Loading...
FLS2005-06038M ? Planning Department 100 South Myrtle Avenue CleClearwater arwater, Florida 33756 Telephone: 727-562-4567 Fax: 727-562-4865 ? SUBMIT ORIGINAL SIGNED AND NOTARIZED APPLICATION ? SUBMIT 14 COPIES OF THE ORIGINAL APPLICATION including 1) collated, 2) stapled and 3) folded sets of site plans ? SUBMIT APPLICATION FEE $ CASE #: DATE RECEIVED: RECEIVED BY (staff initials): ATLAS PAGE #: ZONING DISTRICT: LAND USE CLASSIFICATION: SURROUNDING USES OF ADJACENT PROPERTIES: NORTH: SOUTH: WEST: _ EAST: S. Aftr%I man a e ,I NOTE: 15 TOTAL SETS OF INFORMATION REQUIRED (APPLICATIONS PLUS SITE PLAN SETS) '.. !\' t FLEXIBLE STANDARD DEVELOPMENT APP ' ICATION v L any (Revised 12/30/2004) - PLEASE TYPE OR PRINT --- A. APPLICANT, PROPERTY OWNER AND AGENT INFORMATION: (Code Section 4-202.A) APPLICANT NAME: City of Clearwater - Engineering MAILING ADDRESS: 100 South Myrtle Avenue, Clearwater, Florida 33756 PHONENUMBER: 727-562-4747 FAX NUMBER: 727-562-4755 PROPERTY OWNER(S): City of Clearwater (Must include ALL owners as listed on the deed - provide original signature(s) on page 6) AGENT NAME: McKim & Creed, PA Attention: Brent Heath, PE MAILING ADDRESS: 1365 Hamlet Avenue, Clearwater, Florida 33756 PHONENUMBER: 727-442-7196 FAXNUMBER: 727-461-3827 CELL NUMBER: E-MAIL ADDRESS: bheaib@ B. PROPOSED DEVELOPMENT INFORMATION: (Code Section 4-202. STREET ADDRESS of subject site: 3C--'b k LA-r) 1 1!') JUN 0 2 20M LEGAL DESCRIPTION: See attached (if not listed here, please note the location of this document in the submittI) L,MAA?R PARCEL NUMBER: CITY SIZE: 0,263 acres, (11,475 ft2) (acres, square feet) PROPOSED USE(S) AND SIZE(S): 1,950 - ft2 building to house reclaimed water pump station (number of dwelling units, hotel rooms or square footage of nonresidential use) DESCRIPTION OF REQUEST(S): Construct site owned building to house reclaimed water PUMPS, Attach sheets and be specific when identifying the request (include all requested code deviations; e.g. reduction in required number of parking spaces, specific use, etc.) controls. 1 i al equipment and chemical storage and pumping (utility substation) Development includes access driveway and stormwater pond. Page 1 of 6 - Flexible Standard Development Application 2005- City of Clearwater ORIGIN DOES THIS APPLICATION INVOLVE THE TRANSFER OF DEVELOPMENT RIGHTS (TDR), A PREVIOUSLYAPPRQVED.PLANNED UNIT DEVELOPMENT, OR A PREVIOUSLY APPROVED (CERTIFIED) SITE PLAN? YES NO X (if yes, attach a copy Attie applicable documents) C. PROOF OF OWNERSHIP: (Code Section 4-202.A.5) ? SUBMIT A COPY OF THE TITLE INSURANCE POLICY, DEED TO THE PROPERTY OR SIGN AFFIDAVIT ATTESTING OWNERSHIP (see page 6) _ SPe nttanhPCf Warranty Deed D. WRITTEN SUBMITTAL REQUIREMENTS: (Code Section 3-913.A) ? Provide complete responses to the six (6) GENERAL APPLICABILITY CRITERIA - Explain how each criteria is achieved, in detail: 1. The proposed development of the land will be in harmony with the scale, bulk, coverage, density and character of adjacent properties in which it is located. The proposed building is a_, ' gie story.-wasoury and stucco str4 -wturp that 7?S consistent in scale and exterior detailing with the adjacent school structures. 2. The proposed development will not hinder or discourage the appropriate development and use of adjacent land and buildings or significantly impair the value thereof. The proposed building is designed aesthetically to blend into the surrounding area developments. The use of landscaping, including trees and shrub hedge, will furt add to the visual appeal, 3. The proposed development wil t adversely affect the health or safety or persons residing or working in the neighborhood of the proposed use. The proposed building will house pumps, motors, and electrical and control equipment, Chemical storage and pumping system will be enclosed in building with secondary containment, leak detection, and telemetry monitoring. 4. The proposed development is designed to minimize traffic congestion. _ Thi- prnpnsed "ilding v periodic bg an unmanned facility tbat will Only receJuvisits. Access to the facility is via an improved ravel drive extended from Abbey Lane Road. 5. roposed development is consistent with the community character of the immediate vicinity of the parcel proposed for development. Site Dl . 6. The design of the proposed development minimizes adverse effects, including visual, acoustic and olfactory and hours of operation impacts, on adjacent properties. The building is designed to maximize sound attPnuation of the pumps and mntnrs by the inclusion of a solid buffer wall and landscaping. ? Provide complete responses to the applicable flexibility criteria for the specific land use as listed in ea i t i r i requested (use separate sheets as necessary) - Explain how each criteria is achieved, in detail: 4L ILUUJ P LA INln DE l?lT/ A nar ?ENTW fsw er Page 2 of 6 - Flexible Standard Development Application 2005- City of Clearwater • ORIGINAL E. STORMWATER PLAN SUBMITTAL REQUIREMENTS: (City of Clearwater Storm Drainage Design Manual and 4-202.A.21) A STORMWATER NARRATIVE MUST BE SUBMITTED WITH ALL APPLICATIONS. All applications that invo addition or modification of impervious surface, including buildings, must include a stormwater plan that demonstrates compliance with I City of Clearwater Storm Drainage Design Criteria manual. A reduction in impervious surface area does not qualify as an exemption this requirement. If a plan is not required, the narrative shall provide an explanation as to why the site is exempt. ? At a minimum, the STORMWATER PLAN shall include the following: Existing topography extending 50 feet beyond all property lines; Proposed grading including finished floor elevations of all structures; All adjacent streets and municipal storm systems; Proposed stormwater detention/retention area including top of bank, toe of slope and outlet control structure; A narrative describing the proposed stormwater control plan including all calculations and data necessary to demonstrate compliance with the City manual. Signature and seal of Florida Registered Professional Engineer on all plans and calculations. ? COPY OF PERMIT INQUIRY LETTER OR SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT (SWFWMD) PERMIT SUBMITTAL (SWFWMD approval is required prior to issuance of City Building Permit), if applicable owledgement of stormwater plan requirements (Applicant must initial one of the following): Stormwater plan as noted above is included Stormwater plan is not required and explanation narrative is attached. At a minimum, a grading plan and finished floor elevations shall provided. CAUTION - IF APPLICATION REVIEW RESULTS IN THE REQUIREMENT FOR A STORMWATER PLAN AND NONE HAS BEEN SUBMITTED, APPLICATION MUST BE RESUBMITTED AND SIGNIFICANT DELAY MAY OCCUR. If you have questions regarding these requirements, contact the City Public Works Administration Engineering Department at (727) 562-4750. F. SUPPLEMENTAL SUBMITTAL REQUIREMENTS: (Code Section 4-202.A) SIGNED AND SEALED SURVEY (including legal description of property) - One original and 14 copies; ? TREE SURVEY (including existing trees on site and within 25' of the adjacent site, by species, size (DBH 4" or greater), and location, including drip lines and indicating trees to be removed) - please design around the existing trees; LOCATION MAP OF THE PROPERTY; ? PARKING DEMAND STUDY in conjunction with a request to make deviations to the parking standards (ie. Reduce number of spaces). Prior to the submittal of this application, the methodology of such study shall be approved by the Community Development Coordinator and shall be in accordance with accepted traffic engineering principles. The findings of the study will be used in determining whether or not deviations to the parking standards are approved; ? GRADING PLAN, as applicable; ? PRELIMINARY PLAT, as required (Note: Building permits will not be issued until evidence of recording a final plat is provided); ? COPY OF RECORDED PLAT, as applicable; G. SITE PLAN SUBMITTAL REQUIREMENTS: (Section 4-202.A) D ? SITE PLAN with the following information (not to exceed 24" x 36"): All dimensions; North arrow; JUN 0 2 2005. _ Engineering bar scale (minimum scale one inch equals 50 feet), and date prepared; Location map; Index sheet referencing individual sheets included in package; PNNI?i Footprint and size of all EXISTING buildings and structures; PMENT VCS Footprint and size of all PROPOSED buildings and structures; CITY OF CLEARWATER All required setbacks; All existing and proposed points of access; All required sight triangles; Identification of environmentally unique areas, such as watercourses, wetlands, tree masses, and specimen trees, including description and location of understory, ground cover vegetation and wildlife habitats, etc; Page 3 of 6 - Flexible Standard Development Application 2005- City of Clearwater IGINAL Location of all public and private easements; - ?• - Location of all street rights-of-way within and adjacent to the site; Location of existing public and private utilities, including fire hydrants, storm and sanitary sewer lines, manholes and lift stations, gas and water lines; All parking spaces, driveways, loading areas and vehicular use areas; Depiction by shading or crosshatching of all required parking lot interior landscaped areas; Location of all solid waste containers, recycling or trash handling areas and outside mechanical equipment and all required screening (per Section 3-201(D)(i) and Index #701); Location of all landscape material; _ Location of all onsite and offsite storm-water management facilities; _ Location of all outdoor lighting fixtures; and Location of all existing and proposed sidewalks. SITE DATA TABLE for existing, required, and proposed development, in written/tabular form: Land area in square feet and acres; Number of EXISTING dwelling units; Number of PROPOSED dwelling units; Gross floor area devoted to each use; Parking spaces: total number, presented in tabular form with the number of required spaces; Total paved area, including all paved parking spaces and driveways, expressed in square feet and percentage of the paved vehicular area; Size and species of all landscape material; Official records book and page numbers of all existing utility easement; Building and structure heights; Impermeable surface ratio (I.S.R.); and Floor area ratio (F.A.R.) for all nonresidential uses. ? REDUCED SITE PLAN to scale (8 '/z X 11) and color rendering if possible; ? FOR DEVELOPMENTS OVER ONE ACRE, provide the following additional information on site plan: One-foot contours or spot elevations on site; Offsite elevations if required to evaluate the proposed stormwater management for the parcel; Ail open space areas; Location of all earth or water retaining walls and earth berms; Lot lines and building lines (dimensioned); Streets and drives (dimensioned); Building and structural setbacks (dimensioned); - Structural overhangs; - Tree Inventory; prepared by a "certified arborist", of all trees 8" DBH or greater, reflecting size, canopy (drip lines) and condition of such trees. H. LANDSCAPING PLAN SUBMITTAL REQUIREMENTS: (Section 4-1102.A) U LS It LANDSCAPE PLAN: All existing and proposed structures; JUN O ??? Names of abutting streets; Drainage and retention areas including swales, side slopes and bottom elevations; Delineation and dimensions of all required perimeter landscape buffers; RANNIN MENT ?/ Sight visibility triangles; CITY O Delineation and dimensions of all parking areas including landscaping islands and curbing; _ Proposed and required parking spaces; Existing trees on-site and immediately adjacent to the site, by species, size and locations, including driplines (as indicated on required tree survey); Plant schedule with a key (symbol or label) indicating the size, description, specifications and quantities of all existing and proposed landscape materials, including botanical and common names; Location, size, and quantities of all existing and proposed landscape materials, indicated by a key relating to the plant schedule; Typical planting details for trees, palms, shrubs and ground cover plants including instructions, soil mixes, backfilling, mulching and protective measures; Interior landscaping areas hatched and/or shaded and labeled and interior landscape coverage, expressing in both square feet and percentage covered; Conditions of a previous development approval (e.g. conditions imposed by the Community Development Board); Irrigation notes. ? REDUCED LANDSCAPE PLAN to scale (8 % X 11) (color rendering if possible); ? IRRIGATION PLAN (required for level two and three approval); ? COMPREHENSIVE LANDSCAPE PROGRAM application, as applicable. Landscape associated with the Comprehensive Landscape Program shall exceed minimum Code requirements to offset the areas where minimum Code will not be met. Page 4 of 6 - Flexible Standard Development Application 2005- City of Clearwater • - 17 WRIGINAL 1. BUILDING ELEVATION PLAN SUBMITTAL REQUIREMENTS: (Section 4-202.A.23)--,,- Required in the event the application includes a development where design standards are in issue (e.g. Tourist and Downtown Districts) or as part 9f a Comprehensive Infill Redevelopment Project or a Residential Infill Project. ELEVATION DRAWINGS - all sides of all buildings including height dimensions, colors and materials; ? REDUCED BUILDING ELEVATIONS - four sides of building with colors and materials to scale (8 % X 11) (black and white and color rendering, if possible) as required. J. SIGNAGE: (Division 19. SIGNS / Section 3-1806) ? All EXISTING freestanding and attached signs; Provide photographs and dimensions (area, height, etc.), indicate whether they will be removed or to remain. ? All PROPOSED freestanding and attached signs; Provide details including location, size, height, colors, materials and drawing; freestanding signs shall include the street address (numerals) ? Comprehensive Sign Program application, as applicable (separate application and fee required). ? Reduced signage proposal (8 '/: X 11) (color), if submitting Comprehensive Sign Program application. K. TRAFFIC IMPACT STUDY: (Section 4-202.A.13 and 4-801.C) ? Include if required by the Traffic Operations Manager or his/her designee or if the proposed development: • Will degrade the acceptable level of service for any roadway as adopted in the Comprehensive Plan. • Will generate 100 or more new vehicle directional trips per hour and/or 1000 or more new vehicle trips per day. • Will affect a nearby roadway segment and/or intersection with five (5) reportable accidents within the prior twelve (12) month period or that is on the City's annual list of most hazardous intersections. Trip generation shall be based on the most recent edition of the Institute of Transportation Engineer's (ITE) Trip General Manual. The Traffic Impact Study must be prepared in accordance with a "Scoping Meeting" held with the Traffic Operations Manager and the Planning Department's Development Review Manager or their designee (727-562-4750) Refer to Section 4-801 C of the Community Development Code for exceptions to this requirement. of traffic impact study requirements (Applicant must initial one of the following): Traffic Impact Study is included. The study must include a summary table of pre- and post-development levels of service for all roadway le and each turning movement at all intersections identified in the Scoping Meeting. Traffic Impact Study is not required. CAUTION - IF APPLICATION REVIEW RESULTS IN THE REQUIREMENT FOR A TRAFFIC IMPACT STUDY AND NONE HAS BEEN SUBMITTED, APPLICATION MUST BE RESUBMITTED AND SIGNIFICANT DELAY MAY OCCUR. If you have questions regarding these requirements, contact the City Public Works Administration Engineering Department at (727) 562-4750. L. SIGNATURE: I, the undersigned, acknowledge that all representations made in this application are true and accurate to the best of my knowledge and authorize City representatives to visit and photograph the property describeq?n this application. of property owner or represero JUN 0 2 2005 STATE OF FLORIDA, COUNTY OF PINELLAS Sworn to and subscribed before me this day of 1 A. ' to me and/or by L ? QOdwhosis personally know has produced as i !n!: I do H ary pu I comm ssi expires: _. 01'.'7411 lean G Potter May Z 2007 BONDED THRU TROY FAIN INSURANCE, INC Page 5 0 S = tefj6;q1%rW1r1WAMMT 3 Iication 2005- City of Clearwater • (ORIGINAL AFFIDAVIT TO AUTHORIZE AGENT: City of Clearwater (Names of all property owners on deed - please PRINT full names) 1. That (I am/we are) the owner(s) and record title holder(s) of the following described property (address or general location): 3001 Union Street Clearwater Florida 2. That this property constitutes the property for which a request for a: (describe request) Reclaimed water booster pump station 3. That the undersigned (has/have) appointed and (does/do) appoint: McKim & Creed, PA as (his/their) agent(s) to execute any petitions or other documents necessary to affect such petition; 4. That this affidavit has been executed to induce the City of Clearwater, Florida to consider and act on the above described property; 5. That site visits to the property are necessary by City representatives in order to process this application and the owner authorizes City representatives to visit and photograph the property described in this application; 6. That (1/we), the undersigned authority, hereby certify that the foregoing is true and correct. r Property Owner Property Owner Property Owner Property Owner STATE OF FLORIDA, COUNTY OF PINELLAS / Before me the undersigned, an officer duly commissioned by the laws of the State of Floridar on this p?1p day of ff ??? :O 5 personally appeared 'r-f4af? t `D, QA l P r,? who having been first duly sworn Depoges and says that he/she fully understands the contents of the affidavit that he/she sig(ne?d. I?.Jtn?lc? 0.SDugnOl-CC' Notary My Commission Expires: N DINA KATSOUGRAKIS P blic Notary Public State of Florida f . _ rnmissionbamIMCK22, 2009 Commission # DD 314365 Bonded By National Notary Assn. S:IPlanning DepartmentlApplication Formsldevelopment reviewlflexible standard development application 2005.doc Page 6 of 6 - Flexible Standard Development Application 2005- City of Clearwater 6 ! ORIGINAP ?? AFFIDAVIT TO AUTHORIZE AGENT: City 'of` Clearwater (Names of all property owners on deed - please PRINT full names) That (I am/we are) the owner(s) and record title holder(s) of the following described property (address or general location): 3001 Union Street, Clearwater, Florida 2. That this property constitutes the property for which a request for a: (describe request) 3. That the undersigned (has/have) appointed and (does/do) appoint: McKim & Creed, PA as (his/their) agent(s) to execute any petitions or other documents necessary to affect such petition; 4. That this affidavit has been executed to induce the City of Clearwater, Florida to consider and act on the above described property; 5. That site visits to the property are necessary by City representatives in order to process this application and the owner authorizes City representatives to visit and photograph the property described in this application; 6. That (1/we), the undersigned authority, hereby certify that the foregoing is true correct. i 1 perty Owner Property Owner Property Owner Property Owner COUNTY OF PINELLAS STATE OF FLORIDA, Before me the undersigned, an officer duly commissioned by the laws of the State of Florida, on this 3rcQ day of :5- ? (\ e , -- 6z W S pE I I who having been first duly sworn Deposes and says that he/she signed. My Commission Expires: Notary Public SAPlanning Department\Application FormsWevelopment reviewAliexible standard development application residential infill 2005.doc Page 7 of 7 - Flexible Standard Development Application Residential Infill 2005- City of Clearwater 05/26/2005 07:55 7275624755 pri y:& RETI)RLd TO; • • SOMERS TITLE COMPANY 1290 COURT STREET CLEARWATER, n 33756 (727) 4'41-1088'ph. (727) 449-1359 fa-x incidental to the issuance of a title ittsurattce policy. File Nwnber: 04120026c Parcel M #: 04-29.16-00000-220-0200 Grantee(s) SS#: 11"i ENG • KEN BURKE, CLERK OF COURT PINELLAS COUNTY FLORIDA INSTN 3006073647 02128120(15 at 09:28 AM OFF REC BK: 14141 PG: 1284-1285 Doctype:DEEn RECORDING: S18.50 SPECIAL WARRANTY DEED This 5PECLAL WARRANTY DEED, dated February 24, 2005 by SCHOOL BOARD OF P)NELLAS COUNTY, FLORIDA Whose post office address is: 11111 S. Belcher Rued, Largo, FL 33773 herednsftes called the GRANTOR, to City of Clearwater, Florida, a Manicip2l Corporation whose past office addresa is: F. O. )iox 4748, Clearwater, , FL 33758-4748 hereinafter called the GRANTEE: PAGE 02/13 ORIGINAL (Wherever used herein the term "GRANTOR" and "GRANTEE" include all the parties to this instrurnent and the heirs, legal representatives std assigns of individuals, and the successors and assigns of corporations) WITNESS= That the CiRA.NTOR, for and inconsideration of the stair of $10.00 and other valuable considerations, receipt whereof is hereby acknowledged, hereby grants, bargains, sells, aliens, remises, releases, conveys and confirms unto the GRANTEF- all that certain land situate in PJnellas County, Florida, viz; A portion Of Farce) No• 04-29-16-00000-220-0200 A truct Orland lying and beJng In Section 5, Township 29 South, Range 16 East, Pinellas County, Florida, being more particularly described as follows; Commence at the Northeast corner of Section 51 Township 29 Soutb, Range 16 East, Pinellas County, Florida, and rua thence South 00°05'34' West, along the Easterly boundary of said Section 5, a distance of 669.94 feet to The Point of Beginning; thence continue along said Easterly boundary, South 00°05'34" West, it distance of 85.00 feet; thence departing said Eastcrly boundary, North 89°46'39" Vest, a distance of 135.00 feet to it point of Intersection with a line lying and being 135.00 feet West of and parallel to said Easterly boundary of Section 5; thence North 00°05'34" East, along said parallel line, a distance of 85-00 feet to a point of intersection with the Southerly boundary of a parcel of land as described In O.R. Book 9159, Page 1898, Public Records of PiPeHAs County, Fiorida; thence departing said parallel line, South 89°54'26" East, along said Southerly boundary, a distance of 135.00 feet to a polar of Intersection with the aforesaid Easterly boundary of Sectloh 5 and the Point of Beginning. Vv IF! 0 2 2005 I U 011?jmll ?3 @5/26/2005 07:55 7275624755 ENG PAGE 03/13 • • 117 .1 ORIGINAL SUBJECT TO covenants, candidons, restxietioas, rest vations, asaeasraenls for the linutatioos, easetnestts and agreements of record, if any; taxes and year 2008 and subsequent years; and to all opplicablo zoning ordinances and/or unposed by goverafnental authorities, if any, restrictions and prolubitiotts TOGETHER with all the tenements, hereditanaea(s and appurtrusnees thereto belongiUg or in afo-mse appertaining. TO HAVE AND TO HOLD, the same in fee simple' forever. AND THE GRANTOR hereby covenants with said G&ANT Ei3 that it is rightand lawful authority to lawfully seized o£seid 1aAd in fee si[aple; that it ltss geed, sell and convey said land; that it hereby fully warrants the title to said land and will defend the same seainar the Lawful claims of all nerso9s claigring by, through or under the said GFANTOR. IN WITNESS WHEREOF, The Grantor has caused these presents to be executed In its name by its undersigned duly authorized officers this 24th. day of February, 2005 Signed, sealed and delivered., in It presence of: W, eae: (Type/ rlnt f ame) lzL'eje r rlnt Name) r M IANNE SCHAFFER STATE OF FLORIDA COUNTY OF PINELLAS SCHOOL. 60ARD OF PINELLAS COON LORIDA BY: ohn . owe chool Board Attorney The foregoing instrument was acknowledged before me this John W. 4th, day of February 2005, by Bowen, School Board Attorney, whom, being duly authorized, executed the foregoing Instrument on behelf of said School Board, and acknowledged the execution thereof to be his free acl and deed for the use and purposes herein set forth. 4t ry Florida My Commission expires! ?dARIANNE SCHAFFEn UADIAKIKIC t?HA= Notsry public, State or Rodda Type/Print Name , Ih4yCommtsston mo ` Corrlmlaston ires 12/tq,pg No. Y bppg8427 05/26/2005 07:55 7275624755 ENG PAGE 04113 u' Return to; Somers Title Company 1290 Court St. Clearwater, FL 33756 File No. 041200260 Parcel No.: A Portion of 04-29-16-00000-220-0200 ORIGINAL KEN BURKE, CLERK OF COURT PINELLAS COUNTY FLORIDA INST# 2006073548 02/2812005 at 09:28 AM OFF REC 13K: 14141 PG: 1286-1290 Doclype:EAS RECORDING: S44.00 UTILITIES EASEMENT FOR AND IN CONSIDERATION of the sum of One Dollar ($1.00) cash in hand paid to it, the receipt of which is hereby acknowledged, and the benefits to be derived therefrom, the SCHOOL BOARD OF PINELLAS COUNTY, FLORIDA C/O Real Property Management 11119 South Belcher Road, Largo, Florida 33773 (herein, "Grantor") does hereby grant, bargain and convey to the CITY OF CLEARWATER, FLORIDA, a Florida Municipal Corporation, (herein, "Grantee"), its licensees, agents, successors and assigns, for the use of the general public, easement for the purposes herein expressed over, under and across the following described land lying and being situate in the City of Clearwater. County of Pinellas, State of Florida, to wit: A portion of the Northwest'/4 of the Northwest '/4 of Section 4, Township 29 South, Range 16 East, Pinellas' County, Florlda, as more particularly described and depicted in EXHIBIT "A' appended hereto. This easement is granted for public utility purposes. The CITY OF CLEARWATER, FLORIDA, shall have the right to enter upon the above-described premises and to construct, install and maintain thereon and therein public utility facilities and to inspect and alter such public utility facilities from time to time. Grantee shall in every instance restore the easement premises and contiguous lands of the Grantor, if impacted, to equal or better condition as existed immediately prior to every exercise of said rights and obligations of Grantee_ Grantor hereby warrants and covenants with Grantee that Grantor is the lawful owner simple title to the herein described easement grant and convey this easement to Grantee, use and enjoyment of this easement. of fin fe e V premises, that Grantor has full right and lawful authori'.y to and that Granteeshyall have quiet and peaceful possession, 3A_?' 0 ORIGINAL 0 FLS2005-06001 3001 UNION ST Date Received: 06/02/2005 CITY OF CLEARWATER ENGINEERING ZONING DISTRICT: LAND USE: ATLAS PAGE: 256A PLANNER OF RECORD: NOT ENTERED CLWCoverSheet t 1 ,? V C? 3 Cleamater tt DRAFT ACTION AGENDA DEVELOPMENT REVIEW COMMITTEE Thursday, August 4, 2005 8:30 a.m. STAFF REVIEW 12.00 am Case Number: FLS2005-06038 -- 3001 UNION ST Owner(s): City Of Clearwater 100 S Myrtle Ave Clearwater, Fl 33756 TELEPHONE: 727-562-4755, FAX: No Fax, E-MAIL: No Email Representative: Brent Heath Mckim & Creed Pa Clearwater, FI 33756 TELEPHONE: 727-461-7196, FAX: 727461-3827, E-MAIL: No Email Location: 0.263 acres located approximately 700 feet south of Union Street adjacent to the McMullen School. Atlas Page: 256A Zoning District: I, Institutional Request: Flexible Standard Development approval for a Utility/Infrastructure Facility including 1 reduction from 25 feet to 15 feet (to pavement) , per section 2-1203.M. Proposed Use: Utility/infrastructure facilities Neighborhood Clearwater Neighborhoods Coalition Association(s): Clearwater, F133761 2544 Frisco Drive TELEPHONE: 727-725-3345, FAX: No Fax, E- IL: D' e Neighborhood South Clearwater Citizens For Progr Association(s): Clearwater, F133756 1120 Kingsley St. TELEPHONE: N one, FAX: No F -MA du a aol.com Presenter: John Schodtler,Planner A0 Attendees Included: The DRC reviewed this application with General Engineering: Printed: 7/28/2005 Times are subject to change Elementary (east) Development Review Agenda - Thursday, August 4, 2005 - Page 1 0 9 1) Need to show proposed drive on site plan from Abbey Lake Road to Booster Pump Station. 2) Need to show any/all road improvements for Abbey Lake Road for the driveway connection. 3) Need to show driveway culvert for existing ditch. All of the above to be addressed prior to D.O. The following to be addressed prior to building permit. 1) Need to show on site plan (Sheet C203) a 1-l/2" water meter to be installed along Union Street for the proposed 1-1/2" water service line to the Booster Pump Station. 2) Will there be a temporary work easement required for the installation of reclaimed water mains and 1-1/2" service line during construction? Need to show on site plan. 3) Any damage to existing 8 ft. pedestrian sidewalk on School Board property shall be repaired by contractor. 4) Need M.O.T. for the existing 8 ft. pedestrian sidewalk along the west side of the School Board property, if construction is during normal school session, and work area is on east side of the 20 ft. wide utility easement granted per O.R. 14141, Pages 1286-1290. 5) Contractor will be responsible for removal and the reinstallation of existing fence(s), if needed to provide a work zone. 6) The proposed driveway to be of permanent all weather paving material, either concrete or asphalt per Community Development Code Section 3-1403(B). 7) Per the City of Clearwater Contract Specifications and Standards, Part "B", Technical Specifications, Section IV, Article (19), "all round reinforced concrete pipe joints under pavement, driveways and sidewalks within public right-of-way and any outfall system, shall be wrapped with Mirafi 140N filter fabric or equal". Fabric to be a min. of 30" in width and centered on pipe. General Note: DRC review is a prerequisite for Building Permit Review, additional comments may be forthcoming upon submittal of a Building Permit Application Environmental: 1 . No Issues Fire: 1 , This DRC review by Fire is not an approval or review of any construction plans or documents other than site work. 2. Provide a fire hydrant on the same side of the street and within 300 feet of the most remote point of the building. PRIOR TO D.O. 3 . Where underground water mains and hydrants are to be installed, they shall be installed, completed, and in service prior to construction as per NFPA-241. PRIOR TO D.O. 4. Provide fire department access roadway (with turn-around, Y, T or Cul-de-sac) in accordance with NFPA-1. Fire department access roadway must have 24 ft clear width and 14 ft vertical clearance, and be capable of supporting the weight of fire department vehicles (80,000 lbs.) PRIOR TO D.O. Harbor Master: No Comments Legal: No Comments Land Resources: I . The tree survey is required to include all trees with their canopies within 25' of all of the proposed construction. Provide prior to D.O. 2. Realign the proposed access re to avoid the 28" Oak tree at Abbey Lake Rd. Revise prior to D.O. 3 . Either change the alignment or directional bore the proposed water line and ductile iron water main adjacent to the very large oak trees just south of Union Street. Revise prior to D.O. 4. Provide a Tree Preservation Plan prepared by a certified arborist, consulting arborist, landscape architect or other specialist in the field of arboriculture. This plan must show how the proposed building, parking, stormwater and utilities impact the critical root zones (drip lines) of tree to be preserved and how you propose to address these impacts ie; crown elevating, building lintels, root pruning and/or root aeration systems. Other data required on this plan must show the trees canopy line, actual tree barricade limits (2/3 of the drip line and/or in the root prune lines if required), and the tree barricade detail. And any other pertinent information the arborist feels relates to tree preservation. Provide prior to building permit. Development Review Agenda - Thursday, August 4, 2005 - Page 2 0 Landscaping: I . Per Section 3-1204.D. The landscaping located to the west of the entrance* must be protected from vehicular and pedestrian traffic by the installation of curbing along the perimeter of any landscaping which adjoins vehicular use areas and sidewalks. These protective devices shall have a minimum height of six inches above grade. *Only need to provide along the the radius of the entrance than the curbing may stop. 2. Revise landscape plan noting a fully automatic irrigation system for all landscaped areas (100% coverage) is required. 3 . Clarify. Why does the perimeter landscaping along the eastern property line stop near the northern boundary? 4. Clarify. Total number of tree proposed. Code requires a tree every 35 feet, there are at are areas to allow for six additional trees on the site to meet this requirement. 5 . Revise the tree legend on page L201 - "Proposed Deciduous Tree" - The proposed "Live Oaks" are not deciduous. 6. Staff recommends diversifying the types/species of trees to assist in preventing common disease spread. Recommended species: Elm, Oak, Pine, Cypress, Magnolia... Parks and Recreation: I , No issues Stormwater: I . No Issues Solid Waste: No Comments Traffic Engineering: I . Need a site plan showing the proposed driveway connection on Abbey Lake Road. 2. Show 20'x 20' sight visibility triangles at the driveway. (City's Community Development Code, Section 3-904) All of the above to be addressed prior to a D.O.. Planning: Development Review Agenda - Thursday, August 4, 2005 - Page 3 b I . You have provided a Hydrograph labelled UNION ST RCW PS - PRE 25YR/24HR. This document is not legible, provide one that can be read. 2. Provide written response to the following Flexibility Criteria: Front setback: The reduction in front setback results in an improved site plan or improved design and appearance. 3 . Provide written response to the following Flexibility Criteria: Rear setback: The reduction in rear setback is necessary to preserve protected trees and/or results in an improved site plan or more efficient design and appearance and landscaping exceeds the minimum required. - An answer addressing that no rear setback is request is acceptable. 4. Provide written response to the following Flexibility Criteria: Any above ground structure other than permitted telecommunication towers and utility distribution lines located on or along a rear lot line shall be screened from view by a landscaped opaque wall or fence which is at least two-thirds the height of the above ground structure and shall be landscaped with trees which will five years after installation substantially obscure the fence or wall and the above ground structure. 5 . How is the design minimizing adverse effects on adjacent properties, including sound, smell, visual, and hours of operation. The building elevations show several fans, vents and an external mechanical unit (air conditioner). How will these impact the adjacent properties with regards to sound and smell? There is a great concern from the surrounding community about the storage of chemicals at this facility. How does this design minimize adverse effects with regards to the chemical storage? 6. Explain how criterion #5 is being achieved. The supplemented site plan is unacceptable as a response. 7. General Applicability Criterion #4 needs to be revised to address the minimization of traffic congestion to the property. 8. General Applicability criterion #3 needs to be strengthened. There is a great concern from the immediate community about the chemical storage at this facility. Please address this concern. 9. It is unclear how General Applicability Criterion number 2 is being met? Revise your answer. How will this not hinder or discourage appropriate development and use of adjacent land and buildings or significantly impair the value thereof? 10. How is the proposed development in harmony with the scale, bulk, coverage, density and character of adjacent properties? Your reply only addresses the adjacent school property. What about the other adjacent properties? In addition to revising the answer to this criterion it would be helpful to provide photographs of the adjacent properties. 11 . Provide a Tree Survey 12. 06/17/05 Provide building elevations including colors, and materials. 06/03/05 Provide building elevations including all sides of the building including height dimensions, colors, and materials. 13. Provide a Floor Plan of the proposed building. Other: No Comments Notes: Development Review Agenda - Thursday, August 4, 2005 - Page 4 • • Thompson, Neil From: Delk, Michael Sent: Wednesday, July 20, 2005 2:05 PM To: Thompson, Neil Cc: Clayton, Gina Subject: FW: Site Location for Reclaimed Water Booster Pump Station FYI. Proceed accordingly. Thanks. mld -----Original Message----- From: Neff, Andrew Sent: Wednesday, July 20, 2005 12:02 PM To: Fears, Thomas; Petrie,Todd; Murrin, Lisa; Barrett, Earl; Badami, Louis; 'slee@mckimcreed.com'; Quillen, Michael; Delk, Michael; Clayton, Gina Cc: Arasteh, Mahshid; Manni, Diane Subject: FW: Site Location for Reclaimed Water Booster Pump Station FYI Mike/Gina: Let's put the DRC review and annexation issue on hold for now while we fully explore the county retention pond site option. -----Original Message----- From: Arasteh, Mahshid Sent: Wednesday, July 20, 2005 10:10 AM To: Horne, William; Brumback, Garry Cc: Neff, Andrew Subject: RE: Site Location for Reclaimed Water Booster Pump Station Yes thanks Mahshid D. Arasteh, P.E. Public Works Administrator 727-562-4757 -----Original Message----- From: Horne, William Sent: Wednesday, July 20, 2005 9:23 AM To: Arasteh, Mahshid; Brumback, Garry Subject: RE: Site Location for Reclaimed Water Booster Pump Station Mashid, Let's stay committed to the County retention water site until it fails, then move to the School Bd site as a fall back position. Since the county is, a full partner in this effort, we have a good chance of being successful. Bill Horne City Manager Clearwater, FL (727) 562-4046 -----Original Message----- From: Arasteh, Mahshid 0 • Sent: Tuesday, July 19, 2005 4:37 PM To: Horne, William; Brumback, Garry Subject: FW: Site Location for Reclaimed Water Booster Pump Station Please see update below. Please see new concerns on the County Retention Pond site.... Potential opposition from McMullen, the southern neighbor. Mahshid D. Arasteh, P.E. Public Works Administrator 727-562-4757 -----Original Message----- From: Neff, Andrew Sent: Friday, July 15, 2005 12:00 PM To: Arasteh, Mahshid Cc: Manni, Diane; Fears, Thomas; Petrie,Todd; Murrin, Lisa; Barrett, Earl; Badami, Louis; 'slee@mckimcreed.com'; Quillen, Michael; Delk, Michael; Clayton, Gina Subject: Site Location for Reclaimed Water Booster Pump Station Thought I'd give you a recap of where we're at with the siting of the RWBPS. On the County Retention Pond Site • Still need location of wetlands jurisdictional bou ndary--McKim &Creed working • Develop cost--M&C • Work out details of property transaction--Earl B. • Work out issues with stormwater volume and add'I runoff caused by pump station--M&C • Work out zoning issues. Perhaps we can take advantage of AE designation with large enough site and seek an easement to place the station without subdividing parcel which would not require BOCC approval. Otherwise, if we carve out a parcel, probably would require BOCC approval. M&C working on options. • Spoke to Charlie Norwood (County) who again indicated we could work out a property transfer or purchase if we subdivide. Charlie also helping with locating docs on jurisdictional boundary of wetlands. • Potential opposition from McMullen, the southern neighbor, must be considered. Recommend this be discussed at the ACM/CM level for political ramifications. Also understand from Earl there is a planned development adjacent to the location of the RWBPS. If this location is opposed, could wind up in the same spot. • Develop option pros/cons--Tom F. School Board Site • Develop response to their Industrial Hygienist letter on 150 foot separation--M&C. (not much effort until outcome of pond option) • Tree issue reviewed by Tim K. Tim believes little impact, may have to do some root pruning. E-mail forthcoming from Tim. • Assume 150 foot requirement by Ciullas a deal killer in view of our proposed 20-30 foot add'I distance offer. The Ciulla's existing home is approx. 60 feet from property line; bulk sodium hypo storage is approx 50 feet from the property line for a total of 110 feet. With the School Board's 30 feet offer , that would total 140 feet from the house. Please let me know if this is different. Next steps from our end is putting together costs and issues associated with the county stormwater retention site for your consideration. Would recommend moving forward with this option if at all possible. Expect this to be available perhaps by the end of next week at the earliest. If this option proves out, recommend dropping School Board provided site in favor of the stormwater pond location. Next meeting of DRC is Aug 4th to continue with the School Board option site--would like resolution prior to that meeting. Plan to change site location as a change order to the successful bidder on this project if stormwater site is agreed upon. If you need add'I info, pls let me know. • 0 Schodtler, John From: Watkins, Sherry Sent: Monday, July 18, 2005 10:53 AM To: 'sunny@fhlaw.net' Cc: Schodtler, John Subject: 3001 Union Street Good Morning, The City of Clearwater 3001 Union Street is on the DRC for August 4, 2005. FLS2005-06038 DRC and ANX2005- 05019 DRC/CDB/City Council. Thank you Sherry Watkins 562-4582 Planning Department 0 Schodtler, John From: Sunny Moody [sunny@fhlaw.net] Sent: Friday, July 15, 2005 2:23 PM To: Schodtler, John Subject: FLS2005-06038 and ANX2005-05019 / Attention Home 0 Page 1 of 1 I have been trying to find out if the hearing dates have been reset for FLS2005-06038 DRC and ANX2005-05019 DRC/CDB/City Council. Maybe you can help me?...can you please let me know whether or not they've been reset; and if so, what the new dates are? Thank you very much and have a great weekend. Sunny L. Moody Figurski & Harrill (727) 942-0733 This e-mail message and any attachments are confidential and may be privileged. If you are not the intended recipient, please notify Figurski & Harrill immediately by replying to this message or by sending an e-mail to sunny(a.fhlaw.net and destroy all copies of this message and any attachments. 7/18/2005 Schodtler, John From: Clayton, Gina Sent: Friday, June 24, 2005 1:23 PM To: Schodtler, John; Thompson, Neil Cc: Watkins, Sherry; Schoderbock, Michael Subject: FW: Status of Issues: Reclaimed Booster Pump Station -----Original Message----- From: Neff, Andrew Sent: Friday, June 24, 2005 12:21 PM To: Horne, William; Brumback, Garry; Arasteh, Mahshid; Fears, Thomas; Barrett, Earl; Petrie,Todd; Badami, Louis; Delk, Michael; 'bheath@mckimcreed.com'; 'jmiller@pcsb.org' Cc: Manni, Diane; Clayton, Gina; Gray, Joel; Wells, Jerry; 'slee@mckimcreed.com'; Ruff, Bryan; Dougall-Sides, Leslie Subject: Status of Issues: Reclaimed Booster Pump Station The intent of this email is to outline where we're at with the options and issues associated with the siting of the reclaimed booster pump station in view of the fact I'll be on vacation next week. I have a call into the Ciulla's requesting status of their acceptance of sliding the site behind their property 20-30 feet and advised them we were delaying the siting for the DRC review until the next meeting as a good faith gesture. Expressed urgency due to imminent departure of Mr. Miller. I called Mike Maroney at the County and learned they are still reviewing the siting at the stormwater retention pond. Mike informed me there may be a mitigation issue that would need to be addressed--the proposed site location is in an area where mitigation was required due to wetlands impacts associated with the McMullen-Booth Rd expansion. More to come next week. Informed both they could reach Todd Petrie next week to continue working towards resolution. Mike--pls consider this e-mail a formal request to delay the DRC meeting. I understand from Gina all subsequent dates shall now slip. Tom--since bids were rc'd already, it appears we'll extend beyond the 90-day award cycle--pis work with the contractors to extend the award timeline once we receive word from Planning on revised dates. Will also need to prepare appropriate change orders for selected option. We will continue working on issues associated with the existing site. Attached are notes from our meeting Wednesday. McKim&Creed will send a copy to the Ciulla's via mail. Minutes 062205.doc i • MEETING MINUTES Drew and Union Streets Reclaimed Water System Contract 2 - Booster Pump Stations CITY OF CLEARWATER Wednesday, June 22, 2005 at 11:00 am Attendees: Andy Neff Todd Petrie Bill Horne Michael Delk Mahshid Arasteh Lisa Murrin Joel Gray Bryan Ruff Brent Heath Sandy Ciulla Jim Ciulla Joe Laurinaitis Tim Kerwin Shirley John Jim Miller 00992-0084(17) City of Clearwater, Public Utilities Director City of Clearwater, Asst. Public Utilities Director City of Clearwater, City Manager City of Clearwater, Planning Director City of Clearwater, Public Works Administrator City of Clearwater, Utility Engineering Manager City of Clearwater, Deputy Fire Chief City of Clearwater, City Attorney McKim & Creed, Project Engineer Attention Home Attention Home Attention Home Attention Home Attention Home Pinellas County School Board Real Property The following represents an understanding of the discussions from the subject meeting. If changes should be made, please inform the author promptly so that an accurate record can be maintained. 1. The meeting was held at the City Manager's Office, City Hall. 2. The purpose of the meeting was to discuss the site location behind the Attention Home that is intended to be used as a location for a city reclaimed water booster pump station. 3. The issues of Sodium Hypochlorite (liquid bleach) were outlined by Attention Home (AH) representatives, who also distributed a Hazardous Substances Fact Sheet from the New Jersey Department of Health and Senior Services to attendees. Major concerns of the chemical are: a. Hazardous Substance b. Corrosive c. Proximity to Attention Home and School d.Vapor/Fumes from pump station vents e. Potential health effects from bleach vapor AH also stated concerns with 150' evacuation zone from bleach spill area. 4. The City responded to these issues. The pump station building is designed with secondary containment basin to contain any leak or spill from the chemical storage, pumps or piping. The facility has leak detection and alarm functions. The storage tank has a vapor recovery system for chemical delivery, where vapor release is potentially highest. 5. Chief Gray (City Fire Marshall) discussed the DOT Emergency Response Guide in detail. The ERG is provided primarily as a guide to "first responders" of a chemical spill, pertaining to transportation related spills. The 150' referenced by the AH is not an evacuation zone, but an 0 0 immediate precautionary measure to.isolate,the spill zone. During a spill event, first responders would contain the spill within the isolation zone, assess the spill threat, mitigate any threat, and coordinate cleanup. 6. AH stated concerns about the chemical supplier's accident history, chemical delivery trucks, driver training. City will request qualifications, training requirements and spill response protocol from the supplier and provide the information to the AH. The City will look into this. 7. The proximity of the pump station to the Attention Home property was discussed. The City asked the AH if moving the station further away would be acceptable. The AH responded favorably. The City stated they had discussed with Pinellas County Real Property (PCRP) sliding the building further from the AH property. The PCRP stated concerns with limiting future school development but that they would be supportive of allowing another 20-30' south of the current location. AH is to send a letter to the City if the setback is acceptable, as this letter will be necessary for PCSB approval. 8. Jim Miller (PCRP) reiterated that he would support the sliding of the site, but that the distance would be limited. The discussed distance of 20-30' would be the limit. Any agreement between the City and AH that involved sliding the site, and require additional property, would need to be approved by the Pinellas County School Board. 9. The City is investigating possible pump station siting at the Pinellas County stormwater site. County stated they are initially favorable, but will need to check pond engineering and permitting data. City will continue to pursue this option with the County, as this site appears viable from an engineering perspective, however additional investigation is required before this if known. No details or specifics regarding the available or allowable use of this site have been provided by the County to the City, so this option is only conceptual at this point. 10. Sandy Ciulla asked about the status of the Feurst property option. Andy Neff stated this option was no longer being considered by the City due to the cost and public objections. The intensity of the objections on the present site has made it very difficult to place the pump station elsewhere. 11. A potential agreement in concept was discussed, where the City and Attention Home would agree to the following: a.The City would continue to pursue the siting of the pump station on a portion of the County's stormwater pond property. b.The City would continue with permitting efforts at the City's existing site adjacent to the AH property. c. The City, with PCSB approval, will agree to slide the site 20-30' from the AH property, if the AH will agree to support the pump station siting. (The distance the AH is willing to agree to is not determined. They will consult with their engineer and hygienist.) 12. Mr. Horne indicated the City was willing to work with the Ciulla's on the existing site and the City would pursue the possibility of placing the pump station on County property near the County's stormwater retention pond, but can't keep chasing options indefinitely. Mr. Horne asked for the Ciulla's support on either existing option on the table once a decision is made. Prepared By: Brent A. Heath, PE . Pagel of 2 F Schodtler, John From: Schodtler, John Sent: Wednesday, June 22, 2005 12:31 PM To: 'Fred MJR@mesimer.com' Subject: RE: Flexible Standard Development at 3001 Union Street (FLS2005-06038) Your comments need to be received prior to the meeting. You may email: john.schodtler@myclearwater.com; Fax: 727-562-4865; or mail to: John Schodtler, Planning Department, P.O. Box 4748, Clearwater, FL 33758-4748. -----Original Message----- From: FredMJR@mesimer.com [ma i Ito: Fred MJ R@mesimer.com] Sent: Wednesday, June 22, 2005 12:18 PM To: Schodtler, John Subject: RE: Flexible Standard Development at 3001 Union Street (FLS2005-06038) Mr. Schodtler: If I wish to submit written comments, should they be mailed or dropped off prior to the meeting? If they need to be mailed, what is the proper address? Thanks. Fred Mortimer, AICP Vice President Mesimer and Associates, Inc. Office (727) 894-8589 Fax (727) 898-4937 <John.Schodtler@myClearwater.com> To <FredMJR@mesimer.com> 06/22/2005 08:22 AM cc Subject RE: Flexible Standard Development at 3001 Union Street (FLS2005-0( Mr. Mortimer: 1. The Development Review Committee meeting is not a public hearing and is not open to public discussion. 2. Interested parties are encourage to participate in the review by submitting written comments/concerns to be considered in the review of the application. 3. The Flexible Standard approval will be subject to the approval of the Annexation (ANX2005-05019) that will go on to the Community Development Board and the City Council for approvals. a. For those in opposition of the Flexible Standard approval: an appeal of the decision of the Planning 6/22/2005 0 0 Page 2 of 2 v Director may be initiated by the applicant or property owners within the required notice area who present competent substantial evidence at, or prior to the DRC meeting on June 30, 2005. If you have further questions please feel free to contact me. John Schodtler Planner I -----Original Message----- From: FredMJR@mesimer.com [mailto:FredMJR@mesimer.com] Sent: Tuesday, June 21, 2005 4:52 PM To: Schodtler, John Subject: Flexible Standard Development at 3001 Union Street (FLS2005-06038) Mr. Schodtler: I have several questions regarding the above referenced application It is set for a DRC review on June 30, 2005. 1. Is this meeting public? 2. Will the DRC listen to persons for and against the application at that meeting? 3. If the application is approved at this meeting, what is the next step for the City and for those in opposition? I look forward to your response. Thank you. Fred Mortimer, AICP Vice President Mesimer and Associates, Inc. Office (727) 894-8589 Fax (727) 898-4937 6/22/2005 `J Mr. Mortimer: 0 1. The Development Review Committee meeting is not a public hearing and is not open to public discussion. 2. Interested parties are encourage to participate in the review by submitting written comments/concerns to be considered in the review of the application. 3. The Flexible Standard approval will be subject to the approval of the Annexation (ANX2005-05019) that will go on to the Community Development Board and the City Council for approvals. a. For those in opposition of the Flexible Standard approval: an appeal of the decision of the Planning Director may be initiated by the applicant or property owners within the required notice area who present competent substantial evidence at, or prior to the DRC meeting on June 30, 2005. If you have further questions please feel free to contact me. John Schodtler Planner I -----Original Message----- From: FredMIR@mesimer.com [mailto:FredMJR@mesimer.com] Sent: Tuesday, June 21, 2005 4:52 PM To: Schodtler, John Subject: Flexible Standard Development at 3001 Union Street (FLS2005-06038) Mr. Schodtler: 1 have several questions regarding the above referenced application. It is set for a DRC review on June 30, 2005. 1. Is this meeting public? 2. Will the DRC listen to persons for and against the application at that meeting? 3. If the application is approved at this meeting, what is the next step for the City and for those in opposition? I look forward to your response. Thank you. Fred Mortimer, AICP Vice President Mesimer and Associates, Inc. Office (727) 894-8589 Fax (727) 898-4937 • 0 Page 1 of 1 Schodtler, John From: Schodtler, John Sent: Friday, June 17, 2005 7:51 AM To: 'Sunny Moody at Figurski & Harril' Subject: RE: Petition ANX2005-05019 The Flexible Standard Development Approval (FLS2005-06038) is going before the Development Review Committee (DRC) on June 30, 2005. As of today, the schedules have not been set. This usually occurs within the week before the meeting. You should contact Sherry Watkins, Administrative Analyst (562-4582) around that time frame for an update on the time. This case is only going to the DRC it is not required to go before the Community Development Board or City Council for approvals, as the Annexation will. For further information regarding the annexation case I suggest you contact Gina Clayton, Asst. Planning Director (562-4587). John Schodtler Planner I -----Original Message----- From: Sunny Moody at Figurski & Harril [mailto:sunny@fhlaw.net] Sent: Thursday, June 16, 2005 2:51 PM To: Schodtler, John Subject: Petition ANX2005-05019 Good afternoon. Our client, Attention Home, has supplied us with a copy of your Notice of Filing for Flexible Standard Development Approval (FLS2005-06038) regarding Petition ANX2005-05019 pertaining to the potential Union Street annex. I see from your notice that this is going before the DRC on 6/30, please provide me with the time for this. Also, can you provide me with the CDB and City Commission dates/times for this item as well? If you need additional information, please let me know. Thank you, Sunny L. Moody Figurski & Harrill (727) 942-0733 This e-mail message and any attachments are confidential and may be privileged. If you are not the intended recipient, please notify Figurski & Harrill immediately by replying to this message or by sending an e-mail to sunny@fhlaw_net and destroy all copies of this message and any attachments. 6/17/2005 ?P PINELLAS BD OF PUB INST ATTENTION HOME INC PHILLIPS, CAROLYN F THE PO BOX 2942 PO BOX 945 2975 UNION ST LARGO FL 33779 - 2942 SAFETY HARBOR FL 34695 - CLEARWATER FL 33759 - 1621 0945 BROWN, GREGORY J BROWN, CHARLES J BROWN, THERESA A BROWN, JOAN E - 2965 UNION ST 2969 UNION ST CLEARWATER FL 33759 - 1621 CLEARWATER FL 33759 - 1621 JVS 3001 Union St - - Clearwater Neighborhood Coalition Doug Williams P.O. Box 8204 - Clearwater, Fl 33758 - "-"I[1[?l11: 1?.?:'EIk't1 114?i1[? --- File Edit , Options V''indow Help Exit Ncw Dpcn Ta 1; Li_t QBE GIs CI , c Edit bcltc Ca c. Qawmentc 7 i Name-, BRENT'HE,ATH Updated-, E,1K005 JvS ?tl?ac ??ner?l ' ???'1 address.: 3001 ;UNION ST Master# F L S 2 0 0 5 - 0 Wi#. LS2005-000_8 ??Prj Na?7 CITY OF CLEARW ATER ENGINEERING Zoning I Des, Role: N i Ohl ??rh (I A ?}? Updated:4/111t'2005 By.- JVS Nam l SOUTH CLEAR WATER CITIZENS FOR PR Address N_'IISLEY ST. _. I r l city: ,_'LEARWAtiTEP Stave I Province FL ZpPdstal: 3 6 ; Company Name: DUCE TIEMAN I? Hold. -4 Commi kE ; Viet,,? people Infornietlon Star Pidnnin De ertmen 17? 3,35 ._ CITY OF CLEARWATER > 1 .1FA1 WARM PLANNING DEPARTMENT MUNICIPAL SERVICES BUILDING 100 SOUTH MYRTLE AVENUE, CLEARWATER, FLORIDA 33756 TELEPHONE: (727) 562-4567 FAX: (727) 562-4576 W W W . MYC LEARW ATER. C OM June 13, 2005 RE: NOTICE OF FILING OF AN APPLICATION FOR FLEXIBLE STANDARD DEVELOPMENT APPROVAL AT 3001 UNION ST (FLS2005-06038) To Surrounding Property Owners: As a property owner within 200 feet of 3001 UNION ST, the City of Clearwater Planning Department gives notice that an application for Flexible Standard Development approval for a Utility/Infrastructure Facility including a front (east) setback reduction from 25 feet to 15 feet (to pavement) , per section 2-1203.M.. On June 30, 2005, the Development Review Committee (composed of the City's professional staff) will review and determine whether the application demonstrates compliance with the City's Community Development Code. Following that review and determiniation, the Planning Director will issue a Development Order approving, approving with conditions, or denying the application. The earliest date that the City will make a decision on the application will be June 30, 2005. The City encourages you to participate in the review of this application. You may contact me at 727-562-4604 or John.Schodtler@myclearwater.com for further information, visit our office to review the files and/or submit written comments to be considered in the City's review of the application. Please be advised that the applicant may submit additional or new information regarding this case; which you may review during regular business hours. However, no further notice will be provided to you should the application be amended. An appeal of the decision of the Planning Director may be initiated by the applicant or property owners within the required notice area who present competent substantial evidence at, or prior to, the Development Review Committee meeting on June 30, 2005. An appeal must be filed, including an appeal fee, with the Planning Department within seven days of the date of the Development Order. Thank you for your interest in the City of Clearwater's development review process. You may access our Planning Department through the City's website: www.myclearwater.com. Sincerely yours, q*Wk.,??LLA, Jo n Schodtler Planner I Letter of Notification - FLS2005-06038 - 3001 UNION ST `Clearwater June 10, 2005 City Of Clearwater 100 S Myrtle Ave Clearwater, F133756 • • CITY OF CLEARWATER PLANNING DEPARTMENT MUNICIPAL SERVICES BUILDING 100 SOUTH MYRTLE AVENUE, CLEARWATER, FLORIDA 33756 TELEPHONE: (727) 562-4567 FAX: (727) 562-4576 WWW.MYCLEARWATER. COM RE: FLS2005-06038 -- 3001 UNION ST -- Letter of Completeness Dear City Of Clearwater : The Planning Staff has entered your application into the Department's filing system and assigned the case number: FLS2005-06038. After a preliminary review of the submitted documents, staff has determined that the application is Complete. The Development Review Committee (DRC) will review the application for sufficiency on June 30, 2005, in the Planning Department conference room - Room 216 - on the second floor of the Municipal Services Building. The building is located at 100 South Myrtle Avenue in downtown Clearwater. Please call Sherry Watkins, Administrative Analyst, at 727-562-4582 no earlier than one week prior to the meeting date for the approximate time that your case will be reviewed. You or your representative (as applicable) must be present to answer any questions that the DRC may have regarding your application. Additional comments may be generated by the DRC at the time of the meeting. If you have any questions, please do not hesitate to contact me at 727-562-4604 or John. Schodtler@myclearwater.com. Sincerely yours, John Schodtler Planner I Letter of Completeness - FLS2005-06038 - 3001 UNION ST Conditions Associated With FLS2005-06001 ` 3001 UNION ST ti Zoning Condition John Schodtler 562-4547 06/03/2005 Complete the ackowledgement of traffic impact study requirements (Letter K of the application - Not Met page 5 of 6). 06/03/2005 Complete the ackowledgement of stormwater plan requirements (Letter E of the application - Not Met page 3 of 6). 06/03/2005 Provide one signed and sealed survey and 14 copies. Not Met 06/03/2005 Provide a Tree Survey Not Met 06/03/2005 Provide building elevations including all sides of the building including height dimensions, colors, Not Met and materials. Print Date: 06/03/2005 CaseConditons Page 1 of 1 'Clearwater June 09, 2005 City Of Clearwater 100 S Myrtle Ave Clearwater, F133756 CITY OF CLEARWATER PLANNING DEPARTMENT MUNICIPAL SERVICES BUILDING 100 SOUTH MYRTLE AVENUE, CLEARWATER, FLORIDA 33756 TELEPHONE: (727) 562-4567 FAX: (727) 562-4576 WWW.MYCLEARWATER. COM RE: FLS2005-06038 -- 3001 UNION ST -- Letter of Incompleteness Dear City Of Clearwater : The Planning Staff has entered your application into the Department's filing system and assigned the case number: FLS2005-06038. After a preliminary review of the submitted documents, staff has determined that the application is Incomplete with the following comments. 1. Complete the ackowledgement of traffic impact study requirements (Letter K of the application - page 5 of 6). 2. Complete the ackowledgement of stormwater plan requirements (Letter E of the application - page 3 of 6). 3. Provide one signed and sealed survey and 14 copies. 4. Provide a Tree Survey 5. Provide building elevations including all sides of the building including height dimensions, colors, and materials. Section 4-202 of the Community Development Code states that if an application is deemed incomplete, the deficiencies of the application shall be specified by Staff. No further development review action shall be taken until the deficiencies are corrected and the application is deemed complete. Please resubmit by If you have any questions, please do not hesitate to contact me at 727-562-4604 or John. Schodtler@myclearwater.com. Sincerely yours, John Schodtler Planner I Letter of Incompleteness - FLS2005-06038 - 3001 UNION ST Back Locate Help Exit Codes Clearwater Zoning ELYSIUM r ; Layers Visible Active Parcel r' Information _J?WAFFEE Streets r (7 Parcels MDR [?? (7 Future Land Use ? y Q * F771 C Zoning C Pinellas Count C Aerial Photo t?A1 ? ¦ r Refresh Map Adomatcally i • • f IF' ASKY- { Street's { LOR HOMESTEAD ¦ + i l Owner Name Search Exact Address Search Parcel ID Search Approximate Address or Inters a ction S e arch 7 Find the location of interest and follow the prodded instructions. To return to this page, use the "Locate" menu on the top of the screen. Gael 1;4,4 1 ?1ap; -t'9 689. F 1:33 1 U 12 Im•zl ge; 02, _81 ` Ln_•ylintranet Astart I 'jj t ! }3 ?1..?... _ - r V- ;, y In6n - 11i_romrr r;ut• 111 TidGrirarE ?d,;dnta?e ut, of CI ar .arPr G, • Clearwater honing . Fle)- -tandgr FL-?1 " ? , _j i 1:41 P1%9 UNION 30 15 0 30 SCALE:1 "=30' . _ • ?. ._? t.?._...? J.. _. Fn _ ... A d( Art f }}!" '? SI; .pyq" .?... new ..,. _. p ?1 V 3 4 3 ECi1C1 5-29-15 FOUND NAIL & DISK L36565 I I? STREET (COUNT' ROAD NO, 194) SOUTH BOUNDARY OF A PARCEL OF LAND Q SOUTHERN RIW LINE_) FC1R 112" OF UNION STREET LB107 I N PARCEL OF LAND CIO o AS DESCRIBED IN O.R. 9159, PAGE 1898 ° OF THE PUB I rn L C RECORDS OF PINELLAS COUNTY, FLORIDA u o ? o o W Z ((O J AS DESCRIBED IN O.R. 9159, PAGE 1898 OF THE PUBLIC RECORDS OF PINELLAS N COUNTY, FLORIDA SCIR LB6566 S89 4632"E 135.00 X-X--X X----X__X X_.l X X_X-X_X_ 6' 60Q7 FENCE L6 POINT OF BEGINNIA O O VACANT I LC) (NO IMPROVEMENTS) O SCIR LB6566 -NAL N89 46'32"W 135.00' v N fMM v & CREED 1365 Hamlet Avenue Clearwater, Florida, 33756 Phone: (727)442-7196, Fax: (727)461-3827 Certificate of Authorization No. L36566 Internet Site: http://www.mckimcreed.cam DATE: 9/14/04 MCE PROJ. d 0992-0114 DRAWN AWS CHECKED BD F.B. 9A,P. 24-32 SHEET 1 OF 1 4.1' i i } FCIR 1/2" LB18J4 " E 'ntlF`NCN: ._ -.. ................a...,. J. I 4 TRACT LY- _?.J L LNG AAE BFNG IN Sc6:lbtir 5, 'h" C?y1Nry, 'i RIUA, RE'NG 110RE PARTICULARLY DESCRIBED AS FCLIOWS: MA+ENr'ti A7 NE NORTHEAST CCRNtP fy SECTION TOHNSrr 27 SCiEA*, RANGE 16 EAST PINELLAS COUNF6 r2CRIG'A, AND RUN IHEAV'C,' C :r JOV5'74' ?T ALONG RHE EASTERLY 3011NDAR}" OF SAID SECTON S A 01STANCE OF 669.94 FEET X THE POINT OF BEGNNING,' ;HENCE CON77NUE ALCWG ;AID EASTERLY BOUNDARY, SOUTH 00V6 J4' HEST A DISTANCE OF ZOO FEft; 7HENC£ DEPARTING SAID EASTERLY BOUNDARY, NORTH 8946'39' WEST, A DISTANCE OF IJ500 FEET TO A PAINT OF INIERSECTTCN WIN A UNf L NG AND BEING 13500 FEET WEST OF AND PARALLEL 70 SAID EASTERLY BOUNDARY OF SEC77ON 5; THENCE NORTH 0017574' EAST, ALONG SAID PARALLEL UNE A DISTANCE OF 85.00 FT£T TO A POINT OF WTERSEC71(W W 1H T E SOU THfR(Y BOUNDARY OF A PARCEL OF LAND AS DESCRIBED IN OFFICIAL RECORDS BOCK 9159, PACE 1898 OF THE PUBLIC RECORDS OF PINELLAS COUNTY FLCFr10A; THENCE DEPARTING SAID PARALLEL LINE, SOUTH 895416' EAST ALONG SAID SOUTHERLY BOUNDARY, A DISTANCE OF 13500 FEET TO A POINT OF I7FR6FC7TCW NTH THE AFORESAID EASTERLY BOUNDARY OF TC77ON 5 AND THE POINT OF BEGINi1ING LLNTAINING 11,472 SQUARE FEET OR 0.263 ACRES, MORE OR LESS. GENERAL NOTES rNTERIOR IMPROVEMENTS HERE NOT LOCATED EXCEPT AS SHORN AND THEIR RELATONSHIP TO THE PROPERTY LINES ARE CLRREC71Y SHORN. INTERIOR IMPROVEMENTS ARE SHORN AS THEY 1STED CN THE DATE OF THE FIELD SURVEY NON-VISIBLE AND OTHER SUBSURFACE IMPROVEMENTS, SUCH AS U77LI77ES AND FOUNDATCINS AND OTHER UNDERGROUND ENCROACHMENTS 'HAT MAY EXIST HAVE NOT BEEN FIELD LOCATED. FENCE LINE TIES SHORN HEREIN ARE GIVEN AT NINETY-DECREE (90) ANGLES (PERPENDICULAR) TO PROPERTY LINES UNLESS OTHERWSE NOTED. FENCES DEPICTED HEREIN MAY HAVE BEEN aAGGERATED FAR CLARITY. THE OHNERSIP OF THE FENCES SHORN HEREIN WAS NOT DETERUNED. THIS SURVEY MAKES NO CLAIMS REGARDING OHNERSIIP OR RIGHTS OF POSSESSYON. MIS SURVEY MAY HAVE BEEN REDUCED IN SIZE BY REPRODUCTION. THIS MUST BE COV90ERED WHEN OBTAINING SCALED INFORMATION. 'HIS SURVEY WAS PERFORMED FAR THE SOLE AND EXCLUSIVE BENEFIT OF THE PARTIES LISTED HEREIN AND SHALL NOT BE RELIED UPON BY ANY OTHER ENTITY OR INDIVIDUAL WHOMSOEVER. JKEWS; ANY RE-US£ OF THIS SURVEY FOR ANY PURPOSE 07HER THAN WHICH WAS ORIGNALL Y 1NTENOED, WTHOUT THE HRIM PERMISSION OF THE UNDER-SIGNED SURVEYOR AND <4APPER, WLL BE DANE SO AT THE RIS( OF THE RE-USER AND WTHOUT ANY LIABILITY TO THE UNDERSIGNED SURVEYOR AND MAPPER. ADDITIONS OR DELE77COVS TO THIS SURVEY AND/OR GENERAL NOTES, BY ANY PARTY OTHER THAN THE UNDERSIGNED SURVEYTM AND MAPPER, ARE PROHIB17ED WTHOUT THE EXPRESS W77EN CAVSEVT Or THE UNDERSIGNED SURVEYOR AND MAPPER. ;V07HING SOW UPON THIS SURVEY STALL BE CONSTRUED AS GIVING ANY RIGHTS OR BENEFITS TO ANY PERSON OR PERSONS OTHER THAN 70 WIOM THIS SURVEY IS CER77RED. .SYMBOLS S/OHN UPON THIS SURVEY MAY NOT BE DRAWN TD SCALE A UST CP ABBREWA77OVS AND A SW80L LEGEND ARE SHORN WTHIN THE CONTENTS OF THIS SURVEY. THE INFORMATION SHOWN UPON THIS SURVEY WAS ACQUIRED IN ACCORDANCE WTH THE MINIMUM TECHNICAL STANDARDS FAR SURVEYS AS ESTABLISHED BY CHAPTER 61G17-6 OF THE -CRIDA ADMINI,S7RA77W CEDE ALL COMPUTATIONS ARE BASED UPON MEASUREMENTS MADE FROM A (IOSED GEOME7RIC FIGURE AND MEET OR EXCEED THE REWIRED PRECISION ESTABLISHED FOR COMMERCIAL/HIGH RISK AREAS BY THE MINIMUM TECHNICAL STANDARDS FOR SURVEYS AS ESTABLISHED BY CHAPTER 61G17-6 OF THE FLORIDA ADMWISIRA77W CODE. 0 ILL MAPPED fEAlURfS SHORN HEREIN ARE THE RESPONSIBILITY OF THE UNDERSIGNED SURVEYOR AND MAPPER O Q-S 5IF LEGAL DESCRIPTION SHORN UPON THIS SURVEY WAS PREPARED BY THE UNDERSIGNED SURVEYOR AND MAPPER AT THE REQUEST OF THE CLIENT AND THE BOUNDARY SURVEY SHORN ;-"REIN REPRESENTS THE BOUNDARY OF THE LAND ENCOMPASSED BY SAND DESCRIPTION. THIS SURVEY WAS PREPARED WTHOUT THE BETNERT OF A TT£ COMMITMENT NOR WAS THIS PARCEL ABSTRACTED FOR EASEMENT OF RECORD AND/CR RIGHTS DF WAY. D D?Dr0RE, THE LWDERSGVED PROFES90NA SURVEYOR AND MAPPER MAKES NO GUARANTEES OR R£PRESENTATOVS REGARDING INFGRMA770V SHORN NERE7N PERTAINING 70 EASEMENT$ RESERVA7I0NS -97-BACK OWES, AGREEMENTS RIGHTS-CF WAY OR OTHER SMI AR MATTERS OTHER THAN THOSE SHORN UPON THIS SURVEY THE UNDERSIGNED SURVE)VR AND MAPPER HAS NOT MADE A SEARCH OF THE PUBLIC RECORDS FOR ANY TRES DEEDS RESERVATIONS EA.SEWENTS RIGHTS OF WAY, SETBACK UES AGREEMENTS OR OTHER SIMILAR MATTERS OTHER THAN WIAT IS p ifADIL Y I0E1177RABLE 7HRW6;Y THE PROPERTY APPRAISERS HEBSTE THE USE OF THE PROPERTY APPRAISERS WFORMA 7701V IS BY NO MEANS 70 BE CCN57RUED AS A PROPER OR p 110ROUGH WVESTGATIOV OF THE PUBLIC RECORDS AS 4VULD BE ACCOMPLISHED BY AN ABSTRACT OF 777L£, AND/OR OFIINIOV OF 777LE BY AN ATTORNEY AT LA W. HIS PROPERTY MAYBE SJ&ECT 10 ADDITONA! EASEalQN1S COVENANTS AND RESTRICTAVS NOT SHORN HERfW BUT FOUND W THE PUBi/C REGARDS OF PINELLAS COUNTY, FLORIDA. ALL PROPERTY OHWERSHIP, RIGHT OF WAY, EASEMENT AND/OR RECORD PLAT INFORMATION SHOW HEREIN WAS OBTAINED FROM THE PUBLIC RECORDS OF PINELLAS COUNTY, FLORIDA, ;iNLESS 07HERWSE N07M 711S DRAWNG REPRESENTS A BOUNDARY SURVEY PERFORMED ON THE GROUND UNDER THE DIREC77ON OF THE UNDERSIGNED LICENSED FLORIDA PROFESSIONAL SURVEYOR & MAPPER AND IS SCR NOT 1NTERDE9 TO DELINEATE THE REGULA TORY JURISDICTION OF ANY FEDERAL, STATE, REGIONAL OR LOCAL AGENCY, BOARD, COMMISSION OR OTHER SIMILAR ORGANIZATON. L36566 ALL BEARINGS SHORN HERON ARE REFERENCED TO AN ASSUMED DATUM REFERENCE BEARING FAR THIS SURVEY IS THE EASTERLY BOUNDARY OF SECTION 5, TOWS IP 29 SOUTH, RANGE td EAST WNCH HAS AN ASSUMED BEARING OF SOUTH 00'0574' AES: PARENT TRACT PER O.R. 8142, PAGE 2341 ALL MATERS OF RECORD SHOW HEREIN ARE CONTAINED WTHIN THE FILES OF MCKIM A CREED OR HAVE BEEN OBTAINED FROM A TILE COMMITMENT OWERSHIP AND ENCUMBRANCE REPORT OR THE PUBLIC RECORDS SURVEY PREPARED FOR.' CITY OF CLEARWATER SCHga kO?RO NELLAS'VOUNTY, FLORIDA REASONS •• LEGEND FC1R = FOUND CAPPED IRON ROD SCIR = SET 518" CAPPED IRON ROD WLLIAM R. DEES " •. PROFESSIONAL SURVEYOR & MAPPER FLORIDA C977CATE NO. 5493 UNLESS THIS SURVEY BEARS THE ORIGNAL -70A7DRf AND 6MBCSSED RASED SEAL OF THE FLORIDA LICENSED SURVEYOR AND MAPPER ST470 ABOVE, THIS SURVEY IS FOR INFORMA77ONAL PURPOSES ONL Y AND IS NOT NAND. FIELD SURVEY COMPLETED ON SEPTEMBER 08, 2004. 05P26/2005 07:55 7275624755 ENG PAGE 07/13 DESCRIP77CW SKETCH-NOT A SURVEY Pinellas County, Florida a Z10 00 =po rft GRAPHIC SCALE PO/NT OF COMMENCEMENT 5 ? I inn - ;loo It. NW CORNER Of S SEYTJON 4-29-16 h PO/NT OF /NG UNION STREET (C.R. l94) V S6976 47 E I 5,u Df 94) J962 b 1 ' PROPOSED 20 WIDE UACTY EASEMENT ? a z 2J.30' 4 . ,'1 L1 P Go SB9 54 26 E $ `~ 2LJO' PROPOSED PUMP STATION SITE' NB954; 5?W 4 J, J0' LEGOQ O.R. OMOAt RECORDS 900k C.R. - COUNTY ROAD ORIGINAL JUN 0 -2 2005 46 :'?NFKM&CREED 1365 HQMIat Avcnu9 Caorwater, Florldo, 33756 Phone; ()27442-7196, For: (727)481-3927 C-jfj ete o$ Au QjUrlip[lon No. L5 t)66 Internet Site: h1tp://www,tttckkncraed,com ATE: 0 4164 P Da ertA?v Alva CHECKED tip • SHEET 1 oC 9 05,26/2005 07:55 7275624755 ENG DESCR/P770M SKETCH-NOT A SURVEY Pinellas County, Florida DESCRIP nON, A PARCEL OF LAND L WO AND BEINC IN SECTION 4, TOWNSHIP 29 SOUTH, RANGf 16 EAST, PIN£LLAS COUNTY. FLORIDA, SAID PARCEL BEING A/OR£ PARTICULARLY OESCRIPBED AS FOL401K. COMMENCE AT THE NORTHWEST CORNER OF SECAON 4, TOWNSHIP 29 SOUTH, RANGE 16 EAST PINELLAS COUNTY, FLORIDA, AND RUN THENCE SOUTH 0010534' WEST ALONG THE WESTERLY BOUNDARY OF SAID SEOPON 4, A DISTANCE OF 32.95 FEET 70 A POINT OF INTERSECACN WITH THE SOUTHERLY RICNT OF WAY Ll(,- OF UNION STREET (COUNTY ROAD NQ 194); THENCE DEPARTING THE SAID WESTERLY BOUNDARY, SOUTH 6476'47' EAST ALONG SAID SOUTHERLY RIGHT OF WAY U)V& A DISTANCE OF 21.39 FEET 70 A POINT Or INTERS£CTTON {NTH A LINE LYING AND BUNG 21.30 FEET EAST OF AND PARALLEL WITH SAID WESTERLY BOUNDARY OF SECI70N 4 SAID POINT OF INTERSECPON ALSO BEINC THE POINT OF BEGINNING OF THE HEREN DESCRIBED PARCE4- ]HENCE CONTINUE SOUTH 347'47' EAST ALONC SAID SOUTHERLY RIGHT OF WAY LINE A OTSTANCE OF 20.09 FEET TO A PONT OF INTERSE077ON WITH A LINE LWO AND BEING 41.JO FFET EAST OF AND PARALLEL WIH SAID KE51ERLY BOUNDARY OF SECTION 6- THENCE DEPAR77MC SAID SOUTHERLY RIGHT OF WAY UNE, SOUTH OOV.S34' WEST, ALONG SAID PARALLEL LINE A DISTANCE OF 666..72 FE£P, THENCE DEPARTING SAID PARALLEL LINE, NORTH 893425' {VEST, A O/STANCE OF 41.JO FEET 70 A POINT OF 1N7ERSECTION OfTY THE AFORESAID WESTERLY BOUNDARY SECTION A. THENCE NORTH 0012534' EAST, ALONG SAID WESTERLY BOUNDARY, A DISTANCE OF 20,010 FEED 7H£NC£ DEPARTING SAID WESTERLY BOUNDARY, SOUTH 695426 EAST A DISTANCE OF 21.30 FEET TO A POINT OF INTFRSECPON WITH THE AFORESAID LINE' LYING AND BUNG 21.JO FEET FI$T OF AND PARALLEL " 78E WESTERLY BOUNDARY OF SEC77ON A- THENCE NORTH DO'05'34' EAST, ALONG SAID PARALLEL LINE A DISTANCE OF 648.58 FEET TO THE POINT OF BEGINNING, CONTAINING IJ, 779 SOUARE FEET OR O X6 AGWES, MORE OR CE'5S CENERAL NaTES.- THIS DRAWIVO R£PRESE8 75 A DESCRIP17CW SKETCH ANO IS NOT A BOUNDARY SURVEY, THIS SKETCH MA Y HA lE BEEN Rc'DUC£D IN SIZE BY REPRODUCTION. THIS AJUS7 HE CONSIDERED WHEN 067AINING SCALED INFORMATION. THE L£CAL aESCRIPRON INLYUDED 07774 THIS SKETCH WAS PREPARED BY 7H£ UNDERSIGNED SURVEYOR AND MAPPER AT 7HE REOUEST Or THE CLIENT. ALL BEARINGS SHOWN HEREIN ARE REFERENCED TO AN ASSUMED DATUM. REFERENCE BEARING FOR THIS SKETCH IS 774E WEST ONE OF SEC7701V 4-29-16 WHICH HAS AN ASSUMED BEARING OF NORTH 00125:34' EAST THIS SKETCH CONSIS75 Of TWO (2) SHEETS AND EACH SHEET /S INCOMPLETE TNTHOUT THE 077YERS PROPERTY CORNER MONUMENN77ON HAS NOT SET IN ASSOCIATION WITH THE PREPARA71ON Or THIS 5Yf£1CH. T1fLLIAM R. DEES PROFESSIONAL SURVEYOR A: MAPPER FLORIDA C£R77f7CA7E N0. 5493 UNLESS THIS SKETCH GEARS 7W ORIaNAL SIGNATURE ANO EM80SS£D RAISED SEAL OF THE FZORIDA LICEI so SURVEYOR AND RAPPER STATED ABOW, 71YIS SKETCH 15 fOR INfORMA7ICN/AL PURPOSES ONLY AND IS NOT VALID. 46. * 01r1-1CLLyj&?D 1365 Hamlet A?onue Clearwater, ('lorlda, 33756 Phoney (727)442-7196, Fox: (727)481-3827 Cerllfca(e of AuthorlZatlan No. L86166 ?^t•r?•1 Site: http://.w..MCkirnCFeed.COM n1E v 4 4 DRAWN --------------- Ams acCxeo en PAGE 08/13 ORIGINAL City of Clearwater ORIGINAL Drew/Union Reclaimed Water System Contract No. 2 - Booster Pump Stations Flexible Standard Development Application General Summary of the Project and Site Data Table The proposed project consists of the construction of a Reclaimed Water Booster Pump Station Building that will be located on a City owned parcel adjacent to the McMullen Booth Elementary School property, approximately 700 feet south of Union Street. The parcel is to the west of the school's south entrance road. The parcel identifications in which the proposed building, driveway and sidewalk will be located are 05-29-16-00000-110-0900. The listed owner is the City of Clearwater. The parcel is currently unused and vacant. The area is currently zoned "Agricultural Estate Residential District" (A-E) and located within Pinellas County. An Application for Annexation has been submitted to the City concurrent with this Site Plan Application. The proposed building will contain pumps, motors, chemical storage, controls and electrical equipment for the reclaimed water transmission main along Union Street to serve the area west of McMullen Booth Road. The building will not be occupied. The building use is "Utility/Infrastructure Facilities". The proposed building is a single story structure with a hip roof design. The building will be of masonry and stucco construction, consistent in scale and exterior detailing with the adjacent school structures. The dimensions of the building are listed in the Site Data Table. Site Data Table Land Area 11,475 sf 0.263 acres) Project Limits Area 11,475 sf (0.263 acre) No. of Existing Dwelling Units 0 No. of Proposed Dwelling Units 0 Gross Floor Area 1,950 sf Parking Spaces 0 Total Paved Area 2,900 sf Landscape Materials See Landscaping Plan Existing Easements 20' wide Utility Easement from site North to Union Street. 20' wide Access Easement from site South to Abbe Lake Road. Building Height 19'-3" Impermeable Surface Area Ratio See Below Floor Area Ratio See Below The proposed Booster Pump Station Building will add approximately 1,950 sf of floor area and approximately 2,900 sf of other impervious area (access drive and sidewalk). In the site area, the "impermeable surface area ratio" will be 0.423. The "floor area ratio" will be 0.170. The Drainage Narrative and supporting calculations are attached. 05/26/2005 07:55 7275624755 ENG PAGE 05/13 ORIG'INAL Page 2 -Utilities Easement RE: Parcel No.: A Portion of 04-29-16-00000-220-0200 Grantor: School Board of Pinellas County Grantee: City of Clearwater, Florida It is expressly understood and agreed that Grantor reserves unto itself all rights of ownership of the easement premises not inconsistent with the easement rights granted herein- Subject to the terms and conditions hereof, Grantor shall have the right at its sole discretion to grant such other easements, rights or privileges to other persons and entities so long as such grants shall not unreasonably interfere with rights and privileges conveyed herein to Grantee. The easement herein granted, and the covenants and restrictions hereby imposed, shall be easements, restrictions and covenants running with the land, intended where appropriate to bind the Grantor's property and to benefit the Grantee. Each person, firm or entity accepting a conveyance of the Grantor's property or any portion thereof, shall be bound by the terms, provisions or conditions of this Grant of Easement, as if said person, firm or entity were original parties hereto- I?? JUN 0 2 2005 05/26/2005 07: 55 7275624755 ENG PAGE ' 06/13 ORIGINAL Page 3 -Utilities Easement RE: Parcel No_ : A Portion of 04-29-16-00000-220-0200 Grantor: School Board of Pinellas County Grantee: City of Clearwater, Florida IN WITNESS WHEREOF, the Grantor, as caused these resents to be executed in its name by its undersigned duly authorized officers this24 day of 2005. Signed, sealed and delivered In t presence of: ?ti•?-[e - IAAW?- ff WI ESS si natt r LL Prim TNESS Name SCHAFFER WITNESS Name STATE OF FLORIDA COUNTY OF PINELLAS authorized, : S3 SCHOOL BOARD OF PINELLAS CO , FLORIDA By: JA Q W Bowen,.School Board Attorney The foregoing instrument was acknowledged before me this Z?? day of 2005 by John W_ Bowen, School Board Attorney, whom, being duly a cuted the foregoing instrument on behalf of said School Board, and acknowledged the on then f o e her free act and deed for the use and purposes herein set forth. My Commission Expires: of Florida MARIANNE SCHAFFER t Name MARIANNE SCH CAFFa Florida Notary Public, Sta fires 12/14105 My Commission Exp Commission No. # 13DO63W [ ] Personally Known Produced Identification Type of Identification Produced-?& Approved to form: John W. B wen chool Board Attorney Rp.Mamuuen.pumPSON.Eeeem ,.U6?iGes 05/26/2005 07:55 Return to: Somers Title Company 1290 Court St, Clearwater, FL 33756 File No. 04120026c 7275624755 ENG PAGE 09/13 i i ORIGINAL. KEN BURKE, CLERK OF COURT PINELLAS COUNTY FLORIDA INST# 2095073549 02/28/2006 at 09:29 AM OFF REC BK:14141 PO: 1291-1295 DmType:EAS RECORDING: $44.00 Parcel No.: A Portion of 04-29-16-00000-220-0200 INGRESS & EGRESS EASEMENT FOR AND IN CONSIDERATION of the sum of One Dollar ($1.00) cash in hand paid to it, the receipt of which is hereby acknowledged, and the benefits to be derived therefrom, the SCHOOL BOARD OF PINELLAS COUNTY, FLORIDA C/O Real Property Management 11111 South Belcher Road, Largo, Florida 33773 (herein, "Grantor") does hereby grant, bargain and convey to the CITY OF CLEARWATER, FLORIDA, a Florida Municipal Corporation, (herein, "Grantee"), its licensees, agents, successors and assigns, for the use of the general public, easement for the purposes herein expressed over, under and across the following described land lying and being situate in the City of Clearwater, County of Pinellas, State of Florida, to wit: A portion of the Northeast % of the Northeast '/4 of Section 5, Township 29 South, Range 16 East, Pinellas County, Florida, as more particularly described and depicted in EXHIBIT "A" appended hereto. This easement is granted for public Ingress & egress purposes. The CITY OF CLEARWATER, FLORIDA, shall have the right to enter upon the above-described premises and to construct, install and maintain thereon a grass entrance road and to inspect and alter such road from time to time. Grantee shall in every instance restore the easement premises and contiguous lands of the Grantor, if Impacted, to equal or better condition as existed immediately prior to every exercise of said,rights and obligations of Grantee. Grantor hereby warrants and covenants with Grantee that Grantor is the lawful owner of the fee simple title to the herein described easement premises, that Grantor has full right and lawful authority to grant and convey this easement to Grantee, and that Grantee shall have quiet and peaceful possession, use and enjoyment of this easement, 5 JUN 0 2 2005 F+i.ANNI?I & OEVEI-OPMENT VCS CITYOF CLEARWATER ?. 05/,26/2005 07:55 7275624755 ENG PAGE 10/13 Page 2 Ingress & Egress Easem . ent ORIGINAL RE: Parcel No.: A Portion of 04-29-16-00000-220,0200 Grantor: School Board of Pinellas County Grantee: City of Clearwater, Florida It is expressly understood and agreed that Grantor reserves unto itself all rights of ownership of the easement premises not inconsistent with the easement rights granted herein. Subject to the terms and conditions hereof, Grantor shall have the right at its sole discretion to grant such other easements, rights or privileges to other persons and entities so long as such grants shall not unreasonably interfere with rights and privileges conveyed herein to Grantee. The easement herein granted, and the covenants and restrictions hereby imposed, shall be easements, restrictions and covenants running with the land, intended where appropriate to bind the Grantor's property and to benefit the Grantee. Each person, firm or entity accepting a conveyance of the Grantor's property or any portion thereof, shall be bound by the terms, provisions or conditions of this Grant of Easement, as if said person, firm or entity were original parties hereto. 05/26/2005 07:55 7275624755 ENG • Page 3 -Ingress & Egress Easement RE: Parcel No.: A Portion of 04-29-16-00000-220-0200 Grantor. School Board of Pinellas County Grantee: City of Clearwater, Florida PAGE 11/13 ORIGINAL IN WITNESS WHEREOF, the Grantor as caused tf? presents to be executed in its name by its undersigned duly authorized officers this day of =mix , 2005. Signed, sealed and delivered In th presence of. WI ESS sionature WITNESS v v T I r%rl ? eRIANNE SCHAFFE? WITNESS Name STATE OF FLORIDA COUNTY OF PINELLAS : ss SCHOOL BOARD OF PINELLAS 7 FLORIDA sy: - J . Bowen, School Board Attorney foregoing instrument was acknowledged before me this-2Y4 day of LCtY 2005 by John W. Bowen, School Board Attorney, whom, being duly authorized, execut46 the foregoing instrument on behalf of said School Board; and acknowledged the exe ,oLt?tt i3.rgof to be her free act and deed for the use and purposes herein set forth. of Florida MARIANNE SCHAFFER rint Name MARIANNE SCHAFFER * * Notary Public-, State Of Florida My Commiss{on Expires 12114/05 Commisslon No. # DD068427 0 My Commission Expires: [ ] Personally Known [%I Produced Identification Type of Identification Produced ?? treYl G /rte Approved as to form: 03 ° MOT I? John W. B wen, chool Board Attorney I+? JUN 0 Z 2005 ressPinal PLAN Nird $ P1 yft Pt ba VG RP.MVuIieRPurnpSIn.E=crrwnUn era;aEe ... ?..,....?.-.? 05,/26/2005 07:55 7275624755 EXFi «A1j DESCRIPTION SKETCH-NOr A SURVEY Pinellas County, Florida POINT Or.COMMENcaar NE CORNER ar UNION STREET (C R. 194) I SECAON 5-2 9-76 a q I ? ?tr ¢xhx R PROPOSED PUMP STATION 571E Ses5426"E POINT OF 9EGINNING 20.00 ' PROPOSED 20' WIO£ ACCESS EASEM£Nr LMM D.R. = OFFICIAL RECORDS BODK C, R. COUNTY ROAD N89'46 ;39 'W 20. DO' 50UWfRL Y UNE L F NE 114 OF NE 114 OF SEC77aN 3^29-16 4$M K M&CREED T365 Hamlet Avenue Clnarvater, Florlda, 23756 Phone: (727)442-71911 , Fax; (727)461-3827 Certiflcate of Authorl7atlon No, L8 566 lnternot Mtaa nttD;//-wN,mcklmcreed.aom ¦ e 20 100 zaa GRAPHIC SCALE 1 Inch = 100 ft. NORTNERIY LINE OF SW 714 Of NW 114 a' SEMN 4-29-16 PER NOAICSTEAO OAKS, PLAT BOOK 99, vACE 7 71R000N 9 SE CORNER OF NE Vd OF NE 1/4 of sECnaN s-29-Is HOMESTEAD OAKS i e ZJ I 12 i 21 HOMESTEAD COURT ENG D D o a/ Y FLRQJ 4 agg2-a114 DRANK AN9 CUSm an PAGE 12/13 ORIGINAL 0 JUN 0 2 2005 05;1,26/2005 07:55 7275624755 ENG -i DESCRIPTION SKETCH-NOT A SURVEY Pinellas County, Florida DESCRIPTION., A PARCEL OF LAND LYING AND BEING IN SECTION A TOWNSHIP 29 SOUTH, RANGE 16 EAST, PIAt S CLLA -COUNTY, FLORIDA, SAID PARCEL SEINC MORE PARTCULARLY DESCRIBED AS FOLLOWS' COMMENCE AT 7HE NORTHEAST CORNER OF 5EC77ON ? 70A9VSHIP 29 5' ,, RANGE 16 EAST PINFLLAS , COUNTY, FLORIDA, AM RUN THENCE SOU77f 0Oa5'34" ASST, ALONG THE` EASTER( Y BOUNDARY OF SAID SEC770N 5% A 01STANCF OF 754,94 FEET Tn THE POINT OF BEGINNING OF THE HEREIN DESCRIBED PARCEL: THENCE CON77NUE ALONG SAID EASTERLY BOUNDARY, SOUTH 00T15Je' WEST, A DISTANCE OF 58,t 91 FEET 70 THE SOUTHEAST COAWER OF THE NORTHEAST 714 OF THE NORTHEA5T 114 Or SAID SEC77m 5, THENCE OEPAR77NO SAID EASTERLY BOUNDARY, NORTH 69%16'39' WEST ALONG THE SOUTHERLY BOUNDARY OF SAID NORTHEAST l14 OF THE NORTHEAST 114, A DISTANCE OF 20.00 FEET R7 A POINT OF 1WERSEC77ON WITH A LINE LY1,VO AND 947NO 20.00 FEET HEST OF AND PARALLEL WITH SAID EASTERLY BOUNDARY OF SECTION 5,• POCE DEPARMIC SAID SOU77 ERLY 4VUNDARY, NORTH 00'D5J4" EAST, ALONG SAID PARALLEL LIMO A DISTANCE OF 584.87 FEET THENCE DEPAR7780 SAID PARALLEL LINE, SOUTH 99 54 26' EAST A DISTANCE OF 20,00 FEET TO A POINT OFTNT£RSECAON Il1TH THE AFORESAID EASTERLY BOUNDARY OF SECTION 5 AND THE POINT OF BEGINNING. CONTAINING ll,698,SOUARE FE£T,OR 0,268 ACRES MORE OR LESS GENERAL NOTFS- THIS DRAHING REPRESENTS A &SCRiPTON 5KE7CH AND IS NOT A BOUNDARY SURVEY. 7HIS SKMH MAY HAVE BEEN REDUCED IN S12E' eY REPRDDUCTOrL THIS MUST HC CONSIDERED AIHCN 08TAINING SCALED INFORMATION THE LEGAL DESCRIP17ON INCLUDED M7H THIS SY mH WAS PREPARED BY 7HE UNDERSIGNED SURVEYOR AND AIAPPc'R AT THE REOLIEST OF 7H£ CLIENT ALL BEARINGS SHOWN HEREIN ARE REFERENCED TO AN ASSUMED DATUM. REFERENCE BEARING FOR I4I5 SKETCH IS THE EAST LINE OF SECT70N 5-29-16 WHICH HAS AN ASSUMED BEARING OF NORTH 00Y15J4" EAST. 7}11S SKETCH CONSI57S OF TWO (2) SHEETS AND EACH SHEET IS INCOMPLETE MHOUT 7HE OTHERS PROPERTY CORNER MONUMENTA7TON WAS NOT SET IN ASSOCIATON W& THE PREPARA77ON OF THIS SKETCH A'ILUAM R. GEES PROFESSIONAL SURVEYOR MAPPER FLORIDA CERTTFICA7E NO. 549J UNLESS THIS SKETCH BEARS THE ORIGINAL SIGVATURE AND EMB0SSE0 RAISED SEAL OF THE FLORIDA LICENSED SURVEYOR AND MAPPER STATED A60VE THIS SKETCH IS FOR INFORMA770JVAL PURPOSES D,v( Y AND lS NOT VA L10. 0 PAGE 13/13 ORIGINAL JUN 0 2 2005 4 bvRJ &CZ$ED 1365 Hamlet avenue Clearwater, Florida. 33756 Phone: (7z7?4A2-7196, Fat; (727)a41-3827 Certlfleote of authorization No. L96566 Internet site; htt,//-N-•mekimcroed.com OAIE. 9 /0" AIrF PPp1- / 09 B7-Ml V o? ORIGINAL, Union Street Pump Station - Drainage Narrative This site is located in Section 5, Township 29 S, Range 16 E, in Pinellas County, Florida. This project consists of the construction of a reclaimed water booster pump station. The project is located next to the McMullen Booth Elementary School, with the site area of 0.263 acres (11,475 SF) and currently undeveloped. Proposed development consists of a 1,950 SF pump station building with associated driveway, sidewalk and stormwater pond for a total proposed impervious area of 7,007 SF. Of this, 2,727 SF will be subject to vehicular traffic. This facility will be an unmanned pump station with access by vehicular traffic for maintenance and servicing only. Therefore, a reduced pollutant load will come from this site than what would normally be associated with entrance drives. Providing a dry pond will reduce runoff and treat any increased pollutants from the site. This will insure no adverse impacts will be introduced to surrounding properties from the construction of this project. Treatment volume of 1/2 inch over the total project area is to be treated on-site by percolation. Geotechnical information used in the drainage calculations have been attached to the drainage calculations. The pond is designed to be a shallow percolation pond, which will receive runoff by over land flow. Overflow from the pond is proposed to outfall through a control structure on the east side of the property into the existing drainage swale that runs along the school entrance road. The pond is sized to ensure total runoff from the site will not exceed runoff from the area prior to its development. Runoff from the existing site sheet flows to an existing roadside ditch that runs along the east property lines. Preliminary results from MODRET are attached. This site is located in Flood Zone "X", as shown on the FEMA Flood Insurance Rate Map, Community Panel # 12103C0127G (Sept. 3, 2003). T nin-TT LE J J U u 0 2 2005 v MC E v ? MEMO ? TELEPHONE ? FIELD REPORT ? ORIGINAL ? CONFERENCE DATE: _ TIME: / J nn AUTHOR: ?`? -? PROJECT: (mold S7L &W P CLIENT: ,n ? t°tii•? tr?r? ?O7 SUBJECT: 20(& ?,?;e, 00.tc,? PROJ. NO..I.°,? ?7 - ) I ? i ? l ? I 1 ? 1 6 1 07 . 4 + ? ? 4 I 1 2 , A I I _ __ lJJ/l} 2 i K T l?dLGv ` ' s --j -# -- k /7. r?.r . -...... .?...:.3 w f 'a,:.:. _ C . ..... O f_. I r f 3 { I ? Y • 4 c r Y ACTION _ ` •mN 7 qw; ? •,;' COPY: I ! 5Y??O? 1 ?LANN P $ ??IEL PMENT VCS CI'IY p? CtEAF?4VATEFi ? ? ?.. ? ?? HEADQUARTERS 800-743-5557 . www.mckimcreed.com ? MEMO ? TELEPHONE ? FIELD REPORT ? CONFERENCE PROJECT: SUBJECT:- ? ORIGINAL yits - TIME: ENT: ffld 4 ? 7 1 4 f ? /? J r q P 2- V, 5 f ALI 111 s r? ? ,? a UU! G ° 7 T1 V]• ? tt 1 VIE f ? i a < ( _? ? x 15 _ A,...s. " ..n....,... i ? x.,,... ?:..,..,... ?..,.,.., ,. EE ? ...n? _m.... ........ <..<n..,...:n...n,?nvn...n5 wr»,...y ,,...n... # >-.,?.«..K.+ »« ? wvnw. i g R ? t T .... ? ? ! }nwu 4 u $ w ..... ..? - i ! ! .w. JON o ?zaa?! COPY: DATE: _ AUTHOR: S4 - <' . Pvz HEADQUARTERS 800-743-5557 • www.mckimcreed.com l J v c &CREED ? MEMO ? TELEPHONE ? FIELD REPORT • ORIGINAL =1 ? CONFERENCE DATE: /'y TIME: r? (/ AUTHOR: a?m PROJECT: Vl-0I0 I) -3j ? CLIENT: 0? cf le?? lbw?? SUBJECT: colt-s PROJ. NO. 09C?2 06&1 /_D . ? ! 1 I t !,..: - N I + ,,??.?U_,_. - t ' ? .?. y..:,. -^ _N?• / i 3 i ? I 1 111 .. M'%.-5.4CZ?:F.? ..- .. M:.L CJ J? r ?/J R p}p} i f N ? ...: ? ? ..r ` 7 7 anql + j + _? ? { y t3 4j4j YYYY N ? i i i ? '3$ f(( 11 3 F ? ? + I !? 't ? 4( I ? t f j ( r7 ?f R4 ////// j -^-- i -- - - - E _ - T I' 77- F pp I PILAN Ini CTION L1tARlI?Aq COPY: HEADQUARTEas 800-743-5557 . www.mckimcreed.com • v &CREE ? MEMO ? TELEPHONE ? FIELD REPORT ? CONFERENCE PROJECT: Uflim s- SUBJECT: 5prn-l of • ORIGINAL DATE: A-?? TIME: AUTHOR: a]?7 ?j S CLIENT: 6 6!/ Oak ? r PROJ. NO.(2 q?-22 L >? t I ! d : i d ! ? ! d i _ ° 3 I tq i I ? I i a 3 i I I i I I R r? -; '\C I ION COPY: HEAOQUARTERs 800-743-5557 . www.mckimcreed.com • 0 ORIGINAL TABLE A-1 Approximate Effective Storage Coefficient of Fine Sands (Sourer. Adapted from SFWMD Soi! Storage Curves) ENec?Pre I ?eptt? t? tT Contact d`. Unccmpaced 0.00 0,05 2 Q.GS 0.11 0.14 0.18 7 _ 0.17 0.23 0;20 0.26 0.30 DJ ??L ?12 JUN 0 2 2005 A-1 PLANNiniG&OEVEL_PMENT, v/011! A- w. ?. u rs i u c r? ?) t Iv U I Iv C C H I IV 6 6 E H V I C E S I N C 0 R P 0 R A T E D Geotechnical Engineering & Construction Materials Testing January 24, 2005 McKim & Creed ORIGINAL 1365 Hamlet Avenue Clearwater, Florida 33756 Attention: Mr. Brent Heath, P.E. RE: Results of Drainage Area Studies U? ? P-) U Proposed Union Street Booster Pump Station UJ Clearwater, Florida JUN 0 2 2005 Our File: DES 055429 1- 1 Dear Brent: Transmitted herewith are results of the exploratory boring and Double Ring Infiltration (DRI) test conducted at the subject site. The results of the structure area borings will be presented in a separate report. A hand auger classification boring was conducted to a depth of 5.4 feet beneath present grade within the proposed stomlwater pond area. A Double Ring Infiltration (DRI) test was conducted adjacent to the boring at a depth of 18 inches below existing grade. Topographic data on the plan provided indicates that this would be near the pond bottom elevation. Soils penetrated by the boring consisted principally of fine sands with variable silt and clay fines content. The soils to about 1.4 feet generally comprise the SP Unified Soil Classification. Between about 1.4 and 4.2 feet, the sands contained an increase in :fines, resulting in an!E M to SC classification. Slightly silty to relatively clean fine sands were evidenced from 4.2 eet to -ezrilip elenon depth of the boring. Note that rock fragments in the soils prohibited sampling below about 5.4 feet. C- ox, A..,- 16 lasz __-- -- w____ ?iroundwater was evidenced at a depth of 4.8 feet in_the :borin . Please note that our field studies were conducted during a relatively dry period during the typical dry time of the year. Review of the Pinellas County Soil Survey indicates the presence of "Wauchula and Myakka soils in the project vicinity. These soils have an indicted normal seasonal high groundwater level within a foot of the original ground surface. Based upon results of our studies, it is our opinion Sarasota Clearwater Tampa Phone: 941.371.3949 12220 49th Street No-th > Clearwater, Florida 33,'62 Phone: 813.948.6027 Fax: 941.3371.8962 Phone: 727.57111 .131-3 • Fax: 727.572.4090 Fax: 613.948.7645 sarof;ice@drilers-eng.com clwoffice@driggers-eng.com toaoffiCRPdriP1aPrcPnc cnm ORIGINAL that normal seas no al-high yroundw•atez-levels may occur above the lower permeability clayey zone, or at about;2 feet.b.elow-the-existing_.ground_"surface. However, groundwater may temporarily perch above the silty sands during periods of increased rainfall. Results of field testing indicate an` infiltration rate of 5.-per-ho u-M at the test location and depth. Care should certainly be exercised in the application-of Dbuble-Ring Infiltration test results to the design of drainage facilities. The analysis of seepage infiltration must include a careful assessment of hydraulic seepage boundary conditions, and other factors, which will influence pond operating characteristics. The presence of low permeability silty to clayey soils at and below the planned pond bottom elevation would certainly affect the pond performance. DRIGGERS ENGINEERING SERVICES, INC. appreciates the opportunity to be of assistance to you on this project. Should you have any questions, please do not hesitate to contact this office at your convenience. Respectfully submitted, DRIGGERS ENGINEERING SERVICES, INC. Vii holas "TTKK no rr ee c k iP. E. Senior Geotechnical Engineer FL Registration No. 45529 NTK-LET\055429-DRI Copies Submitted: (3) Driogers Engineering Services Incorporated ORIGINAL DOUBLE RING INFILTRATION TEST Job No: DES 055429 Test No. DRI - 1 Date: 1/20/2005 Client : McKim & Creed Project: Union Street Booster Pump Station, Clearwater, Florida Location: See Sketch Test Depth: 18" Outer Cyl. Diam: 24" Inner Cyl. Diam: Description of Soil at Test Depth: Light Brown silty Fine SAND Depth of Groundwater Below Test Depth: 40" Infiltration Rate: 5.3 12" In/Hr 20 I 15 O 2 Z _ 0 10 Q: C O ca L C 5 ? JUN 0 '2 2005 PLANN, I & DEVELOP MENT Q0D?4RWATEA V1 i S 0 0 1 2 3 4 5 6 7 Elapsed Time of Infiltration - HOURS TEST PROCEDURE: The test was conducted in general accordance with ASTM D 3385-75. A seven (7") inch hydraulic head was utilized. The infiltration rate was determined at selected time intervals by recording the time for a 1 inch drop in water level. The seven (7) inch head was then re-established until the next test interval. The test was continued until stability was achieved and the infiltration rate did not vary in excess of 5% between successive measurements. Readings were recorded at intervals not exceeding 30 minutes. The plotted infiltration rate above represents the average of all observations during each interval. ?chnician: M. F. Reviewed by: ?F DRIGGERS ENGINEERING SERVICES INCORPORATED HAND AUGER BORING LOG PROJECT: Union Street Booster Pump Station CLIENT: McKim & Creed Clearwater, Florida Project No.: DES 055429 WATER TABLE: 4.8' DATE: 1/20/05 TECHNICIAN: P.C./M.F. DATE: 1/20/05 COMPLETION DEPTH: 5.4' LOCATION: See Plate I TEST NUMBER: DRI-1 ELEV. (FT) DESCRIPTION DEPTH (FT) J m REMARKS Grayish-brown Fine SAND (SP) 0 Surface Elevation: +49.3+/-' 49 ORIGINAL 48 Light brown silty Fine SAND (SM) 2 47 Light grayish-brown clayey Fine SAND (SC) 3 46 Light brown silty, slightly clayey Fine SAND (SM) 4 45 Orangish-brown slightly silty Fine SAND (SP-SM) a:l? l ? J •1:C? i 5 i•I•f ? 44 Light brown Fine SAND with rock fragments SP Could not penetrate below depth 5 4' . due to rock fragments . (? ?) ll 43 JUN 0 2 2005 N1mG $ BEVEL PMENT VCS PILAN .. ^ pF? Ai?NIATER 7 SUMMARY Or LABORATORY TEST RESULTS WOKING NO. DEPTH (tQ DESCRIPTION W% Ya ( eQ G, ATTERRERG LIMITS P.F. U.C. CON G.S. ORG P11 Cl. Soy RES. P LL PL SL (tst) (%) (PPm) (PP-1) (Ohm-cm) . DR1-I 1.5 Light brown silty Fine SAND t i! T U VV Le E JUN 0 2 7005 r` E? eLAN?IN DEVE1. PMENTT VCS W% = Water Content Con. = Consolidation Test v a(PCO = Dry Density G.S. (+I) = Grainsize Analysis (Hydrometer) Gs = Specific Gravity ORG. (%) = Organic Content LL = Liquid Limit Cl. (ppm) = Total Chloride PL = Plastic Limit S04 (ppm) = Total Sulfate SL = Shrinkage Limit RES. (ohm-cm) = Lab Resistivity P.P. (tst) = Pocket Penetrometer * = See Test Curves U.C. = Unconfined Compression ** = Percent Passing No. 200 Sieve CLIENT: McKim &. Creed T PROJECT: Union Street Booster Pump Station, Clearwater, Florida FILE: DES 055429 sou z o Nnr DRIGGERS ENGINEERING SERVICES, INC. P i U. S Standard Siwe OpemnR in Inclm U. S Standard Sieve Numbers Hydrometer 100 3 2 - 1 I 3 4 5 10 14 6 20 30 40 50 70 100 110 0 90 !0 80 20 70 30 L ha Z 60 __ - L O0 ? M - 40 3 c 50 v a C 50 12 0 N 40 U a 30 a 70 20 H T 80 10 90 ° I ' I 100 50 10 5 1 0.5 0.1 0.05 0.01 0.005 0 0 Grain Size in Millimeters 100 01 GRAVEL SAND Coarse Medium Fine SILT or CLAY umber Depth Natural Moisture L L. P. L P. I. Classification CLIENT: McKim & Creed DRI-1 1.5' Light brown silty Fine SAND PROJECT: Union Street Booster Pump Station, Clearwater, Florida FILE: DES 055429 l MODRET 0 ORIGIN,AL HYDROGRAPH DATA INPUT -RATIONAL HYDROGRAPH METHOD Project Name : UNION ST RCW PS - PRE 2SYR/24HR Contributing Basin Area Runoff Coefficient C Time of Concentration Rainfall Depth Storm Duration 0.26 ac. 0.20 10.00 min. 9.00 in. 24.00 hrs Analysis Date: 3/3/2005 S'' t is- R L"wiis *' v ??aaoe??oo i<aaF ,.1tdKWAS? 3W - :id N. A AS NCO M : ;WRZTC383'3I.H `... . 7 i z :=:?SE9. ;•r.1?r.:y e_i?i:_ 'ise:f ,o ?'r:?;. sta ,.r,?prj :?:t^-..axe • • ORiGiNi MODRET L HYDROGRAPH DATA INPUT - RATIONAL HYDROGRAPH METHOD Project Name : UNION ST RC1W PS - POST 25YR24HR Contributing Basin Area Runoff Coefficient C Time of Concentration Rainfall Depth Storm Duration 0.26 ac. 0.62 10.00 min. 9.00 in. 24.00 hrs Analysis Date: 3/3/2005 . N? f3 feed 3^ any. %s::• YiR!C iS rR`? v s %Z. ... ii ?. <. 52 ?'i LS ?L 4f ?i r? r. r.? ••r u .. - r .. .. .. > .?oooaoaw..,. 23 OZ`05Z 1:ith3 - Cd;,KM 3.S NC:h`?i? : w+oDeEr ORIGINAL SUMMARY OF UNSATURATED & SATURATED INPUT PARAMETERS PROJECT NAME : UNION ST RCW PS - POST INFILTRATION 25YR HYDROGRAPH RUNOFF DATA USED UNSATURATED ANALYSIS INCLUDED Pond Bottom Area Pond Volume between Bottom & DHWL Pond Length to Width Ratio (L/W) Elevation of Effective Aquifer Base Elevation of Seasonal High Groundwater Table Elevation of Starting Water Level Elevation of Pond Bottom Is there overflow ? Avg. Effective Storage Coefficient of Soil for Unsaturated Analysis Unsaturated Vertical Hydraulic Conductivity Factor of Safety Saturated Horizontal Hydraulic Conductivity Avg. Effective Storage Coefficient of Soil for Saturated Analysis Avg. Effective Storage Coefficient of Pond/Exfiltration Trench Time Increment During Storm Event Time Increment After Storm Event Total Number of Increments After Storm Event Runoff Hydrograph File Name: POST25YR24HR.RAT Time of Peak Runoff: 0.17 hrs Rate of Peak Runoff: 0.06 cfs Hydraulic Control Features: Groundwater Control Features - Y/N Distance to Edge of Pond Elevation of Water Level Impervious Barrier - Y/N ElevatrM PUU 2 2005 540 .00 ft2 1,900.00 ft3 6.32 44.00 ft 46.00 ft 47.50 ft 47.50 ft y 0.27 7.07 ft/d 2.00 15.90 ft/d 0.20 1.00 2.00 hrs 12.00 hrs 6.00 Top Bottom Left Right N N N N 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 N N N N 0.00 0.00 0.00 0.00 Analysis Dad 1 • MODRET ORIGINAL ELEVATION VS OVERFLOW RELATIONSHIP PROJECT NAME : UNION ST RCW PS - POST INFILTRATION 25YR Structure Type: BROAD CRESTED Crest Elevation 48.50 ft Crest Length 1.00 ft Coefficient of Discharge 3,31 Weir Flow Exponent 1.50 Number of Contractions 0.00 Design High Water Level Elevation 49.00 ft Analysis Date: 3/7/2005 MODRET ORIGINAL SUMMARY OF RESULTS PROJECT NAME: UNION ST RCW PS - POST INFILTRATION 25YR I CUMULATIVE TIME (hrs) WATER ELEVATION (feet) INSTANTANEOUS INFILTRATION RATE (cfs) AVERAGE INFILTRATION RATE (cfs) CUMULATIVE OVERFLOW (ft3) 00,00-0.00 46.000 0.000 0.00000 0.00 46.000 0.03047 0.03043 4.75 47.891 0.03038 0.00 0.03036 6.75 48.062 0.02897 0.00 0.02757 8.75 48.249 0.02740 0.00 0.02722 10.75 48.438 0.02613 0.00 0.02503 12.75 48.532 0.02356 135.74 0.02209 14.75 48.547 0.02097 392.19 0.01986 16.75 48.551 0.01915 679.60 0.01845 18.75 48.553 0.01792 979.98 0.01739 20.75 48.554 0.01694 1,288.70 0.01650 22.75 48.555 0.01549 1,604.10 0.00945 34.75 48.232 0.00804 1,604.10 0.00663 46.75 48.006 0.00584 1,604.10 0.00506 58.75 47.834 0.00455 1,604.10 r JUN 0 2 2005 Analysis Date: 3/7/2005 •- • MoDRET ORIGINAL SUMMARY OF RESULTS PROJECT NAME : UNION ST RCW PS o POST INFILTRATION 25YR I CUMULATIVE TIME (hrs) WATER ELEVATION (feet) INSTANTANEOUS INFILTRATION RATE (cfs) AVERAGE INFILTRATION RATE (cfs) CUMULATIVE OVERFLOW (ft3) 0.00404 70.75 47.696 0.00369 1,604.10 0.00334 82.75 47.582. 0.00309 1,604.10 0.00283 92.92 47.500 1,604.10 .; i + u I A o .;t7 i 1 ?Q JUN ,.. lip APWATEq _ ? . CtxY F? E ME 7 V Maximum Water Elevation: 48.555 feet @ 22.75 hours Recovery @ 92.920 hours * Time increment when there is no runoff Maximum Infiltration Rate: 2.075 ft/day Analysis Date: 3///2005 • rl C ( > -57 ?m c HUI N try 1 IM -1 Time (hrs) Total Volume Infiltrated = 3,329 (t° CD V I • INFILTRATION : UNION ST RCW PS - POST INFILTRATION 25YR 4.. G 0 fV O t?7 r? ?J ?1 J INFILTRATION : UNION ST RCW PS -POST INFILTRATION 25YR MODRET • ORIGINAL SUMMARY OF UNSATURATED & SATURATED INPUT PARAMETERS PROJECT NAME : UNION ST RCW PS - POLLUTION ABATEMENT POLLUTION VOLUME RUNOFF DATA USED UNSATURATED ANALYSIS INCLUDED Pond Bottom Area Pond Volume between Bottom & DHWL Pond Length to Width Ratio (L/W) Elevation of Effective Aquifer Base Elevation of Seasonal High Groundwater Table Elevation of Starting Water Level Elevation of Pond Bottom Is there overflow ? Avg. Effective Storage Coefficient of Soil for Unsaturated Analysis Unsaturated Vertical Hydraulic Conductivity Factor of Safety Saturated Horizontal Hydraulic Conductivity Avg. Effective Storage Coefficient of Soil for Saturated Analysis Avg. Effective Storage Coefficient of Pond/ExfiItration Trench Hydraulic Control Features: Groundwater Control Features - Y/N Distance to Edge of Pond Elevation of Water Level Impervious Barrier - Y/N Elevation of Barrier Bottom Top Bottom Left Right N N N N 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 N N N N 0.00 0.00 0.00 0.00 540.00 ft2 1,900.00 ft3 6.32 45.00 ft 46.00 ft 47.50 ft 47.50 ft y 0.27 7.07 ft/d 2.00 15.90 ft/d 0.20 1.00 Analysis Date: 3/7/2005 MODRET TIME - RUNOFF INPUT DATA ORIGINAL PROJECT NAME: UNION ST RCW PS - POLLUTION ABATEMENT I STRESS PERIOD NUMBER INCREMENT OF TIME (hrs) VOLUME OF RUNOFF (ft3) Unsat 2.75 218.70 1 1.00 259.30 2 4.03 0.00 3 4.03 0.00 4 4.03 0.00 5 4.03 0.00 6 4.03 0.00 7 4.03 0.00 8 4.03 0.00 9 4.03 0.00 0 JUN 0 z 2005 Analysis Date: 3/7/2005 • llD lrlnia? NfODRET a1VHL ELEVATION VS OVERFLOW RELATIONSHIP PROJECT NAME : UNION ST RCW PS - POLLUTION ABATEMENT Structure Type: BROAD CRESTED Crest Elevation 48.50 ft Crest Length 1.00 ft Coefficient of Discharge 3.31 Weir Flow Exponent 1.50 Number of Contractions 0.00 Design High Water Level Elevation 49.00 ft i ? JUN o z zoos Analysis Date: 3/7/2005 9 • P90DREY ORIGINAL SUMMARY OF RESULTS PROJECT NAME : UNION ST RCW PS - POLLUTION ABATEMENT I CUMULATIVE TIME (hrs) WATER ELEVATION (feet) INSTANTANEOUS INFILTRATION RATE (ds) AVERAGE INFILTRATION RATE (ds) CUMULATIVE OVERFLOW (ft3) 00.00-0.00 46.000 0.000 0.00000 0.00 46.000 0.02931 0.02432 3.75 47.618 0.01933 0.00 0.01397 6.73 47.500 0.01110 0.00 0.00823 11.81 47.364 0.00709 0.00 0.00596 15.84 47.296 0.00536 0.00 0.00476 19.87 47.241 0.00438 0.00 0.00400 23.91 47.195 0.00373 0.00 0.00346 27.94 47.156 0.00326 0.00 0.00306 31.97 47.120 0.00290 0.00 0.00274 36.00 47.089 0.00 Maximum Water Elevation: 47.618 feet @ 3.75 hours D C u ?er 28 hours * Time increment when there is no runoff Maximum Infiltration Rate: 1.659 ft/day JUN 0 2 Analysis Date: 3/7/2005 R NNI l DEVEL p ? CLFARWAV,?T VCS.