric~iion Abandonment This project provides funding for the Well, Lake, Pond Irrigation Abandonment program that was approved by the City Council May 3, 2007. This program provides a homeowner a rebate if they are willing to properly abandon a private well, lake or pond irrigation system, when establishing reclaimed water service at Their residence. Comprehensive Plan Objective: (21.2J 7o provide adequate quantities and qualities of water services to all customers in the Clearwater service area; for the City's water system to be compatible with the environment; and also seek 1o conserve and protect sensitive natural resources. 96770 Hydra Stop System This device is used to install a valve without shutting down a water main. This system would eliminate many of the boil water notices we post, the completely shutting down a water main for tie-ins or cut & caps, and hiring a contractor to make taps. 967xx RO Plant Pick-up Trucks This project provides funding for two (2) additional 1 /2 ton pick-up trucks to be used by the additional personnel io investigate plant arms (operational and chemical) at other Water Treatment Plants and to collect water samples as needed. CAPITAL IMPROVEMENT PROGRAM WATER SYSTEM (continued) ANNUAL OPERAi1NG BUDGET IMPACT Project FTE's 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 ReclaimedWoterDistribution 2.0 56,900 59,500 62,800 66,100 69,500 73,100 System (3). (a). (a) Water Pick up Trucks (2}. (s} 0.0 9,370 9,270 9,270 18,760 18,760 9,490 Elevated Water Tanks Upgrade (!}, lot 0.0 35,280 37,040 38,890 40,840 42,880 45,020 Reverse Osmosis PIan1 Expansion - Reservoir # 1 (!}, la}. (s) 0.0 498,400 523,820 550,520 Reverse Osmosis Plant @ 8.0 2,299,870 Reservior #2 (t). (s}, (a}. ia} RO Pick-up Trucks (z1. I6) 0.0 12,690 Hydra Stop System (z) 0.0 7,960 7,960 7,960 7,960 7,960 Total Water System 10.0 109,510 113,770 118,920 632,060 662,920 2,990,690 (!) Operofing costs ore for mgintenonce. (21 Operoiing costs ore for debt service to be furxled by the Woler 8 Sewer Fund. (3) Operoling costs ore for personal services. IQ) Operofrng costs ore for ufiilles. (6} Operoting costs ore for Flee) MgintenorlCe. (81 Operating costs ore for chemcials and/or other operating supplies. 5 Pr~tab Water El~~t ~I~ ~:ty ref leartivafi~r CQrnpret~~r~sv~ Stan Appendix D: Wellhead Protection Map (D-2) City of Clea~-Water Gam~arehensiv~ Pl~r~ 20Q$ ... CURLEWRO. l~trlf ~f ~/(~kiGU MICHICBw e(vD S ~ DUNEDIN ~ ;. SOLONAVE os ~ s 7 _ SAN CHR/STOPNFROR r ................... : ~f. ~ VIRGINN - ST. ' ' 0P~A .~] - W ~ ~ ~~0 NRGINIA , .stc ..~ .r ,~ ~ ~ • ~ ti ~.. .. . i . ~ I.1 _. ~@R ~~ < OLDSMAR ~ .' • ~ ~rR3/OR { .. swsso ~ .~.z . .~ ). cOUNtp $E ; r ~wc: _kyoon 'e ~~ 'E'NTER~R(SE _~ T p ...................... x ,.;, uN~oNSr ~ i ~ ~~ uNroNSr :~ ~~ W ~ SUNSET pq,~yT, .:,pp -•• MAMST. .,., G` L {'Y N. SUN~Ei PG1HY RD. . t . ~': . ~ Y SR 590 . 1- <' '. Si ,~~ ~ PALME7T0 ST ~ PALMETTO ~ ]S s ' ~ I ~ e ' ~ °s # ~~~ ~ .~~ ~~ del IY:~ , ~ ~ `h- .~ peaty ;~P ~ ~ ,... OREwsr. ' s. ;' 7 ~. 6LgVEEAN9 tST Iq ~ . i i{ a SR-EP ~~ L yRi SF,' ~UtH tU OAV g4VDJ ~ - ~ RbOI ~~ • ~! ~ C+E'FIJW13tR! 6RESTNtIT W t .. . , NarLOr - ~ i. URU/p '. ttD , I ° ~ .. A ~:, ~ j 1:. . ~~0~4' ~IF I h /' ..........~ti is ; litkE~/~W RD 4yi~ {~ m . 1 t p ' BELLEV~Ew ~.' ~ypjl. i f P , . . , . ' .... • .~ ~ G•'• ~i 1~ S - ~ f~ NURSEA!' m .RD ~ - ~ W E BELLEAIR '1 f 4~. ~ 1 ~ 7 1 .. 5 .... S$Mp .~.....' .st.+ .. .BELLEAIR. ..:.Z~........J .. ......... j ............................... h '..J Y..... LARGO ...:1.`:............................................... ScaleTN.T.S. Potable Water Welis and Wellhead Protection Zones ' Map #: D-2 Date: 8/29!2008 Source: ClealwaterEngineering Deptf Ju12008 Legend ~ IN SERVICE WELL ~ ;Wellhead Protection Zone ,_ Clearwater Planning Area Outside Clearwater City Limits Pnpvia hr: ° ClearWater,o $ M;;°ooa ~~nplop[Dlil]]i63 ~~'-'~•...i.~/ .ih'~`i`~ ~h: 1)3)13{].]{0 i :l)3)11ri~)!f "^%~`• ~`/•`.''~."``. www M)CI rwSN).com Q'}NMm.f. ter. ~mm i~{ydGi.~y.,..inr.n~vmn eo ufoeMM MI>r Ihi un a m'!uw a iYth OSI{. ~T~ c~~ ~~~~~~~%A.~~~~~ ;~,_ 1'as1.Ori-cr_.ir 13c;x ri r~~8, L;~i"~e~ti~~"rr:~, l~i.~sxi~~.~ 7~~5~--z t~~~ :~11~?:11 6Pii. Sffi~IC;F!~ lits'ii ~)tif.'i. li~(3 ~t?i.i1't? V~Yii'C;:: Avftit,l:, ~,':.I.1#sx':1"I"(:R, I'l,:;i'.I~ -A X;'J~~t~ '~'lil.!3f>?iQtii (1?';s"} ~G2-~3f>% I':1X {'? jC,Z-~f~f» `lay 22, 20U8 Mr. Kay Eubanks T'lorida Department of Community Affairs Bureau of Local Planning Divisiozz of Conzrnurzity Plarz7iirzg Plan Processing Team 2555 Shumard Oak Boules'ard Tallahassee, l~'L 32399-2100 RE: Transmittal of Camprehensive Plan Arriendment Package City of Clearwater's Water Flan to be incorporated rota the City's Utility Element Potable Water and Natural Ground W ater Aquifer Recharge section Tear Mr. Eubanks: The City of Clearwater is subirzzitting this transmittal as part of the requirements latzrsuant to 9J- l1.U06 "Submittal Kequirenzents for .Proposed Local {~ovenzmezzt Comprehensive PlaYz Amendnxents". This is the City's transmittal of its plan zznzendzzzezat package for the Cle~iz-~vater Water :Plait to be izicarporated into the City's Utility Element (Parable 1~ater and iv'atural Ground Water Aquifer Recharge section) pursuant to ~l'~.5. Section 1G3.3177(~ij(c) and it .is req)zested that it be processed as a Prelizn.inar,~± R£view. "The City is transinttizzg one (l }proposed Plan r~mendnzent lvith this letter for your review: • CPA2UU8-03002 -Plan Amendment to the Utility Elemezzt {Potable Water and Natrzrat Graiuld 'Water Aquifer Recharge section) of the Compre:hensiwe Plan (Ordinance Number 795U-U4) 9J-11.0{)bpi a l: The Clearwater Community Develaprnent Board (CDBj, as the .Local Planning Agency, held a public meeting on April 15, 2UQ8 for CPA2U08-03U02. The CDB recommended approval to the City Council, 9J- l 1.Q(?~1~ 'The Clearwater City Couzzcil, as the local governing body; held a transmittal public hearing meeting on May 15, 2008 for CPA2008-U3002. • The City Couzzcil approved the transmittal of CPr'1200$-03QU2 to the Florida D~partrnent ~~Community Affairs. "3t~~'~t. T:~~wi.cirzc~r non r~rz'i3t:~i:1"]1VI z1s;1•rc~;4 E;~~~t.t3v[:t~" May 22, 2008 Ray Eubanks Page 2 of 5 The City received no requests far information and no objections from citizens at either the Local Planning Agency hearing or the transmittal. hearing as shown by the enclosed Comprehensive Plan. Citizen Courtesy Information Lists. The abo1re proposed plait aasaendnaent package and. one copy of each item specified under paragraphs 97-11.006{1)(a), {b) and {c}, .FAC, were sent to the Pinellas County Planning Department, the Tampa Bay Regional .Planta.ing Coutac.il, the Southwest Florida Management District, th.e .Florida Department of Transportation, the Florida Departrrtent of State and Florida :Department of Environmental Protection, as ide.ntifi.ed in 9J-11.009(6) under separate cover on dais date. 9J-11.06 1 a 3: The following is the sutazmary of the plan. amendment package that the City of Cleartivater requests the department to reviet~~: CPA2008=03002- Plan Amendment to the Utility Element (Potable Water and Natural Ground ~+Vater Agtyafer Recharge section) of tlac Comprehensive Flan (CJrdinatace Number 7950-08) 9J-1 l .Ot?6~ 1 }~,,,~ The anticipated month. of adoption for the plan amendment is July 2008. 97-~_l_~{l6 .1 ti 5: 'I'he proposed plan amendment package does not pertain to aaa area of.' critical state concern, 9J-1.1.006{1){a)6: The plan amendment package is not ~~~ithin orange, Lake or Setalincile Counties. 9J-11.006(1)(a~7.t~: The proposed plan atnendtaient package is an exemption. to the twice-a- year limit of amen.dm.ents {incorporating the regional water supply work p1a1t approved pursuant to Sections 373.0361 and.163.3177~6)(c),F.S,}. 97-11_OOC(:1.)(a}9: The plan amendment package wilt not be adopted under a joint plantai.ng agreement. . 9J-i 1.006~)~a)l0: Satatixa E. Herman. Planner 1IT P.C?. Box 4748 Clearwater, FL 33758-4748 Telephone: 727-562-45 $6 Fax: 727-562-4865 sandra.herman(~ mycleanva#er.com ]f you need further assistance, please contact Sandra Herman. Thank you for you help in this matter. fvlay 22, 21?OS R.av _l~tibariks Page ~ of 5 Sincerely, ~ f~` _~ ~ t 1 Gina L. Clayton assistant I>ircctor of Planni~~g City ofClearwater Cc: Michael Quillen, Director of Engineering Robert. Fahey, .)/ngineernglProducti«n Manager May 22, 2008 Ray Eubanks Page ~ ofd inlay 22, 2008 Pinellas Count}r Planning .Department Attn:.Briall Smith, .1.1.C:P, .I3i.rector (i00 Cleveland Street, Suite 75{) C.;leanvater, FI, 33755 Tampa Bay Regional Planning Council ;lttn: Manny Pumarieda, Executive .Director 400t) Gateway Centre Boulevard, Suite 100 Pinellas Park, FL 33782 Soutll~vest Florida Water Management District Attn: Ray Mazur; Executive Director 23 i 9 Broad Stz-eet .Brooksville, FL 3460=1-6899 I;loricia Department of State F3ureau of" Historic Preservation Attn: ills. Susan Harp R, A. Gray Building 50{7 South Bronough Street Tallahassee, F.L 32399-0250 Florida Deprzrtzllent of Transportatiozl District Seven ~'~ttil: Caz•ol Nl. Collins, LGCP ~c CIuIS Coordinator 11201 North iU1clCinley Drive Mall Statloil ~-500 Tampa, FL 33612-656 Departzllent of Ezlvirorunezltal Protection Attn: Jim Qiliiuz, Environmental Manager Qtfice of Intergovernmental Prograrris 390{7 Commomvealth. Boulevard, Mail Station 47 Tallahassc:c., I`L 32399-3000 `Clearwater RE: "Transmittal of Comprehensive Plan Amendment Package City of Clearwater's Water .Plan to he incorporated into the City's Utility Element Potable 1~'ater and. Natural Ground Water Aquifer Recharge section May 22, 20f)8 Ray Fuban.ks Page S of` 5 To lwhom it may concern: Pursuant to Kule 9J-11.f)f)Ci{]) of the Florida Administrative Code, the City of Clearwater is subr~~itting dais pxoposed plan arnendme~at package #o the aforementioned organizations. Also, enclosed is a copy o.f the tra7isjnittal let#:xr sent to the Department of Cornxnunity Affairs. If you nerd further assistance, please contac# Sandra I~Ierrnan, Flannel- III at '727-562-4586. Thank you for your courtesy in This matter. tnCerel V, ,:. ~ 3p f~ Cii7~a I.,. Clayton Assistant Director of Planning City of Clea~-~vater Cc: I)awid Healey, Pinellas Planning Council City of Clearwater Transmittal of Local government Comprehensive Plan Amendment Utility Element/ Potable Water and I~atura:( ground Water Aquifer Recharge (EX:EIVI PT) CPA200~-03~C32 t.Ttility Etementl Potable'Water and Natural Ground. Water Aquifer Recharge City of Clearwater Transmittal of Local Government Comprehensive Plan Amendment Utility Elementl Potable Water and. Natural Ground Water Aquifer Recharge ~E~ EM PT) CPA2C3U8-03U~2 Utility Flem~nt/ Potable "Water and Natural Ground. 'mater Aquifer Recharge CDI3 Meeting Bate: April 1.5, 2QU8 Case ~ CPA2U08-U3UU2 Ordinance #: 795U-U8 Agenda Item: F-l. CITY Old CLEARWATER PLAN:IV:ING DEPARTTtifENT STAFF REPORT C():M:PItEI~IENSIVE PL4N.AMENDMF."+TTS REQUEST: Clearwater CUmprehensive P'lurt Text Arnendrnents )CNITTd1,TEI) TiY: City of Clearwater Planning Department IIiA.CIC(=R()l:7ND INFURMATIi~N: This item involves an amendment to the Clnanvatcr t::ornprehe~~sive .flan to update the Utility F,lement related to the City's water supply plan as per Sec~[ion 16331.77(6){c), I;Icarida State Statutes and Florida Administrative Code section 9J-S.UI 1. `l'he fimdamental purpose of a water supply plan is to ensure that the cammunity is able to supply quality drinking water of a sufficient quantity for current and suture needs. T'he statuton requirements call. for each. local government in the planning region to adopt amendments to its comprehensive plan to incorporate their water supply plan within 18 months after the approval of the regional. water supply plan. The City's regional district, the Southwest Florida V~ater Management District (SW:EWM:D), approved its plan on November 3U, 2UU6. 'T'herefore, the deadline for the Citti•'s amendment is May 3U, ZUUS. This amendment is exempt from the twice a year limitation far large-scale amendments. The cansulting firm of made Trim was retained by the City to draft an updated "Yotabte 1~ater Element" (sub-c;lemnt to the Utility Element) to the Clearwater Cornprehensrve Plan based an the City's 2UU4 ~'trter ~a~ster Plum produced by Parsons Water and Infrastructure, Inc. According to the plan, based an population and density projections, the City will be firnctionally capable of providing water through the year 2U25. q'}~e proposed text amendment meets state statutes and rules by amending current Gaals, Objectives and Policies of the 1'Vater Sub-element of the Utility Element of Clearwaters Comprehensive Plan. ANALYSIS: One amendment is proposed. to th.e text of the Clerznvater Coinprntiensive Plan in C)rdinance No. 79~U-U8. '1'1ie summary of the amendment follows. Pt~gc -1 CPA2UU8-U3UU2 Aznen.dment - I)TILITY ~<I.,:EM:EN•I' ti{~r'II,S OBJECTIVES AND PC)I.,l:t'CIS: Potable 4~iater and Natura} Ground Water Aquifer I~echarue Needs (pages are liven from current Comprehensive P}an): The .t~illowing are substantive; changes that are being made to incorporate the City's 2004 t3jater i1~~rster Plr~rr into the 1;~tility :Element and to ensure consistency with the regional water supply.plan far otrr district (S~,Y'l~ W}~I:D): Policy 21.2.7 page IJ-l?): Add the following sentence: "7-he City's }ang range l~'Qte,~ :L1acter ~'lar~ completed in 2004 sha}} serve as the guiding document for water ;apply and treatment methods." Remove: "Various recommendations ha.~°e recently been submitted. in a study on long range water supply and treatment". Policy 2.1.2,8 (page D-17): Add the fallowing sentence: "The City's long range tt''uter Maxster Ptu~ completed in 2004 autlinc:s a work plan for continued coordination with. the Southwest blorida Water Management District's Regional Water Supply Plan. adapted in December 2006". Pa}:icy 21.6.4 (page I)-19); Add. as a new policy: "Ensure consistency with. the actions defined within the Regional Water Supply Plan prepared by the Southwest Water Ivianagement District." The remaining amendments involve updates to years given for projects, m}oar text changes and ttipagraph}cal and,'ar grammatical corrections. STAIYDARi)S FC?R REVI:F.,~' ...Pursuant to Comjmunity I.7evelapment Cade; Section 4-603{F} no arr-e;ndment to the t;lecrrwrrter f:ampr~hensive Plan shall be approved unless it complies with the following standards; l.. "1`ixe amendment will further implementation of the corn~rehensive pion consistent wit}~ the ag als, palrc,tes and ab~ectives contained in the plan. The proposed amendment to the Utility Element: Potable Water and Natural Ciraund 't~later Aquifer Recharge Needs Sub-Element of the Clearwater Comprehensive Plan. furtht;r refines the City's existing pa}ic}es and objectives. The proposed amendment is consistent with the existing goals, objectives, and policies contained in the compre;he:nsive; plan anal expands the city's long range planning policies related to the .provisions fox the City's water plan. 2. `I°he amendtent is oat inconsistent with. other pravisiax-s of the comprehensive .plan. Tlie proposed amen;dment is consistent with the provisions o:f the Comprehensive Ilan. It broadens the City's approach. to providing cvntiniaed coardit~ation with the Page - ? C'P.A2t1U1~-03002 Snutl~west Florida -Water Management Uistxict (SWFWI~ID) and specifically to its Regional Water Supply flan (R'~4>Sf'). a, 1"he available uses, if anplicabte, to ~~rhtch the property may be Irut are appropriate to the property in questions and cnmpat~hlc, r~~ith exi5tin~ and planned uses in the area. The proposed an3end~r~t rs a text arnenclment that is not directly related to a specific property. 4. Sufficient trublic facilities are available to serve tll~ro e The proposed atr~endnxe,nt .is a text amendment that is not directly related to a specific property. S. "I'he amendment ~yill not adversely affect the natural environment, The proposed amendment seeks to provide consistent and c;nordinated e;tfi~rts for the processes and procedures for water manageauent within the area governed by the South~~est Florida ~7Vater Management I}istriot (SWFWMI)). 6. "Che an~endntent will .not adversely impact the use of property in the immediate area.. The proposed amendrr~ent is a text amendment that is not directly related to a specifc property. Si7l~1:MARY AND R:FCO'YfM:F..NDATI:E)N: The purpose of this amendment is to incorporate the City's 2044 Water ~1~Icrster Plcrrt into the Utility Element of the C'lear~water Comprehensive Plan and to ensure consistency r~vith the regicu~al water supply plan as required in Section } 53.477(6){c), F.S. The Planning Department Staff recommend APl'I20~AL of C)rdinance No. 7950-48 that amends the C."leur~uter t;r~mprehensive Plc~rc. Prepared by Plannint; Department Staff Sandra E.I}erxnan Planner II:I :1TT~CI-IMENT: Page_3 CI'A204g-03002 fJRI~INANOE NC3. 79~fl-08 AN ORDINANCE {)I^ '7:'II:E CI'T'Y {)F C.[aIARWA'I`EI~, FLORIDA, 1ti1A.KING AMI3NDMENTS 'I'C) THE COMPREHENSItt11 PLAN OF Tl-I:I C;CTY AS ADOPTED ON ~iAY I8, 2000 AND AIviEN.DED ON JUI.,Y i2, 2001, OCTOBER 7, 2004, OCTOBER. 20, 2005, DECF.;MBER l.S, 2005, AUGUST 14, 2007, AND FEBR.UAR.Y 2.1, 2008; BY A.'viENI)ING THE UTILITY EL,EM:ENT; IN ACCORDANCE WITH SECTIONS 163,3177, 1b3.3184, 163,31$7 OR 1b3.31.89, IaLO:RII)A S"I`A':I"U°I'E:~, 'I`O 'C1PDA"I,E THE CITY OI^ CI.,EA.RWA'I'ER'S WATER WORK PLAN IN ACCORDANCE Wl'I-I THE UPDATED SOUTHWEST FI,O.RIDA WATER. D1STR:1C;,1''S :REGIONAL WA't"EK..SUPI'LY :PLAN; PROVIDINCr FOR. SEVERABIIITY; AND PROVIDING AN EFFECTNE I3.ATE; 1~7HIa.RIAS, the local Government Comprehensive Planning and .Land Deveioptnent Regulation Act of.' Clc~rida empowers and requires the City Council of the City of Cleaxwater to plan for the future development and growth. of the City, and to adopt and periodically amend the Comprehensive .Plan, including elements and portions thereof; anal WHEREAS, the City of Clearwater adopted a Comprehensive Plan on May i8, 2000 by Ordinance Number 6522-00; and ~'HFItEAS, the Ciiy Council approved Ordinance Number b794-O1, which. amended the Compr~lyensive Plan ofthc City on July 12, 2001; and WI-II:~,RI'AS, the City Co~~ncil approved Ordinance Ivnmber '295-04, which. amended the Comprehensive I'1an of the City on October 7, 2004; and WHEREAS, the City Council approved Ordinance Number 738€1-05, which amended the Comprehensive Plan of the City an October 20, 2005 and December 15, 2005; and 17v'HEREAS, the City Council approved Ordinance Number 7782-07, which amended the Comprehensive flan of the City on August 14, 2007; anti. WHER.f-;AS, the City Council approved {)rdinance Number 7870-07, which. amended the Comprehensive Plan of the City on February 21, 2008; and ~+UHEREAS, the City i,s al~itrg these changes to the Comprehensive Plan in accordance with statutory requirements; anal WHEREAS, amendments to the Comprehensive Tian of the City have been prepared in accordance with the applicable regrcirements cif law, afier c;o~xducting ~e appropriate planning analysis, and public participatian through public hearings, opportunity for, writ#en comm~zats, open discussion and the consideration ofpublic and official comrrzents; and _t_ I/xl~ibit A t~rc3.inance 7950-0R y~}={_l.R.FAS, the Ct>mmunit}° Develapmertt :Board, serving as the designated Local Planning Agency tax the City, has held apublic hearing an the prapased arnend~ments and has recont.mended adaption of the praposed Catnprehensive :Plan amendments; and 1~i+1-IlIiEAS, the prapased amendments Dave been transmitted. to the Florida Department of Cam~mtnity Affairs for review and comments, and the objections, recommendations and comntc;nts received front the Florida Departrrtent of Community AtTairs have been. considered by the City Council, together with. all c;atnments from lacal regional agencies and other persans, in preparing the final draft oftlte amendments; and W1-lEltEAS, the City Council ti.nds it necessary, desirable and proper to adapt the an~endnten>s to the objectives and palic.ies of the Comprehensive Plan .in order to reflect changins~ conditions; naw, therefore, I3E l'I' O'itUrl.I~ED BY THE CITY CtJUNCII:, t)f~ "I F:CE t;I TY OIL CLE.>a,IZ~VATER, FLt'~RIDA: Section. l.. Ameadrnent to the Clearwater Comprehensive flan attached hereta as Exhibit "A" is hereby adopted. . Section 2. Severability. If any section, pravision, clause, phrase, ar appiication of this Ordittance shall be declared unconstitutianai ttr invalid far any reasan by a court of cantpetcnt .jurisdiction, the remaining pray}signs shall be deemed severable theretront and shall remain in fill force and affect. Section 3. This ard:inance shall became eftectve when. the :Department of Community Affairs tDCA) issues a final. arder determiniing the adapted amendment to be in campliance, ar thee. Adrrtinistratian Commission issues a final arder determining the adapted a.ntendments to be in canrpliance, in accordance with Section 163.31'7'7, 163.31.8, IC>3.3187 ar 163.31$9, F.S., as amended. PASSED ON F1TtST kEADl1~'G PASSED ON SECOND ANt1 F}NAL R.EAI)INO f~ND ADOPTED Frank I-~i.bbard hf ayar-t;aunci lmember t~ppraved as to .farm; Attest: L.e.slie K. Dctuaall-Sides Cymthia I. t.Yaudeait Assistant City Attorney City Clerk -2- ~~;xhibii A C)rdinance 7950-Og F.,XII[I:RIT A A'E"~ :~iCHMENT TO ORDINANCE 795fl-4$ A.'YLF,i~ll):IVI:EN'i' -'C:`TILI'I~Y EI.~F.,MENT G(3A:E:S, t7R,IECTI"YES AND PnLiCI:ES An:enrl Gaul 21 rr~`'tlae IlLllil3~ Element of the Cvnzprehextsive .Plrue, us follows: FU'['AIi:LE'VVATER AND NATURAL {~RC3LINll WATER A©UiF'ER RECHARGE 21.. Ct?A.L -- I'Itt?VIDE, DEV.EL().P, AN.I) MA.iNTAiN A .FERMANENT PC~TAl3I.E WATER. SL~PPI..Y ~YSTF,iVi TO MEET Ah"i'iCIFATF:D i?FMANn W~iILE FROViDING 1•IAX.iMUVI PRACTICAL .FRUTECTION TtJ THE ENVIR{)N.iVIENT AT A COST CONS.iSTEiYT WITii THE FUBLiC'S ABILITY f^~ND WILI:INGNESS `l"tvD FAY. 21.1. Objective - "i't~ maintain adequate Levels ref Service fc~r existing artri future populations through the rear ZO1S ~8-1-A. ***~* 21.2 Objective - Frcrvide adequate quantities and qualities o€ water service to all customers of the Clearwater service ar~;a. Current sen•ice level (,Tiny, 20117 •) is ~0 39i1:r~43A customer acc+~unts otahle, reclaimed. and hre . Policies 21.2.1 Ensure that laud development regulations, building caries and City ordinances adequately address water system pro~s~isions by pcr.forming a thorough evaluation of City codes and by coordinatizag proposed provisions with the Soutlrzvest Florida Wager Management District acid Florida I)epartcnent of F~nviroumental Protection ~a-i3ay~'~ter. 21.2.:? q~ke Fngineerin~ 1#tl~lis--V~t~s-ar#rnat~ shall analyze the condition and adequacy of any water d.rstribution system that the City may inherit through aztnexation and prepare cosi estimates for upgrading those systems to meet City requirements. ? 1.2.3 When new subdivisions are being developed, it shall be the responsibility of the developer to provide irctenial potable water and reclaimed water systems Yvhich are constricted to City speciticatiotas. *~~* 2,1.,2.5 Continue, to dl~evelop a systecta and construct improvements which wall conserve energy. ~.uater, and other valuable resources. 3 ._ I~xhihit t~ Or~iaance 795018 21.2.b lfie City ~-£=~ shall continue to participate and assist the Southwest Florida ~~iaier Management t3istsict =spa-i~at~~, Pinellas (;aunty Health Department, and the U.S. Environmental Protection Agency in developing innovative techniques to augmrent existing water supplies to provide far future needs. 21.2.7 Continue to identify, acgrtire, and develop sources of'water• suppl}~ and methods of water treattnetrt to meet existing and future needs. Some l~~ays this can be accomplSshed are through well. rehabilitation prx~je~ts andlor exploration and drilling of new wells. Some type of water treatment may be initiated. Additional volumes of water may be acquired from. the .Pinellas County Water System through Cleaxwater's intergovernmental water service agreement. "The City's long range Wafer ILiirster /'iC~rx completed in 21)04 shall serve ~r~ti the uiding dacuxnent fo:r water supply and treatment methods. ' ~l')!'It 21.2.8 Ensttre that water managernetrt projects are desia ed and operated to maintain and exrhance natural systems as well as man made s}+stems by working closely with the Scrutliwest i'3orida Water Management District when proposing new projects and water rnanagemc:nt programs. The Ci 's lams ratrs;e Water,~asfcr flan armpleted in 2fl04 outlines a work pion fc>r continued cogrdination with the Southwest Florida Water .Marratienrent District's Rik=,onal '1~ater Supply .Plan adopted in December 200b. ~~**~ 2I.3 objective -Continue to maintain the water system. in a safe, sound! and efticieut manner on a Baily trasis. Policies 21,3.1 'i'lre Public Utilities Department , VL'ater Division, shall monitor water quality and the operation of the water distribution system with the intent of repairing acrd replacing deficient portions ofthe system within the framework ofthe capitalized budgeting process. *~~~~ 21..4.5 "17re City shall. continue to refine the inverted rate structure for residential water meters, loom meters and all othec water meters pernaitted by the Water llivision of the Public 1_Itilities Department 21..5 objective - t;ontinue to dll~evelop a potable water system that is compatible with the environment and seeks to conserve and protect sensitive u~rtural resources. -4- E~tibil A Ortl:nattce 795.0 Policies 21.5,1 Except for areas oi`the City where reclaimed tivater is available, shallow wells shall be recognized as a saurce of water for irrigation purposes. Establ ish. a City pernait for shallow well installation ~ the end of 2i1~8. 21.5.2 Tlae City's biulding code shall be-:~e~~e include the requixen~ent for water conserving fixtun;s in newly canstruct~:d or remodeled buildings. ~~~~* 21.x.5 T'he City skat~atex shall maintain its current Water Restriction ©rdnance. .a*~:~~ 2l.ti C)bjective - Cantinue to ~chicve efl'ct-tivc coardinatian with aher gavern~nent agencies to solve prahlems of an extraterritarial nature with coaperation and in canjunctian with the Southwest Fiarida Water.Management.Uistrict. ~~~~~ 21.fi.' Cantinue to cooperate with. the southwest Florida Water Management District and 'Tampa Bay L'~ater in developing environmental and hydrologic data that will identify safe and reliable potable water yields in existing and future well,fields. 21.6.3 Continue to cGoordsnatc with. appropriate local, State, regional and Federal agenciLS in implementing the water system plan. ~~~~~ 23.6. F:~LSUre cnns5tenc~with the actinns defined within the, R~gi~nal Water sunyly Plan prepared by tha Southwest Water :ylanagement district. 21.7 Objective -Continue to protect all natural recharge areas having functional hydrological characteristics. *~*~~ 21.'~ .2 The City e€-6~1+~ater sha11 include inaentivss in the Conlmunlty Development Code for 'the proteciion of natural groundwater aquifer recharge areas as idcntifaed in the Conservatian Element of the Clearwater Comprehensive Plan. 21..7..3 'The City c~-~l-~wi shall. continue to protect graundwater duality by enforcing 'Wellhead Protection Ordinance. -s- Exhibft A i7rdinaace X950-~B GOmprehensive Plan citizen COUrtesy Information List CPA2008~-03002 {Ordinance No. 7950-08) Local government: City Of Clearwater Nearing Date: April 15, 2008 Type Hearing: Community Development Beard DG~ amendment Number. {DCA official Usa) Please Print dearly By providing your name and address you v~rill receive information concerning the date of publication of the Notice of Intent by the Department of Community Affairs. _~.._.___ _, _~ __~ _ ~u a_~ ~.m.~. _..i_.. _._~. ~.~.._ _.__- __. _m .__. ~ ._._.._w __._...._......_~. 7_. Check Appropriate Identify ` Address, City, State, Box Amendment Citizen Name dip Code ; ----------~ ; _._..r__..__.~_.__..___~ which is o~ 3 ~ Writ~ezs Spc~kety Interest ~c~znnaent Corn~r~eirt 1 ~_.. .._.. ;.~.~.____. _..._._..~..__._m..~.~_.._.~... ~.W.__._..~._~..~.~ ;NONENONE ;NONE NONE t_...,.W,..,W,... .,.,.._ __,_ _._,... ..r_ ... .............. , i ~ ' ,F,,, ..~,.,....w,.,,... ~ ....___ f ,_ ...., ..~ .w., ..........,.. ,,...... ... _...,. _ I E)rcr fir more spaces Comprehensive Plan Citizen Courtesy information ~.ist CP~ooB-o30o2 {~r~inance No. 730-08) ~.ocal ~overnmerit: City of Ciearvvater Nearing ®ate; Nlay ~ 5, 2008 Typo Nearing: City Council T`ransrr~ittal Hearing DC~ 1-~mendrnent Number: Please Print Clearly {DCA t3fficiai Us~~ By providing your name and address you will receive information concerning the date of publication ofi the Notice of Intent by the Department of Community Affairs. Citizen dame ~..._.. i {{~ i _..__.___..__.._._._._..~ .__._..,-Check Appropriate ,.~ _^nMl~ientify `y~_ Address, City, State, ~ Bnx Amendment Zip Code i ._~µ ...~_~::_~..~.._~.... which is of ZTirriilera ~ ~polcen ~ ~ merest Cozzu~ient ~ Cnnunent ,~ __. ~ ._, ~ . __~_....W_..._~.. ~._. _._._~__.____ NONE NL~NE ~N{JNENONE ;~ ~ i S ~( I S UY~CT ~~T iil(31't'. S~3dC£'S City of Clearwater Transmittal of Local. Government Comprehensive Plan Amendment BATA ,~i ANAL~~:iS CPA2~08-03~0~ Utility 111ementl potable eater and Natural Ground. ti'~'ater Aquifer Recharge ~ i QS P~ ~ ~.( ~9 2~-0~ 5 ORDINANCE NO. 7950-08 AN ORDINANCE OF THE CITY OF CLEARWATER, FLORIDA, MAKING AMENDMENTS TO THE COMPREHENSIVE PLAN OF THE CITY AS ADOPTED ON MAY 18, 2000 AND AMENDED ON JULY 12, 2001, OCTOBER 7, 2004, OCTOBER 20, 2005, DECEMBER 15, 2005, AUGUST 14, 2007, AND FEBRUARY 21, 2008; BY AMENDING THE UTILITY ELEMENT; IN ACCORDANCE WITH SECTIONS 163.3177, 163.3184, 163.3187 OR 163.3189, FLORIDA STATUTES, TO UPDATE THE CITY OF CLEARWATER'S WATER WORK PLAN IN ACCORDANCE WITH THE UPDATED SOUTHWEST FLORIDA WATER DISTRICT'S REGIONAL WATER SUPPLY PLAN; PROVIDING FOR SEVERABILITY; AND PROVIDING AN EFFECTIVE DATE; WHEREAS, the Local Government Comprehensive Planning and Land Development Regulation Act of Florida empowers and requires the City Council of the City of Clearwater to plan for the future development and growth of the City, and to adopt and periodically amend the Comprehensive Plan, including elements and portions thereof; and WHEREAS, the City of Clearwater adopted a Comprehensive Plan on May 18, 2000 by Ordinance Number 6522-00; and WHEREAS, the City Council approved Ordinance Number 6794-01, which amended the Comprehensive Plan of the City on July 12, 2001; and WHEREAS, the City Council approved Ordinance Number 7295-04, which amended the Comprehensive Plan of the City on October 7, 2004; and WHEREAS, the City Council approved Ordinance Number 7388-05, which amended the Comprehensive Plan of the City on October 20, 2005 and December 15, 2005; and WHEREAS, the City Council approved Ordinance Number 7782-07, which amended the Comprehensive Plan of the City on August 14, 2007; and WHEREAS, the City Council approved Ordinance Number 7870-07, which amended the Comprehensive Plan of the City on February 21, 2008; and WHEREAS, the City is making these changes to the Comprehensive Plan in accordance with statutory requirements; and WHEREAS, amendments to the Comprehensive Plan of the City have been prepared in accordance with the applicable requirements of law, after conducting the Ordinance No. 7950-08 • • appropriate planning analysis, and public participation through public hearings, opportunity for written comments, open discussion and the consideration of public and official comments; and WHEREAS, the Community Development Board, serving as the designated Local Planning Agency for the City, has held a public hearing on the proposed amendments and has recommended adoption of the proposed Comprehensive Plan amendments; and WHEREAS, the proposed amendments have been transmitted to the Florida Department of Community Affairs for review and comments, and the objections, recommendations and comments received from the Florida Department of Community Affairs have been considered by the City Council, together with all comments from local regional agencies and other persons, in preparing the final draft of the amendments; and WHEREAS, the City Council finds it necessary, desirable and proper to adopt the amendments to the objectives and policies of the Comprehensive Plan in order to reflect changing conditions; now, therefore, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CLEARWATER, FLORIDA: Section 1. Amendment to the Clearwater Comprehensive Plan attached hereto as Exhibit "A" is hereby adopted. Section 2. Severability. If any section, provision, clause, phrase, or application of this Ordinance shall be declared unconstitutional or invalid for any reason by a court of competent jurisdiction, the remaining provisions shall be deemed severable therefrom and shall remain in full force and effect. Section 3. This ordinance shall become effective when the Department of Community Affairs (DCA) issues a final order determining the adopted amendment to be in compliance, or the Administration Commission issues a final order determining the adopted amendments to be in compliance, in accordance with Section 163.3177, 163.3184, 163.3187 or 163.3189, F.S., as amended. PASSED ON FIRST READING May 15, 2008 2 Ordinance 7950-08 PASSED ON SECOND AND FINAL READING AND ADOPTED Approved as to form: Leslie K. Dougall-Sides Assistant City Attorney • ~~o~• ~ S, 7.oy8 Frank Hibbard Mayor-Councilmember Attest: Cynthia E. Goudeau City Clerk Ordinance 7950-08 • EXHIBIT A ATTACHMENT TO ORDINANCE 7950-08 AMENDMENT -UTILITY ELEMENT GOALS, OBJECTIVES AND POLICIES Amend Goal 21 of the Utility Element of the Comprehensive Plan, as follows: POTABLE WATER AND NATURAL GROUND WATER AQUIFER RECHARGE 21. GOAL -PROVIDE, DEVELOP, AND MAINTAIN A PERMANENT POTABLE WATER SUPPLY SYSTEM TO MEET ANTICIPATED DEMAND WHILE PROVIDING MAXIMUM PRACTICAL PROTECTION TO THE ENVIRONMENT AT A COST CONSISTENT WITH THE PUBLIC'S ABILITY AND WILLINGNESS TO PAY. 21.1 Objective - To maintain adequate Levels of Service for existing and future populations through the year 2018 2A~~0. 21.2 Objective -Provide adequate quantities and qualities of water service to all customers of the Clearwater service area. Current service level (July, 2007 X93) is 40,390 a3;43A customer accounts (potable, reclaimed and fire). Policies 21.2.1 Ensure that land development regulations, building codes and City ordinances adequately address water system provisions by performing a thorough evaluation of City codes and by coordinating proposed provisions with the Southwest Florida Water Management District, a~ .Florida Department of Environmental Protection. Pinellas County, and Tampa Bay Water. 21.2.2 Tie Engineering shall analyze the condition and adequacy of any water distribution system that the City may inherit through annexation and prepare cost estimates for upgrading those systems to meet City requirements. 21.2.3 When new subdivisions are being developed, it shall be the responsibility of the developer to provide internal potable water and reclaimed water systems which are constructed to City specifications. 4 Ordinance 7950-08 ~ • ***** 21.2.5 Continue to dsevelop a system and construct improvements which will conserve energy, water, and other valuable resources. 21.2.6 The City ef~earwater shall continue to participate with and assist Tampa Bay Water, the Southwest Florida Water Management District, Pinellas County Health Department, and the U.S. Environmental Protection Agency in developing innovative techniques to augment existing water supplies to provide for future needs. 21.2.7. Continue to identify, acquire, and develop sources of water supply and methods of water treatment to meet existing and future needs. Some ways this can be accomplished are through well rehabilitation projects and/or exploration and drilling of new wells. Some type of water treatment may be initiated. Additional volumes of water may be acquired from the Pinellas County Water System through Clearwater's intergovernmental water service agreement. The City's long range Water Master Plan updated in 2008 shall serve as the ug iding document for water supply and treatment methods. ~+nrl ~ro~++mon4 21.2.8. Ensure that water management projects are designed and operated to maintain and enhance natural systems as well as man made systems by working closely with the Southwest Florida Water Management District when proposing new projects and water management programs. The City's long term Water Supply Master Plan outlines a work plan for continued coordination with the Southwest Florida Water Management District's Regional Water Supply Plan adopted in December 2006_ 21.2.9. Water service shall not be extended to properties outside the City's service area unless sufficient capacity and quality of water exists to serve the areas already committed to City service. 21.2.10.Water service shall not be extended except in those areas so designated for City of Clearwater by interlocal or other agreement. Ordinance 7950-08 • • 21.2.11. Encourage the development of local and regional water supplies within the jurisdiction of the Southwest Florida Water Management to avoid transporting surface water across other district boundaries. girder-~em~ze--tho efF-^a ;~e#ec~~~~s~f~he 21.3 Objective -Continue to maintain the water system in a safe, sound, and efficient manner on a daily basis. Policies 21.3.1 The Public Utilities Department ~ , Water Division, shall monitor water quality and the operation of the water distribution system with the intent of repairing and replacing deficient portions of the system within the framework of the capitalized budgeting process. ***** 21.4.5 The City shall continue to refine the inverted rate structure for residential water meters, lawn meters and all other water meters permitted by the Water Division of the Public Utilities De artment 21.4.6 Encourage partnerships among federal, state, local governments, and the private sector that would identify and build needed potable water facilities and allocate such facilities costs among the partners in proportion to the benefits accruing to each of them. 21.5 Objective -Continue to dOevelop a potable water system that is compatible with the environment and seeks to conserve and protect sensitive natural resources. Policies 21.5.1 Except for areas of the City where reclaimed water is available, shallow wells shall be recognized as a source of water for irrigation purposes. Establish a City permit for shallow well installation by the end of 2008. 21.5.2 The City's building code shall include the requirement for water conserving fixtures in newly constructed or remodeled buildings. ***** 6 Ordinance 7950-08 • • 21.5.5 The City e~£4earwatef shall maintain its current Water Restriction Ordinance. ***** 21.5.7 Reclaimed water service will continue to be extended to private residences based on the Twenty (20) Year Reclaimed Water Master Plan. 21.5.8 The Citv will continue to develop strategies aimed at reducin potable water consumption by means such as water conservation rates, conservation codes, operational measures, rebate and plumbing retrofit programs, landscape and irrigation efficiency programs, research and evaluation, and re-use alternatives. 21.5.9 The City will expand, in coordination with other stakeholders, educational programs to promote water conservation measures. 21.6 Objective -Continue to ai4chieve effective coordination with other government agencies to solve problems of an extraterritorial nature with cooperation and in conjunction with the Southwest Florida Water Management District. ***** 21.6.2 Continue to cooperate with the Southwest Florida Water Management District and Tampa Bay Water in developing environmental and hydrologic data that will identify safe and reliable potable water yields in existing and future well-fields. 21.6.3 Continue to cGoordinate with appropriate local, State, regional and Federal agencies in implementing the water system plan. *~*** 21.6.5 Ensure consistency with the actions defined within the Regional Water Supply Plan prepared by the Southwest Florida Water Management District. 21.6.6 The City will maintain a Water Supply Facilities Work Plan that is consistent with the Southwest Florida Water Management District's Water Supply Plan by updating the work Plan within 18 months of an update to the District's Regional Supply Plan that affects the City. 21.7 Objective -Continue to protect all natural recharge areas having functional hydrological characteristics. ***** Ordinance 7950-08 • • 21.7.2 The City ef-GI°^eT shall include incentives in the Community Development Code for the protection of natural groundwater aquifer recharge areas as identified in the Conservation Element of the Clearwater Comprehensive Plan. 21.7.3 The City ef--Sleafwatef shall continue to protect groundwater quality by enforcing the Wellhead Protection Ordinance within the area specified on Map D-2. Guidelines and criteria for protection of potable water wellfields include: 1. Issuance of a Permit al A wellhead protection permit shall be obtained from the engineering director for any new business, commercial, industrial or other nonresidential activity on property within the city if any portion of the subject property is within 1,000 feet of a potable water well. New residential construction on property located within the city should also obtain a permit if any portion of the subject property is within 100 feet of potable water well. 2. Permit Requirements: (a) Activities within a 1,000-foot radial distance around a potable water supply well shall conform to the requirements of Chapter 62-521, F.A.C., Wellhead Protection. fib) Activities defined as potentially high risk to ground water quay in Chapter 62-555.312, F.A.C. shall not be permitted within 100 feet of an existing potable water supply well. (c) Activities defined as a moderate risk to ground water quality in Chapter 62-555.312, F.A.C. shall not be permitted within 50 feet of an existing potable water supply well. d) If any contaminating material is proposed to be used or stored for any business, commercial, industrial or other nonresidential use within 1,000 feet of a potable water supply well, aprotection- containment plan shall be submitted. If any contaminating material is proposed to be used or stored for residential use within 100 feet of a potable water supply well, aprotection-containment plan shall be submitted. Ordinance 7950-08 • • (e) A wellhead protection permit application shall at a minimum include a location map of the potable water well and 1,000 feet surrounding the well, plans for the proposed development or expansion/change of an existing use (if applicable), the location and identification of existing uses in a 1,000-foot zone for a commercial use application or a 100-foot zone for a residential use application, a listing of any contaminating material to be used or stored on the site and aprotection-containment plan if necessary. 3. Permit Review ~a) In reviewing a protection-containment plan submitted by an applicant for a wellhead protection permit, the following factors shall be considered when determining the sufficiency of the plan: 11 The amount. character and intended use of the contaminating material involved; ~2) Storage, conveyance and handling techniques to be employed by the applicant; ~3) The extent of any propensity to spill, break, lose or discharge contaminating material; ~4) The type of containment devices to be employed; ~5) The extent of employee safety training and practices; and ,~6) Any other consideration appropriate to the protection of the wellhead. bl No wellhead protection permit shall be issued unless the protection-containment plan and permit application fully addresses all contamination and safety matters to the satisfaction of the engineering director. A wellhead protection permit may be issued subject to conditions related to the protection of the public potable water supply. Ordinance 7950-08 CURLEW RD. ••""'• curt ~~ «~ s ~ NORTHSIpE U,. ~I i MICHIGAN BLVD ~ DR ~ Mexico W v DR Q J ~ ~ •..~ a m ~°' a ... .... ~y ~ DUNEDIN y ~ SOLONAVE ~~ o x z J ~ a g ~ SR-580 Q •--' SAN CHRISTOPHER DR ' 1 SR-560 ..................... ~P\~ S ..~ ..... '~' A '~', VIRGINIA ST Ads ' ~ ~~ ©,p RD. O ENTERPRISE ~ VIRGINIA R~~r,RR,PR o 3 ~ ~; Q W ~ `\~_ ''r 0 Q ~ W 1 Q ....................... W ............................. UNION ST..... m ~ ~ UNION ti ~ r We J 1 W W ~ I~ON'fCLA1R RD. W p0 Q Y O y SUNSET POINJ i OO RD. SUNSET POfNT ~~ ~ ~ I h .E-.. ..o t ~2 .j :~ VSL ~~ MAIN ST. RD. 3q SBo OLDSMAR h ~~ o eZ00'F I .,~pIJI`Illl)(~~~,~ T SR-590 J '~ a QoQ R0 ....~0 ........................... PALMETTO ST. ~ O i ~' ~ l o PALMETTO w l~ ~~ c~, G W 1 ~- G Il ~ - y 4 Sys R~9< ui m ~ ~ 8pV 0 0 > E ~~p s~ ¢ DREW ST a ~ DREW ST ~ CLEVELAND ST _ Z 9'~ o l ~ 11 ~~ a ~ Q ~ ~~ 1 J z ~ ~i COUrtr ~ ~ a .. ~, , .,~-- SR 60 Y COURT ST GULF TO BAV BLVD. °`"i Clearwater cHESrNUr ~~~~~~~' ;~ 0 ~ " ' " ~ sR-fio ,1~~ ~ _ ;, ~, Harbor W ~If~llil l~'i~ : _ ~ - -. " _ ~d~ C DRUID i RD. J~Q~ y 20 W ~ /~, , . ' (0 07 ~ W W W .z K _ -, ......... W ~ ti ~ ~ C IY J O ~ ~ ~ ~ L LAKEVIEW RD. ~ ti9 y D W ~D ~ Q ~ Z ~ W ~ W y BLVD. ~ ~ N ~ ~, W 5 W r ~ ~ m BELLEV~W ? p~ m ~ Y = W ~' A ~O i 0 ~ Q y T g NURSERY m RD. OGl W E ¢ ~ ~ m I BELLEAIR BELLEAIR RD. S •.... .. ....... •~ti: ~. .........'. .. ........ ........ .................... ............................... ... r... LARGO ..................................................... Scale: N.T.S. r• Potable Water Wells and Wellhead Protection Zones Map #: D-2 Date: 812912008 Source:ClearwaterEngineering De~IJu1200E Legend ® IN SERVICE WELL ;Wellhead Protection Zone ;..:Clearwater Planning Area Outside Clearwater City Limits L Prepared by: Englneadnp Department learwater,o SBMyAIelAvaeClearwater,'FL33766 ~ Ph: (7211662-0760, Fax: (72716264766 www. MyCI ea rwatar.com Disclaimer Public in/ormation data is lurnished by the City o/ Clearwater Engineering Department, and must be accepted end used by the recipient with the understanding that the data received was collected for fhe purpose of developing a graphic infrashucfu2 inventory. As such, the City o/ Cleanvatt makes n0 warranties, expressed or implied, concerning fhe accuracy, completeness, reliability, or suitability of this date for eny other particular use. Furthermore, fhe City of C/earwaterassumes noliability whatsoever assoaated with the use or misuse of such data. CURLEW RD. ••""'• ...... SR Sas ' ~~ OLDSMAR Gulf NOR7H5lDE Of MICHfGAN BLVD a DR. Mexico W v DR' a ...; ly m :° a ... .... ~y ~ DUNEDIN j SOLONAVE ~~ o _ ~ J' t, d g SR-580 Q ... SAN CHRISTOPHER DR ~a. SR-580 my ..................... PAP gT. ...~...., N~RVgIDE ¢ ' ~' OpU ~ 3 z VIRGINIA ST ~~~ ~!N WOOD ~, c r~. ~ RD. :E.. ' -p ENTERPRfSE ••~ 0 ' 1 '' ~ > VIRGINIA RE~agR1P~ ~ ~ ' ~ , o ~ j q .g7:......~........ r ;m ~ ~ y 4i ~ W ~~• > W - ~.Wi ~ Q ~ a Q Z Q .j . ~ ' O ; v ' ........................ UNION ST. .g ~ ............................. UNION ST.....: m ~ ~ ~ , rude J T W W ~ ~~CLAIR RD. ~ 0 ~ ~ Y o ~ J 0 ~ MAIN ST. W SUNSET POINT ~ ORD. SUNSET POINT RD o I ~' l ICI {O~ OLF Y g ~jIJLIV~~~t~ W 0 y BA ~ v o ~e~Q = ~ ~ SR-590 , 00'F I ~O1~~~~~~~~~ i ? ~AhOfl(I(J mil, . ~ . . PALMETTO ST ` O PALMETTO w P~ ~=~~If ~r IC%~~ ~~ W 0 ~ 0 S ~i0'Qi ~ ~ W ~ ~ ~ ' ' ~ ~ ` ' m OPC~t~ I ~ ~ ~ `' ~~- Z G h O Asa quo > m _ E ¢ gPV ~~p SQL Q DREW ST ~ ~ - DREW ST. CLEVELAND ST _ II ~ ,' ~ •' 2 ~ I ~ ~y ~ r ~' COURT {'~--_ SR-60 Y COURT S7, GULF TO BAY BLVD. ~ III ~~ OO ~ - `- ~ I SR-60 I --~,~"~-- ~ r Clearwater cHESrNUr ~~ 1 _~-'-' -- Harbor W -~' I~~IppII d~ a DRUID '.fI~F - ~ ' ~ ~ RD. ~ Q ~ ~ G .......~•....i ~ J 5 ~ ~ ~, 0 LAKEVIEW RD. w yq,9 h D o a ti Q ~ z ~ W 2 BLVD. ~ o N W W '' a °' W ~ ¢ W ~ T m ' BECLEV%EW ? o ~ m ~ Y Y ~ ° m ' ~ ~ ~ w _! n 0 w ~~ = g NURSERY m RD. ,7 ~ f Y ~ W E m BELLEAIR BELLEAlR RD. S ......... ~~~Pd:r ........'.., .~ .. ........ ......... .................... ,v,.. ^ ............................... ... f... LARGO ..................................................... Scale: N.T.S. Potable Water Wells and Wellhead Protection Zones Map #: D-2 Date: 8!2912008 Source: Clearvrater Engineering DeptIJu12008 Legend o IN SERVICE WELL _ ;Wellhead Protection Zone .. ;Clearwater Planning Area Outside Clearwater City Limits a Prepared by: Clearwater,boSeMy rtlelAveeCDnaloOyDIFLl39766 IJ,v vV~,\~ Ph:17 27166 2-07 60, Fax: 172716261766 www.MyClearwateccom asclaimer Public inlormation data is /urnished by the City of Clearwater Engineering Department, and must be accepted and used by the recipient with the understanding That the data received was collected for the purpose of daveloping a graphic in/rastructure inventory. As such, the City of Cleerwate makes no warranties, expressed orimplied, cronceming the accuracy, completeness, reliability, or suitability o/this data /or any other particular use. Furthermore, the City of Clearwater assumes no liability whatsoever associated with the use or misuse of such data. • • MOTION TO AMEND EXHIBIT A OF ORDINANCE N0.7950-08 ON SECOND READING Amend Exhibit A of Ordinance No. 7950-08 as follows. Objective 21.1 is amended as follows: 21.1 Objective - To maintain adequate Levels of Service for existing and future populations through the year 2018 X8-15. Policy 21.2.1 is amended as follows: 21.2.1 Ensure that land development regulations, building codes and City ordinances adequately address water system provisions by performing a thorough evaluation of City codes and by coordinating proposed provisions with Pinellas Coun ,Tampa Bay Water, the Southwest Florida Water Management District and Florida Department of Environmental Protection. Policy 21.2.6 is amended as follows: 2-1.2.6 The City. shall continue to participate with and assist the Southwe_s~Fl.orida -ateS. Management District, Pinellas County Health Department, ~ampa Bay Water, ~d the U.S. Environmental Protection Agency in developing`i~o-vat-iw~ tec:f~es to augment existing water supplies to provide for firture needs. Policy 21.2.7 is amended as follows: 21.2.7 Continue to identify, acquire, and develop sources of water supply and methods of water treatment to meet existing and future needs. Some ways this can be accomplished are through well rehabilitation projects and/or exploration and drilling of new wells. Some type of water treatment may be initiated. Additional . volumes of water may be acquired from the Pinellas County Water System through Clearwater's intergovernmental water service agreement. The City's long range Water Master Plan updated in 2008 4 shall serve as the guiding document for water supply and treatment methods. ~~ Add new Policy 21.2.11 to read as follows: 21.2.11 Encourage the development of local and regional water supplies within the 2 [~ ~, jurisdiction of the Southwest Florida Water Management District to avoid / ' transportin surface water across other district boundaries. v Add new Policy 21.4.6 to read as follows: 21.4.6 Encourage partnerships among_federal state local governments and the private sector that would identifYand build needed potable water facilities and allocate such facilities costs among the partners in proportion to the benefits accruing, to each of them. Policy 21.5.7 is added to ordinance 7950-08 and amended as follows: 21.5.7 Reclaimed water service will continue to be extended to private residences based on the Twenty (20) Year Reclaimed Water Master Plan. -1- t ~. s • Add new Policies 21.5.8 and 21.5.9 to read as follows: 21.5.8 The City will continue to develop strategies aimed at reducingpotable water consumption by means such as conservation codes, operational measures, plumbing retrofit programs landscape and irrigation efficiency programs, research and evaluation, and re-use alternatives. 21.5.9 The City will expand, in coordination with other stakeholders, educational programs to promote water conservation. measures. Policy 21.6.5 is amended as follows: 21.6.5 Ensure consistency with the actions defined within the Regional Water Supply Plan prepared by the Southwest Florida Water Management District. Add new Policy 21.6.6 to read as follows: 21.6.6 The City wi11 maintain a Water Supply Facilities Work Plan that is consistent with the Southwest Florida Water Management District's Water Supply Plan by updating the work plan within 18 months of an update to the District's Re i Supply Plan that affects the City. Policy 21..7.3 is amended as follows: 21.7.3 The City shall continue to protect groundwater quality by enforcing the Wellhead Protection Ordinance- within the area specified on Map D-2. Guidelines and criteria for protection of potable water wellfields include: L Issuance of a Permit al A wellhead protection permit shall be obtained from the engineering director for any new business, commercial, industrial or other nonresidential activi on property within the ci if any portion of the subject property is within 1,000 feet of a potable water well. New residential construction on property located within the city should also obtain a permit if andportion of the subject proper is within 100 feet of potable water well. 2. Permit Requirements: (a) Activities within a 1,000-foot radial distance around a potable water supply well shall conform to the requirements of Chapter 62-521, F.A.C., Wellhead Protection. fib) Activities defined as potentially high risk to ground water quality in Chanter 62-555.312, F.A.C. shall not be permitted within 100 feet of an existing potable water supply well. (c) Activities defined as a moderate risk to ground water quality in Chapter 62-555.312, F.A.C. shall not be permitted within 50 feet of an existing~potable water supply well. -2- • M d) If anv contaminating material is proposed to be used or stored for anv business commercial, industrial or other nonresidential use within 1000 feet of a potable water supply well aprotection-containment plan shall be submitted. If anv contaminating material is proposed to be used or stored for residential use within 100 feet of a potable water suppler a protection-containment plan shall be submitted. ~) A wellhead protection permit application shall at a minimum include a location map of the~otable water well and 1 000 feet surrounding the well plans for the proposed development or expansion/change of an existing use (if applicable), the location and identification of existing uses in a 1,000-foot zone for a commercial use application or a ] 00-foot zone for a residential use application a listing of any contaminating material to be used or stored on the site and aprotection- containment plan if necessary. 3. Permit Review (a) In reviewing aprotection-containment plan submitted by an applicant for a wellhead protection permit, the following factors shall be considered when determining the sufficiency of the plan: 11 The amount, character and intended use of the contaminating material involved_ (2) Storage conveyance and handling techniques to be emplo~d b t~pplicant; (3) The extent of any propensity to spill, break, lose or discharge contaminating material; (4) The tape of containment devices to be employed; ~5) The extent of em~ployee safety training and practices; and ~) Any other consideration appropriate to the protection of the wellhead. b) No wellhead protection permit shall_ be issued unless the protection-containment plan and permit application fully addresses all contamination and safety matters to the satisfaction of the en ing Bering director. A wellhead protection permit maw be issued subject to conditions related to the protection of the public potable water supply. Add new Map D-2 Potable Water Wells and Wellhead Protection Zones (attached). Pamela K. Akin City Attorney September 18, 2008 -3- ,? • • !f CITY OF CLEARWATER Interdepartment Correspondence TO: Mayor and City Council FROM: Gina Clayton, Assistant Planning Director SUBJECT: Ordinance No. 7950-08 /Exhibit A, for the City's Water Master Plan to be Incorporated into the Utilities Element of the City's Comprehensive .Plan (City Case No. CPA2008-03002, DCA 08-RWSP1) DATE: September 5, 2008 This item was approved on first reading at the City Council meeting May 15, 2008 and was subsequently transmitted to the State Department of Community Affairs (DCA) for their review. On August 1, 2008, the City received from DCA their "ORC" report (objections, recommendations and comments) for this submittal. The Engineering and Planning Departments and Wade Trim, the City's consulting company for this project, have been working with DCA, SWFWMD and the County to address the recommendations from the ORC report. The following summarizes the report and our responses to it. A. Objections: 1. Lack of a Minimum Ten-year Planning Horizon. a. Response: Objective 21.1, changed year to "2018" to maintain adequate levels of service for existing and future populations. 2. Lack of Current Data and Analysis to support the Water Supply Plan. a. Response: Wade Trim has provided updated tables from .Pinellas County to support the plan -reviewed by SWFWMD to be consistent with the Regional Water Supply Plan 2006 update. 3. Lack of Policies Guiding Coordination with Southwest Florida Water Management District. a. Response: Policy 21.2.9 and new Policies 21.6.5 and 21.6.6 address this objection. 4. Inadequate Policy No. 21.7.3 (to include an updated wellhead protection area map based on supporting data and analysis). a. Response: Policy 21.7.3 has been revised to include the guidelines and criteria of the updated wellhead protection ordinance and a new Map D-2, Potable Water Wells and Wellhead Protection Zones, has been included. _. . ., ... .. ., _. .._ .. .__ ~ ,. f, ... .. i~~ << s • Page 2 Memo CPA2008-03002 B. Comments: The Department recommends that the City consider using the same per capita standard as the County. o Wade Trim has provided updated tables from Pinellas County to support the plan -has been approved by SWFMWD. SWFWMD recommends that further language to support water conservation should be developed by the City giving the location of the City within the Northern Tampa Bay Water Use Caution Area where groundwater is insufficient. o New policies 21.5.8 and 21.5.9 have been prepared to address this comment. The City should retain references to Tampa Bay Water (TBA) in Policies 21.2.1 (coordinate building code revisions) and 21.2.6 (assist efforts to augment existing water supplies and provide for future needs). o Policies 21.2.1 and 21.2.6 have been revised to retain TBA references as per the comment. The City should discuss in detail how the emergency interconnections operate with Pinellas County and the City of St. Petersburg and the amount of water committed to those interconnections. o The City has an /nterlocal Agreement with Pinellas County and 15 MGD is committed from Pinellas County. This is truly an emergency connection. A copy of the agreement will be provided to DCA. TI_ ..__ Ll. 1 ~ 1 I...__ _ 'll I L lI_ ~ iiNir i.~ ~i~i~aiPi~i~f -ir~ ~e~irF~r=iii-iP-ii .i~~~ ~~t) vr~~ririir_ !`r~ii~riiiir$f~ rw ~i~~ rr--• - ~ -•~- --..._.._ ~ City of St. Petersburg. Attached is a MOTION TO AMEND EXHIBIT A OF ORDINANCE NO. 7950-08 ON SECOND READING that includes the above changes, scheduled for the September 18, 2008 City Council Meeting. .. ~ ,. ,. ,. ,. . y... . ., ,. • Work Session Council Chambers -City Hall SUBJECT /RECOMMENDATION: • Page 1 of 1 Meeting Date:9/15/2008 Adopt Ordinance No. 7950-08 on second reading, making amendments to the Comprehensive Plan of the City by amending the utility element to update the City of Clearwater's Water Work Plan in accordance with the updated Southwest Florida Water District's Regional Water Supply Plan. SUMMARY: Review Approval: 1) Clerk http://msb-laser-app/CouncilAgendaBluesheet.aspx?ItemID=4152&MeetingID=183 9/15/2008 C.,over Memo • ~ 2i ORDINANCE NO. 7950-08 AN ORDINANCE OF THE CITY OF CLEARWATER, FLORIDA, MAKING AMENDMENTS TO THE COMPREHENSIVE PLAN OF THE CITY AS ADOPTED ON MAY 18, 2000 AND AMENDED ON JULY 12, 2001, OCTOBER 7, 2004, OCTOBER 20, 2005, DECEMBER 15, 2005, AUGUST 14, 2007, AND FEBRUARY 21, 2008; BY AMENDING THE UTILITY ELEMENT; IN ACCORDANCE WITH SECTIONS 163.3177, 163.3184, 163.3187 OR 163.3189, FLORIDA STATUTES, TO UPDATE THE CITY OF CLEARWATER'S WATER WORK PLAN IN ACCORDANCE WITH THE UPDATED SOUTHWEST FLORIDA WATER DISTRICT'S REGIONAL WATER SUPPLY PLAN; PROVIDING FOR SEVERABILITY; AND PROVIDING AN EFFECTIVE DATE; WHEREAS, the Local Government Comprehensive Planning and Land Development Regulation Act of Florida empowers and requires the City Council of the City of Clearwater to plan for the future development and growth of the City, and to adopt and periodically amend the Comprehensive Plan, including elements and portions thereof; and WHEREAS, the City of Clearwater adopted a Comprehensive Plan on May 18, 2000 by Ordinance Number 6522-00; and WHEREAS, the City Council approved Ordinance Number 6794-01, which amended the Comprehensive Plan of the City on July 12, 2001; and WHEREAS, the City Council approved Ordinance Number 7295-04, which amended the Comprehensive Plan of the City on October 7, 2004; and WHEREAS, the City Council approved Ordinance Number 7388-05, which amended the Comprehensive Plan of the City on October 20, 2005 and December 15, 2005; and WHEREAS, the City Council approved Ordinance Number 7782-07, which amended the Comprehensive Plan of the City on August 14, 2007; and WHEREAS, the City Council approved Ordinance Number 7870-07, which amended the Comprehensive Plan of the City on February 21, 2008; and WHEREAS, the City is making these changes to the Comprehensive Plan in accordance with statutory requirements; and WHEREAS, amendments to the Comprehensive Plan of the City have been prepared in accordance with the applicable requirements of law, after conducting the Ordinance No. 7950-08 • • appropriate planning analysis, and public participation through public hearings, opportunity for written comments, open discussion and the consideration of public and official comments; and WHEREAS, the Community Development Board, serving as the designated Local Planning Agency for the City, has held a public hearing on the proposed amendments and has recommended adoption of the proposed Comprehensive Plan amendments; and WHEREAS, the proposed amendments have been transmitted to the Florida Department of Community Affairs for review and comments, and the objections, recommendations and comments received from the Florida Department of Community Affairs have been considered by the City Council, together with all comments from local regional agencies and other persons, in preparing the final draft of the amendments; and WHEREAS, the City Council finds it necessary, desirable and proper to adopt the amendments to the objectives and policies of the Comprehensive Plan in order to reflect changing conditions; now, therefore, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CLEARWATER, FLORIDA: Section 1. Amendment to the Clearwater Comprehensive Plan attached hereto as Exhibit "A" is hereby adopted. Section 2. Severability. If any section, provision, clause, phrase, or application of this Ordinance shall be declared unconstitutional or invalid for any reason by a court of competent jurisdiction, the remaining provisions shall be deemed severable therefrom and shall remain in full force and effect. Section 3. This ordinance shall become effective when the Department of Community Affairs (DCA) issues a final order determining the adopted amendment to be in compliance, or the Administration Commission issues a final order determining the adopted amendments to be in compliance, in accordance with Section 163.3177, 163.3184, 163.3187 or 163.3189, F.S., as amended. PASSED ON FIRST READING May 15, 2008 Ordinance 7950-08 • PASSED ON SECOND AND FINAL READING AND ADOPTED Approved as to form: Leslie K. Dougall-Sides Assistant City Attorney • Frank Hibbard Mayor-Councilmember Attest: Cynthia E. Goudeau City Clerk Ordinance 7950-08 i ~ ~~: ~~ i ~ C ~ EXHIBIT A ~~ ATTACHMENT TO ORDINANCE 7950-08 ~ AMENDMENT -UTILITY ELEMENT GOALS, OBJECTIVES AND POLICIES Amend Goal 21 of the Utility Element of the Comprehensive Plan, as follows: POTABLE WATER AND NATURAL GROUND WATER AQUIFER RECHARGE 21. GOAL -PROVIDE, DEVELOP, AND MAINTAIN A PERMANENT POTABLE WATER SUPPLY SYSTEM TO MEET ANTICIPATED DEMAND WHILE PROVIDING MAXIMUM PRACTICAL PROTECTION TO THE ENVIRONMENT AT A COST CONSISTENT WITH THE PUBLIC'S ABILITY AND WILLINGNESS TO PAY. 21.1 Objective - To maintain adequate Levels of Service for existing and future populations through the year 2018 ~Aa-A. ***** 21.2 Objective -Provide adequate quantities and qualities of water service to all customers of the Clearwater service area. Current service level (July, 2007 ~9) is 40,390 A customer accounts (potable, reclaimed and fire). Policies 21.2.1 Ensure that land development regulations, building codes and City ordinances adequately address water system provisions by performing a thorough evaluation of City codes and by coordinating proposed provisions with the Southwest Florida Water Management District1 a~ Florida Department of Environmental Protection, Pinellas County, and Tampa Bay Water. 21.2.2 ~e Engineerinq shall analyze the condition and adequacy of any water distribution system that the City may inherit through annexation and prepare cost estimates for upgrading those systems to meet City requirements. 21.2.3 When new subdivisions are being developed, it shall be the responsibility of the developer to provide internal potable water and reclaimed water systems which are constructed to City specifications. 4 Ordinance 7950-08 • • ***** 21.2.5 Continue. to dsevelop a system and construct improvements which will conserve energy, water, and other valuable resources. 21.2.6 The City shall continue to participate with and assist Tampa Bay Water, the Southwest Florida Water Management District, Pinellas County Health Department, and the U.S. Environmental Protection Agency in developing innovative techniques to augment existing water supplies to provide for future needs. 21.2.7 Continue to identify, acquire, and develop sources of water supply and methods of water treatment to meet existing and future needs. Some ways this can be accomplished are through well rehabilitation projects and/or exploration and drilling of new wells. Some type of water treatment may be initiated. Additional volumes of water may be acquired from the Pinellas County Water System through Clearwater's intergovernmental water service agreement. The City's long range Water Master Plan updated in 2008 shall serve as the guiding document for water supply and treatment methods. Teeen#fy-Beep-su~+tted- ;~~u~'.~-~;--lam-rat~~e~etely n , , .,.,a +~o.,+.,,,o.,+ ~~ V ~(~ 21.2.8 ncourage the development of local and regional water supplies ~" Management to avoid transporting surface water across other district boundaries. . nsure that water management projects are designed and operated to maintain and enhance natural systems as well as man made systems by working closely with the Southwest Florida Water Management District when proposing new projects and water management programs. The City's long term Water Supply Master Plan outlines a work plan for continued coordination with the Southwest Florida Water Management District's Regional Water Supply Plan adopted in December 2006. 0 . Water service shall not be extended to properties outside the City's service area unless sufficient capacity and quality of water exists to serve the areas already committed to City service. 22.11 Water service shall not be extended except in those areas o designated for City of Clearwater by interlocal or other agreement. Ordinance 7950-08 • • '~.' `~ `1 .7 1 1 ~ntin~ ~o }n rlevclnn m inli~cr) nhn4 nr~or~+nrc ~~iFin mco4 appli6al3~° °rc~ciinvurrc~rS-aiv-SeFtifin~+irirr9F~z°-r~6 H1a~clrTll~e- ~k}c n~r~ior~nv nr~rJ effc n}ive nccc of 4hc }rc~4mon} nrnnccc 21.3 Objective -Continue to maintain the water system in a safe, sound, and efficient manner on a daily basis. Policies 21.3.1 The Public Utilities Department , Water Division, shall monitor water quality and the operation of the water distribution system with the intent of repairing and replacing deficient portions of the system within the framework of the capitalized budgeting process. ***** 21.4.5 The City shall continue to refine the inverted rate structure for residential water meters, lawn meters and all other water meters permitted by the Water Division of the Public Utilities Department 1A/nrL~+ 4rlminie}roFinn 21.4.6 Encourage partnerships among federal, state, local governments, and the private sector that would identify and build needed potable water facilities and allocate such facilities costs among the partners in proportion to the benefits accruing to each of them. 21.5 Objective -Continue to dsevelop a potable water system that is compatible with the environment and seeks to conserve and protect sensitive natural resources. Policies 21.5.1 Except for areas of the City where reclaimed water is available, shallow wells shall be recognized as a source of water for irrigation purposes. Establish a City permit for shallow well installation by the end of 2008. 21.5.2 The City's building code shall f~+~edi#+ed~e include the requirement for water conserving fixtures in newly constructed or remodeled buildings. ***** 21.5.5 The City shall maintain its current Water Restriction Ordinance. ***** Ordinance 7950-08 • • 21.5.7 Reclaimed water service will continue to be extended to private residences based on the Twenty (20) Year Reclaimed Water Master Plan. 21.5.8 The Citv will continue to develop strategies aimed at reducin potable water consumption by means such as water conservation rates, conservation codes, operational measures, rebate and plumbing retrofit programs, landscape and irrigation efficiency programs, research and evaluation, and re-use alternatives. 21.5.9 The City will expand, in coordination with other stakeholders, educational programs to promote water conservation measures. 21.6 Objective -Continue to a~4chieve effective coordination with otf~er government agencies to solve problems of an extraterritorial nature with cooperation and in conjunction with the Southwest Florida Water Management District. ***** 21.6.2 Continue to cooperate with the Southwest Florida Water Management District and Tampa Bay Water in developing environmental and hydrologic data that will identify safe and reliable potable water yields in existing and future well-fields. 21.6.3 Continue tordinate with appropriate local, State, regional and Federal g ncies in implementing the water system plan. ***** 21.6.5 Water Su I Plan re ared b the Southwest Florida- ater Management District. 21.6.6 The City will maintain a Water Supply Facilities Work P an that is consistent with the Southwest Florida Water Management District's Water Supply Plan by updating the work Plan within 18 months of an update to the District's Regional Supply Plan that affects the City. 21.7 Objective -Continue to protect all natural recharge areas having functional hydrological characteristics. ***** W~ ~,~ ~i`~" ~• {'~ w~ Ordinance 7950-08 • i 21.7.2 The City e#-GIea~nrater shall include incentives in the Community Development Code for the protection of natural groundwater aquifer recharge areas as identified in the Conservation Element of the Clearwater Comprehensive Plan. 21.7.3 The City shall continue to protect groundwater quality by enforcing the Wellhead Protection Ordinance within the area specified on Map D-2. Guidelines and criteria for protection of potable water wellfields include: 1. Issuance of a Permit a) A wellhead protection permit shall be obtained from the engineering director for any new business, commercial, industrial or other nonresidential activity on property within the city if any portion of the subject property is within 1,000 feet of a potable water well. New residential construction on property located within the city should also obtain a permit if any portion of the subject property is within 100 feet of potable water well. 2. Permit Requirements: ~a) Activities within a 1,000-foot radial distance around a potable water supply well shall conform to the requirements of Chapter 62-521, F.A.C., Wellhead Protection. (b) Activities defined as potentially high risk to ground water quality in Chapter 62-555.312, F.A.C. shall not be permitted within 100 feet of an existing potable water supply well. (c) Activities defined as a moderate risk to ground water quality in Chapter 62-555.312, F.A.C. shall not be permitted within 50 feet of an existing potable water supply well. d) If any contaminatina material is proposed to be used or stored for any business, commercial, industrial or other nonresidential use within 1,000 feet of a potable water supply well, aprotection- containment plan shall be submitted. If any contaminating material is proposed to be used or stored for residential use within 100 feet of a potable water supply well, aprotection-containment plan shall be submitted. Ordinance 7950-08 • • (e) A wellhead protection permit application shall at a minimum include a location map of the potable water well and 1,000 feet surrounding the well, plans for the proposed development or expansion/change of an existing use (if applicable), the location and identification of existing uses in a 1,000-foot zone for a commercial use application or a 100-foot zone for a residential use application, a listing of any contaminating material to be used or stored on the site and aprotection-containment plan if necessary. 3. Permit Review (a) In reviewing a protection-containment plan submitted by an applicant for a wellhead protection permit, the following factors shall be considered when determining the sufficiency of the plan: 11 The amount. character and intended use of the contaminating material involved; (2) Storage, conveyance and handling techniques to be employed by the applicant; (3) The extent of any propensity to spill, break, lose or discharge contaminating material; (4) The type of containment devices to be employed; (5) The extent of employee safety training and practices; and (6) Any other consideration appropriate to the protection of the wellhead. b) No wellhead protection permit shall be issued unless the protection-containment plan and permit application fully addresses all contamination and safety matters to the satisfaction of the engineering director. A wellhead protection permit may be issued subject to conditions related to the protection of the public potable water supply. Ordinance 7950-08 • Comprehensive Plan Citizen Courtesy Information List CPA2008-03002 (Ordinance No. 7950-08) Local Government: City of Clearwater Hearing Date: September 18, 2008 Type Hearing: City Council Adoption Hearing DCA Amendment Number: DCA 08-RWSP1 ~~cao~c~ai use> Please Print Clearly By providing your name and address you will receive information concerning the date of publication of the Notice of Intent by the Department of Community Affairs. Over for more spaces • • Comprehensive Plan Citizen Courtesy Information List CPA2008-03002 (Ordinance No. 7950-08) Local Government: City of Clearwater Hearing Date: May 15, 2008 Type Hearing: City Council Transmittal Hearing DCA Amendment Number: (DCAOfficialUse) Please Print Clearly By providing your name and address you will receive information concerning the date of publication of the Notice of Intent by the Department of Community Affairs. Over for more spaces • • Comprehensive Plan Citizen Courtesy Information List CPA2008-03002 (Ordinance No. 7950-08) Local Government: City of Clearwater Hearing Date: April 15, 2008 Type Hearing: Community Development Board DCA Amendment Number: (DCAO~cialUse) Please Print Clearly By providing your name and address you will receive information concerning the date of publication of the Notice of Intent by the Department of Community Affairs. Over for more spaces MeetingAgenda 1. Presentations 1.1 Service Awards • • WORK SESSION AGENDA Council Chambers -City Hall. 9/15/2008 -1:30. PM Attachments 1.2 Police Recruit Swearing In L~ Attaclnnents Page 1 of 5 2.Office of Management and Budget 2.1 Adopt Ordinance No. 8004-08 on second reading, declaring the millage rate to be levied for the fiscal year beginning October 1, 2008 and ending September 20, 2009, for operating purposes including the funding of pensions, debt service and road maintenance for capital improvement expenditures at 4.7254 mills. Attachments 2.2 Adopt Ordinance No. 8005-08 on second reading, adopting an operating budget for the fiscal year beginning October 1, 2008 and ending September 30, 2009; authorizing the City Manager to issue such instructions that are necessary to achieve and accomplish the service programs so authored; authorizing the City Manager to transfer monies and programs among the departments and activities within any fund as provided by Chapter 2 of the Clearwater Code of Ordinances. Attachments 2.3 Adopt Ordinance No. 8006-08 on second reading, adopting the Capital Improvement Program budget for the fiscal year beginning October 1, 2008 and ending September 30, 2009; approving the six-year Capital Improvement Program which shall be reevaluated at the beginning of each fiscal year; authorizing the City Manager to issue such instructions that are necessary to achieve and accomplish the capital improvements so authorized; authorizing the City Manager to transfer money between projects in the Capital Improvement Program; appropriating available and anticipated resources for the projects identified. Attachments 2.4 Amend the City's fiscal year 2007/08 Operating and Capital Improvement Budgets at Third Quarter and pass Ordinances 7995-08 and 7996-08 on first reading. Attachments 3. Economic Development and Housing 3.1 Approve an Agreement with the Clearwater Regional Chamber of Commerce (CRCC) for tourism services in Fiscal Year 2008-2009 in return for funding in the amount of $190,000 and authorize the appropriate officials to execute same. (consent) Attachments 4. Financial Services http://msb-laser-app/CouncilAgenda/MeetingAgenda.aspx?meetingid=183 9/16/2008 MeetingAgenda Page 2 of 5 4.1 Approve a not to exceed~ount of $500,000, to pay Gallagher Batt Services, Inc., for workers' compensation claims due and payable for the period October 1, 2008 to September 30, 2009. (consent) Attachments 4.2 Award a contract to The Bancorp Bank/dba Mears Motor Leasing to provide a $30,000,000 line of credit to cover all planned lease purchase of equipment acquired in the next five fiscal years starting October 1, 2008, authorize all uncompleted equipment acquisitions previously approved for financing under the current agreement with SunTrust to be financed under this new agreement, authorize the appropriate officials to execute the same, and adopt Resolution 08-23 authorizing the City to be reimbursed from tax-exempt proceeds. Attaclunents 4.3 Approve payment of insurance premiums up to $665,000, with effective dates beginning October 1, 2008 to September 30 2009, and authorize the appropriate officials to execute same. (consent) Attacl~unents 5. Gas System 5.1 Approve the second and final renewal of the contract (Purchase Order)with Mastec North America, Inc., 7221 East Martin Luther King Jr. Boulevard, Tampa, FL for the period October 1, 2008, to September 30, 2009, for the Installation of Gas Mains and Service Lines in the amount of $1,098,750 and authorize the appropriate officials to execute same. (consent) Attachments 6. Parks and Recreation 6.1 Award a contract to Purvis Curbs of Largo, Florida for $200,000 for materials and labor to install various concrete projects throughout the year (Bid 33-08)and authorize the appropriate officials to execute same. (consent) Attaclunents 7. Police 7.1 Approve assignment of the Hispanic Outreach Center Lease Agreement with YWCA of Tampa Bay to Pinellas Core Management Services, Inc.; terminate YWCA contracts providing 1) Operacion Apoyo Hispano services, 2) Human Trafficking advocacy services and 3) Human Trafficking Immersion training and approve contracts with Pinellas Core Management Services to provide these services using funding remaining in the 2006 Edward Byrne Memorial Justice Grant, the 2006 Bureau of Justice Assistance Grant for Human Trafficking and the 2008 Bureau of Justice Human Trafficking Immersion Learning Grant and authorize the appropriate officials to execute same. (consent) Attachments 7.2 Approve acceptance of a FY 2008 U.S. Department of Justice, Bureau of Justice Assistance (USDOJBJA) Edward Byrne Memorial Justice Assistance grant in the amount of $30,414 to fund the purchase of Tactical Weapons Illuminators and Holsters. (consent) Attachments 8. Solid Waste/General Support Services 8.1 Award a Contract (Blanket Purchase Order) for $530,000 to M/A-COM Private Radio Systems of Lynchburg, VA for the Quarterly Payments during the period of 10/01/08 through 9/30/10 toward the 20 Year Maintenance Agreement approved by Council on June 20, 2002 and authorize the http://msb-laser-app/CouncilAgenda/MeetingAgenda.aspx?meetingid=183 9/16/2008 MeetingAgenda • Page 3 of 5 appropriate officials to e~te same. (consent) Attachments 9. Engineering 9.1 Accept a Water Main and Hydrant Easement containing 5,075 square feet, more or less, conveyed by Mary Salinas Huber, as Trustee of the Church of Scientology Religious Trust, over, under and across a portion of OAK COVE, A COMMERCIAL CONDOMINIUM (COMMON ELEMENT), in consideration of receipt of $1.00 and the benefits to be derived therefrom. (consent) Attachments 9.2 Approve an amendment to the lease with COTEL Inc., LLC to increase the rent by $14,700 annually, 'for a new annual total of $44,100 and authorize appropriate officials to execute same. (consent) Attachments 9.3 Approve amendment to the Interlocal Agreement between Pinellas County and its NPDES Co- . Permittess for the design, implementation, operation and maintenace of the ambient water quality monitoring program at a cost to the City of $36,000. (consent) (~ Attachments 9.4 Approve a contract to Thompson Well anad Pump, Inc. of Deland, Florida, for the construction of 13 wells including aquifer testing of 3 wells for Reservoir 2 - RO Plant Project (06-0055-UT) in the amount of $790,526.31, which is the lowest responsible bid in accordance with specifications and authorize the appropriate officials to execute same. (consent) Attachments 9.5 Accept a 242 square foot Drainage & Utilities Easement conveyed by Nicholas J. Southard and Betty A. Southard, over, under and across a portion of Lot 16, FAIR OAKS SUBDIVISION FIRST ADDITION, in consideration of receipt of $1.00 and the benefits to be derived therefrom. (consent) Attachments 10. Planning 10:1 Approve a Future Land Use Plan Amendment from the Residential Medium (RM) Category to the Recreation/Open Space (R/OS) Category, and a Zoning Atlas Amendment from the Business (B) District to the Open Space/Recreation (OS/R) and Preservation (P) Districts for property located at 1551 Gulf Boulevard (consisting of a portion of Section 19, Township 29 South, Range 15 East in Metes and Bounds 43/01); and Pass Ordinances 7973-08 and 7974-08 on first reading. (LUZ2008- 05002) Attachrr~ents 10.2 Approve a Zoning Atlas Amendment from Business (B) District to the High Density Residential (HDR) and Preservation (P) Districts for property located at 1170, 1180, 1200, and 1226 Gulf Boulevard (consisting of a portion of Section 17, Township 29 South, Range 15 East in Metes and Bounds 33/021 and Pass Ordinance 7976-08 on first reading.(REZ2008-05003) Attachments 10.3 Approve a Zoning Atlas Amendment from Business (B) District to the High Density Residential (HDR) District for property located at 1520, 1540, and 1560 Gulf Boulevard (consisting of a portion of Section 19, Township 29 South, Range 15 East and Pass Ordinance 7977-08 on first reading. (REZ2008-05004) Attachments 10.4 Approve a Zoning Atlas Amendment from Business (B) District to the Medium Density Residential http://msb-laser-app/CouncilAgenda/MeetingAgenda.aspx?meetingid=183 9/16/2008 M_ eetingAgenda Page 4 of 5 (MDR) and Preservation Districts for property located at 1501~1f Boulevard (consisting of a portion of Section 19, Township 29 South, Range 15 East in Metes and Bounds 43/01 and Pass Ordinance 7978-08 on first reading. (REZ2008-05005) (~ Attachments 10.5 Short-Term Rental Policy Update (WSO) L~ Attachments 11. City Manager 11.1 Report on negotiations regarding public -private beach parking garage. Attachments 12.Official Records and Legislative Services 12.1 Approve amendments to Sections 2.061 through 2.069, Advisory Board Generally and delete Article 2, Divisions 3 and 4, Beautification Committee and Community Relations Board in their entirety and pass Ordinance 8003-08 on first reading. Attachments 13. Legal 13.1 Adopt Ordinance No. 7929-08 on second reading, amending Appendix A, Article 25 regarding Solid Waste rolloff container fees. Attachments 13.2 Adopt Ordinance No. 7950-08 on second reading, making amendments to the Comprehensive Plan of the City by amending the utility element to update the City of Clearwater's Water Work Plan in accordance with the updated Southwest Florida Water District's Regional Water Supply Plan. Attachments 13.3 Adopt Ordinance No. 7984-08 on second reading, amending Chapter 2, Article IV, Division 4, Code of Ordinances, regarding employee travel. Attachments 13.4 Adopt Ordinance No. 7997-08 on second reading, amending the Community Development Code to adopt criteria by which sandwich board signs may be permitted in certain areas, providing a fee for such signage, and making other minor editorial changes. Attachments 13.5 Royalty Theater Attachments 14. City Manager Verbal Reports 14.1 City Manager Verbal Reports (~ Attachments 15. Council Discussion Items 15.1 Sandwich Boards on the Beach Attachments 16. Other Council Action 16.1 Other Council Action http://msb-laser-app/CouncilAgenda/MeetingAgenda.aspx?meetingid=183 9/16/2008 MeetingAgenda • Page 5 of 5 L~- Attachments • ' 17. Adjourn 18. Presentation(s) for Council Meeting 18.1 2008 End of Session Report -Senator Charlie Justice and Representative Ed Hooper .Attachments 18.2 FDOT Presentation of Safety Improvements for U.S.19 from Sunset Point to Enterprise Road I~ Attachrrients 18.3 Proclamation: September is Lukemia, Lymphomia and Myeloma Month Attachments 18.4 Employee of the Month -Louis Corona, Police Department Attachments http://msb-laser-app/CouncilAgenda/MeetingAgenda.aspx?meetingid=183 9/16/2008 MeetingAgenda • Page 1 of 4 City Council Agenda Location: Council Chambers -City Hall Date: 5/15/2008- 6:00 PM Welcome. We are glad to have you join us. If you wish to speak, please wait to be recognized, then state your name and address. Persons speaking before the City Council shall be limited to three (3) minutes unless otherwise noted under Public Hearings. For other than Citizens to be heard regarding items not on the Agenda, a spokesperson for a group may speak for three (3) minutes plus an additional minute for each person in the audience that waives their right to speak, up to a maximum of ten (10) minutes. Prior to the item being presented, please obtain the needed. form to designate a spokesperson from the City Clerk (right-hand side of dais). Up to thirty minutes of public comment will be allowed for an agenda item. No person shall speak more than once on the same subject unless granted permission by the City Council. The City of Clearwater strongly supports and fully complies with the Americans with Disabilities Act (ADA). Please advise us at least 48 hours prior to the meeting if you require special accommodations at 727-562-4090. Assisted Listening Devices are available. Kindly refrain from using beepers, cellular telephones and other distracting devices during the meeting. 1. Call to Order 2. Invocation 3. Pledge of Allegiance 4. Presentations 4.1 All Children's Hospital Attachments 4.2 Certificate presented by Mayor to Zach Railey, 2008 Olympic contender from Clearwater Attachments 4.3 Proclamation: Poppy Day -presented to Gi Gi Janesik, American Legion Auxiliary Attachments 4.4 Proclamation: Hurricane Awareness Month Attachments 4.5 Proclamation: National Public Works Week Proclamation Attachments 4.6 Proclamation: Bike Month -Kevin Dunbar Attachments 4.7 Proclamation: Emergency Medical Services Week -Fire Department Attachments 4.8 Proclamation: Safe Boating Week: May 19 - 25 Attachments http://msb-laser-app/CouncilAgenda/MeetingAgenda.aspx?meetingid=170 5/14/2008 MeetingAgenda • Page 2 of 4 5. Approval of Minutes 5.1 Approve the minutes of the May 1, 2008 City Council Meeting as submitted in written summation by the City Clerk. Attachments 6. Citizens to be Heard re Items Not on the Agenda Public Hearings -Not before 6:00 PM 7.Administrative Public Hearings - Presentation of issues by City staff - Statement of case by applicant or representative (5 min.) - Council questions - Comments in support or opposition (3 min. per speaker or 10 min maximum as spokesperson for others that have waived their time) - Council questions - Final rebuttal by applicant or representative (5 min.) - Council disposition 7.1 Approve the Annexation, Initial Land Use Plan Designation of Industrial General (IG) and Initial Zoning Atlas Designation of Industrial, Research and Technology (IRT) District for 1949 Calumet Street (a portion of Section 1, Township 29 South, Range 15 East in Metes And Bounds 34/11); and pass Ordinances 7951-08, 7952-08 and 7953-08 on first reading. (ANX2008-02005) Attachments 7.2 Approve the Annexation, Initial Land Use Plan Designation of Residential Low (RL) and Initial Zoning Atlas Designation of Low Medium Density Residential (LMDR) District for 1709 El Trinidad Drive East (Lot 3, Virginia Grove Terrace, Section O5, Township 29 South, Range 16 East); and pass Ordinances 7954-08, 7955-08 and 7956-08 on first reading. (ANX2008-02006) Attachments 7.3 Approve amendment to the Clearwater Comprehensive Plan to update the Utility Element to incorporate the City's Water Master Plan and pass Ordinance 7950-08 on first reading. Attachments 8. Quasi-judicial Public Hearings -Staff states and summarizes reasons for recommendation (2 minutes) -Applicant presents case, including its testimony and exhibits. Witness may be cross-examined (15 minutes) - Staff presents further evidence. May be cross-examined (10 minutes) - Public comment (3 minutes per speaker or 10 minutes maximum as spokesperson for others that have waived their time) - Applicant may call witnesses in rebuttal (5 minutes) - Conclusion by applicant (3 minutes) -Decision 8.1 Approve a Zoning Atlas Amendment from Business (B) District to the Tourist (T) District for property located at 1101 and 1201 Gulf Boulevard (consisting of Lot 2, Subdivision of Radisson Bayside Hotel, in Section 17 and 20, Township 29 South, Range 15 East and pass Ordinance 7940- 08 to amend the Zoning Atlas for this property on first reading. (REZ2008-02001) Attachments 9. Second Readings -Public Hearing http://msb-laser-app/CouncilAgenda/MeetingAgenda.aspx?meetingid=170 5/14/2008 MeetingAgenda ~ ~ Page 3 of 4 9.1 Adopt Ordinance No. 7928-08 on second reading, creating section 21.18, Code of Ordinances, to prohibit soliciting, begging, and panhandling in the Clearwater downtown core redevelopment zone and the Clearwater Beach core tourist zone as defined in the ordinance. Attachments 9.2 Adopt Ordinance No. 7941-08 on second reading, rescinding Ordinance No. 7405-OS and Ordinance No. 7406-05. L~ Attachments City Manager Reports 10. Consent Agenda 10.1 Approve finalization of the main library funding, authorize project 315-93523 to be closed, resulting in the return of $370,515.24 to the General Fund, and acknowledge the amount contributed by the Clearwater Library Foundation at $2.95 million of the original $5 million pledged. (consent) Attachments 10.2 Authorize settlement of the workers' compensation claim of Claimant, George Agovino III, in its entirety to include medical, indemnity and attorney fees for the sum of $30,000. (consent) (~ Attachments 10.3 Award a Contract (Purchase Order) for $113,994.00 to Altec Industries of Birmingham, AL for one (1) 2009 Internationa14300 Cab and Chassis with Altec LRV58 Aerial Lift w/Chipper Dump Body in accordance with Sec. 2.564(1)(d), Code of Ordinances -Other governmental bid, authorize lease purchase under the City's Master Lease Purchase Agreement and authorize appropriate officials to execute same. (consent) Attachments 10.4 Award a Contract (Purchase Order) for $124,672.50 to Communications International, Inc of Tampa, FL for memory and software upgrades to existing City 800 Mhz radios, authorize lease purchase under the City's Master Lease Purchase Agreement and authorize the appropriate officials to execute same. (consent) Attachments 10.5 Approve the first amendment to the Alligator Creek Watershed Implementation Project, Phase III, Channel F cooperative funding contract with Southwest Florida Water Management District to extend the contract period to December 31, 2011 and authorize the appropriate officials to execute same. (consent) [~ Attachments 10.6 Approve two Local Agency Program (LAP) Agreements with the Florida Department of Transportation for the Beach Connector Trail project to receive grants in the amount of $852,429.00 (Agreement FPN 415744 1 58 O1) and $416,152.00 (Agreement FPN 415744 2 58 O1) and authorize the appropriate officials to execute same. (consent) [~ Attachments 10.7 Approve a work order to URS Corporation in the amount of $441,107 for engineering design and support during construction services in the Chautauqua/Coachman Reclaimed Water Project (07- 0053-UT), and approve the Cooperative Funding Agreement with the Southwest Florida Water Management District (SWFWMD) which provides reimbursement of project cost up to $1,977,000.00, and that the appropriate officials be authorized to execute same. (consent) http://msb-laser-app/CouncilAgenda/MeetingAgenda.aspx?meetingid=170 5/14/2008 MeetingAgenda ~ ~ Page 4 of 4 Attachments 10.8 Approve the McKim & Creed supplemental work order in the amount of $278,731 for additional engineering design services for expanding the City of Clearwater Reclaimed Water System to serve residents in the Morningside area in the southeastern portion of the City (OS-0022-UT). (consent) Attachments 10.9 Authorize staff to negotiate a contract with Chase Real Estate, Inc. to provide Real Estate Brokerage Services for land assembly suitable for development of a 300 space parking garage on south Clearwater beach and authorize the City Manager to approve and execute same that best represents the interests of the City. (consent) Attachments ll. Other items on City Manager Reports 11.1 Award a contract to lease desktop and laptop computers for 3 years from.Hewlett-Packard Financial Services Company; Murray Hill, NJ, and Insight Public Sector, Bloomingdale, IL as the lowest bid respondents to RFP 14-08, for an amount not to exceed $1,200,000; and adopt Resolution 08-07 authorizing the City Manager to delegate to the Information Technology Director or other designee the ability to execute documents on Lease Agreements with Hewlett-Packard, and authorize appropriate officials to execute same. (~ Attachments Miscellaneous Reports and Items 12. City Manager Verbal Reports 12.1 City Manager Verbal Reports Attachments 13.Other Council Action 13.1 Other Council Action Attachments 14. Adjourn http://msb-laser-app/CouncilAgenda/MeetingAgenda.aspx?meetingid=170 5/14/2008 • (~r~i 1~~ n~ ~ C~,S - ~ L~/~7` ORDINANCE NO. 7950-08 ~ 5t~~~~~c1 AN ORDINANCE OF THE CITY OF CLEARWATER, FLORIDA, MAKING AMENDMENTS TO THE COMPREHENSIVE PLAN OF THE CITY AS ADOPTED ON MAY 18, 2000 AND AMENDED ON JULY 12, 2001, OCTOBER 7, 2004, OCTOBER 20, 2005, DECEMBER 15, 2005, AUGUST 14, 2007, AND FEBRUARY 21, 2008; BY AMENDING THE UTILITY ELEMENT; IN ACCORDANCE WITH SECTIONS 163.3177, 163.3184, 163.3187 OR 163.3189, FLORIDA STATUTES, TO UPDATE THE CITY OF CLEARWATER'S WATER WORK PLAN IN ACCORDANCE WITH THE UPDATED SOUTHWEST FLORIDA WATER DISTRICT'S REGIONAL WATER SUPPLY PLAN; PROVIDING FOR SEVERABILITY; AND PROVIDING AN EFFECTIVE DATE; WHEREAS, the Local Government Comprehensive Planning and Land Development Regulation Act of Florida empowers and requires the City Council of the City of Clearwater to plan for the future development and growth of the City, and to adopt and periodically amend the Comprehensive Plan, including elements and portions thereof; and WHEREAS, the City of Clearwater adopted a Comprehensive Plan on May 18, 2000 by Ordinance Number 6522-00; and WHEREAS, the City Council approved Ordinance Number 6794-O1, which amended the Comprehensive Plan of the City on July 12, 2001; and WHEREAS, the City Council approved Ordinance Number 7295-04, which amended the Comprehensive Plan of the City on October 7, 2004; and WHEREAS, the City Council approved Ordinance Number 7388-05, which amended the Comprehensive Plan of the City on October 20, 2005 and December 15, 2005; and WHEREAS, the City Council approved Ordinance Number 7782-07, which amended the Comprehensive Plan of the City on August 14, 2007; and WHEREAS, the City Council approved Ordinance Number 7870-07, which amended the Comprehensive Plan of the City on February 21, 2008; and WHEREAS, the City is making these changes to the Comprehensive Plan in accordance with statutory requirements; and WHEREAS, amendments to the Comprehensive Plan of the City have been prepared in accordance with the applicable requirements of law, after conducting the appropriate planning analysis, and public participation through public hearings, opportunity for written comments, open discussion and the consideration of public and official comments; and -1- ?•~J rdinance 7950-08 v WP.~.. ~n.AS r/'P~-vJ~c~c ~Y~ry„~,,, • • WHEREAS, the Community Development Board, serving as the designated Local Planning Agency for the City, has held a public hearing on the proposed amendments and has recommended adoption of the proposed Comprehensive Plan amendments; and WHEREAS, the proposed amendments have been transmitted to the Florida Department of Community Affairs for review and comments, and the objections, recommendations and comments received from the Florida Department of Community Affairs have been considered by the City Council, together with all comments from local regional agencies and other persons, in preparing the final draft of the amendments; and WHEREAS, the City Council finds it necessary, desirable and proper to adopt the amendments to the objectives and policies of the Comprehensive Plan in order to reflect changing conditions; now, therefore, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CLEARWATER, FLORIDA: Section 1. Amendment to the Clearwater Comprehensive Plan attached hereto as Exhibit "A" is hereby adopted. Section 2. Severability. If any section, provision, clause, phrase, or application of this Ordinance shall be declared unconstitutional or invalid for any reason by a court of competent jurisdiction, the remaining provisions shall be deemed severable therefrom and shall remain in full force and effect. Section 3. This ordinance shall become effective when the Department of Community Affairs (DCA) issues a final order determining the adopted amendment to be in compliance, or the Administration Commission issues a final order determining the adopted amendments to be in compliance, in accordance with Section 163.3177, 163.3184, 163.3187 or 163.3189, F.S., as amended. PASSED ON FIRST READING PASSED ON SECOND AND FINAL READING AND ADOPTED Approved as to form: Leslie K. Dougall-Sides Assistant City Attorney Frank Hibbard Mayor-Councilmember Attest: -2- Cynthia E. Goudeau City Clerk Exhibit A Ordinance 7950-08 • ~ EXHIBIT A ATTACHMENT TO ORDINANCE 7950-08 AMENDMENT -UTILITY ELEMENT GOALS, OBJECTIVES AND POLICIES Amend Goal 2I of the Utility Element of the Comprehensive Plan, as follows: POTABLE WATER AND NATURAL GROUND WATER AQUIFER RECHARGE 21. GOAL -PROVIDE, DEVELOP, AND MAINTAIN A PERMANENT POTABLE WATER SUPPLY SYSTEM TO MEET ANTICIPATED DEMAND WHILE PROVIDING MAXIMUM PRACTICAL PROTECTION TO THE ENVIlZONMENT AT A COST CONSISTENT WITH THE PUBLIC'S ABILITY AND WILLINGNESS TO PAY. 21.1 Objective - To maintain adequate Levels of Service for existing and future populations through the year 2015 ~0. ***** 21.2 Objective -Provide adequate quantities and qualities of water service to all customers of the Clearwater service area. Current service level (July, 2007 X19) is 40,390 ~3,~0 customer accounts (notable, reclaimed and fire). Policies 21.2.1 Ensure that land development regulations, building codes and City ordinances adequately address water system provisions by performing a thorough evaluation of City codes and by coordinating proposed provisions with the Southwest Florida Water Management District and Florida Deparhnent of Environmental Protection 21.2.2 Tke En ing Bering . shall analyze the condition and adequacy of any water distribution system that the City may inherit through annexation and prepare cost estimates for upgrading those systems to meet City requirements. 21.2.3 When new subdivisions are being developed, it shall be the responsibility of the developer to provide internal potable water and reclaimed water systems which are constructed to City specifications. ***** 21.2.5 Continue to dDevelop a system and construct improvements which will conserve energy, water, and other valuable resources. -3- Exhibit AOrdinance 7950-08 • • 21.2.6 The City ^~ ~ shall continue._to parti~cipat~ and assist the Southwest Florida Water Mana ement Distric ~ er,~Pinellas County Health Department, and the U.S. Environ ta~l-1?roteetjon Agency in developing innovative techniques to augment existing water supplies to provide for future needs. 21.2.7 Continue to identify, acquire, and develop sources of water supply and methods of water treatment to meet existing and future needs. Some ways this can be accomplished are through well rehabilitation projects and/or exploration and drilling of new wells. Some type of water treatment may be initiated. Additional volumes of water may be acquired from the Pinellas County Water System through Clearwater's intergovernmental water service agreement. The City's lone range Water Master Plan completed in 2004 shall serve as the auidina document for water supply and treatment methods. ~~_ 21.2.8 Ensure that water management projects are designed and operated to maintain and enhance natural systems as well as man made systems by working closely with the Southwest Florida Water Management District when proposing new projects and water management programs. The City's long range Water Master Plan completed in 2004 outlines a work plan for continued coordination with the Southwest Florida Water Management District's Regional Water Supply Plan adopted in December 2006. ****~ 21.3 Objective -Continue to maintain the water system in a safe, sound, and efficient manner on a daily basis. Policies 21.3.1 The Public Utilities Department ,Water Division, shall monitor water quality and the operation of the water distribution system with the intent of repairing and replacing deficient portions of the system within the framework of the capitalized budgeting process. *~*** 21.4.5 The City shall continue to refine the inverted rate structure for residential water meters, lawn meters and all other water meters permitted by the Water Division of the Public Utilities Department 21.5 Objective -Continue to develop a potable water system that is compatible with the environment and seeks to conserve and protect sensitive natural resources. -4- Exhibit AOrdinance 7950-08 Policies • 21.5.1 Except for areas of the City where reclaimed water is available, shallow wells shall be recognized as a source of water for irrigation purposes. Establish a City permit for shallow well installation by the end of 2008. 21.5.2 The City's building code shall be~ed~ed-te include the requirement for water conserving fixtures in newly constructed or remodeled buildings. ***** 21.5.5 The City ^~ ~~'~° shall maintain its current Water Restriction Ordinance. ***** 21.6 Objective -Continue to az4chieve effective coordination with other government agencies to solve problems of an extraterritorial nature with cooperation and in conjunction with the Southwest Florida Water Management District. ***** 21.6.2 Continue to cooperate with the Southwest Florida Water Management District and Tampa Bay Water in developing environmental and hydrologic data that will identify safe and reliable potable water yields in existing and future well-fields. 21.6.3 Continue to cEoordinate with appropriate local, State, regional and Federal agencies in implementing the water system plan. **~** 21.6.5 Ensure consistency with the actions defined within the Regional Water Supply Plan prepared by the Southwest Water Management District. 21.7 Objective -Continue to protect all natural recharge areas having functional hydrological characteristics. ***** 21.7.2 The City ^~ ~ shall include incentives in the Community Development Code for the protection of natural groundwater aquifer recharge areas as identified in the Conservation Element of the Clearwater Comprehensive Plan. 21.7.3 The City ^~ r'°~~~~~`°~ shall continue to protect groundwater quality by enforcing Wellhead Protection Ordinance. -5- Exhibit AOrdinance 7950-08 • • Comprehensive Plan Citizen Courtesy Information List Local Government: City of Clearwater Hearing Date: April 15, 2008 hype Hearing: Community Development Board DCA Amendment Number: Please Print Clearly (DCA Official Use) By providing your name and address you will receive information concerning the date of publication of the Notice of Intent by the Department of Community Affairs. Address, City, State, Citizen Name ~ Zip Code i NONE Check Appropriate Box ~~ Written ,~~ Spoken ,~ Comment Comment ONE 'INONE Identify Amendment which is of Interest E Over for more spaces . • LL 7 O } ~ ~~~ U CONSENT AGENDA COMMUNITY DEVELOPMENT BOARD Date: Tuesday, April 15, 2008 Time: 1:00 p.m. Place: 112 South Osceola Street, 3rd Floor, Clearwater, Florida, 33756 (City Hall Council Chambers) Revised 4/14/2008 Welcome the City of Clearwater Community Development Board (CDB) meeting. The City strongly supports and fully complies with the Americans with Disabilities Act (ADA). Please advise us at least 72 hours prior to the meeting if you require special accommodations. Assisted listening devices are available. An oath will be administered swearing in all participants in public hearing cases. If you wish to speak please wait to be recognized, then state and spell your name and provide your address. Persons speaking before the CDB shall be limited to three minutes unless an individual is representing a group in which case the Chairperson may authorize a reasonable amount of time up to 10 minutes. Kindly refrain from conducting private conversations, using beepers, cellular telephones, etc. as they are distracting during the meeting. Florida Statue 286.0105 states: Any person appealing a decision of this Board must have a record of the proceedings to support such appeal. Conu~luiuty Development Code Section 4- 206 requires that any person seeking to: personally testify, present evidence, argument and witness, cross-examine witnesses, appeal the decision and speak on reconsideration requests should request party status during the case discussion. Party status entitles parties to: personally testify, present evidence, argument and witnesses cross-examine witnesses, appeal the decision and speak on reconsideration requests. If you have questions or concerns about a case, please contact the staff presenter from the Planning Department listed at the end of each agenda item at 727-562-4567. Make Us Your Favorite! www.myclearwater.com/ o~ v/depts/planning Community Development Board Agenda -April 15, 2008 -Page 1 of 3 A. CALL TO ORDER, IIQPOCATION, PLEDGE OF ALLEGIAN~ B. ROLL CALL: Chair Fritsch, Vice Chair Coates, Members Adelson, Behar, Dame, Tallman, DiPolito, Alternate Member Carlough, City Staff C. APPROVAL OF MINUTES OF PREVIOUS MEETING: March 18, 2008 D. ELECTION OF OFFICERS: CHAIR AND VICE CHAIR E. REQUEST FOR WITHDRAWAL (Item 1): 1. Case: APP2007-00004 - 624 S. Missouri Avenue Owner/Applicant: Peter Nichols (624 S. Missouri Avenue, Clearwater, Florida 33756; phone: 727- 441-4511; fax: 727-446-4796). Appellant: Jon Gaudineer and Frank Marinelli, RDA Construction (4711 34"' Street N., Suite D, St. Petersburg, Florida 33714; phone: 813-967-0746; fax: 727-525-9159). Location: 0.38-acre parcel located on the west side of S. Missouri Avenue between Turner Street and Druid Road. Atlas Page: 296A. Zoning: Commercial (C) District. Request: An appeal from a Level One (Flexible Standard Development) denial decision pursuant to Community Development Code (CDC) Section 4-SO1.A.3, that the reestablishment of a restaurant with a reduction to the side (north and south) setbacks from ten feet to zero feet (to pavemenbparking) as per. CDC Section 2-703.P does not fully comply with the development standards set forth in CDC Section 2-703; does not meet the minimum landscape requirements set forth in CDC Sections 3- 1202.D.1 and 3-1202.E.1; and does not meet the minimum design standards for parking lots set forth in CDC Section 3-1402.A. Proposed Use: Restaurant. Neighborhood Associations: Clearwater Neighborhoods Coalition (President Joe Fritz, P.O. Box 8204, Clearwater, FL 33758). Presenter: Robert G. Tefft, Planner III. F. CONSENT AGENDA: The following cases are not contested by the applicant, staff, neighboring property owners, etc. and will be approved by a single vote at the beginning of the meeting (Item 1): 1. Case: CPA2008-03002 Level Three Application Owner/Applicant: City of Clearwater, Planning Department Request: Amendments to the Comprehensive Plan of the City as adopted on May 18, 2000 and ~eGaywm ' amended on July 12, 2001, October 7, 2004, October 20, 2005, December 15, 2005, August 14, 2007 and February 21, 2008 by amending the Utility Element to update the City of Clearwater's Water ~°~ Work Plan in accordance with the updated Southwest Florida Water District's Regional Water Supply O,~ ~ ~ S l p $ Plan, in accordance with Florida Statutes. Type of Amendment: Separate submittal to State DCA - exempt from large-scale submittal process Neighborhood Association(s): Clearwater Neighborhoods Coalition (Joe Evich, President, P.O. Box 8204, Clearwater, FL 33758) Presenter: Sandra E. Herman, Planner III. Community Development Board Agenda -April 15, 2008 -Page 2 of 3 G. LEVEL THREE API~ATIONS (Item 1): 1. Case: REZ2008-02001 - 1 101 and 1201 Gulf Boulevard Level Three Application Owner/Applicant: Andrew R. Duff TRE. Representative: E. D. Armstrong, III, Johnson, Pope, Bokor, Ruppel & Burns, LLP (P.O. Box 1368, Clearwater, FL 33757; telephone: 727-461-1818). Location: 4.8 acres located on the southeast side of Gulf Boulevard approximately 1800 feet south of Clearwater Pass Bridge. Atlas Page: 294A and 303B. Request: Application for a Zoning Atlas amendment from the Business District (B) to the Tourist (T) District. Existing Uses: Overnight Accommodations. Neighborhood Association(s): Clearwater Neighborhoods Coalition (Joe Evich, President, P.O. Box 8204, Clearwater, FL 33758); and Sand Key Civic Association (Mike Dooley, President, P.O. Box 3014, Clearwater, FL 34630). Presenter: Steven Everitt, Planner II. H. ADJOURNMENT S:IPlanningDepartmentlCDBlAgendasDRC& CDBICDB12008104Apri115, 20081CDB Consent Agenda AprillS, 2008.doc Community Development Board Agenda -April 15, 2008 -Page 3 of 3 ~ • ~.~~.t ~~~r~ U `~ i CITY OF CLEARWATER Interdepartmental Correspondence Sheet TO: Community Development Board Members FROM: Sandra E. Herman, Planner III ~~¢~----~ SUBJECT: CPA2008-0300 -Revisions DATE: April 9, 2008 We are forwarding to you a copy of an email today from Robert Fahey, City Engineering, who has requested three small changes to be made to the potable water document. Due to a timing consideration, Wade Trim was notable to make these changes prior to the submittal of the packets for the April 15, 2008 Community Development Board meeting. However, Wade Trim will be making the changes pursuant to Mr. Fahey's request prior to the City Council Meeting on May 15, 2008. Please include these revisions in your motion. C:IDocuments and SettingslSandra.HermanlDesktoplCDB Memo CPA2008-03002 April 9 2008.doc • • Herman, Sandra From: ~ Fahey, Robert Sent: Wednesday, April 09, 2008 1:30 PM To: Herman, Sandra Subject: RE: URGENT: Water Plan Page 17 -change second sentence to read "... the City water sources are ~ 23 groundwater wells..." for consistency. Page 18 -third paragraph -add #63 to listing of wells feeding Reservoir #3 bringing the total to 6 instead of 5. Also add sentence "Two inactive wells are also connected (Wells Nos. 79 and 80)." Everything else looks good Rob -----Origi From: Sent: To: Subject: nal Message----- Herman, Sandra Wednesday, April 09, 2008 9:55 AM Fahey, Robert URGENT: Water Plan Rob, Hi. We are preparing our packets today for the CDB meeting - I put a copy of the revised plan from Wade Trim on your chair this morning. Have the revisions been made as you requested? Please let me know ASAP, so we can put them in the packets to be mailed tomorrow morning. Thanks. Sandy Sandra E. Herman Planner III Planning Department City of Clearwater, Florida 100 South Myrtle Avenue Clearwater, FL 33756-5520 PO Box 4748, 33758-4748 Telephone: (727) 562-4586 Fax: (727) 562-4865 sandra.hermanC~myc learwater. com CDB Meeting Date: Case # Ordinance #: Agenda Item: April 15, 2008 CPA2008-03002 7950-08 F-1 ` ~ ~w~ o~-v~-off CITY OF CLEARWATER PLANNING DEPARTMENT STAFF REPORT COMPREHENSIVE PLAN AMENDMENTS REQUEST: Clearwater Comprehensive Plan Text Amendments INITIATED BY: City of Clearwater P1ar~h~Ang Department BACKGROUND INFORMATION: This item involves an amendment to the Clearwater Comprehensive Plan to update the Utility Element related to the City's water supply plan as per Section 163.3177(6)(c), Florida State Statutes and Florida Administrative Code section 9J-5.011. The fundamental purpose of a water supply plan is to ensure that the community is able to supply quality drinking water of a sufficient quantity for current and future needs. The statutory requirements call for each local government in the planning region to adopt amendments to its comprehensive plan to incorporate their water supply plan within 18 months after the approval of the regional water supply plan. The City's regional district, the Southwest Florida Water Management District (SWFWMD), approved its plan on November 30, 2006. Therefore, the deadline for the City's amendment is May 30, 2008. This amendment is exempt from the twice a year limitation for large-scale amendments. The consulting firm of Wade Trim was retained by the City to draft an updated "Potable Water Element" (sub-element to the Utility Element) to the Clearwater Comprehensive Plan based on the City's 2004 Water Master Plan produced by Parsons Water and Infrastructure, Inc. According to the plan, based on population and density projections, the City will be functionally capable of providing water through the year 2025. The proposed text amendment meets state statutes and rules by amending current Goals, Objectives and Policies of the Water Sub-element of the Utility Element of Clearwater's Comprehensive Plan. ANAT,Y~T~: One amendment is proposed to the text of the Clearwater Comprehensive Plan in Ordinance No. 7950-08. The summary of the amendment follows. Page - 1 CPA2008-03002 C] • Amendment -UTILITY ELEMENT GOALS OBJECTIVES AND POLICIES: Potable Water and Natural Ground Water Aquifer Recharge Needs (pages are given from current Comprehensive Plan): The following are substantive changes that are being made to incorporate the City's 2004 Water Master Plan into the Utility Element and to ensure consistency with the regional water supply plan for our district (SWFWMD): • Policy 21.2.7 (page D-17): Add the following sentence: "The City's long range Water Master Plan completed in 2004 shall serve as the guiding document for water supply and treatment methods." Remove: "Various recommendations have recently been submitted in a study on long range eater supply and treatment". • Policy 21.2.8 (page D-17): Add the following sentence: "The City's long range Water Master Plan completed in 2004 outlines a work plan for continued coordination with the Southwest Florida Water Management District's Regional Water Supply Plan adopted in December 2006". • Policy 21.6.5 (page D-19): Add as a new policy: "Ensure consistency with the actions defined within the Regional Water Supply Plan prepared by the Southwest Water Management District." The remaining amendments involve updates to years given for projects, minor text changes and typographical and/or grammatical corrections. STANDARDS FOR REVIEW Pursuant to Community Development Code Section 4-603 (F) no amendment to the Clearwater Comprehensive Plan shall be approved unless it complies with the following standards: 1. The amendment will further implementation of the comprehensive plan consistent with the goals, policies and objectives contained in the plan. The proposed amendment to the Utility Element: Potable Water and Natural Ground Water Aquifer Recharge Needs Sub-Element of the Clearwater Comprehensive Plan further refines the City's existing policies and objectives. The proposed amendment is consistent with the existing goals, objectives, and policies contained in the comprehensive plan and expands the city's long range planning policies related to the provisions for the City's water plan. 2. The amendment is not inconsistent with other provisions of the comprehensive plan. The proposed amendment is consistent with the provisions of the Comprehensive Plan. It broadens the City's approach to providing continued coordination with the Page - 2 CPA2008-03002 LJ Southwest Florida Water Management District (SWFWMD) and specifically to its Regional Water Supply Plan (RWSP). 3. The available uses, if applicable, to which the property maybe put are appropriate to the property in questions and compatible with existing and planned uses in the area. The proposed amendment is a text amendment that is not directly related to a specific property. 4. Sufficient public facilities are available to serve thepropertv. Tl'e proposed amendment is a text amendment that is not directly related to a specific property. 5. The amendment will not adversely affect the natural environment. The proposed amendment seeks to provide consistent and coordinated efforts for the processes and procedures for water management within the area governed by the Southwest Florida Water Management District (SWFWMD). 6. The amendment will not adversely impact the use of property in the immediate area. The proposed amendment is a text amendment that is not directly related to a specific property. SUMMARY AND RECOMMENDATION: The purpose of this amendment is to incorporate the City's 2004 Water Master Plan into the Utility Element of the Clearwater Comprehensive Plan and to ensure consistency with the regional water supply plan as required in Section 163.077(6)(c), F.S. The Planning Department Staff recommend APPROVAL of Ordinance No. 7950-08 that amends the Clearwater Comprehensive Plan. Prepared by Planning Department Staff: ATTACHMENT: Ordinance No.7950-08 Page - 3 ,9~~ f S~/ Sandra E. Herman Planner III CPA2008-03002 • • ORDINANCE NO. 7950-08 AN ORDINANCE OF THE CITY OF CLEARWATER, FLORIDA, MAKING AMENDMENTS TO THE COMPREHENSIVE PLAN OF THE CITY AS ADOPTED ON MAY 18, 2000 AND AMENDED ON JULY 12, 2001, OCTOBER 7, 2004, OCTOBER 20, 2005, DECEMBER 15, 2005, AUGUST 14, 2007, AND FEBRUARY 21, 2008; BY AMENDING THE UTILITY ELEMENT; IN ACCORDANCE WITH SECTIONS 163.3177, 163.3184, 163.3187 OR 163.3189, FLORIDA STATUTES, TO UPDATE THE CITY OF CLEARWATER'S WATER WORK PLAN IN ACCORDANCE WITH THE UPDATED SOUTHWEST FLORIDA WATER DISTRICT'S REGIONAL WATER SUPPLY PLAN; PROVIDING FOR SEVERABILITY; AND PROVIDING AN EFFECTIVE DATE; WHEREAS, the Local Government Comprehensive Planning and Land Development Regulation Act of Florida empowers and requires the City Council of the City of Clearwater to plan for the future development and growth of the City, and to adopt and periodically amend the Comprehensive Plan, including elements and portions thereof; and WHEREAS, the City of Clearwater adopted a Comprehensive Plan on May 18, 2000 by Ordinance Number 6522-00; and WHEREAS, the City Council approved Ordinance Number 6794-01, which amended the Comprehensive Plan of the City on July 12, 2001; and WHEREAS, the City Council approved Ordinance Number 7295-04, which amended the Comprehensive Plan of the City on October 7, 2004; and WHEREAS, the City Council approved Ordinance Number 7388-05, which amended the Comprehensive Plan of the City on October 20, 2005 and December 15, 2005; and WHEREAS, the City Council approved Ordinance Number 7782-07, which amended the Comprehensive Plari of the City on August 14, 2007; and WHEREAS, the City Council approved Ordinance Number 7870-07, which amended the Comprehensive Plan of the City on February 21, 2008; and WHEREAS, the City is making these changes to the Comprehensive Plan in accordance with statutory requirements; and WHEREAS, amendments to the Comprehensive Plan of the City have been prepared in accordance with the applicable requirements of law, after conducting the appropriate planning analysis, and public participation through public hearings, opportunity for written comments, open discussion and the consideration of public and official comments; and -1- Exhibit AOrdinance 7950-08 • • WHEREAS, the Community Development Board, serving as the designated Local Planning Agency for the City, has held a public hearing on the proposed amendments and has recommended adoption of the proposed Comprehensive Plan amendments; and WHEREAS, the proposed amendments have been transmitted to the Florida Department of Community Affairs for review and comments, and the objections, recommendations and comments received from the Florida Department of Community Affairs have been considered by the City Council, together with all comments from local regional agencies and other persons, in preparing the final draft of the amendments; and WHEREAS, the City Council finds it necessary, desirable and proper to adopt the amendments to the objectives and policies of the Comprehensive Plan in order to reflect changing conditions; now, therefore, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CLEARWATER, FLORIDA: Section 1. Amendment to the Clearwater Comprehensive Plan attached hereto as Exhibit "A" is hereby adopted. Section 2. Severability. If any section, provision, clause, phrase, or application of this Ordinance shall be declared unconstitutional or invalid for any reason by a court of competent jurisdiction, the remaining provisions shall be deemed severable therefrom and shall remain in full force and effect. Section 3. This ordinance shall become effective when the Department of Community Affairs (DCA) issues a final order determining the adopted amendment to be in compliance, or the Administration Commission issues a final order determining the adopted amendments to be in compliance, in accordance with Section 163.3177, 163.3184, 163.3187 or 163.3189, F.S., as amended. PASSED ON FIRST READING PASSED ON SECOND AND FINAL READING AND ADOPTED Approved as to form: Leslie K. Dougall-Sides Assistant City Attorney Frank Hibbard Mayor-Councilmember Attest: Cynthia E. Goudeau City Clerk -2- Exhibit A Ordinance 7950-08 • • EXHIBIT A ATTACHMENT TO ORDINANCE 7950-08 AMENDMENT -UTILITY ELEMENT GOALS, OBJECTIVES AND POLICIES Afnend Goal 2l of the Utility Element of the Comprehensive Plan, as follows: POTABLE WATER AND NATURAL GROUND WATER AQUIFER RECHARGE 21. GOAL -PROVIDE, DEVELOP, AND MAINTAIN A PERMANENT POTABLE WATER SUPPLY SYSTEM TO MEET ANTICIPATED DEMAND WHILE PROVIDING MAXIMUM PRACTICAL PROTECTION TO THE ENVII20NMENT AT A COST CONSISTENT WITH THE PUBLIC'S ABII.,ITY AND WILLINGNESS TO PAY. 21.1 Objective - To maintain adequate Levels of Service for existing and future populations through the year 2015 304q. ~**~* 21.2 Objective -Provide adequate quantities and qualities of water service to all customers of the Clearwater service area. Current service level (July, 2007 ~9~94) is 40,390 ~9 customer accounts (potable, reclaimed and fire). Policies 21.2.1 Ensure that land development regulations, building codes and City ordinances adequately address water system provisions by performing a thorough evaluation of City codes and by coordinating proposed provisions with the Southwest Florida Water Management District and Florida Department of Environmental Protection a4~tar. 21.2.2 ~ Engineering shall analyze the condition and adequacy of any water distribution system that the City may inherit through annexation and prepare cost estimates for upgrading those systems to meet City requirements. 21.2.3 When new subdivisions are being developed, it shall be the responsibility of the developer to provide internal potable water and reclaimed water systems which are constructed to City specifications. ***~* 21.2.5 Continue to dOevelop a system and construct improvements which will conserve energy, water, and other valuable resources. -3- Exhibit AOrdinance 7950-08 • 21.2.6 The City ^r r'°~~~~~*°~ shall continue to participate and assist the Southwest Florida Water Management District ,Pinellas County Health Department, and the U.S. Environmental Protection Agency in developing innovative techniques to augment existing water supplies to provide for future needs. 21.2.7 Continue to identify, acquire, and develop sources of water supply and methods of water treatment to meet existing and future needs. Some ways this can be accomplished are through well rehabilitation projects and/or exploration and drilling of new wells. Some type of water treatment maybe initiated. Additional volumes of water may be acquired from the Pinellas County Water System through Clearwater's intergovernmental water service agreement. The City's long range Water Master Plan completed in 2004 shall serve as the guiding document for water supply and treatment methods. iia`d°v r°cc°cixti~vc°cir Si~l3~~€~ ~~3 & S~L~d~A~3 ~6i3~run~~~.'irt8r "~pp'r')'--ai~~sa ~~ 21.2.8 Ensure that water management projects are designed and operated to maintain and enhance natural systems as well as man made systems by working closely with the Southwest Florida Water Management District when proposing new projects and water management programs. The City's long range Water Master Plan completed in 2004 outlines a work plan for continued coordination with the Southwest Florida Water Management District's Regional Water Supply Plan adopted in December 2006. *~~** 21.3 Objective -Continue to maintain the water system in a safe, sound, and efficient manner on a daily basis. Policies 21.3.1 The Public Utilities Department ~ ,Water Division, shall monitor water quality and the operation of the water distribution system with the intent of repairing and replacing deficient portions of the system within the framework of the capitalized budgeting process. *~~** 21.4.5 The City shall continue to refine the inverted rate structure for residential water meters, lawn meters and all other water meters permitted by the Water Division of the Public Utilities Department ~x'^r'~° ^ am:r: ^+~~'~ ^^ 21.5 Objective -Continue to develop a potable water system that is compatible with the environment and seeks to conserve and protect sensitive natural resources. -4- Exhibit AOrdinance 7950-08 ~ • Policies 21.5.1 Except for areas of the City where reclaimed water is available, shallow wells shall be recognized as a source of water for irrigation purposes. Establish a City permit for shallow well installation by the end of 2008. 21.5.2 The City's building code shall'~° ,r^~'~~'°a ~^ include the requirement for water conserving fixtures in newly constructed or remodeled buildings. *~**~ 21.5.5 The City e€E~~ shall maintain its current Water Restriction Ordinance. ***** 21.6 Objective -Continue to aY4chieve effective coordination with other government agencies to solve problems of an extraterritorial nature with cooperation and in conjunction with the Southwest Florida Water Management District. ***** 21.6.2 Continue to cooperate with the Southwest Florida Water Management District and Tampa Bay Water in developing environmental' and hydrologic data that will identify safe and reliable potable water yields in existing and future well-fields. 21.6.3 Continue to cCoordinate with appropriate local, State, regional and Federal agencies in implementing the water system plan. *~~** 21.6.5 Ensure consistency with the actions defined within the Regional Water Supply Plan prepared by the Southwest Water Management District. 21.7 Objective -Continue to protect all natural recharge areas having functional hydrological characteristics. ***** 21.7.2 The City ^~ r shall include incentives in the Community Development Code for the protection of natural groundwater aquifer recharge areas as identified in the Conservation Element of the Clearwater Comprehensive Plan. 21.7.3 The City e~-Glear-~ shall continue to protect groundwater quality by enforcing Wellhead Protection Ordinance. -5- Exhibit AOrdinance 7950-08 • RESUME SANDRA E. HERMAN 100 South Myrtle Avenue Clearwater, FL 33756 Telephone: (727) 562-4586 sandra. hennanna,myclearwater. com PROFESSIONAL EXPERIENCE City of Clearwater -January 1986 to Present (Starting from current position) Planner III -Planning Department • Primary responsibilities: Advanced professional level planning work of a difficult and aesponsible nature in connection with growth and orderly development of the City in accordance with the Comprehensive Plan and other statutes, ordinances and regulations related to land use. Administrative Support Manager (previously titled Special Projects Manager) -Development and Neighborhood Services Department • Primary responsibilities: Annual Department Budget -research for initiatives proposals, preparation and maintenance of the Budget for the department under the approval of the department director - FY07 $4.136M Budget / 54.5 FTE's / $4.046 Revenues Projected; Primary supervision of administrative support employees and their priorities including all financial work for the department, payroll, customer service, code enforcement casework input into the Tidemark Permit Plan system, and all other administrative support functions; Backup for the director and other managers in the supervision of department employees, and attendance in city meetings; Preparation and submittal of all City Council Agenda Items for the department; and special projects such as the City's Development Guides -Residential and Commercial (initial research, meetings, preparation, distribution -hard copy books, CD's and on the Internet, and periodic updates). Planning .Administrator /Assistant to the Department Head - Central Permitting Department (included Planning and Development Services) • Primary responsibilities: Assistant to the Department Head: Directing and supervising planners, zoning staff, and staff assistants involved with all planning functions -current and long range, including development plans in accordance with the land development regulations and the City's Comprehensive Land Use Plan; preparation of reports and agencies including the City Commission, Planning and Zoning Board, Development Code Adjustment Board, Pinellas Planning Council, .Countywide Planning AuthorityBoard of County Commissioners, the State Department of Community Affairs and the Tampa Bay Regional Planning Council. Member of the administrative team for large redevelopments including the "Sunshine Mall" project. Coordinator for development reviews, working closely with developers, attorneys, architects, engineers and citizen groups. Permits Manager -Central Permitting Department (included Planning and Development Services) • Primary responsibilities: Supervision of permits counter staff working with occupational licenses and building permits; lead planner for the State mandated Occupational License Equity Commission project -successfully increasing occupational license fees and revenues ~ • by 10% ($140,000}; supervision of planning staff and functions as listed above. Report preparation and presentation of cases to the City Commission and advisory boards. Senior Planner -Planning and Development Department • Primary responsibilities: Lead planner for the City in the 5-year Countywide Pinellas Planning Council Land Use Plan Consistency Program, and City representative and Chairperson for the Pinellas Planning Council's Planners Advisory Committee. Report preparation and presentations to the City Commission and advisory boards. Development Planner II -Planning and Urban Redevelopment Department • Primary responsibilities: Lead planner responsible for site plan reviews and subdivision plat reviews. Worked closely with applicants, attorneys, engineers and architects. Report preparation and presentation of cases to the City Commission and advisory boards. City of St. Petersburg -October 1974 -January 1986 Planner II -Planning Department • Primary responsibilities: Lead planner responsible for site plan reviews, special exceptions, and subdivision plat reviews. Worked closely with applicants, attorneys, engineers and architects. Report preparation and presentation of cases to the City's Environmental Development Commission and the City Council. Planner I -Planning Department • Primary responsibilities: Provide information and interpretation on zoning code regulations to developers, architects, attorneys, and the general public; preparation of notices for public hearings; and preparation of reports for vacations of rights-of--way and minor adjustments to subdivision plats. Draftsman -Traffic Engineering Department • Primary responsibilities: Engineering drafting of street and intersection plans in coordination with state and county plans, and graphic presentations for Traffic Engineering projects. EDUCATION Bachelor of Science, Visual Arts /Communications, Florida State University, 1974 Associate of Arts, St. Petersburg Junior College, 1972 PROFESSIONAL MEMBERSHIPS Florida Planning and Zoning Association, Inc. since 1982 American Planning Association, since 1986 ~ ~ Resume Robert S. Fahey, P.E. 100 South Myrtle Avenue Clearwater, FL 33756 727-562-4608 robert.faheynmyclearwater.com PROFESSIONAL EXPERIENCE • Utilities Engineering Manager City of Clearwater 2005 to present • Engineer II City of Clearwater 2002 to 2005 • Chief Estimator & Senior Project Manager Eagle Amalgamated Services 1996 to 2002 Management responsibility for overseeing engineering and implementation of Capital Improvements Projects involving Water Supply, Transmission and Distribution, Reclaimed Water, Wastewater Collection and Treatment. Responsible for all Water and Sewer permitting through the Florida Department of Environmental Protection within the City limits excluding plumbing permits on private property. EDUCATION Bachelor of Science in Civil Engineering, University of South Florida, 1995 LICENSES & CERTIFICATES Professional Engineer -State of Florida Board of Professional Engineers -June 2007 • C WADE TRIM RESUMES FOR DAVID B GILDERSLEVE JOSE RAUL FERNANDEZ • David B. Gildersleeve, Executive Vice President Role Lead Planner Education B.S., Urban and Regional Planning, California State Polytechnic University, 1973 Masters of Urban and Regional Planning, California State Polytechnic University, 1974 ProfessionalAffiliations • American PlanningAssociation • American Public Works Association (APWA) • Florida Planning and Zoning Association • Chairman Clearwater Community Development Board • Past Chairman, Design Review Board, Pinellas Park Redevelopment Agency • Executive Fellow, University of South Florida • Tampa Chamber of Commerce • National Association of Office and Industrial Parks (NAIOP) • International Council of Shopping Centers • Former Member, Cleaitivater Planning and Zoning Commission • Society For Marketing Professional Services (SMPS) • Safety Harbor Chamber of Commerce • Clearwater Regional Chamber of Commerce As Senior Vice President and Member of the Board of Directors for 17 years, Dave Gildersleeve is intimately involved in all phases of company operations. He routinely serves as Principal-in-Charge, Client Manager and/or Project Manager on major public and private planning, land development and transportation projects. Areas of specific experience include comprehensive planning, zoning and land use studies, Developments of Regional Impact (DRIs), Planning, Project Development and Environmental (PD&E) studies, land development regulations, waterfront planning and design, parks and recreation master planning, development/redevelopment studies and plans, public participation, and charrette facilitation. Dave also serves as National Sales Manager for the Company's Land Development Services Market Segment. Representative Project Experience: Evaluation and Appraisal Report, City of Cleanwater, FL, Principal-in-Charge and Project Manager. Preparation of City's EAR which was approved for transmittal to DCA in June 2006. Dave also served as Chairman of the City's Community Development Board, the City's Local Planning Agency for five years Clearwater Recreation and Aquatic Center, City of Clearwater, FL. Principal-in- Charge. Project involved master planning, park design and public involvement for a $4.3 million recreation and aquatic center. Clearwater Bluff-to-Beach Guideway Study, City of Clearwater, FL, Project Manager. Project involved a review of alternative alignments, technologies, and estimated costs to construct a fixed guideway system between Downtown Clearwater and Clearwater Beach. Sheraton Sand Key Resort, Grand Couloir Corporation, Clearwater, FL, Project Manager. Responsible for 750-suite resort DRI expansion study. Clearwater Sewer System Expansion Study, City of Clearwater, FL, Project Manager for the study of the estimated costs and revenues associated with expanding the city's sewer system into select locations being annexed by the City. Tamiami TraIl Revitalization Strategy, City of Bradenton, FL, Principal-in-Charge. This project involved the development and approval of a specific strategic plan to establish a direction and policy for the revitalization of this historic corridor within the City. The City is aggressively implementing recommendations of the strategy with proposed amendments to its Land Development Regulations and Comprehensive Plan and the acquisition of properties along the corridor as a development incentive. The project included a review and analysis of the existing land use patterns within the corridor and surrounding neighborhoods, review of market conditions impacting the region, assessment of community design desires and opportunities, and development of a financially feasible implementation and management plan for the revitalization. City of Venice Evaluation and Appraisal Report - "Envision Venice", City of Venice, FL, Principal-in-Charge. The result of this project was the development and approval of the Evaluation and Appraisal Report of the City's Comprehensive Plan pursuant to Florida Statutes. In addition, the Suncoast Section of the Florida Chapter of the American Planning Association awarded the project the "Project of Excellence" in November 2005. Wade Trim provided project strategy recommendations, facilitation of public workshops, GIS mapping and analysis of land use, environmental/open space, utilityinfrastructure,cnd transportation, review and analysis of the City's vacant • ~ David B. Gildersleeve, Executive Vice President lands, concurrency system, school coordination, water supply coordination, and capital planning. Dave is serving as Project Manager for the proposed amendments to the City Comprehensive Plan. Alachua County Parks & Recreation Master Site Plan, Phase II, Alachua County, FL, Principal-in-Charge and Senior Project Planner. Wade Trim developed Phase II of the Alachua County Parks and Recreation Master Site Plan project. This project is focused on taking the results of the general needs analysis that was completed in Phase I of the project in 2001 and refining and focusing the specific needs for parks and recreation facilities throughout 12 planning areas in Alachua County. This project has a strong focus on building support within the community and other local recreational/ social/community organisations assisting in the implementation of the recommendations of the project. Florida Keys Parks & Recreation Master Plan, Monroe County (Florida Keys), Principal-in-Charge and Senior Project Planner. Wade Trim was recently selected by Monroe County to develop along-range parks and recreation master plan for the Florida Keys. The Florida Keys is aworld-renowned vacation destination and is home to some of the most beautiful and fragile ecosystems in the United States. The focus of this master planning effort is to focus on enhancing parks and recreational opportunities not only for the visitors to the Florida Keys but with a focus on meeting the year-round needs of the residents of the Florida Keys. Clearwater High and Dry Multi-Site Feasibility Study, Clearwater, FL, Principal-in- Charge and Project Manager evaluating three potential sites for the City's proposed high a dry boat storage facility. Project included an evaluation of land use, zoning, transportation, utilities, building design options and cost order of magnitude cost estimates, neighborhood perceptions, and recommendation of a preferred site. A preliminary site plan was developed for the preferred site. City CouncIl is scheduled to adopt the study and approve a recommended site during this initi9al phase to be followed by more detailed studies, design options, permitting issues, updated cost estimates, and public information documents regarding the project. Sarasota County Parks and Recreation Master Plan, Sarasota County, FL, Principal- in-Charge. Project includes compiling background data; assessing trends, identifying future park facility needs, establishing level of service standards, and facilitating community workshops. Responsible for quality control, client satisfaction with services provided, facilitating public involvement, assessing trends and funding opportunities and developing recommendations and implementation strategies. Polk County Parks & Open Space Master Plan for 2010, Polk County, FL, Principal- in-Charge and Project Manager. The Plan included coordination between the County and fifteen municipalities. The Florida Planning and Zoning Association recognized the Plan as the State's Outstanding Public Report in 2001. The Master Plan was instrumental in the County passing an MSTU to assist in the funding of the Plan's capital projects. City of Cape Coral Parks and Recreation Master Plan, City of Cape Coral, FL, Principal-in-Charge and Senior Project Planner. Responsible for providing support studies, level of service evaluation and meeting facilitation in the development of a 10- year action plan to improve park and recreation facilities city-wide. The Planning Commission and City Council unanimously approved the Plan. • • David B. Gildersleeve, Executive Vice President Pasco County Parks and Recreation Master Plan, Pasco County, FL (Received Award of Merit from Florida Chapter of the American Planning Association), Principal-in- Charge and Senior Project Planner. Project included preparing support studies that include community profiles, inventories of existing park land and recreation facilities, and condition and operational assessments. An update of the master plan was also completed in January 2007. Buckingham Community Park, Lee County, FL, Project Planner. Responsible for the master planning fora 130-acre communitypark east of Ft. Myers. Primaryinvolvement included conducting charrettes with area residents as a key component in identifying park needs and design criteria. The first phase of the project was constructed in 1994. Phase II was completed in 1996. St. Petersburg Boyd Hill Master Plan, City of St. Petersburg, FL, Principal-in-Charge. Responsible for developing the master plan for Boyd Hill Nature Park and Lake Maggiore. Clearwater Christian College Campus Master Plan, Clearwater, FL, Client Manager/ Project Manager. Prepared a campus master development plan fora 15-year planning horizon. The master plan includes the preparation of a boundary survey for the 144- acre campus, ecological studies, jurisdictional wetlands mapping, rezoning and land use plan amendments, projections of future classroom, dormitory, student activity center, parking, and cultural arts facility needs, athletic facilities expansion, pedestrian pathways and new campus signage. Bayshore Area Neighborhood Plan, Manatee County, FL, Principal-in-Charge. Project includes developing the first neighborhood plan for the Bayshore Area (approximately 7,300 residents) in southwest Manatee County. The planwas unanimously approved by resolution by the Manatee County Board of County Commissioners (BOCC) in November 2001. The project received the 2002 Certificate of Merit Award for Public Report from the Florida Planning and Zoning Association. Oviedo Downtown Plan, City of Oviedo, FL, Principal-in-Charge and Planner. Responsible for the creation of a new downtown plan including the redevelopment of the historic area of the City. The project involved land use evaluation and alternative land use concepts, conceptual site planning, cost estimates, strategies tocreate apublic/ private partnership for implementation, extensive public meetings and charettes. 14th Street Community Redevelopment Area (CRA) Plan, Manatee County, FL, Principal-in-Charge. Responsible for establishing the first Community Redevelopment Agency (CRA) in Manatee County. Included preparing a fording of necessity (blight study) and developing a community redevelopment plan pursuant to the requirements of the Community Redevelopment Act of 1969 as embodied in Chapter 163, Part III, Florida Statutes. Daytona Beach ISB and MMB Corridor Redevelopment Plan, City of Daytona Beach, FL, Principal-in-Charge. Project includes conducting a market study and preparing a redevelopment plan for a declining urban arterial and traditional retail street. Comprehensive Plan, Town of Belleair Shore, FL, Project Manager. Responsible for preparation of the Town's Comprehensive Plan. Primary tasks included data and analysis, policy formulation, public involvement through workshops and hearings, development of concurrency management system and land development regulations. • • David B. Gildersleeve, Executive Vice President Comprehensive Plan, City of Palmetto, FL, Project Manager and primary author of the City's first Comprehensive Plan required by Chapter 163. F.S. The project involved extensive data collection and analysis, policy formulation, financial (CIP) planning and extensive public charrettes /workshops to obtain community consensus. Comprehensive Plan, City of Belleair Beach, FL, Project Manager and primary author of the City's Comprehensive Plan. This effort involved data collection and analysis, policy formulation, extensive public charrettes/workshops/hearings to gain plan consensus. North Greenwood Commercial District Urban Design Guidelines, City of Clearwater, FL, Project Manager. Responsibilities included the preparation of urban design guidelines for the Greenwood Commercial Neighborhood. The project involved design of a Caribbean theme, streetscaping and public space design elements. Design Guidelines, City of Pinellas Park, FL, Past Chairman of the City's Design Review Board of the Community Redevelopment Agency. Conducted numerous workshop sessions in developing guidelines and building community consensus. Regional Policy Guide, Tampa Bay Regional Planning Council, Tampa, FL, Councils Chief. Comprehensive Planning Division and drafted the first Regional Policy Plan for the Tampa Bay Region. The project was funded through a planning grant and provided policy direction for land use, transportation, environmental resources, economic development and infrastructure. Extensive workshops were conducted to achieve a regional consensus toward implementation. Governor's Task. Force on Urban Growth Patterns, Department of Community Affairs, Tampa, FL, Project Manager. Responsibilities consisted of special case studies of the Countryside and Tampa Palms communities. Projectincluded a detailed analysis of the growth patterns associated with each area and the associated governmental subsidies required to support the specific development pattern. Under a contract from the Department of Community Affairs, this project provided valuable data in support of ELMS III Legislation passed by the Florida Legislature in support of the State's Growth Management Act. Coastal Management Elements Comprehensive Plans, City ofTampa and Hillsborough County, FL, Project Director. Responsibilities included preparation of the Coastal Management Elements for each municipality. Under contracts with the Hillsborough County-City County Planning Commission extensive data collection and analysis, policy formulation implementation strategies and finance options were developed. The projectinvolved extensive technical and citizen inputwith municipal staffs, private developers, elected officials and the general public. Concurrency Management System, City of Sarasota, FL, Project Director. Responsibilities included preparation of the Ciry's Concurrency Management System (CMS). The project involved extensive meetings with City staff to develop procedures in implementing the CMS. Public charrettes /workshops were conducted involving governmental officials, appointed and elected City officials, developers and the business community. Upon developing consensus, the system was implemented in the early 1990s. Tampa Bay Downs, Hillsborough County, FL, Project Manager. Responsible for preparation of technical study assessing the environment, transportation and land use issues surrounding future expansion of the race track. • ~ David B. Gildersleeve, Executive Vice President Coastal Management Elements, City of Tampa and Hillsborough County, FL, Project Planner. Responsible for preparation of coastal management elements for both municipalities. Work included data collection and analysis, policy formulation, review of multiple modes of transportation within the designated coastal zone (i.e., roadway, transit, rail, shipping, etc.). Conducted public workshops to obtain citizen input in plan formulation. Coastal Management and Conservation Elements of Comprehensive Plan, Project Manager. Responsible for providing consulting services in preparation of the comprehensive plan. Evaluation and Appraisal Report (EAR), City of Palmetto, FL. Prepared EAR including evaluation of City's compliance with adopted goals, objectives and policies for transportation and land use. Evaluation and Appraisal Report (EAR). City of Port Richey, FL, Project Manager. Prepared EAR and City Comprehensive Plan policies to determine compliance and to make policy revisions, where appropriate. Evaluation and Appraisal Report (EAR), City of Inverness, FL, Principal-in-Charge. Responsible e for updating the City's Comprehensive Plan including goals, objectives and policies. Pasco County Evaluation and Appraisal Report and Comprehensive Plan Update, Principal-in-Charge and Senior Professional Planner. Served as a principal planner on this recent EAR and plan amendments with focus on public meeting. The County's EAR included five planning areas. The EAR was approved DCA and the Comprehensive Plan Update approved in January 2007. Project Manager for coordinating staff reviews and report preparation for Regional Impact Reports for the following DRIB (while at Wade Trim or Tampa Bay Regional Planning Council): • Beker Mine, Manatee County • Carrollwood Village, Hillsborough County • East Lake Woodlands, Pinellas County • Ramblewood, Pinellas County • Suncoast Highlands, Pasco County • Tarpon Lake Village, Pinellas County • Lake Padgett Pines, Pasco County • Florida Power and Light Oil Storage, Manatee County • East Lake Square Shopping Mall, Hillsborough County • Kingsford Mine, Hillsborough County • Dominion, Hillsborough County • Bayonet Point Shopping Mall, Pasco County • Boot Ranch, Pinellas County • Carriage Hill Mall, Largo, FL • Sugar Creek, Pasco County • Gulf View Square Mall, Pasco County • North Lake Village, City of St. Petersburg • Bloomingdale, Hillsborough County • Trout Creek, Pasco County • Harbor Ventures, Manatee County • Spoonbill Bay, City of Bradenton • Sunset Lakes, Pasco County • • David B. Gildersleeve, Executive Vice President • Agrico Storage Facilities, Hillsborough County • Turtle Lakes, Pasco County • Phillips Phosphate Mine, Manatee County Hardee County Comprehensive Plan Update, Hardee County, FL, Principal-in- Charge and Planner. Responsible for the preparation of the county's EAR and comprehensive plan update required by state statute. Evaluation and Appraisal Report (EAR), City of Palmetto, FL. Prepared EAR including evaluation of City's compliance with adopted goals, objectives and policies for transportation and land use. 1-Iomeless Emergency Project Campus Master Redevelopment Plan, Ciry of Clearwater, Principal-in-Charge and Project Manager. Responsible for the development of a campus master plan including existing facilities, proposed facilities for demolition and addition of transient housing units, new thrift store and expansion of office and clinic space. Processed master plan and construction plans through the Ciry of Clearwater. Site civil engineering and permitting has followed for a new thrift store, two residential structures with a third residential structure scheduled for approval in the spring of 2007 Wesley Chapel Lakes, Lee Arnold and Associates, Pasco County, FL, Project Manager. Project consisted of Wesley Chapel Lakes, a 2,100-acre mixed-use DRI development in Pasco County. Prepared environmental studies, traffic analysis, infrastructure impacts and availability, storm water studies and preliminary conceptual design, flood plain evaluation, economic impact analysis, revenue analysis, impact on schools, fire, EMS, parks, hospitals, and housing study/analysis for the project. Thomas Ranch, Metro Development Company, Hillsborough County, FL, Project Manager. The project consisted of 1,451-acre mixed-use DRI development. Prepared master plan and environmental, economic, traffic drainage and flood plain studies. The project was subsequently developed as Westchase one of Tampa Bay's most livable communities. River Club, Manatee County Joint Venture, FL, Project Manager. Project consisted of 1,000-acre residential DRI, including master site planning, environmental studies, traffic analysis, storm water and flood plain studies, economics and housing. Processed DRI through regulatory agencies. Manatee Park of Commerce, Manatee County Joint Venture, FL, Project Manager. Project consisted of 245-acre business park DRI, including master plan, environmental studies, transportation studies and economic studies. Safety Harbor Master Stormwater Management Plan, City of Safety Harbor, FL, Principal-in-Charge and Senior Planner. Responsible for master plan which identified and prioritized citywide storm water improvements. Safety Harbor Master Sewer and Water Management Plans, City of Safety Harbor, FL, Principal-in-Charge and Senior Planner. Responsible for master plans which identified and prioritized citywide sewer and water improvements. Glen Subregional Wastewater Treatment Plant, Glen Lakes Partners, Hernando County, FL, Principal-in-Charge and Client Manager. Project consisted of design and construction inspection for 1.0 mgd subregional wastewater treatment plant. • • David B. Gildersleeve, Executive Vice President Pasco County Libraries Master Plan and Impact Fee Ordinance, Pasco County, FL,. Completed in 2003. Principal-in-Charge. Project plan involved the development of a 20-year Master Plan, including Impact Fee Study and Ordinance.. The master plan was updated in 2007 Pasco County Emergency Services (Fire /EMS) Master Plan and Impact Fee Ordinance, Pasco County, FL. Completed in 2004. Project involved the development of a 10-year Master Plan, including Impact Fee Study and Ordinance. The master plan was updated in 2007. Bike and Hike Trail, City of Port Richey, FL, Project Manager. Responsible for establishing preferred alignment and preparation of construction plans fora 1.6-mile Bike and Hike facility. Prior to joining Wade Trim in 1987, Dave was owner and principal of Land Design Group, a company providing planning consulting services to the private sector in the areas of re-zonings and land use plan amendments, land use studies, special studies, variances, special exceptions and site feasibility analysis. Prior to that Dave served as the Planning Director for the City of Pinellas Park, FL and DRI Review Coordinator for the Tampa Bay Regional Planning Council ('I'BRPC). • Jose Raul Fernandez, Professional Planner Role Jose Fernandez is an architect and urban planner with 15 years of professional Land Use/Community Planner experience. His knowledge and professional practice cover a wide range of topics such as strategic urban planning, comprehensive planning, land use and transportation Education analysis, housing, redevelopment, character studies, visioning, site planning and communirydesign.Jose isalso experienced in buildingpositive and strongrelationships MS, Urban Planning, Summa Cum among all levels of government, the private sector and the community. Jose is fluent Laude, University of Arizona, 1997 in Spanish. (Fulbright Scholar) Before joining Wade Trim, Fernandez was the Planning Director for the City of BS, Architecture, Cum Laude, Santiago de los Caballeros in the Dominican Republic where he was responsible for Pontificia Universidad Catolica Madre developing its strategic and comprehensive plans under the cooperation of the public y Maestra, Dominican Republic, 1993 and the private sectors. He also worked as a Consultant for the European Union and as an instructor and facilitator for ±-' e Sustainable Development and Human Settlements Special Training Division of the United Nations. • "Site Planning." American Planning Association (APA) and the Representative Project Experience: Department of Housing and Urban Comprehensive Planning Development (HUD) of the United Comprehensive Plan Evaluation and Appraisal Report (EAR), City of Clearwater, FL, States. 2001. Project Planner. The Clearwater EAR process included the input of a 23 member • "Urban Indicators Habitat Istanbul Citizens Advisory Committee, several meetings with adjacent governments, and close + 5." Urban Management Program coordination with various City departments. The EAR was approved by the City's of the United Nations. 2000. Community Development Board, the City Council and the Florida Department of • "Urban Strategic Planning." Ibero- Community Affairs. Responsibilities included the preparation of discussion materials American Center for Urban and presentation of information in Citizen's Advisory Meetings; performance of all Strategic Planning CIDEU- City of data collection and analysis of the project according to State requirements to identify Barcelona, 1998 local issues; preparation of recommendations for plan amendments and preparation • "Environmental Economics of the final document for adoption. Workshop." Harvard Institute for International Development HIID. Comprehensive Plan Evaluation and Appraisal Report (EAR), City of Venice, FL, Ford Foundation and the Bureau of Project Planner. The EAR allowed the City to identify critical community issues for Educational and Cultural Affairs of consideration when amending the Comprehensive Plan. The EAR was approved by the United States Department of the Planning Commission, the City Council and the Florida Department of Community State, LASPAU, 1998. Affairs. Responsibilities include the preparation of an overall community character study in which critical issues are identified for the City's EAR in order to identify existing Professional Affiliations and potential activity centers, linkages, gateways, focal points, and character areas for • American PlanningAssociation the City. Also participated in the "visioning" process. (APA) • Florida Chapter of the American Comprehensive Plan Update, City of Venice FL, Project Planner. This Comprehensive PlanningAssociation (FAZA) Plan includes perform data and analysis, and develop strategies (goals, objectives and Urban Land Institute (UL)) policies) to the following elements: Environment Coastal Management, Parks and Florida Planning and Zoning Recreation, Public Facilities and Infrastructure; Future Land Use, Housing, Historic Association (FPZA) Preservation, Transportation, Intergovernmental Coordination and Capital Improvements. TheCityofVeniceprocessincludestheinputwithadjacentgovernments, Documents and Presentations close coordination with various City departments, and the ultimate review and approval by the City's Community Development Board and City Council. • Fernandez, J. Stakeholders and Responsibilities included preparing discussion materials and presentinginformation in Conflict Management Analysis for Scoping Meetings; performing all data and analysis of the project according to State the Development of Mao's Strategic requirements (Rule 9J-5), reviewingproposedgnals, objectives and policies; preparing Plan. City of Mao. State Reform conceptual diagrams; and preparing the final document for adoption. and Modernization Program for the Dominican Republic (PARME). Comprehensive Plan, City of Tampa, Fl., Project Manager. This Comprehensive Plan Mao, Dominican Republic. includes perform data and analysis, and develop goals, objectives and policies to the following elements: Potable Water, Stormwater, Wastewater and Solid Waste. The • Jose Raul Fernandez, Professional Planner ' Fernandez, J. Santiago's City of Tampa process includes close coordination with utilities and planning Development Planning Process. departments, the Planning Commission, and the ultimate review and approval by the International Workshop: "Land Use City Council and the Florida Department of Community Affairs. Responsibilities Planning in Port and Intermediate include managing resources and schedule of the project; coordinating discussion Cities." Organized by the Central materials and presenting information in Department Meetings; coordinating all data American and the Caribbean and analysis of the project according to State requirements (Rule 9J-5), reviewing Foundation for Municipal proposed goals, objectives and policies; and preparing the final document for Development (DEMUCA) and the adoption. Spanish Agency for International Cooperation (AECI). San Jose, Comprehensive Plan, Ciry of Bradenton, Fl. Project Manager. This Comprehensive Costa Rica. Plan includes perform data and analysis, and develop goals, objectives and policies to the following elements: Housing and Capital Improvements Elements. The City of Suarez, C; Fernanriez, J. Bradenton process includes close coordination with the planning and finance Organizational Framework for the departments, as well as with other consultants involved in the process. These elements Development of Santiago's are developed under the new legislative provisions in the Florida Statutes and close Comprehensive Plan. State Reform coordination with the Florida Department of Community Affairs. Responsibilities and Modernization Program for the include managing resources and schedule of the project; coordinating discussion Dominican Republic (PARME). materials and presenting information in Department Meetings; coordinating all data European Union. Santiago de los and analysis of the project according to State requirements (Rule 9J-5), reviewing Caballeros. proposed goals, objectives and policies; and preparing the final document for adoption. Fernandez, J. "The Experience of Santiago's Strategic Plan." Neighborhood Planning, Design and Downtown Redevelopment International Workshop: "Best TamiamiTrailRevitalizationStrategy,CityofBradenton,FL,Planner.Theresultofthis Practices in Strategic Urban project was the development and approval of a specific strategic plan to establish a Planning." Organized by the Ibero- direction and policy for the revitalization of this historic corridor within the City. The American Center for Urban Ciry is aggressively implementing recommendations of the strategy with proposed Strategic Planning (CIDEU). Quito, amendments to its Land Development Regulations and Comprehensive Plan and the Ecuador. acquisition ofproperties along the corridor as a development incentive. Responsibilities included participation in the assessment o f community design desires and opportunities, Strategic Development Council of and final write-up. Santiago (CDES). Santiago 2010: Strategic Development Plan, Jose 14th Street West Community Redevelopment District (CRA) Overlay Zoning District Raul Fernandez, General and Design Guidelines. Manatee County, FL, Project Planner. This project is intended Coordinator. Promoted by the to develop an Overlay Zoning District and Design Guidelines based on smart growth Municipality of Santiago and the principles to incentive redevelopment through public and private partnerships within Spanish Agency for International a distressed area of the County. The 14th Street CRA process includes a close Cooperation (AECI). coordinationwithvariousstockholdersincludingcommunityleaders,privatedevelopers, the Manatee County Planning and the Manatee County Board of County Commissioners. Fernandez, J. Participatory Strategic Responsibilities include performing an analysis of the district including land use Planning at the Municipal Level on patterns, character and resource analysis (structure, streetscape, circulation patterns, Internacional Workshop: "Reducing activity centers, building facade, etc.) and reviewing recent studies developed by the Poverty and Corruption: An County related to the 14th Street CRA District. Also include the preparation of zoning Integrated Approach to Good regulations and design guidelines. Governance" Organized by the International Consortium on Visioning Governmental Financial Sumter 2030: Countywide Visioning Plan. Sumter County, Fl. Project Planner. This Management/Casals Associates. project is intended to develop a county-wide visioning process that is open to all Miami, Florida. citizens of Sumter County. The vision process will include preparation for and facilitation of public meetings and preparation of a vision plan (written and graphic) that defines and describes the desired land use patterns and infrastructure for the next 20 years in Sumter County. The visioning process is essential to: a) create awin-win planning scenario between the County and five Cities and, b) provide valuable input necessary for preparation of the County's state mandated Evaluation and Appraisal ~~~_ .~_= - - ~ -`~ ^~:,~`. STATE OF FLORIDA ~ w. ~~ mow, DEPARTMENT OF COMMUNITY AFE~ ~~.~~~~',1'~ ~~ ted to mak-ng Florida a better place to call home Ded-ca II THADDEUS L."C~~j~r~f ! "~'~},~ JEB BUSH ~UU Governor ~ _ c~ R ~ June 29, 2004 ~- ~ ~~ RE: Legislative Action Affecting Due Date of Water Supply Facilities Work Plans Dear Local Planning Official: During the 2004 session, the Florida Legislature enacted House Bill 293 changing the due date for the 10-year water supply work plan from January 1, 2005, to December 1, 2006. The bill was signed into law by Governor Bush on June 24, 2004. This is a change to legislation passed in 2002 in which the Legislature amended Section 163.3177(6)(c), Florida Statutes, requiring local governments having responsibility for water supply facilities to amend their infrastructure element to adopt ~ water supply work plan. The work plan must cover at least a 10-year planning period and must reflect consideration of the applicable water management districts' Regional Water Supply Plan. The work plan was due January 1, 2005, or the the Legislature evaluation and appraisal report (EAR) due date, whichever came first. This session, extended the due date to December 1, 2006, and eliminated the language regarding the EAR due date. Postponing the due date allows the work plans to reflect the most current update of the regional water supply plans, which are due to be revised in 2005. In addition, the legislation requires that once the work plans have been adopted they be updated every five years within 12 months of the update to the regional water supply plans. Also, amendments to incorporate the work plans are now exempt from the twice per year limitation on amendments to the comprehensive plan. An excerpt from the legislation is attached. The entire bill can be viewed at http //www flsenate ~ov/data/session/2004/House/bills/billtext/pdf/h0293er.pdf. Some local governments have already begun preparation of the work plan and are now considering whether to continue or wait. We are advising that local~governments delay adopting the work plan until after the regional water supply plans have been updated. If you choose not to delay, then the work plans will still need to be updated as necessary within 12 months of the approval of the revised Regional Water Supply Plan. Local governments 'who ha ~e already adopted the work plan, or who have transmitted to the Department, will be contacted by the Growth Management Administrator responsible for that area. If you have questions, please call Mike McDaniel at 850-922-1806 (email mike mcdanielndca.state.fl.us) oY Walker Banning at 850-922-1785 (email: walker bannin~(a~dca.state.fl.us). Sincerely, G Valerie J. H bbard, AICP Director, Division of Community Planning 2555 SHUMARD OAK BOULEVARD TALLAHASSEE, FLORIDA 32399-2100 Phone: 850.488.846n6esrnet addre8s$ h66 ://www.d$ aoscate.~l7Ss~Suncom 291.0781 COMMUNITY PLANNING ~ ~ EMERGENCY h1ANAGEMENT HOUSING & COMMUNITY DEVELOPMENT CRITICAL STATE CONCERN FIELD OFFICE 2551 Shumard Oak Boulevard 2796 Overseas Highway, Suite 212 2555 Shumard Oak Boulevard Ta IahasseeaFL032399-2100rd Tallahassee, FL 32399-2100 Marathon, FL 33050-2 2 2 7 Tallahassee, FL 32399-2100 (g50) 413-9969 (850) a88-7956 ,~nG~ ~na_~am (850) -188-2356 FLORIDAHOUSEOFREPRESENTATIVES ENROLLED HB 293, Engrossed 2 2004 Legislature Section 2. Paragraph (c) of subsection (6) of section 163.3177, Florida Statutes, is amended to read: 163.3177 Required and optional elements of comprehensive plan; studies and surveys.- (6) In addition to the requirements of subsections (1)- (5), the comprehensive plan shall include the following elements: (c) A general sanitary sewer, solid waste, drainage, potable water, and natural groundwater aquifer recharge element correlated to principles and guidelines for future land use, indicating ways to provide for future potable water, drainage, sanitary sewer, solid waste, and aquifer recharge protection requirements for the area. The element may be a detailed engineering plan including a topographic map depicting areas of prime groundwater recharge. The element shall describe the problems .and needs. and the general facilities that will be required for solution of the problems and needs.- The element shall also include a topographic map depicting any areas adopted by a regional water management district as prime groundwater recharge areas for the Floridan or Biscayne aquifers, pursuant to s. 373.0395. These areas shall be given special consideration when the local government is engaged in zoning or considering future land use for said designated areas. For areas served by septic tanks, soil surveys shall be provided which indicate the suitability of soils for septic tanks. By December 1, 2006 aa~~~-Z'~A-~5 , e~-t~e ~a~ t ~e-~-~6 31.9-~-Fa-} ~ ~v~e~re=o=~da ~ ^ F : ~ ^ `' t h e element must consider .the appropriate .water management district's regional water supply plan approved pursuant to s. 373.0361. The element must include a work plan, covering at least a 10-year planning period, for building water supply facilities that are identified in the element as necessary to serve existing and new development and for which the local government is responsible. The work plan shall be updated, at a minimum, every 5 years within 12 months after the governing board of a water management district approves an updated regional water supply plan. Amendments to incorporate the work plan do not count toward the limitation on frequency of adoption of amendments to the comprehensive plan. r Pinellas County Utilities Ten-Year Water Supply Facilities Work Plan ~ PCU' TOTAL WATER DEMAND tMGt31 ~ FY03 FY04 FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15 64.78 67.00 65.00 64.50 64.00 63.50 63.00 62.50 62.00 61.50 61.00 61.00 61.00 TYPE PROJECT TITLE FUNDING SOURCE LOCATION TEN YEAR SCH EDULE OF IMPROVEMEN TS (Dollar Shown in Thousands) Total Facility Replacement Distribution Mains Water Enterprise Fund Throughout Service Area nla 37,841 12,235 2,573 2,680 2,530 1,530 1,530 1,530 1,530 1,530 1,530 1,530 68,569 Facility Replacement Water Supply Stations Water Enterprise Fund Throughout Service Area nla 1,322 2,778 85 85 85 85 85 85 85 85 85 85 4,950 Facility Replacement CIAC2 Water Enterprise Fund Throughout Service Area nla 100 100 100 100 100 100 100' 100 100 100 100 100 1,200 Facility Replacement Source and Treatment Water Enterprise Fund Throughout Service Area nla 4,953 21,750 35,025 12,625 25 25 25 25 25 25 25 25 74,553 Facility Replacement Transmission Mains Water Enterprise Fund Throughout Service Area nla 1,150 4,510 3,440 4.,000 0 0 D 0 0 0 0 0 13,100 Facility Replacement Distribution Stations Water Enterprise Fund Throughout Service Area nla 1,410 3,045 25 25 25 25 25 25 25 25 25 25 4,705 Facility Replacement Distribution Buildings Water Enterprise Fund Throughout Service Area n/a 40 185 40 40 40 40 40 40 40 40 40 40 625 New Facility Reuse System Expansion3 Sewer Enterprise Fund Select Area -North County nla 6,700 11,185 19,900 5,000 2,000 2,000 1,000 0 0 0 0 0 47,785 New Facility Reuse System Expansion3 Sewer Enterprise Fund Select Area -South County nla 10,479 10,380 0 0 0 0 0 0 0 0 0 0 20,859 FY04 - FY05 63,995 66,168 61,188 24,555 4,805 3,805 2,805 1,805 1,805 1,805 1,805 1,805 236,346 a O&M PROGRAMS Conservation Projects" Efficient Use of Potable Water Water I Wastewater Enterprise Throughout Service Area 3,812 3,899 3,749 3,843 1,206 1,236 1,267 1,298 1,126 1,154 1,183 1,212 24,985 Conservation Educations Education and Outreach Water l Wastewater Enterprise Countywide 980 910 840 770 700 718 735 754 773 792 812 832 9,616 FY04 - FY05 4,792 4,809 4,589 4,613 1,906 1,954 2,002 2,052 1,899 1,946 1,995 2,044 34,601 ' PCU =Pinellas County Utilities; the PCU water service area includes approximately 110,000 retail connections. PCU provides wholesale service to the cities of Clearwater, Pinellas Park, Oldsmar, Tarpon Springs, Safety Harbor and Dunedin. Several of these communities are considering water supply alternatives to reduce their demand on PCU. z CIAC = Contributions in Aid of Construction -for example, the implementation of the reclaimed water system benefits the water system in that the system doesn't need to expand to meet the new demand. Therefore, funds are transferred from the water system enterprise to the sewer enterprise to pay for part of the reclaimed system construction. 3 The expansion of Pinellas County's reclaimed water distribution system and incentives to citizens to utilize alternative water sources for irrigation are key conservation and potable water demand reduction strategies. ° Water conservation programs are focused on: a) Ultra-low volume toilet retrofits ($9.7 million estimated), b) Alternate water sources for irrigation ($1.5 million estimated), and c) Industrial, commercial and institutional performance contracting incentive ($300,00 for pilot). s Due to reducing per capita consumption of water, the focus will shift to maintaining public knowledge and sensitivity to water resource issues. NOTE: All figures are projections based on best available data, The Pinellas County Board of County Commissioners approves budgets and priorities annually. AMENDMENTS PROPOSED TO THE WATER SUPPLY ELEMENT AND THE INTERGOVERNMENTAL COORDINATION ELEMENT OF THE PINELLAS COUNTY COMPREHENSIVE PLAN TO ADDRESS CH. 163.3177, F.S., REQUIREMENTS TO INCLUDE A TEN YEAR WATER SUPPLY FACILITIES PLAN IN THE WATER SUPPLY ELEMENT. WATER SUPPLY ELEMENT New Policy 1.1.9 Pinellas County supports the value of local and re ig onal partnerships in the provision of potable water supply and will coordinate its water supply facilities lp anning with Tampa Bay Water and the Southwest Florida Water Management District and with their respective Master Water Plan and Regional Water Supply Plan. Amended Objective 1.2 A Ten Year Workplan, including a six year schedule of Capital Improvements, shall be adopted in order P~ to correct existing deficiencies, to replace worn out or obsolete facilities, to fund new and ongoing conservation initiatives, to provide the facilities and programs to meet retail and wholesale customer needs and to accommodate desired future growth . INTERGOVERNMENTAL COORDINATION ELEMENT Amended Policy 1.4.5. Pinellas County shall continue to coordinate with the SWFWMD, including with its adopted Regional Water Supply Plan, and area governments and agencies in planning for a reliable long term regional potable water supply. Note: additional and related updates and amendments will occur in conjunction with the evaluation and appraisal of the Pinellas County Comprehensive Plan to more fully integrate the new requirements with the remainder of the Comprehensive Plan. Pinellas County's Evaluation and Appraisal Report is due to DCA by August 1, 2005. water policy new stuff f e retrofit-rebate program to replace 94,000 toilets for a demand reduction of 2 million gallons per day by 2006. To reduce the demand for outdoor use of potable water for irrigation, PCU has instituted an alternate water source incentive program where customers can be reimbursed up to $300 per customer for developing an alternative source of water for irrigation such as shallow or deep wells, or surface water withdrawal. This program is only available in areas where reclaimed water is not to be provided, and to those connected to our wholesale customers' systems. PCU continues to enforce watering restrictions as a means to educate customers, limiting water use for irrigation to appropriate days and times. This has had the effect of controlling growth in the demand for outdoor irrigation and educating customers on excess, or over, use of irrigation water. For example, PCU's Healthy Lawns program is aimed at changing water demand by changing habits and educating citizens on native plant species and xeriscaping concepts that can reduce demand, and assuring an understanding of the benefits to lawns when appropriate watering techniques are employed. With the exception of the reclaimed water system build-out, PCU's capital program for the water system is driven by repair and replacement of existing facilities. This is due to the lack of growth being experienced in the service area and the age of the system. Other considerations in the capital program include actions necessary to address varying water qualities received from Tampa Bay Water. To address the softer water being received from Tampa Bay Water, an accelerated pipe replacement program was initiated. To address issues associated with Tampa Bay Water's water being received from multiple sources (and therefore multiple qualities), PCU is considering developing the infrastructure to allow blending and retention as a way to assure that a stable, more consistent quality product is delivered to PCU customers via the distribution system. Clearly, the rising cost of water from Tampa Bay Water, combined with the cost of the capital programs described above, will impact rates to customers for the foreseeable future. Consistent with Section 163.3177, F.S., a 10 Year Water Supply Facilities Work Plan has been prepared by PCU. It does not address costs associated with water supply, as that is the responsibility of Tampa Bay Water. It does address things like distribution, transmission, treatment, and associated facilities, for the entire Pinellas County Water Demand Planning Area, consistent with individual wholesale agreements. Water narrative for 10 year plan final c. - t An Overview of Pinellas County Utilities' Water Supply Programs, Challenges and Long-Range Facility Planning Pinellas County Utilities (PCU) is a mature water and wastewater utility system providing service to most of the unincorporated area and several municipalities. As Pinellas County is essentially built-out, there is little anticipated growth in Pinellas County Utilities Water Demand Planning Area. A very small percentage of the County still remains on private wells or septic systems. Pinellas County is a member of Tampa Bay Water, through interlocal agreement, and Tampa Bay Water is required to meet all its member governments' water supply needs. With the formation of Tampa Bay Water, Pinellas County is no longer permitted to own its own potable water producing assets or supplies. Tampa Bay Water currently provides an average of 70 million gallons of potable water per day to PCU from groundwater, surface water and desalination sources. PCU provides water to both retail and wholesale customers. The wholesale customers represent approximately 35 percent of the overall system demand. Of the wholesale customers, Clearwater and Tarpon Springs currently have their own water use permits issued by the Southwest Florida Water Management District. Due to the rising cost of water from Tampa Bay Water, these customers are considering reducing their reliance on Pinellas County as a source of their water supply. Oldsmar is also considering developing their own water supply capabilities due to this increase in cost. While Pinellas County is forbidden by agreement from seeking other sources of water supply other than Tampa Bay Water, PCU's wholesale customers are not under similar constraints. A partial reduction of two million gallons per day of potable water demand is projected for these wholesale customers and is currently factored into the demand projections included with the 10 Year Water Supply Facilities Work Plan. A significant portion of PCU's strategy for reducing potable water demand and thereby providing an environmental benefit, is the expansion of the reclaimed water transmission and distribution system. When complete, the system will have 30,000 connections, which is in the same order of magnitude as Clearwater's op table water system. The total projected effect of the build-out of the reclaimed water system is a reduction in potable demand of 6 million gallons per day. The impact of this potable water demand reduction will be felt when the system reaches its projected subscription rate (i.e., when the maximum number of people have signed up for reclaimed water service) in 2013. PCU is also committed to several other conservation programs which are focused on structurally changing water demand through public education and instilling efficient water use habits in PCU customers, both wholesale and retail. Some of the structural programs used so far include the distribution of water conserving fixtures and toilet tank devices to reduce the volume of water used per flush. However, recent studies have shown that, since their introduction, these fixtures have significantly penetrated the local market, so less emphasis will be placed on these methods in the future. Another retrofit opportunity, however, exists with ultra-low volume toilets. PCU has established a 11~~ste~ ccte~ I~lccn The Plan includes an aggressive conservation program with the goal of reducing regional demand by 10 mgd in 2000 and 17 mgd in 2005. Board-Approved Projects Projected Capacities - MGD System Confiauration I Projects Q Brandon Urban Dispersed Wells 6 North-Centro I I nterti o Tampa Bay Seawater Desalination 25 Enhanced Surface Wafer Systom Including Tampa 60-66 Bypass CanalMillsborough River High Wator, fJafia River, South-Control Interne, Tampa Bay Rogional Rosorvoir, Regional WaterTreatmont Plant) Blandon/South-Control Connection Loop 72 ~4tem Configuration II Projects Downs ream Augmentation 13-17' Mid-Pinellas Brackish Wafer Dosalination 5' Crystals International WatorSupply 3.5-5.5' Stand-By Projects Cone Ranch W®Ilfield 8-10' Tampa Bay Seawater Dosalination II 10• Bmndon Wells II 2-6• Cypress Bridge II 4(mox)' Gulf Coast Dosalination 9-25• Developmental Small Scale ODDOrtunities Starfcoy Ecosystem Enhancomon} 2+' Tomplo Tenaco Interconnect 1.5• Corgill Reclaimed Ezchango 1• Eagles Wells II 0.3• Emergency Supply Morris Bridge Sink Emorgonry Uso Only * Estimate of capacity. Permit applications will be based on optimized capacity within the limits of sound environmental practice. TAMPA BAYS WATER Supplying Water Tolle Flaglon ^ Existing Facilities _.4 Cross Bar wenfield N N. Pasco Wellfield O Cypreu Creek W.T.P. NN ~r11 RkheyeW.T.P. ltyM}pRa $fartCe ~ Gulf Coast ~`'r°jt~'° Desalination Starkey Ecosystem h En ancement south Pasco Wellfield Keller $eCfiOn 21 lek w.T.. Wellfield Eldridge Co;me- R.w.lt. a Wilde Odessa O ~ Mor well#ield Loo 72 Leks Perk e W.T.P. Well • ~~ Temple Terr II N o o Interconnect W!~.P.HIAs.L~ O o N.W. Hills Reg. Wellfield North-C Hills. I Ffilbborouyyh~ River WT.P Down sh"ea m PINELLAS Augmentation _ COUNTY Mid-Pinellas Brackish Water Desalination LEGEND Study Area New Water Supplies ^ System Configuration II Projects ® Future Potential Sources New Pipelines / Interties Q New Water Treatment Plant m pa tonal Tampa Bay Seawater T Desalination II ~.ree . Cypress Bridge Wellfield PASCO COUNTY Bride Study Area .T.P. Morris Bridge r wdQe W Ilfield . T. . , orris Cone Ranch • Bridge ~/ellfield Sink Study Area ent I Tampa nt le yp ass Canal Cr" StalS ~1~' Supply ~~`•~` ~ • Brandon I N L. Wells M , II ` "~~ • Brandon / South- South- O~ Central ~ Hills. 1• ~ O pop Interfia ~ W~.~, p Car Ill Sout Central g Hillsb rough Alafia Reclaimed Wellfl Id w„~ Exchange supply • Tampa Bay Regional Rese rvoi r HILLSBOI~O UGH COUNTY M WP t-30-2004.CDR DAG-1/30/2004 .. t . TAMPA BAYS WATER Supplying Water To The Region Board of Directors Robert Stewart, Frank Parker, Rick Baker, Kathy Castor, Ann Hildebrand, Pam lorio, Susan lotvala, Jan Platt, Ted Schrader General Manager Jerry L. Maxwell General Co~r,sel Donald D. Conn 2535 landmark Drive, Suite 211, Clearwater, FL 33761-3930 Phone: 727796.2355 /Fax: 727.791.2388 / SunCom: 513.7010 www. t a m p a b a yw a to r. o r g February 23, 2004 Mr. Brian Smith, Director Pinellas County Planning Department 315 Court Street Clearwater, FL 33756 Re: Water Supply Facilities Work Plan Tampa Bay Water is a regional water supply authority that provides wholesale water to its six Member Governments: Hillsborough, Pasco, and Pinellas counties, and the cities of New Port Richey, St. Petersburg, and Tampa. Tampa Bay Water is governed by two agreements with its Member Govemments, the Amended and Restated Interlocal Agreement (Interlocal Agreement) and the Master Water Supply Contract, which were established in 1998. Tampa Bay Water has an unequivocal obligation to provide for the wholesale water supply needs of its Member Governments. The Interlocal Agreement outlines requirements for Tampa Bay Water's Long- term Water Supply Plan and Master Water Plan, which must contain. sufficient water supply projects to meet Member Governments' water needs over the 20-year planning horizon. Dear S~i~~ The Long-term Water Supply Plan 2003 was provided to you and to the Pinellas County Utilities Department in May 2003 for your use in developing your Water Supply Facilities Work Plan for Pinellas County. In addition, this correspondence is being sent to you to further assist you with the requirements of the Work Plan. The requirements of the Long-Term Water Supply Plan 2003 as outlined by the Interlocal Agreement can be found in the report sections as shown in the table below. Requirement Can Be Found In denti current customers, ro~ects, and future customers Section 5 eview and generally inventory existing Tampa Bay Water Facilities Section 2 denti a ca ital im rovement ro am Section 3 eview current Tampa Bay Water permits, existing and ro~ected re lations Section 7 Identi ro osed new water su 1 facilities Section 3 valuate staffin Section 4 rovide hydraulic analysis of both existing and proposed systems Section 6 valuate present and. future sources and treatment requirements in terms of ca aci , reliabili ,and econom Section 8 pdate the list of water supply facilities required to meet the anticipated qualitq water needs of the Member Governments for the next twen ears Section 3 T:\Strat_Plan\DYE\Water Supply Facilities Work Plan coaespondence-Smith.doc ,~. Mr. Brian Smith, Director p February 23, 2004 Page 2 The Long-term Water Supply Plan and Master Water Plan identify sufficient supply projects to meet the 20-year planning horizon needs of Tampa Bay Water's Member Governments. Several reports have been issued, in addition to the Long-term Water Supply Plan 2003 of the Master Water Plan, that document Tampa Bay Water's planning efforts towards updating its Master Water Plan. These documents include the following and are support documents for the Long-term Water Supply Plan 2003 of the Master Water Plan: ~ Long Term Water Supply Planning Technical Memorandum -Comprehensive Project Screening List, December 2001 o Long Term Water Supply Planning - PrajectAlternative Information, December 2001 e Lang Term Water Supply Planning -Recommended Developmental Study Lz;rt, January 2002 e Source WaterAssessment Guide, February 2003 The Comprehensive Project Screening List considered every water supply project listed in the Southwest Florida Water Management District's Regional Water Supply Plan (RWSP). Applicable ideas in the RWSP were further evaluated in the Project Alternative Information and the Developmental Study list. Three of the five projects that were moved into the Master Water Plan by Tampa Bay Water's Board of Directors in Apri12003 are recommended in the RWSP. In order to meet the Member Governments' future water needs, Tampa Bay Water must understand projected water demands. The Long-term Plan reviews and evaluates the Member Governments' Annual Reports, Tampa Bay Water's Demand Forecasting System, and the Southwest Florida Water Management District's Regional Water Supply Plan projections for this purpose. Tampa Bay Water's demand projections when compared with those contained in the Southwest Florida Water Management District's RWSP were found to be compatible with each other (within approximately 5% of each other). As a part of evaluating future water supply needs, Tampa Bay Water must consider the next scheduled reduction in pumping from the Consolidated Wellfields in December 31, 2007, which is a requirement of the Partnership Plan between Tampa Bay Water and the Southwest Florida Water Management District. Based on Tampa Bay Water's final Demand Forecasting System probabilistic forecasts, the expected water demand (mean probabilistic water demand forecast) in 2008 is approximately 253 mgd. Considering the City of Tampa's surface water system supply (which produced 62 mgd of supply during the dry season conditions of 2001), Tampa Bay Water's existing and Configuration I facilities are more than adequate to meet this demand. Additional water supply facilities would not be needed until the 2013 timeframe. In addition to finalizing its Demand Forecasting System (DFS), Tampa Bay Water completed a detailed Probabilistic Need Forecast in September 2003. This forecast analyzes the capacity and timing of future supplies needed by comparing existing supply sources, their expected production capability in the future, and then comparing that to future water supply demands. The purpose of the Probabilistic Need Forecast is to take the demand forecast a step further and look at the timing and quantity of supply needs so that future supply projects can be built at the optimal time, thus limiting future rate impacts, while assuring that demands are met. Tampa Bay Water will update the Probabilistic Need Forecast on an annual basis and use this to confirm the schedule of its Capital Improvements Program. The results of the Probabilistic Need Forecast are graphically depicted below. T:\Strat_Plan\DYE\Water Supply Facilities Work Plan correspondence-Smithdoc In addition to its capital planning program, Pinellas County Utilities conducts its conservation and conservation education program throughout its entire Water Demand Planning Area. This program includes such things as eligibility for incentive programs (e.g., low flow toilet rebates, shallow well rebates, etc.) as well as education programs and materials in the schools, at special events, at hotels and motels, as well as general conservation materials for distribution at municipal buildings and events. The commitment and resultant success of Pinellas County Utilities' conservation programs is reflected in the fact that Pinellas County Utilities' customers have one of the lowest per capita water consumption rates in the State. A short narrative, and a corresponding (draft) amendment to the objectives and policies of the Water Supply Element and Intergovernmental Coordination Element of the Pinellas County Comprehensive Plan, has also been included with this letter. You may wish to use some of the information as you update your own Water Supply Element to meet the requirements of Section 163.3177, F.S. While the County proposes to amend its Water Supply Element to include the new policy and amended objective, we intend to more fully address the additional and related Chapter 163, F.S., requirements through the evaluation and appraisal process also underway at this time. It is our intention that this letter, and the attached information, should satisfy the Department of Community Affairs that Pinellas County is planning for the long-term wholesale water needs of the City of Clearwater, and that the required coordination has occurred between the County and the City, as well as the County and Tampa Bay Water, and Tampa Bay Water and the Southwest Florida Water Management District. In addition, the County will continue to coordinate directly with the Southwest Florida Water Management District during the evaluation and appraisal process to ensure, at a minimum, that the additional Chapter 163, F.S. requirements relating to the Conservation and Intergovernmental Coordination Elements are fully met. We will continue to share information with you as our comprehensive plan amendments move forward, and as we make progress on the evaluation and appraisal of the Pinellas County Comprehensive Plan. Please feel free to contact me at 464-3485, or my Planning staff, at 464-8200, if you need additional information, or have any questions. ~ . ~-~ K. Smith, Director of Planning as County Planning Department cc: Jacob Stowers, Assistant County Administrator Pick Talley, Director of Utilities Chris Staubus, Assistant Director of Utilities Walker Banning, DCA Terry Johnson, SWFWMD Paula Dye, Tampa Bay Water - Mr. Brian Smith, Director ~ February 23, 2004 ~ Page 3 3zo t Historic pemand 10 ngd of supplies:added in -~--Expedeil Demand 2017 and 2021 ~3--Supply Capacity 300 Reservoir online g mgd new supplies in 2005 online in 2042 280 Wellfiel d 260 cutback s to 158 ingd in 1998 ---- 240 - -- -- . ----- --- Well field 6utbacks to 90 mgd in 2008: 220 Wellfield cutbacks to 2003 mgd and System Gonf I projects on-line 200 O ' N ~~' V A f0 r m ~~ N N H N O~ O 1 T~ Onl pO I OI O C i .Oql O .O O ~O O O O O A I OI O P O O O Q o O .O N N O Q O E O Q w N iv R e°.. R n R N 'tE .° N These results indicate that an additional 8 mgd of new supplies will need to be developed by 2012 to meet the requirement for new supply in 2013. Tampa Bay Water's Master Water Plan contains potential future projects with an estimated capacity of over 90 mgd (see attached map). The Tampa Bay Water Board of Directors has set a goal of developing 8-12 mgd of new supply sources by 2012 in order to meet the 2013 supply requirements. In December 2003, the Tampa Bay Water Board chose projects for System Configuration II of the Master Water Plan. Three projects were moved into System Configuration II including the Crystals International Water Supply Project, the Downstream Augmentation Project, and the Mid-Pinellas Brackish Water Project. These three projects have an estimated capacity of 21.5 - 27.5 mgd on annual average. I trust this information, along with the Long-term Water Supply Plan and supporting documents, will be of assistance to you in compiling your Water Supply Facilities Work Plan. Please call me at 727-796-2355 if you have any questions. Sincerely, t ~~-_ ~~ Paula Dye, AICP ~ Chief Environmental Planner Enclosure T:\S[rat_Plan\DYE\Water Supply Facilities Work Plan correspondence-Smi[h.doc Mr. Brian Smith, Director February 23, 2004 .~ Page 4 xc: Mr. Walker Banning, Florida Department of Community Affairs Mr. Richard Deadman, Florida Department of Community Affairs T:\Scrat Plan\DYE\Water Supply Facilities Work Plan correspondence-Smithdoc Growth Management 2005 ~ FL Dept of Community Affairs '`. R'•lilli ~:,,~ ~. , • 6LItLDtNG GDDE3 ~ F~ORtDACOnItauNrttES j "7 RUST ,FRONT PORCH FLORIDA I ;,: NEw3 1 I .~pR£QUE~RLY ASKED -';QUE9TtON9 , • ABOUT OUR SECRETARY • ~_µAILTHE SECRETARY ~` ~ INSPECTOR+;ENEFtAL . • VgEB ggSIgTA~fCE • CONTACT U9 • OUR tAGO • DCAE-~~YEE services ;, ;~" - _ ,' Page 1 of 10 '~ a ~. • `° ~• J , .~'_ ~'.. -.~ ,,,~ ; :~ ~ t. `^~„~- ~ ~~~ ~ Mgt ~ _ ~~'r-:-: ` ~ . ~i ~,~ -y~ ,w ~ _ ~~ ~~-' _ ._ . .. _ _ e _ ~ _ . , ou Grover Ilan .AI'ayA-s~ For Florida s Future Water Supply Planning Frequently Asked Questions Alternative Water Supply Funding Assistance Program Sections 373.196, 373.1961 and 403.890, F.S. (2005) Introduction . Better coordinates local government comprehensive planning=with water management districts' regional water supply plans, which arE currently being updated. . Establishes a closer link between ocal governmentito determ nee availability of water by requiring whether adequate water supplies will be available no later than issuance of a certificate of occupancy. . Provides for more comprehensive regional water supply plans, lie permitting incentives for develePelonmentlfundang ass stancepp and alternative water supply d P The 2005 Florida Legislature en ualia lof ~fean Floridahfor years to come. legislation that will impact the q Y Senate Bills 360 and 444 contai management st tute) dais well ashapter 163, Part II (the state s growth I S ecifically with Chapters 373 and 40i wthe leg station: ater supp y• P regard to-water supp Y, 5, ,- 9/21 /2005 ..~ ~~ nn c /.~,atPrfaa s.cfin Growth Management 2005 ~ FL.Dept of Community Affairs - Page 2 of 10 . Provides $200 million for fiscal year 2005-06 to fund alternative I water projects ($100 million), TMDLs ($50 million), water supp y the SWIM Program ($25 million) and the Disadvantaged Sma Community Wastewater Program ($25 million). Beginning with the 2006-07 fiscal year, the annual funding will drop to $100 million, with $60 million of that being for alternative vvater supply development. he state's water management dislanss Duringrdevellopmentnof those ~spective regional water supply p leers should meet and tans, local governments and other water supp ~teract closely with water management district staff. Under the new ~gislation, local governments subjeit to o ectsonecessary topmeePlan nust identify alternative water supp y P j existing and future development needs. By working with the distri tiers luring the update of the plans, local governments and Ovate o ecpts that Nell have an opportunity to provide input on water supp y p j They want to be included~e d strPct for inclusion in theoupdatedpplancts under consideration by t Local governments should contact their water mortunet es t dobt ~n(s) to inquire about upcoming meetings and other opp information from district stable to the localsgovernmen 9 Pleasegsee the water supply plan(s) applic answers to Questions 20-21 tafftinvolved Sn the planaupdates and n of water management district s ~ alternative water supply funding. FAQs 1. What kinds of water supply projects qualify for funding? The new funding is for alternative water supply projects, defined in Section 373.019(1), F.S., as "salt water; brackish surface and groundwater; surface water a th ough the additionl of new st rage ather flows; sources made availabl capacity for surface or ground pace alNindustr al,hcommercial Iomed after one or more public supply, mu p agricultural uses; the downstream augmentation of water bodies with reclaimed water; stormwater; and any other watlann ng region' n the designated as nontraditional for a water supp y P applicable regional water supply Plan• In most cases, the project should be included in Ithou h 20 pe cent o f hl plan of the water management district (WMD), a 9 funds may be allocated - at the ditenttwith is goals. FuDnds aPeonotts the are not in the plan, but are consis available for traditional water supply projects or for purchasing water from other entities or jurisdictions. 2, What aspects of alternative water supply projects qualify for state and district funds? 9/21/2005 ,., .L,,,~.....,,~a,,,P„r~(1(15/waterfags.cfin Growth Management 2005 ~ FL Dept of Community Affairs D Page 3 of 10 rect financial assistance provided under the F St) is foreconstructon stainability Program (Section 373.1961(3), ply. The WMDs may, however, choose to fund some non-construction :tivities, such as feasibility studies, from other district programs related ~ water resource and supply development. Are reimbursements available for water projects completed. efore passage of the new law? rogram funding is only available for new alternative water supply projects or new P ram funding by therWMDlgoverning board beforebe approved for prog expenditures are made. ~, What permitting requirements apply to an alternative water ;apply project approved for program funding? All applicable permitting requirements (e.g., those of state, regional and local agencies) normally applicable to alternative water supply projects will remain unchanged for projects funded under the new programeaser additional information regarding WMD permitting requirements, p contact the WMD staff listed in the answer to Question 21 or see the appropriate district's website listed below: http://www.nwfwmd.state.fl.us/permits/permit.htm htt www.srwmd.state.fl.us/services/permitting/default.htm p:// https://permitting.sjrwmd.com/epermitting/jsp/start.jsp http://www.swfwmd.state.fl.us/permits/ http://www.sfwmd.gov/site/index.php?id=25 5. What action can a local government take to implement an alternative water supply project if it is not listed in the current regional water supply plan? Local governments should get involved in WMD activities i ha tans. Local currently under way for updating the regional water supp y P governments and water suppliers should work closely with the WMDs over the next several months to have proposed projects included in the regional water supply plans as they are updated. Alternatively, Section 373.1961(3)(h), F.S., provides that a district governing fundi g for allocate up to 20 percent of the alternative water supp y "projects that are not identified or listed in the regional water supply plat but are consistent with the goals of the plan." 6. The statutory deadline f6r Cant a water management dis~~cts plans is December 31, 200 award funds under the new program prior to that deadline? Yes. The districts are miannu datesrThe S t'Johns Rive ~WMDtexpects tc regional water supply p p 1, 2006. The South Florida WMD complete its plan update by February royal in )uly 200' and Southwest Florida WMD anticipate plan update app ~_ n ..,.ir~,,.,,+~,r~tanaaement2005/waterfags.cfm 9/21 /2005 Growth Management 2005 ~ FL Dept of Community Affairs ai Page 4 of 10 ~d the Northwest Florida WMD update is expected in October 2006. Prior completion of the plan updates, the districts will use the current ~gional water supply plans as the guide for selecting projects for funding. Can a WMD's regional water supply plan be updated more ~equent/y than once every five years to amend the list of Iternative water supply protects? , es, if the WMD feels that additio Ian sodas deemedtneces ad yd, it may emend its regional water supply p ( ) 3. If a WMD updates its regional water supply plan more 'requently than once every five years, does each update trigger `he requirement for the local government to update its :omprehensive plan? [f the update adds new alternative water supply projects to the regional water supply plan's list of alternative water supply projects and indicates the entity recommended for implementation of the project, the WMD would have to notify only those recommended entities. If the notified entity is a local government, it would have. to update its comprehensive plan within the statutory 18-month time frame. 9. If a city/county falls in two water management districts, can we apply to both? If a proposed water supply project would assist in providing water in more than one water management district, the applicant could seek funding from both districts. To allow the districts to coordinate their funding efforts, the application should indicate that a submittal has been made to both districts and clearly state the amount of funds sought from each district. 10. What if the applicant (local government or water supplier) is in one district, but the alternative water supply project it wants to develop is located in another? The funding application should be submitted to the district where the water will be used, with a courtesy copy sent to the district where the project will be located. A consumptive use permit for the projector uds~o e obtained from the district where the water is withdrawn, as opp where the water is used. 1 i. Who can apply for the new funds? Local governments, public anda other uublic and privatelwateruserstmay operations, special districts an P all apply for program funds. While the prima the prog~amgs not I m ed to of the legislation was on public f teFrsu provides: "It is in the public that sector. Section 373.196(1)( ), interest that county, municipal, industrial, agricultural, and other public 9/21/2005 ' _ Page 5 of 10 Growth Management 2005 ~ FL Dept of Community Affairs nd private water users, the Department of Environmental Protection, nd the water management districts cooperate and work together in the evelopment of alternative~tive water supplies to avoid the adverse ffects of competition for limited supplies of water. Public moneys or ervices provided to private entities for alternative water supply evelopment may constitute public purposes that also are in the public iterest." l2. Can more than one jurisdiction apply together? (es. Local governments, special districts, and publicly or privately owned water utilities are encouraged to form multijurisdictional water supply entities to jointly develop alternative water supplies (Sections 373.019 ;12) and 373.196(1)(e), F.S.). One of the factors "to be given significant weight by a WMD in selecting projects for funding is whether or not the project will be implemented by a multijurisdictional water supply entity or regional water supply authority. 13. Are the state funds matched by the water management districts? The statute provides that it is the goal of the WMDs to match state funds on adollar-for-dollar basis. Two types of district funding allocations will count as match for the state funds. Under Section 373.196(6)(a), F.S., districts must include the following two separate allocations in their annual budgets: (1) Funds for alternative water supply projects selected for inclusion in the Water Protection and Sustainability Program. This district allocation will be combined with state funds provided through the Water Protection and Sustainability Program Trust Fund under Section 403.890, F.S., and made available to water suppliers (through cost-sharing agreements) to assist them in constructing alternative water supply projects. (2) Funds for "water resource development that supports alternative water supply development[.]" Although the statutory. definition of'~water resource development" is very broad, the critical factor for purposes of determining what qualifies as match is menth'r In general, water resourrce ive water supply develop development that furthers the i mpfo ect s tmay bene or more specific alternative water supp y P j ( ) appropriately counted as match. For example, district funds expended for project feasibility analysis, des rt a part cula 9~ or specific data collection ro e t would qualfy as match. alternative water supply p j 14. What is the local government contribution for project construction? _ _~...,. ~, „~irr~.x,rt,wtana~ement2005/waterfags.cfrn 9/21/2005 Growth Management 2005 ~ FL Dept of Community Affairs Page 6 of 10 section 373.1961(3)(e), F.S., states that applicants must pay at least .0% of the project's construction costs. Each WMD governing board will letermine the percentage of project construction costs to be provided by he program. In some cases, the level of program funding may be less han 40% of the construction costs, so that the governing board can naximize the number of projects that will receive construction funding jssistance. Water management districts have the discretion to waive ;partially or totally) the 60% requirement for projects sponsored by Financially disadvantaged small local governments. Water management districts or basin boards may also use ad valorem or federal revenues to yelp an applicant meet the 60% requirement. I5. Can local governments use other grant money, such as federal funds, for matching funds? Federal, regional and local funds may be used as match for the alternative water supply funds provided by the state and water management districts under Section 373.1961(3), F.S. Other state or district funds may not be used as match. 16. Who decides which projects will be funded by the new alternative water supply funding program established by Section 373.196i(3), F.S.? The governing boards of the water mana9ement districts (Section 373.1961(3)(f), F.S.) 17. What factors will the governing board use to determine which projects to fund? Will the water management districts have additional factors of their own? The statute provides two sets of factors that the WMD Governing Boards must consider when determining those projects that will be selected for funding. The legislation does not designate any one factor as a "precondition" for funding assistance. Rather, the Governing Board has the discretion to weigh each of the factors in its consideration of proposed projects. Section 373.1961(3)(f), F.S., provides factors that must be F S. given significant weight in project selection. Section 373.1961(3)(8), , provides a second List of factors that should also be considered. The Governing. Board also has the discretion to establish additional factors. The statutory factors are not "minimum criteria"; rather, they serve to guide the WMD Governing Boards, in their assessment of the relative benefits of potential projects. Sections 373.1961(3)(f) and (g), F.S., provide: (f) The governing boards shall determine those projects that will be selected for financial assistance. The governing boards may establish factors to determine project funding; however, significant weight shall be given to the following factors: 1. Whether the project provides substantial environmental 9/21 /2005 Growth Management 2005 ~ FL Dept of Community Affairs .~ benefits by preventing or limiting adverse water resource impacts. 2. Whether the project reduces competition for water supplies. Page 7 of 10 3. Whether the project brings about replacement of traditional sources in order to help implement a minimum flow or level or a reservation. 4. Whether the project will be implemented by a consumptive use permittee that has achieved the targets contained in a goal-based water conservation program approved pursuant to s. 373.227. 5. The quantity of water supplied by the project as compared to its cost. 6. Projects in which the construction and delivery to end users of reuse water is a major component. 7. Whether the project will be implemented by a multijurisdictional water supply entity or regional water supply authority. (g) Additional factors to be considered in determining project funding shall include: 1. Whether the project is part of a plan to implement two or more alternative water supply projects, all of which will be operated to produce water at a uniform rate for the participants in a multijurisdictional water supply entity or regional water supply authority. 2. The percentage of project costs to be funded by the water supplier or water user. 3. Whether the project proposal includes sufficient preliminary planning and engineering to demonstrate that the project can reasonably be implemented within the timeframes provided in the regional water supply plan. 4. Whether the project is a subsequent phase of an alternative water supply project that is underway. 5. Whether and in what percentage a local government or local government utility is transferring water supply system revenues to the local government general fund in excess of reimbursements for services received from the general fund, including direct and indirect costs and legitimate payments in lieu of taxes. 28. If an alternative water supply project is listed in a regional ana~ement2005/waterfags.cfin 9/21/2005 Growth Management 2005 ~ FL Dept of Community Affairs Page 8 of 10 eater supply plan, does that mean the WMD must fund it? !o, but the project would be eligible for funding under the program if elected by the Governing Board. I9. If a city or county has existing water capacity, can they apply `or future projects in advance? ' NMDs' regional water supply plans have 20-year planning horizons to dentify whether additional water supply will be needed in the future. If a District has determined that certain jurisdictions will need additional water supplies in coming years to serve projected growth, those jurisdictions should start planning for those sources and facilities now. Local governments' early identification of projects needed to meet future demand would demonstrate its commitment to providing adequate water and facilities to serve future growth, encourage the WMD's inclusion of the project in its regional water supply plan, and reflect the local government's desire to obtain funds under the Water Protection and Sustainability Program. Alternative water supply projects can take seven to 12 years to plan, design and construct. Keeping in mind thlicants s from the new program can only be used for construction, app should apply for funds well enough in advance to ensure that the facility can be built and operational in time to meet the projected need. 20. Who should local governments contact to apply for funds? The state's water management districts will administer the alternative water supply funds. The contacts for each water management district are listed below: NWFWMD: Paul Thorpe - (850) 539-5999 paul.thorpe@nwfwmd.state.fl.us SRWMD: David Still - (386) 362-1001 or 1-800-226-1066 still_d@srwmd.state.fl.us SJRWMD: John Wester - (386) 329-4457 or 1-800-451-7106 jwester@sjrwmd.com SFWMD: Henry Bittaker - (561) 682=6792 or 1-800-432- 2045 hbittak@sfvvmd.gov SWFWMD: Rand Baldwin, Tampa Service Office (Hillsborough, Pinellas, Pasco Counties) - (813) 985-7481 rand.baldwin@watermatters.org Jimmy Brooks, Lecanto Service Office (Levy, Marion, Sumter, Citrus, Lake, Hernando) - (352) 527-8131 jimmy brooks@watermatters.org ar,a~ement2005/waterfags.cfm 9/21/2005 Growth Management 2005 ~ FL Dept of Community Affairs Page 9 of 10 Brett Cyphers, Bartow Service Office (Polk, Hardee, Highlands) - (863) 534-1448 or 1-800-492-7862 brett.cyphers@watermatters.org Steve Minnis, Sarasota Service Office (Manatee, Sarasota, Charlotte, Desoto) - (941) 377-3722 or 1-800-320-3503 stevert.minnis@watermatters.org http://www.swfwmd.state.fl.us/business/coopfnd/guideln.htm 21. Is assistance available to help with the application process? Yes. Applicants should contact the following staff of the water management district in which the applicant is located (Section 373.196 NWFWMD: Ron Bartel - (850) 539-5999 ron.bartel@nwfwmd.state.fl.us http://www. nwfwmd.state.fl. us SRWMD: David Still - (386) 362-1001 or 1-800-226-1066, still_d@srwmd.state.fl.us http://www.mysuwaneeriver.com SJRWMD: Barbara Vergara - (386) 329-4169 or 1-800-451- 7106, bvergara@sjrwmd.com http://www.sjrwmd.com/programs/watersupply.html SFWMD: Jane Bucca - (561) 682-6791 or 1-800-432-2045, x. 6791, jbucca@sfwmd.gov http://www.sfwmd.gov/org/wsd/aws/index.html SWFWMD: Rand Baldwin, Tampa Service Office (Hillsborough, Pinellas, Pasco Counties) - (813) 985-7481 rand.baldwin@watermatters.org Jimmy Brooks, Lecanto Service Office (Levy, Marion, Sumter, Citrus, Lake, Hernando) - (352) 527-813L jimmy.brooks@watermatters.org Brett Cyphers, Bartow Service Office (Polk, Hardee, Highlands) - (863) 534-1448 or 1-800-492-7862 brett.cyphers@watermatters.org Steve Minnis, Sarasota Service Office (Manatee, Sarasota, Charlotte, Desoto) - (941) 377-3722 or 1-800-320-3503 steven.minnis@watermatters.org http://www.swfwmd.state.fl.us/business/coopfnd/guideln.htm 22. What deadlines exist for expending the funds? uement2005/waterfags.cfin 9/21/2005 Growth Management-2005 ~ FL Dept of Community Affairs - Page 10 of 10 Expenditures by the recipient must comply with the accounting requirements, procedures and deadlines established by the water management district from whom the funds were obtained. Z3. Can local governments apply for phased funding to implement project construction over time? =unds may be granted for a portion of a project or the entire project, depending on the length of time needed to complete the project, the complexity of the project, and other factors related to the particular Funding cycle. 24. If an application is not funded, can it be resubmitted at a later date? Projects that are not funded initially can be resubmitted at a later date, assuming the project is eligible for funding under the program and was not previously selected due to other higher priority projects, or the project application was amended to correct deficiencies previously identified by the WMD. 25. Once a local government is awarded funds to implement a project, can it modify the application to change or reschedule the project? Any changes to the original application would have to be approved by the WMD. If a modification would affect the original funding decision or result in a substantial delay, the district could redirect the funds to another project. 26. What are the obligations of the local government when it receives funding? The local government must build and operate the project to produce water supplies from the alternative water supply source in accordance with the project proposal approved by the WMD for funding. In addition, the local government must have water rates that promote water conservation and the use of alternative water supplies in accordance with Section 373.1961(3)(j), F.S. (2005). 9/21/2005 BOARD OF COUNTY COMMISSIONERS Susan Latvala -Chairman John Morroni -Vice Chairman Calvin D. Harris Karen Williams Seel Robert B. Stewart Barbara Sheen Todd Kenneth T. WelchMay 6, 2004 Cyndi Tarapani, Director Planning Department City of Clearwater PO Box 4748 Clearwater, FL 33756 Subject: Water Supply Facilities Work Plan Dear Ms. T ani: ~y,~c~~ Pinellas i~~ Count ` ~' y PLANNING f~~~~'f ~ l ~0~4 f~LANi~I(~G DEPARTMENT CITY ®F CLEARVVATER While the City of Clearwater provides a large portion of its own potable water supply, the City is also included within the Pinellas County Water Demand Planning Area (PCWDPA) and the City is considered to be a wholesale customer of Pinellas County Utilities. By this letter, Pinellas County is providing the City with assurance that Pinellas County Utilities plans for, and provides, the facilities necessary to transmit and distribute potable water within the Pinellas County Water Demand Planning Area (see Figure 1). For the City's purpose, this means that Pinellas County Utilities actively plans for, and can provide the facilities, to meet its wholesale water obligations to the City. Pinellas County Utilities is not, however, responsible for the potable water supply itself. Pinellas County Utilities receives its potable water supply from Tampa Bay Water, Inc., the regional water supply utility. Pinellas County is a member government of the regional utility, and Tampa Bay Water is under agreement with its member governments, including the Pinellas County Board of County Commissioners, to supply the potable water to meet all member government water demands. Attached to this letter is correspondence from Tampa Bay Water evidencing this commitment as well as coordination of their Master Water Plan with the Regional Water Supply Plan prepared by the Southwest Florida Water Management District. As you know, Section 163.3177, F.S., now requires assurance that water suppliers coordinate their water supply planning with Regional Water Supply Plans, where appropriate. Also attached to this letter is the 10 Year Water Supply Facilities Work Plan prepared by Pinellas County Utilities which reflects the long term funding commitment to the facilities required to support the potable water needs of Pinellas County Utilities' retail and wholesale customers. The Work Plan is compiled to address the entire Water Demand Planning Area, which includes the City. PLEASE ADDRESS REPLY To: 3"15 Court Street Clearwater, Florida 33756 Website: www.pinellascounty.org ,., ,. ~I~ ~~y4: . . -~ ~RTMF "ol~'~ ~ ~ ~~~J~AT-_ iA«1 - /~1 b1 ~ /~ = .-- ~~ `. = ,~ ,, '~,P~o°. STATE OF FLORIDA DEPARTMENT OF COMMUNITY AFFAIRS "Dedicated to making Florida a better place to call home" CHARLIE CR1ST Governor August 1, 2008 The Honorable Frank V. Hibbard Mayor, City of Clearwater Post Office Box 4748 Clearwater, Florida 33758-4748 Dear Mayor Hibbard: THOMAS G. PELHAM Secretary "The Department has completed its review of the proposed Comprehensive Plan Amendment for the City of Clearwater (DCA No. 08-RWSP1), which was received on May 29, 2008. Based on Chapter 163, Part Il, Florida Statutes, we have prepared the attached report, which outlines the Department's findings concerning the amendment. It is particularly important that the City address the objections set forth in our review report so that these issues can be successfully resolved prior to adoption. We have also included a copy of local, regional and state agency comments for your consideration. Within the next 60 days, the City should act by choosing to adopt, adopt with changes, or not adopt the proposed amendment. For your assistance, our report outlines procedures for final adoption and transmittal. The City's proposed Plan Amendment 08-RWSPI consists of the City's Water Supply Work Plan (Work Plan) and related text amendments. The Department has identified objections with the Work Plan due to the lack of, a minimum ten-year planning horizon, coordination with Pinellas County regarding a level of service standard for potable water, alternative water supply/reuse projects, and policies guiding coordination with Southwest Florida Water Management District. The Department has also identified an objection to the Potable Water Sub- Element pertaining to an inadequate policy to protect potable water wellfields. 2555 SHUMARD OAK BOULEVARD • TALLAHASSEE, FL 32399-2100 850-488-8466 (pJ • 850-921-0781 (f) • Website: wvr~:r dca state fl us • COMMUNITY PLANNING 850-488-2356 (p) 850 188-3309 (f) • HOUSING AND COMMUNITY DEVELOPMENT 850-488-7956 (pl 850-922-5623 (f) • The Honorable Frank V. I-~libbard August l , 2008 Page Two • If you, or your staff; have any questions or if we may be of further assistance as you formulate your response to this Report, please contact Valerie Jenkins, Senior Planner, at (850) 922-1803, or Bernard Piawah, Regional Planning Administrator, at (850) 922-1810. Sincerel , 1 Mike McDaniel, Chief Office of Comprehensive Planning MM/vj Enclosures: Objections, Recommendations and Comments Report Review Agency Comments cc: Manny Pumariega, Executive Director, Tampa Bay Regional Planning Council Sandra E. Herman, Planner II, City of Clearwater • • DEPARTIVIEN'T OF COMMUNITY AFFAIRS OBJECTIONS, RECOMMENDATIONS AND COMMENTS FOR THE CITY OF CLEARWATER COMPREHENSIVE PLAN AMENDMENT 08-RWSPI August 1, 2008 Division of Community Planning Office of Comprehensive Planning This report is prepared pursuant to Rule 9J-1 I.O10, F.A.C. • • INTRODUCTION The following objections, recommendations and comments are based upon the Department's review of the City of Clearwater proposed amendment to their comprehensive plan (DCA No. 08-RWSP1) pursuant to Chapter 163.3184, Florida Statutes (F.S.). The objections relate to specific requirements of relevant portions of Chapter 9J-5, Florida Administrative Code (F.A.C.), and Chapter 163, Part II, F.S. Each objection includes a recommendation of one approach that might be taken to address the cited objections. Other approaches may be more suitable in specific situations. Some objections may have initially been raised by one of the other external review agencies. If there is a difference between the Department's objection and the external agency advisory objection or comment, the Department's objection would take precedence. Each of these objections must be addressed by the local government and corrected when the amendment is resubmitted for our compliance review. Objections, which are not addressed, may result in a determination that the amendment is not in compliance. The Department may have raised an objection regarding missing data and analysis items, which the local government considers not applicable to its amendment. If that is the case, a statement justifying its non- applicability pursuant to Rule 9J-5.002(2), F.A.C., must be submitted. The Department will make a determination on the non-applicability of the requirement, and if the justification is sufficient, the objection will be considered addressed. The comments, which follow the objections and recommendations section, are advisory in nature and will not form bases of a determination of non-compliance. They are included to call attention to items raised by our reviewers. The comments can be substantive, concerning planning principles, methodology or logic, as well as editorial in nature dealing with grammar, organization, mapping, and reader comprehension. Appended to the back of the Department's report are the comment letters from the other state review agencies and other agencies, organizations and individuals. These comments are advisory to the Department and may not form bases of Departmental objections unless they appear under the "Objections" heading in this report. • • TRANSMITTAL PROCEDURES Upon receipt of this report, the City has 60 days in which to adopt, adopt with changes, or determine that the City will not adopt the proposed amendment. The process for adoption of local comprehensive plan amendments is outlined in s. 163.3184, Florida Statutes (F.S.), and Rule 9J-11.011, Florida Administrative Code (F.A.C.). The City must ensure that all ordinances adopting comprehensive plan amendments are consistent with the provisions of Chapter 163.3189(2)(a), F.S. Within ten tivorking days of the date of adoption, the City must submit the following to the Department: Three copies of the adopted comprehensive plan amendment; .A copy of the adoption ordinance; A listing of additional changes not previously reviewed; A listing of findings by the local governing body, if any, which were not included in the ordinance; and. A statement indicating the relationship of the additional changes to the Department's Objections, Recommendations and Comments Report. The above amendment and documentation are required for the Department to conduct a compliance review, make a compliance determination and issue the appropriate notice of intent. In order to expedite the regional planning council's review of the amendment, and pursuant to Rule 9J-11.011(5), F.A.C., please provide a copy of the adopted amendment directly to Manny Pumariega, Executive Director, Tampa Bay Regional Planning Council. Please be advised that Section 163.3184(8)(c), F.S., requires the Department to provide a courtesy information statement regarding the Department's Notice of Intent to citizens who furnish their names and addresses at the local government's plan amendment transmittal (proposed) or adoption hearings. In order to provide this courtesy information statement, local governments are required by law to furnish the names and.addresses of the citizens requesting this information to the Department. Please provide these required names and addresses to the Department w{ien }'nu transmit your adopted amendment package for compliance review. In the event no names, addresses are provided, please provide this information as well. For efficiency, we encourage that the information sheet be provided in electronic format. • • OBJECTIONS, RECOMNIENDATIONSRND COMMENTS ~'\ FOR THE CITY OF CLEARWATER AMENDMENT 08-RWSP1 I. CONSISTENTLY WITH CHAPTER 163, PART II, FLORIDA STATUTES (F.S.), AND RULE 9J-5, FLORIDA ADMINISTRATIVE CODE (F.A.C.) Introduction: "I~he City of Clearwater's proposed 08-RWSP1 Amendment includes a Potable Water Sub-Element along with a schedule of Capital Improvements to be incorporated into the Utilities Element of the City's Comprehensive Plan. The Department has the following objections and comments to the proposed amendment. A. Objections 1. Lack of a Minimum Ten-year Planning Horizon: The City submitted a Water Supply Plan (Potable Water Sub-Element) along with a schedule of Capital Improvements to be incorporated into the Utilities Element of the City's Comprehensive Plan. The proposed 1 amendment does not include adequate data and analysis for aTen-year planning timeframe for ~~~5 the Water Plan. The Cityhas•provided potable water demand projections through the year 2025 / but the information in~able 7 did not include reuse offset projections that covers at least ten ~~-- ~~ years. ~,.,- ~~ 30 ~ 4.~Ja-.~ ?'tit,..,,;.,.. - -----V ~____.. [Sections 163.3177(2), (6)(a), and (c); 163.3177(8), F.S.; and Rules 9J-5.005(2)(c), 4, 5(a), and (6), F.A.C.] Recommendation: Revise the Water Supply Plan to include information in Table 7 regarding reuse ol~sets that covers at least the required ten years. 2. Lack of Current Data and Analysis: The Water Supply Plan is not based on current data and analysis. The Water Plan references the City's 2004 Water Master Plan which was prepared prior to Southwest Florida Water Management District's (District) Regional Water Supply Plan adopted in 2006. Additionally, the Water Supply Plan does not include the District's Consumptive Use Permit information, including permit number(s), quantities, and expiration dates for the City's 23 potable water wells. [Sections 163.3177(6)(c); l b3.3177(8), F.S.; and Rules 9J-5.005(2)(c), (~), F.A.C.] Recommendation: The City should update as appropriate the City's 2004 Water Master Plan in coordination with the District's Regional Water Supply Plan and the Pinellas County Water Supply Plan, and include the City's 2004 Water Master Plan or excerpts from it as data and analysis. Also, the City should coordinate with the District regarding the Consumptive User Per-rmit info~-~nation for all the municipal potable wells. • • 3. Lack of Policies Guiding Coordination with Southwest Florida Water iVlanagement District: The City did not amend the Intergovernmental Coordination Element to address Section 163.3177(6)(c), F.S., which requires a local government to '`update the water supply work plan every five years within 18 months after the governing board of a water management district approves an updated regional water supply plan.'' [Sections 163.3177(5)(b); 163.3177(6)(c) and (h) l ; 163.3177(9)(f) and (g), F.S.; and Rules 9J- 5.011(2)(a) and (b); 9J-5.015(3)(b)1 and (3)(c)I1, F.A.C.] Recommendation: The City should revise the proposed text amendments to the Intergovernmental Coordination Element to include a policy that states, '`The City will maintain a Water Supply Facilities Work Plan that is consistent with the Southwest Florida Water Management District's Water Supply Plan by updating the Work Plan within 18 months of an update to the District's Regional Water Supply Plan that affects the City. 4. Inadequate Policy: Adopted Policy 21.7.3 is inadequate because it defers to the Wellhead Protection Ordinance the establishment of guidelines and criteria that will ensure the protection of potable water wellfields instead of establishing them in the comprehensive plan as required. Also, the City did not provide an updated wellhead protection area map based on the supporting data and..analysis. [Sections 163.3177(5)(b), (6)(c), (9)(f) and (g), F.S.; and Rules 9J-5.003(90); 9J-5.005(2, 5 and 6); 9J-5.006(3)(c)6, F.A.C.] Recommendation: Revise the policy to delete reference to the Wellhead Protection Ordinance and include in the comprehensive plan the guidelines and criteria that will ensure t e protection of wellheads as required. Also, include an updated wellhead protection area map. B. Comments: Pinellas County provides over 60 percent of the City's potable water. The County has an established 2007 to 20101evel of service standard of 120 gallons per capita per day Co , (gpcpd) which will decrease to a level of service standard of 115 gpcpd after 2010. The 616~e~"~S City's comprehensive plan establishes a level of service standard of 120 gallons per capita per day but does not reflect the change to 115 gpcpd after 2010. Since the City receives 60% of its water from Pinellas County, the Department recommends that the City consider using the same per capita standard as the County. Although the City has identified the water conservation programs it currently has in place, the Southwest Florida Water Management District recommends that further language to support water conservation should be developed by the City giving the location of the City within the Northern Tampa Bay Water Use Caution Area where groundwater is insufficient (please see the District's letter attached to this memorandum). • ~-,~,~ • In light of the City's agreement acid the Count ~ticipation with Tanlpa Bay Water (TBW), the City should retain references t BW ' Policies 21.2.1 (coordinate building code revisions); and 21.2.6 (assist efforts to augment existing water supplies and provide for future needs). The Water Supply Plan states that the City has an emergency interconnect with Pinellas County and the City of St. Petersburg. The City should discuss in detail how those interconnections operate and the amount of water committed from those interconnections. II. CONSISTENCY WITH STATE COMPREHENSIVE PLAN The proposed amendment is not consistent with and does not further the following goals and objectives of the State Comprehensive Plan [Section187.201, F. S.]: (7) Water Resources; Goal (a) and Policies (b) 3, 5, 11 and 13: these issues pertain to objections 2 through 7; (17) Public Facilities; Goal (a) and Policies (bj 4, 5, 6, 7, and 9: these issues pertain to objections 3 and 7; (25) Plan Implementation: Goal (a) and Policies (b)7: this issue pertains to all of the above objections. Recommendation: Revise the proposed amendment, as indicated in the objections and recommendations of this report in order to further the above goals and policies of the State Comprehensive Plan. ~ • July 14, 2008 Ray Eubanks, Plan Review Administrator Florida Department of Community Affairs Division of Community Planning 2555 Shumard Oak Boulevard Tallahassee, FL 32399-2100 Subject: City of St. Clearwater 08RWSP1 Dear Mr. Eubanks: fn accordance with Chapter 163, F.S., the staff of the Southwest Florida Water Management District (District) has reviewed the above referenced Comprehensive Plan amendment and offers the following comments for your consideration. As part of the above referenced amendment package, the City of Clearwater has submitted a Water Plan (Potable Water Sub Element) along with a schedule of Capital Improvements to be incorporated into the Utilities Element of the Clearwater Comprehensive Plan. However, it is not clear if this amendment (08RWSP1) is meant to satisfy the requirements of adopting a Water Supply Facilities Work Plan for a minimum Ten Year planning horizon set forth in Chapter 163.3177(6)(c), F.S. The amendment does not specify a planning horizon, many of the data tables are for varying time periods, and several maps (Maps 5 and 6) were missing from the packet. The Level of Service outlined in the plan only goes through 2015 and some tables only project through 2010. Furthermore, the City's long range Water Supply Master Plan that is referred to in the review materials was not included in the amendment packet and it is somewhat unclear what the difference is between the included Potable Water Sub Element and the Water Supply Master Plan. The City should clearly define responsibilities for planning, financing, construction, and operation of the water supply facilities by all entities providing service within its jurisdiction for a minimum 10 year period. Further documentation (at least by reference) should be included to illustrate the City's potable water agreement and concurrency planning with Pinellas County, and the City's emergency potable water agreement with the City of St. Petersburg to validate the terms of these relationships. Also, all District Water Use Permit information should be included in the Potable Water Sub Element including permit number(s), quantities, expiration dates, etc. It is important that future withdrawals of groundwater (fresh or brackish) are planned and operated in a manner that is environmentally responsible and • Ray Eubanks .1uly ~4. ?OOFi Page 2 • sustainable. Therefore, the District recommends additional wellhead protection policy language and an updated wellhead protection area map in the Work Plana The City is located within the Northern Tampa Bay Water Use Caution Area, where groundwater resources are insufficient to provide for increases in potable water demand. Therefore, the District recommends further language to support conservation and ~°alternative water sources, and the City should quantify conservation programs in more detail to reflect water savings and potable water offset. The Regional Water Supply Plan (RWSP) and associated Appendices provide important information regarding water resource constraints, potential sources (traditional and alternative), regional partnerships, ,demand projections, conservation options, and quantifiable conservation and reclaimed water data. To access the RWSP and the Appendices (4 and 5), please visit: http://www.swfwmd.state.fl.us/documents/plans/ RWSP. Finally, the District commends the City for conducting several water conservation programs, in-school education programs, and utilizing reclaimed water but further emphasis should be placed on public education and messaging campaigns (e.g., Water C.H.A.M.P.), land use ordinances, and complying with the District's year-round conservation measures as required by Chapter 40D-22, F.A.C. For more information on water conservation including many practical options, please visit the District's on-line library at www.conservationinfo.org. The District appreciates the opportunity to participate in the review of comprehensive plan amendments. Please note that this review does not constitute permit approval under Chapter 373, Florida Statutes (F.S.), or any rules promulgated thereunder, nor does it stand in lieu of normal permitting procedures in accordance with Florida Statutes and District rules. If I may be of further assistance, please do not hesitate to contact me at (352) 796-7211, extension 4423. Sincerely, Jason M. Mickel Senior Planner cc: Gina L. Clayton, Assistant Director of Planning,100 South Myrtle Ave., Clearwater, FL 33756 Ralph Lair, CLA-TPA Jim Quinn, Department of Environmental Protection (via a-mail) ,~~''`~FSrFt ~ ~ 2379 Broad Street, Brooksville, Florida 34604-6899 ~~ ~~ d Southwest Florida 352 796-7211 or 1-800-423-1476 FL onl ~--~ ~ ~ mater Management District ` ' ` y' ~ o '~a T~.~.-~--~,~ TDD only 1-800-231-6103 FL onlvl_..-= ~-----~ `'^'.~EM~'` _. -,. - - , "" On t ~ nternet at;~l2t~r~l~~terS;c~ I ~ ~~ ~~ II 4 An Equal Bartow Service Office ~ Lecanto Service Office Saras to Service Office. (~ LTar~ipa~rv~ 0 ice ~ ~ ~Em~oUe~ 170 Century Boulevard Suite 226 6750. ~uiiville Road X601 Highway~0 North P Y Bartow, Florida 33830-7700 3600 West Sovereign Path Saras t'a, Florida 34'24'0-9711 MTampa, Florida 3~~ 7-675 (863) 5341448 or Lecanto, Florida 34461-8070 (941) 377-3722 or (813) 985-7481 0~~ l 1-800-492-7862 (FL only) (352) 527-8131 1-800-'320-3503 (fL only) nn ~~ ry. 0797 (FL only) JUL L ~ LUW ~ , ! l ~ --- July 14, 2008 ~ ~-~ Neil Combee ~ - ~ ,' . ~ ^~ ' Chair, Polk Todd Pressman Ray Eubanks, Plan Review Administrator ~ _ = 'AY "_~~ __ Vice Chair, Pinellas Florida Department of Community Affairs i__~f -~~ ~~ Jennifer E. Closshey Secretary, Hillsborough Division of Community Planning Ronald E. oaldey 2555 Shumard Oak Boulevard Treasurer, Pasco Tallahassee, FL 32399-2100 Bryan K. Beswick Desoto Patricia M. Glass SUbJ@Ct: City of St. Clearwater 08RWSP1 Manatee Hugh M. Gramling Dear Mr. Eubanks: Hillsborough A16ert G.Joerger Sarasota In accordance with Chapter 163, F.S., the staff of the Southwest Florida Sallie Parks Water Management District (District) has reviewed the above referenced Pinellas Maritza Rovira-Forino Comprehensive Plan amendment and offers the following comments for your Hillsborough consideration. H. Paul Senft, Jr. Polk Judith C. Whitehead As part of the above referenced amendment package, the City of Clearwater Hernando has submitted a Water Plan (Potable Water Sub Element) along with a schedule of Capital Improvements to be incorporated into the Utilities David L. Moore Element of the Clearwater Comprehensive Plan. However, it is not clear if Executive Director this amendment (08RWSP1) is meant to satisfy the requirements of adopting William 5. Bilenky a Water Su I Facilities Work Plan for a minimum Ten Year tannin General Counsel pP Y p 9 horizon set forth in Chapter 163.3177(6)(c), F.S. The amendment does not specify a planning horizon, many of the data tables are for varying time periods, and several maps (Maps 5 and 6) were missing from the packet. The Level of Service outlined in the plan only goes through 2015 and some tables only project through 2010. Furthermore, the City's long range Water Supply Master Plan that is referred to in the review materials was not included in the amendment packet and it is somewhat unclear what the difference is between the included Potable Water Sub Element and the Water Supply Master Plan. The City should clearly define responsibilities for planning, financing, construction, and operation of the water supply facilities by all entities providing service within its jurisdiction for a minimum 10 year period. Further documentation (at least by reference) should be included to illustrate the City's potable water agreement and concurrency planning with Pinellas County, and the City's emergency potable water agreement with the City of St. Petersburg to validate the terms of these relationships. Also, all District Water Use Permit information should be included in the Potable Water Sub Element including permit number(s), quantities, expiration dates, etc. It is important that future withdrawals of groundwater (fresh or brackish) are planned and operated in a manner that is environmentally responsible and ~r ~ ~"~ Ray Eubanks July 14, 2008 Page 2 sustainable. Therefore, the District recommends additional wellhead protection policy language~and an,updated wellhead protection area map in the Work Plan. ,., The City is located within the Northern Tampa Bay Water Use Caution Area, where groundwater resources are insufficient to provide for increases in potable water demand. Therefore, the District recommends further language to support conservation and alternative water sources, and the City should quantify conservation programs in more detail to reflect water savings and potable water offset. The Regional Water Supply Plan (RWSP) and associated Appendices provide important information regarding water resource constraints, potential sources (traditional and alternative), regional partnerships, demand projections, conservation options, and quantifiable conservation and reclaimed water data. To access the RWSP and the Appendices (4 and 5), please visit: http://www.swfwmd.state.fl.us/documents/plans/ RWSP. Finally, the District commends. the City for conducting several water conservation programs, in-school education programs, and utilizing reclaimed water but further emphasis should be placed on public education and messaging campaigns (e.g., Water C.H.A.M.P.), land use ordinances, and complying with the District's year-round conservation measures as required by Chapter 40D-22, F.A.C. For more information on water conservation including many practical options, p-ease visit the District's on-line library at www.conservationinfo.org. The District appreciates the opportunity to participate in the ,review of comprehensive plan amendments. Please note that this review does not constitute permit approval under Chapter 373, Florida Statutes (F.S.), or any rules promulgated thereunder, nor does it stand in lieu of normal permitting procedures in accordance with Florida Statutes and District rules. If I may be of further assistance, please do not hesitate to contact me at (352) 796-7211, extension 4423. Gina L. Clayton, Assistant Director of Planning,100 South Myrtle Ave., Clearwater, FL 33756 Ralph Lair, CLA-TPA Jim Quinn, Department of Environmental Protection (via a-mail) • • ...... ~~ ~~ - Tampa Ba}~ Regional Plznning Council Council Agenda ~i W W.tbrpC.01'~ 4000 Gateway Centre Blvd, Suite 100, Pinellas Park, FL 33782 July 14, 2008 Phone (727) 570-5151 Suncom 513-5066 FAX (727) 570-5118 10:00 a.m. *** THIS MEETING IS OPEN TO THE PUBLIC *** Please Turn Off All Electronic Devices During the Meeting Call to Order Chair Kynes Invocation and Pledge Commissioner Jane von Hahmann Roll Call Recording Secretary Voting Conflict Report Recording Secretary Please Speak Directly Into The Microphone For Recording Purposes. Approval of Minutes Secretary/Treasurer Mariano Approve minutes from the June 9, 2008 meeting. (report attached). Staff contact: Lori Denman, ext. 17 2. Budget Committee Secretary/Treasurer Mariano A. Approve Financial report for the period ending 05/31/2008. (report attached). B. Approve the 2008/2009 Proposed Budget. C. State Board Administration (SBA) Pool Report. (r_port attached). D. Status of Building Debt Financing. (report attached). Staff contact: John Jacobsen, ext. 19 3. Consent Agenda Chair Kynes A. Budget and Contractual 1. Help A Child Amendment to Lease (reUOrt attached). Action Recommended: Authorize the Executive Director to sign the Amendment to Lease. Staff contact: Manny Pumariega, ext. 17 2. Transportation Services Consultants The Council's transportation services consultants contracts have expired. These services are primarily related to DRI reviews but the consultants may be utilized on other projects as needed. Proposals were received from four firms seeking to provide services. The top three ranked proposals are from Florida Design Consultants, Inc., Grimail-Crawford, Inc., and Kimley-Horn and Associates. Action Recommended: Authorize the Chair to contract with the top three ranked firms to provide transportation consulting services. Staff contact: John Meyer, ext. 29 -1- ^~ B. Intergovernmental Coordination & Review (IC&R) Program 1. IC&R Reviews by Jurisdiction (report attached). 2. June 2008 IC&R Database (report attached). Action Recommended: None. Information Only. Staff contact: John Meyer, ext. 29 3. IC&R #092-08 - I-75 PD&E Study: South of U.S. 301 to Fletcher Avenue, FSC SAI #FL200806054264C, Hillsborough County. (report attached). 4. IC&R #093-08 - I-75 PD&E Study: Moccasin Wallow Road to South of U.S. 301, FSC SAI #FL200806054263C, Hillsborough County (report attached). Action Recommended: None. Information Only. Staff contact: Suzanne Cooper, ext. 32 C. DRI Development Order Reports (DOR) -None Staff Contact: John Meyer, ext. 29 D. DRI Development Order Amendment Reports (ROAR) 1. DRI # 95 -Wingate Creek Mine S/D, Manatee County (report attached). 2. DRI # 235 -Mosaic Southeast Tract, Manatee County (report attached). 3. DRI # 266 -Wolf Creek Branch S/D, Hillsborough County (report attached). Action Recommended: Approve staff report Staff Contact: John Meyer, ext. 29 ' E. Notice of Proposed Change (NOPC) Reports 1. DRI # 129 -Seven Oaks, Pasco County (report attached). 2. DRI # 130 -Cypress Banks, Manatee County (report attached). Action Recommended: Approve staff report Staff Contact: John Meyer, ext. 29 F. Annual Report Summaries (ARS) /Biennial Report Summaries (BRS) 1. DRI # 103 -Cooper Creek, RY 2007-08, Manatee County (report attached). 2. DRI # 132 -Gateway Centre, RY 2006-07, Cities of Pinellas Park/St. Petersburg (report attached). 3. DRI # 208 -The Crescent, RY 2007-08, Hillsborough County (r~O.rt attached). 4. DRI # 216 -University Lakes, RY 2007-08, Manatee County (report attached). 5. DRI # 217 -Harbour Island, RY 2007-08, City of Tampa (report attached). 6. DRI # 247 -Long Lake Ranch, RYs 2006-08, Pasco County (report attached). 7. DRI # 259 -Lake Hutto, RY 2006-07, Hillsborough County re ort attached). Action Recommended: Approve staff reports Staff Contact: John Meyer, ext. 29 -2- • • G. DRI Status Report Information Only. (report attached). Staff contact: John Meyer, ext. 29 H. Local Government Comprehensive Plan Amendments Reviewed 1. DCA # 08-1RWSP, Dunedin (report attached). 2. DCA # 08-1RWSP, New Port Richey (r_port attached). 3. DCA # 08-1RWSP, St. Petersburg (adopted) (report attached). 4. DCA # 08-1PEFE, Holmes Beach (report attached). 5. DCA # 08-1RWSP, Clearwater (report attached). 6. DCA # 08-1PEFE, New Port Richey (adopted) (report attached). 7. DCA # 08-1RSWP, Tarpon Springs (report attached). 8. DCA # 07-1PEFE, Plant City (adopted) (report attached). 9. DCA # 08-lER, Kenneth City (adopted) (report attached). 10. DCA # 08-lER, Madeira Beach (adopted) (report attached). 11. DCA # 08-1PEFE, Largo (adopted) (.report attached). 12. DCA # 07-1PEFE, Temple Terrace (adopted) (report attached). 13. DCA # 08-1PEFE, Bradenton (report attached). 14. DCA #08-IER, Hillsborough (adopted) (report attached) Action Reco mmended: Approve staff reports Staff contact : Jessica Lunsford, ext. 38 4. Item(s) Removed from Consent Agenda and Addendum Item(s) Council members shall notify Chairman of any items they wish to be pulled from the Consent Agenda. These items will be discussed and voted on separately after the remainder of the consent agenda is approved. 5. Review Item(s) or Any Other Item(s) for Discussion 6. A. Meeting the Global Energy & Regional Transportation Challenge of the 215` Century Mr. Raymond Kaiser, Director of Green Building Services for Stewart Engineering Consultants, Inc. will present on Meeting the Global Energy & Regional Transportation Challenge of the 2155 Century. Our current land use and transportation planning and investment decisions presume that over the next 30 years the transportation network will be quite similar to the last 30 years. And the implicit assumption driving land use and development patterns today is based on the belief that energy supplies will be relatively cheap and readily available. Perhaps planners should challenge this basic assumption and assess the region's capacity to respond to a significant shift in the price and availability of liquid fuels. Staff contact: Wren Krahl, ext. 22 B. Mr. Lee Killinger from the Wren Group will make a presentation on the highlights of the 2008 Legislation. Staff contact: Manny Pumariega, ext. 17 -3- D ~ 7. Council Members' Comments -Chair Kynes S. Program Reports A. Agency on Bay Management (ABM)-Mr. Bob Kersteen, Chair The Agency's Public Information Committee met on June 12"' to discuss outreach activities, and a recap of that meeting will be provided. The Agency did not meet in July. The Agency's Natural Resources/Environmental Impact Review Committee will meet on August 14`''. Staff contact: Suzanne Cooper, ext. 32 B. Clearinghouse Review Committee (CRC) -Chair, Commissioner Bill Dodson No Report Staff Contact: Avera Wynne, ext. 30 C. Local Emergency Planning Committee (LEPC) The Tampa Bay LEPC last met on Wednesday, May 28, 2008 and the next meeting is scheduled for July 30, 2008 when the LEPC will hold its biennial elections for Chair and Vice-Chair. Staff completed the 15"' Revision to the LEPC Hazmat Preparedness Plan and forwarded it to Tallahassee in time for the June 30`~ deadline. The LEPC continues with Ethanol/Foam training to area fire departments and is working with CSX Transportation for a tabletop exercise in November to address the large amounts of ethanol that CSX is now transporting. The LEPC is also working with US Department of Transportation Pipeline Safety for aworkshop/roundtable, probably in late August, to discuss anhydrous ammonia transportation in the region. Staff also attended the Quarterly SERC meetings on July 10-11, 2008, to include the Training Task Force and the LEPC Staff and Chairs. A recap of these meetings is not available in time for mail- out and will be placed in member's folders at the Council meeting. Additional Material: SERC Recap, July 10-11, 2008 (To be distributed) Staff Contact: Bill Lofgren, ext. 33 D. Emergency Management- No Report Staff Contact: Betti Johnson, ext. 39 E. Legislative Committee - Mr. Julian Garcia, Jr., Chair - No Report The Legislative Committee will meet immediately following the Council meeting. Staff contact: Wren Krahl, ext. 22 F. Regional Planning Advisory Committee (RPAC) - No Report Staff contact: Avera Wynne, ext. 30 -4- • G. Telework Tampa Bay A Telework Final Report will be provided. Staff contact: Jessica Lunsford, ext. 38 r H. Economic Development Staff will be reconvening the Comprehensive Economic Development Strategy (CEDS) Committee next month. New projects and any revisions to the CEDS will be requested in August. Staff contact: Patrick O'Neil, ext. 31 I. Regional Domestic Security Task Force (RDSTF) - No Report Staff contact: Erika Wiker, ext. 21 9. Other Council Reports 10. Executive/Budget Committee Report -Chair Kynes 11. Chairman's Report -Chair Kynes 12. Executive Director's Report -Manny Pumariega Adjournment Next Meeting: Monday, August 11, 2008 at 10:00 a.m. The Council, in accordance with its adopted rules of procedure, may only take action on matters not on the printed agenda involving the exercise of agency discretion and policy-making upon a f-nding by the Council of an emergency situation affecting the public's health, safety, and welfare. Council meetings are Public Meetings within the context of Section 286.011, Florida Statutes. Council meetings are not Public Hearings within the context of Section 12054, Florida Statutes. The Chair has full discretion as to whether or not to recognize speakers other than Council members or staff, and is not required to recognize individuals to speak on issues before the Council. Public Hearings on issues before the Council are conducted by individual local governments, and are the proper forum for public comment. Please note that if a person decides to appeal any decision made by the Council with respect to any matter considered at the above cited meeting or hearing, s/he will need a record of the proceedings, and for such purpose, s/he may need to ensure that a verbatim record of the proceedings is made, which record includes the testimony and evidence upon which the appeal is to be based. Persons wishing to speak at a Council meeting are required to complete the forth provided at the entrance to the meeting room. The form, after being completed, must be given to the Recording Secretary. If you are a person with a disability who needs any accommodation in order to participate in this meeting you are entitled, at no cost to you, to the provision of certain assistance. Please contact Tampa Bay Regional Planning Council at 727-570-5151 within 3 working days prior to the meeting. -5- <T ~ ~ fir ~~ ~ i'4 ~ ~ STATE OF FLORIDA DEPARTMENT OF COMMUNITY AFFAIRS "Dedicated to making Florida a better place to call home" CHARLIE CRtST THOMAS G. PELHAM Governor Secretary July 8, 2008 The Honorable Frank Hibbard Mayor, City of Clearwater Municipal Services Building 100 South Myrtle Avenue Clearwater, Florida 33756 Dear Mayor Hibbard: The Department received a proposed comprehensive plan amendment from the City of Clearwater (DCA No. 08RWSP1) on May 29, 2008. The City requested that the Department not conduct a review of the amendment. However, after a preliminary review of the amendment, the Department has determined that it will review the amendment and issue an Objections, Recommendations and Comments Report, no later than August 1, 2008 in accordance with Chapter 163, Florida Statute, and Rule 9J-5, Florida Administrative Code. If you have any questions concerning this matter, please contact Valerie Jenkins, Senior Planner, at (850) 922-1803. Sincerely, '~ c ~~~ ~1~~ Mike McDaniel, Chief Office of Comprehensive Planning MDM/vj cc: Sandra E. Herman, Planner III, City of Clearwater Manny Pumariega, Executive Director, Tampa Bay Regional Planning Council -- r ~ ~ , ~ ~ i~ ~ ~ i ~- ~ ~ ~ ) 1 JUI. I Q ?~ 2555 SHUMARD OAK BOULEVARD • TALLAH~ASSE~E, FL 32399-2100y}' ~ 1 850-488-8466 (p) • 850-921-0781 (f) • Webs~ite~ wwti+},-dca.state.ft.us • COMMUNITY PLANNING 850-4P,8-2356 (p) 850-0 -3309 (11 i ~'~r ~'" -_~i - • HOUSING AND COMMUNITY DEVELOPMENT 851;-488-7556 (p 850-922-5623 (~ • ` - -- _~ .'.'JA i cR _ - • ~ ~ T /,, ~T i ~ chair Vice-Mav~or Deborah Iii nes July 3, 2008 Tampa Bay,R.egional P/ann/ng Council Vice-Chair Secretarv~/T'reasurer Executive Director Commissioner Bi~~ Dodson Commissioner JacFz Mariano Mannv~ Pumarieya Gina L. Clayton Asst. Director of Planning City of Clearwater P.O. Box 4748 Clearwater, FL 33758-4748 Dear Ms. Clayton: Enclosed is a copy of the Council's review of the City of Clearwater's comprehensive plan amendment, 08-1 RWSP. The report will be an agenda item for Council consideration at the Monday, July 14, 2008 Council meeting, which will begin at 10:00 a.m. Please do not hesitate to contact me if more information or clarification concerning the contents of the report is needed. Sincerely, essica L sford Senior Planner Enclosure --~----T~- ~' ~CC~ ~Lw=~ -. __ ---- --~~ ~ ,3 - ~. 7 ~~ E ` . ,i L..~-__ ___ __.__l PLANNING £~ DEVELOPMENT SERVICES Il CITY OF CLEARWATER _~ g o 0 o Gatewav~ Centre Bou~evard~ Suite i o o• Pine~~as Par FL 3 3 7$ 2 Phone: 727-570-5 s 5 r • Fax: 727-570-5 r z S • State Number: 5 z 3-5 o6G • wwwtbrpc.org ^ BOARD OF COUNTY COMMISSIONERS Robert B. Stewart -Chairman Calvin D. Harris -Vice Chairman Ronnie E. Duncan Susan Latvala John Morroni Karen Williams Seel Kenneth T. Welch July 3, 2008 • • r-- .r-~ ~~ `_V., 11 ~ e~ .~ u ~_ _ - ._..i ~ s ~ ~~ , PLANN Jr`JELOPMENT ` ~cRVICI=; ~~C_'~Y CF Cl_EARWATER J Ray Eubanks, Administrator Plan Review and Processing Division of Community Planning Department of Community Affairs 2555 Shumard Oak Boulevard Tallahassee, FL 32399-2356 Re: City of Clearwater 08-RWSP1 Pinellas ~._.; County PLANNING As part of the Comprehensive Plan amendment review process, the Pinellas County Planning Department, as the County land planning agency, has reviewed the referenced amendment, and the comments below are developed in accordance with the requirements of Section 163.3184(5), F.S., and Chapter 9J-11, F.A.C., and consider the effect and relationship of the proposed amendments on the Pinellas County Comprehensive Plan. Based on County staff review, it is recommended that the City include a policy regarding coordination with Pinellas County and Pinellas County's adopted standards for potable water supply (perhaps under Objective 21) since Pinellas County Utilities provides over 60 percent of the City's potable water supply. Thank you for the opportunity to comment, and if you have any comments please contact me at (727) 464-8200. Sincerely, °~-~~~~ Elizabeth Freeman, Planning Section Manager Pinellas County Planning Department cc: Gina Clayton, City of Clearwater bcGcorrs.bh PLEASE ADDRESS REPLY T0: 600 Cleveland Street Suite 750 Clearwater, Florida 33755 Phone: (727) 464-8200 Fax: (727) 464-8201 Website: www.pinellascounty.org , ~Aa f i Florida De artment o Trans ortatib~. r~ r' j~, ,~' ~. cxnRLIE GRIST 11201 N. McKinley Drive I -.-~ R ~^ STEPHANIE G.-ICOPELOUSOS GOVERNOR 1 ~ . , SECRETARY ~ I Tampa, FL 33612-6456 L-- June 24, X008 ~'~~`+~"; ~ . ` -______ Mr. Ray Eubanks Division of Community Planning Florida Department of Community Affairs 255 Shuma_~ Oak Rol:l~,~~-cl Tallahassee, Florida 32399 2100 RE: City of Clearwater Proposed Comprehensive Plan Amendment 08-RWSP-1 Dear Mr. Eubanks We have reviewed the City of Clearwater proposed comprehensive plan (the Plan) Amendment 08 RWSP-1 in accordance with the provisions of Chapter 163, Florida Statutes; Chapter 9J-5, Florida Administrative Code; and our Plan review guidelines. The City proposes to revise the Utility Element to update the Potable Water Sub-Element. Background: Clearwater is the county seat of Pinellas County. The estimated 2005 population was 110,831 (BEBR). The City covers 21 square miles and has several miles of shoreline along the Gulf of Mexico and Tampa Bay. The City has little vacant developable land (less than 3% of the area). Tourism is the number one employer in the City (14,000 people directly employed in it). The City is working to diversify its economic base and to redevelop and revitalize the beautiful Clearwater Beach, a popular tourist destination. The aforementioned information is from the Evaluation and Appraisal Report adopted on September 21, 2006. Comments: Clearwater operates a potable water utility with many wells and completed a Water Master Plan in 2004. However, 63% of the City's daily demand for water is supplied through the purchase of water from Pinellas County. Pinellas County is a member of the Tampa Bay Water (TBW) regional water supply authority but the City is not. TBW works with the water management district to address current and future needs for potable water. The City may acquire additional water from Pinellas County through. the City's intergovernmental water service agreement. In light of the agreement and the County's participation in TBW, the City might consider retaining references to TBW in Policies 21.2.1 (coordinate building code revisions); and 21.2.6 (assist efforts to augment existing water supplies and provide for future needs). We support the additional coordination with TBW in proposed revised Policy 21.6.2 (develop data that will identify safe, reliable potable water yields in existing and future well-fields). Also, we would inquire regarding the dwindling number of customer accounts seen in proposed revised Objective 21.2 (53,430 accounts in 1999; and 40,390 accounts in July, 200. www. dot. state.fl.u s ® RECYCLED PAPER • • Mr. Ray Eubanks June 24, 2008 Page Two We appreciate the opportunity to review and comment on the proposed Plan amendment. if you have any questions regarding this letter, please contact me at carol.coilins~a dot.state.fl.us or call me at 813.975.6444 Sincerely, Carol M. Collins LGCP Coordinator cc: Michael Delk, AICP, Director of Planning, City of Clearwater Kathleen Neill, Director of Policy Planning, FDOT f !~ ~ • STATE OF FLORIDA DEPARTMENT OF COMMUNITY AFFAIRS "Dedicated to making Florida a better place to call home" CHARLIE CRIST Governor June 4, 2008 THOMAS G. PELHAM Ms. Gina L. Clayton, Assistant Director City of Clearwater Planning Office Post Office Box 4748 Clearwater, Florida 33758-4748 Deaz Ms. Clayton: 1 L~~--~' n ~~~I~r~r~~~ll,~ i ~" 9 ~ ~r ~-. Thank you for submitting City of Clearwater's proposed amendments to your comprehensive plan. Our reference number for this amendment package is Clearwater 08RWSP-1. We have conducted an inventory of the plan amendment package to verify the inclusion of all required materials. The submission package appears to be complete, and your proposed plan amendment will be reviewed pursuant to Chapter 163, Florida Statutes. Once the review is underway, you may be asked to provide additional supporting documentation by the review team to ensure a thorough review. The Department will evaluate the proposed amendments and mail you a notification on July 8, 2008, with its determination as to whether the amendments will be reviewed pursuant to Chapter 163.3184 and Rule 9J-11.009, F.A.C. The Department's notification will identify the amendments that will and will not be reviewed. Please be advised that Section 163.3184(8)(c), Florida Statutes, requires the Depart- ment to provide a courtesy information statement regazding the Department's Notice of Intent to citizens who furnishtheir names and addresses at the local government's plan amendment transmittal (proposed) or adoption hearings. In order to provide this courtesy information statement, local governments are required by law to furnish the names and addresses of the citizens requesting this information to the Department. Please provide these required names and addresses to the Department when you transmit your adopted amendment package for co,,, liannP rPvieev. I>In the event no names, addresses are provided, please provide this information as well. For efficiency, we encourage that the information sheet be provided in electronic format. 2555 SHUMARD OAK BOULEVARD TALLAHASSEE, FL 32399-2100 Phone: 850-488-8466 Fax: 850-921-0781 Website: www.dca.state.fl.us COMMUNITY PLANNING AREAS OF CRITICAL StATE CONCERN FIELD OFFICE HOUSING AND COMMUNITY DEVELOPMENT Phone:850~388-2356 Fax:850~488-3309 Phone: 30x289-2402 Fax: 305-289-2442 Phone:850-488-7956 Fax 850-922-5623 ~ ~ • June 4, 2008 Page Two • If you have any questions please contact Bernard Piawah, Regional Planning Administrator, that will be overseeing the review of the amendment and assigning the amendment to the respective planner for review, at (850) 487-4545. Sincerely, D. Ray Eubanks, Administrator Plan Review and Processing DRE/af • • ~~~~ STATE OF FLORIDA DEPARTMENT OF COMMUNITY AFFAIRS "Dedicated to making Florida a better place to call home" CHARLIE CRIST Governor MEMORANDUM TO Jim Quinn, DEP Susan Harp, DOS Carol Collins, FDOT7 Paula McCleery, Southwest Florida WMD Jessica White, Tampa Bay RPC Brian Smith, Pinellas County DATE: June 4, 2008 THOMAS G. PELHAM Secretary SUBJECT: COMMENTS FOR PROPOSED COMPREHENSIVE PLAN AMENDMENT LOCAL GOVERNMENT/DCA AMENDMENT #: Clearwater 08RWSP1 DCA CONTACT PERSON/PHONE NUMBER: RPC REQUEST TO REVIEW TO DCA NO LATER THAN: Bernard Piawah, 850-487-4545 June 27, 2008 AGENCYS COMMENTS DUE TO DCA NO LATER THAN: July 3, 2008 Please contact the local government if you do not have a copy of the proposed amendment. Please review the proposed comprehensive plan amendment documents for consistency with applicable provisions of Chapter 163, Florida Statates and Chapter 9J-5, Florida comments to the attention of Ray Eubanks, Administrator, Plan Review and Processing, at the Department address indicated below. Please use the above referenced DCA AMENDMENT NUMBER on all correspondence related to this amendment. ~Vf3'fL: Keview .Agencies -'The local government has indicated that they have mailed the proposed amendment directly to your agency. See attached transmittal letter. Be sure to contact the local government ifyou have not received the amendneent. Also, letter to the local government from DCA acknowledging receipt of amendment is attached. 2555 SHUMARD OAK BOULEVARD TALLAHASSEE, FL 32399-2700 Phone: 850-488-8466 Fax: 850-921-0781 Website: www.dca.state.fl.us COMMUNITY PLANNING AREAS OF CRITICAL STATE CONCERN FIELD OFFICE HOUSING AND COMMUNnY DEVELOPMENT Phone: 850-488-2356 Fa~c:850-d88-3309 Phone:30S289-2402 Fax:30S289-2442 Phone:850-488-7956 Fax:650-922-5623 ~ • • IT'Y ®E ~ LEARWI~`I'E R POST OFFICE BOX 4748, CLFARWA'['ER~ FLORIDA 33758-4748 MUNICIPAL. SERVICES BUILDING, lOO SOUTH MYRTLE AVENUE, CLEARWATER, FLORIDA 33756 TF,LEPHONE (727) 562-4567 FAx (727) 562-4865 PLANNING DEPARTMENT May 22, 2008 Pinellas County Planning Department Attn: Brian Smith, AICP, Director 600 Cleveland Street, Suite 750 Clearwater, FL 33755 Tampa Bay Regional Planning Council Attn: Manny Pumarieda, Executive Director 4000 Gateway Centre Boulevard, Suite 100 Pinellas Park, FL 33782 Southwest Florida Water Management District Attn: Ray Mazur, Executive Director 2379 Broad Street Brooksville, FL 34604-6899 Florida Department of State Bureau of Historic Preservation Attn: Ms. Susan Harp R.A. Gray Building 500 South Bronough Street Tallahassee, FL 32399-0250 Florida Department of Transportation District Seven Attn: Carol M. Collins, LGCP & CMS Coordinator 11201 North McKinley Drive Mail Station 7-500 Tampa, FL 33612-6456 Department of Environmental Protection Attn: Jim Quinn, Environmental Manager Office of Intergovernmental Programs 3900 Commonwealth Boulevard, Mail Station 47 Tallahassee, FL 32399-3000 ~~'~ u c Pq oordoord ...-- RE: Transmittal of Comprehensive Plan Amendment Package City of Clearwater's Water Plan to be incorporated into the City's Utility Element Potable Water and Natural Ground Water Aquifer Recharge section ~~EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER~~ • • To whom it may concern: Pursuant to Rule 9J-11.006(1) of the Florida Administrative Code, the City of Clearwater is submitting this proposed plan amendment package to the aforementioned organizations. Also, enclosed is a copy of the transmittal letter sent to the Department of Community Affairs. If you need further assistance, please contact Sandra Herman, Planner III at 727-562-4586. Thank you for your courtesy in this matter. incerely, Gina L. Clayton Assistant Director of Planning City of Clearwater Cc: David Healey, Pinellas. Planning Council • • ,~ CITY ®F CLEARWATER POST OFFICE BOX 4748, CLEARWATER, FLORIDA 33758-4748 MUNICIPAL. SERVICES BUILDING, LOO SOUTH MYRTLE AVENUE, CLEARWATER, FLORIDA 33756 TELEPHONE (727) 562-4567 FAx (727) 562-4865 PLAALNING DEPARTMENT May 22, 2008 Mr. Ray Eubanks Florida Department of Community Affairs - Bureau of Local Planning Division of Community Planning Plan Processing Team 2555 Shumard Oak Boulevard Tallahassee, FL 32399-2100 RE: Transmittal of Comprehensive Plan Amendment Package City of Clearwater's Water Plan to be incorporated into the City's Utility Element Potable Water and Natural Ground Water Aquifer Recharge section Dear Mr. Eubanks: The City of Clearwater is submitting this transmittal as part of the requirements pursuant to 9J- 11.006 "Submittal Requirements for Proposed Local Government Comprehensive Plan Amendments". This is the City's transmittal of its plan amendment package for the Clearwater Water Plan to be incorporated into the City's Utility Element (Potable Water and Natural Ground Water Aquifer Recharge section) pursuant to F.S. Section 163.3177(6)(c) and it is requested that it be processed as a Preliminary Review. The City is transmitting one. (1) proposed Plan Amendment with this letter for your review: CPA2008-03002 -Plan Amendment to the Utility Element (Potable Water and Natural Ground Water Aquifer Recharge section) of the Comprehensive Plan (Ordinance Number 7950-08) 9J-11.006(1Z(a)1: The Clearwater Community Development Board (CDB), as the Local Planning Agency,. held a public. meeting on April 15, 2008 for CPA2008-03002. • The CDB recommended approval to the City Council. 9J-11.006(1 ~a~2: The Clearwater City Council, as the local governing body, held a transmittal public hearing meeting on May 15, 2008 for CPA2008-03002. • The City Council approved the transmittal of CPA2008-03002 to the Florida Department of Community Affairs. ~~EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER~~ ' May 22, 2008 Ray Eubanks Page 2 of 5 The City received no requests for information and no objections from citizens at either the Local Planning Agency hearing or the transmittal hearing as shown by the enclosed Comprehensive Plan Citizen Courtesy Information Lists. The above proposed plan amendment package and one copy of each item specified under paragraphs 9J-11.006(1)(a), (b) and (c), FAC, were sent to the Pinellas County Planning Department, the Tampa Bay Regional Planning Council, the Southwest Florida Management District, the Florida Department of Transportation, the Florida Department of State and Florida Department of Environmental Protection, as identified in 9J-11.009(6) under separate cover on this date. 9J-11:+JJ6(1)(a~ The following is the summary of the plan amendment .package that the City of Clearwater requests the department to review: • CPA2008-03002- Plan Amendment to the Utility Element (Potable Water and Natural Ground Water Aquifer Recharge section) of the Comprehensive Plan (Ordinance Number 7950-08) 9J-11.006(1)~a)4: The anticipated month of adoption for the plan amendment is July 2008. 9J-11.006 l~a~ The proposed plan amendment package does not pertain to an area of critical state concern. 9J-11.006(1 ~a)6: The plan amendment package is not within Orange, Lake or Seminole Counties. 9J-11.006(1~(a 7.t.: The proposed plan amendment package is an exemption to the. twice-a- year limit of amendments (incorporating the regional water supply work plan approved pursuant to Sections 373.0361 and 163.3177(6)(c),F.S.). 9J-11.006(1)(a)9: The plan amendment package will not be adopted under a joint planning agreement. , 9J-11.006(1 ~(a)10: Sandra E. Herman Planner III P.O. Box 4748 Clearwater, FL 33758-4748 Telephone: 727-562-4586 Fax: 727-562-4865 sandra.herman@myclearwater. com If you need further assistance, please contact Sandra Herman. Thank you for you help in this matter. May 22, 2008 Ray Eubanks Page 3 of 5 Sincerely, j -~ ~ _ z , 1.~, ~ ~~~ Gina L. Clayton Assistant Director of Planning City of Clearwater Cc: Michael Quillen, Director of Engineering Robert Fahey, Engineering/Production Manager ~ ! 1 R T I'.{l~,. }~ ~ itr Ll Z~f ~'4'! 'r'i-~ ~ ~ 41 r y (~~l t~I. fZ~^- A v yi ~ fT,, '~ fff '^ TI r~anf9J YIA\\I\'G DfPART.~1F.\'f May 22, 2008 • • - CITY OF CLEARWATER PosT Orrlcl: 13ox 4748, Cr.t ~xw~rrlx, F~of~lna 33758-4748 ~4l::~lc!l~,~l. Sl:xvlcrs I3~~u.nlxG, 100 SouTf! ~-tYxTl.l. Avl;~c;r, Cl.t~ut»•,~'rr•.x, FLORIDA 33756 ~I~f•:LIiIHOXIi (7~7) 51i2-4567 FAx (727j 562-45<5 Mr. Ray Eubanks Florida Department of Community Affairs Bureau of Local Planning Division of Community Planning Plan Processing Team 2555 Shumard Oak Boulevard Tallahassee, FL 32399-2100 ~ ~ ~ ~`.^,Y 2 ~ 208 `_ + -, r1 r~ "w+, i RE: Transmittal of Comprehensive Plan Amendment Package City of Clearwater's Water Plan to be incorporated into the City's Utility Element Potable Water and Natural Ground Water Aquifer Recharge section Dear Mr. Eubanks: The City of Clearwater is submitting this transmittal as part of the requirements pursuant to 9J- 11.006 "Submittal Requirements for Proposed Local Government Comprehensive Plan Amendments". This is the City's transmittal of its plan amendment package for the Clearwater Water Plan to be incorporated into the City's Utility Element (Potable Water and Natural Ground Water Aquifer Recharge section) pursuant to F.S. Section 163.3177(6)(c) and it is requested that it be processed as a Preliminary Review. The City is transmitting one (1) proposed Plan Amendment with this letter for your review: CPA2008-03002 -Plan Amendment to the Utility Element (Potable Water and Natural Ground Water Aquifer Recharge section) of the Comprehensive Plan (Ordinance Number 7950-08) 9J-11.006(1)(a)1: The Clearwater Community Development Board (CDB), as the Local Planning Agency, held a public meeting on April 15, 2008 for CPA2008-03002. • The CDB recommended approval to the City Council. 9J-11.006(1)(a)2: The Clearwater City Council, as the local governing body, held a transmittal public hearing meeting on May 15, 2008 for CPA2008-03002. • The City Council approved the transmittal of CPA2008-03002 to the Florida Department of Community Affairs. ~~EQUAL I3,4fl3l.OY\1EtiT ADD AI'FIxD1AT[V}i ACTION E\iPL0Y7iR~~ May 22, 2008 • • Ray Eubanks Page 2 of 5 The City received no requests for information and no objections from citizens at either the Local Planning Agency hearing or the transmittal hearing as shown by the enclosed Comprehensive Plan Citizen Courtesy Information Lists. The above proposed plan amendment package and one copy of each item specified under paragraphs 9J-11.006(1)(a), (b) and (c), FAC, were sent to the Pinellas County Planning Department, the Tampa Bay Regional Planning Council, the Southwest Florida Management District, the Florida Department of Transportation, the Florida Department of State and Florida Department of Environmental Protection, as identified in 9J-11.009(6) under separate cover on this date. 9J-11.006(1)(a)3: The following is the summary of the plan amendment package that the City of Clearwater requests the department to review: • CPA2008-03002- Plan Amendment to the Utility Element (Potable Water and Natural Ground Water Aquifer Recharge section) of the Comprehensive Plan (Ordinance Number 7950-08) 9J-11.006(1)(a)4: The anticipated month of adoption for the plan amendment is July 2008. 9J-11.006(1)(a)5: The proposed plan amendment package does not pertain to an area of critical state concern. 9J-11.006(1)(a)6: The plan amendment package is not within Orange, Lake or Seminole Counties. 9J-11.006(1)(a 7.t.: The proposed plan amendment package is an exemption to the twice-a- year limit of amendments (incorporating the regional water supply work plan approved pursuant to Sections 373.0361 and 163.3177(6)(c),F.S.). 9J-11.006(1)(a)9: The plan amendment package will not be adopted under a joint planning agreement. 9J-11.006(1)(a)10: Sandra E. Herman Planner III P.O. Box 4748 Clearwater, FL 33758-4748 Telephone: 727-562-4586 Fax: 727-562-4865 sandra. herman@myc learwater. com If you need further assistance, please contact Sandra Herman. Thank you for you help in this matter. May 22, 2008 • • Ray Eubanks Page 3 of 5 Sincerely, ~~ Gina L. Clayton c~~~~~v flssistant Director of Planning City of Clearwater Cc: Michael Quillen, Director of Engineering Robert Fahey, Engineering/Production Manager May 22, 2008 Ray Eubanks Page 4 of 5 May 22, 2008 Pinellas County Planning Department Attn: Brian Smith, AICP, Director 600 Cleveland Street, Suite 750 Clearwater, FL 33755 Tampa Bay Regional Planning Council Attn: Manny Pumarieda, Executive Director 4000 Gateway Centre Boulevard, Suite 100 Pinellas Park, FL 33782 Southwest Florida Water Management District Attn: Ray Mazur, Executive Director 2379 Broad Street Brooksville, FL 34604-6899 Florida Department of State Bureau of Historic Preservation Attn: Ms. Susan Harp R.A. Gray Building 500 South Bronough Street Tallahassee, FL 32399-0250 Florida Department of Transportation District Seven Attn: Carol M. Collins, LGCP & CMS Coordinator 11201 North McKinley Drive Mail Station 7-500 Tampa, FL 33612-6456 Department of Environmental Protection Attn: Jim Quinn, Environmental Manager Office of Intergovernmental Programs 3900 Commonwealth Boulevard, Mail Station 47 Tallahassee, FL 32399-3000 Clearwater RE: Transmittal of Comprehensive Plan Amendment Package City of Clearwater's Water Plan to be incorporated into the City's Utility Element Potable Water and Natural Ground Water Aquifer Recharge section May 22, 2008 • Ray Eubanks Page 5 of 5 To whom it may concern: Pursuant to Rule 9J-11.006(1) of the Florida Administrative Code, the City of Clearwater is submitting this proposed plan amendment package to the aforementioned organizations. Also, enclosed is a copy of the transmittal letter sent to the Department of Community Affairs. If you need further assistance, please contact Sandra Herman, Planner III at 727-562-4586. Thank you for your courtesy in this matter. incerely, C'c~~~ ( ~ Gina L. Clayton Assistant Director of Planning City of Clearwater Cc: David Healey, Pinellas Planning Council r, w.r .. ~"~ ~ . . ° - .p ~ ~ ~ e ti f F ~ , ~1 D ..- d~- PLANNING DEPARTMENT May 22, 2008 • • ITY OF C LE1~~ZW_~TER POST OFFICE BOX 4748, CLEARWA'CER, FLORIDA 33758-4748 MUNICIPAI. SERVICES BUILDING, ZOO SOUTH MYRTLE AVENUE, CLEARWATER, FLORIDA 33756 TELEPHONE (727) 562-4567 FAx (727) 562-4865 Pinellas County Planning Department Attn: Brian Smith, AICP, Director 600 Cleveland Street, Suite 750 Clearwater, FL 33755 Tampa Bay Regional Planning Council Attn: Manny Pumarieda, Executive Director 4000 Gateway Centre Boulevard, Suite 100 Pinellas Park, FL 33782 Southwest Florida Water Management District Attn: Ray Mazur, Executive Director 2379 Broad Street Brooksville, FL 34604-6899 Florida Department of State Bureau of Historic Preservation Attn: Ms. Susan Harp R.A. Gray Building 500 South Bronough Street Tallahassee, FL 32399-0250 Florida Department of Transportation District Seven Attn: Carol M. Collins, LGCP & CMS Coordinator 11201 North McKinley Drive Mail Station 7-500 Tampa, FL 33612-6456 Department of Environmental Protection Attn: Jim Quinn, Environmental Manager Office of Intergovernmental Programs 3900 Commonwealth Boulevard, Mail Station 47 Tallahassee, FL 32399-3000 RE: Transmittal of Comprehensive Plan Amendment Package City of Clearwater's Water Plan to be incorporated into the City's Utility Element Potable Water and Natural Ground Water Aquifer Recharge section ~~EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER~~ .~ • • To whom it may concern: Pursuant to Rule 9J-11.006(1) of the Florida Administrative Code, the City of Clearwater is submitting this. proposed plan amendment package to the aforementioned organizations. Also, enclosed is a copy of the. transmittal letter sent to the Department of Community Affairs. If you need further assistance, please contact Sandra Herman, Planner III at 727-562-4586. Thank you for your courtesy in this matter. incerelyt~r, ~, I Gina L. Clayton Assistant Director of Planning City of Clearwater Cc: David Healey, Pinellas Planning Council - , • •°~~' ~ ITY OF ~ LEARWATER ,~ ;'. • , ' '~_±~r~ POST OFFICE BOX 4748, CLEARWA'CER, FLORIDA 33758-4748 f , $•~,. ,. '{•`~ w MUNIC[PAI, SERVICES BUILDING, IOO SOUTH MYRTLE AVENUE, CLEARWATF,R, FLORIDA 33756 '~~Y {"fix ~~ ~a ~ TELEPHONE (727) 562-4567 FAx (727) 562-4865 PLANNING DEPARTMENT May 22, 2008 Mr. Ray Eubanks Florida Department of Community Affairs Bareau of Local Planning Division of Community Planning Plan Processing Team 2555 Shumard Oak Boulevard Tallahassee, FL 32399-2100 RE: Transmittal of Comprehensive Plan Amendment Package City of Clearwater's Water Plan to be incorporated into the City's Utility Element Potable Water and Natural Ground Water Aquifer Recharge section Dear Mr. Eubanks: The City of Clearwater is submitting this transmittal as part of the requirements pursuant to 9J- 11.006 "Submittal Requirements for Proposed Local Government Comprehensive Plan Amendments". This is the City's transmittal of its plan amendment package for the Clearwater Water Plan to be incorporated into the City's Utility Element (Potable Water and Natural Ground Water Aquifer Recharge section) pursuant to F.S. Section 163.3177(6)(c) and it is requested that it be processed as a Preliminary Review. The City is transmitting one. (1) proposed Plan Amendment with this letter for your review: • CPA2008-03002 -Plan Amendment to the Utility Element (Potable Water and Natural Ground Water Aquifer Recharge section) of the Comprehensive Plan (Ordinance Number 7950-08) 9J-11.006(1~(a~ The Clearwater Community Development Board (CDB), as the Local Planning Agency, held a public meeting on April 15, 2008 for CPA2008-03002. , • The CDB recommended approval to the City Council. 9J-11.006(1 (~ a)2: The Clearwater City Council, as the local governing body, held a transmittal public hearing meeting on May 15, 2008 for CPA2008-03002. • The City Council approved the transmittal of CPA2008-03002 to the Florida Department of Community Affairs. ~~EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER~~ - - May 22, 2008 ~ • Ray Eubanks Page 2 of 5 The City received no requests for information and no objections from citizens at either the Local Planning Agency hearing or the transmittal hearing as shown by the enclosed Comprehensive Plan Citizen Courtesy Information Lists. The above proposed plan amendment package and one copy of each item specified under paragraphs 9J-11.006(1)(a), (b) and (c), FAC, were sent to the Pinellas County Planning Department, the Tampa Bay Regional Planning Council, the Southwest Florida Management District, the Florida Department of Transportation, the Florida Department of State and Florida Department of Environmental Protection, as identified in 9J-11.009(6) under separate cover on this date. 9J-11:OJ6 1 ~a)3: The following is the summary of the plan amendment package that the City of Clearwater requests the department to review: • CPA2008-03002- Plan Amendment to the Utility Element (Potable Water and Natural Ground Water Aquifer Recharge section) of the Comprehensive Plan (Ordinance Number 7950-08) 9J-11.006(l~a)4: The anticipated month of adoption for the plan amendment is July 2008. 9J-11.006(1)(x,5: The proposed plan amendment package does not pertain to an area of critical state concern. 9J-11.006(1)(a~6: The plan amendment package is not within Orange, Lake or Seminole Counties. 9J-11.006(1Z(a)7.t.: The proposed plan amendment package is an exemption to the twice-a- year limit of amendments (incorporating the regional water supply work plan approved pursuant to Sections 373.0361 and 163.3177(6)(c),F.S.). 9J-11.006 1 ~a)9: The plan amendment package will not be adopted under a joint planning agreement. 9J-11.006 1)(x)10: Sandra E. Herman Planner III P.O. Box 4748 Clearwater,. FL 33758-4748 Telephone: 727-562-4586 Fax: 727-562-4865 sandra.herman@myclearwater.com If you need further assistance, please contact Sandra Herman. Thank you for you help in this matter. May 22, 2008 . t Ray Eubanks Page 3 of 5 Sincerely, ., , r~ ~ Gina L. Clayton Assistant Director of Planning City of Clearwater Cc: Michael Quillen, Director of Engineering Robert Fahey, Engineering/Production Manager • • '~ Herman, Sandra From: Herman, Sandra Sent: Wednesday, December 17, 2008 12:48 PM To: Bertels, Paul Subject: RE: Question at CC on Monday and CONSTRAINED ROADS CLEARWATER FROM MPO LOS May 2008.x1s Paul, Great response -thanks. Sandy -----Original Message----- From: Bertels, Paul Sent: Wednesday, December 17, 2008 12:41 PM To: Herman, Sandra Subject: RE: Question at CC on Monday and CONSTRAINED ROADS CLEARWATER FROM MPO LOS May 2008.x-s First of all the map is correct except construction of the interchanges between Belleair and Gulf to Bay on US 19 has slipped from 09/10 to 2012. With regards to the other roads I offer the following: • Remember that these LOS values are all PM Peak not daily. Do not get the idea that these roads are operating at Fall day long. • Keene north of Drew is projected to go to LOS F in ten years if no improvements are made to it and that is simply based on the model the MPO uses to project where improvements are needed. Basically a very expensive guess based on future development trends along the corridor. • The other roadways are projected to be LOS F in the same manner as Keene and it is based on the model. Many of these will not be widened as there is not enough funding to do all these roadways. Remember this represents a worst case scenario for planning purposes. • One of the options being considered for mitigating the projected LOS F on these corridors is the use of ATMS and BRT wherever it makes sense to do so. In many cases ATMS will raise the LOS to at least an E and maybe a D. Paul Bertels Manager Traffic Operations Division pawl, bertels@myclearwater. com 727-562-4794 -----Original Message----- From: Herman, Sandra Sent: Wednesday, December 17, 2008 10:15 AM To: Bertels, Paul Subject: Question at CC on Monday and CONSTRAINED ROADS CLEARWATER FROM MPO LOS May 2008.x1s Paul, j Hi. At work session on Monday, Vice Mayor'Cretekos was asking about the E-F LOS on the roads shown on the Road Network: 2018 Level of Service (Major Road Network) map in our amendments to the Comp Plan (this map is based on the MPO 2025 map of same name) -many are indicated going to E-F from the existing LOS shown on the Existing Major Road Network map. He was a bit concerned that these roads would be going to E or F in 2018 and what will be done about this. Jill S., Gina C. mentioned that developments would need to make any necessary improvements as required (concurrency reviews). I said some of these roads are constrained roadways such as Gulf to Bay Blvd. What else should be said if he mentions it again on Thursday night? One question I have from these maps: Why does Keene Road north of Drew Street go from existing A-C to an F in 10 years? Is this correct? I found this table from you a few months ago. « File: CONSTRAINED ROADS CLEARWATER FROM MPO LOS May { 2008.x1s » Is it still correct? Sandy • • lands with existing military installations in their future land use plan element shall transmit the update or '° amendment to the department by June 30, 2006. (b) A traffic circu~ation,element consisting of the types, locations, and extent of existing and proposed major thoroughfares and transportation routes, including bicycle and pedestrian ways. Transportation corridors, as defined in s. 334.03, may be designated in the traffic circulation element pursuant to s. 337.273. If the transportation corridors are designated, the local government may adopt a transportation corridor management ordinance. (c) A ~enePal sanitary sewer, so`[id waste, drainage potable water, and; natural groundwater- aquifer. _ , recharge element correlated to principles and guidelines for future land use, indicating ways to provide for future potable water, drainage,. sanitary sewer, solid waste, and aquifer recharge protection requirements for t~se area. The element may be a detailed engineering plan including a topographic map depicting areas of prime groundwater recharge. The element shall describe the problems and needs and the general facilities that will be required for solution of the problems and needs. The element shall also include a topographic map depicting any areas adopted by a regional water management district as prime groundwater recharge areas for the Floridan or Biscayne aquifers. These areas shalt be given special consideration when the local government is engaged in zoning or considering future land use for said designated areas. For areas served by septic tanks, soil surveys shall be.provided which indicate the suitability of soils for septic tanks. Within 18 months after the governing board approves an updated regional water supply plan, the element must incorporate the alternative water supply project or projects selected by the local government from those identified in the regional water supply plan pursuant to s. ~ 373.0361(2)(x) or proposed by the local government under s. 373.0361(7)(b). If a local government is located within two water management districts, the local government shall adopt its comprehensive plan amendment within 18 months after the later updated regional water supply plan. The element must identify such alternative water supply projects and traditional water supply projects and conservation and reuse necessary to meet the water needs identified in s. 373.0361(2)(x) within the local government's jurisdiction and include a work plan, covering at least a 10 year planning period, for building public, private, and regional water supply facilities, including development of alternative water supplies, which are identified in the element as necessary to serve existing and new development. The work plan shall be updated, at a minimum, every_5 years within 18 months after the governing board of a water management. d~str,.i__ct approves_an updated regional water supply plan. Amendments to incorporate the work plan do not count toward the limitation on the frequency of adoption of amendments to the comprehensive p an. Local governments, public and private utilities, regional water supply authorities, special districts, and water management districts are encouraged to cooperatively plan for the development of multijurisdictional water supply facilities that are sufficient to meet projected demands for established planning periods, including the development of alternative water sources to supplement traditional sources of groundwater and surface water supplies. (d) A conseryatiori"element for the conservation, use, and protection of natural resources in the area, including air, water, water recharge areas, wetlands, waterwells, estuarine marshes, soils, beaches, shores, flood plains, rivers, bays, lakes, harbors, forests, fisheries and wildlife, marine habitat, minerals, and other natural and environmental resources. Local governments shalt assess their current, as well as projected, water needs and sources for at least a 10-year period, considering the appropriate regional http://www.leg.state. fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=Ch0163/... 10/3/2006 • CITY OF CLEARWATER NOTICE OF COMPREHENSIVE PLAN AMENDMENTS The City of Clearwater proposes to adopt the following ordinance: ORDINANCE NO. 7950-08 AN ORDINANCE OF THE CITY OF CLEARWATER, FLORIDA, MAKING AMENDMENTS TO THE COMPREHENSIVE PLAN OF THE CITY AS ADOPTED ON MAY 18, 2000 AND AMENDED ON JULY 12, 2001, OCTOBER 7, 2004, OCTOBER 20, 2005, DECEMBER 15, 2005, AUGUST 14, 2007, AND FEBRUARY 21, 2008; BY AMENDING THE UTILITY ELEMENT; IN ACCORDANCE WITH SECTIONS 163.3177, 163.3184, 163.3187 OR 163.3189, FLORIDA STATUTES, TO UPDATE THE CITY OF CLEARWATER'S WATER WORK PLAN IN ACCORDANCE WITH THE UPDATED SOUTHWEST FLORIDA WATER DIS"~RICT'S REGIONAL WATER SUPPLY PLAN; PROVIDING FOR SEVERABILITY; AND'PROVIDING AN EFFECTIVE DATE;. .. The proposed ordinance will affect the land area shown on the map in this advertisement: (INSERT MAP HERE) Public hearings on the proposed ordinance will be held as follows: Tuesday, April 15, 2008 -Community Development Board 1:00 p.m. Thursday, May 15, 2008 -City Council (1st Reading) 6:00 p.m. (or as soon thereafter as the matter may be heard) The public hearings will be heard in the City Council Chambers, 3~d floor of City Hall, 112 South Osceola Avenue, Clearwater, Florida, Any person who decides to appeal any decision made by the Board or Council, with respect to any matter considered at such hearings, will need a record of the proceedings and, for such purpose, may need to ensure that a verbatim record of the proceedings is made, which record includes the testimony and evidence upon which the appeal is to be based per Florida Statute 286.0105. Gina Clayton Cynthia E. Goudeau, MMC Planning Department City Clerk City of Clearwater P.O. Box 4748, Clearwater, FL 33758-4748 A COPY OF THIS AD IN LARGE PRINT IS AVAILABLE IN THE OFFICIAL RECORDS AND LEGISLATIVE SERVICES DEPT. ANY PERSON WITH A DISABILITY REQUIRING REASONABLE ACCOMMODATION IN ORDER TO PARTICIPATE IN THIS MEETING. SHOULD CALL THE OFFICIAL RECORDS AND LEGISLATIVE SERVICES DEPT. WITH THEIR REQUEST AT (727) 562-4093. To learn more about presenting to Clearwater boards and City Council, go to http://cearwater.granicus.com/ViewPublisher.phg?view id=11 and click on "Resident Engagement Video." You can also check the informational video out from any Clearwater public library Ad: 04/03/08 • o~ PARSONS 3450 Buschwood Park Drive, Suite 345 Tampa, Florida 33618 (813) 261-8351 • Main: (813) 933-4650 Fax: (813) 930-7332 sieve. schaeferC~parsons. com Steven A. Schaefer, P.E. Senior Project Manager ~ www.parsons.com PARSONS 3450 Buschwood Park Drive, Suite 345 Tampa, Florida 33618 (813) 261-8310 • Main: (813) 933-4650 Fax: (813) 930-7332 tory.champlin Q parsons.com Tory L. Champlin, Ph.D., P.E. Senior Project Engineer ^ PARSONS 3450 Buschwood Park Drive, Suite 345 Tampa, Florida 33618 (813) 261-8324/Main: (813) 933-4650 Fax: ($13) 930-7332 loren.furland@parsons.com www.parsons.com Loren P. Fur/and, P.E., DEE Client Service/Project Manager ~ www.parsons.com ~u l~ ~o Z.oO¢ M ~ CITY OF CLEARWATER PUBLIC WORKS DEPARTMENT WORK ORDER INITIATION FORM Date: June 28, 2004 1. 2. 3. Project No: CLW2058.01 M City Project No: 04-0040-UT PROJECT TITLE 10-Year Water Supply Facilities Work Plan Comprehensive Plan Amendments SCOPE OF WORK Please refer to Attachment "A" Scope of Work. PROJECT GOALS Florida Statute 163.3177 requires local governments to strengthen coordination of water supply and land use planning. The Statute was amended in 2002 and again in 2004 to require a 10-year long range Water Supply Facilities Work Plan to be incorporated into the Comprehensive Plan. These Comprehensive Plan amendments must provide for the following: 1. Coordination with Southwest Florida Water Management District Regional Water Supply Plan and the Potable Water Sub-Element, Conservation Element, and Intergovernmental Coordination Element. 2. Provide a 10-year Water Supply Work Plan in the Potable Water Sub- Element to meet existing and future development potable water demands. 3. Provide a 10-year assessment of water demands and sources in coordination with the Regional Water Supply Plan. 4. Coordination with Pinellas County and the Regional Water Supplier (Tampa Bay Water). 4. 5. This Scope of Work, Attachment "A", is consistent with the Florida Department of Community Affairs document titled "Guidelines for Preparing the Water Supply Facilities Work Plan Comprehensive Plan Amendment" dated July 2003. BUDGET Method A -Not to Exceed basis fee of $37,000 has been established for the preparation of the Comprehensive Plan amendments. SCHEDULE Please refer to Attachment "A", Scope of Work, for schedule. 6. WADE-TRIM STAFF ASSIGNMENTS David Gildersleeve, Executive Vice President, Principal-in-Charge Brad Cornelius, AICP, Project Manager Matt McLachlan, AICP, Project Planner Amanda Warner, Planner Jessica Claytor, Planning Technician 7. CORRESPONDENCE/REPORTING PROCEDURES Correspondence, progress reports and invoices shall be submitted to Mr. Robert Fahey, E.I., Public Works Department. 8. INVOICING/FUNDING PROCEDURES The budget for this assignment is $37,000. Invoicing Method A, Cost Times Multiplier basis, shall be used. Invoices shall be submitted monthly to the City of Clearwater, Attention: Marty Pages, 100 S. Myrtle Ave., #220, Clearwater, Florida 33756-5520 or P. O. Box 4748, Clearwater, Florida 33758-4748, for work performed. City Invoicing Code: 343-96740-561300-533-000 9. ENGINEERING CERTIFICATION Wade-Trim hereby certifies as a licensed Professional Engineer, registered in accordance with Florida Statute 471, that the above project's site and/or construction plans meet or exceed all applicable design criteria specified by City municipal ordinance, State, and Federal established standards. Wade-Trim understands that it is our responsibility as the project's Professional Engineer to perform quality assurance review and these submitted plans are to the best of our knowledge free from errors and/or omissions. Further, we accept that the City's Final Inspection for a Certificate of Occupancy does not relieve us of our own quality assurance review. This certification shall apply equally to any further revision and/or submittal of plans, computations, or other project documents, which we may subsequently tender. PREPARED BY: CITY: Mr. Andrew Neff, PE Public Utilities ENGINEER: Gregory S. Trim, PE Associate Date Date ATTACHMENT "A" SCOPE OF WORK FOR COMPREHENSIVE PLAN AMENDMENTS TO ADOPT 10-YEAR WATER SUPPLY FACILITIES WORK PLAN Prepared for: City of Clearwater Public Works/Public Utilities 1650 North Arcturas Avenue Clearwater, FL 33765 Prepared By: Wade-Trim, Inc. 4919 Memorial Highway, Suite 200 Tampa, FL 33634 Revised June 28, 2004 • • Project Understanding Florida Statute 163.3177 requires local governments to strengthen coordination of water supply and land use planning. The Statute was amended in 2002 and again in 2004 to require a 10-year long range Water Supply Facilities Work Plan to be incorporated into the Comprehensive Plan. These Comprehensive Plan amendments must provide for the following: 1. Coordination with Southwest Florida Water Management District Regional Water Supply Plan and the Potable Water Sub-Element, Conservation Element, and Intergovernmental Coordination Element. 2. Provide a 10-year Water Supply Work Plan in the Potable Water Sub- Element to meet existing and future development potable water demands. 3. Provide a 10-year assessment of water demands and sources in coordination with the Regional Water Supply Plan. 4. Coordination with the Regional Water Supplier (Pinellas County and Tampa Bay Water). This Scope of Work was developed consistent with the Florida Department of Community Affairs document titled "Guidelines for Preparing the Water Supply Facilities Work Plan Comprehensive Plan Amendment" dated July 2003. • • 1.0 Kick-Off Meeting with City Staff A project kick-off meeting will be held with City Staff from the Utilities and Planning Departments. The purpose of this meeting is to identify the source of data required for the project and to confirm the project schedule. 2.0 Coordination Meeting with the Southwest Florida Water Management District, Pinellas County, and Tampa Bay Water A coordination meeting will be held with City Staff and appropriate representatives of the Southwest Florida Water Management District, Pinellas County, and Tampa Bay Water. The purpose of this meeting is to identify data availability from these agencies and to identify issues of concern or points of emphasis to be addressed in the project. At this meeting a letter will be requested from Pinellas County and Tampa Bay Water to confirm their ability to meet the water demands of the City. 3.0 Data Collection Data required for the development of the Comprehensive Plan amendments will be collected from existing data sources. The primary source of data will be the most recent Water Master Plan for the City of Clearwater. The City shall provide the following data to Wade-Trim: 1. 10-year Projection of Water Demands (Average and Daily Max) 2. Consumptive Use Permit Information 3. Existing and Planned Water Supply Facilities (Plants, Wells, Lines, etc. ) 4. Map and Description of Geographic Service Areas for water supply 5. Water Sources 6. Current and Planned Conservation and Reuse Practices 7. Construction Cost and Funding Sources for New Facilities required to meet 10-year water demand Wade-Trim will collect the appropriate data from the Southwest Florida Water Management District and Tampa Bay Water as determined in Task 2.0. 4.0 Development of Comprehensive Plan Amendments Wade-Trim will review the existing City of Clearwater Comprehensive I~-~p Plan to identify the text, goals, objectives, and polices that relate to the inte ration of the Water Su I Work Plan. The Cit shall r - ~ovl~ g pp y y p ovide Wade Trim with an electronic file of the Comprehensive Plan. Amendments to the text, goals, objectives, and polices will be developed, with the supporting data and analysis, to implement the Water Supply Work Plan, address water sources, facility improvements, conservation and reuse, • • provide consideration for the Regional Water Supply Plan and plans of Tampa Bay Water. It is anticipated that amendments will be required to the Future Land Use, Portable Water, Conservation, Intergovernmental and Capital Improvements Element. Once a draft of the amendments are complete Wade-Trim will meet with City Staff to review the proposed amendments. Wade-Trim will then revise the amendments based on City Staff comments and will submit the final amendments to City Staff for public hearing. 5.0 Comprehensive Plan Amendment Adoption Process Wade-Trim will attend the required transmittal and adoption pubic hearings to present the proposed amendments. The anticipated public hearings at transmittal and adoption include: 1. Community Development Board (2 meetings) 2. City Commission (2 meetings) After the transmittal public hearings Wade-Trim will provide the City the proposed amendments for distribution to the Florida Department of Community Affairs and other required agencies. After receipt of the Objectives, Recommendations and Comments Report (ORC) from the Florida Department of Community Affairs, Wade-Trim will meet with City Staff to formulate responses to the ORC. Wade-Trim will then revise the amendments as necessary. The City shall provide any additional data required to respond to the ORC. The revised Comprehensive Plan Amendments will be provided to the City for the adoption public hearings. After the adoption public hearings Wade-Trim will provide the City with the final amendments to be submitted to the Florida Department of Community Affairs for compliance review. The City shall be responsible for scheduling, advertising, and arranging all required public hearings. 6.0 Additional Services if Required It is assumed that the adopted Comprehensive Plan Amendments will be found in compliances by the Florida Department of Community Affairs. However, in the unlikely event the amendments are found not in compliance by the Florida Department of Community Affairs or are subject to other challenges, Wade-Trim will provide assistance to the City in responding to the challenges for an additional fee. The fee for these • C~ additional services will be negotiated with the City and an amendment to this Scope of Services will be provided to detail the required assistance. Project Fee The fee, on a cost times multiplier basis, for Tasks 1.0-5.0 is not to exceed $37,000. If the City requires services for Task 6.0, then an additional Scope of Work and Fee will be submitted for approval. Schedule The amendments will be prepared to be heard with the cycle of Comprehensive Plan Amendments for the City of Clearwater to be transmitted to the Florida Department of Community Affairs in March 2005. The proposed Comprehensive Plan Amendments will be provided to City Staff by December 1, 2004 to meet deadlines for the Community Development Board and City Commission public hearings. END OF SCOPE OF WORK i ~ ~ jT~ +o De~~ ~n MarJ~ ~~ ~n~-dam CoP~ - Fxl~. CC-l~~eaa~ Ua~cGn. ~ i ~~m d +~~a~ J~ ~o ~ _~~~s ~_ _. . __ ~ __ ___W__._ ~ __ _. :y . it --- - ~~F# --- - - • - h ~ ~, __ ._.. _ _~4~L' ~'~. _ _ rt. ------ ----j~n - - •--- - -- I, ! !~ i .. _..uY ~... ._ ~ _ - ]1L. - i d~z-~ ! ~ie~~ ~~~„~~ .~~~~ ~~~~; ~~ .~ ux„m:l l~aco,+^ ~dy tia~ ~~~~ C~~ y~ ~0 . ~':0/Y) v~ .~ ~~ch s~~~ ~n ~~. ~-~ ~~~. it ~~ '~ ~~ ~i c~.~~, Y~ a~ L~~f~ ~ i~~r ~~ ~ d~~ ~ ~ ~j'W ~'~i -a~wzl%~ c~z+~ ~F rte, I~ ~~- ~!IkN~--~~~~If"~i p~bS~am - znsksfc; ~ iF~~~u-hm~ ~j~m w~U eve cf mane ~ G I Nf~ - 1~ SCIIa;~ U ~-e~ i 3•, 4 ~~ Y~ E~1 - ~- - ~c,~4- ~.~ - - -~- - - _ ~- - _ _~ ~. o~P;maO__.Sc~~lu _ -- - - le0_ Y-PU~ui7 - _ _. _ _ _ -- -vt~~. -b (4.~. P~ .. lleymti~n9- g. A'B~L -- -- U_ ~,<-at'~ rrn~ dux In FYI-er. N~ aa~?'- d^a Cta6~~ _QeG,_l~__2~q - -- -~x~-'6~ a---~cai~-`~ clue_ut_~'~~ _.~,vav~__~c• 22_ -- --~a_ce r_~~.eu.~__ -- - -- vr~F,xn-4~ Gnu a~awtr~ ~ r.~. ~~~ ~L Y,ecQ KQ~IQ.o,~ ~iiu2-~'QWl? __ (~1G~tJG~ _ _O~S_. -~ -i~- ~~-~rnS -- ---- -- 5 t~~ ~~ _~ ~e u_dnw,~ c~' aAuer`hs _ _b ~ • Clayton, Gina From: Berry, Bryan Sent: Tuesday, March 16, 2004 10:30 AM To: Clayton, Gina Subject: RE: Timeframe for Large Scale Amendments There appears to be an exemption process for amendments from the "twice per year" calendar limitation under the 9J- 11.006(1)(a)7. Icould not find anything though on an expedited review? Now I did read something in 9J-11.OO9(4)and(5) stating that if "no requests are received to review the proposed amendment and the Department (DCA) elects not to review the amendment, the Department will notify the local government and review agencies of its decision not to review within 35 calendar days of the Departments completeness determination date. Upon receipt of the notification of the decision not to review, the local government may proceed to adopt the amendment." This is what I found. Let me know if you need me to dig deeper. Bryan ~. -----Original Message----- '" From: Clayton, Gina ;: Sent: Monday, March 15, 2004 3:09 PM To: Berry, Bryan " Subject: RE: Timeframe for Large Scale Amendments did you see anything about an "expedited" review? We've been using that. Look in the DCA files -large scale amendment submission on shared drive. There may be a reference to that on the second page of the transmittal letter. (Look at 2004 1st submission). -----Original Message----- From: Berry, Bryan Sent: Monday, March 15, 2004 2:27 PM To: Clayton, Gina Subject: RE: Timeframe for Large Scale Amendments attached the document to this email. I also included the sections from the state statutes and wrote a sentence at the bottom of my interpretation. Let me know if this is what you were looking for or need me to look some more. Bryan x « File: LargeScaleAmendment.doc » -----Original Message----- From: Clayton, Gina Sent: Monday, March 15, 2004 1:15 PM To: Berry, Bryan Subject: Timeframe for Large Scale Amendments Could you please research F.S. 163 and let me the timeframe for DCA review of a large scale amendment (and how much time we have to approve after DCA approval). I think you should find the information in 163.3187. I would appreciate it if you could provide me this information as a list of bullets - or any other way that works for you. thanks. Gina L. Clayton Long Range Planning Manager (727) 562-4587 gina.clayton@myclearwater.com ~.~p.>o~ ?,~~~ci; TY OF C LEARWATER ,,I,F ~.3184(6)(a a d ~) .- " ~~~ DEVELOPMENT & NEIGHBORHOOD SERVICES DEPARTMENT >~' .AND PLANNING AGF~6~~~8, CLEARWATER, FLORIDA 33758-4748 T w~ MUNICIPAL SERVICES BUILDING, ZOO SOUTH MYRTLE AVENUE, CLEARWATER, FLORIDA 33756 ~A':°I'~) The state land-planningT~~k7~~~~~-(~7iew ~~~dd'~plan amendment upon request of a regional planning council, affected person, or local government transmitting the plan amendment. The request from the regional planning council or affected person must be received within 30 days after transmittal of the proposed plan amendment pursuant to subsection (3). A regional planning council or affected person requesting a review shall do so by submitting a written request to the agency with a notice of the request to the local government and any other person who has requested notice. • (c) The state land planning agency shall establish by rule a schedule for receipt of comments from the various government agencies, as well as written public comments, pursuant to subsection (4). If the state land planning agency elects to review the amendment or the agency is required to review the amendment as specified in paragraph (a), the agency shall issue a report giving its objections, recommendations, and comments regarding the proposed amendment within 60 days after receipt of the complete proposed amendment by the state land planning agency. F.S. 163.3184(7)(x) LOCAL GOVERNMENT REVIEW OF COMMENTS; ADOPTION OF PLAN OR AMENDMENTS AND TRANSMITTAL • (a) The local government, upon receipt of written comments from the state land planning agency, shall have 120 days to adopt or adopt with changes the proposed comprehensive plan or s. 163.3191 plan amendments. It appears the large-scale amendment reviews are 60 days and we have 120 days to adopt the proposed plan amendment.; BRIAN J. AUNGSI', MAYOR-COMMISSIONER HOPI' HAMILTON, VICE MAYOR-COMMISSIONER WIII1'NEY GRAY, COMbIIS$IONER FRANK HIRBARD, COMMISSIONER ® BILL JONSON, COMbtI$$IONER ~~EQUAL EMPLOYMENT' AND AFFIRMATIVE ACTION EMPLOYER~~ BOARD OF COUNTY COMMISSIONERS Ronrnie E. Duncan -Chairman Robert B. Stewart -Vice Chairman Calvin D. Harris Susan Latvala John Morroni Karen Williams Seel Kenneth T. Welch ~~~~~~ ! (-- '"~"~ ! 9~ f PLANNING & DEVELOPMENT SERVICES CITY OF CLEARWATER Michael Delk, Director of Planning City of Clearwater PO Box 4748 Clearwater, FL 33758-4748 Subject: 10 Year Water Supply Facilities Work Plan Dear Mr. Delk: e '. 111~IhS ~. ®unt y PLANNING a, October 5, 2007 On June 13, 2007, the Pinellas County Planning Department mailed out a draft version of the updated Ten-Year Water Supply Facilities Work Plan. Since that time, the figures in the 10 Year Water Supply Facilities Work Plan have been updated to be consistent with the Capital Improvements Plan recently approved by the Pinellas County Board of County Commissioners, and are enclosed. The Ten-Year -Water Supply Facilities Work Plan is a part of our EAR-based amendment package and will be going to the Pinellas County Board of County Commissioners on October 16, 2007 to be approved for transmission to the Department of Community Affairs. Final approval is scheduled for February 2008. Please contact me at 464-8200, if you need additional information, or have any questions. We will also be posting the updated 10 Year Water Supply Facilities Work Plan, as well as draft updates to the Potable Water, Wastewater and Reuse Element of the Pinellas County Comprehensive Plan, on our website at www.pineilascounty.orq/Plan. Sincerely, ~~~%~ Robert G. Feigel, Program Planner Pinellas County Planning Department cc: Roy Mazur, Planning Director, Southwest Florida Water Management District Paula Dye, Chief Planner and Project Supervisor, Tampa Bay Water Kevin Becotte, Division Engineer, Pinellas County Utilities Engineering PLEASE ADDRESS REPLY TD: Attachments: 10 Year Water Supply Facilities Work Plan 600 Cleveland Street Suite 750 Clearwater, Florida 33755 Phone: (727) 464-8200 Fax: (727) 464-8201 Website: www.pinellascounty.org tA1~ r~ ~ DRAFT -Pinellas County Utilities Ten-Year Water Suppl Facilities Work Plan PCU' TOTAL WATER DEMAND,( MGD) FY07 FY08 FY09 FY10 FYii FY12 FY13 FY14 FY15 FY16 FY17 CAPITAL'PROGRAMS ' 67.00 67.00 67.00 67.00 67.00 67.00 67.00 67.00 67.00 67.00 67.00 TYPE PROJECT TITLE FUNDING SOURCE LOCATION TEN YEAR SCH EDULE OF IMPROVEMENTS (Dollar Shown in Thousands) Work Plan Total FY07 FY08 FY09 FY010 FY11 FY12 FY13 FY14 FY15 FY16 FY17 Facility Replacement Water Distribution Mains Water Enterprise Fund ' Throughout Service Area 5,400 4,450 7,800 3,200 2,200 3,200 2,200 2,200 ; 2,200 2,200 2,200 37,250 Facility Replacement Water Supply Stations Water Enterprise Fund Throughout Service Area 400 250 50 50 1,550 800 50 50 50 50 50 3,350 Facility Replacement Source and Treatment Water Enterprise Fund Throughout Service Area 2,316 151 5 5 5 5 5 5 5 5 5 2,512 Facility Replacement Water Transmission Mains and 48-Inch Water Main Water Enterprise Fund Throughout Service Area 3,900 1,432 6,000 6,000 0 0 0 0 0 0 0 17,332 Facility Replacement Distribution Stations Water Enterprise Funtl Throughout Service Area 465 1,050 15 15 390 15 15 15 15 15 15 2,025 Facility Replacement Distribution Buildings Water Enterprise Funtl Throughout Service Area 283 110 80 80 80 80 550 550 550 550 550 3,463 New Facility CIAC z Water Enterprise Funtl Throughout Service Area 50 3,346 3,236 3,236 3,236 3,236 3,236 3,236 3,236 3,236 3,236 32,520 New Facility Water Blending Facility Water Enterprise Funtl Throughout Service Area 0 24,600 37,200 19,700 0 0 0 0 0 0 0 81,500 New Facility Reuse System Expansion3 Sewer Enterprise Fund Select Area -North County 16,000 34,200 10,500 0 0 0 0 0 0 0 0 60,700 New Facility Reuse System Expansion3 Sewer Enterprise Fund Select Area -South County 200 2,700 1,400 0 0 0 0 0 0 0 0 4,300 FY TL 29,014 72,289 66,286 32,286 7,461 7,336 6,056 6,056 6,056 6,056 6,056 244,952 O&M PFfOGRAMS Conservation Projects4 Efficient Use of Potable Water Wafer /Wastewater Enterprise Throughout Service Area 1557 832 747 653 424 270 270 270 270 270 270. 5,833 Conservation Educations Education and Outreach Wafer /Wastewater Enterprise Countywide 620 550 568 585 604 623 642 662 682 682 682 6,280 FY TL 2,177 1,382 1,315 1,238 1,028 893 912 932 952 952 952 12,113 ' PCU =Pinellas County Utilities; the PCU water service area includes approximately 110,897 retail water accounts as of May 2007. PCU provides wholesale service to the cities of Clearwater, Safeiy Harbor, Pinellas Park, Tarpon Springs and Dunedin (Dunedin is only hooked up as a wholesale customer for emergency purposes with the exception of a subdivision serviced by PCU). PCU provides wholesale service to the cities of Belleair Beach, Belleair Bluffs, Belleair Share, Indian Racks Beach, Indian Shores, Kenneth City, Largo, Madeira Beach, North Redington Beach, Oldsmar, Redington Beach, St. Pete Beach, Seminole and Treasure Island. Oldsmar is a retail customer as of October 1, 2006. Several of these communities are considering water supply alternatives which will reduce the demand on PCU. s CIAC = Contributions in Aid of Construction -for example, the implementation of the reclaimed water system benefits the water system in that the system doesn't need to expand to meet the new demand. ~.__ _ ~ - - ~ - - -• - _ . Therefore, funds are transferred from the water system enterprise to the sewer enterprise to pay for part of the reclaimed system construction. 3 The expansion of Pinellas County's reclaimed water distribution system and incentives to citizens to utilize alternative water sources for irrigation are key conservation and potable water demand reduction strategies. I _ Also, Reuse System Expansion includes Aquifer Storage and Recovery in bath North and South County. j ~ ~ "Water conservation programs are focused on: a) Ultra-low volume toilet retrofits ($1.36 million estimated), b) Alternate water sources for irrigation ($0.97 million estimated), and c) Industrial, commercial and institutional ~~ ~ ~~~ performance contracting incentive ($1.2 million estimated). s Due to reducing per capita consumption of water, the focus will shift to maintaining public knowledge and sensitivity to water resource issues. / „~i NOTE: All figures are projections based on best available data. The Pinellas County Board of County Commissioners approves budgets and priorities annually. ~ / GENPLAN/ELEMENTS ...IWATER6SEWER110-YEAR... i I ~~~ , , ~~ ~~'~~I f'' ~~ ~~~~ ~. ~ ~ , i . fry _ ~~~~~T 1 °~~ Southwest Florida ;~ ~ ~ ~aterManc~gement District 't; " o FC An Equal Opportunity Employer Talmadge G. "Jerry" Rice Chair, Pasco Judith C. Whitehead Vice Chair, Hernando Neil Combee Secretary, Polk Jennifer E, Closshey Treasurer, Hillsborough Thomas G. Dabney Sarasota Patricia M. Glass Manatee Heidi B. McCree Hil Isborough Sallie Parks Pinellas Todd Pressman Pinellas Maritza Rovira-Forlno Hil Isborough Patsy C. Symons Desoto David L Moore Executive Director ~~~ y 2379 Broad Street, Brooksville, Florida 34604-6899 (352) 796-7211 or 1-800-423-1476 (FL only) SUNCOM 628-4150 TDD only 1-800-231-6103 (FL only) On the Internet at: WaterMatters.org Bartow Service Office Lecanto Service Office Sarasota Service Office Tampa Service Office 170 Century Boulevard Suite 226 .6750 Fruitville Road 7601 Highway 301 North Bartow, Florida 33830-7700 3600 West Sovereign Path Sarasota, Florida 34240-9711 Tampa, Florida 33637-6759 (863) 534-1448 or Lecanto, Florida 34461-8070 (941) 377-3722 or (813) 985-7481 or 1-800-492-7862 (FL only) (352) 527-8131 1-800-320-3503 (FL only] 1-800-836-0797 (FL only) SUNCOM 572-6200 SUNCOM 531-6900 SUNCOM 578-2070 May 15, 2007 D. Ray Eubanks, Administrator Plan Review & Processing Department of Community Affairs 2555 Shumard Oak Boulevard Tallahassee, FL 32399-2100 Subject: City of Clearwater Proposed Comprehensive Plan Amendment DCA Reference Clearwater 07-1 Dear Mr. Eubanks: In accordance with section 163.3184, Florida Statutes, the staff of the Southwest Florida Water Management District has reviewed the above-referenced plan amendment and provides the following comments: The Pinellas County Comprehensive Plah goals, address water quality and natural resource protection, enhancement, restoration, and management. The policies listed under Section 1.4 of the Comprehensive Plan encourage the use of natural methods toward achieving these goals. Therefore, the District encourages the use of Low Impact Development techniques in this and future redevelopments in Pinellas County as a way to help improve the quality of receiving waters through more natural methods. William S.Bilenky The following list represents several examples of Low Impact Design strategies: General Counsel . Shallow vegetated swales in all parking areas • Appropriate Florida Friend/y plant selections • Small recessed garden areas throughout parking and building landscape areas • Porous pavement and other pervious pavement technologies • Stabilized grass areas for overflow parking • Retention of the maximum amount of existing native vegetation (if applicable) The District appreciates the opportunity to participate in the review of comprehensive plan amendments. If you have any questions or if I can be of further assistance, please contact me in the District's Planning Department at extension 4423. Sincerely, G,I~ ~ l~~/t~ Lori H. Belangia Pinellas-Anclote River Basin Planner cc: Michael Delk, Director of Planning,. City of Clearwater, P.O. Box 4748, Clearwater, FL 33758-4748 Tahla Paige, Senior Administrative Assistant, Executive Dept., SWFWMD Jim Quinn, Environmental Manager, DEP, Via e-mail .. Y.a.s.,;. FiAi~Nlt~~ Oft;~AR'i~~lEt~'f' d;iiY OF Ctl:l~E<tyJ~.TER BOAIF® OF COUiVYY COMMISSIOIVE6iS Ronnie E. Duncan -Chairman Robert B. Stewart -Vice Chairman Calvin D. Harris Susan Latvala John Morroni Karen Williams Seel Kenneth T. Welch April 26, 2007 Michael Delk, Director of Planning City of Clearwater PO Box 4748 Clearwater, FL 33758-4748 Subject: 10 Year Water Supply Facilities Work Plan Dear e k: ~~r'``~~E--~ As you are aware, the City of Clearwater is included within the Pinellas County Water Demand Planning Area (PCWDPA) and is a wholesale customer of Pinellas County Utilities. In mid to late May, the Pinellas County Planning Department will have compiled a packet of information, including a letter of assurance that Pinellas County Utilities plans for, and provides, the facilities necessary to transmit and distribute potable water within the Pinellas County Water Demand Planning Area, including to your jurisdiction. In addition, since Tampa Bay Water is the potable water supplier to the Pinellas County Utility System, we will be obtaining similar assurance from them to distribute to our wholesale customers. Pinellas County is also in the process of updating its 10 Year Water Supply Facilities Work Plan and will provide this information along with the letter of assurance. The 10 Year Water Supply Facilities Work Plan will also consider the findings of the SWFWMD Regional Water Supply Plan, particularly with regard to reclaimed water and water conservation commitments. It is our intention that the letter and packet of other information we will be sending you in May will satisfy the Department of Community Affairs that Pinellas County is planning for the long- term wholesale water needs of the City of Clearwater, and that the required coordination has occurred between the County and the City, as well as the County and Tampa Bay Water, and Tampa Bay Water and the Southwest Florida Water Management District. Please contact Liz Freeman or Robert Feigel of my planning staff at 464-8200, if you need additional information, or have any questions. Sincerely; -- ~ r `--~ Smith, Director of Planning County Planning Department :. ::;=~ ~? % 200 ~ s~J~iV~€tf~C OEPI~R~h1)E'l~ ~liY OF ~P~VJAYEI~ PLEASE ADDRESS REPLY T0: 600 Cleveland Street Suite 750 Clearwater, Florida 33755 Phone: (727) 464-8200 Fax: (727) 464-8201 Website: ~vww.pinellascounty.org ~~~ 3~~~ j ~-tSO. UI~I~ ~~ - ~~- - . - s~~~ ~ s,~- ~r sy~~. iI _ ~ye~n s4,kp~-~ ~lud odd `I ~ ~ v~'-cad/0 (Ot.~ (.t r~CcdQ ~I G~ ~ (Ji9 I ~ ~ M C Lit ~- ~~ ~ se - - . rtQ G~-Qe,~ Cos ~ a5se~~~ U)an;~ ~ ~- vno~ I~o.Q ~o~-~ ativ~ ~ ~l~.e ~r~ , L~U'ts (~a U~CA~9 SV V ~(D~.CX~ OY-P,~'~tF ~LQ~,C-~" ~ tlL~S. PPJ ___ -- - - _ --~, __ ~ _ _ . ~, _. _ ~ ~: ~~ ___ __ _ - -- - "~'A ,~.. ;i~ !~ Rio r~ (~c~~a.~ ~`u~'ica~ -~~~~r~~ ~ ~~ D~~~ ~c~ ---- ~ -~,~? ~s-f~c- '~ log ck- "~,~.f~ ~'~s . ~- -a- C_u~v_n_r~ ~r~. _c ra_ ~ c,~~~z ~! _s~d? ~_ud has_aP ~~ yr~__ ~_ - -- ~-ht~!~.u?.~ _ _ Y~ua t3_~osc~_le. ------- ~~Qs-2 -Get} lx~i~h_(LO I~a~a~aF q?hn~- ~~e_~_CI~ aw, rrla~ ~a~'i ~i ~t pt~ w~l_ -~ Res.-1-hab ~ aloe - - i1~ ~,~{uY, - ~,ult~nt_dazn _rc~P. _wa-,_crn~Y m~~*u ~hs_ _ t ~iU vr~_-fo-1~-dam ~~~ _~o~s~c~f_N~~z PAVn~_~nn_~ynp_n6L~2!~ ra onl _ ._S" ~~ - ~`u`8-af `~es~ op~~s. _I~v_Hp,~ ~;~ n-...~ n ~._ -d -~-_.____..._-... ~ ~ - - -n...~~ - __ ,o~ ~~a _ a~un~i$~ can _~(._~Un2 J'd~~ __ ----- -~S- X_- ACA - .- ~-~_~A '~ _ -. ~% ~ -- a ~~- -' _~ ~, ~~ ~~-V3fy~-~-~DGA-wwiclo~IL_- g w~ b -C~q~~-! Wit?. ~?s5_Co"-'~P - a<'=~.:- - ... !~" _. A D D E N D U M It is hereby mutually agreed by and between the parties hereto that the date of the first delivery of water hereunder for the purposes of Section 8 hereof, is the day of __-_ IN WITNESS WHEREOF, said Pinellas County, Florida, acting by and through its Board of County Commiasioners, has caused this addendum to be executed in its name and on its behalf by the Chair- man of .said Board; its official seal to be hereunto affixed, attested by the Clerk of said Board, and said City, acting by and through its City Commission, has caused this addendum to be executed in its dame and on its behalf by its City Manager and City Auditor and Clerk, countersigned by its Nlayor-Commissioner, and its corporate seal to be hereunto attached, this the day of A. D. - 195 _ .. ~_ _ - - - PINELLAS COUNTY, FLORIDA BX C~iairman, oard of County . Commissioners Attest: r~Y C erk,.Board of County Commissioners Attest: BY City-_uditor an er CITY OF CLEARWATER, FLORIDA BY City nager Countersigned: BY' yor- o sinner Approved as to form and correctness, this day of , 195 Bx City ttorney -10- .~ p _~ IN WITNESS WHEREOF, said Pinellas County, Florida, acting w~ and through its Board of County Commissioners. has caused this agreement to be executed in its name and on its behalf by the Chair- man of said Board, its official seal to be hereunto affixed, attested by the Clerk of said Board, and said City, acting by and through - ~ Yits City Commission, has caused this agreement to .be executed in its name and on its behalf by its City Manager and City Auditor .J . and Clerk, countersigned by its Mayor-Commissioner, and its corporate seal to be hereunto attached, the day and year first above written.. PINELLAS COUNTY, FLORIDA J //~~. - - . ~ BY ,Gv~t. Chai n~ n, Board of County Commis ers Attest• C~e~~oard of County Commissioners . CITY OF CLEARWATER, FLORIDA ,~ - - ~ City ana ' ~ Countersignp : Attest:-.- - $Y ~" yor- ommiss er BY ~ . ity Auditor a C erk Approv d as to form and correctness, this~~~ day of ~. .~ , ~ q5 d `~'~ ~ iI Y Y -9- I ~ users whether :`~iniiividuals or incorporated cities or towns, pro. vided that any required increase in said water supply systems facilities so to do shall not result in any increase in the rates or other financial obligations which the City is required to meet and pay according to the terms and provisions of this agree- meat. 13. This agreement may be amended by mutual agreement of the parties from time to time to meet future conditions not presently anticipated, provided that said County shall not be called upon to amend this•agreement while any revenue certificates are outstanding and unpaid in a manner that will injure or impair the security of such revenue certificates, and it is particularly recognized that this agreement shall inure to and be binding upon the successors and assigns of the respective parties hereto. 14. This contract shall be binding upon the parties here- to unless the County fails to provide necessary finances for the pur- pose of carrying._out the terms: of this..,agreement within one (1} year from the date hereof and unless the County fails to deliver water to the City from this project within two (2) years from obtaining finances through sale of the contemplated water revenue.certificates and upon such failure the parties hereto shall be relieved from the terms of this agreement; provided, however, that the periods pro- vided for herein may be extended by the mutual agreement of the parties hereto. 15. Upon re-negotiation of this contract as provided for in Sections 4 and $, and a rate adjustment provided for in Sec- 1:3.on 10, the parties hereto, based upon the factors existing at the tine of said re-negotiation and/or rate adjustment, will take into consideration Factors customarily considered in the calculations of -rate structures provided that any rate m~itually agreed upon in said re-negotiated contract and/or rate adjustment shall be cal- culated only on those factors directly related to supplying water to the City of Clearwater, and on the basic premise that the County grater supply system shall be operated in the future, as it is presently, at cost. -$- D system, shall be entitled to re-negotiate.~a new contract with said County .upon terms, provisions and conditions then to be mutually agreed upon between the parties; provided, however, that said terms, provisions and conditions shall be consistent with sound, economic and practical operation of the water supply system, and with due .. _ _": " ..__:.. -- =~= -=~=ctirisideration-~f'or~~~He reasonable and equitable rights of the other users of said water supply system for continued use of said system under similar re -negotiated contracts, and provided further that such contracts shall be re-negotiated between the City and County as. provided in Section 15 hereof. '9. It is strictly understood and agreed that the rate of five cents (5¢) per one thousand gallons as herein set forth may be revised by the partied hereto at the end of any year's bill- i.rg as hereinabove set forth; provided such revision is based upon an increase or decrease of the anticipated electric power rate to the County for use in its water system of 1.3 cents per KWH. - 10. It is further understood and agreed that if and when the CityQS requirements for water consumption shall reach i two thousand eight million gallons per year, or an average of 5.5 .million gallons per day, a rate adjustment downward mutually agreeable to the parties, if financially feasible, will be made pursuant to the provisions in Section 15 hereof. lI. The term "date of the first delivery of water here- under" as it appears hereinabove in Section $ hereof, shall be construed.to mean the date upon which the water supply system project herein contemplated shall have been completed to the state where said water supply system as a source of supply shall be avail- abTe to the City of Clearwater, Rlorida, and the`County~s present water supply system, any prior delivery of water to the City from said water supply system shall be in accordance with separate con- tract between the County and the City.. 12. The County'resenves the right at any time to con- tract with and supply water from said water supply system to other -7- . • .. __ 1 cnents become due they shall~be collectible through such other means, method or manner as may be available under the law applicable to such cases. 6. Tf any such monthly bill is not paid within twenty (20) days after the billing thereof as hereinbefore provided, a sun-charge- of :one-per: _cent___(-~~~..g~--the :amount t~rerei3-f: s}iall- bh' added to suEh bill and shall be paid by the City. Should the City ~~ fail to pay any bill as aforesaid within twenty (20) days, as aforesaid, the County shall also have the right to discontinue for that cause, the supply of water hereunder, after giving to said City ten (10) dayso notice in writing of its intention for such cause, to so discontinue the supply. The right of the County to discontinue delivery as herein provided shall be cumulative and in addition to any and ;every other remedy given under this agree- . ment, or otherwise existing. i 7. The City agrees to make full use of its storage r _ ; facilities for _the, purpose of avoi.d~ng ~abriorinal demands oti the water supply system to the detriment of common users, and the ` County reserves the right. to control against such abnormal draw- s down or demands upon the water supply system capacity to the ex- ` tent necessary for. the reasonable protection of other users of the water supply system in their pressure and volume requirements, to ' the end that all common users of the water supply system may enjoy reasonably equal consideration of their respective rights thereto, and in no event will the County be required to furnish in excess of 1Q,000,000 gallons during any single day, so long as the average daily minimum figure remains at 4,p00,000 gallons. ~. Subfect to the conditions hereinabove set .forth, t'ie terms of this agreement shall be for a period of thirty (30) ;ears, commencing on the date of the first delivery of water here- under, and subsequent thereto the said City for the purpose of continuing to receive a supply of water from said water supply •6- time to issue, sell and deliver additional water revenue certi- ficates which shall rank on a parity with the certificates hereby authorized or permitted to be issued as may be then outstanding in order to provide sixch additional finances; i !~. The monthly biYlings for water delivered during _ . __ _ --.. _ - . _ - - -- -- --- - _;____ .. --eaeh~:yea~ :.gf,.~op~erat;an.ufider this-agreement shalt be at the. rate - of five cents (5¢) per thousand gallons, and so long as the County has outstanding any revenue certificates issued in connection with said water supply system the County will not be required to supply water to the City under this agreement at a rate less than five cents (5¢) per orie thousand gallons computed on the basis of an average of four riillion gallons per day for the full calendar year until the expiration of the full thirty (30) year term of this agreement as a maximum-period and the time required to re- tire said certificates as a minimum period, whereupon a new con- tz•act.shall be re-negotiated between the City and the County as ' ._.. . . - ~~ provided iri Section ].5 hereof. 5. The obligations of the County under this agreement are subject to its ability to construct the water supply system, and its ability to issue, sell and deliver the revenue certificates to pay the cost thereof. The City hereby declares its intention to make payment of all sums due the County under this agreement . from the revenues derived from the :pperation of its municipal water distribution system as an operating charge against said system, and_t said City hereby covenants and agrees to continuously fix, charge, collect and account for sufficient revenues from the operation of said municipal water distribution system to make all such payments under this agreement from revenues available from that source, but if the City for any reason fails or refuses to fully perform this ~:venant and agreement with respect to mixing, charging, collect- '.~i? and accounting for sufficient revenues, it shall not be thereby relieved. of its obligations to make the payments under this agreement for water and water service`-but as and when such pay= ~5- ~ _ ~ , . ~ i year, such monthly billings for water ~ahall be made at the rate of five cents {5¢) per one thousand gallons, but if at the end of such full calendar year of such operation and at-the end of each calen- dar year thereafter the quantity of water so delivered and billed during such year is less than an average of four million gallons _~ :- per;--day tYien.. "t.tie C~oiinty-~wiTl~ -tii11 the City, and the City agrees "to " ~ pay the County for an amount of water equidalent to such four million gallons per day at the said rate of five cents {5¢) per one thou- sand gallons whether used by the said City or not; provided, how- ever, that the County shall not sell water to any other water distributor, water distribution system, or municipality at a rate less than the rate then currently charged the City of Clearwater. The County agrees to furnish and the City agrees to purchase annually an average minimum of four million ;gallons {4,000,000) per day or a total minimum of fourteen Yiundred sixty (1,460)-million gallons per year. Settlement of the amount if any, to be paid by the City tsy reason of the minimum quantity of water, all as hereinbefore ~n this numbered section provided, shall be made within forty-five {1c5) days after the close of each calendar wear, and the City agrees to make, payments of the .amounts due for monthly billings for water as hereinbefore in this section provided, within twenty (20) days from the date the County renders the respective monthly billings. Upon execution of this agreement by the parties hereto, it is contemplated that the County will within a reasonable period of time seek and obtain the necessary finances wherewith.to carry out the water supply system project herein contemplated by means of a_revenue certificate issue in an amount the County deems recessary~for the construction, completion and operation of said project as contemplated hereunder, and in the event before such revenue certificate issue shall have been fully retired, increased consumption demands reasonably justify or require expansion of the water supply system thus necessitating additional finances for the purpose, the right is hereby reserved by the County from time to -4- ~~ ~ , ~ 2. All water delivered under this agreement shall be iI good and potable water and shall be of like potability and purity as that furnished. to the County distribution system from the water supply system to be constructed as aforesaid at its connection with the present County water system, and shal•1 meet the bacterial _: ... . _ .. _ - .- - _ ~- _ _.__ --- _.anri-.-okr~mic31.: quality ~~stanc}ards~ o'f the Florida State Board ~ of Health • and the'Uriited States Public -Health Service, and to be of a mini- rmzm quality of a hardness of less than 180 parts per million and with maximum chloride not to exceed 100 parts per million. It shall be measured by a meter or meters of standard make and suffi- ci.ent size to be furnished, installed and maintained by and at the cost of the County and located at the point or points of~;deiivery of water to the City. In case the City shall at any time question whether any meter or meters are registering correctly the City shall have the right upon making written request of the County to have such meter or meters tested in the presence of a representative of the City and, if, as a result of such test, said meter or meters shall be found incorrect or inaccurate, said meter or meters shall be restored to an. accurate condition or a new meter or new meters shall be installed at the cost of the County. If such meter or meters be found to be substantially accurate, the cost of such test shall be borne by the City, but otherwise shall be paid by the County,iand should any such test or tests show any such meter or meters to be substantially inaccurate, computations for water pre- viously delivered since the last preceding monthly meter reading shall be adjusted accordingly. The County reserves the right to test such meters at any time. The term "substantially accurate" hereinabove mentioned shall'be construed to mean within 2~~ plus or minus from perfect registration. 3. The quantity of water delivered to the City shall be determined from meter readings made by or on behalf of the County approximately once in each- month, whereupon the.County agrees to render a bill to the City for the amount then due as thus ascer- tained. Until water has been so delivered fora full calendar -3- ' •' NOW, THEI{EFORE, the parties hereto do hereby covenant and agree as follows: ' 1. The County hereby agree,S subject to the terms of this agreement and particularly to the provisions in the first sentence of Section 5 hereof, to construct an adequate water aupply system to. take water-.-from• the ~ldridge=~7ilde tract and"adjacent tracts ~- -- -- ' '• in the 'Tampa High", and upon completion of the ,construction of said County water supply system and subject to the terms and conditions hereinafter set forth, the County will deliver under a pressure of approximately 65 pounds per square inch, or at a pressure sufficient to supply the demands of the City, at the following take- off points: ' (a) Gulf to Bay and Belcher Road (b) Coachman Road (State Road 590) and Belcher Road (c) Druid and Belcher Road or at such other point or points as may be mutually agreed to by .. _ _. ... `-they partiie'e'~huret~o;~-all the water requested by said City for use ~~ ? in said water distribution system as now exists or as may hereafter be extended for a period of thirty (30) years from the date of commencement of supplying such water. The County will so operate its water supply system as to maintain water pressure at the point of delivery sufficient to supply the City's current requirements except as limited in Suction ~ herein. The County does agree that the supply of water to be delivered hereunder will be at all times continuous except that temporary cessation of.delivery of water at any-time caused by the dct of God, fires, strikes, casualties, accidents, necessary maintenance works, breakdowns of or injuries to machinery, pumps or pipe lines, civil or military authority, insurrection, riot or any cause beyond the control of the County, shall not constitute a breach of this agreement on the part of the County, and the County shall not be liable to the.Cit}-~or its .: inhabitants for any damage resulting from such unavoidable cessa- tion of delivery. -2- . THIS AGREEMENT, made and entered into this _~9~day of ~ 195, by and between PINELLAS COUNTY, FLORIDA, acting by and through its Board of County Commissioners (hereinafter sometimes referred to as the "County"), and~CITY OF CLEARWATER, a municipal corporation in said Pinellas County, acting ,. by. and _thr-ough -it ~-Gity_ Commiss~.-op (Hereinafter _soinet"imes=~refbrre3- -- - ~ :to as the "City".), W I T N E S S E T H: WHEREAS, :the County has proposed to construct a new water supply system and has acquired a supply of water adequate to supply its present and future needs and to take care of certain munici- palities in the County of Pinellas, including the City of Clearwater, through proper action of their respective governir_g bodies indicate. a desire to be furnished a steady and sure supply of water in suffi- cient quantities to serve their respective needs. WHEREAS, the cost of said water supply system, including `expertdes" incidental tkiere~to, are ~to be defrayed through the issu- ance.and sale. by said County of its revenue certificates which are to be payable from and secured solely and only by the revenues frpm said water supply system remaining after payment or allowance for payment o£ the reasonable and neceasary expenses of opeY~ating, maintaining and repairing the system; and, • WHEREAS, the City of Clearwater presently owns and operates the. water distribution system in and immediately adjacent to said City-supplying water for industrial, commercial, domestic and muni- cipal purposes, but desires to adequately supplement its system to assure its citizens of a continuous, sufficient supply of good potable water in the future,"this being esaentfal to the general public welfare and benefit, .it is necessary for the continued successful operation of said existing municipal water distribution system that said City procure an additional supply of water which . the County. upon the construction of its water supply system will be able, and is agreeable, to supply subject to and in accordance with the terms of this agreement. ;1Z. Breach of this contract by the County as described in Paragraphs 1, 2, 4, 6, 7, 8 and 10 does not relieve the County from the comYnitments per Paragraph I for the full term of this agreement or from other obligations under this agreement. 13. The County recognizes the need for upgrading the County`s water system in the Clearwater Service Area and agrees to develop a program, with assistance from appropriate Clearwate=• personnel, to improve fire protection facilities to City standards on the County's water, system within the City's Fire District on as orderly basis under the County's assessment authority. The County will provide . the- City with. a copy of this upgrading program within six(6) months of the effective date. of this agreements The County further. agrees to implement the program-at a capital expenditure rate of .ho less than. $100, 000 per year. 14. This. agreement replaces and supersedes all previous agreements between the County and the City regarding water service. 15. This agreement may be terminated upon the mutual agreement of both parties. IN WITNESS WHEREOF, the said Pinellas County, Flortda, acting by and through its Board of County Comrpissionera, has caused this agreement to be executed in its name and on its behalf by the Chaisman of said .Board. its official seal to be hereunto affixed, attested by the Clerk of said Board, and said City, acting by and thr,ougli its City'C'ommission hoe caused this agreement to be executed in.its name.. sad on its belia~f iiy its proper corporate officers.; and its. corporate seal to be hereunto attached, the .day and yeas first ove written. PI ELL C LINTY, I Attest:. OLD MULLEND ItE By Chairman • De 'Clerk •` ' CITY OF CLEARWAY ,. FI:ORIDA Countersigned: /~ By , ~~T-•!-~~~!~ ~ City Manage - Mayor-Commie sion _ Attest: A o7s~i~~as t or and correctness': City Clerk - °? 0 1g76 ... M ~' City Attorney -6- . _ n• ', . ' ~ailure of the City to pay`~+vhen due any amounts billed un~ar the terms of this agreement shall constitute breach of this agreement and the County's obligation to furnish watei may be voided at the County's option and the City will accept all responsibility for immediatly furnishing its citizens with water. Payments due beyond 30 days will draw reasonable interest charges monthly at the rate set by the Board of County Commissioners.. 10. All. parties agree that the area described in Exhibit Aherein.will be the farthest extension of retail water service by the City,. regardless of future annexa- Eion by the City. Any encroachment by the City beyond this service area boundary, without Witten agreement from the County, shall constitute breach of. this agreement and the County's obligation to furnish water beyond the established service area boundary .shall be void. It is the intent of both parties by adopting, and observing these service areas to avoid duplication of capital investment and maintenance coats and to render water service to the public as efficiently as possible. ^J It is further agreed that those County customers and water facilities which are within the City's service area described in Exhibit A and which can be readily incorporated into the City' a water system will be transferred to the City as the neighborhoods are annexed into the City. 7f the County's water system is not " transferred to the City at the time of annexation, the system will be transferred to the City as soon as it is practicable and economically feasible to do so. . ~ ;. The' City will. ~~ ay the:. County an amount equivalent .fo the currant market cost of these facilitie6 at th'e time of transfer, less depreciation as determined by mutual agreement according to'the .County's water system depreFiati,on schedule. However,.' the City will not be required to pay for those water distribution systears or parts of. systems which are not transferred. Payment will be made in full at the time of transfer or as determined by mutual agreement. 11. This agreement shall be for a term of thirty (30) years commencing October 1, 1975, and ending at midnight September 30, 2005. Breach of this contract by the City as described in Paragraphs 9 sad 10 does not relieve the City from the commitment to purchase annually the minimum quantity of water per Paragraph 1 at the current municipal rate for the full term of this agreement or from other obligations under this agreement. -5- ~ - -~ f option upon implementation of this agreement. 5. The City shall have the right to inspect or request at. its own expense, a teat of the meter or meters installed, at any reasonable time, in order to determine. their accuracy. Should a test be made and the meter not meet AWWA Standards, the coat of the teat shall be paid' fot by the County. The County agrees to maintain said meter, or meters, in proper condition so as to accurately measure the water supply to the City.. ' 6. The County agrees that the supply of water to be' delivered hezeundez shall be at all tiinea continuous, except that temporary ees.sation of,delivery of water at anytime cauaed.by Act of God, fires, strikes, casualties, accidents, necessary maintenance work, .breakdowns of or injuries to machinery, pampa or pipelines, civil or military authority, insurrection, riot or any other cause beyond the control of the County shall not constitute a breach of this agreement on the part of the County, and the County shall not in such case be liable to the City or its inhabitants for any damage resulting from such unavoidable cessation of delivery. 7. It is recognized by both parties hereto that the County supplies water to other municipalities an a wholesale basis, and also to many thousands of retail users; however, t1ie.County. acknowledges. a primary responsibility • to the Citjt_ of Cl'earwatt~~eer and other customers to meet their water •require- I . manta and agrees that.•it will not provide water for new expansion when there is a need for. additional water. to serve present customers. $. .All water delivered under. this: agreement shall conform ~a nearly as possible.to the standards of the State of Florida, Department of Health and Rehabilitative Services, and the United States Public Health Service while at the same time being consistent with community desires for water quality. 9. Billings by the County to the City shall be made between the first and fifteenth of each calendar month and shall relate to water furnished during the preceding month. Payments based upon such billings shall be made to the County by the City within 30 days from the date of billing. -4- ,. i ,OQ ~O reasonable production and transmission costs that can be shown to be required for the supply of water to Piriellas County water users. The rate will become effective October "1 of.the same fiscal year as the. budget and may then be revised at any time by the Board as necessary" to meet the revenue requirements of the Wates System. However, revis"ions after ' Oetob.er 1, which result in .increased rates, will: not be effective until at least 60 days after adoption by the County Commission. Adequate notice, of not less than 30 days, will be• given to the City before any proposed rate. increase. is adopted: The following factors shall be used in determining. the municipal rate referred• to herein: A,. Operation, maintenance, renewal and administrative costa. B. Payment obligations of annual principal and interest payments on water system bonded indebtedness . C. Collection of coverages or other reserves as required by Bond Resolutions and Ordinances. D, Pro rata share of the costs of providing production sad transmission facilities for expanaioa.through z.evenue~s of water sa"les.. E. _Paymea't of the cost of the water to 'the County, should it be purcfiased from other agencies, plus other coats to the " " County required to furnish water to the City. as described in A through D of this paragraph. 4, The quantity of mater delivered to the City shall be measured by a meter or meters of standard make and s"ufficient size, selected and maintained by the .County. The City will purchase and install the meter or meters to the County specifications sad pay all costs of maintenance of meters and installation. The City shall have the option of either a monthly service charge which will pay the cost of maintenance and replacement of the meter(s); or the City may be billed actual cost plus overhead for main- tenance and replacement of meter(s). The Citjr shall specify its desired _3_ _ ~ ~ '~ NEW SERVICES AVERAGE DAILY USE GPD Single Family Residence 300 Apts. 1 bdrm. (.4 x 300) 120 Apts, 2 bdrm. (.5x3.00.} 150 Apts.. 3 bdrm. (. G x 300) 180. Trailers (.7 x.300] 2.10 Duplex (1..4 x 300) 420 Triplex (1..7x 300) ~ 510 Consumption of all other neat/ uses will be. based on.meter sine as follawa: 3~4!' (l.x 300) 300 1" (2.5 x 300) T50 1'.1/2" (5 x 300) 1500 2" (10 x 300) 3000 3" (ZO x 300) 6000 4" (30 x 300} 9000 6" (10.0 x 300) 30000 8" (175 x 300) 52500 The computed increased water use for the new services of the previous calendar year will them b.e.added to both commitments for the current calendar year.. The,aakme method sad schedule of computing water was in- cr$ase will be applied to those County facilities and customers transferred to the City as deacribed~iti thie.a'greement, These commitments will izrcrease annually by the annually computed increased water use from the. transferred. service area throughout the term of this agreement. 2.. The: County agrees, to furnish to the City from and through the County~s water- supply and distribution system, and the City agrees to purnhase from the County, potable water, of the standards described in paragraph 8 and at the rates described in paragraph 3, and upon the terms and conditions hereinafter set forth, 3. The'City will pay for water at the municipal rate set by the Board of County Commissioners. The municipal rate will be based on a pro rata share of revenue requirements of the water system, to include only those -2_ r ~ ' = ~~ ~. .~ ~ - AGREEMENT THIS AGREEMENT~,~m?ade sad entered into this~~~~=-day of ~~ r by and between Pinellas County, a. political subdivision of-the State of Florida, acting by and through its Board of County Commissioners, (lereinafter sometime..s referred to as the County} and the City of Clearwater, F1Prida, a municipal corporation within said Pinellas County;. acting..by and through itp City Commission {hereinafter sometimes referred to as the City}, - WITNESSETH: Whereas the City, to insure an adequate supply of potable water. for distribution to its citizens, desires to purchase from the County a continuing supply of p.ot~ble water which the County is able to furnish from and through its water supply distribution system, NOW, THEREFORE, for and in consideration of the moneys hereinafter agreed to be paid and the mutual covenants to be performed by each of the parties hereto as hereinafter set forth, said parties do hereby mutually agree as follows: ~ •.. 1. The County agrees to furnish the City 10 mgd of water required by the City for its• use sad far rediatlSibution in its water service area. The • City agrees: to purchase from the County a miaitrium of 1,:46.0; 000., 0.00 gallons (1 billion, 460 million gallons) of water withixi.•each calendar year thr.ou$h this agreement for its use and for redistribution is its water service area. This miniiaum purchase commitment: _ by the City ie based on a yearly average • consumption. Both Commitments will increase in direct proportion to the water use increase from the service areas transferred from the. County to the. City ia.this agreement. The County service areas to be transferred to the City are described is Exhibit A. During the month of January of each year of this contract, the increased water use is the transferred areas for the previous calendar year will be computed by reviewing the building permits, certificates of occupancy, and water connections issued during the previous year; Water use increases will be determined by the following schedule: -1- ` • 4 • 1 ~ • • • EXHIBIT "B" .. , .. ~~ EXIIIBIT "A" METER LOCATIONS & SIZE METER LOCATION SIZE Belleair and Belcher 10" Druid & Belcher 10" Gulf ~to Bay Blvd, & Belcher - - 10" ~ --~ SR580 Treatment Plant 06" Coun ide Mall #1 10" Coun side Mall #2 10" Sand Ke 8" U.S. 19 #1 Mazda 12" U.S. 19 #2 Mazda 12" r • • APPROVED AS TO FORM OFFICE OF COUNTY ATTORNEY By. Countersigned: CITY OF CLEARWATER, FLORIDA By: r V. Hibbard . illiam B. Horne II Mayor City Manager Approved as to form: Leslie K. Doug II- i e Assistant City Attorney Attest: ~ . Cy t is E. Goudeau _ Ci lerk 9 • • t service azea as requested. CITY agrees to strictly abide by all decisions of the Boazd of County Commissioners in regard to applications or requests for extensions of the CITY water service azea. 18. Nothing contained herein shall prevent the CITY from obtaining some or all of the water necessary to serve to its customers from any other source. }` 19. This Agreement shall be for a period of thirty (30) years commencing on the date of October 1, 2005 and terminating on September 30, 2035. 20. Both parties represent that the execution of this Agreement has been approved by the governing bodies of both parties in accordance with law and that both parties have the legal authority to execute this Agreement. 21. This Agreement replaces and supersedes all previous Agreements between COUNTY and CITY regarding water service. 22. This Agreement may be amended or terminated upon the mutual agreement of both parties, in writing. 1N WI'T'NESS WHEREOF, the parties herein to have caused this Agreement to be executed by their respective authorized officers and it shall be effective on the day and year first above written. ATT'EST':"'' ~ . ~'' •. "! tin ~:. o ' , :; _ ~ `.Di~pu 'Clerk •~~taa ~~ ,',: a '' ~~. '., PINELLAS COUNTY, FLORIDA By apd\Through its Board of County By: 8 O O 16. CITY will operate its system in such a manner so as to prevent peaking of flow rates that would place an unequal burden on COUNTY'S facilities and be out of proportion to other customers of COUNTY'S water system. Storage to accommodate peak flow demands will be included by CITY in the design and installation of the distribution system in CITY's water service azea. "Peaking" is recognized to be the rate of flow which for any period of time exceeds a rate one and fifty five hundredths (1.55) times the average gallons per day on a yearly average. 17. All parties agreed that the azea described in Exhibit "B" herein will be the farthest extension of retail water service by CITY into COUNTY's water service azea, regardless of future annexation by CITY. Any encroachment by CITY beyond this service azea boundary into COUNTY'S water service azea, without written agreement from COUNTY, shall constitute breach of this Agreement and COUNTY'S obligation to furnish water beyond the established COUNTY service area boundary shall be void. It is the intent of both parties by adopting and observing this service area to avoid duplication of capital investment and maintenance costs and to render water service to the public as efficiently as possible. CITY recognizes the right of the Pinellas County Board of County Commissioners to designate water service azeas for all municipalities in Pinellas County, and accordingly, CITY agrees not to extend any water line into COUNTY's water service area without approval of the Pinellas County Board of County Commissioners. In the event CITY shall wish to extend its water service area, CITY shall make appropriate application to the Pinellas County Boazd of County Commissioners for the passage of a resolution extending CITY'S 7 • • users. The rate will become effective October 1 of the same fiscal year as the budget, and may then be revised at any time by the Board as necessary to meet the revenue requirements of the COUNTY' S water system. However, revisions after October 1st which result in increased rates will not be effective until at least sixty (60) days after adoption by the County Commission. Adequate notice, of not less than thirty (30) ,,:r,.. ,w,,::- ,.. days, will be given to CITX.before any proposed rate increase.is adopted... The following factors shall be used in determining the municipal rate referred to herein: A. Operation, maintenance, renewal and administrative costs. B. Payment obligations of annual principal and interest payments on COUNTY'S water system bonded indebtedness. C. Collection of coverage or other reserves as required by Bond Resolutions and Ordinances. D. Pro-rata share of the costs of providing treatment, transmission and storage facilities for expansion through revenues of water sales. E. Payment of the cost of the water to COUNTY purchased from other agencies, plus other costs to COUNTY required to furnish water to CITY as described in A through D of this pazagraph. 14. On or before March 1 each year during the term of this Agreement, CITY will notify COUNTY on form provided by COUNTY of CTTY's projected requirement by the month for forthcoming year, together with a five (5) year projection of usage. 15. CITY will accept the potable water at the pressure in COUNTY's transmission mains. Not withstanding paragraph 8 above, COUNTY will make every effort to maintain a minimum of 35 psi static pressure or greater at all points of delivery to CITY. 6 0 0 1 measuring devices,and compute the volume of water that has been quantified by the measuring device during the billing cycle. CITY will, within thirty (30) days from the receipt of the bill, make payment to COUNTY of the amount shown on the bill. Failure of CITY to pay when due any amounts billed,- under the terms of this Agreement, shall constitute breach of this Agreement and COUNTY's obligation to furnish water may then be voided at COUNTY.'s option.. Prior to voiding the agreement, City shall provide written notice of any disputed amounts billed within ten (10) days of receipt of such billing. The parties shall resolve said disputed amount within thirty (30) days of the date of City's notice of dispute or submit the controversy to arbitration, to be settled in accordance with the commercial arbitration rules of the American Arbitration Association. However, either party may reject the arbitration award by commencing legal action on the dispute within thirty (30) days after the rendering of the award. If rejected by the commencement of a legal action as provided in this paragraph, the award shall be deemed void and shall not be admissible for any purpose in the legal action. Unless the award .is rejected as provided in this paragraph, the circuit court of the county in which the award is made may enter judgment confirming the award. If payment is not made within the time provided in Section 218.335, Florida Statutes, the CITY will pay to the COUNTY interest at the rate established by Section 55.03, Florida Statutes. 13. CITY will be billed for the water recorded by the flow measuring device at the wholesale rate established by the Board of County Commissioners. The wholesale rate will be based on a pro-rata share of revenue requirements of the COUNTY'S water system to include only those reasonable treatment and transmission costs that can be shown to be required for the supply of water to COUNTY wholesale water 5 • . . delivery related to one of the causes stated in this pazagraph. 9. It is recognized by both parties hereto that COUNTY supplies water to other municipalities on a wholesale basis, and also to many thousands of retail users, and it is agreed that at any time when the total demand for water by all of the users, including CITY, exceeds the capacity of COUNTY'S water supply and distribution -- ~ ~ - «L system; both wholesale.and retail customers will receive equal priority_for the supply _ .... of water; and in such event, the inability of the COUNTY to supply either the wholesale or retail customers' full requirements and needs shall not constitute a breach of this Agreement on the part of COUNTY. CITY agrees that should the Director of Pinellas County Utilities declare an emergency to exist in the supply of water for COUNTY'S water system, the Director shall have the right and complete authority to allocate or pro-rate water supply to CITY based upon existing needs of the system, past and present demands on the system by CITY, and all other reasonable circumstances then existing at the time of the emergency. I0. In the event that COUNTY is unable to furnish the amount of water CITY needs to supply its service azea, CITY shall be entitled to purchase water from other sources for such supply until such time as COUNTY can again furnish CITY'S water needs. 11. All water delivered under this Agreement shall conform to applicable State and Federal laws and regulations and the standards of the State of Florida Department of Health and the Florida Department of Environmental Protection. COUNTY will notify the CITY if water provided to the CITY fails to meet any of the above Federal or State of Florida regulations or standards. 12. COUNTY will bill CITY for water used on a monthly billing cycle. Each month COUNTY will read and record the reading on the register of each of the flow 4 o by either party, such party shall pay for all relocation costs. 6. The ownership of the flow measuring and backflow devices will remain with CITY. CITY will not change, alter, add to, or take away any part of any flow measuring or backflow device without prior approval of COUNTY. COUNTY will, at its expense, install and retain ownership of the telemetering line from the measuring device to the point of readout. ... ~. To assure accuracy, the flow-measuring devices shall be tested yearly by COUNTY with results delivered to CTI'Y's Utilities Director within 30 days of test. At other intervals of time, should any question arise as to the accuracy of any flow measuring device, CITY may require any or all of the flow measuring devices to be tested. Should the tests show the flow measuring device to be registering within an accuracy of two and one half (2-1/2) percent, CITY shall bear all the expense incurred in the testing. If tie tests show the flow measuring device not to be registering within two and one half (2-1/2) percent accuracy, COUNTY will pay all the expense incurred in the testing and will immediately repair the flow measuring device. For any meter found inaccurate, COUNTY will adjust the previous month's or months bills, as appropriate, to reflect the result of the test. S. COUNTY agrees that the supply of water to be delivered hereunder shall be at all times continuous, except that temporary cessation of delivery of water at any time by an Act of God, fires, strikes, casualties, accidents, breakdowns of or injuries to machinery, pumps or pipelines, civil or military authority, insurrection, riot or any other cause beyond the control of COUNTY shall not constitute a breach of this Agreement on the part of COUNTY, and COUNTY shall not in such case be liable to CITY or its inhabitants for any damage resulting from an unavoidable cessation of • • ;., ,~, ~..... . remains on a standby status to the CITY, for that portion obtained elsewhere, the CITY will be chazged a standby fee, that will be determined at the time the CITY obtains water from other sources. 3. The CITY will utilize the connections located as noted in Exhibit "A" or other locations mutually agreed to by COUNTY and CITY. _, 4.. ~„-..,.The CITY and the COUNTY, agree to maintain, an effective cross connection control ~ w, _,_ „~: program in accordance with Federal, State and Local regulations, Safe Drinking Water Acts, FAC62-555.360 and patterned of COUNTY's Cross Connection Ordinance No.. 77-11 and Pinellas County Code, Division 3, Cross Connection Control, Sec. 126-231 thru Sec. 126-244. Should any contamination or possibility of contamination occur in either party's water system, or should any other situation occur in either party's system that would in any manner contaminate the other party's water supply, the causing party will be responsible for any damage to the other party's water system which occurs from such conditions and shall immediately correct the cause of such contamination, take all necessary precautions to insure the protection of the other party's water supply and water system, and shall, if possible, within thirty (30) minutes of knowledge of such occurrence, notify the office of the other's party's Director of Utilities. If the CITY does not provide an ongoing cross connection control program, the COUNTY may require the installation of backflow devices at the meter connection. 5. The quantity of water delivered to CITY shall be quantified by a measuring device of standazd make and sufficient size, selected and maintained by COUNTY. The measuring device shall be equipped with an indicating and recording register and a transmitter for telemetering remote readout. In the event future relocation is required 2 0 :•f AGREEMENT O THIS AGREEMENT, made and entered into as of the ~ day of y~~ 2005, by and between PINELLAS COUNTY, a political subdivision of the State of Florida, acting by and through its Boazd of County Commissioners (hereinafter referred to as "COUNTY") and the CITY OF CLEARWATER, FLORIDA, a municipal corporation within said Pinellas County, acting by and through its CITY Commission (hereinafter referred to as "CITY"). WITNESSETH: WHEREAS, COUNTY and CITY have previously contracted for the sale and purchase of potable water to serve customers in CITY's water service area; and WHEREAS, CITY, to insure an adequate supply of potable water for distribution to its citizens, desires to continue to purchase from COUNTY, a supply of potable water which COUNTY is able to furnish from and through its water supply transmission system; and NOW, THEREFORE, in consideration of the monies hereinafter agreed to be paid and the mutual covenants contained herein, the parties hereby mutually agree as follows: 1. COUNTY agrees to furnish CITY up to 15 MGD yearly average of water for its use and for redistribution in its water service area, as shown on the attached sketch and marked as Exhibit "B" and incorporated herein by reference. 2. CITY shall have the exclusive right to distribute and make available water service to the customers within its water service area, as described in Exhibit "B", and may purchase from COUNTY potable water required to serve the customers within the designated area. At any point during the term of the Agreement; that the CITY determines to provide water for themselves or otherwise obtains a portion of their potable water needs from sources other than the COUNTY and the COUNTY • • Jose Raul Fernandez, Professional Planner Encouraged public officials (Municipality of Santiago) about the importance of environmental management and participatory planningin a project funded by the Ford Foundation. Architect. Architect. Gustavo Montenegro & Associates. Santiago de los Caballeros, Dominican Republic Site planning and architectural design for the followingprojects: Victoria Beach Resort (Puerto Plata, Dominican Republic); Bahia Principe Beach Resort (Magante, Dominican Republic); Saba Villas (Saba, Netherlands Antilles); Profamilia's Officesen (Santiago, Dominican Republic); Design Proposal for Toyota Showroom (Santiago, Dominican Republic). Drafter II. Al;ra~.z, Hahi~~ :; Associates. Santiago de los Caballeros, Dominican Republic Site planning/drawings of Los Hidalgos' Housing Project, Santiago, Dominican Republic. Drafter I.Lopez- Cordero & Associates. Santiago de los Caballeros, Dominican Republic Recording and technical drawings of Cathedral Santiago Apostol. Santiago's Historic District Preservation Plan. • • Jose Raul Fernandez, Professional Planner planning experience in this country, recognized by the Senate of the Dominican Republic, United Nations and the Inter American Development Bank. Strategies developed are being implemented. Responsibilities included the management of schedule, staff, and consultants; attendance at meetings; performance of public presentations; coordination and final review of all documents; and preparation for final adoption.* City of Santiago's North-East Participatory Community Environmental Agenda, Santiago, Dominican Republic, Project Manager. This project concluded with the development of infrastructure improvements (potable water and wastewater) and housing rehabilitation improving the environmental conditions in low income neigl.borhooc~• in the north east area of Santiago. This project was funded through a grant ~.~oviu~.i by the Interamerican Foundation (IAF) and the City of SantagU. Responsibilities included the management of schedule, staff, and consultants; attendance at meetings; performance of public presentations; and coordination and final review of all documents.* Independent Planner Consultant European Union- Project: Stakeholders and Conflict Management Analysis for the City of Mao. City of Mao. State Reform and Modernization Program for the Dominican Republic (PARME). Mao, Dominican Republic. European Union- Project Organizational Framework for the Development of Santiago's Comprehensive Plan. Along with Luis Suarez Carreno (Spanish Urban Planner). State Reform and Modernization Program for the Dominican Republic (PARME). Santiago de los Caballeros. United Nations. Economic Commission for Latin American and Caribbean (ECLAC). Sustainable Development and Human Settlements Division. Instructor for two International Workshops on Urban Management and Sustainable Development. Research Assistant. University of Arizona. Tucson, Arizona. United States Environmental Research Lab: Conducted studies on designs and planning tools for building Neo-Traditional Neighborhood Developments (TND), Transit Oriented Developments (TOD), Pedestrian Pockets (PD), sustainable communities, etc. Also worked on urban/ community indicators. Community Planning and Design Studio: Researched, prepared draft and presented the Northern Peoria Comprehensive Plan Amendment. Researched, prepared draft and presented the Corbett Neighborhood Plan. Participated in Main University Street Design Charrette. Research Assistant. Pontificia Universidad Catolica Madre y Maestra (PUCMM). Center for Urban and Regional Studies (CEUR). Urban and Municipal Studies Program. Santiago de los Caballeros, Dominican Republic Trained neighborhood groups (Yaguita de Pastor Neighborhood) in community organization, environmental. awareness and empowerment planning. Organized, facilitated and evaluated the implementation of a participatory Healthy Neighborhood Strategy in the Pastor's Community in a project funded by the United Nations Development Program (LINDP). • • Jose Raul Fernandez, Professional Planner Sanchez, C; Fernandez, J. Santiago's North-East Participatory Community Environmental Agenda. Project: "Strengthen Capabilities of North-East Community Groups of Santiago." Santiago: Center for Urban and Regional Studies (CEUR-PUCMM). Yunen, R.; Maria, R.; Fernandez, J. "Designing Urban Policies for Cities in the Cibao Region: The City of San Francisco de Macoris" 1~Tc tiUnu~ Council for Urban Development (CONAU). Santiago: Center for Urban and Regional Studies (CEUR- PUCMM). Yunen, R.; Maria, R.; Fernandez, J. "Designing Urban Policies for Cities in the Cibao Region: The City of Moca." National Council for Urban Development (CONAU). Santiago: Center for Urban and Regional Studies (CEUR-PUCMM). Report (EAR) and Comprehensive Plan Update to be completed by the County in subsequent years. Responsibilities included participation in staff meetings; developing a county profile, design visioning materials and facilitate exercises for the visioning sessions (including SWOT analysis, mapping exercises, visual preference surveys, etc.); coordinate the design of a logo and webpage for the process; and preparation of the final countywide vision plan. Public Facilities Planning and Impact Fees Parks and Recreation Master Plan Update, Pasco County, FL, Planner. This project is intended to update the inventory of parks and recreation facilities, evaluate the development of previous recommendations, develop population projections, analyze and determine present and future needs based upon standards, prepare the Capital Plan of the proposed improvements, prepare the impact fees and develop a riew set of recommendations toimprove service delivery. Responsibilities included participation in staff meetings; performance of needs assessment, preparation of capital plan, impact fee, final write-up. Library Master Plan Update, Pasco County, FL, Project Planner. This project is intended to update the inventory of libraries facilities, evaluate the development of previous recommendations, develop population projections, analyze and determine present and future needs based upon standards, prepare the Capital Plan of the proposed improvements, prepare the- impact fees and develop a new set of recommendations toimprove service delivery. Responsibilities included participation in staff meetings; performance of needs assessment, preparation of capital plan, impact fee, and final write-up. • Fernandez, J. "Neighborhood Vitality Fire and Emergency Services Master Plan Update, Pasco County, FL, Project Planner. and the Urban Poor: Case Studies in This projectis intended to update the inventory of fire and emergency services facilities, Santiago de los Caballeros." Master evaluate the development of previous recommendations, develop population Thesis. Department of Urban projections, analyze and determine present and future needs based upon standards, Planning. College of Architecture, prepare the Capital Plan of the proposed improvements, prepare the impact fees and Planning and Landscape Architecture develop a new set of recommendations to improve service delivery. Responsibilities (CAPLA). University of Arizona. include participation in staff meetings; performance of needs assessment, preparation of capital plan, impact fee, final write-up. • Transom Group. "Marginality and Land Use in Santiago de los Multi-site Feasibility Study for a High and Dry Marina, City of Clearwater, FL, Project Caballeros." Santiago: Transom Planner. This project analyzed the feasibility of developing a High and Dry Marina for Group. the Cityin three potential sites, facilitating the decision-makingprocess to the City. The report integrated a detailed analysis of land use patterns, zoning and land development • Fernandez, J. "Affordable Housing: regulations, developmentapprovals,transportationimpacts,environmentalconditions, Community, Self Help and neighborhood perceptions,etc. to determine the strengths and weaknessesofeachsite. Technology." Bachelors in The report also included conceptual site plans and cost estimates for the preferred site, Architecture, Thesis. Department of along with a set of recommendations to develop the project. Responsibilities included Architecture. PUCMM. Santiago, performingthemulti-site analysis, preparingrecommendationsandcostestimates,and Dominican Republic. coordinating with the City. Representative project experience previous joining Wade Trim includes: City of Santiago, Dominican Republic. Planning Director Strategic Development Plan for the City of Santiago de los Caballeros, Dominican Republic, Project Manager. This project concluded with the development and approval by the City CouncIl of a vision, strategies and policies directed to make a city of over 300,000 inhabitants a sustainable, livable and more competitive community towards 2010. This was the first public-private and community based participatory 1 1 1 u 1 C GUIDELINES FOR PREPARING THE WATER SUPPLY FACILITIES WORK PLAN COMPREHENSIVE PLAN AMENDMENT Florida Department of Community Affairs Division of Community Planning State Planning Initiatives July 2003 Page 1 of 21 1 1 1 TABLE OF CONTENTS A. Introduction B. When to Adopt the Water Supply Facilities Work Plan Amendment C. Preparing for the Water Supply Facilities Work Plan Amendment 1. Objective of Work Plan 2. Determine Due Date 3. Coordination With Your Water Management District 4. Coordination With Your Water Supplier 5. Define Extent of Community Involvement 6. Review of Your Current Comprehensive Plan 7. Evaluation and Appraisal Report D. Information to Include in the Water Supply Facilities Work Plan Amendment 1. Supporting Data and Analysis 2. Adopted Portion of the Work Plan Amendment Attachment A: Map Depicting Work Plan Due Dates Attachment B: Overview of Regional Water Supply Plans Attachment C: Selected Sources of Information and Contacts Page 2 of 21 0 A. INTRODUCTION The 2002 Legislature expanded the local government comprehensive plan requirements to strengthen coordination of water supply planning and local land use planning. One of the most significant new requirements is a Long Range Water Supply Facilities Work Plan (Work Plan) identifying needed water supply facilities for at least a 10-year planning period. ,~ These new requirements direct each local government to: 1. Coordinate appropriate aspects of their comprehensive plan with the appropriate water management district's regional water supply plan(s). (see s.163.3177(4)(a), F.S.) ~ 2. Revise the Potable Water sub-element to consider the regional water supply plan(s) of the appropriate water management district(s). (s.163.3177(6)(c), F.S.) 3. Revise the Potable Water sub-element to include a Water Supply Facilities Work Plan for at least a 10-year planning period addressing water supply facilities necessary to serve existing and new development and for which the local government is responsible. (s.163.3177(6)(c), F.S.) 4. Revise the Conservation Element to assess projected water needs and sources for at least a 10-year planning period considering the appropriate regional water supply plan(s) or, in the absence of an approved regional water supply plan(s), the district water management plan(s). (s.163.3177(6)(d), F.S.) 5. Revise the Intergovernmental Coordination Element to ensure coordination of the comprehensive plan with the applicable regional water supply plan(s). (s.163.3177(6)(h)1., F.S.) 6. Consider, during preparation of the Evaluation and Appraisal Report, the appropriate regional water supply plan. (s.163.3191(2)(1), F.S.) 7. During preparation of the Evaluation and Appraisal Report and adoption of EAR- based amendments, revise the Potable Water Sub-element to include the Water Supply Facilities Work Plan. (x.163.3191(2)(1), F.S.) These guidelines have been prepared to help local governments understand their responsibilities under the legislation, the data and analysis that must be collected to prepare the Work Plan, and the amendments to the comprehensive plan that are required. Also included is a list of sources of information that local governments can use to assist them. i Page 3 of 21 t 1 ~~ ~~ 1 B. WHEN TO ADOPT THE WATER SUPPLY FACILITIES WORK PLAN AMENDMENT Initially, only those local governments having responsibility for all or a portion of their water supply facilities and located within an area for which the water management district has prepared a Regional Water Supply Plan (RWSP) must prepare and adopt the Work Plan. See Attachment A for a map depicting areas where RWSPs have been prepared and Attachment B for an overview of the RWSPs. Eventually, however, all local governments with water supply facility responsibilities must prepare and adopt a Work Plan. 1. Local governments having responsibility for water supply facilities and located within designated areas with approved RWSPs should, by January 1, 2005, or the EAR due date, whichever is earlier: a) Revise the Potable Water Sub-element to incorporate consideration of the appropriate RWSP (see Section A, paragraph 2, of these Guidelines). b) Revise the Potable Water Sub-element to include a Water Supply Facilities Work Plan for at least a 10-year period for those water supply facilities necessary to serve existing and new development and for which they are responsible (see Section A, paragraph 3, of these Guidelines). Amend, if necessary, the Five-Year Schedule of Capital Improvements (this will ensure consistency between the Potable Water Sub-element and the Capital Improvements Element). c) During the regularly scheduled EAR update, the local government must also comply with corollary requirements for the conservation element and intergovernmental coordination element (see Section A, paragraphs 1, 4, 5, 6 and 7 of these Guidelines). While these corollary requirements are not explicitly required for the completion of the Work Plan due January 1, 2005, it is recommended they be completed concurrently to provide assurance that the Work Plan adequately addresses the water supply facilities needed for the projected 10- yearperiod. 2. Local governments having no responsibility for water supply facilities and located within designated areas with approved RWSPs should by January 1, 2005 submit to DCA a letter and supporting documentation from the water supplier confirming that the water supplier has identified adequate sources, considering the RWSP, and has made necessary infrastructure plans to serve the agreed upon need projected for your community. 3. Local governments that are not located within areas with approved RWSPs should, as part of their EAR-based amendment, complete all of the above requirements. When revising the Conservation Element to include projected needs and sources, consideration should be given to the district's water management plan including the Districtwide Water Supply Assessment, since no RWSP exists for these areas. [Note: A RWSP could exist for portions of these areas in the future. ] Page 4 of 21 C. PREPARING FOR THE WATER SUPPLY FACILITIES WORK PLAN AMENDMENT 1. Objective of the Work Plan: The Water Supply Facilities Work Plan should ensure the construction of water supply facilities that are necessary to serve existing and new development for at least a 10-year planning period. The Work Plan should address those facilities for which the local government is responsible. In areas where local governments rely on regional water supply authorities or other water suppliers to provide all or a portion of the community's water supply, the Work Plan must address both the provider's plans and also the local government's own water infrastructure needs. The Work Plan will strengthen the coordination between local government land use planning responsibilities, water supply facilities planning activities and the water resource development responsibilities of the water management districts. 2. Determine Due Date: First, determine when your Work Plan amendment should be adopted (see Section B on page 4 of these Guidelines and Attachment B). Determine the date by which you will need to transmit the proposed amendment in order to be able to adopt the amendment by the scheduled due date. Schedule the completion of the proposed Work Plan amendment to occur prior to the local planning agency and local government hearing dates. 3. Coordination With Your Water Management District: When preparing your Work Plan you must consider the plans of the water management district. If your community is located in an area with an approved RWSP, you will need to coordinate with the district regarding demand projections, the use of appropriate water sources to meet projected demand and the use of water conservation and reuse strategies. Other communities not located in regional water supply planning areas will need to consider the district water management plan. See Section A, paragraph 4, on page 3 of these Guidelines. Regardless of where your community is located, ask the district to identify the relevant aspects of their plans that you should consider when formulating your Work Plan. Remember that district water resources planning is a process and the plans are ' updated periodically. As part of their planning process, the district may have relevant information that is not contained within a given plan published on a specific date. Be sure to inquire about the availability of more recent information that might be useful to you. Ask the water management district to designate one person as your point of contact 1 for all of the information and assistance you will need from the district. A single point of contact will greatly facilitate coordination between you and the district. ' Close coordination with the district can avoid concerns when the district reviews your proposed Work Plan amendment . RWSP's are prepared fora 20-year planning timeframe and most include demand projections for five-year increments, such as 2005, 2010, 2015 and 2020. It is recommended that you choose along-range planning timeframe that corresponds to Page 5 of 21 one of the district's five-year planning increments. This will greatly facilitate the sharing and use of consistent data. For example, if normally your 10-year planning period would be say, 2018, you should choose 2020 as your planning timeframe (you would still only need to adopt a 10-year facilities Work Plan). 4. Coordination With Your Water Supplier: In addition to the water management district, your other partner will be the entity that supplies water to your community. This could be your own water utility department, the water utility of another local government, a private water utility, a regional water authority or some combination of these four. You should identify your water supplier(s) and request a single point of 1 contact as your partner in preparing the Work Plan. Many small developments, such as trailer parks and condominiums, are self-supplied. They should be inventoried, but not considered for planning purposes because of their limited development potential. 5. Define Extent of Community Involvement: Next, determine the extent to which your local government is or plans to be involved with the construction, operation, financing and planning for water supply facilities (including facilities provided by regional water supply authorities or other water suppliers, as well as the infrastructure facilities provided by the local government). Involvement can range from none to total control by your local government for withdrawing, treating and distributing potable water and reuse water. In general, the more your community is involved with water supply planning, including water reuse, the more extensive your Work Plan. t Three common water supply situations are discussed below. a. Total Involvement: If your local government owns or has responsibility for all 1 the water supply facilities that serve its community, then you will need to: 1) Project your community's water supply needs for at least aten-year planning period. ' 2) Revise the Potable Water Sub-element to include a Work Plan showing how your local government will meet those needs, reflecting consideration of the RWSP, particularly with regard to adequacy of sources. 3) Revise the Five-Year Schedule of Capital Improvements for any capital improvements needed during the first five years and goals, objective and policies in the plan, as needed. 1 Page 6 of 21 b. Partial Involvement: If your local government owns or has responsibility for some (most commonly the distribution network), but not all of the water supply facilities, then you must: 1) Project your community's water supply needs for at least aten-year planning period. 2) Revise the Potable Water Sub-element to include a Work Plan for those facilities for which your local government has responsibility showing how those needs will be met, reflecting consideration of the RWSP, particularly 1 with regard to adequacy of sources. 3) Revise the Five-Year Schedule of Capital Improvements for any 1 capital improvements needed during the first five years and goals, objective and policies in the plan, as needed. ~~ 4) Coordinate with your water supplier(s), which may include another local government(s), to ensure that the supplier(s) will be able to provide enough water to meet the projected need. The information obtained from the water supplier should include: a. Information from the current consumptive use permit, including permit number, authorized average and maximum daily withdrawal, and permit expiration date. b. Projected demand by type of water user for at least aten-year planning period. c. Identification of existing and planned future water sources; the supply plan identified by each supplier should reflect consideration of the RWSP. 5) If another local government is a water supplier to your community, you should verify that the Work Plan of the supplying government identifies the sources and facilities needed to meet the portion of the projected need of your community for which the supplying local government is responsible. 6) Coordinate with the water management district regarding the ability of your water supplier(s) to meet the projected need, particularly with respect to sources and conservation and reuse strategies. 7) For those components of the water supply system for which your local government does not have responsibility, submit to DCA a letter and supporting documentation from the water supplier confirming that the water supplier has identified adequate sources, considering the RWSP, and made necessary infrastructure plans to serve the need. Page 7 of 21 c. No Involvement: If your local government does not own or have responsibility for any of the water supply facilities that serve its community, then you will need to: 1) Project your community's water supply needs for at least aten-year planning period. 1 2) Coordinate with your water supplier(s), which may include another local government(s), to ensure that the supplier(s) will be able to provide enough water to meet your projected need. The information obtained from the water supplier should include: a. Information from the current consumptive. use permit, including permit number, authorized average and maximum daily withdrawal, and permit expiration date. b. Projected demand by type of water user for at least aten-year planning period; your projected demand and your water supplier's projected demand should be in agreement. c. Identification of existing and planned future water sources; the supply plan identified by each supplier should reflect consideration of the RWSP. d. Identification of water supply facilities needed to serve the agreed upon projected need. The source of water identified by each supplier should reflect consideration of the RWSP. 3) Coordinate with the water management district regarding the ability of the water supplier to meet the projected need, particularly with respect to sources and the use of appropriate water conservation and reuse strategies. Local governments having no responsibility for water supply facilities and located within designated areas with approved RWSPs should by January 1, 2005 submit to DCA a letter and supporting documentation from the water supplier confirming that the water supplier has identified adequate sources, considering the RWSP, and has made necessary infrastructure plans to serve the agreed upon need projected for your community. Local governments having no responsibility for water supply facilities and located outside designated areas with approved RWSPs should incorporate the above requirements into the amendment that updates their comprehensive plan following adoption of their Evaluation and Appraisal Report. 6. Review of Your Current Comprehensive Plan: Review your current comprehensive plan to identify the text, goals, objectives and policies that integrate this Work Plan into the comprehensive plan. This could be done by listing each comprehensive plan element that either contains, or should contain, text, goals, objectives or policies implementing the Work Plan. Typically, the elements would be Conservation, Potable Water, Capital Improvements and Intergovernmental Coordination, but could include more elements. Identify revisions necessary to integrate the Work Plan in the comprehensive plan. For Page 8 of 21 1 ' example, in the Potable Water Sub-element the text should be updated to include the Work Plan, and the goals, objectives and policies should be made consistent with strategies in the Work Plan that address the selection of water sources, improvements of facilities, conservation and reuse. The Conservation Element should be updated to be ' consistent with the assessment of the current and projected water needs and sources, considering the appropriate RWSP, or, in the absence of a RWSP, the district water management plan. The Intergovernmental Coordination Element should be updated to show relationships, and state principles and guidelines to be used to achieve coordination of the comprehensive plan (including the Work Plan) with the applicable regional water supply plan. It is likely that the degree to which the current comprehensive plan will need to be updated will depend on the extent to which your community is involved in water supply facilities. ' 7. Evaluation and Appraisal Report: During the regularly scheduled EAR update, local governments must also comply with corollary requirements for the Conservation Element and Intergovernmental Coordination Element. For the Conservation Element, they must "assess their current, as well as projected water needs and sources for at least a 10-year period, considering the appropriate regional water supply plan ...or, in the absence of a regional water supply plan, the district water management plan...." For the ' Intergovernmental Coordination Element, they must show "relationships" and state "principles" and "guidelines" to be used in the accomplishment of coordination of the adopted comprehensive plan with the applicable regional water supply plan or the water management district plan. While the corollary requirements are not explicitly required for the completion of the Work Plans due by January 1, 2005, it is recommended they be completed concurrently to provide assurance that the Work Plan adequately addresses the water supply facilities ' needed for the projected ten-year period. ' D. INFORMATION TO INCLUDE IN THE WATER SUPPLY FACILITIES WORK PLAN AMENDMENT Like all plan amendments, the Work Plan amendment should be based upon information relevant to your community's unique circumstances. As outlined in Section C, paragraph 5, above, the content of your Work Plan will vary depending on the degree of your community's involvement in water supply facilities planning. In addition to the information outlined in Section C, above, the Work Plan amendment must include the following: 1 Page 9 of 21 i 1. Supporting Data and Analysis: a. Existing Facilities: Identify the existing potable water facilities for which ' your local government is responsible, including the location of wells (or intake point from a surface water source), treatment and storage facilities, and the major distribution mains. Compile information regarding the design capacity of the production and treatment facilities, the current demand on these facilities, the geographic area served and relevant consumptive use permit conditions and duration. If your local government is not responsible for all of the existing water supply facilities, identify the responsible entities by service area. Identify conservation and reuse practices. ' b. Water supply facilities include all of the infrastructure necessary to withdraw water from its source, and to transmit, treat and distribute the water and any associated storage facilities. The location of water sources (wells, surface 1 water), storage facilities (in-ground, above ground) and utility lines should be depicted on maps of a scale and level of detail appropriate to your community's situation. For example, for a major county it would be ' impracticable to depict the smallest lines serving individual customers. However, for a small city this information maybe readily available and easily displayed. In general, maps depicting the location of the largest utility lines (say, 24"), the intermediate sized lines (say, 20", 16", 12" and 10") and the smaller lines (say, 8" and 6") should be included in the Work Plan. ArcView 1 shape files could be created for each of these seven different line sizes. When combined together these seven files provide a good indication of the community's current service area (that portion of the community that is currently served by water facilities). Proposed facilities can be added to the ' appropriate coverage and the results combined to depict the location of proposed facilities for various future time periods. The following tables illustrate a convenient format for comparing projected demand, facility capacity and permit conditions. The first table reveals the ' need to increase permitted withdrawals to accommodate anticipated growth and system expansion. The second table shows one way to portray a situation where the permitted CUP allocation is unlikely to be expanded due to source ' limitations and a deficit is avoided by planning to purchase raw water from an adjacent supplier. i~ Page 10 of 21 u 1 ii 1 1 u 1 Present 2008 2010 201...5 Po ulation Served 1,722 3,073 3,598 3,955 Avg. Daily Demand 96,755 170,600 187,600 196,980 (GPD Demand per Capita 56 56 52 50 (GPD Available Facility 295,200 590,400 590,400 590,400 Ca acity (GPD Facility Capacity 198,445 419,800 402,800 392,420 S lus (Deficit)1 Permitted Amount 130,000 130,000 130,000 130,000 ADR Permitted Surplus 33,245 (40,600) (57,600) (66,980) (Deficit)2 GPD =Gallons Per Day; ADR =Average Daily Rate 1 Calculated by subtracting Average Daily Demand from Available Facility Capacity 2 Calculated b subtracting Avera e Dail Demand from Permitted Amount Present 2008 2010 ' 2015. Po ulation Served 13,857 17,197 17,892 18,987 Avg. Daily Demand 3.4 4.31 4.48 4.76 (MGD) Demand per Capita 245 250 250 251 GPD Available Facility 8.712 9.360 9.360 10.152 Ca acit MGD Facility Capacity 5.312 5.05 4.88 5.392 Su lus (Deficit 3 Permitted Amount 3.46 5.88 5.882 5.882 ADR Permitted Surplus 0.06 1.57 1.40 1.12 (Deficit a MGD=Million Gallons Per Day; GPD=Gallons Per Day; ADR =Average Daily Rate 1 CUP for 3.46 MGD annual average expires 9/2006 2Includes CUP for 3.46 MGD and 2.42 MGD wholesale purchase from XYZ Utility 3Calculated by subtracting Average Daily Demand from Available Facility Capacity 4Calculated b subtractin Avera e Dail Demand from Permitted Amount 1 c. Service Areas: For each geographic service area (the area within your jurisdiction provided with service by a water facility), prepare a map showing its spatial extent, prepare a facility capacity analysis and note capacity surpluses and deficiencies for: Page 11 of 21 1 1 n ~' a. Existing conditions, including geographic area served, population served and level of service. b. Conditions five years in the future based on projected demand, noting capacity surpluses and deficiencies. c. Conditions ten years in the future based on projected demand, noting capacity surpluses and deficiencies. d. Identify water supply facilities needed to serve projected growth and development for each geographic service area for at least the next 10-year period, including relevant information for each facility, such as capacity in average daily flow and maximum daily flow. d. Water Sources: The Work Plan should demonstrate that a sufficient supply of water will be available to meet projected needs. Needed water might be supplied from more than one source. Conservation and reuse should be examined as critical techniques to reduce the demand for potable water. The water management district is an excellent source of information about water sources and you should coordinate closely with them. If your community is located within a RWSP area, you should review the Regional Water Supply Plan with the district staff. You will want to make sure that you have used compatible projections of water demands and that your conclusions regarding water source availability are compatible. You should consider the use of water sources, or some combination of sources, identified in the RWSP. 2. Adopted Portion of the Work Plan Amendment: Based on the supporting data and analysis, the adopted Work Plan amendment should include: a. A Long-Range Water Supply Facilities Work Plan listing the potable water facilities that will be needed during at least the next 10-year period, including relevant information for each facility, such as capacity in average daily flow and maximum daily flow. Place those listed facilities in priority order. For each listed facility, identify: a. The anticipated year of construction, considering the need for permitting and construction b. The water source to be utilized c. The estimated cost of construction d. The source of funds b. Any facilities identified in the Work Plan as being needed during the first five years should be adopted as a revision to the financially feasible Five-Year Schedule of Capital Improvements. c. Any needed revisions to the goals, objectives and policies of the Potable Water Sub-element. Page 12 of 21 ' d. An needed revisions to the goals, objectives and policies of the Conservation Y Element. j ectives and olicies of the eded revisions to the oals ob e. Any ne g ~ p Intergovernmental Coordination Element: £ Any needed revisions to the goals, objectives and policies of any other element ' that addresses water supply facilities, including needs and water sources. g. During the regularly scheduled EAR update, the local government must also ' comply with corollary requirements for the conservation element and intergovernnmental coordination element (see paragraphs 4 and 5 on page three of these guidelines). While these corollary requirements are not explicitly required ' for the completion of the Work Plan amendment due January 1, 2005, it is recommended they be completed concurrently to provide assurance that the Work Plan adequately addresses needed the water supply facilities. ~I [i 1 1 Page 13 of 21 ii 1 ~' 1 1 ATTACHMENT A Map Depicting Work Plan Due Dates Page 14 of 21 Nolmec Jackson ashinpton Nassau Gadcden Namdton Glhoun Icon <I/erso Madison y oval Ba Ilbeny VUakulla umbia Bake 1 Bum annee Taglor n' Gay Gult iranklin ~w lahyette ^Fadbr Ilcbdst Pla chug PM Di.ie levy Marion (1) Areas Where Water Supply Facilities Work Plan is Due by ~ ~~, ~ p ~„ ® EAR-Based Amendment Due Dale Pine Yaa Mdlan (2) Areas Where Regional Water Supply Plans Have Been Prepared and Work Plan Must be Adopted by 1!1/05 NWFWMD -- Planning Region II SFWMD -Kissimmee Basin SFWMD -Lower East Coast \~~~ -SFWMD - Lower W est Coast ®SFWMD -- Upper Easi Coast ~~` ~\ SJRWMD /, SWFWMD --Central and Southern Regions \, \\ , (3) Areas Where County Work Plans are Due by EAR \~~ j/ Due Date as Shown, Earlierthan 1/1/05 Due Date 2003 2004 Monroe eaopa ~ Page 15 of 21 ' Attachment B ' Overview of Re Tonal Water Su 1 Plans g nn v The following briefly summarizes the RWSPs to give an indication of the type of information and assistance that is available from the water management district. The 1 attached map depicts the areas of the state for which RWSPs have been prepared. A RWSP includes a projection of water demands and an identification of potential sources of water to meet these demands. The RWSP looks forward in time for 20 years and is intended to provide the framework for future water supply decisions in the areas where it has been determined that traditional sources of water are not adequate to provide for future needs while sustaining the water resources and related natural systems. Within these area existing and reasonably anticipated sources of water and conservation efforts may not be adequate to (1) supply water for all existing legal users and reasonably ' anticipated future needs and (2) to sustain the water resources and related natural systems. The RWSP identifies potential water supply source options for water supply development, including traditional and alternative sources that will exceed the needs projected by the district. The RWSP also estimates the associated costs for developing these sources. The water source options identified in the RWSP represent a "menu" of possible options for water supply development from which local governments, government-owned and privately owned utilities, self-suppliers and others may choose. The options are provided as reasonable concepts that water users in the region can pursue ' in their water supply planning. Water users may want to select a water supply option as presented in the plan or combine elements of different options that better suit their water supply needs. Additionally, the plan provides information to assist water users in developing funding strategies to construct water supply development projects. ' For planning purposes, water use is separated into six basic categories: agriculture; public supply; domestic supply (including small public supply systems); commercial/industrial and mining/dewatering; thermoelectric power production; and recreation aesthetic. The RWSP identifies potential sources of water capable of meeting projected demand, and options for developing those sources. Sources include (1) new well fields, (2) increased use of reclaimed water, (3) storage reservoirs, (4) surface water withdrawals, (5) aquifer ' storage and recovery, (6) reverse osmosis/desalination (7) conservation. The RWSP includes planning level analyses for each of these sources of water to quantify available water supplies, identify development options, and estimate costs associated with water ' supply development. 1 ' Page 16 of 21 ' The RWSP projects future water supply needs for 20 years and identifies the methods and assumptions used in projecting future demand. Sources of water anticipated to be ' available to meet current and future demands are identified, including a description of existing sources and the ability of each to assist in meeting current demands. The amount ' of water potentially available from each source to meet demands for 20 years is estimated. In addition, the projected demands are compared to available water sources in order to identify deficits that would need to be met by alternative sources. The RWSP describes ' water supply projects currently under development for which districts are providing assistance. Finally, the RWSP contains a list of water supply options that could potentially be developed by regional water supply authorities, public utilities, local governments, public/private water users, etc. The goal of the RWSP is to identify sufficient sources of water within the planning region ' to meet projected water demands. Water supply options and cost estimates are provided to assist users in determining how best to meet their particular demands. It is anticipated that users may want to choose an option or combine elements of different options that ' best fit their needs for water supply development. Prior to future development of any water supply option, it will be necessary to meet the conditions for issuance of and obtain all applicable permits. Following a decision to pursue any option identified in the RWSP, ' it will be necessary for the interested party (ies) to conduct more detailed engineering, hydrologic, economic and biological assessments to provide the necessary technical support for developing the option. Prelimina technical and financial feasibilit anal ses are conducted on selected o tions n' Y Y p ' for each water source. These are considered to be planning level analyses and are prepared to more fully develop concepts for water supply and resource development options. The analyses provide reasonable estimates of the quantity of water that could be developed and the associated costs for development. Each RWSP is updated every five years. All the districts are developing updated information that will be available in the 2005 RWSP updates. Local governments should consult with their respective districts to obtain the latest and most detailed information available. 1 ' Page 17 of 21 1 1 1 1 1 Attachment C Selected Sources Of Information and Contacts Selected Data Sources: 1. Water Management District publications, such as Regional Water Supply Plans, District Water Management Plans. 2. Monthly Public-Supply Water Use (withdrawals) tables. Available from the USGS, Richard Marella at 850-942-9500, for Northwest Florida WMD, Suwannee River WMD and South Florida WMD. Contact St. Johns River WMD and Southwest Florida WMD for similar tables. 3. Regional Water Supply Authority plan and publications. 4. Comprehensive plans of adjacent local governments if they supply water to portions of your jurisdiction. 5. Plans or other documents from public or private utilities serving areas within your jurisdiction. Selected Contacts: Florida Department of Community Affairs http://www.dca.state.fl.us/fdcp/DCP/WaterSup~lyPlanning/water_supply~lanning htm Pilot Communities The Department contracted with five communities, one in each water management district, to prepare a pilot Work Plan in advance of their statutory deadline. The pilot project Work Plans are available as examples on a CD-ROM from the Department and are located on the Department's website. The pilot communities contacts are: City of Cocoa Mr. Nelson Lau 321-639-7549 nlau(a,cocoafl.org City of Lake City Mr. Larry Lee 386-752-2031 Lcld ,isQroup.net Page 18 of 21 Okaloosa County Ms. Pat Blackshear, AICP ' 850-651-7180 pblackshear(a~co. okaloosa. fl.us ' Palm Beach County Mr. Isaac Hoyos ' 561-233-5347 IHOYOS(a),CO.PALM-BEACH.FL.US City of Venice ' Mr. Marty Black, AICP 941-486-2626 mblack(c~r~,ci.venice.fl.us Water Management Districts: South Florida WMD Name: Henry Bittaker ' Phone: s/c 229-6792; 561-682-6792; 800-432-2045, ext 6792 E-mail: hbittak(cr~,sfwmd. ov Website: www.sfwmd.gov ' Name: P.K. Sharma (LGCP Reviews) Phone: s/c 229-6779; 561-682-6779; 800-432-2045, ext. 6779 E-mail: psharma(c-r~,sfwmd. ov Lower East Coast RWSP: Jim Jackson, 800-432-2045 ext. 6334 Kissimmee RWSP: Chris Sweazy; 800-250-4250 ext. 3822 Upper East Coast RWSP: Sharon Fowler; 800-432-2045 ext. 6155 Lower West Coast RWSP: Bonnie Kramer; 800-248-1201 ext 7122 St. Johns River WMD Name: Jeff Cole, Assistant Director, Office of Communications and Governmental Affairs PO Box 1429 Palatka, FL 32178-1429 ' Phone: s/c 860-4497; 386-329-4497 Fax: 386-329-4103 E-mail: jcole(c~sirwmd.com ' Website: http://sjrwmd.com Southwest Florida WMD ' Name: Richard Owen, AICP Phone: 352-796-7211 or 800-423-1476 Fax: 352-754-6749 E-mail: Richard.Owen(a~swfwmd.state.fl.us Website: www.swfwmd.state.fl.us ' Page 19 of 21 1 Suwannee River WMD ' Name: David Still Phone: 386-362-1001; 800-226-1066 e-mail: still d(a,srwmd.state.fl.us ' Website: www.srwmd.state.fl.us ' Northwest Florida WMD Name: Tyler Macmillan, AICP Phone: 850-539-5999; s/c 771-2080, ext. 133 Fax: 850-539-4380 e-mail: Tyler.Macmillan~a,nwfwmd.state.fl.us Website: http://sun6.dms.state.fl.us/nwfwmd/ FDEP ' Name: Janet Llewellyn, Deputy Director, Division of Water Resources Management Phone: 850-488-0784; s/c 272-6407 Fax: 850-488-2118 e-mail: Janet.Llewellyn(c~dep.state.fl.us Website: Re Tonal V~'ater Su 1 Authorities ' Peace River-Manasota Regional Water Supply Authority (covers Charlotte, Desoto, Manatee and Sarasota counties) ' Name: Patrick J. Lehman Phone: 941-316-1776 Fax: 941-316-1772 e-mail: peacemana(a~aol.com Tampa Ba. (cover Hillsborough ,Pasco ,and Pinellas counties) ' Name: Paula Dye, AICP, Chief Environmental Planner Phone: 727-796-2355 Fax:727-701-2340 ' e-mail: pd~(cr~,tampabaywater.org Website: www.tampabaywater.org Walton/Okaloosa/Santa Rosa Regional Utility Authority (cover Okaloosa, Santa Rosa and Walton counties) Name: Terry A. Joseph Phone: 850-595-8910 Fax: 850-595-8967 ' e-mail: josepht(a~wfipc.dst.fl.us ' Page 20 of 21 i 1 1 1 Withlacoochee Regional Water Supply Authority (cover Citrus, Hernando, Marion and Sumter counties) Name: Jackson E. Sullivan Phone: 850-385-0220 Fax:850-385-0223 e-mail: jsullivan(a~carltonfields.com Page 21 of 21 ~ _ n_l -coo d~~r _ __ ~ ~_ an ~~ ~ ~ a~ ~ C~~n(kc~ dr~~ ~l~ eCi-i~' ~ fib' M~',_ w~~l ~'o~.b~-die mmodde io - '_P~~~ --- - - -- F~~a - _ __ _ --- ~~~r~ ~ e~~-f~~,~ ~- _--_ GUIDELINES FOR PREPARING THE WATER SUPPLY FACILITIES WORK PLAN COMPREHENSIVE PLAN AMENDMENT Florida Department of Community Affairs Division of Community Planning State Planning Initiatives July 2003 Page 1 of 21 ~ ~ TABLE OF CONTENTS A. Introduction B. When to Adopt the Water Supply Facilities Work Plan Amendment C. Preparing for the Water Supply Facilities Work Plan Amendment 1. Objective of Work Plan 2. Determine Due Date 3. Coordination With Your Water Management District 4. Coordination With Your Water Supplier 5. Define Extent of Community Involvement 6. Review of Your Current Comprehensive Plan 7. Evaluation and Appraisal Report D. Information to Include in the Water Supply Facilities Work Plan Amendment 1. Supporting Data and Analysis 2. Adopted Portion of the Work Plan Amendment Attachment A: Map Depicting Work Plan Due Dates Attachment B: Overview of Regional Water Supply Plans Attachment C: Selected Sources of Information and Contacts Page 2 of 21 • • A. INTRODUCTION The 2002 Legislature expanded the local government comprehensive plan requirements to strengthen coordination of water supply planning and local land use planning. One of the most significant new requirements is a Long Range Water Supply Facilities Work Plan (Work Plan) identifying needed water supply facilities for at least a 10-year planning period. These new requirements direct each local government to: Coordinate appropriate aspects of their comprehensive plan with the appropriate water management district's regional water supply plan(s). (see s.163.3177(4)(a), F.S.) 2. Revise the Potable Water sub-element to consider the regional water supply plan(s) of the appropriate water management district(s). (s.163.3177(6)(c), F.S.) Revise the Potable Water sub-element to include a Water Supply Facilities Work Plan for at least a 10-year planning period addressing water supply facilities necessary to serve existing and new development and for which the local government is responsible. (s.163.3177(6)(c), F.S.) 4. Revise the Conservation Element to assess projected water needs and sources for at least a 10-year planning period considering the appropriate regional water supply plan(s) or, in the absence of an approved regional water supply plan(s), the district water management plan(s). (s.163.3177(6)(d), F.S.) 5. Revise the Intergovernmental Coordination Element to ensure coordination of the comprehensive plan with the applicable regional water supply plan(s). (s.163.3177(6)(h)1., F.S.) 6. Consider, during preparation of the Evaluation and Appraisal Report, the appropriate regional water supply plan. (x.163.3191(2)(1), F.S.) 7. During preparation of the Evaluation and Appraisal Report and adoption of EAR- based amendments, revise the Potable Water Sub-element to include the Water Supply Facilities Work Plan. (x.163.3191(2)(1), F.S.) These guidelines have been prepared to help local governments understand their responsibilities under the legislation, the data and analysis that must be collected to prepare the Work Plan, and the amendments to the comprehensive plan that are required. Also included is a list of sources of information that local governments can use to assist them. Page 3 of 21 • • B. WHEN TO ADOPT THE WATER SUPPLY FACILITIES WORK PLAN AMENDMENT Initially, only those local governments having responsibility for all or a portion of their water supply facilities and located within an area for which the water management district has prepared a Regional Water Supply Plan (RWSP) must prepare and adopt the Work Plan. See Attachment A for a map depicting areas where RWSPs have been prepared and Attachment B for an overview of the RWSPs. Eventually, however, all local governments with water supply facility responsibilities must prepare and adopt a Work Plan. 1. Local governments having responsibility for water supply facilities and located within designated areas with approved RWSPs should, by January 1, 2005, or the EAR due date, whichever is earlier: a) Revise the Potable Water Sub-element to incorporate consideration of the appropriate RWSP (see Section A, paragraph 2, of these Guidelines). b) Revise the Potable Water Sub-element to include a Water Supply Facilities Work Plan for at least a 10-year period for those water supply facilities necessary to serve existing and new development and for which they are responsible (see Section A, paragraph 3, of these Guidelines). Amend, if necessary, the Five-Year Schedule of Capital Improvements (this will ensure consistency between the Potable Water Sub-element and the Capital Improvements Element). c) During the regularly scheduled EAR update, the local government must also comply with corollary requirements for the conservation element and intergovernmental coordination element (see Section A, paragraphs 1, 4, 5, 6 and 7 of these Guidelines). While these corollary requirements are not explicitly required for the completion of the Work Plan due January 1, 2005, it is recommended they be completed concurrently to provide assurance that the Work Plan adequately addresses the water supply facilities needed for the projected 10- year period. 2. Local governments having no responsibility for water supply facilities and located within designated areas with approved RWSPs should by January 1, 2005 submit to DCA a letter and supporting documentation from the water supplier confirming that the water supplier has identified adequate sources, considering the RWSP, and has made necessary infrastructure plans to serve the agreed upon need projected for your community. 3. Local governments that are not located within areas with approved RWSPs should, as part of their EAR-based amendment, complete all of the above requirements. When revising the Conservation Element to include projected needs and sources, consideration should be given to the district's water management plan including the Districtwide Water Supply Assessment, since no RWSP exists for these areas. [Note: A RWSP could exist for portions of these areas in the future.] Page 4 of 21 • • C. PREPARING FOR THE WATER SUPPLY FACILITIES WORK PLAN AMENDMENT 1. Objective of the Work Plan: The Water Supply Facilities Work Plan should ensure the construction of water supply facilities that are necessary to serve existing and new development for at least a 10-year planning period. The Work Plan should address those facilities for which the local government is responsible. In areas where local governments rely on regional water supply authorities or other water suppliers to provide all or a portion of the community's water supply, the Work Plan must address both the provider's plans and also the local government's own water infrastructure needs. The Work Plan will strengthen the coordination between local government land use planning responsibilities, water supply facilities planning activities and the water resource development responsibilities of the water management districts. 2. Determine Due Date: First, determine when your Work Plan amendment should be adopted (see Section B on page 4 of these Guidelines and Attachment B). Determine the date by which you will need to transmit the proposed amendment in order to be able to adopt the amendment by the scheduled due date. Schedule the completion of the proposed Work Plan amendment to occur prior to the local planning agency and local government hearing dates. 3. Coordination With Your Water Management District: When preparing your Work Plan you must consider the plans of the water management district. If your community is located in an area with an approved RWSP, you will need to coordinate with the district regarding demand projections, the use of appropriate water sources to meet projected demand and the use of water conservation and reuse strategies. Other communities not located in regional water supply planning areas will need to consider the district water management plan. See Section A, paragraph 4, on page 3 of these Guidelines. Regardless of where your community is located, ask the district to identify the relevant aspects of their plans that you should consider when formulating your Work Plan. Remember that district water resources planning is a process and the plans are updated periodically. As part of their planning process, the district may have relevant information that is not contained within a given plan published on a specific date. Be sure to inquire about the availability of more recent information that might be useful to you. Ask the water management district to designate one person as your point of contact for all of the information and assistance you will need from the district. A single point of contact will greatly facilitate coordination between you and the district. Close coordination with the district can avoid concerns when the district reviews your proposed Work Plan amendment. RWSP's are prepared fora 20-year planning timeframe and most include demand projections for five-year increments, such as 2005, 2010, 2015 and 2020. It is Page 5 of 21 • • recommended that you choose along-range planning timeframe that corresponds to one of the district's five-year planning increments. This will greatly facilitate the sharing and use of consistent data. For example, if normally your 10-year planning period would be say, 2018, you should choose 2020 as your planning timeframe (you would still only need to adopt a 10-year facilities Work Plan). 4. Coordination With Your Water Supplier: In addition to the water management district, your other partner will be the entity that supplies water to your community. This could be your own water utility department, the water utility of another local government, a private water utility, a regional water authority or some combination of these four. You should identify your water supplier(s) and request a single point of contact as your partner in preparing the Work Plan. Many small developments, such as trailer parks and condominiums, are self-supplied. They should be inventoried, but not considered for planning purposes because of their limited development potential. 5. Define Extent of Community Involvement: Next, determine the extent to which your local government is or plans to be involved with the construction, operation, financing and planning for water supply facilities (including facilities provided by regional water supply authorities or other water suppliers, as well as the infrastructure facilities provided by the local government). Involvement can range from none to total control by your local government for withdrawing, treating and distributing potable water and reuse water. In general, the more your community is involved with water supply planning, including water reuse, the more extensive your Work Plan. Three common water supply situations are discussed below. a. Total Involvement: If your local government owns or has responsibility for all the water supply facilities that serve its community, then you will need to: 1) Project your community's water supply needs for at least aten-year planning period. 2) Revise the Potable Water Sub-element to include a Work Plan showing how your local government will meet those needs, reflecting consideration of the RWSP, particularly with regard to adequacy of sources. 3) Revise the Five-Year Schedule of Capital Improvements for any capital improvements needed during the first five years and goals, objective and policies in the plan, as needed. Page 6 of 21 • • b. Partial Involvement: If your local government owns or has responsibility for some (most commonly the distribution network), but not all of the water supply facilities, then you must: 1) Project your community's water supply needs for at least aten-year planning period. 2) Revise the Potable Water Sub-element to include a Work Plan for those facilities for which your local government has responsibility showing how those needs will be met, reflecting consideration of the RWSP, particularly with regard to adequacy of sources. 3) Revise the Five-Year Schedule of Capital Improvements for any capital improvements needed during the first five years and goals, objective and policies in the plan, as needed. 4) Coordinate with your water supplier(s), which may include another local government(s), to ensure that the supplier(s) will be able to provide enough water to meet the projected need. The information obtained from the water supplier should include: a. Information from the current consumptive use permit, including permit number, authorized average and maximum daily withdrawal, and permit expiration date. b. Projected demand by type of water user for at least aten-year planning period. c. Identification of existing and planned future water sources; the supply plan identified by each supplier should reflect consideration of the RWSP. 5) If another local government is a water supplier to your community, you should verify that the Work Plan of the supplying government identifies the sources and facilities needed to meet the portion of the projected need of your community for which the supplying local government is responsible. 6) Coordinate with the water management district regarding the ability of your water supplier(s) to meet the projected need, particularly with respect to sources and conservation and reuse strategies. 7) For those components of the water supply system for which your local government does not have responsibility, submit to DCA a letter and supporting documentation from the water supplier confirming that the water supplier has identified adequate sources, considering the RWSP, and made necessary infrastructure plans to serve the need. Page 7 of 21 • • No Involvement: If your local government does not own or have responsibility for any of the water supply facilities that serve its community, then you will need to: 1) Project your community's water supply needs for at least aten-year planning period. 2) Coordinate with your water supplier(s), which may include another local government(s), to ensure that the supplier(s) will be able to provide enough water to meet your projected need. The information obtained from the water supplier should include: a. Information from the current consumptive use permit, including permit number, authorized average and maximum daily withdrawal, and permit expiration date. b. Projected demand by type of water user for at least aten-year planning period; your projected demand and your water supplier's projected demand should be in agreement. c. Identification of existing and planned future water sources; the supply plan identified by each supplier should reflect consideration of the RWSP. d. Identification of water supply facilities needed to serve the agreed upon projected need. The source of water identified by each supplier should reflect consideration of the RWSP. 3) Coordinate with the water management district regarding the ability of the water supplier to meet the projected need, particularly with respect to sources and the use of appropriate water conservation and reuse strategies. Local governments having no responsibility for water supply facilities and located within designated areas with approved RWSPs should by January 1, 2005 submit to DCA a letter and supporting documentation from the water supplier confirming that the water supplier has identified adequate sources, considering the RWSP, and has made necessary infrastructure plans to serve the agreed upon need projected for your community. Local governments having no responsibility for water supply facilities and located outside designated areas with approved RWSPs should incorporate the above requirements into the amendment that updates their comprehensive plan following adoption of their Evaluation and Appraisal Report. 6. Review of Your Current Comprehensive Plan: Review your current comprehensive plan to identify the text, goals, objectives and policies that integrate this Work Plan into the comprehensive plan. This could be done by listing each comprehensive plan element that either contains, or should contain, text, goals, objectives or policies implementing the Work Plan. Typically, the elements would be Conservation, Potable Water, Capital Improvements and Intergovernmental Coordination, but could include more elements. Identify revisions necessary to integrate the Work Plan in the comprehensive plan. For Page 8 of 21 • example, in the Potable Water Sub-element the text should be updated to include the Work Plan, and the goals, objectives and policies should be made consistent with strategies in the Work Plan that address the selection of water sources, improvements of facilities, conservation and reuse. The Conservation Element should be updated to be consistent with the assessment of the current and projected water needs and sources, considering the appropriate RWSP, or, in the absence of a RWSP, the district water management plan. The Intergovernmental Coordination Element should be updated to show relationships, and state principles and guidelines to be used to achieve coordination of the comprehensive plan (including the Work Plan) with the applicable regional water supply plan. It is likely that the degree to which the current comprehensive plan will need to be updated will depend on the extent to which your community is involved in water supply facilities. 7. Evaluation and Appraisal Report: During the regularly scheduled EAR update, local governments must also comply with corollary requirements for the Conservation Element and Intergovernmental Coordination Element. For the Conservation Element, they must "assess their current, as well as projected water needs and sources for at least a 10-year period, considering the appropriate regional water supply plan ...or, in the absence of a regional water supply plan, the district water management plan...." For the Intergovernmental Coordination Element, they must show "relationships" and state "principles" and "guidelines" to be used in the accomplishment of coordination of the adopted comprehensive plan with the applicable regional water supply plan or the water management district plan. While the corollary requirements are not explicitly required for the completion of the Work Plans due by January 1, 2005, it is recommended they be completed concurrently to provide assurance that the Work Plan adequately addresses the water supply facilities needed for the projected ten-year period. D. INFORMATION TO INCLUDE IN THE WATER SUPPLY FACILITIES WORK PLAN AMENDMENT Like all plan amendments, the Work Plan amendment should be based upon information relevant to your community's unique circumstances. As outlined in Section C, paragraph 5, above, the content of your Work Plan will vary depending on the degree of your community's involvement in water supply facilities planning. In addition to the information outlined in Section C, above, the Work Plan amendment must include the following: Page 9 of 21 • 1. Supporting Data and Analysis: a. Existing Facilities: Identify the existing potable water facilities for which your local government is responsible, including the location of wells (or intake point from a surface water source), treatment and storage facilities, and the major distribution mains. Compile information regarding the design capacity of the production and treatment facilities, the current demand on these facilities, the geographic area served and relevant consumptive use permit conditions and duration. If your local government is not responsible for all of the existing water supply facilities, identify the responsible entities by service area. Identify conservation and reuse practices. b. Water supply facilities include all of the infrastructure necessary to withdraw water from its source, and to transmit, treat and distribute the water and any associated storage facilities. The location of water sources (wells, surface water), storage facilities (in-ground, above ground) and utility lines should be depicted on maps of a scale and level of detail appropriate to your community's situation. For example, for a major county it would be impracticable to depict the smallest lines serving individual customers. However, for a small city this information may be readily available and easily displayed. In general, maps depicting the location of the largest utility lines (say, 24"), the intermediate sized lines (say, 20", 16", 12" and 10") and the smaller lines (say, 8" and 6") should be included in the Work Plan. ArcView shape files could be created for each of these seven different line sizes. When combined together these seven files provide a good indication of the community's current service area (that portion of the community that is currently served by water facilities). Proposed facilities can be added to the appropriate coverage and the results combined to depict the location of proposed facilities for various future time periods. The following tables illustrate a convenient format for comparing projected demand, facility capacity and permit conditions. The first table reveals the need to increase permitted withdrawals to accommodate anticipated growth and system expansion. The second table shows one way to pornay a situation where the permitted CUP allocation is unlikely to be expanded due to source limitations and a deficit is avoided by planning to purchase raw water from an adjacent supplier. Page 10 of 21 Present 2008 2010 2015 Po ulation Served 1,722 3,073 3,598 3,955 Avg. Daily Demand 96,755 170,600 187,600 196,980 GPD Demand per Capita 56 56 52 50 GPD Available Facility 295,200 590,400 590,400 590,400 Ca aci GPD Facility Capacity 198,445 419,800 402,800 392,420 Su lus Deficit ~ Permitted Amount 130,000 130,000 130,000 130,000 ADR Permitted Surplus 33,245 (40,600) (57,600) (66,980) Deficit a GPD =Gallons Per Day; ADR =Average Daily Rate ~ Calculated by subtracting Average Daily Demand from Available Facility Capacity 2 Calculated b subtractin Avera e Dail Demand from Permitted Amount Present 2008 2010 2015 Po ulation Served 13,857 17,197 17,892 18,987 Avg. Daily Demand 3.4 4.31 4.48 4.76 MGD Demand per Capita 245 250 250 251 GPD Available Facility 8.712 9.360 9.360 10.152 Ca aci MGD Facility Capacity 5.312 5.05 4.88 5.392 Su lus Deficit 3 Permitted Amount 3.46 5.88 5.88 5.88 ADR Permitted Surplus 0.06 1.57 1.40 1.12 Deficit a MGD=Million Gallons Per Day; GPD=Gallons Per Day; ADR =Average Daily Rate 'CUP for 3.46 MGD annual average expires 9/2006 ZIncludes CUP for 3.46 MGD and 2.42 MGD wholesale purchase from XYZ Utility 3Calculated by subtracting Average Daily Demand from Available Facility Capacity 4Calculated b subtractin Avera e Dail Demand from Permitted Amount c. Service Areas: For each geographic service area (the area within your jurisdiction provided with service by a water facility), prepare a map showing its spatial extent, prepare a facility capacity analysis and note capacity surpluses and deficiencies for: Page 11 of 21 LJ • a. Existing conditions, including geographic area served, population served and level of service. b. Conditions five years in the future based on projected demand, noting capacity surpluses and deficiencies. c. Conditions ten years in the future based on projected demand, noting capacity surpluses and deficiencies. d. Identify water supply facilities needed to serve projected growth and development for each geographic service area for at least the next 10-year period, including relevant information for each facility, such as capacity in average daily flow and maximum daily flow. d. Water Sources: The Work Plan should demonstrate that a sufficient supply of water will be available to meet projected needs. Needed water might be supplied from more than one source. Conservation and reuse should be examined as critical techniques to reduce the demand for potable water. The water management district is an excellent source of information about water sources and you should coordinate closely with them. If your community is located within a RWSP area, you should review the Regional Water Supply Plan with the district staff. You will want to make sure that you have used compatible projections of water demands and that your conclusions regarding water source availability are compatible. You should consider the use of water sources, or some combination of sources, identified in the RWSP. 2. Adopted Portion of the Work Plan Amendment: Based on the supporting data and analysis, the adopted Work Plan amendment should include: a. A Long-Range Water Supply Facilities Work Plan listing the potable water facilities that will be needed during at least the next 10-year period, including relevant information for each facility, such as capacity in average daily flow and maximum daily flow. Place those listed facilities in priority order. For each listed facility, identify: a. The anticipated year of construction, considering the need for permitting and construction b. The water source to be utilized c. The estimated cost of construction d. The source of funds b. Any facilities identified in the Work Plan as being needed during the first five years should be adopted as a revision to the financially feasible Five-Year Schedule of Capital Improvements. c. Any needed revisions to the goals, objectives and policies of the Potable Water Sub-element. Page 12 of 21 • • d. Any needed revisions to the goals, objectives and policies of the Conservation Element. e. Any needed revisions to the goals, objectives and policies of the Intergovernmental Coordination Element. £ Any needed revisions to the goals, objectives and policies of any other element that addresses water supply facilities, including needs and water sources. g. During the regularly scheduled EAR update, the local government must also comply with corollary requirements for the conservation element and intergovernmental coordination element (see paragraphs 4 and 5 on page three of these guidelines). While these corollary requirements are not explicitly required for the completion of the Work Plan amendment due January 1, 2005, it is recommended they be completed concurrently to provide assurance that the Work Plan adequately addresses needed the water supply facilities. Page 13 of 21 • C~ ATTACHMENT A Map Depicting Work Plan Due Dates Page 14 of 21 • • \ r,~e~.= Ad~T6tt t,a Ib,a~Y eYSa e' ~ asnm9rm caarp•o Wmiwn CanoYn 180^ mrso wpison Y al ~ Ba ~B•rtY ~ WaWlb mQla 8aly °Suu n iapor Cbv '~` n OYIf Fran in tab~ctt• gp4r ilMprt Abehua PUnam w.K 4•Y wrbn G b91 t~ 7RDDi .e? r -...~....y,.„., r tt•mane• Baaoa ~ (1) Areas Where Water Supply Facilities Work Plan is Due by Pa a B qrp ,• >r EAR-Based Amendment Due Date (2) Areas Where Regional Water Supply Plans Have Been Prepared ,` ;; •biao RIr. ~ `"` and Work Plan Must be Adopted by 1H/05 ^ ~~~ ®tJWFWMO -Planning Region II ®SFWMD -Kissimmee Basin ® SFW MD -Lower East Coast r ® 5FW MD - Lower W esi Coast ' '~ ®SFW MD -Upper East Coast ®SJRWMD SWFWMD -Central and Southern Regions (3) Areas Where County Work Plans are Dua by EAR ~`~ Due Daie as Shown, Earlier than 1/1ro5 Due Dat® '" ..« , 2003 s'r~ ", 2004 Bhnro ennD~ Page 15 of 21 • Attachment B Overview of Regional Water Supply Plans The following briefly summarizes the RWSPs to give an indication of the type of information and assistance that is available from the water management district. The attached map depicts the areas of the state for which RWSPs have been prepared. A RWSP includes a projection of water demands and an identification of potential sources of water to meet these demands. The RWSP looks forward in time for 20 years and is intended to provide the framework for future water supply decisions in the areas where it has been determined that traditional sources of water are not adequate to provide for future needs while sustaining the water resources and related natural systems. Within these area existing and reasonably anticipated sources of water and conservation efforts may not be adequate to (1) supply water for all existing legal users and reasonably anticipated future needs and (2) to sustain the water resources and related natural systems. The RWSP identifies potential water supply source options for water supply development, including traditional and alternative sources that will exceed the needs projected by the district. The RWSP also estimates the associated costs for developing these sources. The water source options identified in the RWSP represent a "menu" of possible options for water supply development from which local governments, government-owned and privately owned utilities, self-suppliers and others may choose. The options are provided as reasonable concepts that water users in the region can pursue in their water supply planning. Water users may want to select a water supply option as presented in the plan or combine elements of different options that better suit their water supply needs. Additionally, the plan provides information to assist water users in developing funding strategies to construct water supply development projects. For planning purposes, water use is separated into six basic categories: agriculture; public supply; domestic supply (including small public supply systems); commercial/industrial and mining/dewatering; thermoelectric power production; and recreation/aesthetic. The RWSP identifies potential sources of water capable of meeting projected demand, and options for developing those sources. Sources include (1) new well fields, (2) increased use of reclaimed water, (3) storage reservoirs, (4) surface water withdrawals, (5) aquifer storage and recovery, (6) reverse osmosis/desalination (7) conservation. The RWSP includes planning level analyses for each of these sources of water to quantify available water supplies, identify development options, and estimate costs associated with water supply development. Page 16 of 21 • • The RWSP projects future water supply needs for 20 years and identifies the methods and assumptions used in projecting future demand. Sources of water anticipated to be available to meet current and future demands are identified, including a description of existing sources and the ability of each to assist in meeting current demands. The amount of water potentially available from each source to meet demands for 20 years is estimated. In addition, the projected demands are compared to available water sources in order to identify deficits that would need to be met by alternative sources. The RWSP describes water supply projects currently under development for which districts are providing assistance. Finally, the RWSP contains a list of water supply options that could potentially be developed by regional water supply authorities, public utilities, local governments, public/private water users, etc. The goal of the RWSP is to identify sufficient sources of water within the planning region to meet projected water demands. Water supply options and cost estimates are provided to assist users in determining how best to meet their particular demands. It is anticipated that users may want to choose an option or combine elements of different options that best fit their needs for water supply development. Prior to future development of any water supply option, it will be necessary to meet the conditions for issuance of and obtain all applicable permits. Following a decision to pursue any option identified in the RWSP, it will be necessary for the interested party (ies) to conduct more detailed engineering, hydrologic, economic and biological assessments to provide the necessary technical support for developing the option. Preliminary technical and financial feasibility analyses are conducted on selected options for each water source. These are considered to be planning level analyses and are prepared to more fully develop concepts for water supply and resource development options. The analyses provide reasonable estimates of the quantity of water that could be developed and the associated costs for development. Each RWSP is updated every five years. All the districts are developing updated information that will be available in the 2005 RWSP updates. Local governments should consult with their respective districts to obtain the latest and most detailed information available. Page 17 of 21 • Attachment C • Selected Sources Of Information and Contacts Selected Data Sources: 1. Water Management District publications, such as Regional Water Supply Plans, District Water Management Plans. 2. Monthly Public-Supply Water Use (withdrawals) tables. Available from the USGS, Richard Marella at 850-942-9500, for Northwest Florida WMD, Suwannee River WMD and South Florida WMD. Contact St. Johns River WMD and Southwest Florida WMD for similar tables. 3. Regional Water Supply Authority plan and publications. 4. Comprehensive plans of adjacent local governments if they supply water to portions of your jurisdiction. 5. Plans or other documents from public or private utilities serving areas within your jurisdiction. Selected Contacts: Florida Department of Community Affairs http•//www dca state fl us/fdcy/DCP/WaterSupplyPlannin /g water supply„plannin~.htm Pilot Communities The Department contracted with five communities, one in each water management district, to prepare a pilot Work Plan in advance of their statutory deadline. The pilot project Work Plans are available as examples on a CD-ROM from the Department and are located on the Department's website. The pilot communities contacts are: City of Cocoa Mr. Nelson Lau 321-639-7549 nlau(a~cocoafl.org City of Lake City Mr. Larry Lee 386-752-2031 Lcldgnisgroup.net Okaloosa County Page 18 of 21 • • Ms. Pat Blackshear, AICP 850-651-7180 Qblackshear(a~co.olcaloosa.fl.us Palm Beach County Mr. Isaac Hoyos 561-233-5347 IHOYOS~a,CO.PALM-BEACH.FL.US City of Venice Mr. Marty Black, AICP 941-486-2626 mblackna,ci.venice. fl.us Water Management Districts: South Florida WMD Name: Henry Bittaker Phone: s/c 229-6792; 561-682-6792; 800-432-2045, ext 6792 E-mail: hbittaknsfwmd.g_ov Website: www.sfwmd.gov Name: P.K. Sharma (LGCP Reviews) Phone: s/c 229-6779; 561-682-6779; 800-432-2045, ext. 6779 E-mail: psharma(a~sfwmd.gov Lower East Coast RWSP: Jim Jackson, 800-432-2045 ext. 6334 Kissimmee RWSP: Chris Sweazy; 800-250-4250 ext. 3822 Upper East Coast RWSP: Sharon Fowler; 800-432-2045 ext. 6155 Lower West Coast RWSP: Bonnie Kramer; 800-248-1201 ext 7122 St. Johns River WMD Name: Jeff Cole, Assistant Director, Office of Communications and Governmental Affairs PO Box 1429 Palatka, FL 32178-1429 Phone: s/c 860-4497; 386-329-4497 Fax: 386-329-4103 E-mail: jcole(a~Lsjrwmd.com Website: http://sjrwmd.com Southwest Florida WMD Name: Richard Owen, AICP Phone: 352-796-7211 or 800-423-1476 Fax: 352-754-6749 E-mail: Richard.Owen(a,swfwmd.state.fl.us Website: www.swfwmd.state.fl.us Page 19 of 21 • • Suwarmee River WMD Name: David Still Phone:386-362-1001;800-226-1066 e-mail: still d~a srwmd.state.fl.us Website: www.srwmd.state.fl.us Northwest Florida WMD Name: Tyler Macmillan, AICP Phone: 850-539-5999; s/c 771-2080, ext. 133 Fax: 850-539-4380 e-mail: Tyler.Macmillan(c~nwfwmd.state.fl.us Website: http://sun6.dms.state.fl.us/nwfwmd/ FDEP Name: Janet Llewellyn, Deputy Director, Division of Water Resources Management Phone: 850-488-0784; s/c 272-6407 Fax: 850-488-2118 e-mail: Janet.Llewellyn(a~dep.state.fl.us Website: Regional Water Supply Authorities Peace River-Manasota Regional Water Suppl~Authority (covers Charlotte, Desoto, Manatee and Sarasota counties) Name: Patrick J. Lehman Phone: 941-316-1776 Fax: 941-316-1772 e-mail: peacemana(a),aol.com Tampa Bay Water (cover Hillsborough ,Pasco ,and Pinellas counties) Name: Paula Dye, AICP, Chief Environmental Planner Phone: 727-796-2355 Fax: 727-701-2340 e-mail: pdye(a,tampabaywater.org Website: www.tampabaywater.or~ Walton/Okaloosa/Santa Rosa Regional Utility Authority (cover Okaloosa, Santa Rosa and Walton counties) Name: Terry A. Joseph Phone: 850-595-8910 Fax:850-595-8967 e-mail: josepht(a~wfi~c.dst.fl.us Page 20 of 21 • Withlacoochee Regional Water Supply Authority (cover Citrus, Hernando, Marion and Sumter counties) Name: Jackson E. Sullivan Phone: 850-385-0220 Fax:850-385-0223 e-mail: jsullivan(a~carltonfields.com Page 21 of 21 i PARSONS Table 1 Summary of capital and annual operating and maintenance costs for new production facilities. ~P I~F(~ 3' 3 I-0~ Capital Investment Annual Operating & Maintenance Costs Option Description Reduction in Purchased Water from Pinellas County (mgd) Construction Costs' $ Other Costs' l$) Total Capital Costs' ($ Operating 8 Maintenance Costs' ($) Power & Chemical Costs' l$1 Total Operating Costs' ($1 2 Addition of fresh water wells near Reservoir No. 3 for 1-m d rotational ca acit 0.0 $ 1,990,265 $ 497,566 $ 2,487,832 5 28.046 S 1 a aye S x2.502 3 Addition of light brackish wells and expansion of Reservoir No 1 b~~ 1-m d 1 0 S 8,450,028 $ 2.112,507 $ 10,562,535 S ?40,332 3 313,788 5 454.120 12 Neti•~ surface water treatment plant at Reservoir No 2 for treatment of Aili ator Lake 1 08 S 8.445,922 S 2,111.480 3 10,557,402 5 589,C61 $ 170,832 S 759,893 14 New desalination treatment plant at Reservoir No 2 with brine dischar e to Clearvrater Beach 5-0 S 36,902,376 S 9,225,594 3 46.127,970 $ 3,846.555 15 New desalination treatment plant at Reservoir No. 2 with bane dischar a to Tam a Ba 5.0 ~ 29,136,397 3 7,284,099 ~ 36,420,496 $ 3,776,219 16 New light brackish treatment plant at Reservoir No 2 e/i(h brine dischar a to Tam a Ba 3.0 $ 16.267,094 $ 4,066,774 $ 20,333,868 $ 287.679 $ 1,231,546 $ 1,519,225 (1) Listed costs shown are in 2004 dollars Draft 3/30/2004 w PARSONS Table 2 Summary of project costs and associated maintenance and operations costs for improvements to existing facilities. Ranking Description Discipline Construction Costs''2 Project Costs'' Maintenance Costs''a'S Operations Costs''a,e .... s ,. SCADA & Instrumentation $ - $ - $ - $ - Auxilia Power $ 771,500 $ 961,450 $ 18,200 $ 21,000 1 Safety or Code Violation Other $ 37,245 $ 45,425 $ - $ Well Pum Re lacement $ - $ - $ - $ - Total $ 808,745 $ 1,006,875 $ 18,200 $ 21,000 . a _ ... _ ~ ,:_ -~ ~ ~ .. SCADA & Instrumentation $ 488,575 $ 610,719 $ 11,400 $ - Significant cost savings and/or Auxilia Power $ - $ - $ - $ - 2 preventive maintenance to avoid costly Other $ 134,495 $ 162,637 $ 600 $ repair Well Pum Re lacement $ 259,429 $ 324,286 $ 31,763 $ 110,695 Total $ 882,499 $ 1,097,642 $ 43,763 $ 110,695 SCADA & Instrumentation $ 282,200 $ 352,750 $ 9,100 $ - Auxilia Power $ - $ - $ - $ - 3 Cosmetic or Aesthetic Other $ 75,060 $ 80,541 $ - $ - Well Pum Re lacement $ - $ - $ - $ - Total $ 357,260 $ 433,291 $ 9,100 $ - SCADA & Instrumentation $ 770,775 $ 963,469 $ 20,500 $ - Auxilia Power $ 771,500 $ 961,450 $ 18,200 $ 21,000 Totals Other $ 246,800 $ 288,603 $ 600 $ - Well Pum Re lacement $ 259,429 $ 324,286 $ 31,763 $ 110,695 Total $ 2,048,504 $ 2,537,808 $ 71,063 $ 131,695 (1) Listed costs shown are in 2004 dollars (2) Construction costs includes procurement and installation of equipment, materials and labor. (3) Project costs include construction costs plus 10% markup for items requiring contractors mobilization and general overhead. For those items requiring engineering services an additional 15% markup has been included. (4) Maintenance and operations costs listed are only those associated with the respective improvements (5) For those items requiring routine maintenance of equipment an estimate was provided based on 1.5 % of construction costs unless otherwise provided. (6) For the items requiring additional operational labor an estimate was provided based on 1.5 % of construction costs unless otherwise provided. L~ •~ Draft 3/30/2004 r ~ Clayton, Gina From: Fahey, Robert Sent: Thursday, March 18, 2004 11:16 AM To: Clayton, Gina; Tarapani, Cyndi Subject: RE: Rate Study Meeting Change 1650 N. Arcturas, Bldg "C". Take Drew Street east to Hercules and turn north. Before you reach the railroad, turn west onto Sherwood. Go to the end of the street and turn right -you will see the entrance to the Public Utilities complex. Bldg "C" is the office building in back (farthest west). -----Original Message----- From: Clayton, Gina Sent: Thursday, March 18, 2004 11:10 AM To: Fahey, Robert; Tarapani, Cyndi Subject: RE: Rate Study Meeting Change Can you tell me where that is? -----Original Message----- From: Fahey, Robert Sent: Thursday, March 18, 2004 10:06 AM To: Tarapani, Cyndi; Clayton, Gina Subject: FW: Rate Study Meeting Change Hi Cyndi, This 9:30 meeting is with the Water Master Plan consultant, and it looks like it will be held at the Public Utilities Complex. Please let me know if this presents a problem. Rob -----Original Message----- From: Davis, Laura M. Sent: Thursday, March 18, 2004 9:24 AM To: Neff, Andrew; 'loren.furland@parsons.com'; 'ttriedrich@jea.net'; 'slee@mckimcreed.com'; 'dmccullers@tbegroup.com' Cc: Murrin, Lisa; Fahey, Robert; Arasteh, Mahshid; Manni, Diane; 'mburton@burtonandassociates.com'; Bush, Keith; Badami, Louis; Grantham, Judith; Milligan, John; Oster, Scott; Petrie,Todd; Sickler, Neil David (Dave) Subject: RE: Rate Study Meeting Change Meetings with Parsons &JEA are confirmed for 3/31 @ 9:30 & 10:30, in the Public Utilities Conference Roam. Planning is also confirmed to attend. -----Original Message----- From: Neff, Andrew Sent: Tuesday, March 16, 2004 3:34 PM To: 'loren.furland@parsons.com'; 'tfriedrich@jea.net'; 'slee@mckimcreed.com'; 'dmccullers@tbegroup.com' Cc: Murrin, Lisa; Fahey, Robert; Arasteh, Mahshid; Manni, Diane; 'mburton@burtonandassociates.com'; Bush, Keith; Davis, Laura M.; Badami, Louis; Davis, Laura M.; Grantham, Judith; Milligan, John; Oster, Scott; Petrie,Todd; Sickler, Neil David (Dave) Subject: Rate Study Meeting Change The meeting originally scheduled for March 31st for the first run of the options has been delayed until April 16th from 10-1 at the MSB, room 130, due to key people being unavailable. However, I'd like to take advantage of the time since we had planned to meet and it's on people's schedules to review the projects/options. This meeting would just include Parsons and JEA. We'd like to get a better understanding of the water projects being considered and the East Plant potential closure--including O&M impacts and costs. Further, we could also discuss the comp plan issues with Parsons at this same time since we had planned to set up a separate meeting with Planning (Rob--can you coordinate?). The action items conveyed last Monday still apply and will be reviewed at this meeting prior to sending to Burton. So that we don't waste peop~ time, I thought we could meet with Parso~t 09:30-10:30, then JEA from 10:30- 11:30 on March 31st. Thought we'd meet here at PU if possible (Laura, can you set this up?). The April 16th meeting is mandatory! Any thoughts, please share them. Thanks. -----Original Message----- From: Katsougrakis, Dina Sent: Tuesday, March 16, 2004 2:01 PM To: Neff, Andrew; Petrie,Todd; Grantham, Judith; Badami, Louis; Sickler, Neil David (Dave); Milligan, John; Arasteh, Mahshid; Bush, Keith; Simmons, Margie; Wilson, Tina Subject: RE: W/S Meeting This meeting will be held in room 130 at the MSB. thanks, Dina -----Original Message----- From: Katsougrakis, Dina Sent: Tuesday, March 16, 2004 1:52 PM To: Neff, Andrew; Petrie,Todd; Grantham, Judith; Badami, Louis; Sickler, Neil David (Dave); Milligan, John; Arasteh, Mahshid; Bush, Keith; Simmons, Margie; Wilson, Tina Subject: W/S Meeting Immediately following the stormwater meeting, please put on your calendars -Friday, April 16 from 10-1 for the W/S Meeting. Thanks, Dina Public Works Administration (727) 562-4782 i ~~~ I, ~ ~ S~ !~: ~~~, ~ -p ~.p. ~~cll~b~~ ~ ~ 0 _µu~~~.l --C~,le~G'P1o`-"'~~/Vko-~t . ~adP lets svlo,~ru~d So.YOaa1-cL°;p~. Ci'~4-f pbiu]_ ~U.Z70.n- ~~ 200 _l(9 c, we ~~~~'~. - ~~ ~ryh~'~cS~~Z w12.~" O ~ _-~NJ f~~s~r ~ ors . P~a~n rr-~+_ c~s~-r_~-es«~ c w-~n r~xa''z' -~~ ~ U~ --aaf-~rnei~Avr~~_ a~r~ -0#~10~- _~i~-e.Q~ vnwl- b~e. --1 -- ;~ - `6th °'{ .e.~R~43 _ rY~ cb~ (9_e... _avr~e n~ _-~u - -~~~~v~~ c~~oi~ -~ p ~ des - ~ ~~~ ~~ ~~_ ,_ sue- - ~ ~1, ~ - - 1~nU,~,~~C~~~i'~- '~ Ohu ~f,r~.v~~~cv~rp~,ra~-~ a~Geas ~ w~e, ~~~ ~~ . 1!~~ b~ s~-~rn- a~ l_ ~ ova c?~,~1. . Ye:.v~-- ~~x~ ~ ~~ ~ ~ l ~c`~ dcs~l~'c,bJh~_~;LQ,l~ f ('~_~~.P~s ~l lS . . ;_ i ... 1 ' ~ d. ~ ~' =- ~'-u t~ # ~ol~c, ~_ _~ ___. - V1n .. n e,t <.e, -_ ~ S- ~ec~r ~~~s{~~ ~~1~v~R.. ~c~v W i -G- S - ~v ~c~ u~l~ ~ ~~_ r~ ~~~ - - _ - ~~ ~ , ___ ~~ . ~~ ~. .~~~ ~lJ ~ ~ ~J l tQ. (~Y'~ t~-- m 1 ~~S`~-~5 ~~~e.. ae~vc~e. ~.rcals X S~.qr ~~1s~ ~- cQ.np,(,tl ,~scs ~ ~e.ru~~ "~~-1-1/-4\/ ~ ~~ p~ ~J ~! • , _~ S- - _ ~~ .~,.r I.~o~.~f ~x~J D ~}rt- ~ 6n~ he.. "~.~b.~b~Q. ~__ ~.O V~yp~2~ r( ~~s~ O~.Y~~,~tcn!5 _ rn~ ~Q~a..-~ ~i= ~r,a~-ao_,~.ea,.. - co~tS~(a ~'-.~n _ ~wS~' ~_ ~O_~~la~c~?tlri-~ - CO(T-~uw!~~ u~~~rnJ ~- Q~ ~c~p~t?u G~2m(~•~ ~ 5!!y(C~S iaQ 1~.Q.ojts_l_r,~-r'o-~v 'P ~~ ~U ~iQ~~. -lam 9e~. 7 D_n t~ Jp w~RS~r__~~~~ Q~ov~~ _ m~~e. u~~. ~ (~ av~ ~eo~~0 _.U~ lam c~~.9 ~ ~ ~ -~O ~.~~ v ~v i~~ ! • -~ ~~: I" ~! ~~ ~ _. r I~IIV ~' ~ `I ~ i1_~ ~ lv~! ' ~ ~ IS bQIPA/ISX~{ ^~ Y e% ' ~ , ~ _ __- _ gY -_ ~~,~JF~A)~~' oAC~! fns. ar yUeJAS~ ~_. . _ u. - ~ ~ _a - - - l~ Y~az~(- --add~~u_eru i -L~+~.e~ ~w ~ - - ~~ ` ~~ ~ -- .. _. _ I j ~j " ~ ~~~ h L ~~p ~I ~~L,~1~~~ S~ i~~l~~ ~~:~ e~ S' Potable Water Element 1 City of Clearwater Comprehensive Plan ~~~~ D~ C~ D[~ ~;~~ 6 ~~, ~. p~NN/N0 ~ ~ ia.>.. S Qr~,~ EygNJ q TFa Potable Water Element City of Clearwater I~ WanETiuM L Potable Water Element 2 City of Clearwater Comprehensive Plan TABLE OF CONTENTS . INTRODUCTION ....................................................................................... 3 Ii. GOALS, OBJECTIVES AND POLICIES ..........................................................4 III. INVENTORY AND ANALYSIS ..................................................................10 3.1 Operational Responsibility ..................................................................................................................10 3.2 Geographic Service Area and Predominant Land Uses ...............................................................10 3.3 Design Capacity and Current Demand of Existing Facilities ....................................................14 3.4 Level of Service ....................................................................................................................................... 26 3.5 Facility Capacity Analysis .................................................................................................................... 26 3.6 Performance and Condition of Existing Facilities ........................................................................30 3.7 Issues and Opportunities for Expansion and New Facilities ....................................................33 3.8 Natural Drainage and Groundwater Recharge ..............................................................................34 3.9 Existing Regulations and Programs Relating to Natural Drainage and Groundwater Recharge .......................................................................................................................................................... 36 3.10 Capital Improvement projects .........................................................................................................38 IV. APPENDIX A: CAPITAL IMPROVEMENTS PROJECTS ................................. 39 4. Potable Water Element 3 City of Clearwater Comprehensive Plan I. INTRODUCTION According to Florida Administrative Code section 9J-5.01 1, the purpose of the Potable Water Element is to assure that necessary public facilities and services correlate to future land use projections. Furthermore, the purpose of the Potable Water Element is to identify capital improvements and establish goals, objectives and policies that will ensure the City of Clearwater is able to supply quality drinking water of a sufficient quantity for current and future needs. The Potable Water Element focuses on the existing systems and facilities and projected system needs based on projected population growth and future land use ' in the City of Clearwater. This is accomplished through an inventory and analysis of existing data, identification of present and potential problems and their solutions, and projection of future potable water needs for specific planning periods. The City of Clearwater Water Master Plan Water System Assessment, prepared in June of 2004, and the City of Clearwater Water Master Plan Capital Improvements Implementation Master Plan, prepared in October 2004, serve as the primary data sources for the existing conditions inventory and analysis. Both reports were prepared by Parsons Corporation. The composition of the Potable Water Element follows the minimum data requirements outlined in Section 9J-5.01 1, FAC. For ease of reference, the Potable Water Element is organized into two major sections; the first outlines the Goals, Objectives and Policies relating to potable water and the second includes an Inventory and Analysis of the water system. Potable Water Element 4 City of Clearwater Comprehensive Plan II. GOALS, OBJECTIVES AND POLICIES 21. GOAL PROVIDE, DEVELOP, AND MAINTAIN A PERMANENT POTABLE WATER SUPPLY SYSTEM TO MEET ANTICIPATED DEMAND WHILE PROVIDING MAXIMUM PRACTICAL PROTECTION TO THE ENVIRONMENT AT A COST CONSISTENT WITH THE PUBLIC'S ABILITY AND WILLINGNESS TO PAY. 21.1 Objective - To maintain adequate Levels of Service for existing and future populations through the ye~ 15. Policies 21.1.1 The following Level of Service standards have been established for the City of Clearwater and shall be used in determining the availability of facility capacity and demand created by new development: Service Area Level of Service Standards Potable Water Facilities Average Water Consumption Rate City and County Water City Service Area 120 gallons per capita per day at a pressure of 40-45 psi. *Continue to maintain water consumption of one hundred twenty (120) GPCPD or less as per the conditions set forth by Clearwater's Water Use Permit. 21.2 Objective -Provide adequate quantities and qualities of water service to all customers of the Clearwater service area. Current service level (July, 2007) is 40,390 customer accounts (potable, reclaimed and fire). Policies 21.2.1 Ensure that land development regulations, building codes and City ordinances adequately address water system provisions by performing a thorough evaluation of City codes and by coordinating proposed provisions with the Southwest Florida Water Management District and Florida Department of Environmental Protection. Potable Water Element 5 City of Clearwater Comprehensive Plan 21.2.2 Engineering shall analyze the condition and adequacy of any water distribution system that the City may inherit through annexation and prepare cost estimates for upgrading those systems to meet City requirements. 21.2.3 When new subdivisions are being developed, it shall be the responsibility of the developer to provide internal potable water and reclaimed water systems which are constructed to City specifications. 21 .2.4Continue to construct water system improvements which will provide adequate quantity, pressure, and duration of fire flows while meeting system user needs. 21.2.5 Continue to develop a system and construct improvements which will conserve energy, water, and other valuable resources. 21.2.6 he City shall continue to participate and assist the Southwest Florida yj % Water Management District, Pinellas County Health Department, and the U.S. Environmental Protection Agency in developing innovative / techniques to augment existing water supplies to provide for future needs. ~ ~ ~~ ~ ~ 1 ~~j~", 0'~ ~~/ ~tia~-.-sP~ /~,~ ~ f-c ~i~, 21.2.7Continue to identify, acquire, and develop sources of water supply and methods of water treatment to meet existing and future needs. Some ways this can be accomplished are through well rehabilitation projects and/or exploration and drilling of new wells. Some type of water treatment may be initiated. Additional volumes of water may be acquired from the Pinellas County Water System through Clearwater's intergovernmental water service agreement. The City's long range Water Supply Master Plan completed in 2004 shall serve as the guiding document for water supply and treatment methods. Potable Water Element 6 City of Clearwater Comprehensive Plan 21.2.8 Ensure that water management projects are designed and operated to maintain and enhance natural systems as well as man made systems by working closely with the Southwest Florida Water Management District when proposing new projects and water management programs. The City's long term Water Supply Master Plan outlines a work plan for continued coordination with the Southwest Florida Water Management District's Regional Water Supply Plan adopted in December 2006. 21.2.9 Water service shall not be extended to properties outside the City's service area unless sufficient capacity and quality of water exists to serve the areas already committed to City service. 21.2.10 Water services shall not be extended except in those areas so designated for City of Clearwater by interlocal or other agreement. 21.3 Objective -Continue to maintain the water system in a safe, sound, and efficient manner on a daily basis. Policies 21.3.1 The Public Utilities Department, Water Division, shall monitor water quality and the operation of the water distribution system with the intent of repairing and replacing deficient portions of the system within the framework of the capitalized budgeting process. 21.3.2 Continue to provide a minimum operating pressure of 40-45 psi throughout the water distribution system. 21.3.3 Continue to provide adequate spacing of fire hydrants to provide optimum hose lays and fire flow. 21.3.4 Require at the time of application for connection to the public potable water system, that minimum fire flows and hydrant spacing be consistent with fire district standards. Also, require that proper size water pipes are installed to provide desired fire flow rates based on the most recent Insurance Service Office (ISO) Report. Potable Water Element City of Clearwater Comprehensive Plan 21.4 Objective -Continue to provide sound fiscal management for the operation and maintenance of potable water service in the City's service area- Policies 21.4.1 Fees charged users of water services shall continue to be adequate to cover system operating costs, repayments of capital costs, and allow for repair and replacement of existing facilities. The City shall also continue to evaluate new rate structures as necessary. 21.4.2 Prioritization and scheduling of major improvements associated with the water system should be accomplished as a component of the capital improvement program. 21.4.3 Funds set aside for repair and replacement of the water system shall not be diverted to other uses. 21 .4.4The City should continue to seek financial support of the water system through grant programs administered by appropriate State and Federal agencies. 21 .4.5The City shall continue to refine the inverted rate structure for residential water meters, lawn meters and all other water meters permitted by the Water Division of the Public Utilities Department. 21.5 Objective -Continue to Develop a potable water system that is compatible with the environment and seeks to conserve and protect sensitive natural resources. Policies 21.5.1 Except for areas of the City where reclaimed water is available, shallow wells shall be recognized as a source of water for irrigation purposes. Establish a City permit for shallow well installation by the end of 2008 Potable Water Element 8 City of Clearwater Comprehensive Plan 21.5.2 The City's building code shall include the requirement for water conserving fixtures in newly constructed or remodeled buildings. 21.5.3 Manage the supply of water in quantities which would minimize significant adverse impacts on the natural system and protect the long term public interest. 21 .5.4 Develop and modify rate structures and policies which encourage conservation of potable water. 21.5.5 The City shall maintain its current Water Restriction Ordinance. 21.5.6 Provide educational awareness to inform citizens of the need and opportunities for conserving potable water by visiting schools to speak with young children about water conservation practices. 21.5.7 eclaimed water service will continue to be extended to private (~ ~ residences based on the T~••"'`•• "^` "^,~ Master-Plana 21.6 Objective -Continue to achieve effective c ordination with other government agencies to solve problems of an extraterritorial nature with cooperation and in conjunction with the Southwest Florida Water Management District. Policies 21.6.1 The City shall continue to participate in regional and County-wide studies which are or may be formed to seek solutions of problems of an extraterritorial nature. 21.6.2 Continue to cooperate with the Southwest Florida Water Management District in developing environmental and hydrologic data that will identify safe and reliable potable water yields in existing and future well-fields. 21.6.3 Continue to coordinate with appropriate local, State, regional and Federal agencies in implementing the water system plan. t Potable Water Element 9 City of Clearwater Comprehensive Plan 21 .6.4The City shall pursue a coordinated approach to interjurisdictional problems, by providing support of both staff and officials to participate in conservation efforts with Pinellas County and the Tampa Bay Regional Planning Council. oS G ' 21 .6.5 sure consistency with the actions defined within the Regional Water ~' Supply Plan prepared by the Southwest Water Management District 21.7 Objective -Continue to protect all natural recharge areas having functional hydrological characteristics. Policies 21 .7.1 Recognize the importance of groundwater aquifer recharge in the hydrological process and the need for natural groundwater recharge as an integral component of the City's urban environment. 21.7.2 The City of shall include incentives in the Community Development Code for the protection of natural groundwater aquifer recharge areas as identified in the Conservation Element of the Clearwater Comprehensive Plan. 21.7.3 The City shall continue to protect groundwater quality by enforcing Wellhead Protection Ordinance. Potable Water Element to City of Clearwater Comprehensive Plan III. INVENTORY AND ANALYSIS Section 9J-5.003, FAC, defines a potable water facility as a system of structures designed to collect, treat, or distribute potable water, and includes water wells, treatment plants, reservoirs, and distribution mains. The following section details the existing conditions of the City of Cfearwater's water system, with the purpose of identifying future water system needs. 3.1 Operational Responsibility The City of Clearwater Water Division is a municipally operated water supplier, charged with the responsibility of administering the City's water utility. In 2006, the City of Clearwater Water Division supplied more than 5.15 billion gallons of water to more than 140,000 customers, amounting to approximately 100 gallons of water per person per day. The division maintains 4,036 fire hydrants, 8,329 valves and 588 miles of water mains.' Users of the City of Clearwater water system consume approximately 13 million gallons of potable water every day. Approximately 37 percent is pumped from City owned and operated groundwater wells; the remaining 63 percent of the daily demand is supplied by water purchased from Pinellas County. Pinellas County also receives water supplied by the regional water supplier, Tampa Bay Water, which in turn becomes part of the 63 percent supplied to the customers of Clearwater.z 3.2 Geographic Service Area and Predominant Land Uses The geographic service area for the City's water system extends beyond the City limits and represents an area of approximatley 54 square miles in size. The majority of the customers beyond the City limits are located within unincorporated Pinellas County enclaves within the City of Clearwater. The boundaries of the water service area generally extend from the Gulf of Mexico to the west, the City of Dunedin to the north, the City of Safety Harbor and Tampa Bay to the east, and the cities of Largo, Bellair, and Bellair Beach to the south. Map 1 shows the geographic service area of the City of Clearwater potable water system. ~ Public Utilities -Water Division. City of Clearwater Website. Accessed July 2007. Http:l/www.clearwater- fl. com/govldeptslpwalpublic_utilsldivisionslwaterlindex.asp. z Cify of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. ~lea~water Map 1 Water Service Area Q City of Gearwater Water Service Area - Major Roads Jurisdictional Boundaries ~ --- j City of Gearwater Other Cities ,~ ,j Unincorporated Pinellas County 0 0.5 1 2 3 Miles Source: City of Clearwater Water Department, 2007; Pinellas County GIS, 2007. Prepared by Wade 7rlm, Inc., August 2007 for-City of Clearwater Water Supply Element. WADETRIM Potable Water Element 12 City of Clearwater Comprehensive Plan According to the U.S. Census Bureau, the City of Clearwater is estimated to have a total population of 107,742 as of july 1 , 2006.3 However, the City's water service area extends beyond the City limits to include numerous unincorporated Pinellas County enclaves. Thus, to determine the population of the City's water service area, a broader figure that includes both the City population and enclave population must be utilized. Because it includes the City of Clearwater in addition to all interior county enclaves, the Pinellas County Planning Sector 6 closely matches the City of Clearwater's water service area. Therefore, population projections for Planning Sector 6, which have been calculated by the Pinellas County Planning Department, will be utilized for this Potable Water Element. Using the projections from Pinellas County for permanent, seasonal, and tourist populations, the functional population of the water service area can be determined based on the following formula: Functional Population = ((permanent + seasonal) x 41 + (permanent x 81 + tourist 12 2 This formula is based on Water Use Caution Area (WUCA) rules with the purpose of making adjustments for seasonal residents and tourists.4 Once calculated, the functional population figure represents the value utilized to calculate the gross per capita water consumption for the City. Table 1 details the projected service area population served by the City of Clearwater's water system through the year 2025. s Annual Estimates of the Population for Incorporated Places in Florida, April 1, 2000 to July 1, 2006. U.S. Census Bureau. June 28, 2007. a City of Clearwater Water Master Plan, Capital Improvements Implementation Master Plan. Parsons Corporation. October 2004. Potable Water Element i3 City of Clearwater Comprehensive Plan Table 1 Clearwater Water Service Area Population Projections (a) •.. 2005 135, 071 6, 074 19, 472 160 , 616 146 , 832 2006 135,400 6,088 19,488 160,975 147,173 2007 135,728 6,102 19,504 161,333 147,514 2008 136,057 6,115 19,519 161,692 147,855 2009 136,385 6,129 19,535 162,050 148,196 2010 136,714 6,143 19,551 162,408 148,537 2011 136,930 6,152 19,562 162,644 148,761 2012 137,146 6,161 19,572 162,879 148,986 2013 137,361 6,171 19,583 163,115 149,210 2014 137,577 6,180 19,593 163,350 149,434 2015 137,793 6,189 19,604 163,585 149,658 2016 137,934 6,195 19,611 163,740 149,805 2017 138,076 6,201 19,618 163,894 149,951 2018 138,217 6,206 19,624 164,048 150,098 2019 138,359 6,212 19,631 164,202 150,245 2020 138,500 6,218 19,638 164,356 150,392 2021 138,592 6,222 19,642 164,457 150,488 2022 138,685 6,226 19,647 164,558 150,584 2023 138,777 6,230 19,651 164,658 150,679 2024 138,870 6,234 19,656 164,759 150 775 2025 138,962 6,238 19,660 164,860 50,871 (a) For the purpose of this analysis, the population projection for Pinellas County Planning Sector 6 ~~ (Greater Clearwater Area), which closely represents the Clearwater water service area, is utilized. (b) Seasonal population is defined as persons who reside in Pinellas County for less than six months and declare their permanent home elsewhere. (c) Tourist population is the impact that tourists have on public services and facilities that are comparable to the impact of permanent residents. (d) Functional population is calculated by Water Use Caution Area (WUCA) rules (see text). Source for years 2005, 2010, 2015, 2020, and 2025: Pinellas County Population Projections by Planning Sector, 2005-2030, Pinellas County Planning Department, February 2001. - Source for all other years: Data extrapolated from Pinellas County Planning Department. P~~ Potable Water Element 14 City of Clearwater Comprehensive Plan The City of Clearwater is an urban and predominantly built-out city and features a diverse mix of land uses. Within downtown Clearwater, a dense mix of institutional, commercial, office, recreational and high density residential land uses are found. In addition to downtown, the Clearwater Beach area features a dense mix of land uses that include major commercial/resort destinations, high density residential developments, and recreational uses. Intensive commercial land uses, including regional commercial shopping centers are scattered along the City's major transportation arteries, particularly Gulf-to-Bay Boulevard and U.S. Highway 19. The majority of the rest of the City is dominated by well established single- family neighborhoods, intermixed with supportive institutional and recreational uses. Map 2 shows the existing land uses found within the City of Clearwater water service area. 3.3 Design Capacity and Current Demand of Existing Facilities. Water Wells and Treatment Facilities ~~ Potable water within the City of .Clearwater is provided by 22 City-operated fresh ~~,~ ~ water wells (1 7 active and 5 inactive) and six interconnects with the Pinellas County ~J~'' ~ water system. Although it is currently not used, the City has access to the water f~os-fi system of the City of St. Petersburg though an emergency interconnect. The City's p ,~,,~'~ water wells are located in close proximity to three treatment and storage facilities: ~/" U _,r-~ Reservoirs Nos. 1 , 2, and 3. The interconnects to the Pinellas County system are ~ ~''.~'"' found at various locations in the City: Reservoir No. 2; Reservoir No. 3; along Belcher Road near the intersections with Drew Street, Gulf-to-Bay (SR 60), and °S Belleair Road; and at South Sand Keys The locations of the various water supply ~C~l~ facilities within Clearwater are illustrated on Map 3. ~ \, t~ ~ `F~~j\MG~ Pinellas County water is purchased by the City of Clearwater through an Y ,t p, ~ intergovernmental agreement as a means to augment the City's groundwater ~`' . ~ sources and to meet the City's water demands. In the 2002 water year, an average ~~~` of 1 1.5-mgd of water was purchased by the City from Pinellas County. In the Fall ~~ of 2003, after a reverse osmosis treatment facility was implemented at Reservoir U~ No. 1, the City was able to reduce the amount of water purchased from the County by a net of 2-mgd.6 e City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. s City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004.. ~learwa ter Map 2 Existing Land Uses Jurisdictional Boundaries Existing Land Use 2005 OiherCities Category ~~ Pinellas County Single Family - Major Roads Mobile Home ~ Duplex or Triplex t~~._~1 Multi-Family r-...._::,r Commercial Industrial ^-'-n !.,......_~ PubIIGSemi-Public b RecreatioNOpen Space Vacant ConservalioatPreservation Marinas Surface Water [A] 0 0.5 1 2 3 Miles Source: Pinellas County GIS, 2005. Prepared lay Watle Trim, Inc., August 2007 forCity of Clearwater Water Supply Element. WADETRIM ~ ~ wx ---r ,~ ti. ~ ~ q ....~~ - ~,,~ ~ / ea G~.tio^~~ cr, - ~" ~~ v.. ~ ~1~ ~"JRtlw Rtl D i ~. , ;~ 1 '° ,, ~~ e°0 "v?~eHwe ~ ; /4 ,.,...~~ ; ~ ~ f`,, ,~ ,~~ ~ ~~~ Pa ;, ~ rx ~ ~ ~ti QT A / '~ ~-~ ~'.-~ ~~ ~' //%o%// ~ v ~ / 9 Jr ~ /9pLOH AY ! ~ ,, ,% ~ - ~' ~ ~ ~ ~' `/ S ]J OHRI3TOP' ER Ilq ~" +. e , '~~, /1 ,r ,~~N„~ sr/,. } sR o,'? / ~ ~~ ~ ~ { ~- l u sY` . ~ ~ ---s , L ~ ': rn~ d -. o sileraet ab-rr ~~ ~5 0 = . ~ ~Otten Tank- _' ~ ~ ~ ~~~ ~° _ ~ .~ a ~ RO faallty ~~~ ~ ~ $ ~ W WiLNE (S MGj ~' ., ~, ~ t~ Y Y `fir F ~, . .~ t I:i1NC 9L .. OURTSF' l I.. '1 ~ ¢ -R D RD, u 1 z m Y a ~ N~~ „ ~ ~ yy Y d ~.~ ~ w ~ L0.K iE7Y $ 7 _ m ,' GreenWOOd1MLK~Tank ~~, (1 MCj ~~ S _ ~~ lMC6RY RA - t ~/1 n - 34+f ii '~ v ~%~e// j q~ ~ ~ RbsET+r n~ axi ~ '77T`` ~ '/ / ~,u ~ z /_' / f/ / ~ ; ~ / /; y~(-' G .J ~ 0 NLeNeI~C qR-A' /S ~ -,C ~~ ~ ~ /, ~ / ~af %( t / .~ / i f g ~ ~ / ~ /~ i~ teni?aewuHeswY_ ~ ~ r ~r^ ,ti/sr elroxi ,'';/ '-j, ~ <'~~ /. ~~~~GS~ar~ ~. _~ :;~; \ , ~. ~$ , y %~f////~ 7Y ~ .f o AYL N~ ~ ` ~~ TS~ ~ ~. ~ / i i F A~ / f ~l~arwat~~ ( ~ ry -~ ~ t~t ; ~ ~ r---ll -- ~a ` ~ Resevoir Pia ~ { i 1 ka e~ (10 MG) ~ ~ A J ~ ~ ~ ~~ , ~ F n~E~ ,~r „~ { ~ > ~ ~ ~r_ , , u ~ RSHALl9 f ~j / / ' ~^~' 3 ©NgNST ~~ ~ ~ N r e I ~ `.. " ~ ~ ~ "~' / ~~ _ ~ pH~ ~ ~:.Y Y h~ ~~ ~'~t { ~ ~ + ` ,sc 7 p ~~,,,.,,,, ~ y ~ i = ~ -REW ST h ~ ! 7, 3~ ° ~ del Oro Tark ` `' ~ r ~' ~,.e ~i (10.1 G} ,r~.' GOUAINEY ' T YRi. Y ReGCV01f tY2 $ '! (5 MG) R~' ~R ~~ RNgL ~^ ~ ~ .~ ~ ~ ~' I m , ~---^~, G ~, ~ .. ~ ~ ~y ±~ $ / / TNk~'RV Map 3 Potable Water Supply Facilities Elevated Potable Water Tank Potable Water Stange Reservoirs Water Welis Status In Service Out of Service Plugged Q Proposed MonRor Well -Major Roads Jurisdictional Boundaries City of Clearwater Other Cities _; Unincorporated Pinellas County 0 0.5 1 2 3 Miles Source: City of-Clearwater Water Department. 2007; Pinellas County GIS, 2007. Prepared by Wade Trim, Inc., August 2007 forCityof Clsarvaler Water Supply Element. Ea WAnETx~ Potable Water Element 17 City of Clearwater Comprehensive Plan In general, the groundwater source for both Clearwater and Pinellas County comes from a groundwater supply called the Floridan Aquifer. More specifically, the City water sources are 22 groundwater wells, while Pinellas County potable water is obtained from two different sources: Tampa Bay Water's regional water system; and fresh water from Eldridge Wilde wellfields. Tampa Bay Water is a local wholesaler providing water to six local governments in the Tampa Bay metropolitan area. Multiple sources contribute to Tampa Bay Water's regional water supply; these include groundwater and surface water from around the Tampa Bay metropolitan area and saline water from Tampa Bay. A summary of the daily production rates for the three reservoirs is provided in Table 2. The table also details the relative production provided by the City and the production provided by Pinellas County. Table 2 Summary of Daily Productions by Source The values reflect the addition of a reverse osmosis facility at Reservoir No. 1, which, at the time of the preparation of the Water System Assessment (Clearwater Water Master Plan), was expected to reduce the amount of water purchased from Pinellas County by a net of 2-million gallons per day (mgd) on a long term basis. The average daily demand for potable water within the City of Clearwater water service area totals 13-mgd, of which 63 percent is provided by Pinellas County and 37 percent is provided by the City's wells. According to the City's water use permit issued through the Southwest Florida Water Management District (SWFWMD), the City is allowed to pump a maximum of 6.25-mgd from its wells. "Value listed represents finished blended water capacity. In order to produce the 3-mgd blended finished water capacity requires 3.6-mgd of well water, 0.6-mgd of which is concentrate that is discharged to the sanitary sewer. ""Water provided by Pinellas County interconnects located on-site with existing City of Clearwater facilities. Source: City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. Potable Water Element 18 City of Clearwater Comprehensive Plan Reservoir No. 1 is located on Palmetto Street near Saturn Avenue and consists of a reverse osmosis water treatment plant, a single 5 million gallon (mg) storage tank, chloramination facilities for disinfection, and a high service pumping station. Reservoir 1 utilizes 3.6-mgd of raw groundwater to produce 3-mgd of treated potable water. The Reverse osmosis plant uses 2.6-mgd of water to produce 2.0- mgd of permeate which is blended with 1.0-mgd of pre-treated by-passed water, attaining a total of 3-mgd of potable drinking water. Feed water to the plant comes from 10 active wells (Well Nos. 23, 31 , 48, 65, 66, 73, 74, 75, 78 and 81). Production from Well 81 is limited due to the need for a sand pack to prevent sand from entering the well. Reservoir No. 2 is located near the intersection of US 19 and Drew Street and consists of a single 5-mg storage tank, chloramination facilities, and a high service pumping station. Feed water to the plant comes from 3 active wells (Well Nos. 45, 46 and 53). Two additional inactive wells are also connected (Well Nos. 51 and 52). Water from the wells can vary but typically provide on average 0.6 mgd. Also on- site is an interconnect with Pinellas County that provides on average 1.5-mgd. Water from both the wells and interconnect are blended in the 5-mg storage tank. Chlorine and ammonia are added to boost the chloramine concentration of the incoming water. The high service pumps then deliver the finished water to the distribution system.$ Reservoir No. 3, located near the intersection of Countryside Blvd. and State Road 580, consists of two 5-mg storage tanks, chloramination facilities, and a high service pumping station. Feed water to the plant comes from 5 active wells (Well Nos. 56, 58, 68, 69, and 77). Water from the wells can vary but typically provide on average 1.2-mgd. Also on site is an interconnect with Pinellas County that provides on average 7-mgd. Water from both the wells and interconnect are blended in the 5-mg storage tank. Chlorine and ammonia are added to boost the chloramine concentration of the incoming water. The high service pumps then deliver. the finished water to the distribution system.9 ~ City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. s City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. s City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. Potable Water Element 19 City of Clearwater Comprehensive Plan Elevated Storac-e Tanks The City of Clearwater operates three 1 million gallon (mg) elevated storage tanks to provide additional storage capacity, consistent distribution system pressure, and to respond to emergency demands such as fire. The three elevated storage tanks are identified and located as follows: Del Oro, located near the intersection of McMullen-Booth Road and Drew; Martin Luther King, located near the intersection of Bellevue Blvd. and Martin Luther King; and Otten Street, located near the intersection of Otten Street and Highland Ave. At the time of the preparation of the Clearwater Water Master Plan Water System Assessment Qune 2004), the three elevated storage tanks were valved-off due to water stagnation issues and degradation of water quality. However, the City has since placed the Martin Luther King and Otten Street tanks back into service in order to maintain an adequate level of service and for additional emergency storage capabilities.~o With regard to the total capacity of drinking water sources and treatment facilities, Chapter 62-555(6) of the Florida Administrative Code states that: The total capacity of a// water sources and treatment faci/ities connected to a water system sha// at /east equal the water system's design maximum-day water demand (including design fire-f/ow demand if ire protection is being provided). In total, the City has a storage capacity of 23-mgd provided by the four 5-mgd storage tanks at Reservoirs 1, 2 and 3 and the three 1-mgd elevated storage tanks. However, at the time of the Clearwater Water Master Plan Water System Assessment the City's total storage capacity was estimated at 20-mgd, not calculating the capacity of the elevated storage tanks because of their stagnation and water quality issues. In addition to the City's own storage capacity, Pinellas County provides the City with some storage capacity through the interconnections. However, the exact amount of storage capacity available to the City through Pinellas County is unknown.>> Based on the Water System Assessment report, the City's design maximum-day potable water demand is estimated at 19-mgd. At 20-mgd, the City's current storage tank capacity is sufficient to achieve potable water design maximum-day ~~ City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. ~~ City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. Potable Water Element 20 City of Clearwater Comprehensive Plan demand according to Chapter 62-555 F.A.C. However, the Water System Assessment noted that this total capacity may be inadequate to achieve fire-flow demand. For this reason, and as noted above, two of the three 1-mgd elevated storage tanks were put back into service, but several modifications to the distribution system were recommended in the assessment to increase overall capacity, including distribution system pipe modifications, addition of booster pump stations, and addition of inter-distribution system storage tanks.12 Pumping Facilities High-service pumps are found at each of the City's three reservoirs to ensure distribution system capacity and pressure. These pumps ensure that water under sufficient pressure is delivered from the wellheads to the various storage and treatment facilities and then into the distribution system. Additionally, system capacity and pressure is supplemented through the six direct interconnections with the Pinellas County water system. With regard to required pumping capacity, Chapter 62-555.320(1 5) of the Florida Administrative Code states that: (a) Unless e/evated finished-drinking-water storage is provided, the total capacity of a// high-service pumping stations connected to a water system, or the capacity of a booster pumping station, sha// be sufficient to: 1. Meet at /east the water system's, or the booster station service area's, peak- hour water demand (and if fire protection is being provided, meet at /east the water system's, or the booster station service area's, design fire-f/ow rate p/us a background water demand equivalent to the maximum-day demand other than fire-f/ow demand); and 2. Maintain a minimum gauge pressure of ZO pounds per square inch throughout the water system's, or the booster station service area's, distribution system up to each customer's point of connection to the distribution system. (b) Where elevated finished-drinking-water storage is provided, the total capacity of a// high-service pumping stations connected to a water system, or the capacity 12 City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. Potable Water Element 21 City of Clearwater Comprehensive Plan of a booster pumping station, shall be sufficient to at least meet the water system's, or the booster station service area's, maximum-day water demand (inc/uding design fire-flow demand if fire protection is being provided) and to maintain distribution system pressure as specified in subparagraph 6Z- SSS.3Z0(1 S)(a)2., F.A. C. /n addition, the total capacity of the high-service pumping stations, or the capacity of the booster pumping station, combined with the useful elevated finished-water storage capacity sha// be sufficient to meet the water system's, or the booster station service area's, peak-hour water demand for at /east four consecutive hours (and if fire protection is being provided, sha// be sufficient to meet the water system's, or the booster station service area's, design fire-f/ow rate p/us a background water demand equivalent to the maximum-day demand other than fire-f/ow demand for the design fire-f/ow duration). As noted above, the City's' total water storage capacity may be inadequate to achieve fire-flow demand. Because pumping capacity is related to achieving sufficient storage capacity, improvements to the City's pumping capacity is warranted. The Clearwater Water Master Plan Water System Assessment notes that possible solutions include distribution system pipe modifications, addition off booster pump stations, and addition of inter-distribution system storage tanks.13 Distribution System The City of Clearwater's water distribution system includes more than 776 miles of water main, 40,000 water meters, 4,036 fire hydrants, 8,329 valves and 5,445 backflow devices. As shown in Map 4, the water distribution system effectively covers all lands within the City of Clearwater, including the unincorporated Pinellas County enclaves. (The Parsons Report includes did not include a summary and. assessment_of the distribution system. Do we have any additional data ,to include here? Js there any distribution system inventory by pipe size::and classification? ~(~ -,,,,(~,.L. ~. ,MN -~ t..J V s '~ ~;:.~GJ4. G2--U G.,. G~,~-~`-~~ Y ^"-~`-~ • 13 City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. ~~ ~ ~s~ ~~ear~vater u °~..>.°,~. ~, ~~°, Map 4 Fotable Water Distribution Mains City of Clearwater Water Service Area - Distribution Mains - Major Roads Jurisdictional Boundaries City of Clearwater Other Cities Unincorporated Pinellas County ^~ 0 0.5 1 2 3 Miles Source: Ciry of~Clearwater Wafer Department, 2007; Pinellas County GIS, 2007. Prepared by Wade Trim, Inc., August 2007 forCity of Clearwater Water Supply Element. WADETRIM Potable Water Element 23 City of Clearwater Comprehensive Plan Reclaimed Water System The City of Clearwater currently operates a reclaimed water system to ensure that adequate water is available today and in the future and that the City's residents have high quality water at an affordable price. The use of reclaimed water helps the City to preserve high quality potable water sources by providing a reliable and economical alternative source for irrigation water. Use of reclaimed water for irrigation can benefit the City because every gallon of potable water not used for irrigation is one less gallon of water purchased from Pinellas County. This has the potential of significant potable water savings given the escalating costs of purchasing water from Pinellas County.14 The City's reclaimed water system is the result of cooperative funding by the Southwest Florida Water Management District and the City of Clearwater. ~ 5 The City's reclaimed water system is shown on Map 5 and includes 51 miles of reclaimed water main. At present, reclaimed water service extends to the Countryside Country Club Golf Course and driving range, Chi Chi Rodriguez Golf Course and the soccer fields on McMullen Booth Road in the Countryside area, which are fed from the Northeast Treatment Plant. The Northeast Treatment Plant will also serve the reclaimed projects on the east side of Clearwater: Drew Union, Del Oro, Morningside, and Skycrest. The Marshall Street Plant feeds .Jack Russell Stadium, Pier 60 Park, Coachman Park as well as 1 ,400 customers on Island Estates and Clearwater Beach. In 2004, reclaimed water became available to the Harbor Oaks Area of Clearwater. This area also receives it supply from the Marshall Street Plant. Approximately 2,000 customers are now provided reclaimed water, with a current consumption in the range of 2 to 2.5-mgd. The City of Clearwater is currently designing the Skycrest Reclaimed Water Project which will include an east/west interconnection, pumping and storage facility. This interconnection will complete the loop within the City, resulting in both sides of the City being connected for future expansion of our reclaimed program.16 14 City of Clearwater Water Master Plan, Capital Improvements Implementation Master Plan. Parsons Corporation. October 2004. ,e City of Clearwater Reclaimed Water Master Plan. City of Clearwater Website. Http://www.clearwater- fl.com/gov/depts/pwa/public_utils/divisions/reclaimed/rcwater_plan.asp. 16 City of Clearwater Reclaimed Water Master Plan. City of Clearwater Website. Http://www.clearwater- fl.comlgovldepts/pwalpublic_utilsldivisionslreclaimed/rcwater_plan.asp. 1 ~lear~ater Map 5 Reclaimed Water Facilities • Reclamed Waler Fixtures - Reclaimed Wafer Lines - Major Roads Jurisdictional Boundaries I _ ~~ City of Clearwater Other Cities Unincorporated Pinellas County 0 0 0.5 1 2 3 Miles Source: City of~Cleanvater Water Department, 2007; Pinellas County GIS, 2007. Prepared by Wade Trim, Inc:, August 20D7 forCtty of Clearwater Water Supply Element. WADETRIM Potable Water Element 25 City of Clearwater Comprehensive Plan Future extensions are based on several factors, including lawn Irrigation usage/potential offset, proximity to existing reclaim sources, and infrastructure cost. The City of Clearwater has developed a Reclaimed Water Master Plan that includes a ZO-year schedule for reclaimed water extensions with the intent to develop up to 15-mgd of reclaimed water usage. Table 3 provides a summary of the reclaimed water projects included in the Master Plan. (Note: Need to review completed projects) Table 3 Reclaimed Water Master Plan, October 2001 ~5 Cam" °~ ~'1~~ 5 V`~~ (r~~ ~P~'1 Com leted or On Dirt Pro'ects Com leted Island Estates 3,700,000 Com leted N. Beach 2,400,000 Com leted S. Beach 1,700,000 Com leted Drew/Union Street 4,500,000 Com leted Harbor Oaks 2,600,000 Com leted Seville 1,200,000 Under Construction Del Oro Groves 3,400,000 Under Desi n Mornin side 4,200,000 Under Desi n 'Future Pro ects Sk crest .. 10,838,000 ~~~ 4 Sk crest 2,800,000 5 Coachman Ride 2,700,000 6 Enter rise 4,000,000 7 E. Drew Street 1,700,000 8 Count side South 4,800,000 9 Lake Park 3,000,000 10 South Be Lane 3,900,000 11 Count side North 5,000,000 12 North Greenwood 4,500,000 13 North Hercules 2,500,000 14 Count Club Estates 3,700,000 15 Clearwater Hi h 4,500,000 16 Glen Oaks 4,200,000 17 North Belcher 4,300,000 18 Palmetto Street 4,600,000 19 Clearwater Harbor 3,900,000 20 Woodmont 3,000,000 21 Hercules Industrial 1,700,000 22 Sunset Point 3,700,000 23 YMCA 3,100,000 24 S Ivan Abbe 2,500,000 25 Old Coachman • . 2,500,000 ~~~ Source: City of Clearwater Reclaimed City of Clearwater Reclaimed Water Master Plan. October 21, 2001 Potable Water Element 26 City of Clearwater Comprehensive Plan 3.4 Level of Service The existing Clearwater Comprehensive Plan has established the following Level of Service standards to be used in determining the availability of facility capacity and demand created by new development: 120 gallons per capita per day at a pressure of 40-45 psi. Potable water level of service is measured based on the rate of potable water consumption on a per person basis. This method of measurement provides an indicator of the demand placed on the potable water system and allows for tracking improvements in potable water conservation measures. As the rate of consumption decreases, the rate of success of potable water conservation measures increases. Based on the current potable water supply of 13-mgd allocated across the water service area's 2005 functional population of 146,832, the demand for potable water per capita per day is 88.5 gallons. This rate of demand is well within the adopted level of service. 3.5 Facility Capacity Analysis As highlighted in Table 2, the City of Clearwater's water system has an average potable water production capacity of 13 million gallons per day (mgd). What is the total potable water treatment capacity? As of 2005, the City of Clearwater's water system is estimated to have an average daily demand of 13.90-mgd. This is based on a functional population estimate of 146,832 for the water service area, and assumes a demand of 90.5 gallons per capita in addition to 610,000 gallons per day for significant water users.» The estimated average daily demand of 13.90-mgd also takes into account the planned future land uses of the City of Clearwater. Given that the City is almost completely built-out, significant population growth and the conversion of large undeveloped lands to urban use is not expected. The City's population is expected to increase only slightly, while the City's current ~~ City of Clearwater Water Master Plan, Capital Improvements Implementation Master Plan. Parsons Corporation. October 2004. Potable Water Element 27 City of Clearwater Comprehensive Plan distribution of land use is planned to be maintained generally in its present state. Rather, the Future Land Use Element of the Comprehensive Plan focuses on redevelopment efforts throughout the City, particularly within downtown Clearwater and the Clearwater Beach area. Based' on the total water production capacity of _ ___ and an estimated demand of . ~~ .13.90=.mgd for 2005, the City of Clearwater's water system currently has a Jf production surplus of _____. However, the estimated demand of 13.90-mgd does ~~,~ not account for the reduction in potable water demand resulting from the City's ~~~ reclaimed water system. Therefore, 15 and 25 percent water reuse offsets have \k~ been applied to the total demand, resulttng In an average dally demand of 13.69- .... mgd or 1 3.55-mgd, respectively.~$ Based on the total water production capacity of ______, a larger surplus of _____ with a 15 percent offset, or _____r with a 25 percent offset would result. Table 4 provides the projected annual average daily demand for the City of Clearwater water system during the initial 5-year planning increment through 2010. Table 4 Water System Average Daily Demand: 5 Year Planning Period Through 2010 (a) Functional Population is taken from Table 1. (b) Annual average daily demand is calculated based on-90.5 gallons per capita per daq plus 610,000 gallons per dayfor significant users other than hotels. (c) Average annual daily demand considering a 15 percent offset due to the use of reclaimed water for irrigation. (d) Average annual daily demand considering a 25 percent offset due to the use of reclaimed water for irrigation. Source: City of Clearwater Water Master Plan, Capital Improvements Implementation Master Plan. 18 City of Clearwater Water Master Plan, Capital Improvements Implementation Master Plan. Parsons Corporation. October 2004. Potable Water Element 28 City of Clearwater Comprehensive Plan The table also provides the annual average daily demand considering a 1 5 and 25 percent offset for water reuse based on the functional population. Without the offsets provided by the reclaimed water system, the average daily demand is projected to increase to 14.05-mgd by 2010. However, considering a conservative 15 percent offset for water reuse, the average daily demand would actually decline ~ /1~ to 13.35-mgd by 2010. A 25 percent offset results in an average daily demand of ~,d 12.88-mgd.19 Given he City's current production capacity of ______, in additior to ~' ! the reductions in demand resulting from the City's 20-year reclaimed water system ~ IvP/ improvement program, potable -water supply will be more han sufficient during ~/ the 5 year. planning period through 2010: Tab{e; 5 provides the projected annual average daily demand for the City of Clearwater water system during the remaining planning period, 2011 through 2025. By 2025, the water system service area is projected to have a functional population of 1 50,871, resulting in an annual average daily demand of 14.26-mgd. However, considering a conservative 15 percent offset for water reuse, the average daily demand would actually decline to 12.10-mgd by 2025. A 25 percent offset results in an average daily demand of 10.72-mgd by 2025. 19 City of Clearwater Water Master Plan, Capital Improvements Implementation Master Plan. Parsons Corporation. October 2004. Potable Water Element 29 City of Clearwater Comprehensive Plan Table 5 Water System Average Daily Demand: 2005 through 2025 /~ ~~~ i ~o, ~ ~~ ..- .. .- ..- 2005 146,832 13.90 13.69 13.55 2006 147,173 13.93 13.58 13.34 2007 147,514 13.96 13.51 13.21 2008 147,855 13.99 13.46 13.10 2009 148,196 14.02 13.37 12.93 2010 148,537 14.05 13.35 12.88 2011 148, 761 14.07 13.23 12.66 2012 148,986 14.09 13.16 12.53 2013 149,210 14.11 13.06 12.36 2014 149,434 14.13 12.94 12.15 2015 149,658 14.15 12.84 11.96 2016 149,805 14.17 2017 149,951 14.18 2018 150, 098 14.19 2019 150,245 14.21 2020 150,392 14.22 2021 150,488 14.23 2022 150,584 14.24 2023 150,679 14.25 2024 150, 775 14.26 2025 150,871 14.26 12.1 (e) 10.72 (e) (a).Functional Population is taken from Table 1. (b) Annual average daily demand is calculated based on 90.5 gallons per capita per day plus 610,000 gallons per day for significant users other than hotels. (c) Average annual daily demand considering a 15 percent offset due to the use of reclaimed water for irrigation. (d) Average annual daily demand considering a 25 percent offset due to the use of reclaimed water for irrigation. (e) Estimated by applying the percentage change between 2006 and 2015. Data Source 2011 through 2015: City of Clearwater Water Master Plan, Capital Improvements Implementation Master Plan. Parsons corporation. October 2004. Data Source 2016 through 2025: Based on functional population data from Table 1 and a continuation of the method utilized by the City of Clearwater Water Master Plan. Potable Water Element 30 City of Clearwater Comprehensive Plan Water Demand Projections According to The Regional Water Suppfy Plan 2005 -. •. ... .- 153,539 14.9 2010 155, 977 15.1 2015 157,654 15.3 2020 158,817 15.4 2025 159,632 15.5 Source: Southwest Florida Water Management District Regional Water Supply Plan, 2007 ~' , ~~Q'~,~,~'' u ~ GN~ ~~` ~~ Need to discuss: Master Plan Projections and our projections_do not 'match with: ~b is SWFWMD Regional-Water Supply Plan ad~ 3.6 Performance and Condition of Existing Facilities An assessment of the performance and condition of existing facilities was conducted as part of the City of Clearwater Water Master Plan, Water System Assessment, prepared in 2004. The assessment revealed that a variety of corrective measures are necessary to maintain existing levels of service. These recommended corrective measures are outlined below. Well Pump Corrosion Currently, corrosion in the vertical turbine pumps used at each raw water production well requires the periodic replacement and maintenance of the pump shaft and pump bowl assembly. Because this maintenance process is difficult and labor intensive, it is recommended that stainless. steel submersible pumps be utilized instead. The stainless steel construction of the submersible pumps helps to minimize corrosion, extending the useful life of the pumps.20 20 City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. Potable Water Element 31 City of Clearwater Comprehensive Plan Standby Power Requirements Chapter No. 62-555 F.A.C. states that each community water system shall provide standby power for operation of the water source, treatment, and pumping facilities necessary to deliver drinking water meeting all primary and secondary standards to meet the average daily demand for the system. The raw water production wells feeding Reservoir 1 are not currently provided with an auxiliary power source as needed to achieve compliance with Chapter 62-555, F.A.C. Two alternative corrective measures were evaluated: installation of a permanent generator or the purchase of portable generators. In the end, portable generators to serve the production wells were chosen as the preferred alternative given the cost savings. According to the Water System Assessment, backup generators with sufficient capacity are available to serve the treatment and storage facilities at Reservoirs 1 and 2, but not Reservoir 3. Therefore, the study recommended that the existing generator be replaced with a larger generator to handle the current load. Potable Water Element 32 City of Clearwater Comprehensive Plan Control and Monitoring Improvements In order to make control and monitoring of the City's water system centralized, it is recommended the City install the necessary Supervisory Control and Data Acquisition (SCADA) equipment at existing facilities to allow communications with the new network installed at Reservoir No. 1. This includes control and monitoring of Reservoirs Nos. 2 and 3, raw water wells and Pinellas County interconnections. For Reservoir Nos. 2 and 3, the raw water wells, and county interconnects, the Water System Assessment recommended that a radio telemetry system be established to enable effective communications between system facilities. At the county interconnects, it was recommended to add a remotely operated valve to open or close the interconnects. Storage Improvements As stated previously, the City's three elevated storage tanks face water stagnation ~~ issues with the potential result of degradation to water quality. At the time of the `1 Water System Assessment, the storage tanks were valved-off. Additionally, the ~~ 5 Water System Assessment noted that the City's storage tank capacity may be 2 inadequate to achieve fire-flow demand. Therefore, the study recommended the I^~~' elevated storage tanks to be placed back into service, restoring sufficient fire- 1~/ l'J~'`'~ flows to certain areas of the City. To alleviate the water stagnation issues at the ~~.-t' storage tanks, recommendations were outlined that included the installation of a mixing system, an altitude valve, isolation valve and small booster pump station to l~ ~ force water out of the storage tanks. To increase fire-flow capacity, the Water e ~i ~r~yw~~ System Assessment recommended the addition of inter-distribution system ~~ ~,~ ~Q storage tanks in combination with distribution system pipe modifications. ~'`s~ J` Pumping Improvements ~' Improvements to the City's pumping facilities are also necessary to improve fire- ~~ ~ flows. The Water System Assessment indicates that the current high service pumps are deficient in meeting fire-flow levels in some areas of the City. Therefore, ~,~" additional booster pump stations are recommended in conjunction with ~~" distribution system pipe modifications. Ju `~ v ~~ ~5 ~ k~ ~ ~~~ Potable Water Element 33 City of Clearwater Comprehensive Plan 3.7 Issues and Opportunities for Expansion and New Facilities One of the major goals for the City is to increase self sufficiency in water supply to control future costs. Presently, the City purchases approximately 8 million gallons of water from Pinellas County at a cost of approximately 7 million dollars per year. Over the years, wholesale water rates have increased and are projected to continually rise. To accomplish increased self sufficiency, the Capital Improvement Plan portion of the Water Master Plan outlines numerous projects involving the expansion of existing water production facilities or the construction of new water production facilities. Limited Source Water Opportunities The City of Clearwater is uniquely located between the Gulf of Mexico and Tampa Bay in an area that has relatively low rates of aquifer recharge. This results in limited quantities of fresh groundwater, and subsequently, limited opportunities to expand source water production. Source water quality continues to degrade due to increased chloride levels caused by pumping of wells in excess of long term safe yield capacities, but within existing water use permitted quantities.21 Chloride Cap Restriction C~" k~~ ~.,~ ~"n'' ~~,S t''>i' ~'`~ lv One of the greatest challenges in increasing capacity for existing production wells and the construction of new production wells is the Southwest Florida Water Management District's chloride cap of 250 mg/L. This chloride cap level is intended to serve as a guideline in evaluating trends and controlling the effects of wellfield withdraws on groundwater quality. ~~f~-DY7 ~ l ~ (,._ r'" -. ~,,5 LS5 fug ~ h~~~v~ ~~ G~ ~V ~s ~, ~J~ 21 City of Clearwater Water Master Plan, Capital Improvements Implementation Master Plan. Parsons Corporation. October 2004. W\ ~"~ ~ ~~~ ~~~ In order for the City to proceed with new and sustainable water resources as outlined in their Capital Improvement Plan, the chloride cap must be increased. To provide the necessary evidence to support an increase in the chloride cap, the City is planning to undertake a Chloride Monitoring Well Study. The first phase of this study will examine the effects in the vicinity of Reservoir Nos. 1 and 3, as the impact of this cap will limit the water production from these facilities first. In a later phase, a similar study will be initiated in the vicinity of Reservoir 2 and south Potable Water Element 34 City of Clearwater Comprehensive Plan of Gulf-to-Bay to support the development of a new reverse osmosis facility at Reservoir No. 2.zz Feasible New Groundwater Sources As part of the Capital Improvements Plan, the Water Master Plan identifies three improvement projects aimed at increasing water supply that are economically viable as well as technically feasible during the planning period. These three projects include: • Development of an additional 1-mgd of fresh groundwater supply and associated wells and transmission mains to connect to Reservoir No. 3; • Development of an additional 1-mgd of production capacity at Reservoir No. 1 by means of adding an additional 1.25-mgd of raw groundwater supply and expansion of the reverse osmosis facility; and, • Development of an additional 3.5-mgd of production capacity at Reservoir No. 2 by adding an additional 4.25-mgd of raw groundwater supply, transmission mains and a new, low-pressure reverse osmosis facility. As stated previously, these projects are partially dependent upon an increase to the SWFWMD's imposed chloride cap. However, even if the effort to raise the cap is unsuccessful, the proposed new production wells for Reservoir Nos. 1 and 3 are still recommended to be developed and permitted. The development of these welts would increase the rotational capacity, maximize production, rest existing wells, and allow for chloride levels to subside. 3.8 Natural Drainage and Groundwater Recharge The natural drainage features within the City of Clearwater water system are displayed on Map 6. As can be seen, the City is located between the seawater bodies of the Gulf of Mexico and Tampa Bay. Freshwater water bodies within the City include Lake Bellevue, Crest Lake, Alligator Lake, Beckett Lake, Lake zz City of Clearwater Water Master Plan, Capital Improvements Implementation Master Plan. Parsons Corporation. October 2004. ~ •a~..,,,x-~.•I F~,~t err .I ~ KC+I n~~`i ,+w!~ tr~~x~ ~~ / "-.. C ~` t ~ 1 , ~~ ~lear~a~~r CAUSENAYHLVD%"'~ ~ ~~~. ~ ".:{yam ` ~Z ~, `C~ i, ~s ~~c s' ~ _ is % c 'I .~ '~ -~.i"' ~r'rr ~~~ - - ~~~ Fiaes~ rK < ` lJ ° ~~ ~~~-"` i ~ ~~J/; 0`}''iaceNAVE ¢... pL'{+~e ~ ~'~. ~a ~_ Q+..:w~ `~`_ ="y+k' d ~'~ ~ ;~:.. ~ Of Q'J~' v I 4'Y ~ \ ~ EOWGUA RDA 19'~NIGAN9lV0 `ti .~` ~i -' S If ". ~~ .~ ". ~ ~ _~ `lyk ^"iC ,y11., ~ ~~,5 ~~ ~. JU a qr" Y"SR Jep )~~){v/dd,, ~ i e ~ C: II '~ / ~~~ 1'1~ ~ voA sotnu A.e-'" r. .~, ~ - - Nf~~~~ z } ~~trr i ~ `~. .U~j ~ SAN CHA~STOP ER pP Si~~ I f - `r, ~ " I ~ ~~'o. ~' ~ ? ~'.`" t..lLldwat~er ,~ ,~ ~ ~ " ' = o_'~ `~ ~ 9~ ~-~ ~ I :~ . ~ ~,- `, ~':~` Discharge/Recharge " Vt INU ST s,n. ~ / ~ 1~ -'Er.iC 'nYr o y," g ,1 ~' a`C ~ ~ ~`~ y i ~~. ~ ~ - ~ _ r~ g ~ ._, ~ ~~ ,~, ~ ~~ Rivere and Slreams _ - r ... ^~n s. , ~_ I ~~_~~ ~ ~ ~"~~t i~ !Lakes ~ ~ w ~~ ~ ~ _ t .. ~ "' ~ ~ /~ ;'" Floridan Aquifer DischargelRecbarge NTC rm ,_.,i ~~ ;. D _ ~r~ '.. o 9UN3ET PQIMT D ."T~ '~+ ~,•~ __ 1~.=_ ~~ HAMS O ", ~75Chafge L- I ~~ ~ 5 !' ~ / I !~ ~~~.. `,~ ~~ "I °8y, Recharge ~ ~ ~ o z ~(~_ • E _'! '~"'~ r~~~ ~I ~~ 1 -Major Roads ~ ~ a ~ sR - r r ~ k ~ ~ . ~ ,~ . ,r j Q y i Jurisdictional Boundaries o a ~ d z ~~' " 4~,!~-r~,~"'H~ ~ ~' ~ ~ City ofCleanvater ~ Y4 I , ~-''"-'-`F ,.~~f Imo.. '-°."'" _ ~ v i Other Cities yr e ~ t ~Dn ~ t ~~zr ~ ~ ~ ~ _ ~ ~ ~~~,-i;; ~ ~ _; Unincorporated Pinellas County o ~ hr / x rE- ouarsr ~,~ ~.~s~ ~ ~ ~ ~ ~ ~ ~ ~~' ~~ C~ N 3 > ". /M" 5 I( K O .« I \ 1 ~ f 4 \"G1RN gly ~~ bpi ~, k ~ w,n~w= ~~W ff . `~g 0 0.5 1 2 3 ~~ ~ ~ ~ Y ri~~=~~~~ ~ ~ _ oa ~, ~{{ m Miles C J ~ k w't+ qr ,~.~ ~? ,~" '' ~ ~''` r.. Source: Southwest Florida Water Management DistFici, _, ~~~ ~ ~ ~~ ~. '" "- ~ ~ ~ ~ 2002-2007; Pinellas CountyG15,2007. ~ ~ ~ ~ ~ " ~v ~ ~~ w RoeaxYxoac ~~ C ~! ++ ~~ ~ i ~, ~ ; J`z Prepared by Wade'Ttim, Inc., August 2007 -~ ~? eR~eaene rR ROv ~ e ~ 8E „g ~' ~~+rtn7sEr RO '. forCityof Clearwater Water Supply Elerrrent. 5 _ ao s g ~ ~ ~ ~ I' f ~ 4 ~,, !{ v r < s F ~~. ~,Y EnIR OEAGN CSKY 'L€ ,YIEST PA ^RV '~~ F ~~~ 2 '. ~J ~', EASY eA~DR~ "'' ~ ~-'~'.... ~~ ~~ " ~ V\/h TL`111TT ~T Potable Water Element 36 City of Clearwater Comprehensive Plan Chautauqua, and various creeks and drainageways. To the north of the City, Lake Tarpon is a large freshwater resource. According to the Southwest Florida Water Management District over 84 percent of all water used within the District's boundaries emanates from groundwater resources. The deepest and most productive aquifer within the District is the Upper Floridan, which also is found underneath the City of Clearwater.23 In the Clearwater area, the Upper Floridan aquifer contains a relatively thin layer of fresh groundwater underlain by a transition zone of brackish water, which increases in chloride and dissolved solids concentrations with depth until seawater concentrations are reached.24 The Upper Floridan is a productive aquifer, supplying more than ten times the amount of water pumped from the two other aquifer systems found in the Water Management District. In the northern portion of the District, the Floridan aquifer is readily recharged by rainfall (greater than 10 inches per year), and is most highly productive. In central Pinellas County, the Floridan aquifer features a recharge rate of 1 to 10 inches per year.zs 3.9 Existing Regulations and Programs Relating to Natural Drainage and Groundwater Recharge Future protection and use of water resources is a public service for which long- range comprehensive planning is mandatory. The primary threats to groundwater in the Clearwater area are saltwater intrusion via overdraft and contamination. When groundwater recharge exceeds withdrawal, there is a potential for saltwater to move inward from coastal areas, ultimately affecting the quality of the available groundwater. Additionally, contamination from injection and drainage wells, fertilizers, storage tanks, and other sources affect the quality of groundwater. Both overdraft and contamination are risks that can be reduced via careful regulation. The Southwest Florida Water Management- District is .the primary regulator and program administrator relating to natural drainage and groundwater recharge. z3 Southwest Florida Water Management District. Regional Water Supply Plan. December 2006 24 Technical Memorandum. Evaluation of City of Clearwater Existing Production Wells. SDI Environmental Services, Inc. zs Generalized Recharge to the Floridan Aquifer (Map). District Water Management Plan, Southwest Florida Water Management District. July 2000. Potable Water Element 37 City of Clearwater Comprehensive Plan The City of Clearwater is contained within the boundaries of several SWFWMD water supply programs, including:~>> Northern Tampa Bay Water Resource Assessment Project (WRAP) The Northern Tampa Bay Water Resource Assessment Project (WRAP) was initiated by the district to assess water availability, including minimum flows and levels, in order to support water resource recover, water use permitting, and environmental resource permitting. Both the City of Clearwater and Pinellas County provide input to the technical projects performed by the District. Northern Tampa Bay Water Use Caution Area (WUCA) The Northern Tampa Bay Water Use Caution Area sets water use permit (1NUP) for the area, including additional conservation requirements such as reuse. Public supply permits within the WUCA limit per capita water use demands to 1 50 gallons per person per day. Any utility not meeting these numbers has strict timeframes and guidelines to implement this limit. The City of Clearwater is not using its entire permitted allocation of groundwater from the Upper Floridan aquifer although it is anticipated that its utility will eventually grow into its unused quantity to meet future demand. For example, the City of Clearwater's brackish R.O. facility is permitted to withdraw 6.3 mgd of brackish groundwater, although the City has been withdrawing an average of 3 mgd.~z~ The City of Clearwater has been and is actively participating in SWFWMD's efforts to prioritize recharge areas within the Upper Floridan aquifer recharge area. Tampa Bay/Anc%te River Comprehensive Watershed Management (CWM) Project As part of SWFWMD's continuing efforts to ensure the coordination of local governments' planning practices regarding water supply management, SWFWMD has developed the Comprehensive Watershed..Management (CWM) .Program in coordination with local governments to conduct water resource assessments and planning on a watershed rather than district-wide basis. The City of Clearwater is in the Tampa Bay/Anclote River Comprehensive Watershed Management (CWM) Area. This area encompasses all of Pinellas County and parts of Hillsborough and -~~ Southwest Florida Water Management District, 2005 District Water Management Plan. -2~ Southwest Florida Water Management District, 2006 Regional Water Supply Plan Potable Water Element 38 City of Clearwater Comprehensive Plan Pasco Counties or approximately 566 square miles. The Tampa Bay/Anclote River CWM Plan was last adopted in 2002. The 2006 SWFWMD Regional Water Supply Plan requires updates to the CWM Plan in which Pinellas County and the City of Clearwater will be invited to participate. 3.10 Capital Improvement projects Appendix A presents the list and budget for several potable water projects to be completed from 2004-2012. The total of capital facility improvements is about $97 millions dollars. ~~" P, ~s~ ~ ~~s~ ~-~ ~ ~ ID ;Task Name 1 Ov ll W t CIP Start Finish Baseline DOSI ~•-- ' •~~~ tour _ _ 2008 2009 2010 CIV3 DVd Dtrt OU2 Otr3 Otr4 OV1 Otr2 Dtr3 DU4 OV1 Otr2 Otr3 1]Ud Otr1 Dtr2 OV3 OV410U7 DI 2 2011 _ 2012 ~ ~~ ~ ~ era f ~ ~ ~~ ~ ~ ~ Fn 10/7100 Fri 928/12 596,391,400.00 r OU3 OU4 OV1 oh2 pV310V4 _ Dbt ptr2 DIr3 OIr4 Dlr 1 ':, Otr2~~Otr3~~~~Olr4~ 2 7 Elov Led W t Tank UP9 tlea ~ ~ I FrI 10/1/0C ~~ ~~Thu1/4/07,~ ~~ 52,992,100.00 ~~ -' " 3 ' Prof IS l F 1011/04 Th 9%29%05 5425,00000 ........ .... .. .. `_. .. i.. .. _ .. .. A ~ Site DeveloPmenl ~ ~ -~ ~1 Fri 9/30/05! Thu 11/10/05: 55,000.00 ... .. .. .. .. -. - - - "" ~ ~ ` - ~~ - .. ' - 5 Co U ti Olt SL ~ ~ ~ ~ ~~' F 11/11/05 Th 7%6/06 51350,00000 ~~~~~~~ - """ -~ ~~ ~~ ~~ _ _ ....... . .. .... .. .... .. ...... .. .- ~ 6 ~ Co Iru t ~ MLKA _ F ]/7/Ofi Th 1/4/01 ft 38510000 .. _ .... .. .. .. .. .. . _ ~ ..... 7 I ~~ ~~ ~ M nlenance DelOro ~~ ~~ -~ ~~ ~~ Fn 10/1/OG l TAu 9129105; 1127,000.00 ~~ ~~ ~ - - ~ ~~ ~- ........ .. ............ ~ 8 ~~ Tale tryT W II - ~ Fri 10/1/04 F 711108 51085,000.00 ~ ""' "' - .. .. .. .. .. .. .. .. .. ~ ~~ ~~ ~ ~~ ~ ~~ 9 ~ P f nal Serv slCo ulting - ~ 1 ... .. ., Mon 10/3/OSI Fri 2/3/08 ~~-§113,000.00 ~ ""' - - ~~ ~~ ~~ ~~ ~ ~ ~~ ~ ~~ ~ ~~ ~ ~ ~~ .. .. - - ..... .. 10 J S t D I P 1 s ~ ... Fd 10/1/04 Th 1028%OM1 1500000 ..._ . ..... ....... .. .. ..... .. .. 11 C tr cl Pdrit .. .... ~ F 10/1/041 Th 5/26105 55000000 ... .. .... ... ._ ..... ..~ ..... 12 C W ti ~ d 2 M NG/O6I F 929/06 $397 000 00 .. ..... _ .. .... .. 13 .. .. (.o W t P d 3 .... .. M 10/110] F' 7/4/08 5500,000 00 .. .... .. .. .... .. .. .. .. .. .. .. .... 1d Wet G '- 7. .. .. .. .. ., F 10/1/041 Th 2!2!96 ffi00,00000 .. .- ...- .... ~ ~ ~ ~ 15-1 ~ ~ ~~ Pofess onal Serv /Consulting ~ ~~ ~~ ~ F 10/1/04 Thu428/05. 150,000.00 , ~~ ~ ~~ ~ ~~ ~~ ~ ~ ~~ ~~ ~ ~ _ ~ _ -~ " " .~ ~~ ~ - .. ... .. 1 ~. 0 sWChon - ... ~~ ~ F 4%29105 .. Thu 22/06 5550.0000D .. .. .. .. ... ... .. - .. .. ... . 17 I ~Wallfleld EaDanaion4taurvom3~ ~ ~~ ~~ ~I Fn 10/1/01 Tua 9/OD/D8 53,951,000.00 "' '" - -' -"""- ~~~'~~ . ... _ .. .. . 18 .. .. F (ess dnalSemcas/COesult nB-Chlonde Cap .. f ..Fri~10)1/04 ~ ~ The~329/07 .....1300,00000 .- .. .... .. .. . ....,..... ~ .. ... .. ... ... . . ... .. .. ~ . Sl dy .J .. - .. .. .. ... .. ,. ... _.. .. .. P I jg 1 Fri 2/1/07 T e 9130/09. 5329,130 00 .... .... .. .. .. .. .. .. .. .. ~ ~ S s/C ultilg D 9nlBid/P th g . . .. .. .. .. .. .. :.- . . .. .... .. .. .. As 1 . ~ 20 Land Ac9u s Lon. Mm bring Wells ..... Fri 2/4/05 I Thu 115/06 5405,000.00 ... __ .. _...... ... - . . _ . I 2i ~ L rltl A q 'eon P od cV Walls - s M n 10/1106 Fe~92&07 " ' ~ ~ ' ~~ _ ~~ ~~ ~ ~~ ~~ _ ~ ~~ - ~ ~~ ~~ ~~ ~ ~ ~~ ~ ~ ~ ~~ ~~ ~ i2 ~ ~ Sle DevelopmenVWater USe Pemalkig ~ ~~~~ Fri 2/4/051 Thu 312&'0] 5116,450.00 , -~~~~~~~- ~- -~ ~ ~ .. ~. ' _ - .. 2 .,... .... _. ... -.._.. .. -.. .. ~ 24 ~ - ~ Construct on Mon lonng Wells ~~ ~~ ~~ ~ ~ ~~ i 1 Fd 6I24105j hu 026106 311,15000 .. _. ... .. __. ... '- ...... ~ '~ ~ ~ ~ ~ ~ .. .. .. ~ .. .. .... .. 25 .. ~COn W IiomProd Oo W Its ~andR 'N ter.. .- M n1U%1/01i Fri 926/09' 11,968,91000 . ... ... .. .. .. .. ... .. .. .. .. .. .. .. .. .. .. .... .. .. .. .. .. .. .. .. .... ._.. .. ... .. .. .. ~. - 26 RO PI IE pa R #1 ~~ ~ . Fr110/1101 W 49129/10 f1058556U 00 .. - .. . _. ~ P feaianal SemraelDOnwI9n9-DMwitle Gap. .j Fn !0111041 Thui/18/01 5224,12000 - ....... .... .... .. .. ... ....... .. .:.. ... ~ ~ ~ . . ~ .. .. I Sbdy I ... .. . . .. . ~ P of ss al Thu 211/07 ~ Wed 7129109. 11.3$1,150.00 ~ .. .. .................. - I Servicesl0onsulOn9 DesynlBiNPenn rang ' _ ...... .. _ ~ :. - " ' - i Assl Lance .. .. .. .. ..... .. .. ..... .. ...... .... .. : 29 . ...._... ... ........ ... ...... ....._.... ........ .. .... ~,~ ~ ~ 30 ! Land A~ulvlion-Monitoring Walls - - Fn 10/1104 Thu 929/05' 5395,000.00 _ '- '- "~ -~ ~~ ~ ~ ~ ~ ~ ~ ~~ ~~ -~ ~~ ~~ ~~ ~~ ~~ :.. .. ...- .. .. .. 72 .I.. .. .Land Ac9uisilion Production Wells .. J W d 10/1/OB . ~ Tua 9129/08 546],086.00 .:... .. .. .. .. .. .. - .... .:.. .... .. .. .. ~ .. .. .. .. .. .. .. .. . .. 79 ~ .. ... ..... . ..... ...,....,.. .. _. ~ ._ .. ... _._ .. 34 ~ ~ ~~ Sle DevelopmenVPerm nm9-Mon tpnng Wells ~-- 1 Fn 10/1%04; I Thu 8131106 140,60000 ... ...~ ... .. _ "" ~ --~-~~~-- ~ ~ ~~- ~ ~~ -_ _. .. ~ .. .. .. .. .. .. 95 .. .. .. .. .._ ....... .. .. .. .. .. .. .. _. .. .. .. ., l ... _ .. .. .. .. _.. .-. .. .. .. .. .. .. .. .. .. .. _ .. .. .. .. .. .. ... .. .. .. .. . 36 i~ ~ ~~ ~~ Srle Oavabpment Wafer USe Permllting~~~~~ ~-r Mon iN2/O6~ - ~ F~~&5109 - ~~~~~E90,350.00 ~ ~'"' - - ~- --~~ ~~ ;. .. ... .. .. .. .. .. .. . 38 { Co wGion-Man b g W Its ~ M 10%7105 Fd 2/3IOfi 5206,00000 .... ... .. .. . .. ~..... _ .. ..... .. _ .. .. ... ........... ..... .. .. .. .... .. .... 39 _ ... . ... .. .. ..... ... 40 ~ .. C W I~n:Protluceon Wetls. Raw N/aler ~. .. ~ Thu 2%51081 Wed 929710 17807,6`A.00 .. .. .. .. - .. .. ...... .. .. .. .. .. .... ~. ~ _ .. _ .. .. - _ .. .. . .. .. Pp 9 PI tEsp .. .. . .. .. .. .. . . .. .. ~ 41 .. .~ .. .. .. .. .. .. .. .. .. .. .. .... .. .. .. .. .. .... .. 42 ~ Ras27 gd RO PI ~t -~ ~~~~ ~ ~~ ~ Man 1017106 ~ ~ Fri 928/12 f248fi0,06000 ~~ ~~~~ ~- ~~ ~~~~~ ~ ~ ~~ "" "" nal Sem s/0 IGegA1 itonn9 Wall I Mon 70/?lO6 Fri 926/08 5530,41000 -~~ ~~~ ~-~ ~~- ~-~- ~~~~~~~~~' "_"' Study Pilot Testing, Bnne Dsposel Study l , 44 P 1 ~ IS rv 10 III g0e g red/Perm M 9/29/09 F 827/10 525/3,26000 - ~ - - ~ ~~~ ~ "" ~~ -' """ """- 45 ~ Lad h0 Mo 1 ~YVells ~ ~ ~~ AW Ig M 7H 5%071 F i/ti/O6 ~ ~~ I377,31500 "' ~~ '-" -" ' - - ^^^^-- .--- .. .. .. .. _ .. .. ! - , 46 ~ ~ Land Ayuisi6on-ProducSOn Wells Mon 7/1/O9 Fnt29~10 5942.750 00 - ~ - - ..... ... 4) ~~ - ~ SI D ~bp ant W ter Usa Parm W g Brine ~~ ~ - ~ M ~7/5/07~ F ~7ii&10 ~ ~ 1110,97500 ~ - ~ ~ ~~~ ~~~~'- ~~ -- ~' ~' - _ .. .. .. .... .. - D po I P rmilL g . ., .., , . 48 .. .. .. .... ....... .. ................. .. .. .... ........ ...... ... Project: Water Maslen Plan CIP Task Progress ~ p~ q -_--..._..._____._________._ Summery ^ Eatemal Teske Gi ~ ~.:Y Il, DeadlineA V Date: Mon 10/25104 Split Milestone • Project Summary ^ Ektemel M9eebne . Mon 1025/04 Water Master Plan CIP.mpp _.- PARSONS Finish _ _ _. ... Cmslru[hon Prod t Welb, Ra WalerP - Ong' .......,.,.. Mon 1123/10/ ~~ =~~w~o- Fn 928112 u.rruw 519,900,000.00 .. .. .. .. .. .. .. .. '.. .. TreaMenl Plenl Bnne Disposal ...... ............ ............. _......... ' ................ f. .. _.._. __..... . ....._. _.......... ~ ............... ....... _.. .. _........... .............' _...... . _... SYSt R8R-Mai t e~ -~ ~~ ~ ~~ ~~ ~ ~ ~F 10%1/00 Th 9%'13%10' ~~ 5750,00000 I~-~---~~ .. ._ .. .. .. .. .. Racl dWatar Di 1 buban Syeta ~ .. ... ~ F 1011/00' .. .. Thu9Rf/10 .. .. .. f36104,130.00 1 - .. .. .. .. .. _ .. j ~ ~~ ~~ F far revenue ~~~~~ -~~ ~~-~ Mon iO/a/p51 Fr18126108 ~~E2,3T9,22000 -~~~ ~~-~~~~ F 1tun Cantle.. Pnpn lC.zroe Fri 7130/10: E9 823,450 00 ____. ~ ~~ .. .... ... .. F ~ and reimb rsemCnl ~ ~ 9 ~ ~ .. .... I. Fd 10/1/001 ...... Thu 923/10 ..... 572,901,450.00 """ " ... .. .... ... .. ~~ ~ Water Supply and TreaMentJAicc lmProvemenls Fr110/1%04 ~~Thu 923/10 ~ 33,BS0,000.00 .. '_..... .. ... _. .. i ~ ~~~-~~ ~~ ~ '- -' " '- " "~ -~ ~~ ~~ ~~ ~ ~~ ~ ~ ~~ ~ ~~ ~~ I - .. .. .. _ .. R 1M -Ilan Inp a Is .. .. .. . .. F..70%1/0! Th 926/06 Et 53,00000 .... J .. .. .. .. .. .. .. I ~_ .. ~ ~ .. .. .. ~. .. ...Rea 2Mscellaaewslmproveirenh - .. .. .. . .. .. Fn 70/1/00} - Thu 9RB.N6;. .. 5110,00000 . .. .. ... .. .. _ . .. ... .. .. ... .. .. _ R 3M~ Ilaneous lmprovame t .... F 10/t161~ Th ~9R0106. 577.60000 . .... .. .. _ .... .. .. .. ~ ...... .. - .. .. .. .. .. .. .. .. ... _ .. - ~ .. P tabl W II~-M t Ile ~ - slmOrovemenls.... _ ... Fn 10/11041 Th~02~9)06 ~ 5000 .. .. .. ........ ..... .. .. .... _ .. .. .. -.. _. .. ... ............ ... . ... .. .. .. .. .. ~ I ~ ~ W Ilp p-e01a is - .. - F'10/1IU0 Th 92flr06 ~ ~ Y1.422.00000 .. _ .. .. .. .. .... ..... .. ... _. . ,.. .. ~... .. .. .. IntaroonnecLa-sA~sceOaneous Im - .. .. n1s p .. .. Fd 10/1/041 Th 929/08 .. f333,10000 r .,. -_. .. .. .. .. . .. . .. .. .. .. .. .. .. .. .. . .. .. ~ .. .. .. 01h - I . _. .rn 1 ... .. . .... .. .. F_.10%1%0i! .m 929110 ~ 51 750.30000 .. .. _ .. .. .. .. .. j .._ System RB R-Cap UI ad ~ ~ ~~ ~~ ~~ ~Fn 10%1%047 ~ Thu 923/10: 52100,000.00 I .. .. ..:.. .. . Lin R I Oon-Cptl e~ ~ I Fn 10%1 /04~ Thu 923/10 f9,]50,000W i - __ _. ~ ~ ~ ~~ ~~ ~~ ~~ ~ ~~ ~ ~~ ~~ ~~ ~~ ~~ ~ ~~ Met /BacMlow Rpl 1/Chng-0ut ~~- ~ Fri 10/1/04 ! ~ThC923170 53,600,00000 ~~ ~~ '~~ ~~ ~~ ~~ ~~ ~~ ~~ ~~ ~~ ~ ~~ ~~ ~~ ~ ~~ ~~ ~~ ~~ I .. .. .. .. .._ _..._. .. .. ... SYSt Exp .. .. F 10H/04~ Th 92y10 51500.00000 _....i_.. . .. .._.. .._.. .t ... _.. .. .. - ._ .. .. .. .. .. .. . _._ ~_ ~~ ~~ VYaI Sarnce Linea ~ ~~ ~~ ~ ~~ ~~ ~~ F 1017/611 ~Thu923%10 53000.00000 '_ _ Water Pick-up Truck - - ~~ ~~ ~ ~ ~ ~~ ~~ ~~ F 10/1/04 Th 923/10. 3224,040.00 ~~ ~~ .. ... YVa1 ~~M Phaaea 111617 ... .. .. .. .... F i0/1/00 Th 9%29%05 42500.00000 .. ' .. i.. .:. . .. .. .. .... .. .. .. ....... .. .. ... _ .. .... .. .. .. _ ... .. .. .~ .. . ... Wat Meter Testing Eq p an[ .... M n 1013105 F ~929/O6 547.10000 .... ... ...... ..._... ... .. ..... .. .. .. .. .. .. .. .. .... .. .. .. .... .. .. .. .. .. .. .. .Water Duabty Moniionn9 Oevtcas .. .. .. ...... .. Mon 10/3/05 Fri 9l2&0] . ......4800.000.00 ....,.......... .............................. ( ..;. .... ,....... ..... .... _.... ... .. .. .. .. .. .. .. .. .. .. Task Pro9ross Summa? ^ Eslemal Teske I, Project: Wafer Master Plen CIP DeatllineA l Dale: Mon 10/25/04 Splil Milasbne . Project Summery ^ Eslemel Mileslana . ~ Mon 10125/04 Water P ~~ /~.~- ` CSv_I. 0 - -~ ~~ ~-~~-! ' ~--- ~ I~ WAnET1uM To: City of Clearwater 100 South Myrtle Avenue Clearwater, FL Attn: Sandra Herman RE: Draft Potable Water Element We are transmitting 2 copy(s) of the following: Letter of Transmittal WT189-02 If transmitted items are not as noted, notify writer immediately. Date: 8/14/07 Transmitted By: Regular Mail X Hand Delivered Picked Up By: Other: Overnight Delivery __ Certificate for Payment No. Discs Prints Contract Change Order No. Drawings Product Literature _ Construction Change Req. No. Field Measure Plans Samples Copy of Letter Plans Shop Drawings X Other: See Below For your: _ Action As Requested Information _ Approval Distribution Records /Files Remarks: Enclosed are two copies of the draft Potable Water Element Document. Job No. C By: D cc: _ Specs. _ Tracings Work Orders No. X Review/Comment Use Signature 8745 Henderson Road 813.882.8366 Suite 220, Renaissance 5 888.499.9624 Tampa, FL 33634 813.884.5990 fax www.wadetrim.com 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Potable 1A/ater Element 1 City of Clearwater Comprehensive Plan D d ~~~~04 ~~~ ~~~ f ;- -_ ~~~~ ;~-`~~. ., ~~, ,. ~~ ~ ~_ _.- ~®~~~0~ ~~~~~' ~~~~~I~~ City of Clearwater WADETRIM Potable Water Element 2 j City of Clearwater Comprehensive Plan TABLE OF CONTENTS I. INTRODUCTION ....................................................................................... 3 II. GOAL S, OBJECTIVES AND POLICIES ..........................................................4 1 III. INVENTORY AND ANALYSIS ..................................................................10 3.1 Operational Responsibility .................................................................................................................. to 3.2 Geographic Service Area and Predominant Land Uses ............................................................... l0 3 3 Desi n Ca aci and Current D d f E i ti F ili i . g p ty eman o x s ng ac t es .................................................... 14 3.4 Level of Service ....................................................................................................................................... 26 3.5 Facility Capacity Analysis .................................................................................................................... 26 ' 3 6 P rf d C diti f E i i F ili i . e ormance an on on o x st ng ac t es ........................................................................ 30 3.7 Issues and Opportunities for Expansion and New Facilities .................................................... 33 3.8 Natural Drainage and Groundwater Recharge .............................................................................. 34 i 3.9 Existing Regulations and Programs Relating to Natural Drainage and Groundwater Recharge .......................................................................................................................................................... 36 3.10 Capital Improvement projects ......................................................................................................... 38 1 IV. APPENDIX A: CAPITAL IMPROVEMENTS PROJECTS ................................. 39 Potable Water Element 3 City of Clearwater Comprehensive Plan 1 I. INTRODUCTION According to Florida Administrative Code section 9J-5.01 1, the purpose of the Potable Water Element is to assure that necessary public facilities and services correlate to future land use projections. Furthermore, the purpose of the Potable Water Element is to identify capital improvements and establish goals, objectives and policies that will ensure the City of Clearwater is able to supply quality drinking water of a sufficient quantity for current and future needs. The Potable Water Element focuses on the existing systems and facilities and projected system needs based on projected population growth and future land use in the City of Clearwater. This is accomplished through an inventory and analysis of existing data, identification of present and potential problems and their solutions, and projection of future potable water needs for specific planning periods. The City of Clearwater Water Master Plan Water System Assessment, prepared in June of 2004, and the City of Clearwater Water Master Plan Capital Improvements Implementation Master Plan, prepared in October 2004, serve as the primary data sources for the existing conditions inventory and analysis. Both reports were prepared by Parsons Corporation. The composition of the Potable Water Element follows the minimum data requirements outlined in Section 9J-5.01 1 , FAC. For ease of reference, the Potable Water Element is organized into two major sections; the first outlines the Goals, Objectives and Policies relating to potable water and the second includes an Inventory and Analysis of the water system. 7 t Potable Water Element 4 City of Clearwater Comprehensive Plan II. GOALS, OBJECTIVES AND POLICIES 21. GOAL PROVIDE, DEVELOP, AND MAINTAIN A PERMANENT POTABLE WATER SUPPLY SYSTEM TO MEET ANTICIPATED DEMAND WHILE PROVIDING MAXIMUM ~~ PRACTICAL PROTECTION TO THE ENVIRONMENT AT A COST CONSISTENT WITH THE PUBLIC'S ABILITY AND WILLINGNESS TO PAY. 21.1 Objective - To maintain adequate Levels of Service for existing and future populations through the year 2015. Policies 21.1.1 The following Level of Service standards have been established for the City of Clearwater and shall be used in determining the availability of facility capacity and demand created by new development: Service Area Level of Service Standards Potable Water Facilities Average Water Consumption Rate City and County Water City Service Area 120 gallons per capita per day at a pressure of 40-45 psi. *Continue to maintain water consumption of one hundred twenty (120) GPCPD or less as per the conditions set forth by Clearwater's Water Use Permit. ' 21.2 Objective -Provide adequate quantities and qualities of water service to all customers of the Clearwater service area. Current service level (July, 2007) is 40,390 customer accounts (potable, reclaimed and fire). Policies 21.2.1 Ensure that land development regulations, building codes and City ordinances adequately address water system provisions by performing a thorough evaluation of City codes and by coordinating proposed provisions with the Southwest Florida Water Management District and Florida Department of Environmental Protection. 1 Potable Water Element 5 City of Clearwater Comprehensive Plan 1 21.2.2 Engineering shall analyze the condition and adequacy of any water distribution system that the City may inherit through annexation and prepare cost estimates for upgrading those systems to meet City requirements. 21.2.3 When new subdivisions are being developed, it shall be the responsibility of the developer to provide internal potable water and reclaimed water systems which are constructed to City specifications. 21.2.4Continue to construct water system improvements which will provide adequate quantity, pressure, and duration of fire flows while meeting system user needs. 21.2.5 Continue to develop a system and construct improvements which will conserve energy, water, and other valuable resources. 21 .2.6The City shall continue to participate and assist the Southwest Florida Water Management District, Pinellas County Health Department, and the U.S. Environmental Protection Agency in developing innovative techniques to augment existing water supplies to provide for future needs. ~ 21.2.7Continue to identify, acquire, and develop sources of water supply and methods of water treatment to meet existing and future needs. Some ways this can be accomplished are through well rehabilitation projects and/or exploration and drilling of new wells. Some type of water treatment may be initiated. Additional volumes of water may be acquired from the Pinellas County Water System through Clearwater's intergovernmental water service agreement. The City's long range Water Supply Master Plan completed in 2004 shall serve as the guiding document for water supply and treatment methods. Potable Water Element 6 City of Clearwater Comprehensive Plan 21.2.8 Ensure that water management projects are designed and operated to maintain and enhance natural systems as well as man made systems by working closely with the Southwest Florida Water Management District when proposing new projects and water management programs. The City's long term Water Supply Master Plan outlines a work plan for continued coordination with the Southwest Florida Water Management District's Regional Water Supply Plan adopted in December 2006. 21.2.9Water service shall not be extended to properties outside the City's service area unless sufficient capacity and quality of water exists to serve the areas already committed to City service. 21.2.10 Water services shall not be extended except in those areas so designated for City of Clearwater by interlocal or other agreement. 21.3 Objective -Continue to maintain the water system in a safe, sound, and efficient manner on a daily basis. Policies 21.3.1 The Public Utilities Department, Water Division, shall monitor water quality and the operation of the water distribution system with the intent of repairing and replacing deficient portions of the system r within the framework of the capitalized budgeting process. 21.3.2 Continue to provide a minimum operating pressure of 40-45 psi throughout the water distribution system. 21.3.3 Continue to provide adequate spacing of fire hydrants to provide optimum hose lays and fire flow. 21.3.4 Require at the time of application for connection to the public potable water system, that minimum fire flows and hydrant spacing be consistent with fire district standards. Also, require that proper size water pipes are installed to provide desired fire flow rates based on the most recent Insurance Service Office (ISO) Report. Potable Water Element City of Clearwater Comprehensive Plan 21.4 Objective -Continue to provide sound fiscal management for the operation and maintenance of potable water service in the City's service area- __ Policies 21 .4.1 Fees charged users of water services shall continue to be adequate to cover system operating costs, repayments of capital costs, and allow for repair and replacement of existing facilities. The City shall also continue to evaluate new rate structures as necessary. 21.4.2 Prioritization and scheduling of major improvements associated with the water system should be accomplished as a component of the capital improvement program. 21.4.3 Funds set aside for repair and replacement of the water system shall not be diverted to other uses. 21.4.4The City should continue to seek financial support of the water system through grant programs administered by appropriate State and Federal agencies. 21 .4.5The City shall continue to refine the inverted rate structure for residential water meters, lawn meters and all other water meters permitted by the Water Division of the Public Utilities Department. 21.5 Objective -Continue to Develop a potable water system that is compatible with the environment and seeks to conserve and protect sensitive natural resources. Policies 21.5.1 Except for areas of the City where reclaimed water is available, shallow wells shall be recognized as a source of water for irrigation purposes. Establish a City permit for shallow well installation by the end of 2008 Potable Water Element 8 City of Clearwater Comprehensive Plan 21.5.2 The City s building code shall include the requirement for water conserving fixtures in newly constructed or remodeled buildings. 21.5.3 Manage the supply of water in quantities which would minimize significant adverse impacts on the natural system and protect the long term public interest. 21.5.4 Develop and modify rate structures and policies which encourage conservation of potable water. 21.5.5 The City shall maintain its current Water Restriction Ordinance. ^ 21.5.6 Provide educational awareness to inform citizens of the need and opportunities for conserving potable water by visiting schools to ~, speak with young children about water conservation practices. 21.5.7 Reclaimed water service will continue to be extended to private residences based on the Twenty (20) Year Master Plan. 21.6 Objective -Continue to achieve effective coordination with other government agencies to solve problems of an extraterritorial nature with cooperation and in conjunction with the Southwest Florida Water Management District. ' Policies 21.6.1 The City shall continue to participate in regional and County-wide studies which are or may be formed to seek solutions of problems of an extraterritorial nature. ~~ 21.6.2 Continue to cooperate with the Southwest Florida Water Management District in developing environmental and hydrologic data that will identify safe and reliable potable water yields in existing and future well-fields. 21.6.3 Continue to coordinate with appropriate local, State, regional and Federal agencies in implementing the water system plan. t Potable Water Element 9 City of Clearwater Comprehensive Plan 21 .6.4The City shall pursue a coordinated approach to interjurisdictional problems, by providing support of both staff and officials to participate in conservation efforts with Pinellas County and the Tampa Bay Regional Planning Council. 21.6.5Ensure consistency with the actions defined within the Regional Water Supply Plan prepared by the Southwest Water Management District 21.7 Objective -Continue to protect all natural recharge areas having functional hydrological characteristics. Policies 21.7.1 Recognize the importance of groundwater aquifer recharge in the hydrological process and the need for natural groundwater recharge as an integral component of the City's urban environment. 21.7.2 The City of shall include incentives in the Community Development Code for the protection of natural groundwater aquifer recharge areas as identified in the Conservation Element of the Clearwater Comprehensive Plan. 21.7.3 The City shall continue to protect groundwater quality by enforcing Wellhead Protection Ordinance. 1 1 Potable Water Element io j City of Clearwater Comprehensive Plan III. INVENTORY AND ANALYSIS Section 9j-5.003, FAC, defines a potable water facility as a system of structures designed to collect, treat, or distribute potable water, and includes water wells, treatment plants, reservoirs, and distribution mains. The following section details the existing conditions of the City of Clearwater's water system, with the purpose of identifying future water system needs. 3.1 O erational Res onsibili P p tY The City of Clearwater Water Division is a municipally operated water supplier, charged with the responsibility of administering the City's water utility. In 2006, the City of Clearwater Water Division supplied more than 5.15 billion gallons of water to more than 140,000 customers, amounting to approximately 100 gallons of water per person per day. The division maintains 4,036 fire hydrants, 8,329 valves and 588 miles of water mains.' Users of the City of Clearwater water system consume approximately 13 million gallons of potable water every day. Approximately 37 percent is pumped from City owned and operated groundwater wells; the remaining 63 percent of the daily demand is supplied by water purchased from Pinellas County. Pinellas County also receives water supplied by the regional water supplier, Tampa Bay Water, which in turn becomes part of the 63 percent supplied to the customers of Clearwater.z 3.2 Geographic Service Area and Predominant Land Uses The geographic service area for the City's water system extends beyond the City limits and represents an area of approximatley 54 square miles in size. The majority of the customers beyond the City limits are located within unincorporated Pinellas County enclaves within the City of Clearwater. The boundaries of the water service area generally extend from the Gulf of Mexico to the west, the City of Dunedin to the north, the City of Safety Harbor and Tampa Bay to the east, and the cities of Largo, Bellair, and Bellair Beach to the south. Map 1 shows the geographic service area of the City of Clearwater potable water system. ~ Public Utilities -Water Division. City of Clearwater Website. Accessed Jul 2007. Htt :llwww.clearwater- Y P fl.com/govldepts/pwa/public_utils/divisions/waterlindex.asp. z City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. .. r. .. .. .. . .. . . . . .~ . . .. 'Clearwater Map 1 Water Service Area Q Crty of Clearwater Water Service Area - Major Roads Jurisdictional Boundaries City of Clearwater ~__i Other Cities Unincorporated Pinellas County 0.5 1 2 3 Miles iource City of Clearvvater Water Department 2(107: >inellas County GIS. 2007. >repared by Wade Tnm, Inc .August 2007 or City of Clearwater Water Supply Element. ~ W~ETRnvt Potable Water Element i2 City of Clearwater Comprehensive Plan According to the U.S. Census Bureau, the City of Clearwater is estimated to have a total population of 107,742 as of July 1 , 2006.3 However, the City's water service area extends beyond the City limits to include numerous unincorporated Pinellas County enclaves. Thus, to determine the population of the City's water service area, a broader figure that includes both the City population and enclave population must be utilized. Because it includes the City of Clearwater in addition to all interior county enclaves, the Pinellas County Planning Sector 6 closely matches the City of Clearwater's water service area. Therefore, population projections for Planning Sector 6, which have been calculated by the Pinellas County Planning Department, will be utilized for this Potable Water Element. Using the projections from Pinellas County for permanent, seasonal, and tourist populations, the functional population of the water service area can be determined based on the following formula: Functional Population = [(permanent + seasonal) x 41 + (permanent x 81 + tourist 12 2 ^ This formula is based on Water Use Caution Area (WUCA) rules with the purpose of making adjustments for seasonal residents and tourists.4 Once calculated, the functional population figure represents the value utilized to calculate the gross per capita water consumption for the City. Table 1 details the projected service area population served by the City of Clearwater's water system through the year 2025. s Annual Estimates of the Po ulation for Incor orated Places in Florida, A ril 1, 2000 to Jul 1, 2006. U.S. Census Bureau. June 28, P P P Y 2007. a City of Clearwater Water Master Plan, Capital Improvements Implementation Master Plan. Parsons Corporation. October 2004. 1 Potable Water Element City of Clearwater Comprehensive Plan 13 Table 1 Clearwater Water Service Area Population Projections (a) -. 2005 - - 135,071 -. 6,074 -.. 19,472 .. 160,616 146,832 2006 135,400 6,088 19,488 160,975 147,173 2007 135,728 6,102 19,504 161,333 147,514 2008 136,057 6,115 19,519 161,692 147,855 2009 136,385 6,129 19,535 162,050 148,196 2010 136,714 6,143 19,551 162,408 148,537 2011 136,930 6,152 19,562 162,644 148,761 2012 137,146 6,161 19,572 162,879 148,986 2013 137,361 6,171 19,583 163,115 149,210 2014 137,577 6,180 19,593 163,350 149,434 2015 137,793 6,189 19,604 163,585 149,658 2016 137,934 6,195 19,611 163,740 149,805 2017 138,076 6,201 19,618 163,894 149,951 2018 138,217 6,206 19,624 164,048 150,098 2019 138,359 6,212 19,631 164,202 150,245 2020 138,500 6,218 19,638 164,356 150,392 2021 138,592 6,222 19,642 164,457 150,488 2022 138,685 6,226 19,647 164,558 150,584 2023 138,777 6,230 19,651 164,658 150,679 2024 138,870 6,234 19,656 164,759 150,775 2025 138,962 6,238 19,660 164,860 150,871 (a) For the purpose of this analysis, the population projection for Pinellas County Planning Sector 6 (Greater Clearwater Area), which closely represents the Clearwater water service area, is utilized. (b) Seasonal population is defined as persons who reside in Pinellas County for less than six months and declare their permanent home elsewhere. (c) Tourist population is the impact that tourists have on public services and facilities that are comparable to the impact of permanent residents, (d) Functional population is calculated by Water Use Caution Area (WUCA) rules (see text). 1 Source for years 2005, 2010, 2015, 2020, and 2025: Pinellas County Population Projections by Planning Sector, 2005-2030, Pinellas County Planning Department, February 2001. Source for all other years: Data extrapolated from Pinellas County Planning Department. Potable Water Element 14 City of Clearwater Comprehensive Plan 1 The City of Clearwater is an urban and predominantly built-out city and features a diverse mix of land uses. Within downtown Clearwater, a dense mix of institutional, commercial, office, recreational and high density residential land uses are found. In addition to downtown, the Clearwater Beach area features a dense mix of land uses that include major commercial/resort destinations, high density residential developments, and recreational uses. Intensive commercial land uses, including regional commercial shopping centers are scattered along the City's 1 major transportation arteries, particularly Gulf-to-Bay Boulevard and U.S. Highway 19. The majority of the rest of the City is dominated by well established single- family neighborhoods, intermixed with supportive institutional and recreational ' uses. Map 2 shows the existing land uses found within the City of Clearwater water service area. 3.3 Design Capacity and Current Demand of Existing Facilities. Water Wells and Treatment Facilities Potable water within the City of Clearwater is provided by 22 City-operated fresh water wells (1 7 active and 5 inactive) and six interconnects with the Pinellas County water system. Although it is currently not used, the City has access to the water system of the City of St. Petersburg though an emergency interconnect. The City's water wells are located in close proximity to three treatment and storage facilities: Reservoirs Nos. 1, 2, and 3. The interconnects to the Pinellas County system are found at various locations in the City: Reservoir No. 2; Reservoir No. 3; along Belcher Road near the intersections with Drew Street, Gulf-to-Bay (SR 60), and Belleair Road; and at South Sand Keys The locations of the various water supply facilities within Clearwater are illustrated on Map 3. Pinellas County water is purchased by the City of Clearwater through an intergovernmental agreement as a means to augment the City's groundwater sources and to meet the City's water demands. In the 2002 water year, an average of 11.5-mgd of water was purchased by the City from Pinellas County. In the Fall of 2003, after a reverse osmosis treatment facility was implemented at Reservoir No. 1, the City was able to reduce the amount of water purchased from the County by a net of 2-mgd.6 s City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. e City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004.. s ~ ~ ~ ~ ~. ~ r ~r r ~ ~ ~ . ~ ~ ~ ~ ~ Y Clearwater Map 2 Existing Land Uses Jurisdictbnal Boundaries Existing Land Use 2005 Olher Cibes Category ~,~ Pinellas County Single Family - Mayor Roads Mobile Home Duplex or Triplex - MWti-Family - Commercial Industrial - PublidSemi-Public - RecrealioNOpen Spece Vacant - ConservatioNPreservation Marinas Surface Water 0.5 1 2 3 Miles iource. Pinellas County GIS. 2005. >repared by Wade 7nm, Inc.. August 2007 or City of Clearwater Water Supply Element ~ W~,nETxuvt ~ W __ ~ u i 3 2 ~ ..-. csxaAN oR re c n cAUS6wAVa w - _ . - uREEw RB I ~ ~ xN 11AB e a Ox AVEN -~ Fl1 AVE < (1 Y 0 } ~ Y~ ~ ~ NORTli51 ~ ~, ~~ 1~ WGNIBAN B ~~ LVD ~. ~„ ~6 ~~ \_j ~ R f R O E va NE ~h / BAN iB LN O 6 R MAIN BT BR B > m • " ~~a 3 ~ N MN ST o er' ~ p a~ c faY° ~ ~ a 8i ~ ~ f R S T UNq ST • "0 BUMBET POMT E a s Otten Tank ~ o ~ (t MG) ax ,~ ~ ° ~ ReseroNUt~ w ~ ~ $ ~+P~~ Q ~ 'a iM M RO Facility ~ C ae ~ j ` L E (5 M G) ~' iJ ~ 4cc z ~` a i ~ ' ~ ~ c S M C Mp ST E OUBT aT IA lf t YBL < oR tm GreenwootllMLK Tank ] • (1 MGi NURE6NV RO • ~ BEr1~, R6 j~ O l ~ X19 U W RnSERV RD 116W C _,~~ ~ ~/ ~~ 6NwcN6R ~ c .~. ~ I6AM Bl11CN CawY ~ - ~ wEal BAY On` ~ ~ FAST BAV OR sR iO '~ -~ Dei Oro lank (t MG) !SBVOIr R2 (5 MG) ~~ RR. Y M1 tai- a s ~ 'I B __. __ TAIL B J ' ' ,Y Clearwater Ma 3 P Potable Water Supply Facilities . Elevated Potable Water Tank Potable Water Storage Reservoirs Wit®/ Wells Status • In Service Out of Service ~ Plugged ~., Proposed Mondor WeII - Major Roads Jurisdictional Boundaries City of Clearwater Other Cities Unincorporated Pinellas County 0 0.5 1 2 3 Miles Source Cily of Cbarwaler Water Department, 2007; Pinellas County GIS. 2007. Preparetl by Wade Tnm. Inc_ August 2007 for City of Clearwater Water Supply Elerrent. ~ W~ETxn~t Potable Water Element 17 City of Clearwater Comprehensive Plan In general, the groundwater source for both Clearwater and Pinellas County comes from a groundwater supply called the Floridan Aquifer. More specifically, the City water sources are 22 groundwater wells, while Pinellas County potable water is obtained from two different sources: Tampa Bay Water's regional water system; i and fresh water from Eldridge Wilde wellfields. Tampa Bay Water is a local wholesaler providing water to six local governments in the Tampa Bay metropolitan area. Multiple sources contribute to Tampa Bay Water's regional water supply; these include groundwater and surface water from around the Tampa Bay metropolitan area and saline water from Tampa Bay. A summary of the daily production rates for the three reservoirs is provided in Table 2. The table also details the relative production provided by the City and the production provided by Pinellas County. Table 2 Summary of Daily Productions by Source r The values reflect the addition of a reverse osmosis facility at Reservoir No. 1, which, at the time of the preparation of the Water System Assessment (Clearwater Water Master Plan), was expected to reduce the amount of water purchased from Pinellas County by a net of 2-million gallons per day (mgd) on a long term basis. The average daily demand for potable water within the City of Clearwater water service area totals 13-mgd, of which 63 percent is provided by Pinellas County and 37 percent is provided by the City's wells. According to the City's water use permit issued through the Southwest Florida Water Management District (SWFWMD), the City is allowed to pump a maximum of 6.25-mgd from its wells. `Value listed represents finished blended water capacity. In order to produce the 3-mgd blended finished water capacity requires 3.6-mgd of well water, 0.6-mgd of which is concenVate that is discharged to the sanitary sewer. "Water provided by Pinellas County interconnects located on-site with existing City of Clearwater facilities. Source: City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. 1 1 1 I1 1 Potable Water Element City of Clearwater Comprehensive Plan 18 Reservoir No. 1 is located on Palmetto Street near Saturn Avenue and consists of a reverse osmosis water treatment plant, a single 5 million gallon (mg) storage tank, chloramination facilities for disinfection, and a high service pumping station. Reservoir 1 utilizes 3.6-mgd of raw groundwater to produce 3-mgd of treated potable water. The Reverse osmosis plant uses 2.6-mgd of water to produce 2.0- mgd of permeate which is blended with 1.0-mgd of pre-treated by-passed water, attaining a total of 3-mgd of potable drinking water. Feed water to the plant comes from 10 active wells (Well Nos. 23, 31, 48, 65, 66, 73, 74, 75, 78 and 81). Production from Well 81 is limited due to the need for a sand pack to prevent sand from entering the well. Reservoir No. 2 is located near the intersection of US 19 and Drew Street and consists of a single 5-mg storage tank, chloramination facilities, and a high service pumping station. Feed water to the plant comes from 3 active wells (Well Nos. 45, 46 and 53). Two additional inactive wells are also connected (Well Nos. 51 and 52). Water from the wells can vary but typically provide on average 0.6 mgd. Also on- site is an interconnect with Pinellas County that provides on average 1.5-mgd. Water from both the wells and interconnect are blended in the 5-mg storage tank. Chlorine and ammonia are added to boost the chloramine concentration of the incoming water. The high service pumps then deliver the finished water to the distribution system.8 Reservoir No. 3, located near the intersection of Countryside Blvd. and State Road 580, consists of two 5-mg storage tanks, chloramination facilities, and a high service pumping station. Feed water to the plant comes from 5 active wells (Well Nos. 56, 58, 68, 69, and 77). Water from the wells can vary but typically provide on average 1.2-mgd. Also on site is an interconnect with Pinellas County that provides on average 7-mgd. Water from both the wells and interconnect are blended in the 5-mg storage tank. Chlorine and ammonia are added to boost the chloramine concentration of the incoming water. The high service pumps then deliver the finished water to the distribution system.9 ~ City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. a City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. s City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. Potable Water Element 19 City of Clearwater Comprehensive Plan ' Elevated Storage Tanks The City of Clearwater operates three 1 million gallon (mg) elevated storage tanks to provide additional storage capacity, consistent distribution system pressure, and to respond to emergency demands such as fire. The three elevated storage tanks ' are identified and located as follows: Del Oro, located near the intersection of McMullen-Booth Road and Drew; Martin Luther King, located near the intersection ' of Bellevue Blvd. and Martin Luther King; and Otten Street, located near the intersection of Otten Street and Highland Ave. At the time of the preparation of the Clearwater Water Master Plan Water System Assessment (June 2004), the three ' elevated storage tanks were valved-off due to water stagnation issues and degradation of water quality. However, the City has since placed the Martin Luther ' King and Otten Street tanks back into service in order to maintain an adequate level of service and for additional emergency storage capabilities.~~ i With regard to the total capacity of drinking water sources and treatment facilities, Chapter 62-555(6) of the Florida Administrative Code states that: The total capacity of al/ water sources and treatment facilities connected to a water system sha/l at least equal the water system's design maximum-day water demand (including design fire-f/ow demand if fire protection is being provided). In total, the City has a storage capacity of 23-mgd provided by the four 5-mgd storage tanks at Reservoirs 1, 2 and 3 and the three 1-mgd elevated storage tanks. However, at the time of the Clearwater Water Master Plan Water System ' Assessment ,the City's total storage capacity was estimated at 20-mgd, not calculating the capacity of the elevated storage tanks because of their stagnation and water quality issues. In addition to the City's own storage capacity, Pinellas County provides the City with some storage capacity through the interconnections. However, the exact amount of storage capacity available to the City through ' Pinellas County is unknown.>> ' Based on the Water System Assessment report, the City's design maximum-day potable water demand is estimated at 19-mgd. At 20-mgd, the City's current storage tank capacity is sufficient to achieve potable water design maximum-day ~o City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. ~~ City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. Potable Water Element 20 ' City of Clearwater Comprehensive Plan ' demand according to Chapter 62-555 F.A.C. However, the Water System Assessment noted that this total capacity may be inadequate to achieve fire-flow demand. For this reason, and as noted above, two of the three 1-mgd elevated storage tanks were put back into service, but several modifications to the distribution system were recommended in the assessment to increase overall capacity, including distribution system pipe modifications, addition of booster pump stations, and addition of inter-distribution system storage tanks.12 Pumping Facilities High-service pumps are found at each of the City's three reservoirs to ensure distribution system capacity and pressure. These pumps ensure that water under sufficient pressure is delivered from the wellheads to the various storage and treatment facilities and then into the distribution system. Additionally, system capacity and pressure is supplemented through the six direct interconnections with the Pinellas County water system. With regard to required pumping capacity, Chapter 62-555.320(1 5) of the Florida Administrative Code states that: (a) Unless elevated finished-drinking-water storage is provided, the total capacity of a// high-service pumping stations connected to a water system, or the capacity ofa booster pumping station, sha// be sufficient to: 1. Meet at /east the water system's, or the booster station service area's, peak- hour water demand (and if fire protection is being provided, meet at /east the water system's, or the booster station service area's, design fire-flow rate p/us a background water demand equivalent to the maximum-day demand other than fire-flow demand); and 2. Maintain a minimum gauge pressure of 20 pounds per square inch throughout the water system's, or the booster station service area's, distribution system up to each customer's point of connection to the distribution system. (b) Where elevated finished-drinking-water storage is provided, the total capacity ' of a// high-service pumping stations connected to a water system, or the capacity ,z City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. ~J Potable Water Element n City of Clearwater Comprehensive Plan of a booster pumping station, sha// be sufficient to at /east meet the water system's, or the booster station service area's, maximum-day water demand (inc/uding design fire-f/ow demand if fire protection is being provided) and to maintain distribution system pressure as specified in subparagraph 62- 555.320(1 S)(a)2., F.A.C. In addition, the total capacity of the high-service pumping ' stations, or the capacity of the booster pumping station, combined with the useful elevated finished-water storage capacity sha/l be sufficient to meet the water ' system's, or the booster station service area's, peak-hour water demand for at /east four consecutive hours (and if fire protection is being provided, sha// be sufficient to meet the water system's, or the booster station service area's, design ' fire-flow rate p/us a background water demand equivalent to the maximum-day demand other than fire-f/ow demand for the design fire-f/ow duration). ' As noted above, the City's total water storage capacity may be inadequate to achieve fire-flow demand. Because pumping capacity is related to achieving sufficient storage capacity, improvements to the City's pumping capacity is warranted. The Clearwater Water Master Plan Water System Assessment notes that possible solutions include distribution system pipe modifications, addition off booster pump stations, and addition of inter-distribution system storage tanks.13 Distribution System The City of Clearwater's water distribution system includes more than 776 miles of water main, 40,000 water meters, 4,036 fire hydrants, 8,329 valves and 5,445 backflow devices. As shown in Map 4, the water distribution system effectively ' covers all lands within the City of Clearwater, including the unincorporated Pinellas County enclaves. {The Parsons Report includes did not include a summary and assessment of the distribution system. Do we have any additional data to include here? Is there any distribution system inventory by pipe size and classification? ' ,s City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. ,~ Clearwater Map 4 Potable Water Distribution Mains Q City of Clearwater Water Service Area - DisMbutwn Mains - Major Roads Jurisdictional Boundaries Ciry of Clearwater j l Other Cities _ Unincorporated Pinellas County 0.5 1 2 3 Miles source Ciry of Clearwater Water Department. 2007: Pinellas County GIS. Y007. 'repared by Wade Tnm, Inc.. August 2007 or City of Clearwater Water Supply Element. ~ W~,nETxuK it .J Potable Water Element 23 ' City of Clearwater Comprehensive Plan ' Reclaimed Water System ' The City of Clearwater currently operates a reclaimed water system to ensure that adequate water is available today and in the future and that the City's residents have high quality water at an affordable price. The use of reclaimed water helps the ' City to preserve high quality potable water sources by providing a reliable and economical alternative source for irrigation water. Use of reclaimed water for ' irrigation can benefit the City because every gallon of potable water not used for irrigation is one less gallon of water purchased from Pinellas County. This has the potential of significant potable water savings given the escalating costs of ' purchasing water from Pinellas County.14 The City's reclaimed water system is the result of cooperative funding by the Southwest Florida Water Management District and the City of Clearwater. ~ 5 The City's reclaimed water system is shown on Map 5 and includes 51 miles of ~' reclaimed water main. At present, reclaimed water service extends to the Countryside Country Club Golf Course and driving range, Chi Chi Rodriguez Golf ' Course and the soccer fields on McMullen Booth Road in the Countryside area, which are fed from the Northeast Treatment Plant. The Northeast Treatment Plant will also serve the reclaimed projects on the east side of Clearwater: Drew Union, i Del Oro, Morningside, and Skycrest. The Marshall Street Plant feeds Jack Russell Stadium, Pier 60 Park, Coachman Park as well as 1,400 customers on Island Estates and Clearwater Beach. In 2004, reclaimed water became available to the Harbor Oaks Area of Clearwater. This area also receives it supply from the Marshall Street Plant. Approximately 2,000 customers are now provided reclaimed water, with a current consumption in the range of 2 to 2.5-mgd. The City of Clearwater is currently designing the Skycrest Reclaimed Water Project which will include an east/west interconnection, pumping and storage facility. This interconnection will complete the loop within the City, resulting in both sides of ' the City being connected for future expansion of our reclaimed program.16 '"City of Clearwater Water Master Plan, Capital Improvements Implementation Master Plan. Parsons Corporation. October 2004. is City of Clearwater Reclaimed Water Master Plan. City of Clearwater Website. Http:llwww.clearwater- fl.comlgovldepts/pwa/public_utils/divisions/reclaimed/rcwater_plan.asp. is City of Clearwater Reclaimed Water Master Plan. City of Clearwater Website. Http:l/www.clearwater- ' fl.com/gov/depts/pwa/public_utils/divisions/reclaimed/rcwater_plan.asp. ('1ParwatPr v v v v v ~~ U. - - - - - - Map S Reclaimed Water Facilities • Reclamed Water Fixtures - Reclaimed Weter Lines - Mapr Roads Jurisdictional Boundarisa City of Clearwater Other Cities '' Unincorporated Pinellas County 0.5 1 2 3 Miles iource. Gy of Clearwater Water Department, 2007; >inellas County GIS, 2007. >repared by Wade Tnm,lnc.,Augus12007 or City of Clearwater Water Supply Element. ~ WAnETxn~t 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Potable Water Element ~ City of Clearwater Comprehensive Plan Future extensions are based on several factors, including lawn Irrigation usage/potential offset, proximity to existing reclaim sources, and infrastructure cost. The City of Clearwater has developed a Reclaimed Water Master Plan that includes a 20-year schedule for reclaimed water extensions with the intent to develop up to 15-mgd of reclaimed water usage. Table 3 provides a summary of the reclaimed water projects included in the Master Plan. (Note: Need to review completed projects) Table 3 Reclaimed Water Master Plan, October 2001 Com leted or On oin Pro'ects -. Com leted Island Estates 3,700,000 Com leted N. Beach 2,400,000 Com leted S. Beach 1,700,000 Com leted Drew/Union Street 4,500,000 Com leted Harbor Oaks 2,600,000 Com leted Seville 1,200,000 Under Construction Del Oro Groves 3,400,000 Under Desi n Mornin side 4,200,000 Under Desi n Future Pro'ects Sk crest • . 10,838,000 : ~~~ 4 Sk crest 2,800,000 5 Coachman Ride 2,700,000 6 Enter rise 4,000,000 7 E. Drew Street 1,700 000 8 Count side South 4,800,000 9 Lake Park 3,000,000 10 South Bet Lane 3,900,000 11 Count side North 5,000,000 12 North Greenwood 4,500,000 13 North Hercules 2,500,000 14 Count Club Estates 3,700,000 15 Clearwater Hi h 4 500,000 16 Glen Oaks 4,200,000 17 North Belcher 4,300,000 18 Palmetto Street 4,600,000 19 Clearwater Harbor 3,900,000 20 Woodmont 3,000,000 21 Hercules Industrial 1,700,000 22 Sunset Point 3,700,000 23 YMCA 3,100,000 24 S Ivan Abbe 2,500,000 25 Old Coachman 2,500,000 :111 Source: City of Clearwater Reclaimed City of Clearwater Reclaimed Water Master Plan. October 21, 2001 r Potable Water Element 26 ~! City of Clearwater Comprehensive Plan 3.4 Level of Service The existing Clearwater Comprehensive Plan has established the following Level of Service standards to be used in determining the availability of facility capacity and demand created by new development: 120 gallons per capita per day at a pressure of 40-45 psi. Potable water level of service is measured based on the rate of potable water consumption on a per person basis. This method of measurement provides an indicator of the demand placed on the potable water system and allows for tracking improvements in potable water conservation measures. As the rate of consumption decreases, the rate of success of potable water conservation measures increases. Based on the current potable water supply of 13-mgd allocated across the water service area's 2005 functional population of 146,832, the demand for potable water per capita per day is 88.5 gallons. This rate of demand is well within the adopted level of service. 3.5 Facility Capacity Analysis ' As highlighted in Table 2, the City of Clearwater's water system has an average potable water production capacity of 13 million gallons per day (mgd). What is the total potable water treatment capacity? As of 2005, the City of Clearwater's water system is estimated to have an average daily demand of 13.90-mgd. This is based on a functional population estimate of 146,832 for the water service area, and assumes a demand of 90.5 gallons per capita in addition to 610,000 gallons per day for significant water users.» The ' estimated average daily demand of 13.90-mgd also takes into account the planned future land uses of the City of Clearwater. Given that the City is almost completely built-out, significant population growth and the conversion of large undeveloped lands to urban use is not expected. The ' City's population is expected to increase only slightly, while the City's current City of Clearwater Water Master Plan, Capital Improvements Implementation Master Plan. Parsons Corporation. October 2004. Potable Water Element 27 n 1 1 1 1 1 City of Clearwater Comprehensive Plan distribution of land use is planned to be maintained generally in its present state. Rather, the Future Land Use Element of the Comprehensive Plan focuses on redevelopment efforts throughout the City, particularly within downtown Clearwater and the Clearwater Beach area. Based on the total water production capacity of ______ and an estimated demand of 13.90-mgd for 2005, the City of Clearwater's water system currently has a production surplus of _____. However, the estimated demand of 13.90-mgd does not account for the reduction in potable water demand resulting from the City's reclaimed water system. Therefore, 15 and 25 percent water reuse offsets have been applied to the total demand, resulting in an average daily demand of 13.69- mgd or 13.55-mgd, respectively.18 Based on the total water production capacity of ______, a larger surplus of _____ with a 15 percent offset, or ______ with a 25 percent offset would result. Table 4 provides the projected annual average daily demand for the City of Clearwater water system during the initial 5-year planning increment through 2010. Table 4 Water System Average Daily Demand: 5 Year Planning Period Through 2010 .~• ..- •. • , 2005 146832 13.9 13.69 13.55 2006 147173 13.93 13.58 13.34 2007 147514 13.96 13.51 13.21 2008 147855 13.99 13.46 13.1 2009 148196 14.02 13.37 12.93 2010 148537 14.05 13.35 12.88 (a) Functional Population is taken from Table 1. (b) Annual average daily demand is calculated based on 90.5 gallons per capita per day plus 610,000 gallons per dayfor significant users other than hotels. (c) Average annual daily demand considering a 15 percent offset due to the use of reclaimed water for irrigation. (d) Average annual daily demand considering a 25 percent offset due to the use of reclaimed water for irrigation. Source: City of Clearwater Water Master Plan, Capital Improvements Implementation Master Plan. ~a City of Clearwater Water Master Plan, Capital Improvements Implementation Master Plan. Parsons Corporation. October 2004. Potable Water Element Zs City of Clearwater Comprehensive Plan The table also provides the annual average daily demand considering a 15 and 25 percent offset for water reuse based on the functional population. Without the offsets provided by the reclaimed water system, the average daily demand is projected to increase to 14.05-mgd by 2010. However, considering a conservative 15 percent offset for water reuse, the average daily demand would actually decline to 13.35-mgd by 2010. A 25 percent offset results in an average daily demand of 12.88-mgd.19 Given the City's current production capacity of ______, in addition to the reductions in demand resulting from the City's 20-year reclaimed water system improvement program, potable water supply will be more than sufficient during the 5 year planning period through 2010. Table 5 provides the projected annual average daily demand for the City of Clearwater water system during the remaining planning period, 2011 through 2025. By 2025, the water system service area is projected to have a functional population of 150,871, resulting in an annual average daily demand of 14.26-mgd. However, considering a conservative 15 percent offset for water reuse, the average daily demand would actually decline to 12.10-mgd by 2025. A 25 percent offset results in an average daily demand of 10.72-mgd by 2025. 19 City of Clearwater Water Master Plan, Capital Improvements Implementation Master Plan. Parsons Corporation. October 2004. Potable Water Element 29 0 r ii City of Clearwater Comprehensive Plan Table 5 Water System Average Daily Demand: 2005 through 2025 2005 •• 146, 832 • • 13.90 • 13.69 • 13.55 2006 147,173 13.93 13.58 13.34 2007 147, 514 13.96 13.51 13.21 2008 147,855 13.99 13.46 13.10 2009 148,196 14.02 13.37 12.93 2010 148,537 14.05 13.35 12.88 2011 148,761 14.07 13.23 12.66 2012 148,986 14.09 13.16 12.53 2013 149,210 14.11 13.06 12.36 2014 149,434 14.13 12.94 12.15 2015 149,658 14.15 12.84 11.96 2016 149,805 14.17 2017 149,951 14.18 2018 150,098 14.19 2019 150,245 14.21 2020 150,392 14.22 2021 150,488 14.23 2022 150,584 14.24 2023 150,679 14.25 2024 150,775 14.26 2025 150,871 14.26 12.1 (e) 10.72 (e) (a) Functional Population is taken from Table 1. (b) Annual average daily demand is calculated based on 90.5 gallons per capita per day plus 610,000 gallons per day for significant users other than hotels. ' (c) Average annual daily demand considering a 15 percent offset due to the use of reclaimed water for irrigation. ' (d) Average annual daily demand considering a 25 percent offset due to the use of reclaimed water for irrigation. (e) Estimated by applying the percentage change between 2006 and 2015. Data Source 2011 through 2015: City of Clearwater Water Master Plan, Capital Improvements Implementation Master Plan. Parsons corporation. October 2004. Data Source 2016 through 2025: Based on functional population data from Table 1 and a continuation of ' the method utilized by the City of Clearwater Water Master Plan. i~ u Potable Water Element 30 City of Clearwater Comprehensive Plan Water Demand Projections According to The Regional Water Supply Plan 2005 ~.. .- 153,539 14.9 2010 155, 977 15.1 2015 157,654 15.3 2020 158,817 15.4 2025 159,632 15.5 Source: Southwest Florida Water Management District Regional Water Supply Plan, 2007 ;Need to discuss: Master Plan Projections and our projections do not match with SWFWMD Regional Water Supply Plan ' 3.6 Performance and Condition of Existing Facilities An assessment of the performance and condition of existing facilities was ' conducted as part of the City of Clearwater Water Master Plan, Water System Assessment, prepared in 2004. The assessment revealed that a variety of ' corrective measures are necessary to maintain existing levels of service. These recommended corrective measures are outlined below. ' Well Pump Corrosion Currently, corrosion in the vertical turbine pumps used at each raw water production well requires the periodic replacement and maintenance of the pump shaft and pump bowl assembly. Because this maintenance process is difficult and labor intensive, it is recommended that stainless steel submersible pumps be utilized instead. The stainless steel construction of the submersible pumps helps to minimize corrosion, extending the useful life of the pumps.20 ' 20 City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. 1 Potable Water Element 3i ' City of Clearwater Comprehensive Plan ' Standby Power Requirements ' Chapter No. 62-555 F.A.C. states that each community water system shall provide standby power for operation of the water source, treatment, and pumping facilities necessary to deliver drinking water meeting all primary and secondary standards to meet the average daily demand for the system. The raw water production wells feeding Reservoir 1 are not currently provided with an auxiliary power source as needed to achieve compliance with Chapter 62-555, F.A.C. Two alternative corrective measures were evaluated: installation of a permanent generator or the purchase of portable generators. In the end, portable generators to serve the ' production wells were chosen as the preferred alternative given the cost savings. ' According to the Water System Assessment, backup generators with sufficient capacity are available to serve the treatment and storage facilities at Reservoirs 1 and 2, but not Reservoir 3. Therefore, the study recommended that the existing generator be replaced with a larger generator to handle the current load. Potable Water Element s2 ' City of Clearwater Comprehensive Plan ' Control and Monitoring Improvements ' In order to make control and monitoring of the City's water system centralized, it is recommended the City install the necessary Supervisory Control and Data Acquisition (SCADA) equipment at existing facilities to allow communications with ' the new network installed at Reservoir No. 1. This includes control and monitoring of Reservoirs Nos. 2 and 3, raw water wells and Pinellas County interconnections. 1 For Reservoir Nos. 2 and 3, the raw water wells, and county interconnects, the Water System Assessment recommended that a radio telemetry system be established to enable effective communications between system facilities. At the county interconnects, it was recommended to add a remotely operated valve to open or close the interconnects. ' Storage Improvements ' As stated previously, the City's three elevated storage tanks face water stagnation issues with the potential result of degradation to water quality. At the time of the Water System Assessment, the storage tanks were valved-off. Additionally, the Water System Assessment noted that the City's storage tank capacity may be inadequate to achieve fire-flow demand. Therefore, the study recommended the ' elevated storage tanks to be placed back into service, restoring sufficient fire- flows to certain areas of the City. To alleviate the water stagnation issues at the ' storage tanks, recommendations were outlined that included the installation of a mixing system, an altitude valve, isolation valve and small booster pump station to force water out of the storage tanks. To increase fire-flow capacity, the Water ' System Assessment recommended the addition of inter-distribution system storage tanks in combination with distribution system pipe modifications. Pumping Improvements ' Improvements to the City's pumping facilities are also necessary to improve fire- flows. The Water System Assessment indicates that the current high service pumps ' are deficient in meeting fire-flow levels in some areas of the City. Therefore, additional booster pump stations are recommended in conjunction with distribution system pipe modifications. 1 Potable Water Element 33 City of Clearwater Comprehensive Plan 3.7 Issues and Opportunities for Expansion and New Facilities One of the major goals for the City is to increase self sufficiency in water supply to control future costs. Presently, the City purchases approximately 8 million gallons of water from Pinellas County at a cost of approximately 7 million dollars per year. Over the years, wholesale water rates have increased and are projected to continually rise. To accomplish increased self sufficiency, the Capital Improvement Plan portion of the Water Master Plan outlines numerous projects involving the expansion of existing water production facilities or the construction of new water production facilities. Limited Source Water Opportunities i! ~~ i The City of Clearwater is uniquely located between the Gulf of Mexico and Tampa Bay in an area that has relatively low rates of aquifer recharge. This results in limited quantities of fresh groundwater, and subsequently, limited opportunities to expand source water production. Source water quality continues to degrade due to increased chloride levels caused by pumping of wells in excess of long term safe yield capacities, but within existing water use permitted quantities.21 Chloride Cap Restriction One of the greatest challenges in increasing capacity for existing production wells and the construction of new production wells is the Southwest Florida Water Management District's chloride cap of 250 mg/L. This chloride cap level is intended to serve as a guideline in evaluating trends and controlling the effects of wellfield withdraws on groundwater quality. In order for the City to proceed with new and sustainable water resources as outlined in their Capital Improvement Plan, the chloride cap must be increased. To provide the necessary evidence to support an increase in the chloride cap, the City is planning to undertake a Chloride Monitoring Welf Study. The first phase of this study will examine the effects in the vicinity of Reservoir Nos. 1 and 3, as the impact of this cap will limit the water production from these facilities first. In a later phase, a similar study will be initiated in the vicinity of Reservoir 2 and south 21 City of Clearwater Water Master Plan, Capital Improvements Implementation Master Plan. Parsons Corporation. October 2004. 1 Potable Water Element 34 City of Clearwater Comprehensive Plan of Gulf-to-Bay to support the development of a new reverse osmosis facility at Reservoir No. 2.zz Feasible New Groundwater Sources As part of the Capital Improvements Plan, the Water Master Plan identifies three improvement projects aimed at increasing water supply that are economically viable as well as technically feasible during the planning period. These three projects include: • Development of an additional 1-mgd of fresh groundwater supply and .: associated wells and transmission mains to connect to Reservoir No. 3; • Development of an additional 1-mgd of production capacity at Reservoir- No. 1 by means of adding an additional 1.25-mgd of raw groundwater supply and expansion of the reverse osmosis facility; and, ' Development of an additional 3.5-mgd of production capacity at Reservoir No. 2 by adding an additional 4.25-mgd of raw groundwater supply, transmission mains and a new, low-pressure reverse osmosis faci I ity. r As stated previously, these projects are partially dependent upon an increase to the SWFWMD's imposed chloride cap. However, even if the effort to raise the cap is unsuccessful, the proposed new production wells for Reservoir Nos. 1 and 3 are still recommended to be developed and permitted. The development of these wells would increase the rotational capacity, maximize production, rest existing wells, and allow for chloride levels to subside. 3.8 Natural Drainage and Groundwater Recharge The natural drainage features within the City of Clearwater water system are displayed on Map 6. As can be seen, the City is located between the seawater bodies of the Gulf of Mexico and Tampa Bay. Freshwater water bodies within the City include Lake Bellevue, Crest Lake, Alligator Lake, Beckett Lake, Lake ' zz City of Clearwater Water Master Plan, Capital Improvements Implementation Master Plan. Parsons Corporation. October 2004. ii J' S 3 ~6 ~ ~ ajCF '~ a~ ~~ ~ ~ ~ % s ~ ~~ Y Clearwater uueEWAYBLw ~ T~s<LNLE°0LV° cuRiaY Rn - ~'~''~~~.. RY ~~.p NAOENAVE ~ @ 'd s MIEN S m TAM o S~ ~ _ _ .. _ O :. E DOUGUS AO f NORrNSIOE OR 3 S OR ~ ! m'f YK;NgAN BLw rEpap l SR Jb EW y[ LVD ,~ Map 6 t1~ BDIAN AVE ~,TA i3_ BL1G SAR CMRISTO 6R DR kvAN3 "° ~ Surface & MAIN 9T SR ~ Groundwater s m ~ '° Discharge/Recharge f W WN ST l r ~4 O BI{iERRRgE ROE ~ r ~ q ~ ~ W ~~ 'o I °s s si < ~ ` -~ RSHALL 3i 3' ~ ~ ~ ~ Rivers and Streams g ~` rRRD sr UNION sT s ~ Lakes °T `= Floridan Aquifer DischargdRecharge NrcweRa ~ ~ 3 '< _ MAW ST o Discharge suRBET vooRT a ~ ~ &w - Recharge ~ ¥ 1 ~ i € -Major Roads ,` ~ ~ ~ m ao - ~ ° Jurisdictional Boundaries ~~ ~ ' ~ & `'~ ~ City of Clearwater ~ ~ ~ ~ eurE aT '~ ~~ p~ - - J ~ ~ p h - -. -- -~ Other Cities V `~<c s ~i ~ ~ d ~, q~ ~ ~ ~ oRewn ,._ __~; Unincorporated Pinellas County n G ND ST ~ BELL CS<Vt cOURnIEY DAM T T LF T09AV BL ~ ~P W ~ ~ OR RD 0 4 a ik Y ` Y ~ - LAR I.~. a O S[ vd, ~MRN~ ' g . NURbERr RO 0 0.5 1 2 3 BF1LF1~ ao ~ Miles _ ~ >R ~ ~ ~ ~ Source. Southwest Fbrda Water Management District. g $ ~ ~ g 2002-2007; Pinellas County GIS. 2007. ~~ • W RosbRYRDIre+ $ Prepared by Wade Tnm, Inc.. August 2007 ~ ~~ NLENBADNERR ` ~ ~ x ~ ~I for City of Clearwater Water Suppy Element. q i{+ WNITNEV RO 7 'yy~ ~ ~ ~ ~ II ~ i BAM!BEACM CAVY WEST BAY DRO i 5 EASt BAY DR '0.003 vELT 6LV ~ ~ W~ET1LLM r~ ~~ ii u ii 1 Potable Water Element 36 City of Clearwater Comprehensive Plan Chautauqua, and various creeks and drainageways. To the north of the City, Lake Tarpon is a large freshwater resource. According to the Southwest Florida Water Management District over 84 percent of all water used within the District's boundaries emanates from groundwater resources. The deepest and most productive aquifer within the District is the Upper Floridan, which also is found underneath the City of Clearwater.23 In the Clearwater area, the Upper Floridan aquifer contains a relatively thin layer of fresh groundwater underlain by a transition zone of brackish water, which increases in chloride and dissolved solids concentrations with depth until seawater concentrations are reached.24 The Upper Floridan is a productive aquifer, supplying more than ten times the amount of water pumped from the two other aquifer systems found in the Water Management District. In the northern portion of the District, the Floridan aquifer is readily recharged by rainfall (greater than 10 inches per year), and is most highly productive. In central Pinellas County, the Floridan aquifer features a recharge rate of 1 to 10 inches per year.25 3.9 Existing Regulations and Programs Relating to Natural Drainage and Groundwater Recharge Future protection and use of water resources is a public service for which long- range comprehensive planning is mandatory. The primary threats to groundwater in the Clearwater area are saltwater intrusion via overdraft and contamination. When groundwater recharge exceeds withdrawal, there is a potential for saltwater to move inward from coastal areas, ultimately affecting the quality of the available groundwater. Additionally, contamination from injection and drainage wells, fertilizers, storage tanks, and other sources affect the quality of groundwater. Both overdraft and contamination are risks that can be reduced via careful regulation. The Southwest Florida Water Management District is the primary regulator and program administrator relating to natural drainage and groundwater recharge. zs Southwest Florida Water Management District. Regional Water Supply Plan. December 2006 z^ Technical Memorandum. Evaluation of City of Clearwater Existing Production Wells. SDI Environmental Services, Inc. zs Generalized Recharge to the Floridan Aquifer (Map). District Water Management Plan, Southwest Florida Water Management District. July 2000. Potable Water Element 37 City of Clearwater Comprehensive Plan The City of Clearwater is contained within the boundaries of several SWFWMD water supply programs, including:>> Northern Tampa Bay Water Resource Assessment Project (WRAP) The Northern Tampa Bay Water Resource Assessment Project (WRAP) was initiated by the district to assess water availability, including minimum flows and levels, in order to support water resource recover, water use permitting, and environmental resource permitting. Both the City of Clearwater and Pinellas County provide input to the technical projects performed by the District. Northern Tampa Bay Water Use Caution Area (WUCA) The Northern Tampa Bay Water Use Caution Area sets water use permit (WUP) for the area, including additional conservation requirements such as reuse. Public supply permits within the WUCA limit per capita water use demands to 1 50 gallons per person per day. Any utility not meeting these numbers has strict timeframes and guidelines to implement this limit. The City of Clearwater is not using its entire permitted allocation of groundwater from the Upper Floridan aquifer although it is anticipated that its utility will eventually grow into its unused quantity to meet future demand. For example, the City of Clearwater's brackish R.O. facility is permitted to withdraw 6.3 mgd of brackish groundwater, although the City has been withdrawing an average of 3 mgd.t2~ The City of Clearwater has been and is actively participating in SWFWMD's efforts to prioritize recharge areas within the Upper Floridan aquifer recharge area. Tampa Bay/Andote River Comprehensive Watershed Management (CWM) Project As part of SWFWMD's continuing efforts to ensure the coordination of local governments' planning practices regarding water supply management, SWFWMD has developed the Comprehensive Watershed Management (CWM) Program in coordination with local governments to conduct water resource assessments and planning on a watershed rather than district-wide basis. The City of Clearwater is in the Tampa Bay/Anclote River Comprehensive Watershed Management (CWM) Area. This area encompasses all of Pinellas County and parts of Hillsborough and ~~~ Southwest Florida Water Management District, 2005 District Water Management Plan. ' X21 Southwest Florida Water Management District, 2006 Regional Water Supply Plan LJ Potable Water Element 38 City of Clearwater Comprehensive Plan ' Pasco Counties or approximately 566 square miles. The Tampa Bay/Anclote River CWM Plan was last adopted in 2002. The 2006 SWFWMD Regional Water Supply ' Plan requires updates to the CWM Plan in which Pinellas County and the City of Clearwater will be invited to participate. ' 3.10 Capital Improvement projects ' Appendix A presents the list and budget for several potable water projects to be completed from 2004-2012. The total of capital facility improvements is about $97 millions dollars. [] r i~ A endix A. Cit of Clearwater Water Ca ital Im rovement Plan Im lementation Schedule and Bud et Summa ID Task Name _ §tart ~ Flnlsh _ Baxllne Losl zoos zoa6_ _ zao7 ptr3 p tr 4 ptr 7 Qtr2 ptr3 Otr4 ptr1~ Otr2 ptr3 ptr4 ptr1 ptr2 ptr3 zoos zoo9 zolo Izo11 Izotz ,_,_._.___ Ob4 ptr1 p02 OD3 ptr4 pB1 Otr2 ptr3 ptr4 Qt 1 p 2 1 Overap WrterCP _ Frl1G%1N~ Fr19/2B/12 586,SS1A00.00 _ _ ____ _ ~~ ~ ""----~~ -~-- r tr Otr3: ptr4 ptr! ptr2 Otr3 ptr4 ptr1 ptr2 pU3 ~ ptr4 - - - 2 Elevatetl Water Tanks Upgratlea Ftl 10/1N1, Thu i/ND]~. 52,992,100.00• 3 Professbnal ServlcearLOmuIOnB Fri 10/1/(14 Thu 929/05: 5125,000.001 4 Site Devebpment Fd 9/30/06 Thu17/1 QO5, 55.000.00 '., E ConsWCBOn-0den 51. Fd 11/11/(15 Thu 7/6/O6~ f7.350,0g0.001 6 Construgion-MLK AVe. Frl Ill/O6 Thu 7/4N7 N.388,100.00 ~ ' 7 Malydanance-OelOro Fr110/1/O4 Thu928/O6 E127,000.00 -: 8 Telemetry for Wdk Fri 10/1/04 Frt ]/I/OB f 1,066,000.00 9 10 Pr4feeaional ServlceNCaruuging Slte Devebpment Mon 10!!/06 Ftl 7D/1/04 Fri 2/3IOG Thuf02804 E113,000.00~ 55,00000 - ~ L' ~ ~ - - it Lomtrvplon-Par11 Fr110/7N4 Thu52&O6 $50,000 Op ~ ~~~ 72 Canstructlon-Part 2 Man 2/8r06 Fd 929N6 5397,000 00 13 Conmuciion-Part3 Mon 1011/W Fn7/4lOB 5600,000.00 14 Wrter Oerrcrators Fd 10/7N1 Thu 22/08' SeDD,DDD.DD 15 Professbrul ServiceNLOnwMng Fri 10/1/04 Thu 42805' 550,000.00 ~ ' ~~~~16 ~~ Consbuctlan Frt 429/05 Thu Yl/f16, E550,000.00. ~ '. 17 Weplleld E~ansbn42eserwlr ] Fri 10/7/Ot Tue 820/08 3],86],000.00 ~ ' 18 Professional SemcesJCOnwging4:MOriOe Lap FA 70/1/04 Thu329/07 5300,000.00 ~ - '. - 19 Professional Fd 1/1/07 Tue 9130/08 5329.730.00 ServkearCOnaUting-DesIgNBINPermittlig Aesstence '. 20 Lent ASqulsltbn-MOngorinp Weh Fd 2/405 Thu 1/5/06 §405,000.00 - 21 land ACqulpfwn-ProduWOn We6a Mon 102/08 Fd 928r07 E424,J60.00' ~ ' 12 Stte DevebpmeMM2ter Use PennpBnp Fri 1/405 Thu329/07 b118,450.00 ~ - ~ ~ ' 23 24 L4ristruWorFMongodng WeBS Fd 62N05 Thu 92806, §377,750.00 - ~: 25 LensWCbrvProtluoUOn Weh and Rew Watar Mon 10/1N7 Fr1928/08 E7,966,9f0.lXl' ~~ ~ Piping '~, '. 26 RO Plant Expansion Res 01 Frt 10/1/01 Wetl B2B/10: 510,886,660.00 ' 27 Professional Services/COnwBinp-CNarlde CaP Fri1W7/04 Thu1/18!07' 5224,720.00 - ~ ' Study 28 Proyeaalonal Thu1/f 07 Wed 729/09 f1,351,154.00~ '. ServiceslLOnsuglrg-DesigNBiNPermlltlrg ', Amlafance 29 30 Land ACqubilion.Manitonnp WeBa Fr110/104 Thu929/OS f395,000.00~ -~ ~ ': 31 32 Land A4qubNarvProductron Weh Wed 70/1/08 Tue 9/29/09 EW7,088.00~ 33 34 Site DevelopmenUpennittlnpldondortng Wells Fri 10/1/04 Thu 8/3106'. $40,600.00 -~ 36 age Devebpment-Water Use PermlNng Mon 10R/OB Fd 6/5/09 599,360.00 37 ' 38 COnahuc0on-MOnitorlnB WaBS Mon 10llNS Frl 1/3/06' 5208,000.00 38 ' 40 Conatrupion~Produdian Welb, Raw Water Thu 2/5/09 Wetl 929/10 ~ 57,801,650.00 Piping. Pknt Expanalon 41 42 Ras.2 ]mgtl RO plans Mon 102/06 Fri 828/71 S21,BBOA80.00 43~ Proka&onal Servkea/Cenwging-MOngodnB WeO Mon 70/1/OB Fri926N8 E536,410.00 ' Study, Pllot Tes11n8. Brine Disposal Stud/ 44 Proknbnal ServbeNCOnsuMnp-0esigNBitl/Parm Mon 9/29/08 Fri 827/10 §2.513,260.00 45 Lantl AcpuisAlon-MOnitorlrg WeBa Mon 1115/D7 Fri t/11N8 E371,315.00 4fi Land Acqubitlon-Productlon Weh Mon 1/L09 Fr1129/10 5902.7511.001 47 tsr Usa Permiglnp, Brine Mon 2/5107 Frt 7/16/10 5110,975.00 i ~ .... Disposal PsrmlMnp ...... Project: Water Master %en CIP Task ~ Progress Summary ^ Extamal Tasks l s DeamineA IT __ V Date: Mon 1p2.5ID4 SpfA Mikdone . Project Summary Exlemet Mikstone 0 Mon 1 025104 Water Master Pbn LIP.mpP PARSON S ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ i ~ ~ ~ ~ ~ ----R , Conshuction-Pro7udlon Wells, Raw Water Piping, Mon 1122/10 Fh 828112 j79,900,000.00 Treatment Plant, Bnne Disposal System RB R-Maintenance Fri1d1/04 Thu923/f0 5150.000.00 ~~ Raclalmed Wata Distribution SYstem Fri 10/1I0/ Thu 92]/10 526,10!,120.00 from water revenue Mon 7013/05 Fri 928/08' 52,379,220.00 ~ ' Fmm fulurt bon0a Mon 102N8 Fr1713d10' E9,82J,450.00. (--'- ~ FromgrantrolmDUraement F111d1/04 Thu92d10 `~ _-- --' "` '. E12,907,450.00~ Water Supply and Trtatrnant-Mist bnProvemenb Fr170/7Nl Thu825/10' f],BE0,000.00~ ~ ~ '. Rect MlscelWneoua Improvements Frl7d7/04 Thu92&06 5753,000.00 ~ '. Res.2MlsaYaneoua lmprovemems FN 141/04 Thu92&OB E110,000.00~ Rea.3MlsceOaneous Improvements Fri1d1l04 Thu 928/06 S77,fi00.00 Polabb WeOrMixeOeneaus Improvements Fri 141!04 Thu928106. E0.00~ WeO pumpreplacementa Fri7d7/04 Thu 928108 E1,422,000.00 InterconnectaMbcehneOUC lmprovemeMS Fritd7/04 Thu 928108 EJJ3,100.00 Otherlmprovamenb Fri tdl/04 Thu923/10' S1,754,J00.00~ System RBR-CapibOzetl Fri idl/04 Thu923170 52,t00,000.00~ Line RNOeatlon-CapihRZetl Fri1d1/04 Thu923/10~ W~ f -- -- - _~ f9 750 000 ~ . , . M t /B Ml R l VCh -0 ~ - e er ac ow p onn ng N Fri 10/1/04 Thu 923/10. 53,600,000.00 -~ --, S t E b ys em Spana n FrlldiN4 Thu 923/t0 51,500,000.00 W t E k Ll a er erv e lrcs Frl1d1/04 Thu 923/10 53.000,000.00 ~. Wafer Pl l T W F 1 c ruc wP r 1d1l04 Thu 92410 5224,040.00 ;. Water Mein Phases l6-18-1T Fri1d1N4 Thu929N5 f2.500,000.00i 0 _ Water Meter Testing Equipment Mon 1013Po5 Fri929/O8. f07,100.00~ ~-~I Water OUalky MOnilorlrg DeMCes Man 7013/05 Fn 928/07 E60D,000.00 Task ~ Progress Summary ^ Fxtemal Teaks ~~II Project: Water Master Phn CIP ® Dea0lineA V OMe: Mon 7025/04 9p10 Milestone . Project Summary ^ Fxtemal Milestone Mon 1028/04 WalerMester Plan CIP.mpp PAR 50 N 5 1 1 1 1 1 1 1 1 '~ t Potable Water Element 1 City of Clearwater Comprehensive Plan ~~ ~ ~~1~. ! ~% ~' ' ~ , °~ ~~ ~~~ / ~~~~ ~~~ C E7 t ~'~ r ~~~ ,/~ - Potable Water Element City of C earwater /~ I~ WaDETiuM i -. ° ~.~~~` _~ ~~ CITY OF CLEARWATER Interdepartmental Correspondence Sheet TO: Community Development Board Members FROM: Sandra E. Herman, Planner III ~~~~~----f SUBJECT: CPA2008-03002 -Revisions DATE: April 9, 2008 We are forwarding to you a copy of an email today from Robert Fahey, City Engineering, who has requested three small changes to be made to the potable water document. Due to a timing consideration, Wade Trim was not able to make these changes prior to the submittal of the packets for the April 15, 2008 Community Development Board meeting. However, Wade Trim will be making the changes pursuant to Mr. Fahey's request prior to the City Council Meeting on May 15, 2008. Please include these revisions in your motion. C:IDocuments and SettingslSandra.HermanlDesktoplCDB Memo CPA2008-03002 April 9 2008.doc Herman, Sandra From: Fahey, Robert Sent: Wednesday, April 09, 2008 1:30 PM To: Herman, Sandra Subject: RE: URGENT: Water Plan Page 17 -change second sentence to read "... the City water sources are ~ 23 groundwater wells..." for consistency. Page 18 -third paragraph - add #63 to listing of wells feeding Reservoir #3 bringing the total to 6 instead of 5. Also add sentence "Two inactive wells are also connected (Wells Nos. 79 and 80)." Everything else looks good Rob -----Original Message----- From: Herman, Sandra Sent: Wednesday, April 09, 2008 9:55 AM To: Fahey, Robert Subject: URGENT: Water Plan Rob, Hi. We are preparing our packets today for the CDB meeting - I put a copy of the revised plan from Wade Trim on your chair this morning. Have the revisions been made as you requested? Please let me know ASAP, so we can put them in the packets to be mailed tomorrow morning. Thanks. Sandy Sandra E. Herman Planner III Planning Department City of Clearwater, Florida 100 South Myrtle Avenue Clearwater, FL 33756-5520 PO Box 4748, 33758-4748 Telephone: (727) 562-4586 Fax: (727) 562-4865 sandra.hermanC~myc learwater.com 1 n Potable Water Element 2 City of Clearwater Comprehensive Plan TABLE OF CONTENTS . INTRODUCTION ....................................................................................... 3 II. GOALS, OBJECTIVES AND POLICIES ..........................................................4 111. INVENTORY AND ANALYSIS ..................................................................10 3.1 Operational Responsibility ..................................................................................................................10 3.2 Geographic Service Area and Predominant Land Uses ............................................................... l0 3.3 Design Capacity and Current Demand on Existing Facilities ...................................................14 3.4 Level of Service ....................................................................................................................................... 27 3.5 Facility Capacity Analysis .................................................................................................................... 28 3.6 Performance and Condition of Existing Facilities ........................................................................31 3.7 Issues and Opportunities for Expansion and New Facilities .................................................... 33 3.8 Natural Drainage and Groundwater Recharge ..............................................................................34 1 3.9 Existing Regulations and Programs Relating to Natural Drainage and Groundwater Recharge .......................................................................................................................................................... 36 3.10 Capital Improvement Projects ....................................:....................................................................38 IV. APPENDIX A: CAPITAL IMPROVEMENTS PROJECTS .................................39 ' 3 Potable Water Element City of Clearwater Comprehensive Plan I. INTRODUCTION ' According to Florida Administrative Code section 9J-5.01 1, the purpose of the Potable Water Element is to assure that necessary public facilities and services correlate to future land use projections. Furthermore, the purpose of the Potable ~, Water Element is to identify capital improvements and establish goals, objectives and policies that will ensure the City of Clearwater is able to supply quality ~ drinking water of a sufficient quantity for current and future needs. The Potable Water Element focuses on the existing systems and facilities and ~, projected system needs based on projected population growth and future land use in the City of Clearwater. This is accomplished through an inventory and analysis of existing data, identification of present and potential problems and their solutions, and projection of future potable water needs for specific planning periods. The City of Clearwater Water Master Plan Water System Assessment, prepared in June of 2004, and the City of Clearwater Water Master Plan Capital Improvements Implementation Master Plan, prepared in October 2004, serve as the primary data sources for the existing conditions inventory and analysis. Both reports were prepared by Parsons Corporation. The composition of the Potable Water Element follows the minimum data requirements outlined in Section 9J-5.01 1, F.A.C. For ease of reference, the Potable Water Element is organized into two major sections; the first outlines the Goals, Objectives and Policies relating to potable water and the second includes an Inventory and Analysis of the water system. _~ Potable Water Element 4 City of Clearwater Comprehensive Plan II. GOALS, OBJECTIVES AND POLICIES 21. GOAL PROVIDE, DEVELOP, AND MAINTAIN A PERMANENT POTABLE WATER SUPPLY SYSTEM TO MEET ANTICIPATED DEMAND WHILE PROVIDING MAXIMUM PRACTICAL PROTECTION TO THE ENVIRONMENT AT A COST CONSISTENT WITH THE PUBLIC'S ABILITY AND WILLINGNESS TO PAY. r 21.1 Objective - To maintain adequate Levels of Service for existing and future populations through the year 2015. Policies ~~ 21.1.1 The following Level of Service standards have been established for the City of Clearwater and shall be used in determining the availability of facility capacity and demand created by new development: Service Area Level of Service Standards Potable Water Facilities Average Water Consumption Rate City and County Water City Service Area 120 gallons per capita per day at a pressure of 40-45 psi. *Continue to maintain water consumption of one hundred twenty (120) GPCPD or less as per the conditions set forth by Clearwater's Water Use Permit. 21.2 Objective -Provide adequate quantities and qualities of water service to all customers of the Clearwater service area. Current service level (July, 2007) is 40,390 customer accounts (potable, reclaimed and fire). Policies 21.2.1 Ensure that land development regulations, building codes and City ordinances adequately address water system provisions by performing a thorough evaluation of City codes and by coordinating proposed provisions with the Southwest Florida Water Management District and Florida Department of Environmental Protection. 1 5 Potable Water Element City of Clearwater Comprehensive Plan 21.2.2 Engineering shall analyze the condition and adequacy of any water distribution system that the City may inherit through annexation and prepare cost estimates for upgrading those systems to meet City requirements. 21.2.3 When new subdivisions are being developed, it shall be the responsibility of the developer to provide internal potable water and reclaimed water systems which are constructed to City specifications. 21.2.4Continue to construct water system improvements which will provide adequate quantity, pressure, and duration of fire flows while meeting system user needs. 21.2.5 Continue to develop a system and construct improvements which will conserve energy, water, and other valuable resources. 21.2.6The City shall continue to participate and assist the Southwest Florida Water Management District, Pinellas County Health Department, and the U.S. Environmental Protection Agency in developing innovative techniques to augment existing water supplies to provide for future needs. ~~ 21.2.7Continue to identify, acquire, and develop sources of water supply and methods of water treatment to meet existing and future needs. Some ways this can be accomplished are through well rehabilitation projects and/or exploration and drilling of new wells. Some type of ' water treatment may be initiated. Additional volumes of water may be acquired from the Pinellas County Water System through Clearwater's intergovernmental water service agreement. The City's long range Water Supply Master Plan completed in 2004 shall serve as the guiding document for water supply and treatment methods. 1 6 Potable Water Element City of Clearwater Comprehensive Plan 21.2.8 Ensure that water management projects are designed and operated to maintain and enhance natural systems as well as man made systems by working closely with the Southwest Florida Water Management District when proposing new projects and water management I programs. The City's long term Water Supply Master Plan outlines a work plan for continued coordination with the Southwest Florida Water Management District's Regional Water Supply Plan adopted in December 2006. 21.2.9 Water service shall not be extended to properties outside the City's service area unless sufficient capacity and quality of water exists to ^ ~ serve the areas already committed to City service. 21.2.10 Water services shall not be extended except in those areas so designated for City of Clearwater by interlocal or other agreement. 21.3 Objective -Continue to maintain the water system in a safe, sound, and efficient manner on a daily basis. Policies 21.3.1 The Public Utilities Department, Water Division, shall monitor water quality and the operation of the water distribution system with the intent of repairing and replacing deficient portions of the system within the framework of the capitalized budgeting process. 21.3.2 Continue to provide a minimum operating pressure of 40-45 psi throughout the water distribution system. '~ 21.3.3 Continue to provide adequate spacing of fire hydrants to provide optimum hose lays and fire flow. 1 21.3.4 Require at the time of application for connection to the public potable water system, that minimum fire flows and hydrant spacing be consistent with fire district standards. Also, require that proper size water pipes are installed to provide desired fire flow rates based on the ' most recent Insurance Service Office (ISO) Report. 7 Potable Water Element City of Clearwater Comprehensive Plan j ective -Continue to rovide sound fiscal mans ement for the operation 21.4 Ob J P 9 1 and maintenance of potable water service in the City's service area Policies ' 21.4.1 Fees char ed to users of water services shall continue to be ade uate 9 4 to cover system operating costs, repayments of capital costs, and allow for repair and replacement of existing facilities. The City shall also continue to evaluate new rate structures as necessary. 21.4.2 Prioritization and scheduling of major improvements associated with the water system should be accomplished as a component of the capital improvement program. 21.4.3 Funds set aside for repair and replacement of the water system shall not be diverted to other uses. I ntinue to seek financial su ort of the water 21.4.4The City shou d co pp system through grant programs administered by appropriate State and Federal agencies. 21 .4.5The City shall continue to refine the inverted rate structure for residential water meters, lawn meters and all other water meters permitted by the Water Division of the Public Utilities Department. 21.5 Objective -Continue to Develop a potable water system that is compatible with the environment and seeks to conserve and protect sensitive natural resources. Policies 21.5.1 Except for areas of the City where reclaimed water is available, shallow wells shall be recognized as a source of water for irrigation purposes. Establish a City permit for shallow well installation by the end of 2008. r~ 8 Potable Water Element City of Clearwater Comprehensive Plan 1 21.5.2 The City's building code shall include the requirement for water conserving fixtures in newly constructed or remodeled buildings. 21.5.3 Manage the supply of water in quantities which would minimize significant adverse impacts on the natural system and protect the long term public interest. 21.5.4 Develop and modify rate structures and policies which encourage conservation of potable water. 21.5.5 The Cit shall maintain its current Water Restriction Ordinance. Y 21.5.6 Provide educational awareness to inform citizens of the need and opportunities for conserving potable water by visiting schools to speak with young children about water conservation practices. 21.5.7 Reclaimed water service will continue to be extended to private residences based on the Twenty (20) Year Master Plan. 21.6 Objective -Continue to achieve effective coordination with other government agencies to solve problems of an extraterritorial nature with cooperation and ' in conjunction with the Southwest Florida Water Management District. Policies 21.6.1 The City shall continue to participate in regional and County-wide studies which are or may be formed to seek solutions of problems of an extraterritorial nature. ~! 21.6.2 Continue to cooperate with the Southwest Florida Water Management District in developing environmental and hydrologic data that will identify safe and reliable potable water yields in existing and future well-fields. 21.6.3 Continue to coordinate with appropriate local, State, regional and Federal agencies in implementing the water system plan. 9 Potable Water Element City of Clearwater Comprehensive Plan 21.6.4The City shall pursue a coordinated approach to interjurisdictional problems, by providing support of both staff and officials to participate in conservation efforts with Pinellas County and the Tampa Bay Regional Planning Council. 21.6.5Ensure consistency with the actions defined within the Regional Water Supply Plan prepared by the Southwest Water Management District. 21.7 Objective -Continue to protect all natural recharge areas having functional hydrological characteristics. Policies 21.7.1 Recognize the importance of groundwater aquifer recharge in the hydrological process and the need for natural groundwater recharge as an integral component of the City's urban environment. 21.7.2 The City shall include incentives in the Community Development Code for the protection of natural groundwater aquifer recharge areas as identified in the Conservation Element of the Clearwater Comprehensive Plan. ' 21.7.3 The City shall continue to protect groundwater quality by enforcing a Wellhead Protection Ordinance. t f 10 Potable Water Element City of Clearwater Comprehensive Plan III. INVENTORY AND ANALYSIS Section 9j-5.003, F.A.C. defines a potable water facility as a system of structures designed to collect, treat, or distribute potable water, and includes water wells, treatment plants, reservoirs, and distribution mains. The following section details the existing conditions of the City of Clearwater's water system, with the purpose of identifying future water system needs. 3.1 Operational Responsibility The City of Clearwater Water Division is a municipally operated water supplier, charged with the responsibility of administering the City's water utility. In 2006, the City of Clearwater Water Division supplied more than 5.15 billion gallons of water to more than 140,000 customers, amounting to approximately 100 gallons of water per person per day. The division maintains 4,036 fire hydrants, 8,329 valves and 588 miles of water mains.' Users of the City of Clearwater water system consume approximately 13 million gallons of potable water every day. Approximately 37 percent is pumped from City owned and operated groundwater wells; the remaining 63 percent of the daily demand is supplied by water purchased from Pinellas County. Pinellas County also receives water supplied by the regional water supplier, Tampa Bay Water, which in turn becomes part of the 63 percent supplied to the customers of Clearwater.z 3.2 Geographic Service Area and Predominant Land Uses The geographic service area for the City's water system extends beyond the City limits and represents an area of approximatley 54 square miles in size. The majority of the customers beyond the City limits are located within unincorporated Pinellas County enclaves within the City of Clearwater. The boundaries of the water service area generally extend from the Gulf of Mexico to the west, the City of Dunedin to the north, the City of Safety Harbor and Tampa Bay to the east, and the ' cities of Largo, Bellair, and Bellair Beach to the south. Map 1 shows the geographic service area of the City of Clearwater potable water system. 1 ~ Public Utilities -Water Division. Ci of Clearwater Website. Accessed Jul 2007. Htt ://www.clearwater- tY Y P fl.com/gov/depts/pwa/public_utils/divisions/water/index.asp. z City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. 1 rya ~r } ~a - - -,._ Map 1 Water Service Area a City of Clearwater lNater Service Area Major Roads Jurisdictional Boundaries City of Clearwater ~__ Other Cities Unincorporated Pinellas County 0 0.5 1 2 3 Miles Source: City of Clearwater Water Department. 2007; Pinellas County GIS, 2007. Prepared by Wade Trim, Inc., August 2007 for City of Clearwater Water Supply Element. I~ WaDET~ 12 Potable Water Element City of Clearwater Comprehensive Plan According to the U.S. Census Bureau, the City of Clearwater is estimated to have a total population of 107,742 as of .July 1, 2006.3 However, the City's water service area extends beyond the City limits to include numerous unincorporated Pinellas County enclaves. Thus, to determine the population of the City's water service area, a broader figure that includes both the City population and enclave population must be utilized. Because it includes the City of Clearwater in addition to all interior county enclaves, the Pinellas County Planning Sector 6 closely matches the City of Clearwater's water service area. Therefore, population projections for Planning Sector 6, which have been calculated by the Pinellas County Planning Department, will be utilized for this Potable Water Element. Using the projections from Pinellas County for permanent, seasonal, and tourist populations, the functional population of the water service area can be determined based on the following formula: Functional Population = [(permanent + seasonal) x 41 + (permanent x 81 + tourist 12 2 This formula is based on Water Use Caution Area (WUCA) rules with the purpose of making adjustments for seasonal residents and tourists.4 Once calculated, the functional population figure represents the value utilized to calculate the gross per capita water consumption for the City. Table 1 details the projected service area population served by the City of Clearwater's water system through the year 2025. i.~ r 1 s Annual Estimates of the Po ulation for Incor orated Places in Florida, A ril 1, 2000 to Jul 1, 2006. U.S. Census Bureau. June 28, P P P y 2007. 1 ^ City of Clearwater Water Master Plan, Capital Improvements Implementation Master Plan. Parsons Corporation. October 2004., 13 Potable Water Element City of Clearwater Comprehensive Plan 1 r Table 1 Clearwater Water Service Area Population Projections (a) •- -.. 2005 135, 071 6, 074 19,472 160, 616 146, 832 2006 135,400 6,088 19,488 160,975 147,173 2007 135,728 6,102 19,504 161,333 147,514 2008 136,057 6,115 19,519 161,692 147,855 2009 136,385 6,129 19,535 162,050 148,196 2010 136,714 6,143 19,551 162,408 148,537 2011 136,930 6,152 19,562 162,644 148,761 2012 137,146 6,161 19,572 162,879 148,986 2013 137,361 6,171 19,583 163,115 149,210 2014 137,577 6,180 19,593 163,350 149,434 2015 137,793 6,189 19,604 163,585 149,658 2016 137,934 6,195 19,611 163,740 149,805 2017 138,076 6,201 19,618 163,894 149,951 2018 138,217 6,206 19,624 164,048 150,098 2019 138,359 6,212 19,631 164,202 150,245 2020 138,500 6,218 19,638 164,356 150,392 2021 138,592 6,222 19,642 164,457 150,488 2022 138,685 6,226 19,647 164,558 150,584 2023 138,777 6,230 19,651 164,658 150,679 2024 138,870 6,234 19,656 164,759 150,775 2025 138,962 6,238 19,660 164,860 150,871 (a) For the purpose of this analysis, the population projection for Pinellas County Planning Sector 6 (Greater Clearwater Area), which closely represents the Clearwater water service area, is utilized. (b) Seasonal population is defined as persons who reside in Pinellas County for less than six months and declare their permanent home elsewhere. (c) Tourist population is the impact that tourists have on public services and facilities that are comparable to the impact of permanent residents. (d) Functional population is calculated by Water Use Caution Area (WUCA) rules (see text). Source for years 2005, 2010, 2015, 2020, and 2025: Pinellas County Population Projections by Planning Sector, 2005-2030, Pinellas County Planning Department, February 2001. Source for all other years: Data extrapolated from Pinellas County Planning Department. 14 Potable Water Element City of Clearwater Comprehensive Plan The City of Clearwater is an urban and predominantly built-out city and features a diverse mix of land uses. Within downtown Clearwater, a dense mix of institutional, commercial, office, recreational and high density residential land uses are found. In addition to downtown, the Clearwater Beach area features a dense mix of land uses that include major commercial/resort destinations, high density residential developments, and recreational uses. Intensive commercial land uses, including regional commercial shopping centers are scattered along the City's major transportation arteries, particularly Gulf-to-Bay Boulevard and U.S. Highway 19. The majority of the rest of the City is dominated by well-established single- family neighborhoods, intermixed with supportive institutional and recreational uses. Map 2 shows the existing land uses found within the City of Clearwater water service area. 3.3 Design Capacity and Current Demand on Existing Facilities. Water Wells and Treatment Facilities Potable water within the City of Clearwater is provided by 23 City-operated fresh water wells (19 active and 4 inactive) and seven interconnects with the Pinellas County water system. Although it is currently not used, the City has access to the i water system of the City of St. Petersburg though an emergency interconnect. The City's water wells are located in close proximity to three treatment and storage facilities: Reservoirs Nos. 1, 2, and 3. The interconnects to the Pinellas County system are found at various locations in the City: Reservoir No. 2; Reservoir No. 3; along Belcher Road near the intersections with Drew Street, Gulf-to-Bay (SR 60), ! and Belleair Road; and at South Sand Keys The locations of the various water supply facilities within Clearwater are illustrated on Map 3. Pinellas County water is purchased by the City of Clearwater through an intergovernmental agreement as a means to augment the City's groundwater sources and to meet the City's water demands. In the 2002 water year, an average of 1 1.5-mgd of water was purchased by the City from Pinellas County. In the Fall of 2003, after a reverse osmosis treatment facility was implemented at Reservoir No. 1, the City was able to reduce the amount of water purchased from the County by a net of 2-mgd.6 s City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. e City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004.. i~ 1 °~r }eaae _ ,._ Map 2 Existing Land Uses Jurisdictional Boundaries Existing Land Use 2005 Other Cities Category Pinellas County Single Family - Major Roads Mobile Home __' ~, Duplez or Triplet Multi-Family - Commercial Industrial . PubliGSemi-Public - RecreationlOpen Space Vacant - ConservationlPreservation Marinas Surface Water 0 0.5 1 2 3 Miles Source: Pinellas County GIS, 2005. Prepared by Wade Trim. Inc., August 2007 for City of Clearwater Water Supply Element. I~ W~ETiuM z o7 r Y U ~0 ~ ~ p~A^ m J~' ~ " ~ ,IBC " r m ~F ~ m ~ sf C CR765AN0 DR C 39 C 95 z FO,~c ~ T c, a p K CAUSEWAY BLVD m O ~ A ESt I j,KESBLVO '~'r '` URLEW RD Z FpR ) z r ~ F a ~ ~w o a ~ 079 AVEN r x TA~ ye ~ ~'~, ,__ 1 ~ ~p~ NACEN AVE a = > Q v E DOUGLAS RD ' f u r = Qp.~. ~ NORTHSI DE OR z S DR '. Q w a IDQ MICHIGAN BLVD ~ a ~ < ,. ~ _.. y ~RSgU a q7 1 sRSBp ' ~ ~ ' q o G'S ¢ ~' VE __ ~ LVO ~-~'°, - -°: ~~ Tq ~ SOLONAVE Ij,FP ' _ ~q ~ ~ ,, i EPUBLIC D w , ~ n S80 C - _ !' ~ " ~ SAN CHRISTOP ER OR EvANS D Resevoir# 3 ¢ ' a Nv+iw sT sass 10 MG ( I ~ I] w a Y ~ VIR INIA St m o y ~ W . D ENTERPRISE RD E Y ~ ~ = Y J i = W a eP~P L a ~ m w ~ ~ ~.:~ w ~ ~ ~ ~ L E SST ? _ ~ " ~ a . ~ RSHALLST ~ a w ~ Q w Z U f ~' a a 3 a w " 2 O 'JNp ST 2 `-~ a D ` U NgN $T 2 m ~ a f W N • ~ < / C1 RD W /- . w ~ m _ ~ ~ NAM ST ~ ~ > > ~ SUNSET POINT D 0 m t N ~ C'1 = Q m Otten Tank ~ ° ~ f ~ (1 MG) i SR y Y Y p . ~ ~ ? Y P~ Q ' ° ~ ~ Resevoir #1 ; w ~ c ~ p ~P ~ ~ . m e ~o p a i RO Facility Z " _ GO~ o ` m M = J . ~ Y w PALME (S MG) ~ d ~ -. a V ~ ~Y . Z Z z x y ~ G o a GR EW ST " ~ Y CL ELAND ST o Del OrD lank PgELLGS~ EV GAM z w i~ Iv1G) couRTR OURT ST " LF T Y Blv Z , Resevoi #2 > > Q PP (51viG) o ~ ~ DR D RD Z t\a " r = ' a PG C ~ " Y rC j " C _ ~ " ~ ~ ~ LAH IEw D ~ i ~ " N O RN BLV Z W W Y " W Cl " GreenwoodlMLK Tank g y h MG) " " NURSERY'FD ~ 0 6ELLEA RD 0 W i - _ ~ WYA ST a > Z -~~„1 a z ~ ~ ~ ~ o ~~! SF~ p O i, C C+ ~ y qq C w _ i t ROSERY RO NE" w _ _, z V .,~~ _~. , ~~ ~ p4 C < ~ W W _ ry O '` ~-y ? EHLENBACHERRD~ ~ c Y 2 AWHITNEYRO _ ~ _ os Z - ~ n ~ ~ F ~ S _ + ~ ~ O w J Z ~ w Y ~ yl LLEAIR BEACH CSWY a WEST BAY DRS z ~ EAST 8AY DR 8005 vELT BLV z a a~ } earw e Map 3 Potable Water Supply Facilities .Elevated Potable Water Tank . Potable Water Storage Reservoirs Water Wells Status • In Service • Out of Service ~ Plugged L Proposed Monitor Well -Major Roads Jurisdictional Boundaries City of Clearwater ~, Other Cities Unincorporated Pinellas County 0 0.5 1 2 3 Miles Source: City of Clearwater Water Department, 2007; Pinellas County GIS, 2007. Prepared by Wade Trim, Inc., August 2007 for City of Clearwater Water Supply Element. Ia W~ET~uM 1 Potable Water Element 17 City of Clearwater Comprehensive Plan In general, the groundwater source for both Clearwater and Pinellas County comes from a groundwater supply called the Floridan Aquifer. More specifically, the City water sources are 22 groundwater wells, while Pinellas County potable water is obtained from two different sources: Tampa Bay Water's regional water system; and fresh water from Eldridge Wilde wellfields. Tampa Bay Water is a local wholesaler providing water to six local governments in the Tampa Bay metropolitan area. Multiple sources contribute to Tampa Bay Water's regional water supply; these include groundwater and surface water from around the Tampa Bay metropolitan area and saline water from Tampa Bay. A summary of the daily production rates for the three reservoirs is provided in Table 2. The table also details the relative production provided by the City and the production provided by Pinellas County. Table 2 Summary of Daily Productions by Source The values reflect the addition of a reverse osmosis facility at Reservoir No. 1, which, at the time of the preparation of the Water System Assessment (Clearwater Water Master Plan), was expected to reduce the amount of water purchased from ' Pinellas County by a net of 2-million gallons per day (mgd) on a long term basis. The average daily demand for potable water within the City of Clearwater water service area totals 13-mgd, of which 63 percent is provided by Pinellas County and 37 percent is provided by the City's wells. According to the City's water use permit issued through the Southwest Florida Water Management District (SWFWMD), the City is allowed to pump a maximum of 6.25-mgd from its wells. ~~ "Value listed represents finished blended water capacity. In order to produce the 3-mgd blended finished water capacity requires 3.6-mgd of well water, 0.6-mgd of which is concentrate that is discharged to the sanitary sewer. ""Water provided by Pinellas County interconnects located on-site with existing City of Clearwater facilities. Source: City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. 18 Potable Water Element ' City of Clearwater Comprehensive Plan Reservoir No. 1 is located on Palmetto Street near Saturn Avenue and consists of a reverse osmosis water treatment plant, a single 5 million gallon (mg) storage tank, chloramination facilities for disinfection, and a high service pumping station. Reservoir 1 utilizes 3.6-mgd of raw groundwater to produce 3-mgd of treated ' potable water. The Reverse osmosis plant uses 2.6-mgd of water to produce 2.0- mgd of permeate which is blended with 1.0-mgd of pre-treated by-passed water, attaining a total of 3-mgd of potable drinking water. Feed water to the plant comes from 10 active wells (Well Nos. 23, 31, 48, 65, 66, 73, 74, 75, 78 and 81). Production from Well 81 is limited due to the need for a sand pack to prevent sand from entering the well. ' Reservoir No. 2 is located near the intersection of US 19 and Drew Street and consists of a single 5-mg storage tank, chloramination facilities, and a high service pumping station. Feed water to the plant comes from 3 active wells (Well Nos. 45, ' 46 and 53). Two additional inactive wells are also connected (Well Nos. 51 and 52). Water from the wells can vary but typically provide on average 0.6 mgd. Also on- site is an interconnect with Pinellas County that provides on average 1.5-mgd. Water from both the wells and interconnect are blended in the 5-mg storage tank. Chlorine and ammonia are added to boost the chloramine concentration of the incoming water. The high service pumps then deliver the finished water to the distribution system.$ ' Reservoir No. 3, located near the intersection of Countryside Blvd. and State Road 580, consists of two 5-mg storage tanks, chloramination facilities, and a high ' service pumping station. Feed water to the plant comes from 5 active wells (Well Nos. 56, 58, 68, 69, and 77). Water from the wells can vary but typically provide on average 1.2-mgd. Also on site is an interconnect with Pinellas County that provides on average 7-mgd. Water from both the wells and interconnect are blended in the 5-mg storage tank. Chlorine and ammonia are added to boost the chloramine ' concentration of the incoming water. The high service pumps then deliver the finished water to the distribution system.9 ii ~ City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. s City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. s City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. 19 Potable Water Element ' City of Clearwater Comprehensive Plan Elevated Storage Tanks ' The City of Clearwater operates three 1 million gallon (mg) elevated storage tanks to provide additional storage capacity, consistent distribution system pressure, and to respond to emergency demands such as fire. The three elevated storage tanks ' are identified and located as follows: Del Oro, located near the intersection of McMullen-Booth Road and Drew; Martin Luther King, located near the intersection ' of Bellevue Blvd. and Martin Luther King; and Otten Street, located near the intersection of Otten Street and Highland Ave. At the time of the preparation of the Clearwater Water Master Plan Water System Assessment (June 2004), the three ' elevated storage tanks were valved-off due to water stagnation issues and degradation of water quality. However, the City has since placed the Martin Luther King and Otten Street tanks back into service in order to maintain an adequate level of service and for additional emergency storage capabilities.~~ i With regard to the total capacity of drinking water sources and treatment facilities, Chapter 62-555(6) of the Florida Administrative Code states that: The total capacity of a/l water sources and treatment faci/ities connected to a water system sha/l at least equal the water system's design maximum-day water demand (including design fire-f/ow demand if fire protection is being provided). ' In total, the City has a storage capacity of 23-mgd provided by the four 5-mgd storage tanks at Reservoirs 1, 2 and 3 and the three 1-mgd elevated storage tanks. However, at the time of the Clearwater Water Master Plan Water System Assessment ,the City's total storage capacity was estimated at 20-mgd, not calculating the capacity of the elevated storage tanks because of their stagnation ' and water quality issues. In addition to the City's own storage capacity, Pinellas County provides the City with some storage capacity through the interconnections. However, the exact amount of storage capacity available to the City through ' Pinellas County is unknown.>> Based on the Water System Assessment report, the City's design maximum-day potable water demand is estimated at 19-mgd. At 20-mgd, the City's current storage tank capacity is sufficient to achieve potable water design maximum-day io City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. ' ~~ City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. Potable Water Element 20 ' City of Clearwater Comprehensive Plan ' demand according to Chapter 62-555 F.A.C. However, the Water System Assessment noted that this total capacity may be inadequate to achieve fire-flow demand. For this reason, and as noted above, two of the three 1-mgd elevated storage tanks were put back into service, but several modifications to the distribution system were recommended in the assessment to increase overall ' capacity, including distribution system pipe modifications, addition of booster pump stations, and addition of inter-distribution system storage tanks.12 ' Pumping Facilities High-service pumps are found at each of the City's three reservoirs to ensure distribution system capacity and pressure. These pumps ensure that water under sufficient pressure is delivered from the wellheads to the various storage and treatment facilities and then into the distribution system. Additionally, system capacity and pressure is supplemented through the six direct interconnections with the Pinellas County water system. With regard to required pumping capacity, Chapter 62-555.320(1 5) of the Florida Administrative Code states that: (a) Unless e/evated finished-drinking-water storage is provided, the total capacity of a// high-service pumping stations connected to a water system, or the capacity ' of a booster pumping station, shall be sufficient to: 1. Meet at /east the water system's, or the booster station service area's, peak- , hour water demand (and if fire protection is being provided, meet at /east the water system's, or the booster station service area's, design fire-flow rate p/us a background water demand equivalent to the maximum-day demand other than fire-f/ow demand); and r 2. Maintain a minimum gauge pressure of 20 pounds per square inch throughout the water system's, or the booster station service area's, distribution system up to each customer's point of connection to the distribution system. (b) Where elevated finished-drinking-water storage is provided, the total capacity of al/ high-service pumping stations connected to a water system, or the capacity 12 City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. r Potable Water Element 21 ' City of Clearwater Comprehensive Plan of a booster pumping station, sha// be sufficient to at /east meet the water system's, or the booster station service area's, maximum-day water demand (inc/uding design fire-f/ow demand if fire protection is being provided) and to maintain distribution system pressure as specified in subparagraph 62- 555.3Z0(1 S)(a)2., F.A.C. In addition, the total capacity of the high-service pumping stations, or the capacity of the booster pumping station, combined with the useful elevated finished-water storage capacity sha// be sufficient to meet the water ' system's, or the booster station service area's, peak-hour water demand for at /east four consecutive hours (and if fire protection is being provided, sha/l be sufficient to meet the water system's, or the booster station service area's, design fire-f/ow rate p/us a background water demand equivalent to the maximum-day demand other than fire-flow demand for the design fire-f/ow duration). As noted above, the City's total water storage capacity may be inadequate to achieve fire-flow demand. Because pumping capacity is related to achieving sufficient storage capacity, improvements to the City's pumping capacity is warranted. The Clearwater Water Master Plan Water System Assessment notes that possible solutions include distribution system pipe modifications, addition of booster pump stations, and addition of inter-distribution system storage tanks.13 Distribution System ' The City of Clearwater's water distribution system includes 574.6 miles of water main, 40,000 water meters, 4,050 fire hydrants, 8,330 valves and 7,500 backflow ' devices. Approximately 48% of the water mains of the City are 6 inches in diameter while almost 20% are 8 inches. Table 3 displays the distribution of water mains in the system. In 2006, the City of Clearwater completed the implementation of 17 phases of a 20-Year Plan to upgrade the pipes of the distribution system. With this implementation, the City eliminated "cast iron" and undersize lines improving the system to satisfy future demand. Table 4 displays these improvements by year. ' 13 City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Potable Water Element ~ City of Clearwater Comprehensive Plan Table 3 Inventory of City's System Water Main, 2008 2 90,076 17.1 3.0% 3 32,188 6.1 1.1 4 394,359 74.7 13.0% 6 1,439,799 272.7 47.5% 8 597,113 113.1 19.7% 10 42,697 8.1 1.4% 12 254,904 48.3 8.4% 14 280 0.1 0.0% 16 117,591 22.3 3.9% 18 1,915 0.4 0.1% 20 61,422 11.6 2.0% 24 1,363 0.3 0.0% 45 45 0.0 0.0% Total 3,033,752 574.6 100.0% Source: City of Clearwater, 2008 Table 4 20 -Year Improvement of Water Mains 1 2,180 2,750 2,150 -. 1985 2 5,850 14,820 17,900 1986 3 14,000 5,950 11,900 1986 4 10,600 7,750 9,900 1987 5 5,700 17,300 14,500 1987 6 20,700 11,100 18,650 1987 7 10, 439 13, 021 5, 500 1988 8 14,828 32,490 26,750 1992 9&10 11,150 9,180 7,800 1993 11&12 37,000 53,000 62,000 1994 13&14 36,500 58,150 65,900 1995 15,16,17 19,500 16,000 30,000 2006 Source: City of Clearwater, 2008 In addition to these improvements, the City of Clearwater will complete this year a Distribution System Water Quality Optimization Plan (DSOP). The objectives of developing the City's DSOP are as follows: • Evaluate how the City's operating, maintenance, monitoring, treatment, and other practices that can impact distribution system water quality compare to current industry best management practices; 23 Potable Water Element ' City of Clearwater Comprehensive Plan ' Provide a summary of the City's existing practices and protocols; • Provide a prioritized list of practices and potential projects that will enhance system operations; and • Develop a road map for developing and implementing recommended improvements. ' As shown in Ma 4 the water distribution s stem effective) covers all lands within p ~ Y Y ' the City of Clearwater, including the unincorporated Pinellas County enclaves. 1 r 1 ~~ a ~ } ears e _. . Map 4 Potable Water Distribution Mains ~ City of Clearwater Potable Water Service Area Distribution Mains Owner - City of Clearwater - St. Petersburg - Pinellas County Private - No Daia Jurisdictional Boundaries City of Clearwater ~_ Other Cities Unincorporated Pinellas County - Major Roads 0 0.5 1 2 3 Miles Source: City of Clearwater Water Department, 2007; Pinellas County GIS, 2007. Prepared by Wade Trim, Inca August 2007 for City of Clearwater Water Supply Element. I~ WrnETxiM Potable Water Element City of Clearwater Comprehensive Plan Reclaimed Water System The City of Clearwater currently operates a reclaimed water system to ensure that adequate water is available today and in the future and that the City's residents have high quality water at an affordable price. The use of reclaimed water helps the ' City to preserve high quality potable water sources by providing a reliable and economical alternative source for irrigation water. Use of reclaimed water for irrigation can benefit the City because every gallon of potable water not used for irrigation is one less gallon of water purchased from Pinellas County. This has the potential of significant potable water savings given the escalating costs of purchasing water from Pinellas County.14 The City's reclaimed water system is the result of cooperative funding by the Southwest Florida Water Management District ' and the City of Clearwater.~s The City's reclaimed water system is shown on Map 5 and includes 51 miles of reclaimed water main. At present, reclaimed water service extends to the Countryside Country Club Golf Course and driving range, Chi Chi Rodriguez Golf Course and the soccer fields on McMullen Booth Road in the Countryside area, which are fed from the Northeast Treatment Plant. The Northeast Treatment Plant will also serve the reclaimed projects on the east side of Clearwater: Drew Union, Del Oro, Morningside, and Skycrest. The Marshall Street Plant feeds Jack Russell Stadium, Pier 60 Park, Coachman Park as well as 1,400 customers on Island Estates and Clearwater Beach. In 2004, reclaimed water became available to the Harbor Oaks Area of Clearwater. This area also receives it supply from the Marshall Street Plant. Approximately 2,000 customers are now provided reclaimed water, with a current consumption in the range of 2 to 2.5-mgd. The City of Clearwater is currently designing the Skycrest Reclaimed Water Project which will include an east/west interconnection, pumping and storage facility. This interconnection will complete the loop within the City, resulting in both sides of the City being connected for future expansion of our reclaimed program.16 14 City of Clearwater Water Master Plan, Capital Improvements Implementation Master Plan. Parsons Corporation. October 2004. 15 City of Clearwater Reclaimed Water Master Plan. City of Clearwater Website. Http://www.clearwater- fl.com/gov/depts/pwa/public_utils/divisionslreclaimed/rcwater_plan.asp. ' is City of Clearwater Reclaimed Water Master Plan. City of Clearwater Website. Http://www.clearwater- fl.com/gov/depts/pwa/public_utilsldivisions/reclaimed/rcwater~lan. asp. 1 a er Y ~ar~ Map 5 Reclaimed Water Facilities • Reclamed Water Fixtures Reclaimed Water Lines - Major Roads Jurisdictional Boundaries City of Clearwater Other Cities Unincorporated Pinellas County 0 0.5 1 2 3 Miles Source: City of Clearwater Water Department, 2007; Pinellas County GIS, 2007. Prepared by Watle Trim, Inc., August 2007 for City of Clearwater Water Supply Element. I~ WpnETiuM 1 it ~~ Potable Water Element 27 City of Clearwater Comprehensive Plan Future extensions are based on several factors, including lawn Irrigation usage/potential offset, proximity to existing reclaim sources, and infrastructure cost. In December 2007, the City of Clearwater re-evaluated its Reclaimed Water Master Plan (2001) that includes a 20-year schedule for reclaimed water extensions. Table 5 provides a summary of the reclaimed water projects prioritized in this study for the next 13 years: Table 5 Reclaimed Water Master Plan, December 2007 2007 Skycrest 2008 Chautauqua- Coachman Ridge 2008 Morningside 2009 Palmetto-Glen Oaks 2010 Clearwater Harbor 2011-2020 Resident Initiated/Large Users/Wholesale Costumers Source: City of Clearwater. Reclaimed Water Master Plan Re-Evaluation, 2007 3.4 Level of Service The existing Clearwater Comprehensive Plan has established the following Level of Service standards to be used in determining the availability of facility capacity and demand created by new development: 120 gallons per capita per day at a pressure of 40-45 psi. Potable water level of service is measured based on the rate of potable water consumption on a per person basis. This method of measurement provides an indicator of the demand placed on the potable water system and allows for tracking improvements in potable water conservation measures. As the rate of consumption decreases, the rate of success of potable water conservation measures increases. Based on the current potable water supply of 13-mgd allocated across the water service area's 2005 functional population of 146,832, the demand for potable water per capita per day is 88.5 gallons. This rate of demand is well within the adopted level of service. is Potable Water Element City of Clearwater Comprehensive Plan 3.5 Facility Capacity Analysis As highlighted in Table 2, the City of Clearwater's production is limited to 6.25 mgd from local potable water resources and is supplemented by purchase of potable water through an interlocal agreement with 'Pinellas County to meet demands in excess of what is locally produced by the City. Rated/permitted capacity at the City of Clearwater three Water Reservoirs /High Service Pump Stations is 25 mgd with pumping capable of meeting instantaneous peaks in excess of 31 mgd. The current inter-local agreement between Pinellas) County and the City of Clearwater was signed on September 2005 and it is valid through September 2030. The agreement states that the County agrees to furnish up to 15 mgd yearly average of water (treated) for its use and for distribution in its water service area.» As stated previously, the City of Clearwater's water system is estimated to have an average daily demand of 13.90-mgd. This is based 'on a functional population ' estimate of 146,832 for the water service area, and assumes a demand of 90.5 gallons per capita in addition to 610,000 gallons per day for significant water users.~$ The estimated average daily demand of 13.90-mgd also takes into account the planned future land uses of the City of Clearwater. Taking into consideration the agreement between the City and the County, the City is using only 51 percent of its available capacity of treated water for consumption. The estimated demand of 13.90-mgd does not account for the reduction in potable water demand resulting from the City's reclaimed water system. Therefore, 15 and 25 percent water reuse offsets have been applied to the total demand, resulting in an average daily demand of 13.69-mgd or 13.55-mgd, respectively.19 Table 6 provides the projected annual average daily demand for the City of Clearwater water system during the initial 5-year planning increment through 2010. The table also provides the annual average daily demand considering a 15 and 25 percent offset for water reuse based on the functional population. Without the offsets provided by the reclaimed water system; the average daily demand is projected to increase to 14.05-mgd by 2010. However, considering a conservative ~~ Interlocal Agreement Water Service Delivery. City of Clearwater and Pinellas County. September 2005. ,e City of Clearwater Water Master Plan, Capital Improvements Implementation Master Plan. Parsons Corporation. October 2004. 19 City of Clearwater Water Master Plan, Capital Improvements Implementation Master Plan. Parsons Corporation. October 2004. Potable Water Element 1 29 City of Clearwater Comprehensive Plan 15 percent offset for water reuse, the average daily demand would actually decline to 13.35-mgd by 2010. A 25 percent offset results in an average daily demand of 12.88-mgd.20 Table 6 Water System Average Daily Demand: 5 Year Planning Period Through 2010 F Annu unctional al Average An Dail nual Average y Demand with Annual Average Daily Demand Year Dail y Demand Po pulation (a) o 15 /o Reuse Offset 0 with 25 /o Reuse (b) (c) Offset (d) ~~ ~ ~~ ~~. ~ ~~ ~~: ~ ~ ~~• ~ ~ ~ ~ ~ ~ ~ ~~~ ~ ~ .~ (b) Annual average daily demand is calculated based on 90.5 gallons per capita per day plus 610,000 gallons per dayfor significant users other than hotels. (c) Average annual daily demand considering a 15 percent offset due to the use of reclaimed water for irrigation. (d) Average annual daily demand considering a 25 percent offset due to the use of reclaimed water for irrigation. Source: City of Clearwater Water Master Plan, Capital Improvements Implementation Master Plan. Given that the City is almost completely built-out, significant population growth and the conversion of large undeveloped lands to urban use is not expected. The City's population is expected to increase only slightly, while the City's current distribution of land use is planned to be maintained; generally in its present state. Rather, the Future Land Use Element of the Comprehensive Plan focuses on redevelopment efforts throughout the City, particularly within downtown Clearwater and the Clearwater Beach area. Table 7 provides the projected annual average daily demand for the City of Clearwater water system during the remaining planning period, 2011 through 2025. By 2025, the water system service area is projected to have a functional population of 150,871, resulting in an annual average daily demand of 14.26- , mgd. However, considering a conservative 15 percent offset for water reuse, the average daily demand would actually decline to 12.10-mgd by 2025. A 25 percent offset results in an average daily demand of 10.72-mgd by 2025. 20 City of Clearwater Water Master Plan, Capital Improvements Implementation Master Plan. Parsons Corporation. October 2004. i Potable Water Element 1 1 30 City of Clearwater Comprehensive Plan Table 7 Water System Average Daily Demand: 2005 through 2025 005 •.. 146, 832 ..• .. .- 13.90 .. .- 13.69 ..- 13.55 2006 147,173 13.93 13.58 13.34 2007 147, 514 13.96 13.51 13.21 2008 147, 855 13.99 13.46 13.10 2009 148,196 14.02 13.37 12.93 2010 148, 537 14.05 13.35 12.88 2011 148,761 14.07 13.23 12.66 2012 148, 986 14.09 13.16 12.53 2013 149,210 14.11 13.06 12.36 2014 149,434 14.13 12.94 12.15 2015 149, 658 14.15 12.84 11.96 2016 149,805 14.17 2017 149,951 14.18 2018 150,098 14.19 2019 150,245 14.21 2020 150,392 14.22 2021 150,488 14.23 2022 150,584 14.24 2023 150,679 14.25 2024 150,775 14.26 2025 150,871 14.26 12.1 (e) 10.72 (e) (a) Functional Population is taken from Table 1. (b) Annual average daily demand is calculated based on 90.5 gallons per capita per day plus 610,000 gallons per day for significant users other than hotels. (c) Average annual daily demand considering a 15 percent offset due to the use of reclaimed water for irrigation. (d) Average annual daily demand considering a 25 percent offset due to the use of reclaimed water for irrigation. (e) Estimated by applying the percentage change between 2006 and 2015. Data Source 2011 through 2015: City of Clearwater Water Master Plan, Capital Improvements Implementation Master Plan. Parsons corporation. October 2004. Data Source 2016 through 2025: Based on functional population data from Table 1 and a continuation of the method utilized by [he City of Clearwater Water Master Plan. Taking into consideration the permitted City's capacity to pump from its wells of 6.25 mgd, the governance agreement with Pinellas County that allows purchases of treated water up to 15mgd, and the projected reuse offset (15-25%), it could be concluded that the City of Clearwater has sufficient quantity of treated water available to the City to support the projected growth. ' 31 Potable Water Element City of Clearwater Comprehensive Plan ' 3.6 Performance and Condition of Existing Facilities An assessment of the performance and condition of existing facilities was conducted as part of the City of Clearwater Water Master Plan, Water System Assessment, prepared in 2004. The assessment revealed that a variety of corrective measures are necessary to maintain existing levels of service. These recommended corrective measures are outlined below. Well Pump Corrosion Currently, corrosion in the vertical turbine pumps used at each raw water production well requires the periodic replacement and maintenance of the pump shaft and pump bowl assembly. Because this maintenance process is difficult and labor intensive, it is recommended that stainless steel submersible pumps be utilized instead. The stainless steel construction of the submersible pumps helps r to minimize corrosion, extending the useful life of the pumps.21 Standby Power Requirements ' Chapter No. 62-555 F.A.C. states that each community water system shall provide standby power for operation of the water source, treatment, and pumping facilities necessary to deliver drinking water meeting all primary and secondary standards to meet the average daily demand for the system. The raw water production wells feeding Reservoir 1 are not currently provided with an auxiliary power source as needed to achieve compliance with Chapter 62-555, F.A.C. Two alternative corrective measures were evaluated: installation of a permanent generator or the purchase of portable generators. In the end, portable generators to serve the production wells were chosen as the preferred alternative given the cost savings. According to the Water System Assessment, backup ~ generators with sufficient ' capacity are available to serve the treatment and storage facilities at Reservoirs 1 and 2, but not Reservoir 3. Therefore, the study recommended that the existing generator be replaced with a larger generator to handle the current load. z, City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. 1 1 1 ii Potable Water Element 32 City of Clearwater Comprehensive Plan Control and Monitoring Improvements In order to make control and monitoring of the City's water system centralized, it is recommended the City install the necessary .Supervisory Control and Data Acquisition (SCADA) equipment at existing facilities to allow communications with the new network installed at Reservoir No. 1. This includes control and monitoring of Reservoirs Nos. 2 and 3, raw water wells and Pinellas County interconnections. For Reservoir Nos. 2 and 3, the raw water wells, 'and county interconnects, the Water System Assessment recommended that a radio telemetry system be established to enable effective communications between system facilities. At the county interconnects, it was recommended to add a remotely operated valve to open or close the interconnects. Storage Improvements As stated previously, the City's three elevated storage tanks face water stagnation issues with the potential result of degradation to water quality. At the time of the Water System Assessment, the storage tanks were valved-off. Additionally, the Water System Assessment noted that the City's storage tank capacity may be inadequate to achieve fire-flow demand. Therefore, the study recommended the elevated storage tanks to be placed back into service, restoring sufficient fire- flows to certain areas of the City. To alleviate the water stagnation issues at the storage tanks, recommendations were outlined that included the installation of a mixing system, an altitude valve, isolation valve and small booster pump station to force water out of the storage tanks. To increase fire-flow capacity, the Water System Assessment recommended the addition of inter-distribution system storage tanks in combination with distribution system pipe modifications. Pumping Improvements Improvements to the City's pumping facilities are also necessary to improve fire- flows. The Water System Assessment indicates that the current high service pumps are deficient in meeting fire-flow levels in some areas of the City. Therefore, additional booster pump stations are recommended in conjunction with distribution system pipe modifications. 1 Potable Water Element 33 City of Clearwater Comprehensive Plan 3.7 Issues and Opportunities for Expansion and New Facilities One of the major goals of the City is to increase self sufficiency in water supply to control future costs. Presently, the City purchases approximately 8 million gallons of water from Pinellas County at a cost of approximately 7 million dollars per year. ' Over the years, wholesale water rates have increased and are projected to continually rise. To accomplish increased self sufficiency, the Capital Improvement Plan portion of the Water Master Plan outlines numerous projects involving the expansion of existing water production facilities or the construction of new water production facilities. Limited Source Water Opportunities 1 1 The City of Clearwater is uniquely located between the Gulf of Mexico and Tampa Bay in an area that has relatively low rates of aquifer recharge. This results in limited quantities of fresh groundwater, and subsequently, limited opportunities to expand source water production. Source water quality continues to degrade due to increased chloride levels caused by pumping of wells in excess of long term safe yield capacities, but within existing water use permitted, quantities.22 Chloride Cap Restriction One of the greatest challenges in increasing capacity fo'r existing production wells and the construction of new production wells is the', Southwest Florida Water Management District's chloride cap of 250 mg/L. This chloride cap level is intended to serve as a guideline in evaluating trends and controlling the effects of wellfield withdraws on groundwater quality. In order for the City to proceed with new and sustainable water resources as outlined in their Capital Improvement Plan, the chloride cap must be increased. To provide the necessary evidence to support an increase in the chloride cap, the City is planning to undertake a Chloride Monitoring Well Study. The first phase of this study will examine the effects in the vicinity of Reservoir Nos. 1 and 3, as the impact of this cap will limit the water production from these facilities first. In a later phase, a similar study will be initiated in the vicinity of Reservoir 2 and south zz City of Clearwater Water Master Plan, Capital Improvements Implementation Master Plan. Parsons Corporation. October 2004. Potable Water Element City of Clearwater Comprehensive Plan of Gulf-to-Bay to support the development of a new reverse osmosis facility at Reservoir No. 2.z3 ' Feasible New Groundwater Sources As part of the Capital Improvements Plan, the Water Master Plan identifies three improvement projects aimed at increasing water supply that are economically ' viable as well as technically feasible during the planning period. These three projects include: • Development of an additional 1-mgd of fresh groundwater supply and associated wells and transmission mains to connect to Reservoir No. 3; 1 - it at Reservoir Development of an additional 1 mgd of production capac y No. 1 by means of adding an additional 1.25-mgd of raw groundwater supply and expansion of the reverse osmosis facility; and, • Development of an additional 3.5-mgd of production capacity at Reservoir No. 2 by adding an additional 4.25-mgd of raw groundwater supply, transmission mains and a new, low-pressure reverse osmosis faci I ity. As stated previously, these projects are partially dependent upon an increase to the SWFWMD's imposed chloride cap. However, even if the effort to raise the cap is unsuccessful, the proposed new production wells for Reservoir Nos. 1 and 3 are still recommended to be developed and permitted. The development of these wells would increase the rotational capacity, maximize production, rest existing wells, and allow for chloride levels to subside. 3.8 Natural Drainage and Groundwater Recharge The natural drainage features within the City of Clearwater water system are shown on Map 6. As can be seen, the City is located between the seawater bodies of the Gulf of Mexico and Tampa Bay. Freshwater water bodies within the City include 1 Lake Bellevue, Crest Lake, Alligator Lake, Beckett Lake, Lake ' zs City of Clearwater Water Master Plan, Capital Improvements Implementation Master Plan. Parsons Corporation. October 2004. 1 r } ~ar~a e Map 6 Surface & Groundwater Discharge/Recharge Rivers and Screams Lakes Floridan Aquifer DischargefRecharge Discharge - Recharge - Major Roads Jurisdictional Boundaries City of Clearwater Other Cities Unincorporated Pinellas County 0 0.5 1 2 3 Miles Source: Southwest Florida Water Management District, 2002-2007; Pinellas County GIS, 2007. Prepared by Wade Trim, Inc., August 2007 for City of Clearwater Water Supply Element. I~ WnnETiuM I 1 Potable Water Element 36 City of Clearwater Comprehensive Plan Chautauqua, and various creeks and drainageways. To the north of the City, Lake Tarpon is a large freshwater resource. According to the Southwest Florida Water Management District over 84 percent of all water used within the District's boundaries emanates from groundwater resources. The deepest and most productive aquifer within the District is the Upper Floridan, which also is found underneath the City of Clearwater.24 In the Clearwater area, the Upper Floridan aquifer contains a relatively thin layer of fresh groundwater underlain by a transition zone of brackish water, which increases in chloride and dissolved solids concentrations with depth until seawater concentrations are reached.25 The Upper Floridan is a productive aquifer, supplying more than ten times the amount of water pumped from the two other aquifer systems found in the Water Management District. In the northern portion of the District, the Floridan aquifer is readily recharged by rainfall (greater than 10 inches per year), and is most highly productive. In central Pinellas County, the Floridan aquifer features a recharge rate of 1 to 10 inches per year.26 3.9 Existing Regulations and Programs Relating to Natural Drainage and Groundwater Recharge Future protection and use of water resources is a public service for which long- range comprehensive planning is mandatory. The primary threats to groundwater in the Clearwater area are saltwater intrusion via overdraft and contamination. When groundwater recharge exceeds withdrawal, there is a potential for saltwater to move inward from coastal areas, ultimately affecting the quality of the available groundwater. Additionally, contamination from injection and drainage wells, fertilizers, storage tanks, and other sources affect the quality of groundwater. Both overdraft and contamination are risks that can be reduced via careful regulation. The Southwest Florida Water Management District is the primary regulator and program administrator relating to natural drainage and groundwater recharge. z" Southwest Florida Water Management District. Regional Water Supply Plan. December 2006 zs Technical Memorandum. Evaluation of City of Clearwater Existing Production Wells. SDI Environmental Services, Inc. zs Generalized Recharge to the Floridan Aquifer (Map). District Water Management Plan, Southwest Florida Water Management DisUict. July 2000. Potable Water Element 37 i City of Clearwater Comprehensive Plan The City of Clearwater is contained within the boundaries of several SWFWMD water supply programs, including:27 /Northern Tampa Bay Water Resource Assessment Project (WR,4P) The Northern Tampa Bay Water Resource Assessment Project (WRAP) was initiated ' by the district to assess water availability, including minimum flows and levels, in order to support water resource recover, water use permitting, and environmental ' resource permitting. Both the City of Clearwater and Pinellas County provide input to the technical projects performed by the District. Northern Tampa Bay Water Use Caution Area (WUCA) The Northern Tampa Bay Water Use Caution Area sets water use permit (WUP) for the area, including additional conservation requirements such as reuse. Public supply permits within the WUCA limit per capita water use demands to 150 gallons per person per day. Any utility not meeting these numbers has strict timeframes and guidelines to implement this limit. The City of Clearwater is not using its entire permitted allocation of groundwater from the Upper Floridan aquifer although it is anticipated that its utility will eventually grow into its unused quantity to meet future demand. For example, the City of Clearwater's brackish R.O. facility is permitted to withdraw 6.3 mgd of brackish groundwater, although the City has been withdrawing an average of 3 mgd28. The City of Clearwater has been and is actively participating in SWFWMD's efforts to prioritize recharge areas within the Upper Floridan aquifer recharge area. Tampa Bay/Anclote River Comprehensive Watershed Management (CWM) Project As part of SWFWMD's continuing efforts to ensure the coordination of local governments' planning practices regarding water supply management, SWFWMD has developed the Comprehensive Watershed Management (CWM) Program in coordination with local governments to conduct water resource assessments and planning on a watershed rather than district-wide basis. The City of Clearwater is in the Tampa Bay/Anclote River Comprehensive Watershed Management (CWM) Area. This area encompasses all of Pinellas County and parts of Hillsborough and Pasco Counties or approximately 566 square miles. The Tampa Bay/Anclote River Z' Southwest Florida Water Management District, 2005 District Water Management Plan. 28 Southwest Florida Water Management DisVict, 2005 DisVict Water Management Plan. ' 38 Potable Water Element City of Clearwater Comprehensive Plan 1 CWM Plan was last adopted in 2002. The 2006 SWFWMD Regional Water Supply Plan requires updates to the CWM Plan in which Pinellas County and the City of ' Clearwater will be invited to participate. 3.10 Capital Improvement Projects Appendix A presents the list and budget for several potable water projects to be ' completed from FY 2007-2008 to FY 2012-2013. The total of capital facility improvements is about $85,451,510 millions dollars. t i~ ' 39 Potable Water Element City of Clearwater Comprehensive Plan ' IV. APPENDIX A: CAPITAL IMPROVEMENTS PROJECTS ii 1 1 i 1 1 1 i 1 1 1 1 1 1 1 1 1 1 1 1 1 Appendix A CAPITAL IMPROVEMENT PROGRAM WATER SYSTEM The Water System section includes projects that support the Water System operations for the City, All projects, except the projects funded with Lease Purchase, are included either in the current Rate Study or a future Rate Study. Projects in this section support the "Clearwater Provides the Infrastructure to Support all its Attributes' element of the City Council's Vision and the following related priorities: :• Well Maintained Infrastructure :• Efflcient Responsive City SeMces Protect Funding 2007/08 2008/09 2009/10 2010/11 2011/12 2012/13 Total 96721 System R8cR -Maim Utility R8cR 25,000 25,000 25,000 25,000 25,000 25,000 150,000 96739 Reclaimed Water Water 686,490 141,220 108,630 90,620 160,460 116,070 1,303,490 Distribution System FY 'OS Bond Issue 2,894,000 2894,000 Future Bond Issue 3,542,150 1,877,850 5,455,120 578,170 658,260 12111,550 Utility RBcR 744,230 777,930 706,260 817,080 1,346,020 4,391,520 96740 Water Supply & Utility R8cR 300,000 300,000 300,000 300,000 300,000 300,000 1,800,000 Treatment 96741 System RBcR - Utility R&R 250,000 250,000 250,000 239,300 250,000 250,000 1,489,300 Capitalized 96742 Line Relocation - FY'08 Bond Issue 800,000 800,000 Capitalized Future Bond Issue 800,000 800,000 800,000 800,000 800,000 4,000,000 96743 Meter/BackflowRepl UtilityR&R 621,150 621,150 /Change Out IY'08 Bond Issue 28,850 28,850 Future Bond Issue 650,000 650,000 650,000 650,000 650,000 3,250,000 96744 System Expansion Water Impact 250,000 250,000 220,300 80,760 81,090 81,410 963,560 Uflllty RBcR 29,700 169,240 168,910 168,590 536,440 96752 Water Service Unes FY '08 Bond Issue 500,000 500,Opp Future Bond Issue 500,000 500,000 500,000 500,000 500,000 2,500,000 96757 Water Pick-up Trucks L/P-Water 32,780 33,780 34,770 101,330 continued on next page 1 1 1 1 1 1 1 1 Appendix A CAPITAL IMPROVEMENT PROGRAM WATER SYSTEM (continued) Project Funding 2007/08 2008/09 2009/10 2010/11 2011/12 2012/13 Total 96758 Fluoride in Water Sys Future Bond Issue 1,307,590 1,307,590 96760 Elevated WaterTks Fuiure Bond Issue 250,000 250,000 96761 Telemetry for Welis Ufllily RBcR 119,620 119,620 Water 380,380 380,380 96763 Wellfield Expans(on FY'OS Bond Issue 1,323,820 1,323,820 Water 861,630 861,630 96764 Reverse Osmosis FY'08 Bond Issue 240,400 240,400 E~ansion -Res # 1 Future Bond Issue 4,462640 4,987,880 9,450,520 96767 Reverse Osmosis FY'08 Bond Issue 1,566,340 1,x,340 @ Reservoir#2 Future Bond Issue 2552300 1,516,830 1,117,230 10,000,000 16,982,660 32169,020 96768 Rebate- WeII,Lake,Pond Ing '~ Water 50,000 50,000 50,000 50,000 50,000 50,000 300,000 96769 TraGchoe & Trailer UP-Water 41,000 41,000 Total Water System 10,971,460 14,301,320 12,378,890 10,183,530 15,688,300 21,928,010 85,451,510 96721 System R&R -Maintenance This is an on-going program relating to maintenance, repair or replacement of water mains, service lines, valves, fire hydrants, miscellaneous equ(pment, and damaged facilities. Work Involves maintenance, repair and replacement of facilities that do not Involve upgrading, Comprehensive Plan Obiective: (21.3) Continue to maintain the water system in a safe, sound and efflclent manner oh a dally basis. 96739 Reclaimed Water Distribution Svstem This protect provides for the continued expansion of the City's Reclaimed Water System based on the Reclaimed Water Master Plan. Comprehensive Plan Obtective: (21,2) To provide adequate quantities and qualities of water services to all customers In the Clearwater seMce area; for the City's water system .to be compatible with the environment; and also seek to conserve and protect sensitive natural resources. ~J Appendix A CAPITAL IMPROVEMENT PROGRAM WATER SYSTEM continued ~ ~ 96740 Water Supply and Treatment This project provides funding for maintenance, replacement, and upgrade of supply facilities. Comprehensive Plan Objective: (21.2) To provide adequate quantities and qual(ties of water services to all customers in the Clearwater service area; for the City's water system to be compatible with the environment; and also seek to conserve and protect sensitive natural resources. 96741 System R&R -Capitalized ' This project involves the repair and replacement of water mains, seMce Ilnes, valves, fire hydrants, and facilities equipment, etc. that are upgraded during the repair/replacement process, Funding for capitalized labor, equipment and material for in-house work is Included. Comprehensive Plan Objective: (21.3) Continue to maintain the water system in a safe, sound and efficient ' manner on a daily basis. 96742 line Relocation -Capitalized This is an on-going project to relocate water mains and related facilities conflicting with public works ' projects of various governmental entities and which are upgraded during relocation. Funding for capitalized labor, equipment and material for in-house work is included. Planned work Includes US 19 (Sunset to Countryside), US 19 (Whitney to Seville), US 19 (Seville to SR 60), US 19 @ SR 60 Sunset Point (Alt US 19A to Keene), McMullen Booth at Drew Street, Nursery Road (Belcher to US 19), Belleair Road at Keene ' Road, Progress Energy Trail, Pinellas Trail, Druid Trail, SR 60/Memorial Causeway (east of Island Way to Ft. Harrison), Beach Walk, Osceola Streetscape. Comprehensive Plan Obiective: (18.4) To provide sound fiscal management for the operation and maintenance for potable water service in the City's service area. 96743 Meter/Backflow Replacement/Chanae Out This is an on-going project to repair/replace water meters, backflow prevention devices, and accessories ' to assure accurate flow measurement, maximum revenues, and proper operation, Comprehensive Plan Objective: (21.3) Continue to maintain the water system in a safe, sound and efficient manner on a daily basis. ' 96744 System Expansion This project provides funding and capitalizes Water Division labor, equipment and material expenses relating to additions to Clearwater's distribution system, including new meters, backflow prevention devices, main extensions, etc. Location of work areas is determined by customer demand. ' Comprehensive Plan Obiective: (21.1) To maintain adequate levels of service for existing and future populations. 96752 Water Service Lines This project is to upgrade the City's existing galvanized water service lines that are in poor condition. Comprehensive Plan Objective (21.1) To maintain adequate levels of seMce for existing and future populations. 96757 Water Pick up Trucks This project provides funding for the purchase of three (3) additional 1-ton pick up trucks. The vehicles will be used to perform required annual inspections of the Reclaimed Water System as contained in the Reclaimed Water Master Plan in years 2006-2012. 96758 Fluoride in Water System This project provides funding for the City of Clearwater treatment ad distribution system to be modified to include fluoride Injection at each of the City's reservoirs. ' Comprehensive Plan Objective: (21.3) Continue to maintain the water system in a safe, sound and efficient manner on a dally basis. 96760 Elevated Water Tanks Up rg ade This project provides funding for the renovation and related distribution system work for water and fire protection concerns and the removal of the Del Oro tank in 2010. Comprehensive Plan Objective: (21.3) Continue to maintain the water system In a safe, sound and efficient ' manner on a dally basis, Appendix A CAPITAL IMPROVEMENT PROGRAM ' WATER SYSTEM continued ( ) ' 96761 Teleme for Wells This project provides funding for the purchase of an additional Supervisory Control and Data Acquisition (SCADA) telemetry system. This SCADA system will provide real time monitoring and control of the City's ' wells, treatment plants and points of interconnection to the County. Comprehensive Plan Objective: (21.3) Continue to maintain the water system in a safe, sound and efficient manner on a dally basis. 1 i 1 0 96763 Well Field Expansion This project provides funding for the expansion of the City's current potable water well field. This expansion will provide the potential for an increased local water production by one million gallons per day (MGD), thus reducing our dependency on the regional supply. Comprehensive Plan Objective: (21.2) To provide adequate quantities and qualities of water services to all customers in the Clearwater service area. 96764 Reverse Osmosis Plant Expansion -Reservoir # 1 , This project provides funding for the expansion of the City's existing RO Plant potentially adding one (1) MGD in water production. This includes wells, raw water piping and plant equipment. Comprehensive Plan Objective: (21.2) To provide adequate quantities and qualities of water services to all customers in the Clearwater seMce area. 96767 Reverse Osmosis Plant at Reservoir #2 This project provides funding for brackish wells, raw water pipelines, 3.5 MGD brackish RO Plan with brine disposal to Tampa Bay. Additional operating costs for this project will not begin unfit 2013. Comprehensive Plan Obiective: (21,2) To provide adequate quantities and qualities of water services to all customers in the Clearwater service area. 96768 Rebate-Well, Lake, Pond Irrigation Abandonment This project provides funding for the Well, Lake, Pond Irrigation Abandonment program that was approved by the City Council May 3, 2007. This program provides a homeowner a rebate If they are willing to properly abandon a private well, lake or pond irrigation system, when establishing reclaimed water service at their residence. Comprehensive Pian Obiective: (21.2) To provide adequate quantities and qualities of water services to all customers in the Clearwater service area; for the City's water system to be compatible with the environment; and also seek to conserve and protect sensitive natural resources. 96769 Track Hoe & Trailer This project provides funding for an additional track hoe and trailer. This equipment will be used to excavate water mains and other Jobs in tight areas where large equipment cannot fit. This smaller sized equipment is more versatile and can be transported on a trailer with a standard truck. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Appendix A CAPITAL IMPROVEMENT PROGRAM WATER SYSTEM (continued) ANNUAL OPERATING BUDGET IMPACT Project FTE's 2007/08 2008/09 2009/10 2010/11 2011/12 2012/13 Reclaimed Water Distribution System (n 0.0 80,000 80,000 80,000 80,000 80,000 80,000 Water Pickup Trucks (z), (b) 0.0 7,330 14,880 22660 22,660 22,660 15,330 Fluroide in Water System (s> Elevated Water Tanks Upgrade (i>, (a) Telemetry for Welis (i> Wellfieid Expansion (a>, (s> Reverse Osmosis Plant Expansion - 0.0 15,000 15,750 0.0 33,600 35,280 37,040 38,890 40,840 42880 0.0 49,950 52450 55,070 57,820 60,710 63,750 0.0 50,400 52,920 55,560 58,340 61,260 64,320 0.0 523,400 549,570 577,050 Reverse Osmosis Plant @ 8.0 1,924,50p Reservior #2 (t), <s>, (a>, (s) Track Hoe & Trailer (z>, <e> 0.0 12,170 12,320 12480 12650 12820 3,830 Total Public Works/Sewer System 8.0 221,280 235,530 250,330 781,110 830,040 2,783,580 (1) Operating costs are for maintenance. (2) Operating costs are for debt service to be funded by the Water & Sewer fund. (3) Operating costs are for personal services. (4) Operating costs are for uFdities. (6) Operating costs are for fleet Maintenance. (7) Operating costs are for metering. (B) Operating costs are for chemdals and/or other operating supplies. RECEIVER APR 0 9 2008 PLANNING DEPARTMENT CINOECf.FARWA' Herman, Sandra From: Sent: To: Cc: Subject: In response to this; Fernandez, Jose [JFernandez@WadeTrim.com] Wednesday, September 03, 20081:24 PM Herman, Sandra; Fahey, Robert Gildersleeve, David RE: ASAP please review and comment SWFWMD recommends that further language to support water conservation should be developed by the City giving the location of the City within the Northern Tampa Bay Water Use Caution Area where groundwater is insufficient. Which policy answers-this one? Below we proposed two new policies under objective 21.5 21.5.8 The City will continue and /or explore to reduce potable water consumption by water conservation rates, conservation codes, operational measures, rebate and plumbing retrofit programs, landscape and irrigation efficiency programs, research and evaluation, and re-use alternatives. 21.5.9 The City will expand, in coordination with other stakeholders, educational programs and messaging campaigns to promote water conservation measures Rob, please confirm ... Jose -----Original Message----- From: Sandra.Herman@myClearwater.com [mailto:Sandra.Herman@myClearwater.com] Sent: Wednesday, September 03, 2008 11:04 AM To: Robert.Fahey@myClearwater.com; Fernandez, Jose Subject: FW: ASAP please review and comment here is the draft revised ordinance to review «Ord. No. 7950-08 With Exhibit A for Updated Water Plan REVISED August 29, 2008.doc » > -----Original Message----- > From: Herman, Sandra > Sent: Wednesday, September 03, 2008 11:00 AM > To: Fahey, Robert; 'JFernandez@WadeTrim.com' > Subject: ASAP please review and comment > Rob, Jose, > Please review - I have to get it reviewed by my department management > and then get the info. to Legal and the City Clerk today. Sandy > > «DRAFT Water ORC responses.doc » 1 Herman, Sandra From: Fernandez, Jose [JFernandez@WadeTrim.com] Sent: Wednesday, September 03, 2008 1:56 PM To: Herman, Sandra Cc: Fahey, Robert; Gildersleeve, David Subject: RE: Potable Water Element Update ORC-Consistency with State Com... See responses...on attached text Jose -----Original Message----- From: Sandra.Herman@myClearwater.com [mailto:Sandra.Herman@myClearwater.com] Sent: Wednesday, September 03, 2008 12:09 PM To: Fernandez, Jose Subject: RE: Potable Water Element Update Jose, At the top of the State Comprehensive Plan sheet you say that the yellow are described in our ORC response. Please attach our ORC response. Thanks. Sandy -----Original Message----- From: Fernandez, Jose [mailto:JFernandez@WadeTrim.com] Sent: Thursday, August 28, 2008 2:29 PM To: Fahey, Robert; Herman, Sandra Cc: Gildersleeve, David Subject: RE: Potable Water Element Update Attached a draft of the revised element for your review. We followed the recommendations of the ORC Report from DCA. There is a reference on the report to compliance with the State Comprehensive Plan (Part II- See word attachment. In order to respond, we add two policies (21.2.8) and (21.4.6. We also need to include map A which indicates the wellhead protection area. We have not received this info from the City We are still pending on the data and analysis section Let me know if you have any questions or suggestions let me know Jose Raul Planning Municipal Fernandez Services Wade Trim, Inc. Renaissance 5, Suite 220 8745 Henderson Road Tampa, F1 33634 Ph: 813-882-8366 Fax: 813-884-5990 http://www.wadetrim.com 1 -----Original Message----- From: Robert.Fahey@myClearwater.com [mailto:Robert.Fahey@myClearwater.com] Sent: Thursday, August 28, 2008 8:36 AM To: Fernandez, Jose; Sandra.Herman~myClearwater.com Cc: Gildersleeve, David Subject: RE: Potable Water Element Update See attached text of Wellhead Protection Ordinance (below): The comment to change the level of service was not a requirement, though I won't be upset if you think it would be prudent to change it. if everything else is equal, just leave it alone. Rob -----Original Message----- From: Fernandez, Jose [mailto:JFernandez~WadeTrim.com] Sent: Wednesday, August 27, 2008 9:31 AM To: Herman, Sandra Cc: Fahey, Robert; Gildersleeve, David Subject: RE: Potable Water Element Update There are some changes. 1. Policy regarding updating the water supply plan every five years within 18 months of SWFWMD Regional Plan approval) 2. Expand policy 21.7.3 with text from the wellhead protection ordinance. Make reference to the wellhead protection map I don't think that we will be changing the level of service after 2010 to 115 gppd as Pinellas County. Can you correct me Rob? Jose -----Original Message----- From: Sandra.Herman@myClearwater.com [mailto:Sandra.HermanQmyClearwater.com] Sent: Wednesday, August 27, 2008 8:44 AM To: Fernandez, Jose Subject: RE: Potable Water Element Update Jose, Will this require any revisions to the ordinance itself or is it simply D&A materials being updated? Sandy -----Original Message----- From: Fernandez, Jose (mailto:JFernandez~WadeTrim.com] Sent: Tuesday, August 26, 2008 10:41 AM To: Fahey, Robert; Herman, Sandra Cc: Gildersleeve, David Subject: Potable Water Element Update Importance: High Rob and Sandy, After our two meetings with DCA and SWFWMD...below is the information that is needed for the ORC response for the Potable Water Sub-element Data and Analysis Section 1. Updated population projections (2008/2025)- Table 1 2. Updated projections of Annual Average Daily Demand (base on the 2 established level of service): 120 gppd). Note: are we going to project at 115 gppd Pinellas did after 2010?? 3. Updated projections for Annual Average Daily Demand and Reuse Offset (2008/2025)- Table 7 4. Copy of the District's Consumptive Use Permit for SWFWMD (for 23 wells)- To be included as appendix 5. Copy of most recent agreement with Pinellas County (to be included as appendix) 6. Copy agreement interconnect with St Petersburg (to be included as appendix) 7. Wellhead protection Map (gis-shapefiles) 8. Wellhead protection ordinance (text-word) Rob, we will need to collect from you the information on 4'to 8. We will also need to check with you the projections (1, 2 and 3). In addition tables of the 2004 Water Master Plan and Capital Improvements. Let me know the best way to acces to the info. I have created a folder were you can paste any files ....(see below) ftp://ftp.wadetrim.com/incoming/Clearwater/ Policy Section 1. Policy regarding updating the water supply plan every five years within 18 months of SWFLWMD's Regional Plan approval) 2. Expand policy 21.7.3 with text from the wellhead protection ordinance. Make reference to the wellhead protection map If you have any questions, please let us know Jose Raul Fernandez Planning Municipal Services Wade Trim, Inc. Renaissance 5, Suite 220 8745 Henderson Road Tampa, F1 33634 Ph: 813-882-8366 Fax: 813-884-5990 http://www.wadetrim.com 3 Page 1 of 3 Herman, Sandra From: Fernandez, Jose [JFernandez@WadeTrim.com) Sent: Tuesday, September 02, 2008 9:11 AM To: Fahey, Robert; Herman, Sandra Cc: Gildersleeve, David Subject: FW: Requested Meeting- City of Clearwater 10 Year Water Supply Plan FYI From: Jason.Mickel@swfwmd.state.fl.us [mailto:Jason.Mickel@swfwmd.state.fl.us] Sent: Tuesday, September 02, 2008 8:48 AM To: Fernandez, Jose Subject: RE: Requested Meeting- City of Clearwater 10 Year Water Supply Plan Hello Jose, I reviewed the population projections for the City with several other staff. We determined that the numbers are consistent with the Regional Water Supply Plan 2006 update. Please let me know if you have any other questions or if I can be of any further assistance. Thanks. Jason M. Mickel Sr. Planner, Planning Department Southwest Florida Water Management District 2379 Broad Street, Brooksville, FL 34604 352.796.7211 X4423 ~ Fnx: (352) 754-6749 Jason.mickel(n~swfwmd.state.fl.us (http://www.watennatters.org "Fernandez, Jose" <JFernandez@WadeTrim.com> To <Jason. Mickel@swfwmd.state.fl.us> cc <Robert.Fahey@myCleanvater.com>, "Gildersleeve, David" 08/28/2008 11:59 AM <DGILDERSLEEVE@WadeTrim.com>, <Sandra.Herman@myClearwater.com> Subject RE: Requested Meeting- City of Clearwater 10 Year Water Supply Plan Jason, I found an update to population projections from Pinellas County that we used on our Potable Water Master Plan in 2004. (Sector 6 matches our water service area). have attached the projections from Pinellas County. In addition, attached the proposed Table 1 that shows the updated data and our calculations for the functional population. You can compare the District projections (Regional Supply Plan) with our projections Please let us know your thoughts to move forward with the ORC response. Jose Raul Fernandez 9/3/2008 Page 2 of 3 Planning Municipal Services Wade Trim, Inc. Renaissance 5, Suite 220 8745 Henderson Road Tampa, FI 33634 Ph:813-882-8366 Fax: 813-884-5990 htt www.wadetrim.com From: Jason.Mickel@swfwmd.state.fl.us [mailto:Jason.Mickel@swfwmd.state.fl.us] Sent: Tuesday, August 26, 2008 11:41 AM To: Fernandez, Jose Subject: Re: Requested Meeting- City of Clearwater 10 Year Water Supply Plan Hello Jose, Our economist has been stuck in the Gov Bd meeting most of the day. I will try to get with him this afternoon or early tomorrow. Talk to you soon. Jason M. Mickel Sr. Planner, Planning Department Southwest Florida Water Management District 2379 Broad Street, Brooksville, FL 34604 352.796.7211 X4423 ~ Fnx: (352) 754-6749 Jason.mickel(a~swfwmd.state.fl.us ~ http://www.watermatters.or~ "Fernandez, Jose" <JFernandez@WadeTrim.com> 08/22/2008 11:53 AM Jason, To <jason.mickel@watermatters.org> cc <Robert.Fahey@myClearwater.com>, "Gildersleeve, David" <DGILDERSLEEVE@WadeTrim.com> Subject Requested Meeting- City of Clearwater 10 Year Water Supply Plan We appreciate the opportunity to talk to you this morning. We will be available on Monday 25th from 1:00 pm to 2 pm as you proposed to go over the comments to the City of Clearwater 08RWSP1 (letter to Ray Eubanks- DCA) on July 14th 2008. I will be initiating the conference call and will contact you at 352-796-7211 ext 4423. Please, let me know if I should call to a different number. Have a great weekend Jose Raul Fernandez Planning Municipal Services wade Trim, Inc. Renaissance 5, Suite 220 8745 Henderson Road 9/3/2008 Page 3 of 3 Tampa, F1 33634 Ph: 813-882-8366 Fax: 813-884-5990 http://www.wadetrim.com IMPORTANT NOTICE: All E-mail sent to or from this address are public record and archived. The Southwest Florida Water Management District does not allow use of District equipment and E-mail facilities for non-District business purposes. IMPORTANT NOTICE: All E-mail sent to or from this address are public record and archived. The 9/3/2008 PINELLAS COUNTY, FL POPULATION PROJECTIONS BY PLANNING SECTOR PLANNING YEAR SECTOR 2005 2010 2015 2020 2025 Permanent 28,131 30,033 31,487 32,582 33,401 SECTOR 1 Seasonal 2,842 3,059 3,224 3,348 3,442 Greater Tarpon Springs Tourist 2,453 2,542 2,610 2,661 2,700 Total 33,426 35,634 37,321 38,591 39,543 Permanent 33,361 34,416 34,980 35,278 35,434 SECTOR2 Seasonal 1,750 1,807 1,836 1,852 1,860 East Lake Tarpon Tourist 1,254 1,294 1,316 1,327 1,333 Total 36,365 37,517 38,132 38,457 38,627 Permanent 62,162 63,726 64,567 65,014 65,251 SECTOR 3 Seasonal 2,812 2,903 2,951 2,977 2,992 Palm Harbor Tourist 4,288 ~ 4,360 4,399 4,420 4,431 Total 69,262 70,989 71,917 72,411 72,674 Permanent 43,468 44,254 44,805 45,188 45,453 SECTOR 4 Seasonal 3,200 3,258 3,298 3,325 3,345 Greater Dunedin Tourist 2,826 2,870 2,901 2,922 2,936 Total 49,494 50,382 51,004 51,435 51,734 Permanent 34,153 36,335 37,741 38,643 39,223 SECTOR 5 Seasonal 1,029 1,111 1,159 1,187 1,203 Greater Safety Harbor/Oldsmar Tourist 1,761 1,849 1,905 1,940 1,962 Total 36,943 39,295 40,805 41,770 42,388 Permanent 137,971 140,603 142,483 143,819 144,767 SECTOR6 Seasonal 11,806 12,093 12,298 12,444 12,547 Greater Clearwater Tourist 18,681 18,818 18,916 18,986 19,036 T ota I 168, 458 171, 514 173, 697 175, 249 176, 3 50 Permanent 94,859 95,650 96,239 96,683 97,015 SECTOR 7 Seasonal 8,409 8,473 8,523 8,560 8,589 Greater Largo Tourist 7,543 7,583 7,613 7,635 7,652 Total 110,811 111,706 17 2,375 112,878 113,256 Permanent 24,646 25,833 26,668 27,246 27,643 SECTOR 8 Seasonal 1,138 1,171 1,194 1,210 1,221 Greater HighpoinUFeather Sound Tourist 4,105 4,143 4,170 4,188 4,200 Total 29,889 31,147 32,032 32,644 33,064 Permanent 81,226 82,493 83,632 84,656 85,573 SECTOR 9 Seasonal 5,254 5,356 5,439 5,512 5,576 Greater Seminole Tourist 5,046 5,113 5,170 5,227 5,275 Total 91,526 92,962 94,241 95,395 96,424 Permanent 52,370 54,237 55,766 57,014 58,033 SECTOR 10 Seasonal 2,407 2,538 2,653 2,737 2,802 Greater Pinellas Park Tourist 5,822 5,905 5,973 6,028 6,074 Total 60,599 62,680 64,392 65,779 66,909 Permanent 273,666 277,379 281,005 283,987 287,135 SECTOR 11 Seasonal 17,019 17,276 17,514 17,713 17,907 Greater St. Petersburg Tourist 19,286 19,506 19,684 19,831 19,949 Total 309,971 314,161 318,203 321,531 324,991 Permanent 21,009 21,146 21,225 21,268 21,292 SECTOR 12 Seasonal 7,378 7,472 7,525 7,554 7,571 South County Beaches Tourist 10,591 10,606 10,614 10,619 10,621 Total 38,978 39,224 39,364 39,441 39,484 Permanent 18,144 18,242 18,337 18,426 18,512 SECTOR 13 Seasonal 9,497 9,563 9,626 9,687 9,745 Mid-County Beaches Tourist 4,429 4,439 4,448 4,457 4,466 Total 32,070 32,244 32,411 32,570 32,723 Permanent 39,606 40,130 40,554 40,899 41,179 SECTOR 14 Seasonal 3,565 3,628 3,679 3,718 3,750 Greater Lealman Tourist 2,934 2,962 2,984 3,003 3,017 Total 46,105 46,720 47,217 47,620 47,946 Permanent 944,772 964,477 979,489 990,703 999,911 PINELLAS COUNTY Seasonal 78,106 79,708 80,979 81,824 82,550 TOTAL Tourist 91,019 91,990 92,703 93,244 93,652 T ota I 1,113, 8 97 1,136,17 5 1,153,111 1,165, 771 1,176,113 Nole: 1. Seasonal Population is defined as persons who reside in Pinellas County for less than six months and declare their permanent home elsewhere. 2. Tourist Population is the impact that tourists have on public services and facilities that are comparable to the impact of permanent residents. Source: Pinellas County Planning Dept., 07/04, Rev. 02/07 Projection Methodology/Updated Pop Proj by Sector final 082604 Table 1 (proposed) Population Projections Service Area Annual Population Estimates Year Permanent Seasonal (b) Tourist (c) Total Functional (d) 2005 137;971 11;806 .:.18;681 168,458 15.1,247 2006 138,381 11,849 18,702 168,933 151, 682 2007 138,791 11,893 18,724 169,407 152,117 2008 139,200 11,936 18,745 169,882 152,552 2009 139,610 11,980 18,767 170,356 152,987 2010 10;603 °° I2;093 18,818 171,514' `154,043 2011 140,895 12,124 18,833 171,852 154,353 2012 141,188 12,155 18, 848 172,191 154,664 2013 141,480 12,185 18,864 172, 529 154,974 2014 141,773 12,216 18, 879 172,868 15 5,284 2015 142;483 12;444 18;916 173;843 1 X6,089 2016 142,691 12,274 18,927 173,892 156,246 2017 142,899 12;274 18,938 174,111 156,459 2018 143,107 12,274 18,948 174,329 156,673 2019 143,315 12,274 18,959 174, 548 156, 886 .2020 '143;819 '.12,444 1.8,986 175,249 157,460:: 2021 143,967 12,460 18,994 175,420 157,617 2022 144,114 12,476 19,001 175,591 157,773 2023 144,262 12,491 19,009 175,762 157,930 2024 144,409 12, 507 19, 016 175,933 15 8,087 2025 144.767 12;547 '19,036 176;350 `158,467 (a) For the purpose of this analysis, the population projection for Pinellas County Planning Sector 6 (Greater Clearwater Area), which closely represents the Clearwater water service area, is utilized. (b) Seasonal population is defined as persons who reside in Pinellas County for less than six months and declare [heir permanent home elsewhere. (c) Tourist population is the impact that tourists have on public services and facilities that aze comparable to the impact of permanent residents. (d) Functional population is calculated by Water Use Caution Area (WUCA) rules (see text). SWFWMD Master Plan 2006 153,539?. 155,977- 157,654 158,639 159,632`' Source for years 2005, 2010, 2015, 2020, and 2025: Pinellas County Population Projections by Planning Sector, 2005-2030, Pinellas County Planning Departrnent, February 2007 Source for all other years: Data extrapolated from Pinellas County Planning Department. Herman, Sandra From: Fahey, Robert Sent: Thursday, July 24, 2008 5:19 PM To: Herman, Sandra Subject: RE: URGENT - 2 questions on Utilities Element see comments: -~:.'. Rob Fahey iestions 072408.doc -----Original Message----- From: Herman, Sandra Sent: Thursday, July 24, 2008 3:45 PM To: Fahey, Robert Subject: URGENT - 2 questions on Utilities Element Rob, Need your help on this ASAP. Thanks. Sandy « File: Rob Fahey questions 072408.doc » Sandra E. Herman Planner III Planning Department City of Clearwater, Florida 100 South Myrtle Avenue Clearwater, FL 33756-5520 PO Box 4748, 33758-4748 Telephone: (727) 562-4586 Fax: (727) 562-4865 sandra.herman@myclearwater.com Rob, Two urgent questions as we are finalizing the documents right now to go to CAC, CDB and CC: W....w..._ __.._..__...~ ..._ ~ _ _. _ ..~_-_....,.~_.._._.~. ~,.~,_ e a. _...~ . _......~..~..._. _.~ ~1) 1n the fallowing o{~jecti~ ~, i5 the }~~ar 2015 deri~~~ed from the 2004 Water 11laster Pkm:' [o please `identify sourcein most p1 ices in Ut~hties it has yeaz 202fl, so we nes/d to esylau theme ~~erent year '4l The 2004 Water Master Plan projected populations out until 2015 for the specific purpose of anticipating water demands. Different utility groups have had different planning horizons and subsequently different end dates for the projections: reclaimed projected through 2020, wastewater collection projected through the year 2020, wastewater treatment projected through 2015... D.5.1 21.1 Objective - To maintain adequate Levels of Service for existing and future populations through the year 2015 ~0. (Engineering Department) (2) Do yot~ know anything about the following policy change? Please advise if there is a 7 ~ . } ~<~r requirement (by what year?} and if so is it in 7 years to develop a pt~licy t~ mgture this oi- i5 t~ yeaa~s to require the lines to_be iun? Please lte`lp us write„this one for clarity^Tlaanks~ This is a requirement of the Southwest Florida Water Management District that the City must adhere to in order to remain in compliance with the cooperation funding agreements helping to fund the reclaimed water expansion program. The 7 year period allows the City to reasonably project reclaimed water service areas that will be constructed without putting undue burden on the developer (Having dual distribution systems installed where no reclaimed water becomes available). The seven-year period is generally considered the timeframe from conceptual project area identification, initial submittal to SWFWMD for cooperative funding through design and construction. D.5.5.7 ~~ Reclaimed water service will continue to be extended to private residences based on the . Reclaimed Water Master Plan Re-Evaluation ,December. 2007. A threshold will be developed which will require that new developments that will receive reclaimed water within 7 years shall be required to construct reclaimed water distribution lines. (EAR, Part Iii Herman, Sandra From: Fahey, Robert Sent: Wednesday, July 23, 2008 2:31 PM To: Herman, Sandra Subject: RE: Most recent count of water customers for Wade Trim consultants see suggested edits below: (I'm thinking it may be best to drop "apparently" and "speculation" from the language I provided you as it implies uncertainty in our methods). Just let me know if you think anything sounds wrong. Rob -----Original Message----- From: Herman, Sandra Sent: Wednesday, July 23, 2008 2:03 PM To: Fahey, Robert Subject: FW: Most recent count of water customers for Wade Trim consultants ROB, Does this message back to Valerie James at DCA sound correct to you (I tried to summarize all the messages on the subject). Sandy Valerie, Hi, regarding your question in the email on the 17th: "I have a question about the revised Objective 21.2. Would you please explain to me the customer accounts and why have the numbers decreased? I thought that the customer accounts is based on the estimated population for the City's potable water service area." I ran this by the City's Engineering Manager Robert Fahey and he spoke also on the subject with Laura Damico, Senior Systems Analyst, Customer Service. Answer: because the number of accounts represented before were based on "equivalent" residential units (ERU) -the ERU number is derived by our customer service group by applying various multipliers times the actual number of accounts factoring in land use... while the ERU number was used before, it seems clearer to us to state the number of water accounts we have and that's the 40K number -the 50K number was misleading as it didn't represent total water service in any way. We want to be clearer in representing what the number is to avoid any confusion. From the City's Laura Damico, Senior Systems Analyst, Customer Service: "The 40,390 is very much in line with the Water customer count supplied annually for the CAFR and noted as including the reclaimed (non-potable) water service counts. Additionally, the annual count of water customers data that I provide for the CAFR also includes data from the past 4 years and is relatively stable (between 40,178 and 40,457 for the years of 2003.through 2007)." Below is an email from Ms. Damico to the City's consultant Wade Trim on the subject. Please let me know if this is acceptable justification for the figure change, or if you have any additional questions. Thanks. Sandy Sandra E. Herman Planner III Planning Department City of Clearwater, Florida 100 South Myrtle Avenue Clearwater, FL 33756-5520 PO Box 4748, 33758-4748 Telephone: (727) 562-4586 Fax: (727) 562-4865 snndrn.herman@myclearwnter.com .~ -----Original Message----- From: Damico, Laura Sent: Friday, August 03, 2007 8:47 AM To: 'dgildersleeve@wadetrim.com' Cc: Fahey, Robert; O'Brien, Kelly; Geary, Jim Subject: Most recent count of water customers for Wade Trim consultants Good morning, David. As discussed, here is a breakdown of water customer counts, by service, as of July 31, 2007. Fire Protect 793 Reclaimed availability 566 Fire Detect 606 Hydrant 42 Lawn 3053 Reclaimed Metered 2198 Water Domestic 33132 Total 40390 Note: All services are potable water except Reclaimed. Reclaimed availability is available only, not hooked up. Reclaimed metered are customers that are hooked up to reclaimed. Have a nice day. Regards, Laura Damico Sr. Systems Analyst Clearwater Customer Service (727)562-4618 t Herman, Sandra From: Fernandez, Jose [JFernandez@WadeTrim.com] Sent: Wednesday, April 09, 2008 1:50 PM To: Herman, Sandra Cc: Watkins, Sherry; Fahey, Robert; Gildersleeve, David Subject: RE: URGENT: Water Plan Sandy, We will provide the necessary changes to the document by April 18th. All changes should be submitted no later than Monday 14th. Thanks Jose R. Fernandez Wader--rim, Inc. Planning- Municipal Services Renaissance 5, Suite 220 8745 Henderson Road Tampa, Fl 33634 Ph: 813-882-8366 Fax: 813-884-5990 http://www.wadetrim.com -----Original Message----- From: Sandra.Herman@myClearwater.com [mailto:Sandra.Herman@myClearwater.com] Sent: Wednesday, April 09, 2008 1:45 PM To: Fernandez, Jose Cc: Sherry.Watkins@myClearwater.com; Robert.Fahey@myClearwater.com; Gildersleeve, David Subject: FW: URGENT: Water Plan Jose, Please email us a response immediately so that we can provide a copy to the Community Development Board indicating that you will be making these necessary changes. Then please provide us with 15 new copies of the revised document by Friday April 18th (in time for the submittal to the City Council on May 15th). Thank you. Sandy > -----Original Message----- > From: Fahey, Robert > Sent: Wednesday, April 09, 2008 1:30 PM > To: Herman, Sandra > Subject: RE: URGENT: Water Plan > Page 17 - change second sentence to read "... the are 22 23 groundwater wells..." for consistency. > Page 18 - third paragraph - add #63 to listing of Reservoir #3 bringing the total to 6 instead of 5. "Two inactive wells are also connected (Wells Nos. > Everything else looks good.... > Rob > -----Original Message----- > From: Herman, Sandra > Sent: Wednesday, April 09, 2008 9:55 AM City water sources wells feeding Also add sentence 79 and 80)." 1 > Z > To: Fahey, Robert > Subject: URGENT: Water Plan > Rob, > Hi. > We are preparing our packets today for the CDB meeting - I put a copy of the revised plan from Wade Trim on your chair this morning. > Have the revisions been made as you requested? Please let me know ASAP, so we can put them in the packets to be mailed tomorrow morning. Thanks. > Sandy > Sandra E. Herman > Planner III > Planning Department > City of Clearwater, Florida > 100 South Myrtle Avenue > Clearwater, FL 33756-5520 > PO Box 4748, 33758-4748 > Telephone: (727) 562-4586 > Fax: (727) 562-4865 > sandra.herman@myclearwater.com 2 Notes Meeting with Rob Fahey and Sandra Herman November 30, 2007 Potable Water Element Rob said the City's consultant will soon have the reclaimed water plan updated (probably in about 2-3 weeks). He will get the electronic version of the map to Wade Trim and Sandy. Rob said the part of the Wade Trim report discussing the various capacities of the City's water supply system needs to be reworded. It is the part that refers to the City's goal of eventually providing approximately 80% of the water used by the City's population. Rob explained that we have adequate capacity to serve our population as we have an interlocal agreement with Pinellas County to buy what we need for our population -this is how we address our capacity. We get letters from PINCO that we have capacity for as long as the agreement -they let us know the rates as per the agreement (on LaserFiche). Regarding page 30 and the SWFWMD population projections, Rob said he would follow up on this by sending a letter to SWFWMD for clarification on it. Regarding the Appendix containing the CIP, Rob would like to put in the City's 6 year plan from the Budget in lieu of the PARSON'S report. Sandy said she would send an email to Jose Fernandez at Wade Trim requesting an updated document to be sent electronically to her with the maps (reposted on the FTP site as per Rob) and strike-outs and underlines for the GOP's. Then Rob will take another look at the GOP's to make sure they are appropriate for the City. Sandy asked Rob who she should contact when working on the EAR Based updated GOP's for the other sub-elements of the Utilities Element and Rob said to provide them to him for review/recommendations. Herman, Sandra From: Herman, Sandra Sent: Friday, November 09, 2007 11:43 AM To: Fahey, Robert Subject: FW: CLW2O56- Meeting Minutes ~~~ First Draft- MeetingMinutes_08 :LW-Potable Water.. 2107.doc Rob, Has this version of the draft of the Potable Water Element been revised as per your recommendations at the meeting with Wade Trim? Please advise. Thanks. Sandy -----Original Message----- From: Fernandez, Jose [mailto:JFernandez@WadeTrim.com] Sent: Friday, November 09, 2007 11:35 AM To: Herman, Sandra Subject: RE: CLW2056- Meeting Minutes Attached the information requested Jose -----Original Message----- From: Sandra.Herman@myClearwater.com [mailto:Sandra.Herman@myClearwater.com] Sent: Friday, November 09, 2007 11:23 AM To: Fernandez, Jose Subject: RE: CLW2056- Meeting Minutes Jose, Hi again. Please email me the latest version of the Potable Water Element and the GOP's that you have revised as per our meeting (Rob Fahey's comments). Thanks. Sandy -----Original Message----- From: Fernandez, Jose [mailto:JFernandez@WadeTrim.com] Sent: Friday, November 09, 2007 11:18 AM To: Herman, Sandra Cc: Gildersleeve, David Subject: FW: CLW2056- Meeting Minutes Importance: High Sandra, As pour our conversation today, attached you will find the requested information to follow up with the Potable Water Element. We completed all the revisions as they appear on the meeting minutes. If you have any questions let me know Jose R. Fernandez WadeTrim, Inc. Planning- Municipal Services 1 Renaissance 5, Suite 220 8745 Henderson Road Tampa, Fl 33634 . Ph: 813-882-8366 Fax: 813-884-5990 http://www.wadetrim.com > From: Fernandez, Jose > Sent: Friday, August 24, 2007 11:53 AM > To: 'robert.fahey@myclearwater.com'; > 'Catherine.Porter@MyClearwater.com'; 'Sandra.Herman@myClearwater.com' > Cc: Gildersleeve, David; Warner, Amanda > Subject: CLW2056- Meeting Minutes > All, > Attached are the minutes from our meeting held this week regarding > revisions to our work for the update of the Potable Water Element for > the City. > We need to follow up with the actions expressed on the last page of > the minutes. At this point Wade Trim, will begin making the suggested > changes that do not require additional information from you. > Once we receive the information we will finalize the document. > Please confirm that you have received this email. > If you have any questions, please contact us. > Jose R. Fernandez > WadeTrim, Inc. > Planning- Municipal Services > Renaissance 5, Suite 220 > 8745 Henderson Road > Tampa, F1 33634 > Ph: 813-882-8366 > Fax: 813-884-5990 > http://www.wadetrim.com > «MeetingMinutes 082107.doc » 2 MEETING MINUTES CITY OF CLEARWATER POTABLE WATER ELEMENT AUGUST 21, 2007 - 9:00 A.M. MUNICIPAL SERVICES BUILDING A project progress meeting was held on August 21, 2007 at 9:00 a.m. The following individuals were in attendance: Rob Fahey, City of Clearwater Catherine Porter, City of Clearwater Sandra Herman, City of Clearwater Jose Fernandez, Wade Trim Amanda Warner, Wade Trim Goals of Progress Meeting Wade Trim provided a general overview of the project progress to date along with the goal of the progress meeting, which was to discuss comments on the draft of the Potable Water Element that was delivered to the City on August 16, 2007. The discussion was then opened to the meeting participants to address the content of the (1) Goals, Objectives, and Policies and (2) Data and Analysis sections of the Potable Water Element. Discussion Goals, Objectives, and Policies Wade Trim informed the City that the Goals, Objectives, and Policies of the Potable Water Element were updated taking into account recommendations drawn from the Evaluation and Appraisal Report (EAR) process as well as the requirements of Rule 9J- 5, F.A.C. The City informed Wade Trim that the City of Clearwater Reclaimed Water Master Plan has been updated since the start of the project and that this update will need to be reflected in Policy 21.5.7. The City did not have any further comments on the revised Goals, Objectives, and Policies at this time. The City requested a "strike-through and underline" version of the modifications to the Goals, Objectives, and Policies of the Potable Water Element in Microsoft Word format so that they may have a record of what was changed. Data and Analysis The City and Wade Trim discussed comments regarding the Data and Analysis portion of the Potable Water Element. The City stated that the number of wells and wellfields has changed and should be updated in the document on Page 14. These same revisions should be made to Map 3. P:\CIw2058\01 m\Docs\Planning In reference to Page 21, Wade Trim noted that the Parson's report which was used as a source for much of the information in the Potable Water Element, does not contain detailed information about the City's distribution system and that this information will need to be provided. In reference to Map 4, the City requested that the distribution system be displayed by ownership. A portion of the system displayed north of Curlew Road should appear as County-owned. Additionally, City/County connections should be shown and the Service Area should be verified. In reference to Table 3, the City advised of the completion of the Del Oro project. Other future projects may be represented in the revised Reclaimed Water Master Plan to be provided to Wade Trim by the City. In reference to Page 26, the City requested that the text be revised to reflect the actual conditions of the three reservoirs within the City. Two of the reservoirs are sourced from wells and County-provided water. One of the reservoirs is actually the Reverse Osmosis facility with a capacity of 3.5 MGD. The Reverse Osmosis facility requires a significant level of treatment compared to the other reservoirs with actual pumping level at approximately 2.0 MGD. The City noted that the Reverse Osmosis facility is sourced from a well approximately 150 to 200 feet deep. The City and Wade Trim then discussed the various capacities of the City's water supply system. The City of Clearwater's goal is to eventually provide approximately 80% of the water used by the City's population. The City pointed out that the City does not have a capacity concern because so much of the City's water is purchased from Tampa Bay Water or Pinellas County. The City and Wade Trim discussed the ability of the City to provide water to new developments at Clearwater Beach. The City confirmed that provision of water to Clearwater Beach should not be a problem because existing lines are adequate for distribution. The City pointed out that Table 5 requires additional notes to explain that the absence of numbers in the last column is due to the lack of data available for those years. There was significant discussion regarding Page 30 and the Southwest Florida Water Management Regional Water Supply Plan population projections in comparison to the City of Clearwater's population projections. Rob Fahey will be contacting SWFWMD to discuss the City's projections in comparison to those used in the SWFWMD Regional Water Supply Plan. Mr. Fahey will advise Wade Trim on the appropriate course of action regarding this matter. In reference to Page 32, the City requested that the text be revised to reflect the return of two tanks to the system and the possible demolition of the Del Oro tank due to its condition. In reference to Page 33, the City requested that the text be revised to state that the chloride process has been completed and that a new process with a mitigation plan has been implemented. P:\Clv/2058\01 m\Docs\Planning 2 The Appendix containing the Capital Improvement Plan was discussed. The City pointed out that some of the CIP has changed and will need to be revised in the Potable Water Element. The City will provide Wade Trim with updated CIP information. Conclusions The following actions will be taken as a result of this meeting: Wade Trim Correct the project contact email list so that Catherine Porter will receive correspondence regarding the project. Provide the City with a "strike-through and underline" version of the Goals, Objectives, and Policies for the Potable Water Element. Make corrections to the maps and text discussed in this meeting based on data to be provided by the City (below). City of Clearwater Provide updated information to Wade Trim regarding: o Reclaimed Water Master Plan o Wells and wellfields (numbers, locations) o Distribution system (pipe sizes/types, ownership, general conditions) o Production capacity o Monitoring/Mitigation Plan o Capital Improvement Plan • Contact SWFWMD to discuss the City's projections in comparison to those used in the SWFWMD Regional Water Supply Plan. P:\Clv/L058\01 m\Docs\Planning 3 1 Potable 1~/ater Element City of Clearwater Comprehensive Plan ~; c r`~ ~', r ..y '~ . # C a y potable Water ~@er~ent City of Clearwater I~ W~,nETxuvi Potable Water Element City of Clearwater Comprehensive Plan TABLE OF CONTENTS 2 I. INTRODUCTION .................................................................................... 3 II. GOALS, OBJECTIVES AND POLICIES ........................................................ 4 III. INVENTORY AND ANALYSIS ................................................................ 10 3.1 Operational Responsibility ..................................................................................................................10 3.2 Geographic Service Area and Predominant Land Uses ...............................................................10 3.3 Design Capacity and Current Demand of Existing Facilities ....................................................14 3.4 Level of Service .......................................................................................................................................26 3.5 Facility Capacity Analysis ....................................................................................................................26 3.6 Performance and Condition of Existing Facilities ........................................................................30 3.7 Issues and Opportunities for Expansion and New Facilities ....................................................33 3.8 Natural Drainage and Groundwater Recharge ..............................................................................34 3.9 Existing Regulations and Programs Relating to Natural Drainage and Groundwater Recharge .......................................................................................................................................................... 36 3.10 Capital Improvement projects ...........................................:............................................:................38 IV. APPENDIX A: CAPITAL IMPROVEMENTS PROJECTS ................................ 39 Potable Water Element City of Clearwater Comprehensive Plan 3 I. INTRODUCTION According to Florida Administrative Code section 9J-5.01 1, the purpose of the Potable Water Element is to assure that necessary public facilities and services correlate to future land use projections. Furthermore, the purpose of the Potable Water Element is to identify capital improvements and establish goals, objectives and policies that will ensure the City of Clearwater. is able to supply quality drinking water of a sufficient quantity for current and future needs. The Potable Water Element focuses on the existing systems and facilities and projected system needs based on projected population growth and future .land use in the City of Clearwater. This is accomplished through an inventory and analysis of existing data, identification of present and potential problems and their solutions, and projection of future potable water needs for specific planning periods. The City of Clearwater Water Master Plan Water System Assessment, prepared in June of 2004, and the City of Clearwater Water Master Plan Capital Improvements Implementation Master Plan, prepared in October 2004, serve as the primary data sources for the existing conditions inventory and analysis. Both reports were prepared by Parsons Corporation. The composition of the Potable Water Element follows the minimum data requirements outlined in Section 9J-5.01 1, FAC. For ease of reference, the Potable Water Element is organized into two major sections; the first outlines the Goals, Objectives and Policies relating to potable water and the second includes an Inventory and Analysis of the water system. 4 Potable Water Element City of Clearwater Comprehensive Plan II. GOALS, OBJECTIVES AND POLICIES 21. GOAL PROVIDE, DEVELOP, AND MAINTAIN A PERMANENT POTABLE WATER SUPPLY SYSTEM TO MEET ANTICIPATED DEMAND WHILE PROVIDING MAXIMUM PRACTICAL PROTECTION TO THE ENVIRONMENT AT A COST CONSISTENT WITH THE PUBLIC'S ABILITY AND WILLINGNESS TO PAY. 21.1 Objective - To maintain adequate Levels of Service for existing and future populations through the year 2015. Policies 21.1.1 The following Level of Service standards have been established for the City of Clearwater and shall be used in determining the availability of facility capacity and demand created by new development: Service Area Level of Service Standards Potable Water Facilities Average Water Consumption Rate City and County Water City Service Area 120 gallons per capita per day at a pressure of 40-45 psi. *Continue to maintain water consumption of one hundred twenty (120) GPCPD or less as per the conditions set forth by Clearwater's Water Use Permit. 21.2 Objective -Provide adequate quantities and qualities of water service to all customers of the Clearwater service area. Current service level quly, 2007) is 40,390 customer accounts (potable, reclaimed and fire). Policies 21.2.1 Ensure that land development regulations, building codes and City ordinances adequately address water system provisions by performing a thorough evaluation of City codes and by coordinating proposed provisions with the Southwest Florida Water Management District and Florida Department of Environmental Protectiori. Potable Water Element 5 City of Clearwater Comprehensive Plan 21.2.2 Engineering shall analyze the condition and adequacy of any water distribution system that the City may inherit through annexation and prepare cost estimates for upgrading those systems to meet City requirements. 21.2.3 When new subdivisions are being developed, it shall be the responsibility of the developer to provide internal potable water and reclaimed water systems which are constructed to City specifications. 21.2.4 Continue to construct water system improvements which will provide adequate quantity, pressure, and duration of fire flows while meeting system user needs. 21.2.5 Continue to develop a system and construct improvements which will conserve energy, water, and other valuable resources. 21.2.6The City shall continue to participate and assist the Southwest Florida Water Management District, Pinellas County Health Department, and the U.S. Environmental Protection Agency in developing innovative techniques to augment existing water supplies to provide for future needs. 21.2.7Continue to identify, acquire, and develop sources of water supply and methods of water treatment to meet existing and future needs. Some ways this can be accomplished are through well rehabilitation projects and/or exploration and drilling of new wells. Some type of water treatment may be initiated.. Additional volumes of water may be acquired from the Pinellas County Water System through Clearwater's intergovernmental water service agreement. The City's long range Water Supply Master Plan completed in 2004 shall serve as the guiding document for water supply and treatment methods. Potable Water Element City of Clearwater Comprehensive Plan 6 21.2.8 Ensure that water management projects are designed and operated to maintain and enhance natural systems as well as man made systems by working closely with the Southwest Florida Water Management District when proposing new projects and water management programs. The City's long term Water Supply Master Plan outlines a work plan for continued coordination with the Southwest Florida Water Management District's Regional Water Supply Plan adopted in December 2006. 21.2.9Water service shall not be extended to properties outside the City's service area unless sufficient capacity and quality of water exists to serve the areas already committed to City service. 21.2.10 Water services shall not be extended except in those areas so designated for City of Clearwater by interlocal or other agreement. 21.3 Objective -Continue to maintain the water system in a safe, sound, and efficient manner on a daily basis. Policies 21.3.1 The Public Utilities Department, Water Division, shall monitor water quality and the operation of the water distribution system with the intent of repairing and replacing deficient portions of the system within the framework of the capitalized budgeting process. 21.3.2 Continue to provide a minimum operating pressure of 40-45 psi throughout the water distribution system. 21.3.3 Continue to provide adequate spacing of fire hydrants to provide optimum hose lays and fire flow. 21.3.4 Require at the time of application for connection to the public potable water system, that minimum fire flows and hydrant spacing be consistent with fire district standards. Also, require that proper size water pipes are installed to provide desired fire flow rates based on the most recent Insurance Service Office (ISO) Report. Potable Water Element City of Clearwater Comprehensive Plan 21.4 Objective -Continue to provide sound fiscal management for the operation and maintenance of potable water service in the City's service area Policies 21.4.1 Fees charged users of water services shall continue to be adequate to cover system operating costs, repayments of capital costs, and allow for repair and replacement of existing facilities. The City shall also continue to evaluate new rate structures as necessary. 21.4.2 Prioritization and scheduling of major improvements associated with the water system should be accomplished as a component of the capital improvement program. 21.4.3 Funds set aside for repair and replacement of the water system shall not be diverted to other uses. 21.4.4The City should continue to seek financial support of the water system through grant programs administered by appropriate State and Federal agencies. 21.4.5The City shall continue to refine the inverted rate structure for residential water meters, lawn meters and all other water meters permitted by the Water Division of the Public Utilities Department. 21.5 Objective -Continue to Develop a potable water system that is compatible with the environment and seeks to conserve and protect sensitive natural resources. Policies 21.5.1 Except for areas of the City where reclaimed water is available, shallow wells shall be recognized as a source of water for irrigation purposes. Establish a City permit for shallow well installation by the end of 2008 Potable Water Element 8 City of Clearwater Comprehensive Plan 21.5.2 The City's building code shall include the requirement for water conserving fixtures in newly constructed or remodeled buildings. 21.5.3 Manage the supply of water in quantities which would minimize significant adverse impacts on the natural system and protect the long term public interest. 21.5.4 Develop and modify rate structures and policies which encourage conservation of potable water. 21.5.5 The City shall maintain its current Water Restriction Ordinance. 21.5.6 Provide educational awareness to inform citizens of the need and opportunities for conserving potable water by visiting schools to speak with young children about water conservation practices. 21.5.7 Reclaimed water service will continue to be extended to private residences based on the Twenty (20) Year Master Plan. 21.6 Objective -Continue to achieve effective coordination with other government agencies to solve problems of an extraterritorial nature with cooperation and in conjunction with the Southwest Florida Water Management District. Policies 21.6.1 The City shall continue to participate in regional and County-wide studies which are or may be formed to seek solutions of problems of an extraterritorial nature. 21.6.2 Continue to cooperate with the Southwest Florida Water Management District in developing environmental and hydrologic data that will identify safe and reliable potable water yields in existing and future well-fields. 21.6.3 Continue to coordinate with appropriate local, State, regional and Federal agencies in implementing the water system plan. 9 Potable Water Element City of Clearwater Comprehensive Plan 21.6.4The City shall pursue a coordinated approach to interjurisdictional problems, by providing support of both staff and officials to participate in conservation efforts with Pinellas County and the Tampa Bay Regional Planning Council. 21.6.5Ensure consistency with the actions defined within the Regional Water Supply Plan prepared by the Southwest Water Management District 21.7 Objective -Continue to protect all natural recharge areas having functional hydrological characteristics. Policies 21.7.1 Recognize the importance of groundwater aquifer recharge in the hydrological process and the need for natural groundwater recharge as an integral component of the City's urban environment. 21.7.2 The City of shall include incentives in the Community Development Code for the protection of natural groundwater aquifer recharge areas as identified in the Conservation Element of the Clearwater Comprehensive Plan. 21.7.3 The City shall continue to protect groundwater quality by enforcing Wellhead Protection Ordinance. 10 Potable Water Element City of Clearwater Comprehensive Plan III. INVENTORY AND ANALYSIS Section 9J-5.003, FAC, defines a potable water facility as a system of structures designed to collect, treat, or distribute potable water, and includes water wells, treatment plants, reservoirs, and distribution mains. The following section details the existing conditions of the City of Clearwater's water system, with the purpose of identifying future water system needs. 3.1 Operational Responsibility The City of Clearwater Water Division is a municipally operated water supplier, charged with the responsibility of administering the City's water utility. In 2006, the City of Clearwater Water Division supplied more than 5.15 billion gallons of water to more than 140,000 customers, amounting to approximately 100 gallons of water per person per day. The division maintains 4,036 fire hydrants, 8,329 valves and 588 miles of water mains.' Users of the City of Clearwater water system consume approximately 13 million gallons of potable water every day. Approximately 37 percent is pumped from City owned and operated groundwater wells; the remaining 63 percent of the daily demand is supplied by water purchased from Pinellas County. Pinellas County also receives water supplied by the regional water supplier, Tampa Bay Water, which in turn becomes part of the 63 percent supplied to the customers of Clearwater.2 3.2 Geographic Service Area and Predominant Land Uses The geographic service area for the City's water system extends beyond the City limits and represents an area of approximatley 54 square miles in size. The majority of the customers beyond the City limits are located within unincorporated Pinellas County enclaves within the City of Clearwater. The boundaries of the water service area generally extend from the Gulf of Mexico to the west, the City of Dunedin to the north, the City of Safety Harbor and Tampa Bay to the east, and the cities of Largo, Bellair, and Bellair Beach to the south. Map 1 shows the geographic service area of the City of Clearwater potable water system. ~ Public Utilities -Water Division. City of Clearwater Website. Accessed July 2007. Http://www.clearwater- fl.com/gov/depts/pwa/public_utils/divisions/water/index.asp. 2 City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. Potable Water Element 11 City of Clearwater Comprehensive Plan Map 1 Water Service Area 12 Potable Water Element City of Clearwater Comprehensive Plan According to the U.S. Census Bureau, the City of Clearwater is estimated to have a total population of 107,742 as of July 1, 2006.3 However, the City's water service area extends beyond the City limits to include numerous unincorporated Pinellas County enclaves. Thus, to determine the population of the City's water service area, a broader figure that includes both the City population and enclave population must be utilized. Because it includes the City of Clearwater in addition to all interior county enclaves, the Pinellas County Planning Sector 6 closely matches the City of Clearwater's water service area. Therefore, population projections for Planning Sector 6, which have been calculated by the Pinellas County Planning Department, will be utilized for this Potable Water Element. Using the projections from Pinellas County for permanent, seasonal, and tourist populations, the functional population of the water service area can be determined based on the following formula: Functional Population = i(permanent + seasonal) x 41 + (permanent x 81 + tourist 12 2 This formula is based on Water Use Caution Area tWUCA) rules with the purpose of making adjustments for seasonal residents and tourists.4 Once calculated, the functional population figure represents the value utilized to calculate the gross per capita water consumption for the City. Table 1 details the projected service area population served by the City of Clearwater's water system through the year 2025. s Annual Estimates of the Population for Incorporated Places in Florida, April 1, 2000 to July 1, 2006. U.S. Census Bureau. June 28, 2007. a City of Clearwater Water Master Plan, Capital Improvements Implementation Master Plan. Parsons Corporation. October 2004. Potable Water Element City of Clearwater Comprehensive Plan Table 1 Clearwater Water Service Area Population Projections (a) 13 2005 135, 071 6, 074 -.. 19, 472 160, 616 146, 832 2006 135,400 6,088 19,488 160,975 147,173 2007 135, 728 6,102 19, 504 161, 333 147, 514 2008 136,057 6,115 19,519 161,692 147,855 2009 136,385 6,129 19,535 162,050 148,196 2010 136,714 6,143 19,551 162,408 148,537 2011 136,930 6,152 19,562 162,644 148,761 2012 137,146 6,161 19,572 162,879 148,986 2013 137, 361 6,171 19, 583 163,115 149, 210 2014 137,577 6,180 19,593 163,350 149,434 2015 137,793 6,189 19,604 163,585 149,658 2016 137,934 6,195 19,611 163,740 149,805 2017 138,076 6,201 19,618 163,894 149,951 2018 138,217 6,206 19,624 164,048 150,098 2019 138,359 6,212 19,631 164,202 150,245 2020 138,500 6,218 19,638 164,356 150,392 2021 138,592 6,222 19,642 164,457 150,488 2022 138,685 6,226 19,647 164,558 150,584 2023 138,777 6,230 19,651 164,658 150,679 2024 138,870 6,234 19,656 164,759 150,775 2025 138,962 6,238 19,660 164,860 150,871 (a) For the purpose of this analysis, the population projection for Pinellas County Planning Sector 6 (Greater Clearwater Area), which closely represents the Clearwater water service area, is utilized. (b) Seasonal population is defined as persons who reside in Pinellas County for less than six months and declare their permanent home elsewhere. (c) Tourist population is the impact that tourists have on public services and facilities that are comparable to the impact of permanent residents. (d) Functional population is calculated by Water Use Caution Area (WUCA) rules (see text). Source for years 2005, 2010, 2015, 2020, and 2025: Pinellas County Population Projections by Planning Sector, 2005-2030, Pinellas County Planning Department, February 2001. Source for all other years: Data extrapolated from Pinellas County Planning Department. Potable Water Element i4 City of Clearwater Comprehensive Plan The City of Clearwater is an urban and predominantly built-out city and features a diverse mix of land uses. Within downtown Clearwater, a dense mix of institutional, commercial, office, recreational and high density residential land uses are found. In addition to downtown, the Clearwater Beach area features a dense mix of land uses that include major commercial/resort destinations, high density residential developments, and recreational uses. Intensive commercial land uses, including regional commercial shopping centers are scattered along the City's major transportation arteries, particularly Gulf-to-Bay Boulevard and U.S. Highway 19. The majority of the rest of the City is dominated by well established single- family neighborhoods, intermixed with supportive institutional and recreational uses. Map 2 shows the existing land uses found within the City of Clearwater water service area. 3.3 Design Capacity and Current Demand of Existing Facilities. Water Wells and Treatment Facilities Potable water within the City of Clearwater is provided by 22 City-operated fresh water wells (1 7 active and 5 inactive) and six interconnects with the Pinellas County water system. Although it is currently not used, the City has access to the water system of the City of St. Petersburg though an emergency interconnect. The City's water wells are located in close proximity to three treatment and storage facilities: Reservoirs Nos. 1, 2, and 3. The interconnects to the Pinellas County system are found at various locations in the City: Reservoir No. 2; Reservoir No. 3; along Belcher Road near the intersections with Drew Street, Gulf-to-Bay (SR 60), and Belleair Road; and at South Sand Key.S The locations of the various water supply facilities within Clearwater are illustrated on Map 3. Pinellas County water is purchased by the City of Clearwater through an intergovernmental agreement as a means to augment the City's groundwater sources and to meet the City's water demands. In the 2002 water year, an average of 1 1.5-mgd of water was purchased by the City from Pinellas County. In the Fall of 2003, after a reverse osmosis treatment facility was implemented at Reservoir No. 1, the City was able to reduce the amount of water purchased from the County by a net of 2-mgd.6 s City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. s City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004.. Potable Water Element 15 City of Clearwater Comprehensive Plan Map 2. Existing Land Use map 16 Potable Water Element City of Clearwater Comprehensive Plan Map 3. Water Supply Facilities Potable Water Element City of Clearwater Comprehensive Plan 17 In general, the groundwater source for both Clearwater and Pinellas County comes from a groundwater supply called the Floridan Aquifer. More specifically, the City water sources are 22 groundwater wells, while Pinellas County potable water is obtained from two different sources: Tampa Bay Water's regional water system; and fresh water from Eldridge Wilde wellfields. Tampa Bay Water is a local wholesaler providing water to six local governments in the Tampa Bay metropolitan area. Multiple sources contribute to Tampa Bay Water's regional water supply; these include groundwater and surface water from around the Tampa Bay metropolitan area and saline water from Tampa Bay. A summary of the daily production rates for the three reservoirs is provided in Table 2. The table also details the relative production provided by the City and the production provided by Pinellas County. Table 2 Summary of Daily Productions by Source The values reflect the addition of a reverse osmosis facility at Reservoir No. 1, which, at the time of the preparation of the Water System Assessment (Clearwater Water Master Plan), was expected to reduce the amount of water purchased from Pinellas County by a net of 2-million gallons per day (mgd) on a long term basis. The average daily demand for potable water within the City of Clearwater water service area totals 13-mgd, of which 63 percent is provided by Pinellas County and 37 percent is provided by the City's wells. According to the City's water use permit issued through the Southwest Florida Water Management District (SWFWMD), the City is allowed to pump a maximum of 6.25-mgd from its wells. 'Value listed represents finished blended water capacity. In order to produce the 3-mgd blended finished water capacity requires 3.6-mgd of well water, 0.6-mgd of which is concentrate that is discharged to the sanitary sewer. "'Water provided by Pinellas County interconnects located on-site with existing City of Clearwater facilities. Source: City of Clearwater Water Master Plan, Water System Assessment. Parsons.Corporation. June 2004. Potable Water Element City of Clearwater Comprehensive Plan 18 Reservoir No. 1 is located on Palmetto Street near Saturn Avenue and consists of a reverse osmosis water treatment plant, a single 5 million gallon (mg) storage tank, chloramination facilities for disinfection, and a high service pumping station. Reservoir 1 utilizes 3.6-mgd of raw groundwater to produce 3-mgd of treated potable water. The Reverse osmosis plant uses 2.6-mgd of water to produce 2.0- mgd of permeate which is blended with 1.0-mgd of pre-treated by-passed water, attaining a total of 3-mgd of potable drinking water. Feed water to the plant comes from 10 active wells (Well Nos. 23, 31, 48, 65, 66, 73, 74, 75, 78 and 81). Production from Well 81 is limited due to the need for a sand pack to prevent sand from entering the well. Reservoir No. 2 is located near the intersection of US 19 and Drew Street and consists of a single 5-mg storage tank, chloramination facilities, and a high service pumping station. Feed water to the plant comes from 3 active wells (Well Nos. 45, 46 and 53). Two additional inactive wells are also connected (Well Nos. 51 and 52). Water from the wells can vary but typically provide on average 0.6 mgd. Also on- site is an interconnect with Pinellas County that provides on average 1.5-mgd. Water from both the wells and interconnect are blended in the 5-mg storage tank. Chlorine and ammonia are added to boost the chloramine concentration of the incoming water. The high service pumps then deliver the finished water to the distribution system.$ Reservoir No. 3, located near the intersection of Countryside Blvd. and State Road 580, consists of two 5-mg storage tanks, chloramination facilities, and a high service pumping station. Feed water to. the plant comes from 5 active wells (Well Nos. 56, 58, 68, 69, and 77). Water from the wells can vary but typically provide on average 1.2-mgd. Also on site is an interconnect with Pinellas County that provides on average 7-mgd. Water from both the wells and interconnect are blended in the 5-mg storage tank. Chlorine and ammonia are added to boost the chloramine concentration of the incoming water. The high service pumps then deliver the finished water to the distribution system.9 ~ City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. a .City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. s City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. Potable Water Element 19 City of Clearwater Comprehensive Plan Elevated Storage Tanks The City of Clearwater operates three 1 million gallon (mg) elevated storage tanks to provide additional storage capacity, consistent distribution system pressure, and to respond to emergency demands such as fire. The three elevated storage tanks are identified and located as follows: Del Oro, located near the intersection of McMullen-Booth Road and Drew; Martin Luther King, located near the intersection of Bellevue Blvd. and Martin Luther King; and Otten Street, located near the intersection of Otten Street and Highland Ave. At the time of the preparation of the Clearwater Water Master Plan Water System Assessment (June 2004.), the three elevated storage tanks were valved-off due to water stagnation issues and degradation of water quality. However, the City has since placed the Martin Luther King and Otten Street tanks back into service in order to maintain an adequate level of service and for additional emergency storage capabilities.~~ With regard to the total capacity of drinking water sources and treatment facilities, Chapter 62-555(6) of the Florida Administrative Code states that: The total capacity of al/ water sources and treatment facilities connected to a water system sha// at /east equal the water system's design maximum-day water demand (including design fire-f/ow demand if fire protection is being provided). In total, the City has a storage capacity of 23-mgd provided by the four 5-mgd storage tanks at Reservoirs 1, 2 and 3 and the three 1-mgd elevated storage tanks. However, at the time of the Clearwater Water Master Plan Water System Assessment ,the City's total storage capacity was estimated at 20-mgd, not calculating the capacity of the elevated storage tanks because of their stagnation and water quality issues. In addition to the City's own storage capacity, Pinellas County provides the City with some storage capacity through the interconnections. However, the exact amount of storage capacity available to the City through Pinellas County is unknown.>> Based on the Water System Assessment report, the City's design maximum-day potable water demand is estimated at 19-mgd. At 20-mgd, the City's current storage tank capacity is sufficient to achieve potable water design maximum-day ~~ City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. ~~ City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. Potable Water Element zo City of Clearwater Comprehensive Plan demand according to Chapter 62-555 F.A.C. However, the Water System Assessment noted that this total capacity may be inadequate to achieve fire-flow demand. For this reason, and as noted above, two of the three 1-mgd elevated storage tanks were put back into service, but several modifications to the distribution system were .recommended in the assessment to increase overall capacity, including distribution system pipe modifications, addition of booster pump stations, and addition of inter-distribution system storage tanks.12 Pumping Facilities High-service pumps are found at each of the City's three reservoirs to ensure distribution system capacity and pressure. These pumps ensure that water under sufficient pressure is delivered from the wellheads to the various storage and treatment facilities and then into the distribution system. Additionally, system capacity and pressure is supplemented through the six direct interconnections with the Pinellas County water system. With regard to required pumping capacity, Chapter 62-555.320(15) of the Florida Administrative Code states that: (a) Un/ess a/evated finished-drinking-water storage is provided, the total capacity of a// high-service pumping stations connected to a water system, or the capacity of a booster pumping station, shall be sufficient to: 1. Meet at /east the water system's, or the booster station service area's, peak- hour water demand (and if fire protection is being provided, meet at /east the water system's, or the booster station service area's, design fire-f/ow rate p/us a background water demand equivalent to the maximum-day demand other than fire-f/ow demand); and Z. Maintain a minimum gauge pressure of 20 pounds per square inch throughout the water system's, or the booster station service area's, distribution system up to each customer's point of connection to the distribution system. (b) Where elevated finished-drinking-water storage is provided, the total capacity of a// high-service pumping stations connected to a water system, or the capacity 12 City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. Potable Water Element City of Clearwater Comprehensive Plan 21 of a booster pumping station, sha// be sufficient to at /east meet the water system's, or the booster station service area's, maximum-day water demand (inc/uding design fire-f/ow demand if fire protection is being provided) and to maintain distribution system pressure as specified in subparagraph 62- 555.320(1 S)(a)2., F.A. C. /n addition, the total capacity of the high-service pumping stations, or the capacity of the booster pumping station, combined with the useful elevated finished-water storage capacity sha// be sufficient to meet the water system's, or the booster station service area's, peak-hour water demand for at /east four consecutive hours (and if fire protection is being provided, sha// be sufficient to meet the water. system's, or the booster station service area's, design fire-f/ow rate p/us a background water demand equivalent to the maximum-day demand other than fire-f/ow demand for the design fire-flow duration). As noted above, the City's total water storage capacity may be inadequate to achieve fire-flow demand. Because pumping capacity is related to achieving sufficient storage capacity, improvements to the City's pumping capacity is warranted. The Clearwater Water Master Plan Water System Assessment notes that possible solutions include distribution system pipe modifications, addition off booster pump stations, and addition of inter-distribution system storage tanks.13 Distribution System The City of Clearwater's water distribution system includes more than 776 miles of water main, 40,000 water meters, 4,036 fire hydrants, 8,329 valves and 5,445 backflow devices. As shown in Map 4, the water distribution system effectively covers all lands within the City of Clearwater, including the unincorporated Pinellas County enclaves. (The Parsons Report includes did not include a summary and assessment of the distribution system. Do we have any additional data to include here? Is there any distribution system inventory by pipe size and classification? 13 City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. zz Potable Water Element City of Clearwater Comprehensive Plan Map 4. Distribution Lines 23 Potable Water Element City of Clearwater Comprehensive Plan Reclaimed Water System The City of Clearwater currently operates a reclaimed water system to ensure that adequate water is available today and in the future and that the City's residents have high quality water at an affordable price. The use of reclaimed water helps the City to preserve high quality potable water sources by providing a reliable and economical alternative source for irrigation water. Use of reclaimed water for irrigation can benefit the City because every gallon of potable water not used for irrigation is one less gallon of water purchased from Pinellas County. This has the potential of significant potable water savings .given the escalating costs of purchasing water from Pinellas County.14 The City's reclaimed water system is the result of cooperative funding by the Southwest Florida Water Management District and the City of Clearwater.15 The City's reclaimed water system is shown on Map 5 and includes 51 miles of reclaimed water main. At present, reclaimed water service extends to the Countryside Country Club Golf Course and driving range, Chi Chi Rodriguez Golf Course and the soccer fields on McMullen Booth Road in the Countryside area, which are fed from the Northeast Treatment Plant. The Northeast Treatment Plant will also serve the reclaimed projects on the east side of Clearwater: Drew Union, Del Oro, Morningside, and Skycrest. The Marshall Street Plant feeds Jack Russell Stadium, Pier 60 Park, Coachman Park as well as 1,400 customers on Island Estates and Clearwater Beach. In 2004, reclaimed water became available to the Harbor Oaks Area of Clearwater. This area also receives it supply from the Marshall Street Plant. Approximately 2,000 customers are now provided reclaimed water, with a current consumption in the range of 2 to 2.5-mgd.. . The City of Clearwater is currently designing the Skycrest Reclaimed Water Project which will include an east/west interconnection, pumping and storage facility. This interconnection will complete the loop within the City, resulting in both sides of the City being connected for future expansion of our reclaimed program.16 14 City of Clearwater Water Master Plan, Capital Improvements Implementation Master Plan. Parsons Corporation. October 2004. 15 City of Clearwater Reclaimed Water Master Plan. City of Clearwater Website. Http://www.clearwater- fl.comlgov/depts/pwa/public_utils/divisions/reclaimed/rcwater_plan. asp. 16 City of Clearwater Reclaimed Water Master Plan. City of Clearwater Website. Http://www.clearwater- fl.com/gov/depts/pwa/public_utils/divisions/reclaimed/rcwater_plan. asp. 24 Potable Water Element City of Clearwater Comprehensive Plan Map 5. Reclaimed Water System ~. WADETRIM June 25, 2007 Ms. Marty Pages Administrative Support Manager City of Clearwater Public Works PO Box 4748 Clearwater, FL 33758-4748 Re: 10-Year Water Supply Facility Work Plan City Invoicing Code: 343-96740-561300-533-000 City Project Code: 04-0400-UT Dear Ms. Pages: Enclosed with this monthly status report is a monthly invoice. REPORT PERIOD: April 30, 2007 through June 3, 2007 WORK PERFORMED THIS PERIOD: • Review of Parson's October 2004 Master Plan Documents and work on Data and Analysis Section of The Element Update. WORK TO BE PERFORMED NEXT PERIOD: • Continued work on Data and Analysis, Goals/Objectives/Policies sections of the plan element. Sincerely, WADE TRIM, INC. David B. Gildersleeve Project Manager DBG:fs CIw2058.01 (Invoice) P:1CIw2056\O1mlAdmin-support\Invoicesllnvoice 11318.doc Enclosure cc: Robert Fahey, City of Clearwater Catherine Porter, City of Clearwater ;'Sandra Herman, City of Clearwater ~: _._ ~ '~ i ~ ; JJN 2 8 ~~,~ :.~ .~ il.v~ i _,._.~~ i PLANNING & DEVELOPMENT SERVICES CITY OF CLEARWATER ISO 9001:2000 Registered FL LC Reg. No. 0000121 Wade Trim, Inc. 8745 Henderson Road Suite 220, Renaissance 5 Tampa, FL 33634 813.882.8366 888.499.9624 813.884.5990 fax www.wadetrim.com f B U I L D I N G R E L A T I O N S H I P S O N A F O U N D A T I O N O F E X C E L L E N C F .~ INVOICE Wade Trim, Inc. 8745 Henderson Road • Renaissance 5 • Suite 220 • Tampa, FL 33634 813.882.8366 • FAX: 813.884.5990 • www.wadetrim.com Terms: Net 30 Days 1.5% Per Month After 30 Days 18% Annual Rate City of Clearwater PO Box 4748 Clearwater, FL 33758-4748 Attention: Marty Pages Re: 10-YEAR WATER SUPPLY FAC WORK PLAN For Professional Services rendered from 4/30/2007 through 6/3/2007 City Invoicing Code 343-96740-561300-533-000 cc: Mr. Rob Fahey, PE Total Salaries Total Expenses Professional Services Rendered Invoice Date : June 21, 2007 Invoice # : 11318 Project # : CLW205801 M Remit payment to : Wade Trim 8745 Henderson Road Renaissance 5 Suite 220 $3,545.40 $0.00 - -- Amount Due This Invoice $3,545.40 Statement . Prior Invoices $13,1.40.74 This Invoice .$3,545,40 Total Invoiced $16.,686.14 Paid to Date $13,140.74 Amount Outstanding 53,545.40 Fee Summary Authorized fee $37,000:00 Total Invoiced $16,686'.14 Amount Remaining 520,313.86 r INVOICE Wade Trim, Inc. 8745 Henderson Road • Renaissance 5 • Suite 220 • Tampa, FL 33634 813.882.8366 • FAX: 813.884.5990 • www.wadetrim.com Invoice Date : June 21, 2007 Invoice # : 11318 Project # : CLW205801 M Multiplier Labor Terms: Net 30 Days 1.5% Per Month After 30 Days 18%Annual Rate Class cation Hours Rate ~ Amount ~ Administrative Supervisor 11 1.00 $37.450 $116.10 Principal 16.50 $66.500 $3,401.48 Technician IV 0.50 $17.950 $27.82 Total Multiplier Labor 18.00 $3,545.40 Total Project: CLW205801M -- 10-YEAR WATER SUPPLY FAC WORK PLAN $3,545.40 WORKSHOP AGENDA PREPARING YOUR 10-YEAR WATER SUPPLY FACILITIES WORK PLAN & COMPREHENSIVE PLAN AMENDMENTS Thursday, February 21, 2008 1:00 PM to 4:00 PM SWFWMD Tampa Service Office Board Room ~ , 7601 US Hwy. 301, Tampa, FL 33637 h~~~~ ~~ I. Opening Remarks and Overview Roy Mazur, P.E. Director, SWFWMD Planning Department ` II. Tampa Bay Water Wholesale Information Paula Dye, AICP Chief Environmental Planner, Tampa Bay Water III. Water Supply Planning and Local Comprehensive Planning Vicki Morrison Principal Planner, Department of Community Affairs IV. Ten-Year Water Supply Facilities Work Plan and the RWSP Jason Mickel Senior Planner, SWFWMD Planning Department V. Open Discussion ~,~ Sc~t.r~.~~~~t ~'lc~~~1c~~~ TAMPA ~ , r tauter Management Distrzct BAYS -=~~~ _ WATER ..F.'. ..-. YvvMY.ny w«...e.ro wpw Water Supply Planning and Local Comprehensive Plans ~~ .,. ~ ~3i ~J ~.... ., Tampa, FL February 21, 2008 Presentation Overview > General requirements of a 10-year water supply facilities work plan > What it should include The work plan's format ~ How the plan should be adopted Water supply concurrency ~ Frequently asked questions General Requirements Local governments subject to a regional water supply plan prepared by the water management district are required to: . Prepare a 10-year water supply facilities work plan . Identify how future water supply needs will be met . Amend the local comprehensive plan to incorporate the work plan "1 What should the work plan include? > The format and level of detail should be similar to the Infrastructure Element and include: . Data and analysis . Goals, objectives and policies . A financially feasible five-year schedule of capital improvements What should the work plan include? > The work plan must incorporate some or all of the alternative, traditional, conservation and reuse projects or strategies necessary to meet water supply needs identified in the Water Management District's Regional Water Supply Plan What should the work plan include? > The work plan should include: . Projections of future water demand for at least the next 10 years . Identification and assessment of existing water sources and whether they're adequate to meet projected demand 2 ~ ~ S What should the work plan include? . Identification of alternative water sources, conservation, reuse, and the need for new and expanded facilities regardless of service provider . Demonstration that your local government has coordinated with all of its water suppliers . Cost analysis and funding for capital improvements projects Data and Analysis The work plan should include the following specific information: . Inventory of all water service providers . Geographic service area . Identify existing water supply facilities including wells and intake points, treatment and storage facilities and distribution mains Data and Analysis . Design capacity of production and treatment facilities; the current demand on the facilities, the geographic area served and CUP conditions and duration . Conservation and reuse practices and regulations . Determination of future needs for each service area 3 ~y Capital Improvements . If the local government is a service provider, identify capital improvements needed to serve existing and planned development . Identify publicly and privately funded projects necessary to serve development in the next five years . Include strategies that identify funding programs that the local government intends to use to meet future needs Internal Consistency ~ The work plan may trigger updates to other comprehensive plan elements . Future Land Use . Conservation . Infrastructure . Intergovernmental Coordination . Capital Improvements Work Plan Format 1. Incorporate the plan as asub-element -recommended 2. Incorporate by reference in a policy 3. Include as goals, objectives and policies throughout the comprehensive plan 4 r t Adoption Due Date 11/30/06: date the SWFWMD approved the Central and Southern Region Water Supply Plan 5/30/08: date the following local governments must adopt their water supply facilities work plans: . Charlotte, Desoto, Hardee, Hillsborough, Manatee, Pasco, Pinellas and Sarasota Counties and their municipalities . Avon Park, Lake Placid and Sebring . All municipalities in Polk County Adoption Process The law allows that amendment of the comprehensive plan to incorporate the 10- YearWater Supply Facilities Work Plan can be exempt from the twice-per-year limitation on comprehensive plan amendments What if? ~ What if my local government doesn't adopt its 10-year water supply facilities work plan by the deadline? 5 ti Answer > Future comprehensive plan amendments may be found not in compliance > EAR may be found insufficient Evaluation and Appraisal Report and EAR-based Amendments ~ Latest point at which the work plan can be adopted is at time of the EAR-based amendments What if? ~ What if my local government is not a water supplier. Do I still need to adopt a 10-year water supply facilities work plan? 6 r' Answer Yes. Even if your local govemment is not the water authority, your local government must: . Address how it will get the water necessary to meet future needs . Identify water supply, treatment and distribution facilities, and bulk sales agreements . Demonstrate that it has coordinated with water suppliers to obtain water Water Supply concurrency ~ All local governments have to implement water supply concurrency. > EAR-based amendment is latest point at which a comprehensive plan must be revised to reflect water supply concurrency requirements Water Supply Guides Online > A Guide for Local Governments in Preparing Water Supply Comprehensive Plan Amendments and Water Supply Facilities Work Plans Recommendations for Preparing Water Supply Facility Data and Analysis to Support Local Comprehensive Plan Amendments > Agency Coordination of Comprehensive Planning and Water Supply Planning. in Florida 7 Additional Guides Online > A Guide to Preparing an Evaluation and Appraisal Report > A Guide to the Annual Update of the Capital Improvements Element Capital Improvements Element Best Practices Manual htto://www.dca.state.fl. us/fdc~/DCP/ publications Contact Information Vicki Morrison, Principal Planner Department of Community Affairs 2555 Shumard Oak Boulevard Tallahassee, FL 32399 850-921-3775 vicki.morrison @ dca.state.fl. us Questions and Discussion 8 d. PREPARING YOUR 10-YEAR WATER SUPPLY FACILITIES WORK PLAN & COMPREHENSIVE PLAN AMENDMENTS Ten-Year Water Supply Facilities Work Plan and the Regional Water Supply Plan Jason Mickel Senior Planner SWFWMD Planning Dept. Purpose • 10-Year Water Supply Facilities Work Plans -Why& When? -What does "consider" the Regional Water Supply Plan mean? -What are we looking for in your Work Plan? -Assistance, Resources, and Publications -Help establish compliance with DCA Questions 10-Year Water Supply Facilities Work Plans • Pursuant to Chapter 163.3177(6)(c), F.S., all local governments subject to a RWSP will be required to develop a Work Plan • Intended to improve coordination of water supply & land planning 1 L 10-Year Water Supply Facilities Work Plans • Update Comp Plan within 18 months of the RWSP update to reflect a Work Plan May 30, 2008 What Do We Expect? Actual Document or references detailing a Ten Year Planning Horizon: -Address all water supply, treatment, and distribution facilities -Address water conservation -Consider RWSP What Does "Consider" Mean? • Recognize Resource ,,,,., ,.. : Constraints ~ . .~' ~ • Recognize Regional Partnerships _ 4 1„,._._3 ~ • Includes Demand ~ ~ P"~ Projections and Potential ;~;~,.~~ Sources ~~ s ~ • Quantifiable Conservation and Reuse °--~°~•~- ~°^-~ 2 4 Purpose of the RWSP • Demonstrate water will be available to meet needs through 2025 • Project water demands and identify potential sources through 2025 • Provide potential options for developing Alternative Sources arid water conservation • Protect water resources and provide for environmental recovery Southwest Florida Water ~~T 1 Management Districf 1 Northern - Water Supply Plannin Re ions •r;~ i Reg;on g g Gr \ ~ '(r}a w~ram `^ ~, J~.u Central artd ~ __"' t~vJ ~ Southern w tai Region ~ v `~~ ~ -_ ,~ j ~1 Northern Tampa BayArea ~ ,I'~_ NT,_.~ RlSoufhemWaterUae i ~s ~ ~ ~ Caution Area(SWUCA) ~ i ~~mJ ~. -_-~ Conceptual Map t~~ ~'' r~'r = Showing Areas of ~#4fetl~andan ` Resource Concern ~~e ~~Pa :aoik.:. _ JI f ~t HiOsborou9h . ~° ~~ ~ Causes. ~ r ~ GW pumping in te . FL Aquifer y . ~ ~ . 7~5anacer. -~ Harder i t 1 :. Saltwater ~- ""- intrusion ~ -- , OeSoro ~ +,. sa ca i - ~~-~: Charbcte ~ `n.N 11(1Wt::St 1'`<niCl~t ,,,~ , RiutzAturu((,aantrtDiSalCl 3 ... ,.-,,. ::. Fy ~~y M ~ ~ r t i+'~ ~ V ~~) _ N CAF ~_~NaA~'. .:l~1+ ~ ~ {{{{{ YT• - ni Demand Projections Planning Region 2000-2025 (mgd) Category .2000 2025 Change Agriculture 491.6 496.1 4.5 Public Supply 485.4 712.7 227.4 IC/MD/PG 118.5 133.1 14.6 Recreation 55.2 85.5 30.3 Environmental Restoration 132.0 132.0 Total 1,150.7 1,559.4 408.8 How to Meet Demand? • Partnering and planning . • Alternative sources .- ~~ ~~. ~ ~~--~, - Reuse & Conservation ; ` ~`~; ~~,~~ • Properly manage and protect ~' , ~ '. , ~ ~ ~ the resource - ~`~,~ ~ -Conservation `<v-% - MFLs - WUCAs 4 Water Sources Quantified -Planning Region 2000-2025 (mgd) Category `SWLICA NTB Total , UFAS Fresh G.W. (Unused Permitted) 32 11 43 IAS Fresh G.W. 34 1 35 Brackish G.W. 9 14 23 Surface Water 134 63 197 Reclaimed Water 36 90 126 Seawater 50 50 100 Conservation 119 61 180 Total 414 290 704 Land Use Changes 92 Sub-Regional Water Supply Planning • Tampa Bay Water Others: • Peace River/Manasota Regional Water Supply Authority • Heartland Water Alliance ,~ ti i~ ~. "~ E„ ~" ~ ~ ^ ae r ~- a,.. ', rf f;. 5 Conservation Options • Ultra Low Volume (ULV) Toilets • Plumbing Retrofit Kits • Rain Sensor Shut-Off Device Rebates • Industrial/Commercial Spray Valve Replacement n Conservation Options • Water Efficient Landscape and Irrigation System Rebates • Large Landscape Water Use Surveys • Rate Structures ;~ ~, _~ ~' .4 , ~ .,~ ., .~` , rw ~j ~; ~;, _u, ~ ; ` ,~ RWSP and Conservation Websites What Do We Expect? Data and Analysis • Projected demands • Current demands • Outstanding commitments • Project water supply needs and Level of Service 6 e What Do We Expect? Data and Analysis • Permitted quantities • Traditional and alternative water supply sources (including non-potable) • Consider RWSP or justify why a different water supply option was chosen • Water conservation What Do We Expect? Goals, Objectives, and Policies Policy Language Committing to: • Development of sources to meet the needs • Coordination with the District, RWSA, and other local governments and utilities as appropriate - MOUs, Agreements, etc. What Do We Expect? Goals, Objectives, and Policies • Efficiently using reclaimed water - (Goal: 75% utilization/offset) • Enforcing year-round and water shortage irrigation restrictions , 7 What Do We Expect? Goals, Objectives, and Policies Commitments to conservation activities: • Rate structures • Education programs • Landscape/land development regulations What Do We Expect? Goals, Objectives, and Policies • Address potable water availability in the concurrency management system What Do We Expect? Capital Improvement Program • Include any capital projects identified as needed in the next five years, with funding sources • District's Cooperative Funding Program 8 4 Work Plan Tips • Plan should be well organized • Involvement with District staff • Planning & Utility staff communication • Consider water conservation and reuse as alternative sources • Address influences on future demand Provide Data & Analysis • Reflect in Policies Publication Resources • Regional Water Supply Plan • Annual Reuse Report • Estimated Water Use Report • Reuse and Conservation Projects Summary Report • On-line Water Conservation Library Publication Resources • Reuse Inventory (DEP) • Master Water Plan (TBW) • A Guide for Local Governments in Preparing WS Comp Plan Amendments and WS Facilities Work Plans (DCA) • Water Supply Facilities Work Plan Data Guide (Pinellas PC) 9 4 Internet Resources RWSP http://www.swfwrnd. state.fl. us/documents/plans/RW S P District's Conservation Site www. conservaGo ni nfo.org Tampa Bay Water http://www. tampabavwater.org/ DCA Guidelines http://www.dca.state. fl.us/fdco/dcp/publications/fi na Iguidelines. pdf PPC Guidelines http://www.co.clnellas.fl.us/PPC/docsleardocs/Potable Water Data Guide.pdf District Assistance • Workshops • Individual Assistarice • Review of Work Plans • District Publications Staff Resources • Maya Burke, ext 4408 - Pasco County, New Port Richey, Dade City, Port Richey, San Antonio, St. Leo, Zephyrhills • Jason Mickel, ext 4423 - Pinellas County, Clearwater, Dunedin, Largo, St. Petersburg and all other Pinellas Municipalities • Trisha Neasman, ext 4407 - Hillsborough County, Plant City, Tampa, Temple Terrace Brooksville Office (352) 796-7211 10 A GUIDE FOR LOCAL GOVERNMENTS IN PREPARING WATER SUPPLY COMPREHENSIVE PLAN AMENDMENTS AND WATER SUPPLY FACILITIES WORK PLANS Florida Department of Community Affairs , Division of Community Planning September 2007 TABLE OF CONTENTS Contents Page A. Introduction 3 B. Statutory Requirements 4 C. Overview of Water Supply Planning Requirements 5 D. Preparing the Work Plan 7 1. Work Plan Objective 7 2. Adoption Deadlines 7 3. Coordination With Water Management Districts 7 4. Coordination With Water Suppliers 8 5. Define Extent of Responsibility 9 6. Information to Obtain From Water Suppliers 9 7. Information to Include in the Work Plan 10 a. Data and Analysis 11 b. Capital Improvements 14 c. Goals, Objectives and Policies 15 8. Adopting the Work Plan Into the Comprehensive Plan 16 E. Additional Amendments to the Comprehensive Plan 17 1. Water Supply Concurrency 17 2. Annual Updates to the Five-Year Schedule of Capital Improvements 17 F. Evaluation and Appraisal Reports 17 ATTACHMENTS Attachment A: Map of Regional Water Supply Planning Areas 20 Attachment B: Due Dates for Work Plan Amendments 21 Attachment C: Overview of Regional Water Supply Plans 24 Attachment D: Sources of Information and Contacts 25 -Page 2 of 28 Pages - A. INTRODUCTION Four of Florida's five water management districts have determined that traditional water supply sources currently used in their districts will not be sufficient to meet the demands of the growing population and the needs of the environment, agriculture and industry over the next twenty years. Only the Suwannee River Water Management District has concluded that its traditional water supplies will be sufficient to serve the district's needs over the next twenty years. As potential limitations on the continued use of traditional water supplies became increasingly apparent in recent years, the Florida Legislature enacted bills in 2002, 2004 and 2005 to more effectively address the state's water supply needs by improving the coordination between local land use planning and water supply planning. The focus of the 2002 legislation was to add requirements to Chapter 163, Florida Statutes (F.S.), for local governments to prepare 10-year water supply facilities work plans and to incorporate the work plans into their comprehensive plans. This legislative change emphasized the need for local comprehensive plans to consider the applicable regional water supply plans prepared by the water management districts. In 2004, the Legislature further amended Chapter 163 to give local governments until December 1, 2006, to prepare the 10-year water supply facilities work plans. In 2005, the Florida Legislature significantly changed Chapters 163 and 373, F.S., to improve the coordination of water supply and land use planning. Senate Bills 360 and 444 strengthened the statutory linkage between the regional water supply plans prepared by the water management districts and comprehensive plans prepared by the local governments. Implementation of the new water supply planning requirements will ensure that adequate water supplies and public facilities are available to serve the water supply demands of Florida's growing population. This Guide has been prepared to help local governments understand their responsibilities under current law with regard to water supply planning. It addresses the scope and content of the comprehensive plan amendments required to comply with the current provisions of Chapter 163, F.S., the data and analysis that local governments must provide to support the amendments, the sources of information available to local governments, and the deadlines for adopting the required amendments. In addition to this Guide, a second technical assistance document (Recommendations for Preparing Water Supply and Facility Data and Analysis to Support Local Comprehensive Plan Amendments) has been prepared to explain the water supply and facilities data and analysis that should be included with comprehensive plan amendments submitted for review to the Department of Community Affairs (Department). The Recommendations will soon be available from the Division of Community Planning and will be posted on the Department's website (www.dca.state.fl.us). - Page 3 of 28 Pages - B. STATUTORY REQUIREMENTS With regard to water supply, current statutory provisions direct each local government to: 1. Coordinate appropriate aspects of its comprehensive plan with the appropriate water management district's regional water supply plan. [s. 163.3177(4)(a), F.S.] 2. Ensure that its future land use plan is based upon the availability of adequate water supplies and public facilities and services. [s. 163.3177(6)(a), F.S., effective July 1, 2005.] Data and analysis demonstrating that adequate water supplies and associated public facilities will be available to meet projected growth demands must accompany all proposed Future Land Use Map amendments submitted to the Department for review. The submitted package must also include an amendment to the Capital Improvements Element, if necessary, to demonstrate that adequate public facilities will be available to serve the proposed Future Land Use Map modification. Ensure that adequate water supplies and facilities are available to serve new devel- opment no later than the date on which the local government anticipates issuing a certificate of occupancy and consult with the applicable water supplier prior to approving a building permit, to determine whether adequate water supplies will be available to serve the development by the anticipated issuance date of the certificate of occupancy. [s. 163.3180(2)(a), F.S., effective July 1, 2005.] This "water supply concurrency" is now in effect, and local governments should be complying with the requirement for all new development proposals. In addition, local governments should update their comprehensive plans and land development regulations as soon as possible to address these statutory requirements. The latest point at which the com- prehensiveplan must be revised to reflect the concurrency requirements is at the time the local government adopts plan amendments to implement the recommendations of the Evaluation and Appraisal Report. 4. For local governments subject to a regional water supply plan, revise the General Sanitary Sewer, Solid Waste, Drainage, Potable Water, and Natural Groundwater Aquifer Recharge Element (the "Infrastructure Element"), within 18 months after the water management district approves an updated regional water supply plan, to: a. Identify and incorporate the alternative water supply project(s) selected by the local government from projects identified in the updated regional water supply plan, or the alternative project proposed by the local government under s. 373.0361(7), F.S. [s. 163.3177(6)(c), F.S.]; b. Identify the traditional and alternative water supply projects, bulk sales agree- ments, and the conservation and reuse programs necessary to meet current and future water use demands within the local government's jurisdiction [s. 163.3177(6)(c), F.S.]; and c. Include a water supply facilities work plan for at least a 10-year planning period for constructing the public, private, and regional water supply facilities identified in the element as necessary to serve existing and new -Page 4 of 28 Pages - development. [s. 163.3177(6)(c), F.S.] Amendments to incorporate the water supply facilities work plan into the comprehensive plan are exempt from the twice-a-year amendment limitation. [s. 163.3177(6)(c), F.S.] 5. Revise the Five-Year Schedule of Capital Improvements to include any water supply, reuse, and conservation projects and programs to be implemented during the five-year period. 6. To the extent necessary to maintain internal consistency after making changes described in Paragraphs 1 through 5 above, revise the Conservation Element to assess projected water needs and sources for at least a 10-year planning period, considering the appropriate regional water supply plan(s) or, in the absence of an approved regional water supply plan, the applicable District Water Management Plan, as well as applicable consumptive use permit(s). [s. 163.3177(6)(d), F.S.] If the established planning period of a comprehensive plan is greater than ten years, the plan must address the water supply sources necessary to meet and achieve the existing and projected water use demand for the established planning period, considering the appropriate regional water supply plan. [s. 163.3167(13), F.S.] 7. To the extent necessary to maintain internal consistency after making changes described in Paragraphs 1 through 5 above, revise the Intergovernmental Coordination Element to ensure coordination of the comprehensive plan with applicable regional water supply plans and regional water supply authorities' plans. [s. 163.3177(6)(h)1., F.S.] Address in the Evaluation and Appraisal Report (EAR), the extent to which the local government has implemented the 10-year water supply facilities work plan, including the development of alternative water supplies, and determine whether the identified alternative water supply projects, traditional water supply projects, bulk sales agreements, and conservation and reuse programs are meeting local water use demands. [s. 163.3191(2)(1), F.S.] C. OVERVIEW OF WATER SUPPLY PLANNING REQUIREMENTS Effective July 1, 2005, all local governments must meet water supply concurrency requirements and ensure that their future land use plans (the Future Land Use Element and Future Land Use Map) are based upon the availability of adequate water supplies and associated public facilities. [See Paragraphs B.2.-3. above.] All local governments are advised to update their comprehensive plans and land development regulations as soon as possible to address the water supply concur- rency requirement. [See Section E below.] Data and analysis to demonstrate that adequate water supplies and associated public facilities are (or will be) available to meet projected growth demands must accompanYall proposed Future Land Use Map amendments submitted to the Department for review. [See Recommendations for Preparing Water Supply and Facility Data and Analysis to Support Local Comprehensive Plan Amendments.) -Page 5 of 28 Pages - 2. Local governments subiect to a regional water supply plan must revise their comprehensive plans within 18 months after the water management district approves a regional water supply plan or its update, to ensure that: a. The Infrastructure Element identifies alternative and traditional water supply projects, and conservation and reuse programs necessary to meet the projected water demands identified within the local government's jurisdiction; incorpo- rates the alternative water supply project(s) the local government has selected from the regional water supply plan or proposed as an alternative under s. 373.0361(7)(b), F.S.; and includes a minimum 10-year work plan for building public, private, and regional water supply facilities necessary to serve existing and new development. b. The Capital Improvements Element addresses the need for and location of public facilities, including those identified in the 10-year water facilities work plan. The financially feasible Five-Year Schedule of Capital Improvements must describe projects listed in the 10-year work plan that are to be imple- mented in the first five years of the plan, including both publicly and privately funded water supply projects that are necessary to ensure that adopted level- of-service standards are achieved and maintained. [s. 163.3177(3)(a)5., F.S.] c. The Conservation Element includes an assessment of current and projected water needs, and sources for a minimum 10-year period, considering the appropriate regional water supply plan and consumptive use permit. If the established planning period of the comprehensive plan is greater than ten years, the assessment must address the water supply needs and sources for the longer planning period. d. The Intergovernmental Coordination Element addresses coordination of the comprehensive plan with the applicable regional water supply plan(s) and regional water supply authorities' plans. For local governments that lie within more than one water management district, the due date for adopting the amendments is 18 months from the approval date of the last regional water supply plan (or update) applicable to the local government. See Attachment A for a map depicting areas that are subject to regional water supply plans. Attachment B identifies the dates by which,amendments to local comprehensive plans must be adopted to incorporate the 10-year water supply facilities work plans. See Attachment C for an overview of regional water supply plans. 3. Local governments that are not subiect to a regional water supply plan (see Attachment A) must address the following in their next Evaluation and Appraisal Reports (EARs) and adopt the necessary EAR-based amendments to ensure that: -Page 6 of 28 Pages - a. The Conservation Element identifies the current and projected water needs and sources for a minimum 10-year period, considering the appropriate district water management plan, consumptive use permit and associated water supply assessment reports. If the established planning period of a comprehen- sive plan is greater than ten years, the assessment must address the water supply needs and sources for the longer planning period. b. The Intergovernmental Coordination Element addresses coordination with regional water supply authorities, where the local government is served by a regional water supply authority. See Section F for additional information about addressing water supply issues in Evaluation and Appraisal Reports. D. PREPARING THE WORK PLAN Work Plan Objective: Local governments subject to a regional water supply lan must prepare a minimum 10-year work plan for building public, private, and regional water supply facilities to serve existing and new development within the local government's jurisdiction and adopt the work plan into the comprehensive plan within 18 months after the water management district approves a regional water supply plan or its. update. The work plan and the comprehensive plan amendment must address the development of traditional and alternative water supplies, bulk sales agreements, and conservation and reuse programs that are necessary to serve existing and new development for at least a 10-year planning period. In areas where local governments rely on regional water supply author- ities or other public or private water suppliers to provide all or a portion of the community's water supply, the work plan must contain information about the provider's water supply and infrastructure plans and the local government's own water supply and infrastructure needs (i. e., address each utility that provides water and infrastructure within the local government's jurisdiction). 2. Adoption Deadlines: Each local government must determine the date by which its work plan and comprehensive plan amendment must be adopted (see Section C and Attachment B of this Guide). The local government must then determine the date by which it must transmit the proposed work plan and plan amendment in order to adopt the fmal work plan and amendment by the scheduled due date. The work plan amendment is exempt from the twice-per-year amendment limitation. [s.163.3177(6)(c), F.S.] 3. Coordination with Water Management Districts: When preparing the work plan, the local government should coordinate with the water management district regarding population and water supply demand projections, areas to be served, the use of traditional and alternative water supplies, bulk sales agreements, and water conservation and reuse strategies necessary to meet projected demand. Local governments must base their population projections on the mid-range population projections prepared by the University of Florida, Bureau of Economic and Busi- -Page 7 of 28 Pages - ness Research, unless the local government has been specifically approved by the Department of Community Affairs to use an alternative professionally approved methodology. Projections of water demand must be based upon a professionally accepted and applied methodology. The local government should identify one person at the water management district as apoint-of-contact for information and assistance. A single point-of-contact will greatly facilitate coordination between the local government and the district. Close coordination between the parties can help avoid questions or concerns that could otherwise surface when the district reviews the proposed work plan and the comprehensive plan amendment. Districts' regional water supply plans are prepared for 20-year planning horizons and include water use demand projections for 5-year increments, such as 2010, 2015, 2020, and 2025. In developing the work plan, the local government should consult with the appropriate water management district(s) to determine the feasibility of using compatible planning increments to facilitate the sharing of consistent data. 4. Coordination with Water Suppliers: In addition to coordinating with the water management district, each local government should also work closely with local water utilities that supply water to the community. This could be a city or county water department, the water utility of another local government, a private water supplier, a regional water supply authority or some combination thereof. After identifying the water supplier(s) that serve the community, the local government should request the designation of a single point-of-contact to assist with prepara- tion of the work plan amendment. Section 163.3177(6)(c), F.S., encourages local governments, public and private utilities, regional water supply authorities, special districts, and water manage- ment districts to cooperatively plan for multijurisdictional water supply facilities, including the development of alternative water sources to supplement traditional sources of ground and surface water. Planning for the use of multijurisdictional water supply facilities on a countywide or multi-county basis is recommended, especially for the development of alternative water supply sources. Cooperative water supply planning can avoid non-productive competition for limited water resources and conflicts over future service areas; promote equitable cost-sharing in the development of alternative water supply projects; and promote water reuse programs between local governments. Many small developments, such as trailer parks and condominiums, are self- supplied or serviced by small public supply systems. These small utilities should be inventoried and reported in the data and analysis submitted with the proposed work plan, but need not be considered part of the local government's 10-year water supply work plan due to their limited development potential. 5. Define Extent of Responsibility: Each local government should determine the -Page 8 of 28 Pages - extent to which it plans to be involved in the planning, financing, construction and operation of the water supply facilities that will serve the community, whether the facilities will be provided by a local government utility, a regional water supply authority, or another public or private water supplier. Local government involve- ment can range from none to total control of the withdrawal, treatment and distri- bution of potable water and reclaimed water. The local government must address all of the water supply treatment distribution facilities, and bulk sales agreements that are Manned by all entities providing service within its jurisdiction, regardless of ownership or responsibility for the individual facilities. It, must also address any infrastructure or water supply, including bulk sales, that it will provide outside its own jurisdiction and any current and future water conservation activities. 6. Information to Obtain from Water Suppliers: The following information should be obtained from all water suppliers serving the local government: a. The current consumptive use permit (CUP) number, authorized average and maximum daily water withdrawals under the CUP by source, any applicable source limitations, required alternative water supply projects and/or conser- vation and reuse projects, and the CUP expiration date for the listed sources, as well as water supply commitments made through bulk sales agreements. b. Projected demand for each applicable water use category for at least a 10-year planning period. The local government's projected demand, the water suppliers' projected demand, and the water management district's projections for areas served should be in agreement. c. A map that shows existing and future areas to be served by each water supplier. d. Identification of existing and planned fixture water sources. The source(s) of water identified by each supplier should correlate with those described in the regional water supply plan, including the alternative water supply projects to be implemented: Each local government should coordinate with the water management district regarding the ability of the water supplier to meet the projected need, particularly with respect to water sources, source limitations, and the use of appropriate water conservation and reuse strategies. Identification of water supply facilities needed to serve the agreed-upon projected need. f. If another local government is a water supplier, verify that its 10-year work plan identifies the sources and facilities needed to meet the recipient govern- ment's projected needs - in addition to the supplier's other water supply commitments -for the area served. -Page 9 of 28 Pages - 7. Information to Include in the Work Plan: The work plan should be a planning document based upon information relevant to each local government's unique circumstances. The recommended format and level of detail for the work plan should be similar to the Potable Water, Sanitary Sewer, Solid Waste, and Storm- waterManagement Sub-Elements that currently comprise the local government's Infrastructure Element. Data and analysis; goals, objectives, and policies; and a fmancially feasible five-year schedule of capital improvements should be included. The work plan should address the following water supply and water supply facility issues: o Water supply projections for at least the next 10 years; if the comprehensive plan has a longer planning horizon, projections should cover that time frame; o An assessment of the traditional (current) water sources and whether they will be adequate to meet the projected demand; o If alternative water sources will be needed to meet projected demand, coordination with the water management district to identify and include the alternative water supply projects the local government will implement; o An identification of the water conservation and reuse programs that the local government will expand or implement and a determination of how much of the future water demand will be offset by those programs; o A determination of when alternative water supply projects, water conserva- tion and reuse programs will be implemented and how much they will cost; o An identification of the capital improvements projects to be implemented in the first five years of the plan, including both publicly and privately funded water supply projects necessary to achieve and maintain adopted level-of- service standards, and a financially feasible Five-Year Schedule of Capital Improvements. The fmancial feasibility of privately funded projects must be demonstrated by enforceable development or interlocal agreements. The work plan should also include a general description of the water supply projects and infrastructure needs for the long-term planning time frame; e If the local government relies on a service provider, a demonstration (by data and analysis) that the local government has coordinated with the service provider to ensure that its short- and long-term water supply needs will be met (i. e., reserved capacity, CUP allocations, source limitations, bulk sales, interlocal agreements, timing of capital improvements, periodic updates, and concurrency coordination); and o An identification of the goals, objectives, and policies that will be needed to implement the work plan and water supply concurrency requirements. -Page 10 of 28 Pages - To address the water supply and water supply facility issues described above, the work plan should include the following specific information: a. Data and Analysis (1) An inventory of all potable and reuse water service providers within the jurisdiction of the local government, including small public supply sys- tems, reuse providers, and significant non-potable (e.g., commercial and industrial users, golf courses, etc.) water service providers. Describe the extent to which the local government is (or plans to be) involved in the planning, financing, construction or operation of the facilities that will supply water within its jurisdiction, even if the facilities will be provided by regional water supply authorities or other public or private water suppliers. The local government's involvement can range from none to total responsibility for the withdrawal, treatment and distribution of potable water and reuse water. (2) Geographic service area maps for the potable and reuse water service providers and indications of whether the areas depicted are different from the actual area(s) currently served. Composite maps of potable and reuse service providers should be provided, if possible. Self-supplied and similar small public supply systems can be shown as points, if necessary. To evaluate areas for future water service expansion and reuse, indicate where private wells and septic systems are used and will continue to be used. (3) The term "water supply facilities" includes all infrastructure necessary to withdraw water from its source and to transport, treat and distribute the water, together with any associated storage facilities. For each potable water service area, other than those of the self-supplied and similar small public supply systems; identify the existing facilities, including the general location of existing and planned water wells and intake points from sur- face water sources, treatment and storage facilities, and distribution mains. For each reuse service area, identify treatment and storage facilities and distribution mains. (4) Information on the design capacity of the production and treatment facilities, the current demand on the facilities, the geographic area served, and relevant consumptive use permit conditions and duration. If the local government is not responsible for all the listed water supply facilities, identify the responsi- ble entities by service area and describe existing and proposed agreements for any aspect of potable or reuse water service delivery, including agreements with other local governments, public and private utilities, regional water supply authorities, special districts, and water management districts. (5) An identification of conservation and reuse practices and regulations, including those that apply only to particular service areas. -Page 11 of 28 Pages - (6) A determination of future needs for each service area, other than those of the self-supplied and similar small public supply systems. Provide the following information for the base planning year and for the next 5-year and 10-year increments, plus any additional increments necessary to cover the entire planning period established in the comprehensive plan: (a) Population and water demand projection figures for all water use categories, comparable to those used in the development of the applicable regional water supply plan, for that portion of its juris- diction located in the service area. (b) A facility capacity analysis noting capacity surpluses and deficiencies and consumptive use allocations for each facility, and including relevant information for each facility, such as capacity in average daily flow and maximum daily flow, and relationship to permitted flows, treatment and distribution losses, and current commitments for water supply. The following tables illustrate a convenient format for comparing projected demand, facility capacity and permit conditions. Table 1 reveals the need to increase permitted withdrawals to accommodate anticipated growth and system expansion. Table 2 shows one way to portray a situation where the permitted allocation is unlikely to be expanded due to source limitations and a deficit is avoided by planning to purchase raw water from an adjacent supplier. Please note that additional information relevant to each local government's situation may need to be included in the calculations, such as bulk sales, treatment and distribution losses, and currently committed water supplies. TABLE 1 _ _ '` __ __ :2005 2008'. 2010 2015' Population Served 1,722 3,073 3,598 3,955 Avg. Daily Demand (GPD) 268,632 479',388 546,896 593,250 Demand per Capita (GPD) 156 156 152 150 Available Facility Capacity (GPD) 350,000 700,000 700,000 700,000 Facility Capacity Surplus (Deficit)1 81,368 220,612 153,104 106,750 Permitted Amount (GPD Annual Avg.) 300,000 300,000 300,000 300,000 Permitted Surplus (Deficit)2 31,368 (179,388) (246,896) (293,250) GPD =Gallons Per Day 1 Calculated by subtracting Average Daily Demand from Available Facility Capacity 2 Calculated by subtracting Average Daily Demand from Permitted Amount -Page 12 of 28 Pages - TABLE 2 - 2005 ~ 3008 ' _2010 , 2015 Po ulation Served 21,935 _ 28,733 29,867 32,828 Avg. Daily Demand (MGD 3.40 4.31 4.48 4.76 Demand er Ca ita (GPD 155 150 150 145 Available Facility Ca acity GD) 8.712 9.360 9.360 10.152 Facili Capaci S lus (Deficit)3 5.312 5.05 4.88 5.392 Permitted Amount (MGD Annual Avg. 3.461 5.882 5.882 5.882 Permitted S lus Deficit)4 0.06 1.57 1.40 1.12 MGD=Million Gallons Per Day; GPD=Gallons Per Day 1CUP for 3.46 MGD annual average expires September 2006 ZIncludes CUP for 3.46 MGD and 2.42 MGD wholesale purchase from XYZ Utility 3Calculated by subtracting Average Daily Demand from Available Facility Capacity 4Calculated by subtracting Average Daily Demand from Permitted Amount (c) Identification of potable and reuse water supply sources and facilities needed to serve projected growth and development, including relevant information for each facility, such as capacity and consumptive use allocations in average daily flow and maximum daily flow. Include any reuse, conservation, traditional, or alternative water supply projects, and conservation and reuse measures, selected from the regional water supply plan or stipulated in the CUP. Provide general planning-level detail for projects proposed as alternatives to the projects identified in the regional water supply plan. Identify the amount and timing of water supply expected to be produced by each project. (d) Identification of current and prospective conservation and reuse prac- tices and regulations that will be utilized to meet projected demand. Identify those that apply jurisdiction-wide and those that apply only to particular service areas or specific water users. Provide an estimate of the reduction in water use attributable to conservation and reuse allowed as an offset in the CUP. (e) Identification of current or prospective participation in any county-wide or other multijurisdictionalp1anning initiatives to meet future water supply needs, including the development of alternative water supplies. (f) Facilities maps showing the location of water sources (wells and surface waters), storage facilities (in-ground and above-ground), and the extent of the distribution. system. The maps should be at a scale and level of detail appropriate to the local government's situation. For example, it would be impractical to depict the smallest lines serving individual customers in a county. For a small city, however, that information may be readily available and easily displayed. Maps depicting the location of water distribution mains should be included. -Page 13 of 28 Pages - b. CanitalImprovements (1) The work plan's data and analysis should identify and discuss the capital improvements required to build all public, private, and regional water supply facilities to serve the existing and new development within the local government, even if the local government is not responsible for the improvements. If a local government is a service provider, the data and analysis should identify the capital improvements that will be needed to serve existing and planned development within the utility's service area. (2) All capital improvements that will be provided by a water supplier other than the recipient local government should be identified in the data and analysis, but only those publicly and privately funded projects necessary to serve development in the next five years must be included in the recipient local government's Five-Year Schedule of Capital Improvements. (3) A local government that is a water supply provider will need to identify (in its financially feasible Five-Year Schedule of Capital Improvements) the capital improvements for water supply projects and other water supply infrastructure needed in the next five years. Funding provided through an interlocal agreement, or by private contributions through an enforceable development agreement, must be referenced in the schedule of capital improvements to demonstrate fmancial feasibility. Interlocal and develop- ment agreements should address the cost of the capital improvement, the funding source, the entity responsible for funding and constructing the improvement, the populations to be served, and the construction time line. Privately funded projects must also be included in the schedule if the local government intends to rely on those projects to achieve and maintain adopted level-of-service standards when approving new development. To demonstrate fmancial feasibility, committed funding sources must be identified for the first three years of the Five-Year Schedule of Capital Improvements. Committed or planned revenue sources can be identified for years four and five. If the local government intends to use planned revenue sources that require referenda or other actions to secure the revenue source, the plan must (in the event the referenda are not passed or required actions do not occur) identify other existing revenue sources that will be used to fund the capital projects or otherwise amend the schedule to ensure fmancial feasibility [see Sections 163.3164(32) and 163.3177(3)(a)5, F.S.]. (4) Local governments do not need to demonstrate that funding is currently available or will be available through planned revenue sources to address water supply projects needed beyond the Five-Year Schedule of Capital Improvements. Instead, strategies should be included in the comprehen- siveplan policies that identify the funding programs that the local govern- ment intends to utilize to address those future needs. The programs may include a plan for new funding sources. -Page 14 of 28 Pages - (5) For more information about capital improvements planning, interested readers are referred to the Department's technical assistance report, A Guide to the Annual Update of the Capital Improvements Element. The report is available from the Division of Community Planning and posted on the Department's website (www.dca.state.fl.us). c. Goals, Objectives, and Policies Local governments should review their comprehensive plans to identify the goals, objectives and policies (GOPs) that address water supply sources and facilities, as well as conservation and reuse programs. Typically, these GOPs will be located in the following plan elements: Future Land Use, Infrastructure (particularly the Potable Water and Sanitary Sewer Sub-Elements), Conserva- tion, Capital Improvements, and Intergovernmental Coordination. The work plan should include an assessment of current GOPs and identify any new or revised GOPs needed to implement the work plan. The following list of issue areas where new or revised GOPs maybe appropriate is based on the comprehensive plan requirements in Chapter 9J-5, Florida Administrative Code (F.A.C.). The list is provided as an example of issues that may need to be considered. Each local government will need to develop its own list of issues to be addressed through new or revised GOPs, based on the work plan and its supporting data and analysis. (1) Coordination of land uses and future land use changes with the availability of water supplies and water supply facilities; (2) Revision of potable water level-of-service standards for residential and non- residential users; (3) Provision for the protection of water quality in the traditional and new alternative water supply sources; (4) Revision of priorities for the replacement of facilities, correction of existing water supply and facility deficiencies, and provision for future water supply and facility needs; (5) Provision for conserving potable water resources, including the implemen- tation of reuse programs and potable water conservation strategies and techniques; (6) Provisions for improved or additional coordination between a water supply provider and the recipient local government concerning the sharing and updating of information to meet ongoing water supply needs; -Page 15 of 28 Pages - (7) Coordination between local governments and the water supply provider in the implementation of alternative water supply projects, establishment of level-of-service standards and resource allocations, changes in service areas, and potential for annexation; (8) Coordination of land uses with available and projected fiscal resources and a fmancially feasible schedule of capital improvements for water supply and facility projects; and (9) The need for additional revenue sources to fund water supply and facility projects. 8. Adopting the Work Plan Into the Comprehensive Plan As described in Section 7 above, the format of the work plan is like that of a "sub-element," similar to the Potable Water and Sanitary Sewer Sub-Elements included in the Infrastructure Element of most local comprehensive plans. The sub-element format -with its data and analysis, list of capital improvements, and GOPs incorporated as sub-sections within the Infrastructure Element - is the recommended format for the work plan. A five-year schedule of capital improvements for water supply and infrastructure projects could be adopted as part of the Infrastructure Element, or those projects could be included in the Capital Improvements Element's Five-Year Schedule of Capital Improvements. Other alternatives for incorporating the work plan into the comprehensive plan include: a. Incorporating the work plan as a set of GOPs, exhibits or attachments in the Infrastructure Element and making related GOP changes in other elements, with a five-year schedule of capital improvements either as part of the Infrastructure Element or incorporated in the Five-Year Schedule of Capital Improvements located in the Capital Improvements Element; b. Including the work plan data and analysis, GOPs, and five-year schedule of capital improvements in the various elements of the comprehensive plan (e.g., Future Land Use, Infrastructure, Conservation, Coastal Management, Inter- governmental Coordination, and Capital Improvements Elements). If this option is utilized, the local government should identify where the various portions of the work plan are located in the comprehensive plan; or c. Adopting the work plan by reference in a policy of the Infrastructure Element. This option is not recommended, however, because the comprehensive plan would have to be amended each time the work plan is revised, including any revision to sections that would not otherwise require an amendment to the comprehensive plan. -Page 16 of 28 Pages - E. ADDITIONAL AMENDMENTS TO THE COMPREHENSIVE PLAN All local governments must revise their comprehensive plans to address water supply concurrency and to ensure their Five-Year Schedules of Capital Improvements are financially feasible. In 2005, s. 163.3180(2)(a), F.S., was amended to add water supply as a concurrency requirement. The 2005 legislation also revised s.163.3177(6)(a), F.S., to require the future land use plan be based on the availability of water supplies and public facilities, and added a definition of "financial feasibility" [x.163.3164(32), F.S.]. The following section provides guidance for addressing requirements associated with concurrency and the financial feasibility of the Five-Year Schedule of Capital Improvements. See Paragraphs B.2. and C.1. for requirements associated with changes to the Future Land Use Element. 1. Water Supply Concurrence: The local government's concurrency management system will require revision to formalize the consultative process between the local government and the water supplier. The GOPs that establish the local govern- ment's concurrency management system and the land development regulations that implement the concurrency management system could, for example, be revised to require the local permitting entity to request and obtain from the water supplier a written statement regarding the availability of water to serve a proposed project. Such a statement should clearly identify the available water supply for all existing and proposed water demands, consistent with the supplier's consumptive use permit and the applicable regional water supply plan. 2. Annual Updates to the Five-Year Schedule of Capital Improvements: All local governments must annually update their Five-Year Schedules of Capital Improvements to maintain financial feasibility. Annual updates should include water supply development projects for which the local government is responsible, including reuse facilities and the development of any alternative water supply projects; new potable water facilities .and upgrades; and all other publicly and privately funded capital improvement projects needed to achieve and maintain adopted level-of-service standards for the next five years. For any privately funded project that will be paid for through individual developer contributions, an executed (and enforceable) agreement must be provided as data and analysis and referenced in the Five-Year Schedule of Capital Improvements to demonstrate that financial feasibility requirements have been met. An amendment to the compre- hensive plan is required to update the schedule on an annual basis or to eliminate, defer, or delay the construction of ariy facility listed in the five-year schedule. . F. EVALUATION AND APPRAISAL REPORTS All local governments, including those within the Suwannee River Water Management District, must address water, supply planning in the Evaluation and Appraisal Report (EAR) process and subsequently adopt amendments based on the EAR fmdings. In addition, local governments subject to a regional water supply plan must also address the extent to which they have implemented their 10-year water supply facilities work -Page 17 of 28 Pages - plans and identified water supply projects necessary to address the water needs identified in the applicable regional water supply plan. The two sets of requirements are described below. For additional guidance regarding EAR requirements, please see the Department's website at http://www.dca.state.fl.us/fdcp/dcp/EAR/index.cfrn. 1. In the EAR process, local governments that are not subject to a regional water supply plan, including those in the Suwannee River Water Management District, must: a. Update the comprehensive plan to identify the capital improvement projects needed within the next five years and within the minimum ten-year planning horizon to ensure the availability of potable water supplies and infrastructure to meet the anticipated residential and non-residential demands for those two planning periods. The identification of capital improvements should include the water supply projects, the infrastructure improvements for the treatment and delivery of potable water, and the water conservation and reuse projects to be implemented to meet projected demands. Any capital improvements projects needed in the first five-year period must be included in the fmancially feasible Five-Year Schedule of Capital Improvements. b. Update the Conservation Element to include an assessment of current and projected water needs and sources for at least aten-year period, considering the applicable District Water Management Plan and consumptive use permit. If the established planning period of a comprehensive plan is greater than ten years, the plan must address the water supply sources necessary to meet and achieve the existing and projected water use demand for the established planning period. [s. 163.3167(13), F.S.] Update the Intergovernmental Coordination Element to address cooperative efforts with other local governments, public and private utilities, regional water supply authorities, special districts, and water management districts with regard to potable and reuse water service delivery. Any local govern- ment that relies on a regional water supply authority for its water supply must review this element to determine if coordination with the regional water supply authority has been addressed. If not, the comprehensive plan must be revised to address this requirement. The requirements for data and analysis and goals, objectives, and policies outlined in Rule 9J-5.015, F.A.C., for the preparation of the Intergovernmental Coordination Element can be used to address this requirement. 2. In the EAR process, local governments that are subject to a regional water supply plan must: a. Address items l.a. through l.c., above. b. Indicate the extent to which the local government has implemented the work plan for building public, private and regional water supply facilities, including the development of alternative water supplies, to meet local water use needs identified in the Infrastructure Element. -Page 18 of 28 Pages - c. Indicate the extent to which the local government has been successful in identifying alternative water supply projects, traditional water supply projects, bulk sales agreements, and conservation and reuse programs to meet the water needs identified in the applicable regional water supply plan. d. Based on the evaluations described in paragraphs b. and c. above, update the comprehensive plan to include new or revised programs and activities to address any shortcomings in the implementation of the water supply facilities work plan, including the development of alternative water supplies, bulk sales agreements, and the implementation of conservation and reuse programs to meet current and future needs. -Page 19 of 28 Pages - ATTACHMENT A Map of Regional Water Supply Planning Areas i _- --- ,- ~ ~ ~ ~O~II~~'~' ~ ~ ~~~E~f~~f1 ~S ~` ~~ a ~` ~ ~~ ~f -Page 20 of 28 Pages - ATTACHMENT B Due Dates for Work Plan Amendments The following local governments are located in the Northwest Florida Water Manage- ment District's Region II Water Supply Planning Area. An update of the area's regional water supply plan was approved by the District's Governing Board on October 26, 2006. The following local governments must therefore prepare their 10-year water supply facilities work plans and update their comprehensive plans by Apri126, 2008 (18 months after the District Governing Board approved the updated regional water supply plan) [s. a. Okaloosa County and all municipalities located in the county b. Santa Rosa County and all municipalities located in the county c. Walton County and all municipalities located in the county The following local governments are located in the Northwest Florida Water Manage- ment District's Region V Water Supply Planning Area. A regional water supply plan for Region V was approved by the District's Governing Board on January 25, 2007. The fol- lowing local governments must therefore prepare their 10-year water supply facilities work plans and update their comprehensive plans by July 25, 2008 (18 months after the District Governing Board approved the regional water supply plan) [s. 163.3177(6)(c), F.S.]: d. Franklin County and the municipalities of Apalachicola and Carrabelle e. Gulf County and the municipalities of Port St. Joe and Wewahitchka 2. The following local governments are located in the St. Johns River Water Management District's Priority Water Resource Caution Area (PWRCA), a water supply planning region where existing and reasonably anticipated sources of water may not be adequate to supply water for all existing legal uses and anticipated future needs while sustaining water resources and related natural systems. The regional water supply plan for the PWRCA area (District Water Supply Plan 2005) was approved by the District Governing Board on February 7, 2006, and an addendum affecting some local governments was approved on October 10, 2006. The following local governments located within the PWRCA must therefore prepare their 10-year water supply facilities work plans and update their comprehensive plans by August 7, 2007, except as noted [s. 163.3177(6)(c), F.S.]: a: Brevard County and the municipalities of Cape Canaveral, Cocoa, Cocoa Beach, Indialantic, Indian Harbour Beach, Melbourne, Melbourne Beach, Melbourne Village, Palm Shores, Rockledge, Satellite Beach and West Melbourne; the municipality of Titusville has a deadline of April 10, 2008. b. Flagler County and all municipalities located in the county -Page 21 of 28 Pages - c. Lake County and the municipalities of Astatula, Clermont, Eustis, Groveland, Howey-in-the-Hills, Lady Lake, Leesburg, Mascotte, Minneola; Montverde, Mount Dora and Tavares; the municipalities of Fruitland Park and Umatilla have a deadline of April 10, 2008. d. Marion County (part of the County -but no municipalities - is in the PWRCA) has a deadline of April 10, 2008. Orange County municipalities of Apopka, Belle Isle, Eatonville, Edgewood, Maitland, and Winter Park; the municipality of Oakland has a deadline of April 10, 2008. Note: the unincorporated area of the County and the municipalities of Ocoee, Orlando and Winter Garden are split with the SFWMD -see item 4 below for the applicable deadline). f. Osceola County is split with SFWMD -see item 4 below for deadline g. Seminole County and all municipalities located in the county h. Volusia County and the municipalities of Daytona Beach Shores, DeBary, Deland, Deltona, Edgewater, Holly Hill, Lake Helen, Oak Hill, Orange City, Ormond Beach, Pierson, Ponce Inlet, Port Orange and South Daytona; the municipalities of Daytona Beach and New Smyrna Beach have a deadline of April 10, 2008. 3. The following local governments are located in the Southwest Florida Water Management District's Central and Southern Region, a regional water supply planning area. An updated regional water supply plan for the Central and Southern Region was approved by the District Governing Board on November 30, 2006. The following local governments located in the Central and Southern Region must therefore prepare their 10-year water supply facilities work plans and update their comprehensive plans by May 30, 2008 (18 months after the District Governing Board approves the updated regional water supply plan) [s. 163.3177(6)(c), F.S.]: a. Charlotte County and its municipality b. Desoto County and its municipality c. Hardee County and all municipalities located in the county d. Avon Park, Lake Placid, and Sebring e. Hillsborough County and all municipalities located in the county f. Manatee County and all municipalities located in the county g. Pasco County and all municipalities located in the county h. Pinellas County and all municipalities located in the county i. All municipalities located in Polk County j. Sarasota County and all municipalities located in the county -Page 22 of 28 Pages - 4. Two of the four regional water supply plans for the South Florida Water Management District (the Upper East Coast plan and the Lower West Coast plan) were approved by the District's Governing Board on July 12, 2006. The following local governments located in those planning regions must prepare their 10-year water supply facilities work plans and update their comprehensive plans by January 12, 2008 (18 months after the District Governing Board approved each regional water supply plan) [s. 163.3177(6)(c), F.S.]: a. Collier County and all municipalities located in the county b. Hendry County and all municipalities located in the county c. Lee County and all municipalities located in the county d. Martin County and all municipalities located in the county e. St. Lucie County and all municipalities located in the county The regional water supply plan for the Kissimmee Basin was approved by the District's Governing Board on December 14, 2006. The following local governments located in the Kissimmee Basin planning region must prepare their 10-year water supply facilities work plans and update their comprehensive plans by June 14, 2008 (18 months after the District Governing Board approved the regional water supply plan). [s. 163.3177(6)(c), F.S.]: f. Glades County and its municipality g. Highlands County h. Okeechobee County and its municipality i. Orange County, Bay Lake, Lake Buena Vista, Ocoee, Orlando, Reedy Creek, Windermere, and Winter Garden j. Osceola County and all municipalities located in the county k. Polls County The regional water supply plan for the Lower East Coast was approved by the District's Governing Board on February 15, 2007. The following local governments located in the Lower East Coast planning region must prepare their 10-year water supply facilities work plans and update their comprehensive plans by August 15, 2008 (18 months after the Dis- trict Governing Board approved the regional water supply plan). [s. 163.3177(6)(c), F.S.]: n. Broward County and all municipalities located in the county o. Miami-Dade County and all municipalities located in the county p. Monroe County and all municipalities located in the county q. Palm Beach County and all municipalities located in the county -Page 23 of 28 Pages - ATTACHMENT C Overview of Regional Water Supuly Plans The following briefly summarizes the content and application of regional water supply plans (RWSPs) and describes the types of information and assistance that are available from the water management districts. The map in Attachment A depicts the areas of the state for which RWSPs have been prepared. A RWSP includes a 20-year projection of future population and associated water supply demands, as well as an identification of water supply projects that could meet those demands. The RWSP is intended to provide the framework for future water supply decisions in areas where existing and reasonably anticipated sources of water and conservation efforts may not be adequate to provide for. all existing legal users and reasonably anticipated future needs, while sustaining water resources and related natural systems. For planning purposes, water use is separated into six categories: agriculture; public supply; domestic self-supply (including small public supply systems); commerciaUindustrial and mining/dewatering; thermoelectric power production; and recreational irrigation. The RWSP identifies potential sources of water capable of meeting projected demand and options for developing those sources. Typical sources include (1) new groundwater wellfields; (2) increased use of reclaimed water; (3) storage reservoirs; (4) surface water withdrawals; (5) aquifer storage and recovery; (6) reverse osmosis/desalination; and (7) conservation. The RWSP includes planning-level analyses for each of these potential sources of water to quantify available water supplies, identify project development options, and estimate costs associated with water supply development. The RWSP identifies potential.water supply development projects, including conservation, reuse, traditional, and alternative water supply projects that will exceed the needs projected by the district. The RWSP also estimates the associated costs for developing the projects. The water supply projects identified in the RWSP represent a "menu" of possible options from which each identified local government, government-owned and privately owned utility, self-supplier or other entity may choose to address its water supply needs. The individualized project options are provided as reasonable concepts that water users in the region can pursue through water supply planning. Water users may also propose specific alternative water supply projects for inclusion in the regional water supply plan. If the water management district determines that the proposed projects meet the goals of the plan, they will be included in the approved regional water supply plan. Additionally, the plan provides information to assist water users in developing funding strategies to construct water supply devel- opment projects, and the inclusion of a specific alternative water supply project in the plan indicates that state and water management district funding assistance maybe available for the project. Each RWSP is to be updated at least every five years. Local governments should consult with their respective districts to obtain the latest and most detailed information available. -Page 24 of 28 Pages - ATTACHMENT D Sources of Information and Contacts Data and Information Sources: 1. Water Management District publications, such as Regional Water Supply Plans, water supply assessments, and District Water Management Plans. 2. Monthly Public Supply Water Withdrawal tables, available from the USGS. Contact Richard Marella at (850) 942-9500, for Northwest Florida WMD, Suwannee River WMD and South Florida WMD. Contact St. Johns River WMD and Southwest Florida WMD for similar tables. 3. Regional Water Supply Authority plans and publications. 4. Comprehensive plans of adjacent local governments if they supply water to portions of your jurisdiction. 5. Plans or other documents from public or private utilities serving areas within your jurisdiction. Agency and District Contacts: Florida Department of Community Affairs Vicki Morrison, Principal Planner (850) 921-3775; Suncom 291-3775 E-mail: vicki.morrison@dca.state.fl.us Website: www.dca.state.fl.us Florida Department of Environmental Protection Janet Llewellyn, Director Division of Water Resources Management (850) 245-8676; Suncom 205-8676 E-mail: janet.llewell~na,dep.state.fl.us Website: www.dep.state.fl.us -Page 25 of 28 Pages - Northwest Florida Water Management District Paul Thorpe, AICP, Director, Resource Planning Section (850) 539-5999; (800) 913-1518, ext. 254 E-mail: paul.thorpe(c~nwfwmd.state.fl.us Website: www.nwfwmd.state.fl.us St. Johns River Water Management District Peter Brown, Policy Analyst (386) 329-4311; (800) 451-7106 E-mail: pbrown(a~Lsirwmd.com Website: www.sirwmd.com Suwannee River Water Management District David Still, Deputy Executive Director (386) 362-1001 or (800) 226-1066 E-mail: still ~srwmd.state.fl.us Steven Minnis, Senior Resource Development Coordinator (386) 362-1001 or (800) 226-1066 E-mail: minnis s(a~srwmd.state.fl.us Website: www.srwmd.state.fl.us Southwest Florida Water Management District Rand Frahm, AICP, Planning Manager (352) 796-7211 or (800) 423-1476, ext. 4411 E-mail: Rand.Frahm(a~watermatters.org Miki Renner, AICP, Planning Manager (352) 796-7211 or (800) 423-1476, ext. 4413 E-mail: Miki.Renner(a,watermaters.org Website: www.watermatters.org -Page 26 of 28 Pages - South Florida Water Management District Jim Jackson, AICP, Senior Supervising Planner. (561) 682-6334; (800) 432-2045, ext. 6334; Suncom 229-6334 E-mail: jjackson(a~sfwmd.~ov Jane Bitcca, Alternative Water Supply Program Manager (561) 682-6791; (800) 432-2045, ext. 6791; Suncom 229-6791 E-mail: jbuccansfwmd.gov Henry Bittaker, AICP, Senior Planner Comprehensive Planni~}g Issues (561) 682-6792;(800) 432-2045, ext. 6792; Suncom 229-6792 E-mail: hbittak(a~sfwmd.gov Website: www.sfwmd.gov Lower East Coast Regional Water Supply Plan Barbara Powell, AICP, Plan Manager (561) 682-2236 or (800) 432-2045, ext. 2236 E-mail: bpowell(a~sfwmd.gov Kissimmee Basin Regional Water Supply Plan Chris Sweazy, Plan Manager (407) 858-6100 or (800) 432-2045, ext. 3822 E-mail: csweazy~,sfwmd.gov Upper East Coast Regional Water Supply Plan Linda Hoppes, Plan Manager (561) 682-2213 or (800) 432-2045, ext. 2213 E-mail: lhoppes(cr~,sfwmd. goy Lower West Coast Regional Water Supply Plan Terry Bengtson, Regional Coordinator (239) 338-2929 or (800) 432-2045, ext. 7740 E-mail: tbengts@sfwmd.gov ' -Page 27 of 28 Pages - Regional Water Supply Authorities Peace River/Manasota Regional Water Supply Authority (Charlotte, Desoto, Manatee and Sarasota Counties) Patrick J. Lehman, Executive Director (941) 316-1776 E-mail: peacemana(a~aol.com Website: www.regionalwater.org Tampa Bay Water (Hillsborough, Pasco, and Pinellas Counties and the Cities of New Port Richey, - Tampa and St. Petersburg) Paula Dye, AICP, Chief Environmental Planner (727) 796-2355 E-mail: pdye(a~tampabaywater.org Website: www.tampabaywater.org Walton/Okaloosa/Santa Rosa Regional Utility Authority (Okaloosa, Santa Rosa and Walton Counties) Terry A. Joseph, Executive Director (850) 595-8910 E-mail: josepht@`fipc.dst.fl.us Website: www.wfipc.dst.fl.us Withlacoochee Regional Water Supply Authority (Citrus, Hernando,'and Sumter Counties and all municipalities in those Counties, and the City of Ocala) Jackson E. Sullivan, Executive Director (850) 385-0220 E-mail: jsullivannu,carltonfields.com Website: www.wrwsa.cc -Page 28 of 28 Pages - ~~ Southwest Florida 2379 Broad Street, Brooksville, Florida 34604-6899 ~ ,F` o ~= C mater Mana ement District (352) 796-7211 or 1-800-423-1476 (FL only) y~ g '~-"'~ -, y, _ °"• .-~ SUNCOM 628-4150 TDD only 1-800-231-6103 (FL only) ~~ °~ ^'A~EM~'` _ - '-- On the Internet at: WaterMatters.org An Equal Bartow Service Office Lecanto Service Office Sarasota Service Office Tampa Service Office Opportunity 170 Century Boulevard Suite 226 Employer 6750 Fruitville Road 7601 Highway 301 North Bartow, Florida 33830-7700 3600 West Sovereign Path Sarasota, Florida 34240-9711 Tampa, Florida 33637-6759 (863) 534-1448 or Lecanto, Florida 34461-8070 (941) 377-3722 or (813) 985-7481 or 1-800-492-7862 (FL only) (352) 527-8131 1-800-320-3503 (FL only) 1-800-836-0797 (FL only) - SUNCOM 572-6200 SUNCOM 531-6900 SUNCOM 578-2070 Talmadge G. "Jerry Hire CERTIFIED MAIL Chair, Pasco May 14, 2007 ~ ~~Q./' Q Judith C. Whitehead ~~ ~~ I) rT+'J ~ ~ , Vice Chair, Hernando The Honorable Frank Hibbard ~(' , Neil Combee Secretary, Polk Mayor, City of Clearwater ~~~.` ~~~ ~` Jennifer&Closshey 112 South Osceola Avenue Treasurer, Hillsborough plANt~IN~ ®EP{1R~~fcf+If =~ „ ,,9.~" Thomas G. Dabney Clearwater, Florida 33756 C~qY pg ~l,~,RYJATER , ~~; Sarasota ~~C7 ~~ ~ Patricia M. Glass Dear Mayor Hibbard: ~ Manatee Heidi B.McCree The Southwest Florida Water Management District (District) is pleased to announce uE2~~ Hillsborough Sa1HeParks the update of its Regional Water Supply Plan (RWSP). The RWSP covers a 10- Pinellas county planning region within the District, projects water supply demands through Todd Pressman 2025 and identifies a varlet of alternative water su I ro ect o dons to meet these Pinellas y. pp y p j p' Maritza RoHillsbo orugh needs. In an effort to conserve energy and resources, the District is not initially distributing copies of the RWSP. The document may be viewed or downloaded from Patsy C.Symens the District's website at http://www.swfwmd.state.fl.us/documents/plans/RWSP/ or, if Desoto you prefer, we would be happy to send a copy of the RWSP in hard copy or CD-ROM format upon request. David L. Moore Executive Director The purpose of this correspondence is to comply with section 373.0361(7)(x), Florida William S.Bilenky Statutes (F.S.), which requires the District to notif b certified mail the entities General Counsel y y identified in the RWSP as the parties responsible to implement the various project options listed in Chapter 6 of the RWSP. Accordingly, a list of projects is attached for which your organization has been identified as the responsible party. We encourage you to read all portions of Chapter 6 relevant to your area, since some options have no specific entity identified for implementation. It is not required that your entity implement any of the options in the RWSP. However, there are statutory provisions described below that require action on your part. Within one year of the receipt of this notification, section 373.0361(7)(b), F.S. requires you to provide the District with written notification of the following: • Which of the water supply options identified in Chapter 6 of the RWSP your entity has developed or intends to develop, • An estimate of the quantity of water to be produced by each project, and • The status of project implementation, including: financial planning, facilities master planning, permitting, and efforts in coordinating or participating in multijurisdictional projects. This information is required to be updated annually and a progress report provided to the District by November 15 of each year (373.0361(7)(b), F.S.) and should be sent to the District Planning Department at the Brooksville address above. ~. The Honorable Frank Hibbard Page 2 May 14, 2007 If your entity does not intend to develop one or more of the project options in Chapter 6 of the RWSP, you are required to, within one year of this notification: e Propose another alternative water supply project or projects sufficient to address the needs identified for your entity in the RWSP, o Provide an estimate of the quantity of water to be produced by the project(s), and e Describe the status of project implementation including: financial planning, facilities master planning, permitting, and efforts in coordinating or participating in multijurisdictional projects. Another statutory requirement calls for each local government in the planning region to adopt amendments to its comprehensive plan within 18 months after the approval of the RWSP (the RWSP was approved on November 30, 2006, so the deadline is May 30, 2008). Per section 163.3177(6)(c), F.S. such amendments must: o Include a 10-year Water Supply_Facilities Work Plan, o Incorporate the alternative water supply project(s) selected by the local government from those identified in the RWSP or proposed by the local government, and . e Identify such alternative water supply projects, traditional water supply projects, conservation and reuse necessary to meet the water needs identified in the RWSP for the local government. In addition to the specific water supply options identified for your entity, we would like to emphasize the water conservation options detailed on pages 142-149 of the RWSP. These proven techniques can help water supply utilities reduce current water use and future demands. Cost information is provided to demonstrate the affordability of water conservation in contrast to more costly altemative water supply options. Water conservation and the reuse of reclaimed water are essential components of the RWSP and should be pursued by all water suppliers in the planning region. The District is prepared to provide assistance to local governments and other entities as they plan and develop water supply projects, including conservation and reuse, to meet current and future water use demands. We believe the updated RWSP provides a solid foundation for such coordination. In addition to technical assistance, the District may provide partial funding for eligible alternative water supply projects. If you would like to obtain a copy of the RWSP or discuss its findings and recommendations, please contact the District's Planning Department at (352) 796-7211 extension 4400, or planning~a watermatters.org. We look forward to working with you in planning for future water supply needs. Sincerely, ~~ ~ % David L. Moore Executive Director Attachment cc: William Horne, City Manager Mike Delk, Planning Director m Southwest Florida Water Management District Regional Water Supply Plan 2006 Water Supply Project Options for the City of Clearwater Option RWSP Pa a Number s Reuse Expansion in Clearwater 2011-2025 138 The above .options are those for which the City of Clearwater is specified as the entity responsible for implementation. These options represent reasonable concepts the City may pursue as presented or combine elements of different options that better suit the City's needs, provided that the resulting projects are consistent with the intent and direction of the RWSP. Other options are available in Chapter 6 of the RWSP, including water conservation options, for which no responsible party is specified. Potable Water Element City of Clearwater Comprehensive Plan 1 1 1 1 1 1 1 1 1 ~~~-~", ~~ { ice, ~' r` ~.,~'. s ~~, ' ~. ~~ s i ++ ~_, f j ~o$able ilV~ter ~lemen~ City of Clearwater ~ W~ETiu~ 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Potable UVater Element 2 City of Clearwater Comprehensive Plan TABLE OF CONTENTS . INTRODUCTION ....................................................................................... 3 II. GOALS, OBJECTIVES AND POLICIES ..........................................................4 III. INVENTORY AND ANALYSIS ..................................................................10 3.1 Operational Responsibility ..................................................................................................................lo 3.2 Geographic Service Area and Predominant Land Uses ...............................................................10 3.3 Design Capacity and Current Demand on Existing Facilities ...................................................14 3.4 Level of Service .......................................................................................................................................27 3.5 Facility Capacity Analysis ....................................................................................................................28 3.6 Performance and Condition of Existing Facilities ........................................................................31 3.7 Issues and Opportunities for Expansion and New Facilities .................................................... 33 3.8 Natural Drainage and Groundwater Recharge ..............................................................................34 3.9 Existing Regulations and Programs Relating to Natural Drainage and Groundwater Recharge .......................................................................................................................................................... 36 3.10 Capital Improvement Projects .........................................................................................................38 IV. APPENDIX A: CAPITAL IMPROVEMENTS PROJECTS .................................39 Potable Water Element 3 City of Clearwater Comprehensive Plan I. INTRODUCTION According to Florida Administrative Code section 9j-5.01 1, the purpose of the Potable Water Element is to assure that necessary public facilities and services correlate to future land use projections. Furthermore, the purpose of the Potable Water Element is to identify capital improvements and establish goals, objectives and policies that will ensure the City of Clearwater is able to supply quality drinking water of a sufficient quantity for current and future needs. The Potable Water Element focuses on the existing systems and facilities and projected system needs based on projected population growth and future land use in the City of Clearwater. This is accomplished through an inventory and analysis of existing data, identification of present and potential problems and their solutions, and projection of future potable water needs for specific planning periods. The City of Clearwater Water Master Plan Water System Assessment, prepared in June of 2004, and the City of Clearwater Water Master Plan Capital Improvements Implementation Master Plan, prepared in October 2004, serve as the primary data sources for the existing conditions inventory and analysis. Both reports were prepared by Parsons Corporation. The composition of the Potable Water Element follows the minimum data requirements outlined in Section 9J-S.O1 1, F.A.C. For ease of reference, the Potable Water Element is organized into two major sections; the first outlines the Goals, Objectives and Policies relating to potable water and the second includes an ' Inventory and Analysis of the water system. L ii Potable Water Element 4 City of Clearwater Comprehensive Plan II. GOALS, OBJECTIVES AND POLICIES 21. GOAL PROVIDE, DEVELOP, AND MAINTAIN A PERMANENT POTABLE WATER SUPPLY SYSTEM TO MEET ANTICIPATED DEMAND WHILE PROVIDING MAXIMUM PRACTICAL PROTECTION TO THE ENVIRONMENT AT A COST CONSISTENT WITH THE PUBLIC'S ABILITY AND WILLINGNESS TO PAY. 21.1 Objective - To maintain adequate Levels of Service for existing and future populations through the year 2015. Policies 21.1.1 The following Level of Service standards have been established for the City of Clearwater and shall be used in determining the availability of facility capacity and demand created by new development: ^ Service Area Level of Service Standards Potable Water Facilities Average Water Consumption Rate City and County Water City Service Area 120 gallons per capita per day at a pressure of 40-45 psi. *Continue to maintain water consumption of one hundred twenty (120) GPCPD or less as per the conditions set forth by Clearwater's Water Use Permit. 21.2 Objective -Provide adequate quantities and qualities of water service to all customers of the Clearwater service area. Current service level duly, 2007) is 40,390 customer accounts (potable, reclaimed and fire). Policies 21.2.1 Ensure that land development regulations, building codes and City ordinances adequately address water system provisions by performing a thorough evaluation of City codes and by coordinating proposed provisions with the Southwest Florida Water Management District and Florida Department of Environmental Protection. Potable 1A/ater Element 5 City of Clearwater Comprehensive Plan . 21.2.2 Engineering shall analyze the condition and adequacy of any water distribution system that the City may inherit through annexation and prepare cost estimates for upgrading those systems to meet City requirements. `~ 2i.2.3When new subdivisions are being developed, it shall be the responsibility of the developer to provide internal potable water and ' reclaimed water systems which are constructed to City specifications. 21.2,4 Continue to construct water system improvements which will provide adequate quantity, pressure, and duration of fire flows while meeting system user needs. 21,2,5 Continue to develop a system and construct improvements which will conserve energy, water, and other valuable resources. 21.2.6The City shall continue to participate and assist the Southwest Florida Water Management District, Pinellas County Health Department, and ti the U.S. Environmental Protection Agency in developing innovative techniques to augment existing water supplies to provide for future needs. 21,2.7 ntin i ntif ac uire and develo sources of water su I Co ue to de y, q p pp y and methods of water treatment to meet existing and future needs. Some ways this can be accomplished are through well rehabilitation projects and/or exploration and drilling of new wells. Some type of water treatment may be initiated. Additional volumes of water may be acquired from the Pinellas County Water System through Clearwater's intergovernmental water service agreement. The City's long range Water Supply Master Plan completed in 2004 shall serve as the ~, guiding document for water supply and treatment methods. f Potable 1A/ater Element 6 ' City of Clearwater Comprehensive Plan 21.2.8 Ensure that water management projects are designed and operated to maintain and enhance natural systems as well as man made systems by working closely with the Southwest Florida Water Management District when proposing new projects and water management programs. The City's long term Water Supply Master Plan outlines a work plan for continued. coordination with the Southwest Florida Water Management District's Regional Water Supply Plan adopted in ' December 2006. 21.2.9Water service shall not be extended to properties outside the City's service area unless sufficient capacity and quality of water exists to ~ serve the areas already committed to City service. 21.2.10 Water services shall not be extended except in those areas so r designated for City of Clearwater by interlocal or other agreement. 21.3 Objective -Continue to maintain the water system in a safe, sound, and efficient manner on a daily basis. °" Policies 1 21.3.1 The Public Utilities Department, Water Division, shall monitor water quality and the operation of the water distribution system with the intent of repairing and replacing deficient portions of the system within the framework of the capitalized budgeting process. 21.3.2 Continue to provide a minimum operating pressure of 40-45 psi throughout the water distribution system. ~ 21.3.3 Continue to provide adequate spacing of fire hydrants to provide optimum hose lays and fire flow. 21.3.4 Require at the time of application for connection to the public potable water system, that minimum fire flows and hydrant spacing be consistent with fire district standards. Also, require that proper size water pipes are installed to provide desired fire flow rates based on the most recent Insurance Service Office {ISO) Report. Potable 1A/ater Element ' City of Clearwater Comprehensive Plan 21.4 Objective -Continue to provide sound fiscal management for the operation and maintenance of potable water service in the City's service area Policies d equate 21.4.1 Fees charged to users of water services shall continue to be a to cover system operating costs, repayments of capital costs, and allow for repair and replacement of existing facilities. The City shall also continue to evaluate new rate structures as necessary. 21.4.2 Prioritization and scheduling of major improvements associated with the water system should be accomplished as a component of the capital improvement program. 21.4.3 Funds set aside for repair and replacement of the water system shall not be diverted to other uses. 21 .4.4The City should continue to seek financial support of the water system through grant programs administered by appropriate State and Federal agencies. 21.4.5The City shall continue to refine the inverted rate structure for residential water meters, lawn meters and all other water meters permitted by the Water Division of the Public Utilities Department. 21.5 Objective -Continue to Develop a potable water system that is compatible with the environment and seeks to conserve and protect sensitive natural resources. .. Policies 21.5.1 Except for areas of the City where reclaimed water is available, shallow wells shall be recognized as a source of water for irrigation purposes. Establish a City permit for shallow well installation by the end of 2008. Potable UVater Element s City of Clearwater Comprehensive Plan ~' 21.5.2 The City's building code shall include the requirement for water conserving fixtures in newly constructed or remodeled buildings. 21.5.3 Mana a the su I of water in uantities which would minimize 9 Pp Y q 1 significant adverse impacts on the natural system and protect the long term public interest. 21.5.4 Develop and modify rate structures and policies which encourage conservation of potable water. ~ 21.5.5 The City shall maintain its current Water Restriction Ordinance. 21.5.6 Provide educational awareness to inform citizens of the need and opportunities for conserving potable water by visiting schools to speak with young children about water conservation practices. ' 21.5.7 Reclaimed water service will continue to be extended to private residences based on the Twenty (20) Year Master Plan. 21.6 Objective -Continue to achieve effective coordination with other government agencies to solve problems of an extraterritorial nature with cooperation and in conjunction with the Southwest Florida Water Management District. Policies ' 21.6.i The City shall continue to participate in regional and County-wide studies which are or may be formed to seek solutions of problems of an extraterritorial nature. 1 21.6.2 ontinue o coo erate with the Southwest Florida Water Mana ement C t p g District in developing environmental and hydrologic data that will identify safe and reliable potable water yields in existing and future well-fields. 21.6.3 Continue to coordinate with appropriate local, State, regional and Federal agencies in implementing the water system plan. Potable Water Element 9 City of Clearwater Comprehensive Plan 21.6.4The City shall pursue a coordinated approach to interjurisdictionai problems, by providing support of both staff and officials to ' participate in conservation efforts with Pinellas County and the Tampa Bay Regional Planning Council. 21.6.5Ensure consistency with the actions defined within the Regional Water Supply Plan prepared by the Southwest Water Management District. 21.7 Objective -Continue to protect all natural recharge areas having functional hydrological characteristics. Policies 21.7.1 Recognize the importance of groundwater aquifer recharge in the hydrological process and the need for natural groundwater recharge as an integral component of the City's urban environment. 21.7.2 The City shall include incentives in the Community Development Code for the protection of natural groundwater aquifer recharge areas as identified in the Conservation Element of the Clearwater Comprehensive Plan. 21,7.3 The City shall continue to protect groundwater quality by enforcing a Wellhead Protection Ordinance. 1 Potable Water Element to City of Clearwater Comprehensive Plan Illo INVENTORY AN®ANALYSIS Section 9~-5.003, F.A.C. defines a potable water facility as a system of structures designed to collect, treat, or distribute potable water, and includes water wells, treatment plants, reservoirs, and distribution mains. The following section details the existing conditions of the City of Clearwater's water system, with the purpose of identifying future water system needs. 1 3.1 Operational Responsibility The City of Clearwater Water Division is a municipally operated water supplier, charged with the responsibility of administering the City's water utility. In 2006, the City of Clearwater Water Division supplied more than 5.15 billion gallons of water to more than 140,000 customers, amounting to approximately 100 gallons of water per person per day. The division maintains 4,036 fire hydrants, 8,329 valves and 588 miles of water mains.' Users of the City of Clearwater water system consume approximately 13 million gallons of potable water every day. Approximately 37 percent is pumped from City owned and operated groundwater wells; the remaining 63 percent of the daily demand is supplied by water purchased from Pinellas County. Pinellas County also receives water supplied by the regional water supplier, Tampa Bay Water, which in turn becomes part of the 63 percent supplied to the customers of Clearwater.z 3.2 Geographic Service Area and Predominant Land Uses ' The geographic service area for the City's water system extends beyond the City limits and represents an area of approximatley 54 square miles in size. The majority of the customers beyond the City limits are located within unincorporated ' Pinellas County enclaves within the City of Clearwater. The boundaries of the water service area generally extend from the Gulf of Mexico to the west, the City of Dunedin to the north, the City of Safety Harbor and Tampa Bay to the east, and the cities of Largo, Bellair, and Bellair Beach to the south. Map 1 shows the geographic service area of the City of Clearwater potable water system. ~ Public Utilities -Water Division. City of Clearwater Website. Accessed July 2007. Http:l/www.clearwater- fl.com/gov/depts/pwa/public_utils/divisions/water/index.asp. s City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. _____. CAUSEWAY 9L~ ..,: _.. ~ ~.. 1 aroma ~~ _~ Map 1 Water Service Area City of Clearwater Water Serrice Area ~riajor Roads Jurisdictional Boundaries City of Clearwater Other Cities ~_ ' .Unincorporated ?inellas County 0.5 1 2 3 Miles Scurce Cibj of Clear~rater Water Oecartment. 2007. Pinellas County GIS 2007 Prepared by Wade Trim. Inc.. August 200' for City of Clear~rater Nlater Supply Element. ~ W~ET~u~i ~' Potable Water Element 12 City of Clearwater Comprehensive Plan According to the U.S. Census Bureau, the City of Clearwater is estimated to have a total population of 107,742 as of )uly 1 , 2006.3 However, the City's water service area extends beyond the City limits to include numerous unincorporated Pinellas County enclaves. Thus, to determine the population of the City's water service area, a broader figure that includes both the City population and enclave population must be utilized. Because it includes the City of Clearwater in addition to all interior county enclaves, the Pinellas County Planning Sector 6 closely matches the City of Clearwater's water service area. Therefore, population projections for Planning Sector 6, which have been calculated by the Pinellas County Planning Department, will be utilized for this Potable Water Element. I unt for ermanent seasonal and tourist Using the projections from Pine las Co y p , populations, the functional population of the water service area can be determined based on the following formula: Functional Population = ((permanent + seasonal? x 41 + (permanent x 81 + tourist 12 2 This formula is based on Water Use Caution Area (WUCA) rules with the purpose of making adjustments for seasonal residents and tourists.4 Once calculated, the t ~ functional population figure represents the value utilized to calculate the gross per capita water consumption for the City. Table 1 details the projected service area 1 population served by the City of Clearwater's water system through the year 2025. 1 1 s Annual Estimates of the Population for Incorporated Places in Florida, April 1, 2000 to July 1, 2006. U.S. Census Bureau. June 28, 2007. ^ City of Clearwater Water Master Plan, Capital Improvements Implementation Master Plan. Parsons Corporation. October 2004. Potable UNater Element 13 City of Clearwater Comprehensive Plan 1 1 t Table 1 Clearwater Water Service Area Population Projections (a) Gxt~G~'I~t1 ' " _ '. '.. ~ _ 2005 135,071 6,074 19,472 160,616 146,832 2006 135,400 6,088 19,488 160,975 147,173 2007 135,728 6,102 19,504 161,333 147,514 2008 136,057 6,115 19,519 161,692 147,855 2009 136,385 6,129 19,535 162,050 148,196 2010 136,714 6,143 19,551 162,408 148,537 2011 136,930 6,152 19,562 162,644 148,761 2012 137,146 6,161 19,572 162,879 148,986 2013 137,361 6,171 19,583 163,115 149,210 2014 137,577 6,180 19,593 163,350 149,434 2015 137,793 6,189 19,604 163,585 149,658 2016 137,934 6,195 19,611 163,740 149,805 2017 138,076 6,201 19,618 163,894 149,951 2018 138,217 6,206 19,624 164,048 150,098 2019 138,359 6,212 19,631 164,202 150,245 2020 138,500 6,218 19,638 164,356 150,392 2021 138,592 6,222 19,642 164,457 150,488 2022 138,685 6,226 19,647 164,558 150,584 2023 138,777 6,230 19,651 164,658 150,679 2024 138,870 6,234 19,656 164,759 150,775 2025 138,962 6,238 19,660 164,860 150,871 (a) For the purpose of this analysis, the population projection for Pinellas County Planning Sector 6 (Greater Clearwater Area), which closely represents the Clearwater water service area, is utilized. (b) Seasonal population is defined as persons who reside in Pinellas County for less than six months and declare their permanent home elsewhere. (c) Tourist population is the impact that tourists have on public services and facilities that are comparable to the impact of permanent residents. (d) Functional population is calculated by Water Use Caution Area (WUCA) rules (see text). Source for years 2005, 2010, 2015, 2020, and 2025: Pinellas County Population Projections by Planning Sector, 2005-2030, Pinellas County Planning Department, February 2001. ~ Source for all other years: Data extrapolated from Pinellas County Planning Department. Potable 11Vater Element 14 1 City of Clearwater Comprehensive Plan The City of Clearwater is an urban and predominantly built-out city and features a diverse mix of land uses. Within downtown Clearwater, a dense mix of institutional, commercial, office, recreational and high density residential land uses are found. In addition to downtown, the Clearwater Beach area features a dense mix of land uses that include major commercial/resort destinations, high density residential developments, and recreational uses. Intensive commercial land uses, including regional commercial shopping centers are scattered along .the City's ' major transportation arteries, particularly Gulf-to-Bay Boulevard and U.S. Highway 19. The majority of the rest of the City is dominated by well-established single- family neighborhoods, intermixed with supportive institutional and recreational uses. Map 2 shows the existing land uses found within the City of Clearwater water service area. 3.3 Desi n Ca aci and Current Demand on Existin Facilities. 9 P tY 9 ' Water Wells and Treatment Facilities Potable water within the City of Clearwater is provided by 23 City-operated fresh water wells (19 active and 4 inactive) and seven interconnects with the Pinellas M County water system. Although it is currently not used, the City has access to the water system of the City of St. Petersburg though an emergency interconnect. The City's water wells are located in close proximity to three treatment and storage facilities: Reservoirs Nos. 1, 2, and 3. The interconnects to the Pinellas County system are found at various locations in the City: Reservoir No. 2; Reservoir No. 3; along Belcher Road near the intersections with Drew Street, Gulf-to-Bay (SR 60), and Belleair Road; and at South Sand Key.S The locations of the various water supply facilities within Clearwater are illustrated on Map 3. Pinellas County water is purchased by the City of Clearwater through an intergovernmental agreement as a means to augment the City's groundwater sources and to meet the City's water demands. In the 2002 water year, an average of 1 1.5-mgd of water was purchased by the City from Pinellas County. In the Fail of 2003, after a reverse osmosis treatment facility was implemented at Reservoir No. 1, the City was able to reduce the amount of water purchased from the County by a net of 2-mgd.6 e City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. s City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004.. 1 ---- 'i ~~ ti I i i t I `` ~. ' ~ c rh I r: '~ i „ ii 1 y' ._. _J n U I E~l°AIRBE _.}{~. 6 „` ~ s ~~i.. 1 t ±`~ AJ l., ,_,:.~ 1. ~,: °; ear~a er ~~ Map 2 Existing Land Uses unsdictional Boundaries E;asting !and Use 2405 I Other Cities Categor/ ~;' Pinellas County Single gamily - P~lalcr Roads Nlcplle Home Quple.~ or Triplex Multi-gamily . Commercial Industrial Public,Semi-Puplic - RecreatioNOpen apace liacank ConseriatlonrPresenlation Marrnas Scr'ace Vllate~ i 05 1 2 3 MiIE source Plneilas CounC~ GIS 2045. 'repared oy'Nade Trim. Inc .August 2007 ~r City of Clean,vater Nlater Supply Element, WADETRIM ~ar~a ~r ,~ .., .~ Map 3 Potable Water Supply Facilities . Sleuated Potable ~Nater Tank Potable Water Storage Reservoirs Water Weils Status In Service • Out of Service ~ Plugged Prooosed Monitor +Nell ~lajer Roads Jurisdictional Boundaries City of Clearwater Other Cities ~. ~s ~'~ Unincorporated Pinellas County Q 0.5 1 ~ 3 N~~les Source City of C~eanaater ~Alater Depar*.ment_ 200' Pinellas COUnh~ GIS 2007 Prepared ~y Nrade Trim. lnc.. August 2001 for City of Clearwater ~Nater Supply Element. I~ W~ET~uhi Potable VNater Element 1 ~~ City of Clearwater Comprehensive Plan In general, the groundwater source for both Clearwater and Pinellas County comes from a groundwater supply called the Floridan Aquifer. More specifically, the City water sources are 23 groundwater wells, while Pinellas County potable water is obtained from two different sources: Tampa Bay Water's regional water system; and fresh water from Eldridge Wilde wellfields. Tampa Bay Water is a local wholesaler providing water to six local governments in the Tampa Bay metropolitan area. Multiple sources contribute to Tampa Bay Water's regional water supply; these include groundwater and surface water from around the Tampa Bay metropolitan area and saline water from Tampa Bay. A summary of the daily production rates for the three reservoirs is provided in Table 2. The table also details the relative production provided by the City and the production provided by Pinellas County. Table 2 Summary of Daily Productions by Source d~ -. Reservoir No. 1 3-mgd* 0-mgd 3-mgd Reservoir No. 2 0.6-m d 1.5-mgd'* 2.1-mgd Reservoir No. 3 1.2-mgd 6.7-mgd'* 7.9-mgd Other Pinellas Count Interconnects NA < 1-mgd .. .. .. *Value listed represents finished blended water capacity. In order to produce the 3-mgd blended finished water capacity requires 3.6-mgd of well water, 0.6-mgd of which is concentrate that is discharged to the sanitary sewer. **Water provided by Pinellas County interconnects located on-site with existing City of Clearwater facilities. Source: City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. The values reflect the addition of a reverse osmosis facility at Reservoir No. 1, which, at the time of the preparation of the Water System Assessment (Clearwater Water Master Plan), was expected to reduce the amount of water purchased from Pinellas County by a net of 2-million gallons per day (mgd) on a long term basis. The average daily demand for potable water within the City of Clearwater water service area totals 13-mgd, of which 63 percent is provided by Pinellas County and 37 percent is provided by the City's wells. According to the City's water use permit issued through the Southwest Florida Water Management District (SWFWMD), the City is allowed to pump a maximum of 6.25-mgd from its wells. Potable 1Alater Element 18 City of Clearwater Comprehensive Plan ' Reservoir No. 1 is located on Palmetto Street near Saturn Avenue and consists of a reverse osmosis water treatment plant, a single 5 million gallon (mg) storage tank, 1 chloramination facilities for disinfection, and a high service pumping station. Reservoir 1 utilizes 3.6-mgd of raw groundwater to produce 3-mgd of treated potable water. The Reverse osmosis plant uses 2.6-mgd of water to produce 2.0- mgd of permeate which is blended with 1.0-mgd of pre-treated by-passed water, attaining a total of 3-mgd of potable drinking water. Feed water to the plant ' comes from 10 active wells (Well Nos. 23, 31, 48, 65, 66, 73, 74, 75, 78 and 81). Production from Well 81 is limited due to the need for a sand pack to prevent sand ' from entering the well. ' Reservoir No. 2 is located near the intersection of US 19 and Drew Street and consists of a single 5-mg storage tank, chloramination facilities, and a high service pumping station. Feed water to the plant comes from 3 active wells (Well Nos. 45, 46 and 53). Two additional inactive wells are also connected (Well Nos. 51 and 52). Water from the wells can vary but typically provide on average 0.6 mgd. Also on- ' site is an interconnect with Pinellas County that provides on average 1.5-mgd. Water from both the wells and interconnect are blended in the 5-mg storage tank. ' ... Chlorine and ammonia are added to boost the chloramine concentration of the incoming water. The high service pumps then deliver the finished water to the distribution system.8 ' Iv nd ~ tate Road Reservoir No. 3, located near the intersection of Countryside B d a S 580, consists of two 5-mg storage tanks, chloramination facilities, and a high service pumping station. Feed water to the plant comes from 6 active wells (Well Nos. 56, 58, 63, 68, b9, and 77). Two inactive wells are also connected (wells 79 and 80). Water from the wells can vary but typically provide on average 1.2-mgd. Also on site is an interconnect with Pinellas County that provides on average 7- mgd. Water from both the wells and interconnect are blended in the 5-mg storage tank. Chlorine and ammonia are added to boost the chloramine concentration of the incoming water. The high service pumps then deliver the finished water to the distribution system.9 ' ~ City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. a City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. s City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. Potable UNater Element 19 City of Clearwater Comprehensive Plan Elevated Storage Tanks The City of Clearwater operates three 1 million gallon (mg) elevated storage tanks to provide additional storage capacity, consistent distribution system pressure, and to respond to emergency demands such as fire. The three elevated storage tanks ' are identified and located as follows: Del Oro, located near the intersection of McMullen-Booth Road and Drew; Martin Luther King, located near the intersection of Bellevue Blvd. and Martin Luther King; and Otten Street, located near the i intersection of Otten Street and Highland Ave. At the time of the preparation of the Clearwater Water Master Plan Water System Assessment (June 2004), the three elevated storage tanks were valved-off due to water stagnation issues and degradation of water quality. However, the City has since placed the Martin Luther ' King and Otten Street tanks back into service in order to maintain an adequate level of service and for additional emergency storage capabilities.~~ With regard to the total capacity of drinking water sources and treatment facilities, Chapter 62-555(6) of the Florida Administrative Code states that: The total capacity of all water sources and treatment facilities connected to a water system shall at least equal the water system's design maximum-day water demand ' _ (including design fire-flow demand if fire protection is being provided). ' In total, the City has a storage capacity of 23-mgd provided by the four 5-mgd storage tanks at Reservoirs 1, 2 and 3 and the three 1-mgd elevated storage tanks. However, at the time of the Clearwater Water Master Plan Water System Assessment ,the City's total storage capacity was estimated at 20-mgd, not calculating the capacity of the elevated storage tanks because of their stagnation and water quality issues. In addition to the City's own storage capacity, Pinellas County provides the City with some storage capacity through the interconnections. However, the exact amount of storage capacity available to the City through Pinellas County is unknown.>> Based on the Water System Assessment report, the City's design maximum-day potable water demand is estimated at 19-mgd. At 20-mgd, the City's current ' storage tank capacity is sufficient to achieve potable water design maximum-day ~~ City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. ~ ~ City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. Potable 1Alater Element 20 City of Clearwater Comprehensive Plan demand according to Chapter 62-555 F.A.C. However, the Water System Assessment noted that this total capacity may be inadequate to achieve fire-flow demand. For this reason, and as noted above, two of the three 1-mgd elevated storage tanks were put back into service, but several modifications to the distribution system were recommended in the assessment to increase overall capacity, including distribution system pipe modifications, addition of booster pump stations, and addition of inter-distribution system storage tanks.12 ' Pumping Facilities High-service pumps are found at each of the City's three reservoirs to ensure distribution system capacity and pressure. These pumps ensure that water under ' sufficient pressure is delivered from the wellheads to the various storage and treatment facilities and then into the distribution system. Additionally, system capacity and pressure is supplemented through the six direct interconnections i with the Pinellas County water system. ' With regard to required pumping capacity, Chapter b2-555.320(15) of the Florida Administrative Code states that: ' (a) Un/ess e/evated finished-drinking-water storage is provided, the total capacity of al/ high-service pumping stations connected to a water system, or the capacity of a booster pumping station, shall be sufficient to: 1. Meet at least the water system's, or the booster station service area's, peak- hour water demand (and if fire protection is being provided, meet at /east the water system's, or the booster station service area's, design fire-flow rate p/us a background water demand equivalent to the maximum-day demand other than fire-flow demand); and ' Z. Maintain a minimum au e pressure of ZO pounds per square inch throughout 9 9 the water system's, or the booster station service area's, distribution system up to each customer's point of connection to the distribution system. (b) Where elevated finished-drinking-water storage is provided, the total capacity of all high-service pumping stations connected to a water system, or the capacity t2 City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. Potable Water Element 21 ' City of Clearwater Comprehensive Plan ' of a booster pumping station, sha/l be sufficient to at least meet the water system's, or the booster station service area's, maximum-day water demand (including design fire-flow demand if fire protection is being provided) and to ' maintain distribution system pressure as specified in subparagraph 6Z- SSS.3Z0(1 S)(a)2., F.A. C. /n addition, the Iota/ capacity of the high-service pumping ' stations, or the capacity of the booster pumping station, combined with the useful elevated finished-water storage capacity steal/ be sufficient to meet the water ' system's, or the booster station service area's, peak-hour water demand for at least four consecutive hours (and if fire protection is being provided, shall be sufficient to meet the water system's, or the booster station service area's, design fire-f/ow rate plus a background water demand equivalent to the maximum-day demand other than fire-flow demand for the design fire-flow duration). As noted above, the City's total water storage capacity may be inadequate to achieve fire-flow demand. Because pumping capacity is related to achieving sufficient storage capacity, improvements to the City's pumping capacity is warranted. The Clearwater Water Master Plan Water System Assessment notes that possible solutions include distribution system pipe modifications, addition of booster pump stations, and addition of inter-distribution system storage tanks.13 Distribution SLrstem The City of Clearwater's water distribution system includes 574.6 miles of water main, 40,000 water meters, 4,050 fire hydrants, 8,330 valves and 7,500 backflow devices, Approximately 48% of the water mains of the City are 6 inches in diameter while almost 20% are 8 inches. Table 3 displays the distribution of water mains in the system. In 2006, the City of Clearwater completed the implementation of 17 phases of a 20-Year Plan to upgrade the pipes of the distribution system. With this implementation, the City eliminated "cast iron" and undersize lines improving the system to satisfy future demand. Table 4 displays these improvements by year. ,s City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Potable ~I/ater Element 22 City of Clearwater Comprehensive Plan Table 3 Inventory of City's System Water Main, 2008 2 90,076 17.1 3.0% 3 32,188 6.1 1.1% 4 394,359 74.7 13.0% 6 1,439,799 272.7 47.5% 8 597,113 113.1 19.7% 10 42,697 8.1 1.4% 12 254,904 48.3 8.4% 14 280 0.1 0.0% 16 117,591 22.3 3.9% 18 1,915 0.4 0.1% 20 61,422 11.6 2.0% 24 1,363 0.3 0.0% 45 45 0.0 0.0% Total 3,033,752 574.6 100.0% Source: City of Clearwater, 2008 Table 4 20 -Year Improvement of Water Mains flW ~~ ~(R~l ~~ -. 1 2,180 2,750 2,150 1985 2 5,850 14,820 17,900 1986 3 14,000 5,950 11,900 1986 4 10,600 7,750 9,900 1987 5 5,700 17,300 14,500 1987 6 20,700 11,100 18,650 1987 7 10,439 13,021 5, 500 1988 8 14,828 32,490 26,750 1992 9&10 11,150 9,180 7,800 1993 11&12 37,000 53,000 62,000 1994 13&14 36,500 58,150 65,900 1995 15,16,17 19,500 16,000 30,000 2006 Source: City of Clearwater, 2008 In addition to these improvements, the City of Clearwater will complete this year a Distribution System Water Quality Optimization Plan (DSOP). The objectives of developing the City's DSOP are as follows: Evaluate how the City's operating, maintenance, monitoring, treatment, and other practices that can impact distribution system water quality compare to current industry best management practices; Potable Water Element ' City of Clearwater Comprehensive Plan 23 ' Provide a summary of the City's existing practices and protocols; • Provide a prioritized list of practices and potential projects that will enhance system operations; and ' Develop a road map for developing and implementing recommended improvements. As shown in Map 4, the water distribution system effectively covers all lands within ' the City of Clearwater, including the unincorporated Pinellas County enclaves. n 1 ii ,~, c4 °Sew,ar a~vo ~ ~p ``' -~ ;~~:-, ~" i 1 ' ,~ Z ~~ 0 a W ~', ~ ~ earwa er Map 4 Potable Water Distribution Mains .City of Clearwater Potable tl~Jater Service Area Distribution ti9ains Owner -City of Clearwater - St. Petersburg - Pinellas County Prntate - No Data Jurisdictional Boundaries Gtv of Cleann~ater Other Cities Unincerparated Pinellas County - ~rlajor Rcads 0 ~5 ~ ? 3 Mile Scurce City of Clear,vater Water department. ?007 Pinellas County GIS 2007 Prepared by ~~laoe Trim. Inc August 2007 for City of Clear,vater!Nater Supply Element. ~ W~ETiu~i Potable UVater Element 25 City of Clearwater Comprehensive Plan _ Reclaimed Water System The City of Clearwater currently operates a reclaimed water system to ensure that adequate water is available today and in the future and that the City's residents have high quality water at an affordable price. The use of reclaimed water helps the City to preserve high quality potable water sources by providing a reliable and economical alternative source for irrigation water. Use of reclaimed water for ' irrigation can benefit the City because every gallon of potable water not used for irrigation is one less gallon of water purchased from Pinellas County. This has the potential of significant potable water savings given the escalating costs of purchasing water from Pinellas County.14 The City's reclaimed water system is the result of cooperative funding by the Southwest Florida Water Management District and the City of Clearwater.15 The City's reclaimed water system is shown on Map 5 and includes 51 miles of reclaimed water main. At present, reclaimed water service extends to the Countryside Country Club Golf Course and driving range, Chi Chi Rodriguez Goif Course and the soccer fields on McMullen Booth Road in the Countryside area, which are fed from the Northeast Treatment Plant. The Northeast Treatment Plant will also serve the reclaimed projects on the east side of Clearwater: Drew Union, Del Oro, Morningside, and Skycrest. The Marshall Street Plant feeds Jack Russell Stadium, Pier 60 Park, Coachman Park as well as 1,400 customers on Island Estates and Clearwater Beach. In 2004, reclaimed water became available to the Harbor Oaks Area of Clearwater. This area also receives it supply from the Marshall Street Plant. Approximately 2,000 customers are now provided reclaimed water, with a current consumption in the range of 2 to 2.5-mgd. The City of Clearwater is currently designing the Skycrest Reclaimed Water Project which will include an east/west interconnection, pumping and storage facility. This interconnection will complete the loop within the City, resulting in both sides of the City being connected for future expansion of our reclaimed program.16 14 City of Clearwater Water Master Plan, Capital Improvements Implementation Master Plan. Parsons Corporation. October 2004. ~s City of Clearwater Reclaimed Water Master Plan. City of Clearwater Website. Http:/lwww.clearwater- fl.comlgovldepts/pwa/public_utilsldivisionslreclaimedlrcwater_plan.asp. ~s City of Clearwater Reclaimed Water Master Plan. City of Clearwater Website. Http:llwww.clearwater- fl. com/govldeptslpwalpublic_utilsldivisionslreclaimedlrcwater_plan.asp. 1 ~~ 1 'I ~j I I I ,`. i ~' I ~ ~~ ` ir; li ~y r ~ '~ 5 ' Ll~A1R0f ~: r r ~~ ~r; r~ _ ,., ,9 ~. ~_~, - `~,-~ . , - ~, c a~.,c~ a ~o ~~~~ 4 ,~qr .Fra ~ar~a er Map 5 Reclaimed Water Facilities • Reclamed +;~later Fixtures Reclaimed'aVater Lines i~laior Roads Jurisdictional Boundaries City of Gearvater `_ Other Cities ~ Unincorporated Pinellas County d'. 0 05 ~ ? 3 ~ Miles Source. Cihj of Clearwater Water Depar±ment. ?`J07 Pinellas Count~~ GIS 2007 Prepared cy bVade Trim. !nc.. August 2007 for City of Clearwater Wafer Supply Element. ~~DETRII~1 Potable Water Element z~ I City of Clearwater Comprehensive Plan Future extensions are based on several factors, including lawn irrigation ~' usage/potential offset, proximity to existing reclaim sources, and infrastructure cost. In December 2007, the City of Clearwater re-evaluated its Reclaimed Water Master Plan (2001) that includes a 20-year schedule for reclaimed water extensions. Table 5 provides a summary of the reclaimed water projects prioritized in this ~, study for the next 13 years: 1 1 Table 5 Reclaimed Water Master Plan, December 2007 113+7 • • - 2007 Skycrest 2008 Chautauqua- Coachman Ridge 2008 Morningside 2009 Palmetto-Glen Oaks 2010 Clearwater Harbor 2011-2020 Resident Initiated/Large Users/Wholesale Costumers Source: City of Clearwater. Reclaimed Water Master Plan Re-Evaluation, 2007 3.4 Level of Service The existing Clearwater Comprehensive Plan has established the following Level of Service standards to be used in determining the availability of facility capacity and demand created by new development: i 20 gallons per capita per day at a pressure of 40-45 psi. Potable water level of service is measured based on the rate of potable water consumption on a per person basis. This method of measurement provides an indicator of the demand placed on the potable water system and allows for tracking improvements in potable water conservation measures. As the rate of consumption decreases, the rate of success of potable water conservation measures increases. Based on the current potable water supply of 13-mgd allocated across the water service area's 2005 functional population of 146,832, the demand for potable water per capita per day is 88.5 gallons. This rate of demand is well within the adopted level of service. Potable Water Element 28 City of Clearwater Comprehensive Plan 3.5 Facility Capacity Analysis As highlighted in Table 2, the City of Clearwater's production is limited to 6.25 `' mgd from local potable water resources and is supplemented by purchase of potable water through an interlocal agreement with Pinellas County to meet demands in excess of what is locally produced by the City. Rated/permitted capacity at the City of Clearwater three Water Reservoirs /High Service Pump Stations is 25 mgd with pumping capable of meeting instantaneous peaks in excess of 31 mgd. The current inter-local agreement between Pinellas County and the City of Clearwater was signed on September 2005 and it is valid through September 2030. The agreement states that the County agrees to furnish up to 15 mgd yearly average of water (treated) for its use and for distribution in its water service area.» As stated previously, the City of Clearwater's water system is estimated to have an average daily demand of 13.90-mgd. This is based on a functional population estimate of 146,832 for the water service area, and assumes a demand of 90.5 gallons per capita in addition to 610,000 gallons per day for significant water M1 users.18 The estimated average daily demand of 13.90-mgd also takes into account the planned future land uses of the City of Clearwater. Taking into consideration the agreement between the City and the County, the City is using only 51 percent of its available capacity of treated water for consumption. The estimated demand of 13.90-mgd does not account for the reduction in potable water demand resulting from the City's reclaimed water system. Therefore, 15 and 25 percent water reuse offsets have been applied to the total demand, resulting in an average daily demand of 13.69-mgd or 13.55-mgd, respectively.19 Table 6 provides the projected annual average daily demand for the City of Clearwater water system during the initial 5-year planning increment through 2010. The table also provides the annual average daily demand considering a 15 and 25 percent offset for water reuse based on the functional population. Without the offsets provided by the reclaimed water system, the average daily demand is projected to increase to 14.05-mgd by 2010. However, considering a conservative ~~ Interlocal Agreement Water Service Delivery. City of Clearwater and Pinellas County. September 2005. 18 City of Clearwater Water Master Plan, Capital Improvements Implementation Master Plan. Parsons Corporation. October 2004. 19 City of Clearwater Water Master Plan, Capital Improvements Implementation Master Plan. Parsons Corporation. October 2004. 1 Potable Water Element 29 City of Clearwater Comprehensive Plan 1 5 percent offset for water reuse, the average daily demand would actually decline to .13.35-mgd by 2010. A 25 percent offset results in an average daily demand of 12.88-mgd.zo Table 6 Water System Average Daily Demand: 5 Year Planning Period Through 2010 A l A Annual A verage Annual Average Fun nnu ctional vera a ge Daily Dem and with Daily Demand Year Dail y Deman d Popul ation (a) b o 15 /o Reus e Offset 0 with 25 /o Reuse ( ) (c ) Offset (d) ~~ •~ .• ~~. : -~ ~~ •. I ~~: •• ~. ~ ~~. ~ ~ ~ - ~ (a) Functional Population is taken from Table 1. (b) Annual average daily demand is calculated based on 90.5 gallons per capita per day plus 610,000 gallons per dayfor significant users other than hotels. (c) Average annual daily demand considering a 15 percent offset due to the use of reclaimed water for ' irrigation. (d) Average annual daily demand considering a 25 percent offset due to the use of reclaimed water for irrigation. Source: City of Clearwater Water Master Plan, Capital Improvements Implementation Master Plan. TM Given that the City is almost completely built-out, significant population growth and the conversion of large undeveloped lands to urban use is not expected. The City's population is expected to increase only slightly, while the City's current distribution of land use is planned to be maintained generally in its present state. Rather, the Future Land Use Element of the Comprehensive Plan focuses on redevelopment efforts throughout the City, particularly within downtown Clearwater and the Clearwater Beach area. Table 7 provides the projected annual average daily demand for the City of r Clearwater water system during the remaining planning period, 2011 through 2025. By 2025, the water system service area is projected to have a functional population of 150,871, resulting in an annual average daily demand of 14.26- mgd. However, considering a conservative 1 5 percent offset for water reuse, the average daily demand would actually decline to 12.10-mgd by 2025. A 25 percent offset results in an average daily demand of 10.72-mgd by 2025. 20 City of Clearwater Water Master Plan, Capital Improvements Implementation Master Plan. Parsons Corporation. October 2004. Potable Water Element 30 City of Clearwater Comprehensive Plan Table 7 Water System Average Daily Demand: 2005 through 2025 2005 146, 832 ..- 13.90 .. .- 13.69 13.55 2006 147,173 13.93 13.58 13.34 2007 147,514 13.96 13.51 13.21 2008 147,855 13.99 13.46 13.10 2009 148,196 14.02 13.37 12.93 2010 148,537 14.05 13.35 12.88 2011 148,761 14.07 13.23 12.66 2012 148,986 14.09 13.16 12.53 2013 149,210 14.11 13.06 12.36 2014 149,434 14.13 12.94 12.15 2015 149,658 14.15 12.84 11.96 2016 149,805 14.17 2017 149,951 14.18 2018 150,098 14.19 2019 150,245 14.21 2020 150,392 14.22 2021 150,488 14.23 2022 150,584 14.24 2023 150,679 14.25 2024 150,775 14.26 2025 150,871 14.26 12.1 {e) 10.72 (e) (a) Functional Population is taken from Table 1. (b) Annual average daily demand is calculated based on 90.5 gallons per capita per day plus 610,000 gallons per day for significant users other than hotels. (c) Average annual daily demand considering a 15 percent offset due to the use of reclaimed water for irrigation. (d) Average annual daily demand considering a 25 percent offset due to the use of reclaimed water for irrigation. (e) Estimated by applying the percentage change between 2006 and 2015. Data Source 2011 through 2015: City of Clearwater Water Master Plan, Capital Improvements Implementation Master Plan. Parsons corporation. October 2004. Data Source 2016 through 2025: Based on functional population data from Table 1 and a continuation of the method utilized by the City of Clearwater Water Master Plan. Taking into consideration the permitted City's capacity to pump from its wells of 6.25 mgd, the governance agreement with Pinellas County that allows purchases of treated water up to 15mgd, and the projected reuse offset (1 5-25%), it could be concluded that the City of Clearwater has sufficient quantity of treated water available to the City to support the projected growth. Potable Water Element si City of Clearwater Comprehensive Plan 3.6 Performance and Condition of Existing Facilities An assessment of the performance and condition of existing facilities was conducted as part of the City of Clearwater Water Master Plan, Water System Assessment, prepared in 2004. The assessment revealed that a variety of corrective measures are necessary to maintain existing levels of service. These recommended corrective measures are outlined below. Well Pump Corrosion Currently, corrosion in the vertical turbine pumps used at each raw water production well requires the periodic replacement and maintenance of the pump 1 shaft and pump bowl assembly. Because this maintenance process is difficult and labor intensive, it is recommended that stainless steel submersible pumps be utilized instead. The stainless steel construction of the submersible pumps helps i to minimize corrosion, extending the useful life of the pumps.21 Standby Power Requirements ~, Chapter No. 62-555 F.A.C. states that each community water system shall provide standby power for operation of the water source, treatment, arid pumping facilities necessary to deliver drinking water meeting all primary and secondary standards to meet the average daily demand for the system. The raw water production wells feeding Reservoir 7 are not currently provided with an auxiliary power source as needed to achieve compliance with Chapter 62-555, F.A.C. Two alternative corrective measures were evaluated: installation of a permanent generator or the purchase of portable generators. In the end, portable generators to serve the production wells were chosen as the preferred alternative given the cost savings. According to the Water System Assessment, backup generators with sufficient capacity are available to serve the treatment and storage facilities at Reservoirs 1 and 2, but not Reservoir 3. Therefore, the study recommended that the existing generator be replaced with a larger generator to handle the current load. 2, City of Clearwater Water Master Plan, Water System Assessment. Parsons Corporation. June 2004. Potable 1Mater Element 32 City of Clearwater Comprehensive Plan Control and Monitoring Improvements In order to make control and monitoring of the City's water system centralized, it is recommended the City install the necessary Supervisory Control and Data Acquisition (SCADA) equipment at existing facilities to allow communications with 1 the new network installed at Reservoir No. 1. This includes control and monitoring of Reservoirs Nos. 2 and 3, raw water wells and Pinellas County interconnections. For Reservoir Nos. 2 and 3, the raw water wells, and county interconnects, the Water System Assessment recommended that a radio telemetry system be established to enable effective communications between system facilities. At the county interconnects, it was recommended to add a remotely operated valve to open or close the interconnects. Storage Improvements As stated previously, the City's three elevated storage tanks face water stagnation issues with the potential result of degradation to water quality. At the time of the Water System Assessment, the storage tanks were valved-off. Additionally, the Water System Assessment noted that the City's storage tank capacity may be ~, inadequate to achieve fire-flow demand. Therefore, the study recommended the elevated storage tanks to be placed back into service, restoring sufficient fire- flows to certain areas of the City. To alleviate the water stagnation issues at the storage tanks, recommendations were outlined that included the installation of a mixing system, an altitude valve, isolation valve and small booster pump station to force water out of the storage tanks. To increase fire-flow capacity, the Water System Assessment recommended the addition of inter-distribution system storage tanks in combination with distribution system pipe modifications. Pumping Improvements Improvements to the Cit 's um in facilities are also necessary to improve fire- Y P p 9 1 flows. The Water System Assessment indicates that the current high service pumps are deficient in meeting fire-flow levels in some areas of the City. Therefore, additional booster pump stations are recommended in conjunction with distribution system pipe modifications. Potable VI/ater Element 33 City of Clearwater Comprehensive Plan 3.7 Issues and Opportunities for Expansion and New Facilities One of the major goals of the City is to increase self sufficiency in water supply to control future costs. Presently, the City purchases approximately 8 million gallons of water from Pinellas County at a cost of approximately 7 million dollars per year. 1 Over the years, wholesale water rates have increased and are projected to continually rise. To accomplish increased self sufficiency, the Capital Improvement 1 Plan portion of the Water Master Plan outlines numerous projects involving the expansion of existing water production facilities or the construction of new water production facilities. Limited Source Water Opportunities The City of Clearwater is uniquely located between the Gulf of Mexico and Tampa Bay in an area that has relatively low rates of aquifer recharge. This results in limited quantities of fresh groundwater, and subsequently, limited opportunities to expand source water production. Source water quality continues to degrade due to increased chloride levels caused by pumping of wells in excess of long term safe yield capacities, but within existing water use permitted quantities.z2 ~' Chloride Cap Restriction One of the greatest challenges in increasing capacity for existing production wells and the construction of new production wells is the Southwest Florida Water Management District's chloride cap of 250 mg/L. This chloride cap level is intended to serve as a guideline in evaluating trends and controlling the effects of wellfield withdraws on groundwater quality. In order for the City to proceed with new and sustainable water resources as outlined in their Capital Improvement Plan, the chloride cap must be increased. To provide the necessary evidence to support an increase in the chloride cap, the City 1 is planning to undertake a Chloride Monitoring Well Study. The first phase of this study will examine the effects in the vicinity of Reservoir Nos. 1 and 3, as the impact of this cap will limit the water production from these facilities first. In a later phase, a similar study will be initiated in the vicinity of Reservoir 2 and south r 2s City of Clearwater Water Master Plan, Capital Improvements Implementation Master Plan. Parsons Corporation. October 2004. Potable 1Nater Element ~ City of Clearwater Comprehensive Plan - of Guif-to-Bay to support the development of a new reverse osmosis facility at Reservoir No. 2.23 i Feasible New Groundwater Sources As part of the Capital Improvements Plan, the Water Master Plan identifies three improvement projects aimed at increasing water supply that are economically ' viable as well as technically feasible during the planning period. These three projects include: e Development of an additional 1-mgd of fresh groundwater supply and associated wells and transmission mains to connect to Reservoir No. 3; ~ e Development of an additional 1-mgd of production capacity at Reservoir No. 1 by means of adding an additional 1.25-mgd of raw groundwater supply and expansion of the reverse osmosis facility; and, e Development of an additional 3.5-mgd of production capacity at Reservoir No. 2 by adding an additional 4.25-mgd of raw groundwater F supply, transmission mains and a new, low-pressure reverse osmosis facility. As stated previously, these projects are partially dependent upon an increase to the SWFWMD's imposed chloride cap. However, even if the effort to raise the cap is unsuccessful, the proposed new production wells for Reservoir Nos. 1 and 3 are still recommended to be developed and permitted. The development of these wells ' would increase the rotational capacity, maximize production, rest existing wells, and allow for chloride levels to subside. 3.8 Natural Drainage and Groundwater Recharge The natural drainage features within the City of Clearwater water system are shown on Map 6. As can be seen, the City is located between the seawater bodies of the Gulf of Mexico and Tampa Bay. Freshwater water bodies within the City include Lake Bellevue, Crest Lake, Alligator Lake, Beckett Lake, Lake z3 City of Clearwater Water Master Plan, Capital Improvements Implementation Master Plan. Parsons Corporation. October 2004. _----- -------- ----^--- - t-_ _ _ ___ _ --- _ -------------- - --------- - ~. ~ ~ m ~~u ~P~ 't - ~ c ~ c % Z coq r CAUSEWAY9tV0 ` r F ~ ~ 51,~~ESaLID ` ~... r p p p ~ ~~ ~ O i C 6 _ ~ 01g A4'E N ~_ s tA~11P,q f 2 f 9 ~ W ~ eve HAGEN 4Vc < ~ w ~., I .m 0 ~ w I Q P~t~ ~ ~ f- , ~ ~ ~ 1__,__I p o r ~ J v I. E OOUGLIS RO ~Z ~TH$IDE pR ~ S DR ~ ~ w I mQt' MICHIGAN BLVD ~ ~^/ ~ ,~, ~--- ~- ~ - TERSgU Op~\4lc ? SRS Map 6 I ~ z' LEW yg ~ ~ I ~ ~ 6LV0 ~sT9 ~ f SOLONAVE ` ~ ~FpVE ~ 2 oUBIIG ~ W i Fwj~j SAN CHRI5T0'P~1ER OR j =~'4N4 ~ ~ ~~~~~ "' "'~ i dl I MAIN ST SR 58 ~ ~~~'/~'~.~~ ~~ ~~ Groundwater ~. SR 5180 ~ Z i ,C `, i (W ~m ~' II' Dischar a Rechar e w x m, g/ g > A o < o~ ~ a ENTERPR~E RQ E ~ ~ ~~ z l y i VIRt~INU ST ~ G+ ~5 f W , > 1 ~~ i~ ~(~Fi~ j r_ ~L = I ~ d lI s' B L E SSTI <, w , ~'~ s~--~----tr' z j ~ ~ /,-- MgRSHALLST J __ < ~ r al ~~ / W < `~~'~' ~ ~ ~T-~`~-~ Rivers and Streams Q, i a'~ ~' ' ~ N ~ z Lakes ~,~ 2 , ~ ~ I t7NI0 ST z Z tBrpN 5T g i ( f ~ ~I oI ~ " ~ z1 ~ Floridan Aquifer DischargelRecharge ~ NiCLAIRRO :. w °'' i ~ WI ~ I i uis~,har e ~;i ~JI ~ < ~ - ~ ~ MAINSTi 0- ,3 a I~ I }t >; a SUNSET POINT D i~ ~ f ~; ~I QI ,~~ ~ ~w~- ~ Recharge ~?; ~~T ~ ~ ~ ~ `-' ` ~~~' 141a or Roads \ ~ e i '~' Yi =Ir ~r.~ o sR ~ '' ~ Jurisdictional Boundaries ' S~~ ~ ~ W ~~ ~~ T ~. °w ; ~ >' '< ~~ .5~~ ~ x'`' Cirr of ClearNater ~. a x> z ~ < n w 0~X yi ~ z a Y PALMETTO ST ~ ~ ~ e ,~(cG ~ ~ ~ I ~ v, z'~~~(, ~ ~! w, ~ ~ W ~ r -~ ~ ` ~ ~ Other C;ties ~ w aq ~ I~ / z "- '" (• ~~4( 2 > I i~ ~ w z < I i y i o,~ si ~~ z i ~,, ~ ~ _~~~ '~ ~ , ~.,..~:~ Lnincorporated Pineilas County Z ~ I ~'`~ ~ z x - v ' r ~ < DREW 5T I ~ <~ Cl ELAND ST v 6~LC'~ / ~ ~ YID z z I W ~ COURTN>rY CAMS I ~ ~ ~ w COURTS' `I ~ LFTOBAYBIVd zl w ¢' a > ~ i A~ <~ ~ s ~ CR DAD v < S~PP ~ K ~~ ~ 7 ~ .. '-'~ ~~ r i ~ 1 ~ o c ~ "~a ~ ~ ~ ~ 1.488V'EW D s of ~ f C w ~~ HARN BlV Y m SZi Z yl 1 W W W -. ~ t » M ,e o ~ ~ I rn NURSERY RD ~ ~~ I I ~ BELLEA~t AD / ~ _ ~' W( WYA ST < L l I ~ z 2'. W ,. a a eF a ~ ] . r5/ 4q ~ ~ W ?ROSERY RD NE'n' W v rp ~ p Ov / a~ < ~ W ~ "~i, ' o m( ~ ~h1EHLENBACHEAflD'~' j~ ~ X ~ ~ WNITN'EYRD ~ o. _ ~ ,r°$~ z ~ ") a ~ i ELlE.4iR8EACHCSWY ~ o~ WEST BAY']flv ~ z, ~ EASTBAVDR ~C-03 VELTBLYa _~-,-~ 0 0.5 1 2 3 M Source South;-Ast Florda I,Vater ~,~lanagemert DlstnDi 2002-2007 Pinellas County GIS 2007 PreoarAd ;,y Ahade `~~m. Inc .August 20C? for CIDI of Ctearnrater bVater Supply Element. ~ wa~ET~u~~ 1 Potable Water Element 36 City of Clearwater Comprehensive Plan ' Chautauqua, and various creeks and drainageways. To the north of the City, Lake Tarpon is a large freshwater resource. According to the Southwest Florida Water Management District over 84 percent of all water used within the District's boundaries emanates from groundwater resources. The deepest and most productive aquifer within the District is the Upper Floridan, which also is found underneath the City of Clearwater.24 In the Clearwater area, the Upper Floridan aquifer contains a relatively thin layer of fresh r groundwater underlain by a transition zone of brackish water, which increases in chloride and dissolved solids concentrations with depth until seawater concentrations are reached.25 The Upper Floridan is a productive aquifer, supplying more than ten times the amount of water pumped from the two other aquifer systems found in the Water Management District. In the northern portion of the District, the Floridan aquifer is readily recharged by rainfall (greater than 10 inches per year), and is most highly productive. In central Pinellas County, the Floridan i aquifer features a recharge rate of 1 to 10 inches per year.26 3.9 Existing Regulations and Programs Relating to Natural Drainage and Groundwater Recharge " Future protection and use of water resources is a public service for which long- range comprehensive planning is mandatory. The primary threats to groundwater 1 in the Clearwater area are saltwater intrusion via overdraft and contamination. When groundwater recharge exceeds withdrawal, there is a potential for saltwater to move inward from coastal areas, ultimately affecting the quality of the available groundwater. Additionally, contamination from injection and drainage wells, fertilizers, storage tanks, and other sources affect the quality of groundwater. Both overdraft and contamination are risks that can be reduced via careful regulation. The Southwest Florida Water Management District is the primary regulator and program administrator relating to natural drainage and groundwater recharge. z^ Southwest Florida Water Management District. Regional Water Supply Plan. December 2006 ' zs Technical Memorandum. Evaluation of City of Clearwater Existing Production Wells. SDI Environmental Services, Inc. zs Generalized Recharge to the Floridan Aquifer (Map). District Water Management Plan, Southwest Florida Water Management District. July 2000. ' Potable Water Element ~ 37 City of Clearwater Comprehensive Plan ' The City of Clearwater is contained within the boundaries of several SWFWMD water supply programs, including:27 Northern Tampa Bay Water Resource Assessment Project (WRAP) The Northern Tampa Bay Water Resource Assessment Project (WRAP) was initiated by the district to assess water availability, including minimum flows and levels, in order to support water resource recover, water use permitting, and environmental resource permitting. Both the City of Clearwater and Pinellas County provide input ' to the technical projects performed by the District. Northern Tampa Bay Water Use Caution Area (WUCA) The Northern Tampa Bay Water Use Caution Area sets water use permit (WUP) for the area, including additional conservation requirements such as reuse. Public supply permits within the WUCA limit per capita water use demands to 150 gallons ' per person per day. Any utility not meeting these numbers has strict timeframes -and guidelines to implement this limit. The City of Clearwater is not using its ' entire permitted allocation of groundwater from the Upper Floridan aquifer although it is anticipated that its utility will eventually grow into its unused M quantity to meet future demand. For example, the City of Clearwater's brackish R.O. facility is permitted to withdraw 6.3 mgd of brackish groundwater, although the City has been withdrawing an average of 3 mgd28. The City of Clearwater has been and is actively participating in SWFWMD's efforts to prioritize recharge areas within the Upper Floridan aquifer recharge area. ' Tampa Bay/Anc%te River Comprehensive Watershed Management (CWM) Project As part of SWFWMD's continuing efforts to ensure the coordination of local governments' planning practices regarding water supply management, SWFWMD has developed the Comprehensive Watershed Management (CWM) Program in coordination with local governments to conduct water resource assessments and ' planning on a watershed rather than district-wide basis. The City of Clearwater is in the Tampa Bay/Anclote River Comprehensive Watershed Management (CWM) Area. This area encompasses all of Pinellas County and parts of Hillsborough and ' Pasco Counties or approximately 566 square miles. The Tampa Bay/Anclote River '' Southwest Florida Water Management District, 2005 District Water Management Plan. '8 Southwest Florida Water Management District, 2005 District Water Management Plan. Potable Water Element 3s City of Clearwater Comprehensive Plan ' CWM Plan was last adopted in 2002. The 2006 SWFWMD Regional Water Supply Plan requires updates to the CWM Plan in which Pinellas County and the City of Clearwater will be invited to participate. i 3.10 Capital Improvement Projects Appendix A presents the list and budget for several potable water projects to be completed from FY 2007-2008 to FY 2012-2013. The total of capital facility improvements is about $85,451,510 millions dollars. Appendix A CAPITAL IMPROVEMENT PROGRAM WATER SYSTEM The Water System section Includes projects that support the Water System operations for the City. All projects, ' except the projects funded with Lease Purchase, are included either in the current Rate Study or a future Rate Study. Projects in this section support the °Clearwater Provides the Infrastructure to Support a111ts AtMbutes" element of ' the City Council's Vision and the following related priorities: • Well Maintained Infrastructure • Efficient Responsive City SeMces Ffiroject Funding 2007/08 2008/09 2009/10 2010/11 2011/12 2012/13 Total 96721 System R8cR -Maint Utility R8cR 25,000 25,000 25,000 25,000 25,000 25,000 150,000 96739 ReGaimed Water Water 686,490 141,220 108,630 90,620 160,460 116,070 1,303,490 Distribution System FY'08 Bond Issue 2894,000 2894,000 Future Bond Issue 3,542150 1,877,850 5,455,120 578,170 658,260 12111,550 Utility RBcR 744,230 777,930 706,260 817,080 1,346,020 4,391,520 96740 Water Supply & Utility R8cR 300,000 300,000 300,000 300,000 300,000 300,000 1,800,000 ' Treatment 96741 System R8cR - Utility R8cR 250,000 250,000 250,000 239,300 250,000 250,000 1,489,300 ' - Capitalized 96742 line Relocation - FY'08 Bond Issue 800,000 ~-~ Capitalized Future Bond Issue 800,000 800,000 800,000 800,000 800,000 4,000,000 96743 Meter/Backflow Repl Utility R8cR 621,150 621.150 /Change Out FY '08 Bond Issue 28.850 28,850 ' Future Bond Issue 650,000 650,000 650,000 650,000 650,000 3,250,000 96744 System Expansion Water Impact 250,000 250,000 220,300 80,760 81,090 81,410 963,560 Utility RBcR 29,700 169,240 168,910 168,590 536,440 ~_ Water Service Lines FY '08 Bond Issue 500,000 ~•~ Future Bond Issue 500,000 500,000 500,000 500,000 500,000 2500,000 ' 96757 Water Pick-up Trucks L/P-Water 32780 33,780 34,770 101,330 ' confinued on next page ' 319 Appendix A CAPITAL IMPROVEMENT PROGRAM ' WATER SYSTEM (con~nuecp Project Funding 2007/08 2008/09 2009/10 2010/11 2011/12 2012/13 Totd ' 96758 Fluoride in Water Sys Future Bond Issue 1,307,590 1,307,590 ' 96760 Elevated Water Tks Future Bond Issue 250,000 250,000 96761 Telemetry for Wells Utility R&R 119,620 119,620 ' Water 380,380 380,380 96763 . ' Welifield F~ansion FY'OS Bond Issue 1,323,820 1,323,820 Water 861,630 861,630 96764 Reverse Osmosis FY'OS Bond Issue 240,400 240.4 E~ansion -Res # 1 Future Bond Issue 4462640 4,987,880 9,450,520 ' 96767 Reverse Osmo~s FY'08 Bond Issue 1,566,340 1,566,340 @ Reservdr #2 Future Bond Issue 2552300 1,516,830 1,117,230 10,000,000 16,982660 32169,020 96768 ' b Rebate- WeII,Lake,Pond Irig Abd Water 50,000 50,000 50,000 50,000 50,000 50,000 300,000 ' 96769 TraGd~oe 8c Trailer UP-Water 41,000 41,000 Total WaterS~r~em 10,971,460 14,301,320 12,378,890 10,183,530 15,688,300 21,928,010 85,451,510 ' 96721 Svstem R&R -Maintenance This is an on-going program relating to maintenance, repair or replacement of water mains, service lines, valves, fire hydrants, miscellaneous equipment, and damaged facilities. Work involves maintenance, repair ' and replacement of facilites that do not involve upgrading. Comprehensive Plan Objective: (21.3) Continue to maintain the water system in a safe, sound and efficient manner on a daily basis. 96739 Reclaimed Water DisMbution System This project provides for the continued expansion of the City's Reclaimed Water System based on the Reclaimed Water Master Plan. ' Comprehensive Plan Objective: (21.2) To provide adequate quantities and qualities of water services to all customers in the Clearwater service area; for the City's water system to be compatible with the environment; and also seek to conserve and protect sensitive natural resources. 320 1 ~, u 1 i Appendix A CAPITAL IMPROVEMENT PROGRAM WATER SYSTEM (conifinued) 96740 Water Supply and Treatment fiis project provides funding for maintenance, replacement, and upgrade of supply facilities. Comprehensive Plan Obiectve: (21.2) To provide adequate quantities and qualities of water services to all customers in the Clearwater service area; for the City's water system to be compatible with the environment; and also seek to conserve and protect sensitive natural resources. 96741 S~rstem R&R -Capitalized fiis project involves the repair and replacement of water mains, seMce lines, valves, fire hydrants, and facilities equipment etc. that are upgraded during the repair/replacement process. Funding for capitalized labor, equipment and material for in-house work is included. Comprehensive Plan Obiectve: (21.3) Continue to maintain the water system in a safe, sound and efficient manner on a daily basis. 96742 Line Relocation -Capitalized fiis is an on-going project to relocate water mains and related facilities conflicting with public .works projects of various governmental entities and which are upgraded during relocation. Funding for capitalized labor, equipment and material for in-house work is included. Planned work includes US 19 (Sunset to Countryside), US 19 (Whitney to Seville), US 19 (Seville to SR 60), US 19 @ SR 60 Sunset Point (Alt US 19A to Keene), McMullen Booth at Drew Street Nursery Road (Belcher to US 19), Belleair Road at Keene Road, Progress Energy Trail, Pinellas Trail, Druid Trail, SR 60/Memorial Causeway (east of Island Way to Ft. Harrison), Beach Walk, Osceola Streetscape. Comprehensive Plan Obiectve: (18.4) To provide sound fiscal management for the operation and maintenance for potable water service in the City's seMce area. 96743 Meter/Backflow Replacement/Change Out fiis Is an on-going project to repair/replace water meters, backfiow prevention devices, and accessories to assure accurate flow measurement, maximum revenues, and proper operation. Comprehensive Plan Objective: (21.3) Continue to maintain the water system in a safe, sound and efficient manner on a daily basis. ~, 96744 System Expansion fiis project provides funding and capitalizes Water Division labor, equipment and material expenses relating to additions to Clearwater's distribution system, including new meters, backflow prevention devices, main extensions, etc. Location of work areas is determined by customer demand. Comprehensive Plan Obiective: (21.1) To maintain adequate levels of service for existing and future populations. 96752 Water Service Lines fiis project is to upgrade the City's existing galvanized water service Ifnes that are in poor condition. Comprehensive Pian Obiectve (21.1) To maintain adequate levels of service for existing and future populations. 96757 Water Pick up Trucks This project provides funding for the purchase of three (3) additional 1-ton pick up trucks. fie vehicles will be used to perform required annual Inspections of the Reclaimed Water System as contained in the Reclaimed Water Master Plan in years 2006-2012. 96758 Fluoride in Water System fiis project provides funding for the City of Clearwater treatment ad distribution system to be modified to include fluoride Injection at each of the City's reservoirs. Comprehensive Plan Obiectve: (21.3) Continue to maintain the water system in a safe, sound and efficient manner on a daily basis. 96760 Elevated Water Tanks Upgrade fiis project provides funding for the renovation and related distribution system work for water and fire protection concerns and the removal of the Del Oro tank in 2010. Comprehensive Plan Objective: (21.3) Continue to maintain the water system in a safe, sound and efficient manner on a dally basis. 321 Appendix A CAPITAL IMPROVEMENT PROGRAM WATER SYSTEM (con~nu®cq 96761 Telemetry for Wells ' This project provides funding for the purchase of an additional Supendsory Control and Data Acquisition (SCADA) telemetry system. This SCADA system will provide real time monitoring and control of the City's wells, treatment plants and points of interconnect(on to the County. ' Comprehensive Plan Obiective: (21.3) Continue to maintain the water system in a safe, sound and efficient manner on a daily basis. 96763 Well Field Expansion ' This project provides funding for the expansion of the City's current potable water well field. This expansion will provide the potenfial for an increased local water production by one million gallons per day (MGD), thus reducing our dependency on the regional supply. ' Comprehensive Plan Objectve: (21.2) To provide adequate quantities and qualities of water services to all customers in the Clearwater service area. 96764 Reverse Osmosis Plant Expansion -Reservoir # 1 This project provides funding for the expansion of the City's existing RO Plant potentially adding one (1) MGD in water producton. This includes wells, raw water piping and plant equipment. Comprehensive Plan Objective: (21.2) To provide adequate quantities and qualities of water services to ail customers in the Clearwater seMce area. 96767 Reverse Osmosis Plant at Reservoir # 2 This project provides funding for brackish wells, raw water pipelines, 3.5 MGD brackish RO Plan with brine ' disposal to Tampa Bay. Additional operating costs for this project will not begin until 2013. Comprehensive Plan Obiective: (21.2) To provide adequate quantities and qualities of water services to all customers in the Clearwater service area. ' 96768 Rebate-Well, Lake, Pond Iritaatfon Abandonment This project provides funding for the Well, Lake, Pond Irrgation Abandonment program that was approved by the City Council May 3, 2007. This program provides a homeowner a rebate ff they are willing to properly abandon a private welt, lake or pond irrigation system, when establishing reclaimed water service .. at their residence. Comprehensive Pian Objective: (21.2) To provide adequate quantities and qualities of water services to all customers in the Clearwater service area; for the City's water system to be compatible with the ' environment; and also seek to conserve and protect sensitive natural resources. 96769 Track Hoe & Trailer This project provides funding for an additional track hoe and trailer. This equipment will be used to excavate water mains and other jobs in tight areas where large equipment cannot fit. This smaller sized equipment is more versatile and can be transported on a trailer with a standard truck. 0 ' 322 1 1 1 1 1 1 1 1 1 1 1 1 Appendix A CAPITAL IMPROVEMENT PROGRAM WATER SYSTEM (continued) ANNUAL OPERATING BUDGET IMPACT Project FTE's 2007/08 2008/09 2009/10 2010/11 2011/12 2012/13 Reclaimed Water Distribution System (n 0.0 80,000 80,000 80,000 80,000 80,000 80,000 Water Pick up Trucks (2), (6> 0.0 7,330 14,880 22,660 22660 22,660 15,330 Fluroide in Water System (e> 0,0 15,000 15,750 Elevated Water Tanks Upgrade (ia (a> 0.0 33,600 35,280 37,040 38,890 40,840 42880 Telemetry for Wells (i> 0.0 49,950 52450 55,070 57,820 60,710 63,750 Wellfield Expansion (aa (s> 0,0 50,400 52920 55,560 58,340 61,260 64,320 Reverse Osmosis Plant Expansion - Reselvoir # 1 p~ (a>, (a> 0.0 8.0 523,400 549,570 577,050 1,924,500 Reverse Osmosis Plant Q R6SerVlOr #2 (1~ (3), (4~ (8) Track Hoe & Trailer (2), (s> 0.0 12170 12320 12480 12650 12820 3,830 Total Public Works/Sewer System 8.0 221,280 235,530 250,330 781,110 830,040 2,783,580 (1) Operating costs are for maintenance. (~ Operating costs are for debt seMCe to be funded by the Water & Sewer Fund. (3) Operating costs are for personal services. (a) Operating costs are for uMities. (6) Operating costs are for R9et Maintenance. (n Operating costs are for metering. (8) Operating costs are for chemdalsand/or other operating suppiles. 323 1 1 ii 1 1 C,Q/ ~ qp R c~'N~HG .IBZOO~ ~ 1 ~c F-p~ 1 1