MORNINGSIDE RECLAIMED WATER SYSTEM - 05-0022-UT - CHANGE ORDER #1CHANGE ORDER # 1
PROJECT: Morningside Reclaimed Water
CONTRACTOR: Volt Information Sciences, Inc
12700 56th Street North
Date: July 23, 2010
PROJECT NUMBER: 05-0022-UT
PO REFERENCE NO.: ST 105536
COUNCIL AWARD: June 18, 2009
DATE OF CONTRACT: July 7, 2009
Clearwater, Florida 33760 CODE: 0315-96739-563800-533-000-0000 A
CODE: 0315-96739-563800-533-000-0000 B
CODE: 0376-96739-563800-533-000-0000 C
SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT
This change order is to decrease unused items and increase items for additional reclaimed water main work.
This change order also adds new items and additional contract time (137 calendar days) required for additional
reclaimed water main work.
See attached sheet for detail.
STATEMENT OF CONTRACT AMOUNT ACCEPTED BY:
ORIGINAL CONTRACT AMOUNT
CO #I -CC - 08/18/10
NE O.NTRACT AMOUNT
V t
Fran Hi ard, M yo
$1,557,039.28
$234,165.96
$1,791,205.24
Council Member
?9FTHE6/ A?
Volt Information Sciences, Inc.
By:
Joh . I, jlakely
(SK "
I
Cyn Z1ia E. Goudeau,
Date: 70, 11)
CITY OF CLEARWATER, in
PINELLAS COUNTY, FLORIDA
W' am B. Horne, 11 City Manager
A,7OVED AS TO F M/r
Leslie Dougall-Sides, \ -Assistant City Attorney
Witnesses:
04X -
Recommended By: City of Clearwater
elly J. O' rien,
Project Manager \
r l
X C?r
Michael D. Quillen, P. .
City Engineer
Page 2 of 2
Change Order # 1.
Re: Morningside Reclaimed Water (05-0022-UT)
ITEM DESCRIPTION QUANTITY UNIT UNIT COST TOTAL COST
Code A:0315-96739-563800-533-000-0000
Decreases
A20 Programming Services Allowance 1 LS $13,000.00 ($13,000.00),
Total (Decreases) Code A: ($13,000.00)
Increases
A2 Traffic Control
A3 Erosion Control
A5 Root Pruning
A6 10" HDPE PIPE (HDD)
A9 8" C-900 PVC Pipe (OC)
A10 8" C-900 PVC Pipe (HDD)
A12 8" Compact Ductile Iron Fittings
A13 8" Gate Valve and Box
A14 Combination Air Relief Valve
Assembly
B2 Traffic Control
B3 Erosion Control
B5 Root Pruning
B7 4" C-900 PVC Pipe (OC)
B8 4" C-900 PVC Pipe (HDD)
B11 4" Compact Ductile Iron Fittings
B 12 4" Gate Valve and Box
B13 Permanent Blowoff Assembly
B 14 2" Long Side Service
B15 2" Short Side Service
B16 1" Long Side Service
B17 1" Short Side Service
B28 Owner's Contingency
Additions
A22 Building Pen-nit - Town of Belleair
A23 Uncovering work & Hydrostatic
pressure test 8" RCW main
B29 6" C-900 PVC (OC)
B30 6" C-900 PVC (HDD)
B31 8" x 6" Tapping Tee and Valve
B32 8" x 4" Tapping Tee and Valve
B33 6" Compact Ductile Iron Fittings
B34 Survey
B35 Pre-construction Video
1 LS $500.00 $500.00
1 LS $500.00 $500.00
300 LF $7.58 $2,274.00
275 LF $35.20 $9,680.00
650 LF $26.50 $17,225.00
50 LF $25.30 $1,265.00
6 EA $105.00 $630.00
4 EA $1,285.00 $5,140.00
I EA $2,105.00 $2,105.00
1
1
290
200
2750
60
8
2
14
6
33
35
1
LS $500.00
LS $500.00
LF $7.50
LF $22.50
LF $15.23
EA $55.00
EA $855.00
EA $1,259.00
EA $800.00
EA $71.0.00
EA $625.00
EA $425.00
LS $18,275.75
Total In creases Code A
$500.00
$500.00
$2,175.00
$4,500.00
$41,882.50
$3,300.00
$6,840.00
$2,518.00
$11,200.00
$4,260.00
$20,625.00
$14,875.00
$18,275.75
150
1320
3
1
17
1
1
EA $943.12
EA $5,870.59
$170,770.25
$943,12
$5,870.59
LF $28.50 $4,275.00
LF $26.50 $34,980.00
EA $3,500.00 $10,500.00
EA $2,800.00 $2,800.00
EA $85.00 $1,445.00
LS $13,332.00 $13,332.00
LS $2,250.00 $2,250.00
Total Additons Code A: $76,395.71.
Total Net (Decreases)/Increases/Additions Code A: $234,165.96