Loading...
2009 BRIDGE REHABILITATION PROJECT - 09-0050-EN - CHANGE ORDER #2 ;G CHANGE ORDER #2 PROJECT: 2009 Bridge Rehabilitation Project PO REFERENCE NO.: ST 106247 COUNCIL AWARD: February 18, 2010 CONTRACTOR: Castco Construction, Inc. 9001 126th Avenue No. Largo, Florida 33773 Date: June 25, 2010 PROJECT NUMBER: 09-0050-EN DATE OF CONTRACT: _February 23, 2010 CODE: 0315-92274-563800-541-000-0000 A CODE: 0315-96721-563800-533-000-0000 B CODE: 0376-96739-563800-533-000-0000 C CODE: 0376-96665-563800-533-000-0000 D SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT CO 2 provides for concrete repair on bridges 155501 and155502 as well as replacement of a section of a failing sanitary sewer force main. See attached sheet for decreases/increases and additional items. STATEMENT OF CONTRACT AMOUNT ACCEPTED BY: ORIGINAL CONTRACT AMOUNT CO # 1 - CC - 04/15/10 CO # 2 - CC - 07/15/10 NEW CONTRACT AMOUNT $155,507.76 $26,474.99 $25,419.23 Castco Construction, Inc. Date ATTEST: $207,401.98 ?EALO; -n Cynthia E. Goudeau, Date: ('11 It- -D- /L) CITY OF CLEARWATER, in PIN LAS COUNTY, FLORIDA William B. Horne, II City Manager B (SEAL) -, Israel Castro, President Recommended By: City of Clearwater Perry M.-Lopez - Construction Manager Michael D. Quillen, P.E. Engineering Director Camilo Soto, Assistant City Attorney Date: (Off Ito Page 2 of 2 Change Order #2 Re: 2009 Bridge Rehabilitation (09-0050-EN) ITEM DESCRIPTION QUANTITY UNIT UNIT COST TOTAL COST Bridge Code: 0315-92274-563800-541-000-0000 "A" Decreases 11 Repair cracking, delaminations and 1 LS $17,502.03 ($17,502.03) spalling of concrete' cap and sheet piling at south abutment Increases 14 Repair cracks in west bridge rail 1 LS $2,333.60 $2,333.60 15 Repair crack in underside of west 1 LS $2,333.60 $2,333.60 rail Total Increases Code A: $4,667.20 Additions 37 Repair cracking, delmaination and 1 EA $17,502.03 $17,502.03 spalling with new cap repair detail at south abutment 38 Repair cracking, delmaination and 1 EA $17,502.03 $17,502.03 spalling with new cap repair detail at norh abutment Total Additions Code A: $35,004.06 Total (Decreases)/Increases/Additions Code A: $22,169.23 Sewer Code: 0376-96665-563800-533-000-0000 D Additions 39 Remove existing and replace four 1 LS $3,250.00 $3,250.00 8" 45 degree elbows on the existing force main Total Net (Decreases)/Increases/Additions to Contract: $25,419.23