Loading...
BAYFRONT UPLAND IMPROVEMENTS - 07-0045-MA - CHANGE ORDER #3 & FINALr ADMINISTRATIVE CHANGE ORDER #3 & Final PROJECT: Bayfront Uplands Improvement Project Date: August ?17, 2010 PROJECT NUMBER: 07-0045-MA PO REFERENCE NO.: ST 106093 COUNCIL AWARD: 12/17/2009 CONTRACTOR: Caladesi Construction Company DATE OF CONTRACT: 01/08/2010 SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT This CO decreases/increases/adds items to the contract to what was actually used in the field, See attached sheet fo ` . r details.,' STATEMENT OF CONTRACT AMOUNT ACCEPTED BY: ORIGINAL CONTRACT AMOUNT $515,314.57 Caladesi Construction CanrPariy Adm. CO #1 -CC - 03/04/2010 $127,680.00 n Adm. CO #2 - CM - 03/17/2010 $7,100.00 / Adm. CO#3 & Final - CM - NEW CONTRACT AMOUNT ($36,806.78) $613,287.79 By: ATTEST: Cynt 1 E. Goudeau,I City Clerk Date: 4A 31, 2.610 CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA William B. Ho , 11 City Manager AS IN Camilo Soto, Assistant City Attorney Date: Donald ilgiurichs, )resident Witn es: 1411 f 01- Recommended By: Ci of Clearwater Perry M. pez Construc n Man er Michael D. Quillen, P.E. City Engineer 1390 Donegan Road Largo, FL 33771 CODE: 0315-93405-563700-575-000-0000 A CODE: 0315-92630-563500-545-000-0000 B CODE: 0315-92636-563500-545-000-0000 C CODE: 0315-93405-563700-575-000-0000 D Page 2 of 3 Administrative Change Order #3 & Final Re: Bayfront Uplands Improvement Project ITEM DESCRIPTION QUANTITY UNIT UNIT COST TOTAL COST Code D -0315-93405-563700-575-000-0000 Decreases: 4 Curb & Gutter Removal 372.65 LF $ 1.60 ($59624) 5 Sidewalk Removal 2,464.89 SF $ 2.00 ($4,929.78) 4" Concrete Sidewalk 279.27 SY $ 30.00 ($8,378.10) 15 6" Header Curb 14 LF $ 14.00 ($196.00) 44 Trachelospermum Asiaticum (Minima 139 EA $ 3.00 ($417.00) Jasmine) 46 Viburnum Suspensum (Viburnum) 3 EA $ 7.00 ($21.00) 49 Stenotaphrum Secundatum (St. 12,452 SF $ 0.35 ($4,358.20) Augustine) 61 De-Water For Lift Station (2-3 days) 1 LS $ 2,875.00 ($2,875.00) 67 Bayfront Uplands Improvements 10% 1 LS $ 42,068.62 ($42,06&62) Contingency Total (Decreases) Code D: ($63,839.90. Increases: 3 Asphalt Removal 17.32 SY $ 3.00 $5196 6 Concrete Median Removal, Parking 504.2 SF $ 2.30 $1,159.66 Pads & Flag Base 12 6 " Concrete Pads, Including Dumpster 34.84 SY $ 43.50 $1,515.54 Pad 30 Annual Color, 1 Gallon, Full 88 EA $ 2.50 $220.00 66 Services 130 SF $ 29.00 $3,770.00 Total Increases Code D: $6,717.16 Additions: 98 Gravity Wall 1 LS $ 5,000.00 $5,000.00 99 Storm Drain Inlet with pipe 1 LS $ 2,650.00 $2,650.00 100 Remove and Replace FDC 1 LS $ 2,284.45 $2,284.45 101 Reconstruct Existing Inlet 1 LS $ 750.00 $750.00 102 Add Compass Rose Paver 1 LS $ 14,635.00 $14,635.00 103 Stainless Steel Handrail I LS $ 7,965.00 $7,965.00 104 Add irrigation 1 LS $ 1,585.81 $1,585.81 Total Additions Code D: $34,870.26 Total net (decreases)/in creases/additions Code D: ($22;252:52) Code B:0315-92630-563500-545-000-0000 83 Asphalt Removal 283.00 SY $ 3.00 ($849.00) 84 Curb & Gutter Removal 516.00 LF $ 1.60 ($825.60) 85 Sidewalk removal 91 SF $ 2.00 ($182.00) 86 Straight Curb FDOT Type D 461 LF $ 15.00 ($6,915-00) 90 Parking Resurfacing 10% Contingency 1 LS $ 2,781.26 ($2.781.26) Total (Decreases) Code B: ($11,552.86) Page 3 of 3 Administrative Change Order #3 & Final Re: Bayfront U plands Improvement Project ITEM DESCRIPTION Code C:0315-92636-563500-545-000-0000 Decreases: 70 12" PVC Storm Pipe - S. Parking Lot 75 Dianella tasmanica (Flax Lily) 76 Podocarpus Macrophylla (Podocarpus) 77 rhaphiolepis Indicia (Indian Hawthorne) 80 Parking Lot Improvements 10% Contingency Increases: 72 Duranta Erecta (Gold Mound Duranta) 78 Trachelospermum Jasminoides 'Variegatum' (Variegated Minima Jasmine) QUANTITY UNIT UNIT COST 4.00 LF $ 17.50 143.00 EA $ 3.50 10 EA $ 7.00 89 EA $ 7.00 1 LS $ 1,996.90 Total (Decreases) Code C: 2 EA $ 6.50 82 EA $ 3.00 TOTAL COST ($70.00) ($500.50) ($70.00) ($623.00) ($1,996.90) ($3,260.40) $13.00 $246.00 Total Increases Code C: $259.00 Total net (decreases)/increases Code C: ($3,1101.40) Total net (decreases)/increases/additions Contract: ($36,806.78).