BEACH CONNECTOR TRAIL AND WALK - PHASES 1 & 2 - 04-0042-EN - ADMINISTRATIVE CHANGE ORDER #1 & FINAL
ADMINISTRATIVE CHANGE ORDER #1 & Final PROJECT: Beach Connector Trail and Walk - Phases 1 & 2 Date: June 1. 2010 PROJECT NUMBER: 04-0042-EN PO REFERENCE NO.: ST 105479 COUNCIL AWARD: May 21, 2009 CONTRACTOR: Clark Hunt Construction, Inc. 2165 Logan Street Clearwater, Florida 33765 DATE OF CONTRACT: June 23, 2009 CODE: 0315-92342-563500-541-000-0000 SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT To adjust quantities to what was actually used and add 28 days to the contract. See attached sheet for decreases / increases and additional items. STATEMENT OF CONTRACT AMOUNT ACCEPTED BY: ORIGINAL CONTRACT AMOUNT $898,57799 Clark Hunt Construction, Inc. Adm. CO #1 & Final ($140,389.03) NEW CONTRACT AMOUNT $758,188.96 By: ?? S A) Warren C. Hunt, Presidci ATTEST: is E. Goudeau, Date: 101 v CITY OF CLEARWATER, in PINELLAS COUNTY, FL ?r- 7 - ? r r Date: _ ko 113 Witnesses: ILL' William B. Home, 11 City Manager Recommended By: City of Clearwater ATTEST: Assistant City Attorney C'"'M;lo Soto M. Michael D. Quillen,'?.E. Engineering Director Page 2 of 3 Administrative Change Order #1 & Final Re: Beach Connector Trail & Walk - Phases 1 & 2 (04-0042-EN) ITEM DESCRIPTION Phase I Decreases 4 Concrete Driveway Removal 5 Concrete Sidewalk Removal 7 Tree Removal 8 Excavation, Trail 9 Fill, Trail 13 Concrete Sidewalk, 4" 15 Concrete Rip-Rap (Contingency) 16 Adjust Force Main Structure Top 17 Raise Utility Pole Box 18 Sod 19 Relocate Water Fountain & Service Connection 24 Water for Grass 30 Quercus Virginiana (Live Oak) 65 gallon 14-16' ht 3" cal Florida Fancy 33 Arachis Glabrata - Rhizoma (Perennial Peanut'Ecoturf) 38 Utility Allowance 39 10% Contingency Increases 10 6" Type "B" Stablization 11 8" Crushed Concrete Base 12 1 1/2" Superpave Asphalt Concrete (Traffic A) (Trail) 14 Header Curb 6" Concrete (Non FDOT Participating) 20 Water Service Sleeve (HDPE - 4") 25 6" Conduit & (3) 1- 1/4" Innerducts Underground Additions 40 Concrete Sidewalks 6" 41 PE Vault #1 Realignment 42 Plant Change 4" Pots & Quart Size QUANTITY UNIT UNIT COST TOTAL COST 621 SF $1.02 ($633.42) 130 SY $6.59 ($856.70) 1 EA $121.89 ($121.89) 439 CY $8.52 ($3,740.28) 548 CY $11.28 ($6,181.44) 418 SF $2.67 ($1,116.06) 125 SF $6.30 ($787.50) 1 EA $709.80 ($709.80) 1 EA $1,001.00 ($1,001.00) 276 SF $0.16 ($44.16) 1 EA $283.14 ($283.14) 33 MG $12.14 ($400.62) 1 PL $335.97 ($335.97) 2,480 SF $2.28 ($5,654.40) 1 LS $75,000.00 ($75,000.00) 1 LS $48,496.06 ($48,496.06) Total (Decreases) Phase I: ($145,362.44) 1,105 SY $3.71 $4,099.55 2,208 SY $9.11 $20,114.88 31 TON $87.00 $2,697.00 217 LF $4.68 $1,015.56 82 LF $12.00 $984.00 21 LF $12.50 $262.50 Total Increases Phase 1: $29,173.49 301 SF $4.83 $1,453.83 1 LF $7,192.00 $7,192.00 1 LS $11,839.00 $11,839.00 Total Additions Phase I: $20,484.83 Total Net (Decreases)/Increases/Additions Phase 1: ($95,704.12) Phase II Decreases 105 Root Pruning 108 Concrete Driveway Removal 111 Relocate Water Meter 113 Tree Removal 124 Concrete Driveway 124a Concrete Driveway (Non FDOT) 685 LF $3.00 ($2,055.00) 854 SF $1.02 ($871.08) 1 EA $293.83 ($293.83) 6 EA $255.00 ($1,530.00) 15.49892 SF $4.63 ($71.76) 1407 SF $4.63 ($6,514.41) Page 3 of 3 Administrative Change Order #1 & Final Re: Beach Connector Trail & Walk - Phases 1 & 2 (04-0042-EN) Phase II continued Decreases 127 Concrete Sidewalk Ramp 487.40 LF $5.92 ($2,885.41) 129 Header Curb, 6" Concrete 201 LF $5.00 ($1,005.00) 132 18" Reinforced Concrete Pipe 10 LF $20.57 ($205.70) 1.35 FDOT Inlet Type J-5 0.30095448 EA $4,126.87 ($1,242.00) 139 Adjust Manhole 1 EA $483.29 ($483.29) 144 Pavement Marking, 18" 28 LF $2.65 ($74.20) 145 Pavement Marking, 24" 70 LF $3.00 ($210.00) 146 Pavement Marking Removal, 6" 67 LF $0.75 ($50.25) 148 Pavement Marking Removal, 24" 72 LF $3.00 ($216.00) 152 Rcmovc Existing Pavcmcnt Markings 300 SF $1.50 ($450.00) 155 Sod 11.04 SF $0.26 ($287.04) 157 Irrigation Sleeve (SCH 80 - 2 inch) 35 LF $6.45 ($225.75) 158 Utility Allowance 1 LS $50,000.00 ($50,000.00) 159 10% Contingency 1 LS $33,192.85 ($33,192.85) Total (Decreases) Phase 2: ($101,863.57) Increases 106 Asphalt Driveway Removal 1 SY $2.04 $2.04 107 Concrete Curb Removal 314 LF $1.30 $408.20 114 Excavation, Trail 104 CY $112.13 $11,661.52 120 8" to 2" Variable Crushed Concrete 3 SY $7.09 $21.27 Base 122 1 " Superpave Asphalt Concrete 1 TON $11.1.00 $111.00 (Traffic A) (Trail) 123 2" Superpave Asphalt Concrete 62.24 TON $150.00 $9,336.00 (Traffic A) (Roadway) 125a Concrete Sidewalk 4" 39 SF $2.65 $103.35 125a Concrete Sidewalk 4" 1,474 SF $2.65 $3,906.10 126 Concrctc Sidewalk 6" 88 SF $4.83 $425.04 128 Detachable Warning Strip 162 SF $19.21 $3,112.02 130 Curb & Gutter, Type 1 65 LF $15.19 $987.35 131 Straight Curb, 6" 148 LF $8.79 $1,300.92 147 Pavement Marking Removal, 12" 52 LF $1.50 $78.00 150 Bi-Directional Arrows, Thermoplastic 2 EA $88.00 $176.00 153 Retro Reflective Pavement Marker 129 EA $4.10 $528.90 Total Increases Phase 2: $32,157.71 Additions 160 Trench Drain and Asphalt Patch 1 LS $6,289.30 $6,289.30 161 Duct Bank Adjustment 1 LS $525.00 $525.00 162 Asphalt & Base Adjustment 1 LS $4,458.00 $4,458.00 163 Cutting of FDOT Wall I LS $2,020.00 $2,020.00 164 STS 1 LS $11,728.65 $11,728.65 $25,020.95 Total Net (Decreases)/Increases/Additions Phase II: ($44,684.91 Total Net (Decreases)/Increases/Additions to the Contract ($140,389.03