Loading...
LAKE BELLEVUE BRANCH 6A STORMWATER MANAGEMENT PROJECT - 03-0030-EN - ADMINISTRATIVE CHANGE ORDER #4 ADMINISTRATIVE CHANGE ORDER # 4 PROJECT: Lake Bellevue Branch 6A Stormwater Treatment Project Date: June 25, 2010 PROJECT NUMBER: 03-0030-EN PO REFERENCE NO.: ST 105380 CONTRACTOR: Caladesi Construction Company 1390 Donegan Rd. Largo, Florida 33771 COUNCIL AWARD: April_ 15, 2009 DATE OF CONTRACT:May 1, 2009 CODE: 0315-96152-563700-539-000-0000 A CODE: 0315-92273-563700-541-000-0000 B CODE: 0376-96742-563800-533-000-0000 C CODE: 0376-96634-563800-535-000-0000 D . SCOPROFCHANGE:?-- THIS CH- GE.ORDER ACCEPTSREVISIONS TO THE. CONTRACT This-chan'ge order is todecrease unu sedit nd increase items for additional ems,a drainage and road work. See.attached sheet for:detail. .... . STATEMENT OF CONTRACT AMOUNT ACCEPTED BY: ORIGINAL CONTRACT AMOUNT $1,662,525.45 Adm. CO # 1 - CM - 08/14/09 $14,375.00 Adm. CO # 2 - CM - 11/04/09 $5,260.00 Adm. CO # 3 - CM - 3/4/10 $40,040.00 Adm. CO # 4 - CM - ($12,201.64) NEW CONTRACT AMOUNT $1,709,998.81 4hi ST: ka E. to Date: lu old CITY OF CLEARWATER, in PIN AS COUNTY, FLORIDA William B. om f II APPR ED AS T( City ? Cler? 4 S ./,?F N ?yr City Manager Ca la esi Constru=Company B) : (SEAL) Donald J. Hi ichs, President' Date: r - Perry M. Lopez Construction Manager r", Camilo Soto Assistant City Attorney Michael D. Quillen, E. City Engineer -i Recommended By: City of Clearwater Page 2 of 3 Administrative Change Order # 4 Re: Lake Bellevue Stormwater Management Project (03-0080-EN) ITEM DESCRIPTION QUANTITY UNIT UNIT COST TOTAL COST Stormwater Code A: 0315-96152-539-000-0000 Decreases I110 Remove existing Manhole and 2 EA $750.00 ($1,500.00) fill 1111 Remove existing Inlet and fill 3 EA $750.00 ($2,250,00) 1116 Brick and Morter Plug 1 EA $1,200.00 ($1,200.00) 1214 Install Storm Sewer 15" RCP 36.5 LF $32.20 ($1,175.30) 1217 Install Storm Sewer 30" RCP 5.5 LF $64.19 ($353.02) 1218 Install Storm Sewer 29"x45" 12 LF $115.00 ($1,380.00) ERCP 1219 Install Storm Sewer 36" RCP 30 LF $78.00 ('$2,340.00) 1220 Connect to Existing Storm 4 EA $350.00 ($1,400.00) Structure or Pipe Total (Decreases) Code A: ($11,598.32) Increases 1210 Install FDOT Junction Box 1 EA $3,385.00 $3,385.00 (Type J-Alt B) Total Net (Decreases)/] ncreases Code A: ($821.3.32) Roads Code B: 0315-92273-541-000-0000 Decreases 2002 Install Type I Curb Index 101 127 LF $17.4486 ($2,215,97) 2008 Prepare Subgrade 759.31 SY $2.4919 ($1,892.12) 2011 Embankment Roadway 120.52 CY $14.51 _($1,748.75) Total (Decreases) Code B: ($5,856.84) Increases 2001 Standard Milling 521 SY $4.25 $2,214.25 2005 Surface Course - Asphalt Conc. 154.3 TONS $110.00 $16,973.00 Type III 2007 Install 8" Crushed Conc. Base 360.1 SY $10.00 $3,601.00 Total In creases Code B: $22,788.25 Total Net (Decreases)/Increases Code B. $16,931.41 Water Code C:0376-96742-563800-533-000-0000 Decreases 3001 Install Water Main 8" (PVC) 17.85 LF $14.00 ($249.90) 3002 Install Water Main 8" (DIP) 1.5 LF $34.00 ($51.00) 3005 Install Gate Valve (8") 2 EA $1,200.00 ($2,400.00) 3006 Tapping Sleeve and Valve (8"x8 I EA $3,400.00 ($3,400.00) 3008 Vertical Offset 12" Water 1 EA $1,800.00 ($1,800.00) 3011 Utilities Relocation (Vertical 1 EA $525.00 ($525.00) and/or Horizontal Offsets) 3012 Install Gate Valve (12") 1 EA $1,700.00 ($1,700.00) 3013 Utility Pipe to be Removed </= 333 LF $6.10 ($2,031.30) 10" Dia. Total (Decreases) Code C: _ ($12,157.20) Page 3 of 3 Administrative Change Order # 4 Re: Lake Bellevue Stormwater Management Project (03-0080-EN) ITEM DESCRIPTION QUANTITY UNIT UNIT COST TOTAL COST Sewer Code D: 0376-96634-563800-535-000-0000 Decreases 3101 Remove and Replace Sanitary - 66.5 LF $44.85 ($2,982,53) 8" 3102 Remove and Replace Sanitary - 20 LF $70.00 ('$1,400,00) 12" 3103 Remove and Replace Sanitary 3 EA $1,060.00 ($3.180.00) Sewer Laterals (Contingency) 3104 Adjust Manholes 2 EA $600.00 ($1,200.00) Total (Decreases) Code D: ($8,762.53 Total Net (Decreases)/Increases to Contract: ($12,201.64) Total Net (Decreases)/Increases Stormwater Code A: 0315-96152-563700-539-000-001 ($8,213.32) Total Net (Decreases)/Increases Roads Code B: 0315-92273-563700-541-000-0000 $16,931.41 Total Net (Decreases)/Increases Water Code C: 0376-96742-563800-533-000-0000 ($12,157.20) Total Net (Decreases)/Increases Sewer Code D: 0376-96634-563800-535-000-0000 ($8,762.53) ($12,201.64)