Loading...
CONTRACT FOR ASBESTOS REMOVAL I I COH.I8ACI .:::. This CONTRACf made and entered into this 13th day of November , 19~, by and between the City of Clearwater, Florida, a municipal corporation, hereinafter designated as "City" and Lang Engineering, of Tampa, County of Hillsborough, State of Florida, hereinafter designated as "Contractor." WITNESSETH: That the parties to this contract each in consideration of the undertakings, promises and agreements on the part of the other herein contained, do hereby undertake, promise and agree as follows: The Contractor, and his or its successors, assigns, executors or administrators, in consideration of the sums of money as herein after set forth to be paid by the City to the Contractor, shall and will at its own cost and expense perform all labor, furnish all materials, tools and equipment as detailed in: University of South Florida Contract with Lang Engineering for Asbestos Removal as specified in USF invitation to Bid No. 3-2065-K In accordance with the City's attached technical specifications and the Contractor's bid response, together with any instructions to bidders, general conditions, and proposal, which may be hereto attached, are hereby made a part of this contract, and all of said work to be performed 1 I I and completed by the Contractor and its successors and assigns shall be fully completed in a good and workmanlike manner to the satisfaction of the City. If the Contractor shall fail to comply with any of the terms, conditions, provisions or stipulations as contained herein within the time specified for completion of the work to be performed by the Contractor, then the City may, at its option, avail itself of any or all remedies provided on its behalf and shall have the right to proceed to complete such work as Contractor is obligated to perform in accordance with the provisions as contained herein. THE CONTRACTOR AND HIS OR ITS SUCCESSORS AND ASSIGNS DOES HEREBY AGREE TO ASSUME THE DEFENSE OF ANY LEGAL ACTION WHICH MAY BE BROUGHT AGAINST THE CIlY AS A RESULT OF THE CONTRACTOR'S ACTMTlES ARISING OUT OF THIS CONTRACT, AND FURTHERMORE, IN CONSIDERATION OF THE TERMS, STIPULATIONS AND CONDITIONS AS CONTAINED HEREIN, THE CONTRACTOR AGREES TO HOLD THE CI1Y FREE AND HARMLESS FROM ANY AND ALL CLAIMS FOR DAMAGES, COSTS OR SUITS,JUDGMENTS OR DECREES RESULTING FROM ANY CLAIMS MADE UNDER THIS CONTRACT AGAINST THE CIlY OR THE CONTRACTOR OR THE CONTRACTOR'S SUB-CONTRACTORS, AGENTS, SERVANTS OR EMPWYEES RESULTING FROM ACTMTIES BY THE AFOREMEN'I10NED CONTRACTOR, SUB-CONTRACfOR, AGENTS, SERVANTS OR EMPWYEES. 2 I ,. ,. 4 I I In addition to the foregoing provisions, the Contractor agrees to conform to the following requirements: In connection with the performance of work under this contract, the Contractor agrees not to discriminate against any employee or applicant for employment because of race, sex, religion, color, or natural original. The aforesaid provision shall include, but not be limited to, the following: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; lay-off or termination; rates of payor other forms of compensation; and selection for training, including apprenticeship. The Contractor agrees to post hereafter in conspicuous places, available for employees or applicants for employment, notices to be provided by the contracting officer setting forth the provisions of the non-discrimination clause. The Contractor further agrees to insert the foregoing provisions in all contracts hereunder, including contractors or agreements with labor unions and/or workers' representatives, except sub- contractors for standard commercial supplies or raw materials. 3 " I I ZH WITHESS WBERBOP, the parties to the agreement have hereunto set their hands and seals and have executed this Agreement, in dupli- cate, the day and year first above written. CITY OP CLEARWATER IN PINBLLAS COUNTY, PLORIDA (SEAL) By: EliZ.f1!i.hhM~la ty Manager Attest: City Clerk Countersigned: issioner Approved as to form and legal sufficiency: 2F' =- J n C. Carassas Assistant city Attorney -..:.::. (Contractor must indicate whether corporation, partnership, Company Lang Engineering, a Florida CorDoration or Individual.) By: (The person signing shall, in his own handwriting, sign the Principal's name, his own name, and his title; where the person is signing for a corporation, he must, by Affidavit, show his authority to bind the Corporation). ( SEAIT).: 4 11/04/Q6 18:13 U813 6j3 6012 1aI001l012 I RECEIVED , 5428 561H COMMERCE PARK BLVD. , TAMPA. R.ORIDA 33610-6857 (8131 6~2-8311 , ,F~(813) 623-6012, ' Nf1/'" 5 1996 'LANG ENGINEERING Bid . & Maint OF~INC" SENT VIA FAX: (813) 462-6457 Mr. James D. ,Wood . Building & Maintenance Division , City of Clearwater 1900 Grand Avenue, Clearwater, ,Florida 34t;)18 proposal: City Hall Building Clearwater; Florida B-96-264 . November 4, 1996 , Bid No.: . Date: Dear Mr. W90d: We ~re pl~ased to 'p'rovide the following unoHo-:exceed- proposal for removal ~f asbestos eontaioLng materials (ACM) from the City Hall Building located at 112, South Osceola Avenue. Clearwater, Florida. This proposal Is based upon the' site 'Its It, revIew of the Plans and OHC SLirvey, and Is more speCifically outlined In this proposal'letter.. " WORK I NCLUOED., . Post asbestos warning signs 'and barrier tape around the perimeter of the work area to notify all personnel In each area th~t asbestos removal is taking place. " . Install' a tun, chambered decontamination unit consisting of a clean room, shower room and , equipment room ,for each ,maj~r work are~ or as appropriate. . Install sufficient air filtration machines to chango out the air In the work areas, as r:equired. , . . Construct a containment system consisting of critical barriers to seal the, openings. Into each work area. , . !nstall6 mil poly on the floors and on the walls, as appropriate, , . Remove ,and dl,spose of as ACM, approximately 1 ns square feet of popcorn ceiling spray from the drywall substrate In the areas designated on the Plans, discussed ~uring the site visit of October 30, and our subseq~ent 'phone conversation of November 1', 1 a9,6 expanding 'the suiface to be abated, ' , . Following ,removal of as~estos~ the work area will' be ,HEPA vacuumed and wet wiped as necessary, and, encapsulated to lock down any fibers. ' . All ACM removed, will be double bagged' or wr:apped' in 6' mil poly, stored in a dumpster or lockable trailer on site, and then disP!Jsed of at an approved'landfill. . Work detailed above will be completed in comp!iance with 'EPA and OSHA regU~a~ions. . , ErWironmental Remediation Specialists . ~ Abatement . IAQ" .' ' General Contractor It CGCA23888 . Asbest()S Co~ctor K.JC046268 . Mechanical Contrador #CMC05680S , ~1/04/96 18:13 'C813 6j3 6012 1lI002/012 I, City, HaJJ Building NO,vember 4, 1996 Page 2. WORK BY OTHERS . Following removal of asbestos in the work area, the owner's Independent laborat~ry, OHC, will run final clearance testing as required with acceptable levels being less than or eq,uai,to 0.01 flee as measured by PCM (PhaSe Contrast M1croscopy). ' , , . . ' .' , Secutlty of ~orK area during non:-working hours, ,. " Pro,vide electric and 'w~ter for us~ during removaf operations', if .required.' , SAFETY AND QUALITY CONTROL PROGRAM Lang' Englnee~lng has an aCtive'" safety program' with ,8 dedic~ted safety 'manage~, who will,' monitor the' project andeonduct weekly safety meetings, as appropriate. . . " ' Lang Engineering' has' Instituted a Drug Free Work. Place' Policy in acco,rdance with State of Florida regul1!ltions. , , " .'" ' ' " '" ,', Personnel ,air monitoring analysis will b~' performed by an independent tes~ing: l~b6ratorY and Lang En~ineering will bear '!he cost for this program.' " , . . .' .' All personn'e~ working on thi!!l'project will have ,pre-employment physicals, and have the medical examinations a,vailable for your review, In accordance with OSHA requlre~e~ts. The supervisor for this ,project Will have Completed the one week "Asbestos Ab~teme;,t Proj~ct Management and Supervision" course offered by the University of Florida in Galne~ville.' This is in'aCcorda.nce.with S~te of Florida legislation. ' . , ' . Air personnel working on thi$ project will have completed a' training program covering the key , aspects of asbestos and safe removQI~ A copy ~f the oUtl!ne is available for review. ' . All personnel shall Complete ,8 ~esplrator' training program as 'p~rt of their overall 'training and shall wear disposable protective ~veraJI~ for removat' and disposal operations. " , ~ . 'All personnel will complete a certificate o(worke'~s release form, outlining his, understandi~g of the nsks':associate'd'.wi~h asbe~tos removal, . ' " " ' I U/04/96 18: 14 " U813 6f 6012 laJ 003101.2 I City Hall Buil~ing . ~ovember 4, 1996 Page 3" LICENSING' Lang Engineering h~s met all of the requirements for licensing a~. an Asbestos . Contractor. (CJ C046268) an,d Class "A" General Contractor (CG CA23888) in' Florida. Lang also' holds a Mechanical Contra~or License (CM C056805) and State of Florida ausiness License (ZA 0000023). DOCUMENTATION . " . . Lang Engineering will' assu~' that the oWne'r receives all' required dQcumentatlori before and a:fter any project. Prior to the &?tart, the' documentation may, consist of the following; EPA notification, permits, insurance, bonds. ~tc. In' addition, post jot::! submittals, consisting of landfill 'receipts, dally log's', air monitoring results, etc. will be submitted'to the cliEmtafter the project is completeQ, ' , 'INSURANCE Lang Engineeri~g h~s. a basi'~ $1, million OcC!-,rrence policy for asbestos' specia!' liability insurance and also a $1 million policy for general liability, automobile and workers compensatlo'n. The owner will be named as an addltlonlill insured. .PRicE AND SCHEDULE Base Bid ' , ' ' Following your notice to procee,d, we are prepar.ed to begin thiS project af a, mutually agreeable date, a,nd complete this work in approximately' five (5) work days: Preparation work, removal, cleanup, and disposal, as detailed above, will be completed for the "not,:to-exc~ed. price of.,,$23.745.25: as detalled on the 'attached estimate form. This propo~alls based on the Unive~lty 'of South Florida Contract that is currently in place with the 'City, and ati ,underruns will be n;talized 'by the City of ' Clearwater., ' ,'" , ODtion No.1, . Per your ,requ~st, we are pleased to provide an estimat~d cost for the removal of 526 square feet HVAC duct Insulation and mastic from designated areas 'of the 'duct lines runnIng, thro'ugh,the. north 'and south duct chases~ As dIscussed during the, site visit, we wiil be removing 2 linear feet (8 square feet) of Insulation and mastic'from each" 0; the 12 lines (per floor) running'from the First .to the Third Floor, The estimated ,cost 'for this WorX will be $2,435.72 and can be comple,ted within ,the five' day~ noted above.' . ,,' ,'. 11/04/Q6 18:13 U813 623 6012 1 IaI 004/(112 1 City Hall ,Building November 4,' ,1996' Page 4. , . INVOICING & TERMS One invoice Will t;Je submitted at the completion 'of' each work activity with payment terms being net 30 from date oflnvolG8. A f1~an~ 'Charge of 1.25% per month will be due on all invoices not paid within 30 days of date of Invoice. ' , Please let me know jf you' require 'any additional : information concerning this proposal~ ' We appreciate the, opportunity to be of a~sistance' to you' on this and future projects. ,Lang will contact OHC to coordinate the start of this 'WOrk" Advise atear1iest convenience ,the' date You wish u~ to proceed., ' ~ , Shicerely, ~~,~ CalhertneA CroWley . '7 Manager', 'Business Developme,nt 11/04/96 18: 15 '0'813 623 6012 ) III (II) !} 1 0 12 1 Clwehall11/1/96 3:29 PM l.IIng Engineering of Florid., Ino. CITY OF CLI!ARWATER CITY HALL BUILDING -112 South Osceola Avenue CLEARWATER, FLORIDA Ceiling Scrape 10/31188 ESTIMATeD UNIT EXTENDED DESCRIPTION QUANTITY ;' UNIT PRice TOTAL AlA WORK 8--5 M-F NO HOLIDA VS Supervisor 55 HRS $19.40 $1 067,00 Foreman HRS $19.40 $0.00 Worker eao HRS $19.40 $13,192.00 AlA WORK AFTER HRS , WEEKENDS SupelVlsor HRS $20.40 $0.00 Foremen HRS $20.40 $0.00 Worker HRS $20,40 $0.00 AlA WORK ON HOLIDA VS Supervisor HRS $20.40 $0.00 Foreman HRS $20.40 $0.00 Worker HRS $20.40 $0.00 HEIGHT FACTORS AlA WORK 8-6 M-F NO HOLIDAYS Supervisor 8-12 feet overhead I HRSI $29.95 I $0.00 OVer 12 feet overhead I HRS I $29.95 I $0.00 Foreman 8-12 feet ovemellld I HRS I $29.95 I so. 00 OVer 12 feet overhead I HRSI $29.95 I $0.00 Worker 8-12 feet overhead I HRSI $29,95 I $0,00 Over 12 feet overhead I HRSI $29,95 T $0.00 AlA WORK AFTER HRS , WEEKENDS Supervisor 8-12 feet overhead I HRS I $30.95 $0,00 Over 12 feet overhslIld I HRsl $30.95T $0,00 Foreman 8-12 fest overhead I HRSI $30.95 I $0.00 Over 12 fest overhead I HRSI $30.95 I $0.00 Worker 8-12 feet overhead I HRS I S30.95 I $0,00 Over 12 feet overhead THRSI $30,95 T $0,00 AlA WORK ON HOUOA VS Supervisor 8-12 filet overhead I HRsl $30,95 I $0.00 OVer 12 feet overheed I HRSI $30.95 I $0,00 Foreman 8-12 feet overhead I HRS I $30.95 ul $0.00 OVer 12 feet overhead I HRSI $30.95 1 $0.00 Worker s..,:z feet overhead I HRSI $30,95 I $0.00 OVer 12 filet overhead I HRSI $30.951 $0,00 ESTIMATe ~ Page 1 11/04196 18:16 U813 623 6012 I IaI 006/012 1 ClwehaIl11/1/96 3:29 PM Lang Engineering of Florida, I no. CITY OF CLeARWATER CITY HALL BUILDING -112 South Osceola Avenue CLEARWATER, FLORIDA Ceiling Sorape 10/31/98 ESTIMATI! ESTIMATED UNIT EXTENDED DESCRIPTION QUANTIIY UNIT PRICE TOTAL MOBILIZATIONS st Petersburg 5 EAI $1.00 I $5.00 CONTAINMENT INSTALL I BREAKDOWN Full containment 11357 SF $0.50 $5,678.50 Full decontamination unit EA $10.00 $0,00 BULK REMOVAL, ENCAP, & DISPOSAL MISCELLANEOUS ITEMS 2')(4' Suspended celllnas SF $0.05 $0.00 Hidden spline ceiling SF $0.01 $0.00 Built-up roofing material SF $0,01 $0,00 Flllshlng material SF $0,01 $0.00 DuctlnQ material SF $0.02 $0.00 Vibration dampers SF $0.05 $0.00 Floor tile SF $0.01 SO.OO Floor tile with mastlo SF $0.02 $0,00 Vinyl sheetlna SF $0.01 $0,00 VinYl sheeting with mll.tlc SF $0.01 $0.00 T.S.I.-(PIPE INSULATION) Less then 6" diameter LF $0.10 $0.00 Less than e" diameter with metal jacket LF $0.10 $0.00 8" to 12" diameter LF $0.10 $0.00 6" to 12" diameter with metal Jack8t LF $0.10 $0.00 Greater thliln 12" diameter LF $0,20 $0.00 Greater than 12" diameter with metaljaoket LF $0.20 $0.00 External wrap or coatlna LF $0.20 $0.00 Insulation on tank LF $0.20 $0.00 SURFACI: MATERIAL Flat $orape with olaster substrate to remain SF $0.01 $0.00 Flat 8Cf1lP8 with sheetrock to remain SF $0.01 $0.00 Removing including plaster substrate SF $0,01 $0.00 Removal including sheetrock 6ublrtrate SF SO,01 $0.00 SCfllpe on concrete plaster decking SF $0,01 $0.00 Scrape on concrete sheetrock decking 1775 SF $0.01 $17.75 scrape on cOfTUgated decklna SF $0.01 $0.00 Beam scrape (SF of beam) SF $0.01 $0.00 Joist screDe ILF of joIst) SF $0.01 $0.00 SMALL SCALE - MEET REQ'T OF SECTION 2083 Glovebag with removal (ie. oiolml fitting removal) I EA $95.00 I $0.00 Minl-enclosure removal I EA I $10,00 I $0.00 SOIL REMOVAL ACM Contaminated soli (per 2" deep) I SF I $0.01 I $0.00 Vec-Loader (for all areas > 1,000 SF) I HRSI $10.00 I $0.00 TRANSITE REMOVAL "- Page 2 - --- -- 11/04/96 18:16 '6"813 623 6012 laJ 0071012 . I I - Clwehall 11/1/96 3:29 PM Lang Engineering of Florid., Inc. CITY OF CLeARWATER 10/31/86 CITY HALL BUILDING -112 South Osceola Avenue CLEARWATER, FLORIDA Ceiling SCrape ~TlMAT~ ESTIMATEO UNIT EXTENDED DESCRIPTION QUANTITY UNIT PRICE TOTAL 1/8" Flat Sheets SF $0.06 $0.00 1/4" Corr\lgated Sheets SF $0.05 $0.00 OTHER MISC ITEMS -IF REQUIRED ACM DisDosal fee (Cost per ton) TN $5.00 I $0.00 Non-Asbestos Dlsposal1ee I TN $3.00 I $0.00 Subtotal = $19,950.25 '- '- Page 3 . eST. EST. UNIT EXTENDED DESCRIPTION QTY UNIT QTY UNIT PRICE TOTAL EQUIPMENT Mobile decontamination unit EA OA $95 0.00 Storage van (40') EA OA $40 0.00 PassenQer van 2 EA 6 OA $90 900.00 Plck~up truck EA OA $70 0.00 Box truck EA DA $120 0.00 Tractor for 26' tfllller EA OA $75 0.00 C.rgo trailer (7'x16' 1 EA 5 OA $38 UIO.OO Cargo trailer (8'X28' EA DA $47 0.00 Office tl1lller (8'x30' EA OA $60 0,00 2000 CFM HEPA air filtration unit 3 EA 6 DA $55 826.00 2 HP HEPA vacuum 2 EA 5 OA $37 370.00 4 HP HI:PA vaouutTI : EA DA $60 0.00 Air compressor (175 CFM) EA DA $125 0.00 8-man maxi air panel EA DA $90 0.00 Combo compressor & 6-man panel EA DA $150 0.00 Single shower unit 1 SA 5 DA $70 350.00 Double shower unit EA DA $120 0,00 Shower filter pump , EA 5 OA $60 300.00 A1rless SPfl!lver 2 EA 5 DA $50 500.00 Negative IJressure recorder EA DA $60 0.00 King pump EA DA $85 0.00 PBJ'1IOnnel monitoring DumD , 2 EA 5 OA $35 350.00 Vec-Loader EA OA $1,200 0.00 Sh~der(~rVe~Loader\ E.A. OA $250 0.00 Electric oenerator - 4 KW EA OA $35 0.00 Electrio aenerator - 15 KW EA OA $165 0.00 Transformer EA DA $80 0.00 Power panel SA DA $60 0.00 Pressure washer EA OA $53 0.00 Water heater : SA DA $25 0.00 Floor tile - tile lift tTllilchine E.A DA $180 0.00 Floor tile - shot blaster EA OA $130 0.00 Floor tile - mastic scrubber EA OA $115 0.00 Floor tile - mastic razor cutter EA DA $95 0.00 Subtotal. $3,785.00 ~ ~1I04/~6 18:17 '!!813 623 6012 I Clwehall 11/1196 3:28 PM Lang Engln..rlng of FlorldB, Inc. '- I CITY OF CLEARWATeR : CITY HALL BUilDING - 112 South Osceola Avenu. CLEARWATeR, FLORIDA I Ceiling Serape ESTIMATE Page .. IaI 008/012 I 10/31/96 '- Estimate Total" ~745.0 tl/~4/96 18:17 'C813 6r 6012 I IaI 009/012 ClwehaIl11/1/QEl 3:27 PM Lang Engineering of Florid., Inc. CnY OF CU!ARWATI!R CITY HALL BUILDING -116 South 05ceola Avenue CLEARWATER, FLORIDA HVAC Duct In8ulatlon Removal 10/31/96 ESTIMATEO UNIT EXTENDEO DESCRI~ION QUANTITY UNIT PRICE TOTAL AlA WORK 8-8 M-F NO HOLIDAYS Supervisor 12 HRS $19.40 $232,80 Foreman HRS $19.40 $0,00 Worker 68 HRS $19.40 $1,280.40 AlA WORK AFTER HRS I WEEKENDS Supervisor HRS $20,40 $0,00 Foreman HRS $20,40 $0.00 Worker HRS $20,40 $0.00 AlA WORK ON HOLIDAYS Supervisor HRS $20.40 $0,00 Foreman HRS $20.40 $0,00 Worker HRS $20.40 $0.00 HEIGHT FACTORS AlA WORK 8-5 M-F NO HOLIDAYS Supervisor &-12 feet overhead THRS $29.95 $0.00 OVer 12 feet overhead THRS $29.95 $0.00 Foreman 8-12 feet overhead I HRS $29.95 $0,00 OVer 12 feet overhead I HRS $29.96 $0,00 Worker &-.12 feet overhead I HRSI $29.95 $0,00 OVer 12 feet overhead THRSI $29.95 I $0,00 AlA WORK AFTER HRS I WEEKENDS SupelVillor tl-12 feet overhead HRSI $30.95 I $0,00 Over 12 feet overhead HRSI $30.95 I $0.00 Foreman 8-12 feet overhead HRSI $30.96 I $0.00 OVer 12 feet overhead HRSI $30.95 I $0.00 Worker 8-12 feet overhead HRSI $30.95 I $0.00 Over 12 feet overhead HRSI $30.95 I $0.00 AlA WORK ON HOUDAYS Supervisor 8-12 fest overhead HRSI $30.95 I $0.00 Over 12 feet overhead HRSI $30.95 I $0.00 Foreman 8-12 feet overhead rHRS I $30.95 I $0.00 OVer 12 feet overhead I HRS I $30.95 I $0.00 Worker 8-12 feet overhead I HRSI $30.95 I $0.00 OVer 12 feet overhead THRS $30,95 I $0.00 ESTIMATE ~ Page 1 11/04/96 18:18 U813 f3 6012 IaI 010/012 I Clwehall1111/96 3:27 PM Lang Engineering of Florida, Inc. CITY OF ClEARWATER CITY HAli BUILDING .112 South Osceola Avenue CLeARWATER. FLORIDA HVAC Duct Insulation Removal 10/31198 ESTIMATED UNIT EXTENDED OESCRIPTION QUANTITY UNIT PRICE TOTAl MOBILIZATIONS St. Petersburg 2 I EA I $1.00 I $2.00 CONTAINMENT INSTALL 1 BREAKDOWN Full containment 750 SF $0.50 $375.00 Full decontamination unit EA $10.00 $0.00 BULK REMOVAL, ENCAP. & DISPOSAL MISCELLANEOUS ITEMS 2')(4' Suspended ceilings SF $0.06 $0.00 HIdden spline celllna SF $0.01 $0.00 Bullt-UD rooflna materiel SF $0.01 $0.00 FI.shlml material SF $0.01 $0.00 Duotlna meterial 578 SF $0,02 $11.62 Vlbl'Btlon dlilmDen SF $0.05 $0.00 Floor tile SF $0.01 $0.00 Floor tile with mastic SF $0,02 $0.00 Vinvl sheeting SF $0.01 $0,00 Vlnvl sheetlna with mastic SF $0.01 $0.00 T.S.I.-(PIPE INSULATION) Less than 6" diameter LF $0.10 $0.00 Less than 6" diameter with metal iacket LF $0.10 $0.00 6" to 12" diameter LF $0.10 $0.00 6" to 12u diameter with metal jacket LF $0.10 $0.00 Greater than 12" diameter LF $0.20 $0.00 Greater than 12u diameter with metallacket L.F $0.20 $0.00 External wrap or costlna LF $0,20 $0.00 Insulation on tank LF $0,20 $0.00 SURFACE MATERIAL FI.t IIICnll). with Diester sub5trate to remain SF $0,01 $0.00 Flat scrage with sheetrock to remain SF $0,01 $0.00 Removing including plaster Bubstnlte SF $0.01 $0.00 RemoYl!lllncludlng sheetrock substrate SF $0.01 $0.00 ScraDe on conc:rste Dlaster decking SF $0.01 SO,OO SCf'8P8 on concrete sheetrock deckina SF SO.01 $0.00 Scrape on corrugated decking SF $0.01 $0.00 Beam scrape (SF of beam) SF $0.01 $0.00 Joist scrape (IF of loiet) SF SO.01 $0,00 SMALL SCALE - MEET REQ"T OF SECTION 2083 Glovebaa with removal! Cle. piplna fitUng removal) I EA I $95.00 I $0,00 Mini-enclosure removal I EA I $10.00 I $0.00 SOIL REMOVAL ACM Contaminated soli (Der 2" deeo) I SF I $0.011 $0.00 Vec-Loader (for 1111 areaB > 1,000 SF) I HRSI $10.00 I $0.00 TRANSITE REMOVAL ~STlMATE '---- '---- Page 2 r-------- ~1I04/.96 18:18 U813 613 6012 I4l 011/012 . '. I "-- Clwehall 11/1/96 3:27 PM Lang Engineering of Florida, Inc:. CITY OF CLeARWATER 10/31/96 CITY HALL BUILDING -112 South Osceola AvenLle CLEARWATI;R, FLORIDA HVAC Duct In.ulatlon Removel eSTIMATE ESTIMATED UNIT EXTENDED DESCRIPTION QUANTITY UNIT PRICE TOTAL 1/8" Flat Sheets SF SO,05 $0,00 1/4" CorruQatllld Sheets SF $0.05 $0.00 OTHER MiSe ITEMS - IF RI;QUIRED ACM Disposal fee (Cost per ton) TN $5.00 I $0.00 Non-Asbestos Disposal fee TN $3.00 I $0.00 Subtotal . $Ul01.72 '- '- Page 3 11/04/-96 18: 19 '5'813 Y3 6012 I IaI 012/012 Clwehall1111/ge 3:27 F'M Lang Engineering of Florida, Inc. CITY OF CLEARWATER CITY HALL BUILDING -11Z South Osceola Avenue CLEARWATER, FLORIDA HVAC Duct Insulation Removal 10/31/96 EST. EST. UNIT EXTENDeD DESCRIPTION QTY UNIT QTY UNIT PRICE TOTAL EQUIPMENT Mobile decontamination unit EA DA $95 0.00 storage Van (40'\ EA DA $40 0.00 Passeneer van 1 eA 2 DA $90 180.00 Pick-up truck EA DA $70 0.00 Box truck EA DA $120 0.00 Tractor for 26' trailer eA DA $75 0.00 Cargo trailer (7')(16') EA DA $38 0.00 Cargo trailer (8')(26') EA DA $47 0.00 Offioe trailer (8'><30'1 EA DA $60 0.00 2000 CFM HEPA air filtniltlon unit 1 eA 2 DA $55 110.00 2 HP HEPA V1lcuum 1 EA 2 DA $37 74.00 4 HP HEPA vacuum EA DA $60 0.00 A1rcomDressor (175 CFM1 E.A. DA $125 0.00 8-man maxi air panel E.A. DA $90 0.00 Combo oompressor & 6-man panel EA DA $150 0.00 Single shower unit EA DA $70 0,00 Double shower unit EA DA $120 0.00 Shower !ilter pump EA DA $60 0,00 Alrle.s 'Imayer 1 EA 2 DA $50 100,00 NliKlatlve DllISsure recorder EA DA $60 0,00 Kina bumD &. DA $85 0.00 Personnel monitorina Dump 1 EA 2 DA $35 70.00 Vec-L.oader EA DA $1,200 0,00 Shredd.... (for Vee-Loader) EP. DA $250 0.00 Electric aenellltor - 4 KW EA OA $35 0.00 Electric aenerator - 15 KW EA DA $165 0.00 Transformer EA OA $80 0.00 Power panel EA DA $50 0.00 Pressure washer EA DA $53 0.00 Water heater EA DA $25 0,00 Floor tile - tile 11ft machine EA DA $180 0.00 Floor tile - shot blast.... EA OA $130 0.00 Floor tU_ w mastic scrubbet EA DA $115 0.00 Floor tile - mastic razor cutter EA DA $95 0.00 Subtotal .. $534.00 ESTIMATE '-- Estimate Total '" 02,435~ Page~ ...... I I" I I -.J ~ <( 0 - a: 0 a: -J z U. 0 >:1: w c w<'> a:- :E - a: ...JW W a: W:;E ~ 0 , [[] <.> 3: > a: ...J W <( ...J ...J W < W -J :I: () >- a: .. l- OW t) o=> ...JZ a: U4( LLW 0 > ,..,co tn~ c w - ~ a: ...J <( a: W -J 0 ..J <.> 0 >:1: W w<'> 0 ~I ...JW en W~ 0 :J: I I- ::;) 0 UJ N ~ I ~ z { f I ) r 1~ f I z I .1 ..J ..J \~ :>- \1- i- o - - -----i m f - --;-- - [] I- I <u I >:1: 00 - wO .... .... CD ...JW ~~ W::E ::E ........ ~ I > ........ W ..J ~ I~ I W I ........ r-.... I W U (!) I .... I .... c - I "- a: "- m I "- > W "- ..J "- , W "- Z >:1: w wO ::E ..JW ~ I W::E I~T - l1J I I " < Q - ex: o ...J I.L .. ex: W ~ 3: a: < w ...J () .. a:W O::l 02 ..JW u.:>- C<( z< C'\I...J ...J o W () en o :x: t- => o en C\I ,... ,... j , I '/ ...J ...J < :I: >- I- - o z J I I ~ UJ 0 Z 00< o Z .... - u. I ~ 0: 0 0 a: C ~ 0:' 0: 0 0 ::E 0: :I: o z ::> ...J 0: o C 0: 0: o o =m t- 0.< UJUJ < 00: (l) w< 0: --r - ~~,~ <( Cl 0:: o -J u.. . a: W ~ s: a: <( w -J U 0: .. OW o=> ...JZ U.w ~~ ('1)<( -J -J o W U en o :c ..... ::> o en N T- T- 12/03/96 10:58 "&813 623 6012 III 002/002 .,. II.~ AMERICAN ~ SAFETY RISK RETENTION ~R(JU". INC. 1 845 The Exchange · Suite 200 . Atlanta, Georgia 30339 770~916-'908 · 800-388.3647 · FAX nO-9iG-06i8 INSURED PROJECT INFORMATION THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE Contract No. PROOF OF INSURANCE DOES NOT AMEND. EXTEND, OR ALTER THE COVERAGE AFFORDED BY P . t THE POLICIES BELOW. rOJec PROOF OF INSURANCE CERTIFICATE cpF INSURANCE CERTlFlOATE NO. 962532391 ISSUE DATE (MMlDDIYY) 05/06/96 TOTAL CONTRACT AMOUNT INSURED LANG ENGINEERING OF FLORIDA, INC. 5428 56TH COMMeRCE PARle Iil W_ TAMPA, Fl 33610 . THIS IS TO CERTIFY THAT POLICieS OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY peRIOD INDICATEO. NOTWITHSTANDING ANY REQUIREMENT. TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PER'l'AIN, THE INSURANCE AF~ORDED BY THE POLICIES OESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS. AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE SEeN REDUCED BY PAID CLAIMS. TYPE OF INSURANCE FORM OF COVERAGE POLICY NUMBER EFF=DATE fXPIM~:DATI! LIABILITY LIMITS tMIMlOIYYl (MMIDDII'Y) X ASBESTOS ABATEMENT X COMMERCIAL GENERAL lIABILITY x lEAD ~AINT ABATEMENT OCCURRENCE OCCURRENCE OCt:URRENCE ASC 96-253-00J 03/01/96 03/01197 $1,000,000.00 AGGREGATE EACH S1,OOO,000'000CCURRl;NCE ADDITIONAL COMMENTS "THIS CERTlFICATe IS FOR PROOF OF UISURANCE." DeRl'Ipllon Of Operallonll/SpeCllal Ilems ThllllertlllClal1lIs not a polley, and is Il&uBd lot' inloll'llalion purposel only. This cerlirlcalo CO/'Jers no r1gll111 on IhB cer1irlClille IIoldor, ~nd dOes nOI Imlllld. extend or 311er Ihe lerms, conditions Qr excluslonl contained in 11IO policy reler_d ebove. Thll roclplent of Ihl. cel1lnClBte 1185 ,,", obligation 10 verily CloyeTBlIes lor the N~1lIe(I Insured and any Addllio~1 Insureds. and the IOrml\, ~ndlllonB and elcluslons In tile polley ref_ad abvvc. This certilica. is iStllOd solely with rsspecllo lhe teleronced proltcl end is nol applicable 10 ally PlO/ecl nDl Ipeciflad on an insurance cerll/leala Issued by Ametican Salely Risk RelanUon Group, Inc. t=ailurll oIlhe Insurvd 10 prilpetly repon all work perfolQllld Dn lhil teleronced proleet. end PlY aU applicalllo premiums therelDr, shan resull in lotlonure 01 all rlghls \D coverage under tile policy sl1Dwn abDve. Coverage under the policy &hown above is condhlDnBd upon lheln&ulecl'S compliance wi" !I8Iety Guidelinaa issued Dy AAlerlcan Sa'ely Risk Rlllllllllon Group. 100, which lorm a pari 01 Ihe PDnCll AmeriCllll SOfOly RIsll RelBn'lon Group. lne. IOSOrves 1118 right 10 require inapllClions 01 the Ill!lUled'll performance on \he plOjoct Shown abon, and lailure 01 tho InSllred, or any rBcipiBnl Df a cotlilicale ollllwrance. 10 petmit suell illSpecllons ahd l1ISuII in lolfeilUt8 of al rlgh19 10 ClIYalllge undllllhe policy. CERTIFICATE HOLDER CANCELLATION PROOF OF INSURANCE SHOULD AN'( OF THE ABOVE DESCRIBED POUCIES BE CANCELLED BE~ORE THE EXPIRATION DATE THEREOF. THE ISSUING COMPANY WILL ENDEAVOR TO MAil 30 DAYS WRITTEN NOTICE TO THE CERTlACATE HOLDER NAMED TO THE LEFT. BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBUGATlON OR LIABILITY OF ANY KIND UPON THE COMPANY, ITS AGENTS OR REPRESENTATIVES. AUTHORIZED REPRE;SENTATIVE ~~ ENVIRONMENTAL MANAGEMENT INSURANCE SERVICES, INC.