CONTRACT FOR ASBESTOS REMOVAL
I I
COH.I8ACI .:::.
This CONTRACf made and entered into this 13th day of November
, 19~, by
and between the City of Clearwater, Florida, a municipal corporation, hereinafter designated as
"City" and Lang Engineering, of Tampa, County of Hillsborough, State of Florida, hereinafter
designated as "Contractor."
WITNESSETH:
That the parties to this contract each in consideration of the undertakings, promises and
agreements on the part of the other herein contained, do hereby undertake, promise and agree
as follows:
The Contractor, and his or its successors, assigns, executors or administrators, in
consideration of the sums of money as herein after set forth to be paid by the City to the
Contractor, shall and will at its own cost and expense perform all labor, furnish all materials,
tools and equipment as detailed in:
University of South Florida Contract with Lang Engineering for
Asbestos Removal as specified in USF invitation to Bid No. 3-2065-K
In accordance with the City's attached technical specifications and the Contractor's bid
response, together with any instructions to bidders, general conditions, and proposal, which may
be hereto attached, are hereby made a part of this contract, and all of said work to be performed
1
I
I
and completed by the Contractor and its successors and assigns shall be fully completed in a good
and workmanlike manner to the satisfaction of the City.
If the Contractor shall fail to comply with any of the terms, conditions, provisions or
stipulations as contained herein within the time specified for completion of the work to be
performed by the Contractor, then the City may, at its option, avail itself of any or all remedies
provided on its behalf and shall have the right to proceed to complete such work as Contractor is
obligated to perform in accordance with the provisions as contained herein.
THE CONTRACTOR AND HIS OR ITS SUCCESSORS AND ASSIGNS DOES
HEREBY AGREE TO ASSUME THE DEFENSE OF ANY LEGAL ACTION WHICH
MAY BE BROUGHT AGAINST THE CIlY AS A RESULT OF THE
CONTRACTOR'S ACTMTlES ARISING OUT OF THIS CONTRACT, AND
FURTHERMORE, IN CONSIDERATION OF THE TERMS, STIPULATIONS AND
CONDITIONS AS CONTAINED HEREIN, THE CONTRACTOR AGREES TO
HOLD THE CI1Y FREE AND HARMLESS FROM ANY AND ALL CLAIMS FOR
DAMAGES, COSTS OR SUITS,JUDGMENTS OR DECREES RESULTING FROM
ANY CLAIMS MADE UNDER THIS CONTRACT AGAINST THE CIlY OR THE
CONTRACTOR OR THE CONTRACTOR'S SUB-CONTRACTORS, AGENTS,
SERVANTS OR EMPWYEES RESULTING FROM ACTMTIES BY THE
AFOREMEN'I10NED CONTRACTOR, SUB-CONTRACfOR, AGENTS, SERVANTS
OR EMPWYEES.
2
I
,.
,. 4
I
I
In addition to the foregoing provisions, the Contractor agrees to conform to the following
requirements:
In connection with the performance of work under this contract, the Contractor agrees not
to discriminate against any employee or applicant for employment because of race, sex, religion,
color, or natural original. The aforesaid provision shall include, but not be limited to, the
following: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising;
lay-off or termination; rates of payor other forms of compensation; and selection for training,
including apprenticeship. The Contractor agrees to post hereafter in conspicuous places, available
for employees or applicants for employment, notices to be provided by the contracting officer
setting forth the provisions of the non-discrimination clause.
The Contractor further agrees to insert the foregoing provisions in all contracts hereunder,
including contractors or agreements with labor unions and/or workers' representatives, except sub-
contractors for standard commercial supplies or raw materials.
3
"
I
I
ZH WITHESS WBERBOP, the parties to the agreement have hereunto
set their hands and seals and have executed this Agreement, in dupli-
cate, the day and year first above written.
CITY OP CLEARWATER
IN PINBLLAS COUNTY, PLORIDA
(SEAL)
By:
EliZ.f1!i.hhM~la
ty Manager
Attest:
City Clerk
Countersigned:
issioner
Approved as to form and legal
sufficiency:
2F' =-
J n C. Carassas
Assistant city Attorney
-..:.::.
(Contractor must indicate whether
corporation, partnership, Company
Lang Engineering,
a Florida CorDoration
or Individual.)
By:
(The person signing shall, in
his own handwriting, sign the
Principal's name, his own name,
and his title; where the person
is signing for a corporation,
he must, by Affidavit, show his
authority to bind the Corporation).
( SEAIT).:
4
11/04/Q6 18:13
U813 6j3 6012
1aI001l012
I
RECEIVED
, 5428 561H COMMERCE PARK BLVD.
, TAMPA. R.ORIDA 33610-6857
(8131 6~2-8311
, ,F~(813) 623-6012, '
Nf1/'" 5 1996
'LANG
ENGINEERING Bid . & Maint
OF~INC"
SENT VIA FAX: (813) 462-6457
Mr. James D. ,Wood .
Building & Maintenance Division
, City of Clearwater
1900 Grand Avenue,
Clearwater, ,Florida 34t;)18
proposal:
City Hall Building
Clearwater; Florida
B-96-264
. November 4, 1996
, Bid No.: .
Date:
Dear Mr. W90d:
We ~re pl~ased to 'p'rovide the following unoHo-:exceed- proposal for removal ~f asbestos eontaioLng
materials (ACM) from the City Hall Building located at 112, South Osceola Avenue. Clearwater,
Florida. This proposal Is based upon the' site 'Its It, revIew of the Plans and OHC SLirvey, and Is more
speCifically outlined In this proposal'letter.. "
WORK I NCLUOED.,
. Post asbestos warning signs 'and barrier tape around the perimeter of the work area to notify all
personnel In each area th~t asbestos removal is taking place.
"
. Install' a tun, chambered decontamination unit consisting of a clean room, shower room and
, equipment room ,for each ,maj~r work are~ or as appropriate.
. Install sufficient air filtration machines to chango out the air In the work areas, as r:equired.
, .
. Construct a containment system consisting of critical barriers to seal the, openings. Into each work
area.
, . !nstall6 mil poly on the floors and on the walls, as appropriate, ,
. Remove ,and dl,spose of as ACM, approximately 1 ns square feet of popcorn ceiling spray from
the drywall substrate In the areas designated on the Plans, discussed ~uring the site visit of
October 30, and our subseq~ent 'phone conversation of November 1', 1 a9,6 expanding 'the
suiface to be abated, '
, . Following ,removal of as~estos~ the work area will' be ,HEPA vacuumed and wet wiped as
necessary, and, encapsulated to lock down any fibers. '
. All ACM removed, will be double bagged' or wr:apped' in 6' mil poly, stored in a dumpster or
lockable trailer on site, and then disP!Jsed of at an approved'landfill. .
Work detailed above will be completed in comp!iance with 'EPA and OSHA regU~a~ions.
. , ErWironmental Remediation Specialists . ~ Abatement . IAQ" .' '
General Contractor It CGCA23888 . Asbest()S Co~ctor K.JC046268 . Mechanical Contrador #CMC05680S ,
~1/04/96 18:13
'C813 6j3 6012
1lI002/012
I,
City, HaJJ Building
NO,vember 4, 1996
Page 2.
WORK BY OTHERS
. Following removal of asbestos in the work area, the owner's Independent laborat~ry, OHC, will
run final clearance testing as required with acceptable levels being less than or eq,uai,to 0.01 flee
as measured by PCM (PhaSe Contrast M1croscopy). '
, , .
. '
.' , Secutlty of ~orK area during non:-working hours,
,. " Pro,vide electric and 'w~ter for us~ during removaf operations', if .required.'
, SAFETY AND QUALITY CONTROL PROGRAM
Lang' Englnee~lng has an aCtive'" safety program' with ,8 dedic~ted safety 'manage~, who will,'
monitor the' project andeonduct weekly safety meetings, as appropriate.
.
.
" '
Lang Engineering' has' Instituted a Drug Free Work. Place' Policy in acco,rdance with State of
Florida regul1!ltions. , , " .'" ' ' " '" ,',
Personnel ,air monitoring analysis will b~' performed by an independent tes~ing: l~b6ratorY and
Lang En~ineering will bear '!he cost for this program.'
" ,
.
.
.' .'
All personn'e~ working on thi!!l'project will have ,pre-employment physicals, and have the medical
examinations a,vailable for your review, In accordance with OSHA requlre~e~ts.
The supervisor for this ,project Will have Completed the one week "Asbestos Ab~teme;,t Proj~ct
Management and Supervision" course offered by the University of Florida in Galne~ville.' This is
in'aCcorda.nce.with S~te of Florida legislation. '
.
, '
. Air personnel working on thi$ project will have completed a' training program covering the key
, aspects of asbestos and safe removQI~ A copy ~f the oUtl!ne is available for review. '
. All personnel shall Complete ,8 ~esplrator' training program as 'p~rt of their overall 'training and
shall wear disposable protective ~veraJI~ for removat' and disposal operations. " , ~
. 'All personnel will complete a certificate o(worke'~s release form, outlining his, understandi~g of
the nsks':associate'd'.wi~h asbe~tos removal, . ' " " '
I
U/04/96 18: 14
"
U813 6f 6012
laJ 003101.2
I
City Hall Buil~ing
. ~ovember 4, 1996
Page 3"
LICENSING'
Lang Engineering h~s met all of the requirements for licensing a~. an Asbestos . Contractor. (CJ
C046268) an,d Class "A" General Contractor (CG CA23888) in' Florida. Lang also' holds a
Mechanical Contra~or License (CM C056805) and State of Florida ausiness License (ZA 0000023).
DOCUMENTATION
. " . .
Lang Engineering will' assu~' that the oWne'r receives all' required dQcumentatlori before and a:fter
any project. Prior to the &?tart, the' documentation may, consist of the following; EPA notification,
permits, insurance, bonds. ~tc. In' addition, post jot::! submittals, consisting of landfill 'receipts, dally
log's', air monitoring results, etc. will be submitted'to the cliEmtafter the project is completeQ, ' ,
'INSURANCE
Lang Engineeri~g h~s. a basi'~ $1, million OcC!-,rrence policy for asbestos' specia!' liability insurance
and also a $1 million policy for general liability, automobile and workers compensatlo'n. The owner
will be named as an addltlonlill insured.
.PRicE AND SCHEDULE
Base Bid ' , ' '
Following your notice to procee,d, we are prepar.ed to begin thiS project af a, mutually agreeable date,
a,nd complete this work in approximately' five (5) work days: Preparation work, removal, cleanup,
and disposal, as detailed above, will be completed for the "not,:to-exc~ed. price of.,,$23.745.25: as
detalled on the 'attached estimate form. This propo~alls based on the Unive~lty 'of South Florida
Contract that is currently in place with the 'City, and ati ,underruns will be n;talized 'by the City of '
Clearwater., ' ,'"
, ODtion No.1, .
Per your ,requ~st, we are pleased to provide an estimat~d cost for the removal of 526 square feet
HVAC duct Insulation and mastic from designated areas 'of the 'duct lines runnIng, thro'ugh,the. north
'and south duct chases~ As dIscussed during the, site visit, we wiil be removing 2 linear feet (8 square
feet) of Insulation and mastic'from each" 0; the 12 lines (per floor) running'from the First .to the Third
Floor, The estimated ,cost 'for this WorX will be $2,435.72 and can be comple,ted within ,the five' day~
noted above.' . ,,' ,'.
11/04/Q6 18:13
U813 623 6012
1
IaI 004/(112
1
City Hall ,Building
November 4,' ,1996'
Page 4.
, .
INVOICING & TERMS
One invoice Will t;Je submitted at the completion 'of' each work activity with payment terms being net
30 from date oflnvolG8. A f1~an~ 'Charge of 1.25% per month will be due on all invoices not paid
within 30 days of date of Invoice. '
,
Please let me know jf you' require 'any additional : information concerning this proposal~ ' We
appreciate the, opportunity to be of a~sistance' to you' on this and future projects. ,Lang will contact
OHC to coordinate the start of this 'WOrk" Advise atear1iest convenience ,the' date You wish u~ to
proceed., '
~
, Shicerely,
~~,~
CalhertneA CroWley . '7
Manager', 'Business Developme,nt
11/04/96 18: 15
'0'813 623 6012
)
III (II) !} 1 0 12
1
Clwehall11/1/96
3:29 PM
l.IIng Engineering of Florid., Ino.
CITY OF CLI!ARWATER
CITY HALL BUILDING -112 South Osceola Avenue
CLEARWATER, FLORIDA
Ceiling Scrape
10/31188
ESTIMATeD UNIT EXTENDED
DESCRIPTION QUANTITY ;' UNIT PRice TOTAL
AlA WORK 8--5 M-F NO HOLIDA VS
Supervisor 55 HRS $19.40 $1 067,00
Foreman HRS $19.40 $0.00
Worker eao HRS $19.40 $13,192.00
AlA WORK AFTER HRS , WEEKENDS
SupelVlsor HRS $20.40 $0.00
Foremen HRS $20.40 $0.00
Worker HRS $20,40 $0.00
AlA WORK ON HOLIDA VS
Supervisor HRS $20.40 $0.00
Foreman HRS $20.40 $0.00
Worker HRS $20.40 $0.00
HEIGHT FACTORS
AlA WORK 8-6 M-F NO HOLIDAYS
Supervisor
8-12 feet overhead I HRSI $29.95 I $0.00
OVer 12 feet overhead I HRS I $29.95 I $0.00
Foreman
8-12 feet ovemellld I HRS I $29.95 I so. 00
OVer 12 feet overhead I HRSI $29.95 I $0.00
Worker
8-12 feet overhead I HRSI $29,95 I $0,00
Over 12 feet overhead I HRSI $29,95 T $0.00
AlA WORK AFTER HRS , WEEKENDS
Supervisor
8-12 feet overhead I HRS I $30.95 $0,00
Over 12 feet overhslIld I HRsl $30.95T $0,00
Foreman
8-12 fest overhead I HRSI $30.95 I $0.00
Over 12 fest overhead I HRSI $30.95 I $0.00
Worker
8-12 feet overhead I HRS I S30.95 I $0,00
Over 12 feet overhead THRSI $30,95 T $0,00
AlA WORK ON HOUOA VS
Supervisor
8-12 filet overhead I HRsl $30,95 I $0.00
OVer 12 feet overheed I HRSI $30.95 I $0,00
Foreman
8-12 feet overhead I HRS I $30.95 ul $0.00
OVer 12 feet overhead I HRSI $30.95 1 $0.00
Worker
s..,:z feet overhead I HRSI $30,95 I $0.00
OVer 12 filet overhead I HRSI $30.951 $0,00
ESTIMATe
~
Page 1
11/04196
18:16
U813 623 6012
I
IaI 006/012
1
ClwehaIl11/1/96
3:29 PM
Lang Engineering of Florida, I no.
CITY OF CLeARWATER
CITY HALL BUILDING -112 South Osceola Avenue
CLEARWATER, FLORIDA
Ceiling Sorape
10/31/98
ESTIMATI!
ESTIMATED UNIT EXTENDED
DESCRIPTION QUANTIIY UNIT PRICE TOTAL
MOBILIZATIONS
st Petersburg 5 EAI $1.00 I $5.00
CONTAINMENT INSTALL I BREAKDOWN
Full containment 11357 SF $0.50 $5,678.50
Full decontamination unit EA $10.00 $0,00
BULK REMOVAL, ENCAP, & DISPOSAL
MISCELLANEOUS ITEMS
2')(4' Suspended celllnas SF $0.05 $0.00
Hidden spline ceiling SF $0.01 $0.00
Built-up roofing material SF $0,01 $0,00
Flllshlng material SF $0,01 $0.00
DuctlnQ material SF $0.02 $0.00
Vibration dampers SF $0.05 $0.00
Floor tile SF $0.01 SO.OO
Floor tile with mastlo SF $0.02 $0,00
Vinyl sheetlna SF $0.01 $0,00
VinYl sheeting with mll.tlc SF $0.01 $0.00
T.S.I.-(PIPE INSULATION)
Less then 6" diameter LF $0.10 $0.00
Less than e" diameter with metal jacket LF $0.10 $0.00
8" to 12" diameter LF $0.10 $0.00
6" to 12" diameter with metal Jack8t LF $0.10 $0.00
Greater thliln 12" diameter LF $0,20 $0.00
Greater than 12" diameter with metaljaoket LF $0.20 $0.00
External wrap or coatlna LF $0.20 $0.00
Insulation on tank LF $0.20 $0.00
SURFACI: MATERIAL
Flat $orape with olaster substrate to remain SF $0.01 $0.00
Flat 8Cf1lP8 with sheetrock to remain SF $0.01 $0.00
Removing including plaster substrate SF $0,01 $0.00
Removal including sheetrock 6ublrtrate SF SO,01 $0.00
SCfllpe on concrete plaster decking SF $0,01 $0.00
Scrape on concrete sheetrock decking 1775 SF $0.01 $17.75
scrape on cOfTUgated decklna SF $0.01 $0.00
Beam scrape (SF of beam) SF $0.01 $0.00
Joist screDe ILF of joIst) SF $0.01 $0.00
SMALL SCALE - MEET REQ'T OF SECTION 2083
Glovebag with removal (ie. oiolml fitting removal) I EA $95.00 I $0.00
Minl-enclosure removal I EA I $10,00 I $0.00
SOIL REMOVAL
ACM Contaminated soli (per 2" deep) I SF I $0.01 I $0.00
Vec-Loader (for all areas > 1,000 SF) I HRSI $10.00 I $0.00
TRANSITE REMOVAL
"-
Page 2
- --- --
11/04/96 18:16 '6"813 623 6012 laJ 0071012
. I I -
Clwehall 11/1/96
3:29 PM
Lang Engineering of Florid., Inc.
CITY OF CLeARWATER 10/31/86
CITY HALL BUILDING -112 South Osceola Avenue
CLEARWATER, FLORIDA
Ceiling SCrape
~TlMAT~
ESTIMATEO UNIT EXTENDED
DESCRIPTION QUANTITY UNIT PRICE TOTAL
1/8" Flat Sheets SF $0.06 $0.00
1/4" Corr\lgated Sheets SF $0.05 $0.00
OTHER MISC ITEMS -IF REQUIRED
ACM DisDosal fee (Cost per ton) TN $5.00 I $0.00
Non-Asbestos Dlsposal1ee I TN $3.00 I $0.00
Subtotal = $19,950.25
'-
'-
Page 3
.
eST. EST. UNIT EXTENDED
DESCRIPTION QTY UNIT QTY UNIT PRICE TOTAL
EQUIPMENT
Mobile decontamination unit EA OA $95 0.00
Storage van (40') EA OA $40 0.00
PassenQer van 2 EA 6 OA $90 900.00
Plck~up truck EA OA $70 0.00
Box truck EA DA $120 0.00
Tractor for 26' tfllller EA OA $75 0.00
C.rgo trailer (7'x16' 1 EA 5 OA $38 UIO.OO
Cargo trailer (8'X28' EA DA $47 0.00
Office tl1lller (8'x30' EA OA $60 0,00
2000 CFM HEPA air filtration unit 3 EA 6 DA $55 826.00
2 HP HEPA vacuum 2 EA 5 OA $37 370.00
4 HP HI:PA vaouutTI : EA DA $60 0.00
Air compressor (175 CFM) EA DA $125 0.00
8-man maxi air panel EA DA $90 0.00
Combo compressor & 6-man panel EA DA $150 0.00
Single shower unit 1 SA 5 DA $70 350.00
Double shower unit EA DA $120 0,00
Shower filter pump , EA 5 OA $60 300.00
A1rless SPfl!lver 2 EA 5 DA $50 500.00
Negative IJressure recorder EA DA $60 0.00
King pump EA DA $85 0.00
PBJ'1IOnnel monitoring DumD , 2 EA 5 OA $35 350.00
Vec-Loader EA OA $1,200 0.00
Sh~der(~rVe~Loader\ E.A. OA $250 0.00
Electric oenerator - 4 KW EA OA $35 0.00
Electrio aenerator - 15 KW EA OA $165 0.00
Transformer EA DA $80 0.00
Power panel SA DA $60 0.00
Pressure washer EA OA $53 0.00
Water heater : SA DA $25 0.00
Floor tile - tile lift tTllilchine E.A DA $180 0.00
Floor tile - shot blaster EA OA $130 0.00
Floor tile - mastic scrubber EA OA $115 0.00
Floor tile - mastic razor cutter EA DA $95 0.00
Subtotal. $3,785.00
~
~1I04/~6
18:17
'!!813 623 6012
I
Clwehall 11/1196
3:28 PM
Lang Engln..rlng of FlorldB, Inc. '- I
CITY OF CLEARWATeR :
CITY HALL BUilDING - 112 South Osceola Avenu.
CLEARWATeR, FLORIDA I
Ceiling Serape
ESTIMATE
Page ..
IaI 008/012
I
10/31/96
'-
Estimate Total" ~745.0
tl/~4/96 18:17
'C813 6r 6012
I
IaI 009/012
ClwehaIl11/1/QEl
3:27 PM
Lang Engineering of Florid., Inc.
CnY OF CU!ARWATI!R
CITY HALL BUILDING -116 South 05ceola Avenue
CLEARWATER, FLORIDA
HVAC Duct In8ulatlon Removal
10/31/96
ESTIMATEO UNIT EXTENDEO
DESCRI~ION QUANTITY UNIT PRICE TOTAL
AlA WORK 8-8 M-F NO HOLIDAYS
Supervisor 12 HRS $19.40 $232,80
Foreman HRS $19.40 $0,00
Worker 68 HRS $19.40 $1,280.40
AlA WORK AFTER HRS I WEEKENDS
Supervisor HRS $20,40 $0,00
Foreman HRS $20,40 $0.00
Worker HRS $20,40 $0.00
AlA WORK ON HOLIDAYS
Supervisor HRS $20.40 $0,00
Foreman HRS $20.40 $0,00
Worker HRS $20.40 $0.00
HEIGHT FACTORS
AlA WORK 8-5 M-F NO HOLIDAYS
Supervisor
&-12 feet overhead THRS $29.95 $0.00
OVer 12 feet overhead THRS $29.95 $0.00
Foreman
8-12 feet overhead I HRS $29.95 $0,00
OVer 12 feet overhead I HRS $29.96 $0,00
Worker
&-.12 feet overhead I HRSI $29.95 $0,00
OVer 12 feet overhead THRSI $29.95 I $0,00
AlA WORK AFTER HRS I WEEKENDS
SupelVillor
tl-12 feet overhead HRSI $30.95 I $0,00
Over 12 feet overhead HRSI $30.95 I $0.00
Foreman
8-12 feet overhead HRSI $30.96 I $0.00
OVer 12 feet overhead HRSI $30.95 I $0.00
Worker
8-12 feet overhead HRSI $30.95 I $0.00
Over 12 feet overhead HRSI $30.95 I $0.00
AlA WORK ON HOUDAYS
Supervisor
8-12 fest overhead HRSI $30.95 I $0.00
Over 12 feet overhead HRSI $30.95 I $0.00
Foreman
8-12 feet overhead rHRS I $30.95 I $0.00
OVer 12 feet overhead I HRS I $30.95 I $0.00
Worker
8-12 feet overhead I HRSI $30.95 I $0.00
OVer 12 feet overhead THRS $30,95 I $0.00
ESTIMATE
~
Page 1
11/04/96 18:18
U813 f3 6012
IaI 010/012
I
Clwehall1111/96
3:27 PM
Lang Engineering of Florida, Inc.
CITY OF ClEARWATER
CITY HAli BUILDING .112 South Osceola Avenue
CLeARWATER. FLORIDA
HVAC Duct Insulation Removal
10/31198
ESTIMATED UNIT EXTENDED
OESCRIPTION QUANTITY UNIT PRICE TOTAl
MOBILIZATIONS
St. Petersburg 2 I EA I $1.00 I $2.00
CONTAINMENT INSTALL 1 BREAKDOWN
Full containment 750 SF $0.50 $375.00
Full decontamination unit EA $10.00 $0.00
BULK REMOVAL, ENCAP. & DISPOSAL
MISCELLANEOUS ITEMS
2')(4' Suspended ceilings SF $0.06 $0.00
HIdden spline celllna SF $0.01 $0.00
Bullt-UD rooflna materiel SF $0.01 $0.00
FI.shlml material SF $0.01 $0.00
Duotlna meterial 578 SF $0,02 $11.62
Vlbl'Btlon dlilmDen SF $0.05 $0.00
Floor tile SF $0.01 $0.00
Floor tile with mastic SF $0,02 $0.00
Vinvl sheeting SF $0.01 $0,00
Vlnvl sheetlna with mastic SF $0.01 $0.00
T.S.I.-(PIPE INSULATION)
Less than 6" diameter LF $0.10 $0.00
Less than 6" diameter with metal iacket LF $0.10 $0.00
6" to 12" diameter LF $0.10 $0.00
6" to 12u diameter with metal jacket LF $0.10 $0.00
Greater than 12" diameter LF $0.20 $0.00
Greater than 12u diameter with metallacket L.F $0.20 $0.00
External wrap or costlna LF $0,20 $0.00
Insulation on tank LF $0,20 $0.00
SURFACE MATERIAL
FI.t IIICnll). with Diester sub5trate to remain SF $0,01 $0.00
Flat scrage with sheetrock to remain SF $0,01 $0.00
Removing including plaster Bubstnlte SF $0.01 $0.00
RemoYl!lllncludlng sheetrock substrate SF $0.01 $0.00
ScraDe on conc:rste Dlaster decking SF $0.01 SO,OO
SCf'8P8 on concrete sheetrock deckina SF SO.01 $0.00
Scrape on corrugated decking SF $0.01 $0.00
Beam scrape (SF of beam) SF $0.01 $0.00
Joist scrape (IF of loiet) SF SO.01 $0,00
SMALL SCALE - MEET REQ"T OF SECTION 2083
Glovebaa with removal! Cle. piplna fitUng removal) I EA I $95.00 I $0,00
Mini-enclosure removal I EA I $10.00 I $0.00
SOIL REMOVAL
ACM Contaminated soli (Der 2" deeo) I SF I $0.011 $0.00
Vec-Loader (for 1111 areaB > 1,000 SF) I HRSI $10.00 I $0.00
TRANSITE REMOVAL
~STlMATE
'----
'----
Page 2
r--------
~1I04/.96 18:18 U813 613 6012 I4l 011/012
. '. I
"--
Clwehall 11/1/96
3:27 PM
Lang Engineering of Florida, Inc:.
CITY OF CLeARWATER 10/31/96
CITY HALL BUILDING -112 South Osceola AvenLle
CLEARWATI;R, FLORIDA
HVAC Duct In.ulatlon Removel
eSTIMATE
ESTIMATED UNIT EXTENDED
DESCRIPTION QUANTITY UNIT PRICE TOTAL
1/8" Flat Sheets SF SO,05 $0,00
1/4" CorruQatllld Sheets SF $0.05 $0.00
OTHER MiSe ITEMS - IF RI;QUIRED
ACM Disposal fee (Cost per ton) TN $5.00 I $0.00
Non-Asbestos Disposal fee TN $3.00 I $0.00
Subtotal . $Ul01.72
'-
'-
Page 3
11/04/-96
18: 19
'5'813 Y3 6012
I
IaI 012/012
Clwehall1111/ge
3:27 F'M
Lang Engineering of Florida, Inc.
CITY OF CLEARWATER
CITY HALL BUILDING -11Z South Osceola Avenue
CLEARWATER, FLORIDA
HVAC Duct Insulation Removal
10/31/96
EST. EST. UNIT EXTENDeD
DESCRIPTION QTY UNIT QTY UNIT PRICE TOTAL
EQUIPMENT
Mobile decontamination unit EA DA $95 0.00
storage Van (40'\ EA DA $40 0.00
Passeneer van 1 eA 2 DA $90 180.00
Pick-up truck EA DA $70 0.00
Box truck EA DA $120 0.00
Tractor for 26' trailer eA DA $75 0.00
Cargo trailer (7')(16') EA DA $38 0.00
Cargo trailer (8')(26') EA DA $47 0.00
Offioe trailer (8'><30'1 EA DA $60 0.00
2000 CFM HEPA air filtniltlon unit 1 eA 2 DA $55 110.00
2 HP HEPA V1lcuum 1 EA 2 DA $37 74.00
4 HP HEPA vacuum EA DA $60 0.00
A1rcomDressor (175 CFM1 E.A. DA $125 0.00
8-man maxi air panel E.A. DA $90 0.00
Combo oompressor & 6-man panel EA DA $150 0.00
Single shower unit EA DA $70 0,00
Double shower unit EA DA $120 0.00
Shower !ilter pump EA DA $60 0,00
Alrle.s 'Imayer 1 EA 2 DA $50 100,00
NliKlatlve DllISsure recorder EA DA $60 0,00
Kina bumD &. DA $85 0.00
Personnel monitorina Dump 1 EA 2 DA $35 70.00
Vec-L.oader EA DA $1,200 0,00
Shredd.... (for Vee-Loader) EP. DA $250 0.00
Electric aenellltor - 4 KW EA OA $35 0.00
Electric aenerator - 15 KW EA DA $165 0.00
Transformer EA OA $80 0.00
Power panel EA DA $50 0.00
Pressure washer EA DA $53 0.00
Water heater EA DA $25 0,00
Floor tile - tile 11ft machine EA DA $180 0.00
Floor tile - shot blast.... EA OA $130 0.00
Floor tU_ w mastic scrubbet EA DA $115 0.00
Floor tile - mastic razor cutter EA DA $95 0.00
Subtotal .. $534.00
ESTIMATE
'--
Estimate Total '" 02,435~
Page~
......
I
I"
I
I
-.J
~ <(
0
-
a:
0
a: -J
z U.
0 >:1:
w c w<'> a:-
:E -
a: ...JW W
a: W:;E ~
0 ,
[[] <.> 3:
> a:
...J W <(
...J ...J W
< W -J
:I: ()
>- a: ..
l- OW
t) o=>
...JZ
a: U4( LLW
0 > ,..,co tn~
c w
- ~
a: ...J <(
a: W -J
0 ..J
<.> 0
>:1: W
w<'> 0
~I ...JW en
W~ 0
:J:
I I-
::;)
0
UJ
N
~ I
~
z
{
f
I
)
r
1~
f
I
z
I
.1
..J
..J
\~
:>-
\1-
i-
o
- -
-----i
m f - --;--
- [] I-
I
<u I >:1:
00 - wO
.... .... CD ...JW
~~ W::E
::E
........ ~ I >
........ W
..J
~ I~ I W I
........ r-....
I W
U (!) I
....
I .... c
- I
"- a:
"- m I
"- >
W
"- ..J
"- , W
"-
Z >:1:
w wO
::E ..JW
~ I W::E
I~T
-
l1J
I
I
"
<
Q
-
ex:
o
...J
I.L
..
ex:
W
~
3:
a:
<
w
...J
()
..
a:W
O::l
02
..JW
u.:>-
C<(
z<
C'\I...J
...J
o
W
()
en
o
:x:
t-
=>
o
en
C\I
,...
,...
j
, I
'/
...J
...J
<
:I:
>-
I-
-
o
z
J
I
I
~
UJ
0
Z
00<
o Z
.... -
u.
I
~
0: 0
0 a:
C ~
0:'
0:
0
0
::E
0:
:I:
o
z
::>
...J
0:
o
C
0:
0:
o
o
=m
t-
0.<
UJUJ <
00: (l)
w<
0:
--r -
~~,~
<(
Cl
0::
o
-J
u..
.
a:
W
~
s:
a:
<(
w
-J
U
0: ..
OW
o=>
...JZ
U.w
~~
('1)<(
-J
-J
o
W
U
en
o
:c
.....
::>
o
en
N
T-
T-
12/03/96
10:58
"&813 623 6012
III 002/002
.,.
II.~ AMERICAN
~ SAFETY
RISK RETENTION ~R(JU". INC.
1 845 The Exchange · Suite 200 . Atlanta, Georgia 30339
770~916-'908 · 800-388.3647 · FAX nO-9iG-06i8
INSURED PROJECT INFORMATION THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND
CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE
Contract No. PROOF OF INSURANCE DOES NOT AMEND. EXTEND, OR ALTER THE COVERAGE AFFORDED BY
P . t THE POLICIES BELOW.
rOJec PROOF OF INSURANCE
CERTIFICATE cpF INSURANCE
CERTlFlOATE NO.
962532391
ISSUE DATE (MMlDDIYY)
05/06/96
TOTAL CONTRACT AMOUNT
INSURED
LANG ENGINEERING OF FLORIDA, INC.
5428 56TH COMMeRCE PARle Iil W_
TAMPA, Fl 33610
.
THIS IS TO CERTIFY THAT POLICieS OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE
POLICY peRIOD INDICATEO. NOTWITHSTANDING ANY REQUIREMENT. TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT
WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PER'l'AIN, THE INSURANCE AF~ORDED BY THE POLICIES
OESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS. AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY
HAVE SEeN REDUCED BY PAID CLAIMS.
TYPE OF INSURANCE FORM OF COVERAGE POLICY NUMBER EFF=DATE fXPIM~:DATI! LIABILITY LIMITS
tMIMlOIYYl (MMIDDII'Y)
X ASBESTOS ABATEMENT
X COMMERCIAL GENERAL lIABILITY
x lEAD ~AINT ABATEMENT
OCCURRENCE
OCCURRENCE
OCt:URRENCE
ASC 96-253-00J
03/01/96
03/01197
$1,000,000.00 AGGREGATE
EACH
S1,OOO,000'000CCURRl;NCE
ADDITIONAL COMMENTS
"THIS CERTlFICATe IS FOR PROOF OF UISURANCE."
DeRl'Ipllon Of Operallonll/SpeCllal Ilems
ThllllertlllClal1lIs not a polley, and is Il&uBd lot' inloll'llalion purposel only. This cerlirlcalo CO/'Jers no r1gll111 on IhB cer1irlClille IIoldor, ~nd dOes nOI Imlllld. extend or 311er Ihe lerms, conditions Qr
excluslonl contained in 11IO policy reler_d ebove. Thll roclplent of Ihl. cel1lnClBte 1185 ,,", obligation 10 verily CloyeTBlIes lor the N~1lIe(I Insured and any Addllio~1 Insureds. and the
IOrml\, ~ndlllonB and elcluslons In tile polley ref_ad abvvc.
This certilica. is iStllOd solely with rsspecllo lhe teleronced proltcl end is nol applicable 10 ally PlO/ecl nDl Ipeciflad on an insurance cerll/leala Issued by Ametican Salely Risk RelanUon Group,
Inc. t=ailurll oIlhe Insurvd 10 prilpetly repon all work perfolQllld Dn lhil teleronced proleet. end PlY aU applicalllo premiums therelDr, shan resull in lotlonure 01 all rlghls \D coverage under tile policy
sl1Dwn abDve. Coverage under the policy &hown above is condhlDnBd upon lheln&ulecl'S compliance wi" !I8Iety Guidelinaa issued Dy AAlerlcan Sa'ely Risk Rlllllllllon Group. 100, which lorm a pari 01
Ihe PDnCll AmeriCllll SOfOly RIsll RelBn'lon Group. lne. IOSOrves 1118 right 10 require inapllClions 01 the Ill!lUled'll performance on \he plOjoct Shown abon, and lailure 01 tho InSllred, or any rBcipiBnl Df
a cotlilicale ollllwrance. 10 petmit suell illSpecllons ahd l1ISuII in lolfeilUt8 of al rlgh19 10 ClIYalllge undllllhe policy.
CERTIFICATE HOLDER CANCELLATION
PROOF OF INSURANCE
SHOULD AN'( OF THE ABOVE DESCRIBED POUCIES BE CANCELLED BE~ORE
THE EXPIRATION DATE THEREOF. THE ISSUING COMPANY WILL ENDEAVOR
TO MAil 30 DAYS WRITTEN NOTICE TO THE CERTlACATE HOLDER NAMED
TO THE LEFT. BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO
OBUGATlON OR LIABILITY OF ANY KIND UPON THE COMPANY, ITS AGENTS
OR REPRESENTATIVES.
AUTHORIZED REPRE;SENTATIVE
~~
ENVIRONMENTAL MANAGEMENT INSURANCE SERVICES, INC.