AGREEMENT & BOND (6)
~.,.
I
AGREEMENT AND BOND
THIS AGREEMENT1 by and between the CITY OF CLEARWATER,
FLORIDA, . amtmicipal..corp.o.ration..L..hereinaftercalled "CITY"') and
LAURilliCE & ASSOCIATES, A FLORIDA CORPORATION,
hereinaf:ter~#CONTRACTORn ,
WIT N E SSE T H:
..... -,'-.......~.,.-.. -...~........- -
That in constLde-ration'.of the mutual covenants and agree-
!
ments.herein''eontained, and in further consideratiQ.g_o~..the-'Permits
and privileges .granted,.hereunder.1 and the bond given for the faithful
i .
!
performance hereof, the parties heret.amutually agree as follows:
1. The Gityhe-reby grants to Contractor the ,permit, right
andpri vilege to "install and construct ..the following for Florida
Power Corporation~
Construct an undeI=grOUhd electrical,Qonduit and
appurtenances on,. Pierce street. from the East ,line
of Garden Avenue easterly a distance-approximately
86 feet and thence Northerly to serve the new County
Engineering Department.
2. Contractor' agrees to submit the..plans for the ,afore-
said work to the office of the City Engineer and receive approval
from said City Engineer before proceeding with the aforesaid work.
3. Contractor agrees to accomplish the work in an order
which shall be satisfactory to the City Engineer.
4. Contract~r agrees th~t the earth excavation incidental
to the above described work shall be done by hand, and no machinery
or power-driven tools will be used in the accomplishment of the said
excavat..ion, exc eI?t,.~uch..:p()r't:,~onsas.. m~x be designate~_.l:>y.the City
Engineer. Contractor further agrees to water-compact all trenches
during back-filling.
5. Contractor shall be wholly responsible for the repair
and replacement of utilities and other damage caused by theaccom-
plishment of the work as aforesaid and Contractor further hereby
covenants and agrees to replace paving removed or damaged by or be-
cause of the accomplishment of the aforesaid work, said paving to
-
. ~
I
--
be of a type and quality equal to the paving so removed or damaged,
and performed in a manner satisfactory to the City Engineer, of the
City of Clearwater.
6. Contractor hereunto binds himself, his successors and
assigns to the faithful performance of this Agreement; and further
binds himself, his successors and assigns to the forfeiture of the
sum of One Thousand and nO/lOD Dollars ($1,000.00)
to City in the event of Contractor's breach or default of any of
Contractor's covenant~, agreements or obligations of Contractor here-
under. If all of the covenants, agreements or obligations of Con-
tractor hereunder be faithfully performed by said Contractor, then
this bond shall be null and void and of no effect.
fifteen
7. The aforesaid work shall be accomplished within ~
~) days; provided, however, that this time for completion shall be
extended by a period of time equal to any delays caused by strike,
riot, civil commotion, Acts of God, Governmental restrictions, or
natural calamity.
WITNESS the hands and seals of the parties hereto, this
J..r~day of Februa:t;y , 1961.
Attest:
CITY OF CLEARWATER, FLORIDA
~ G('/~...~
/ anager
Approved as to form and correct-
~~~
City Attor ey /
~
. .~_ C.lerk. ~<' .~ ~ ~
OOJJWiC.E & ASSOCIATES INC.
- . ... .nn.. -c&':aff.7 t-,,.;,----.~. i.7:-
- ---_/
,.--
-2...
.
~.
AGREEMENT AND BOND
THIS AGREEMENT, by and between the CITY OF CLEARWATER,
FLORIDA, ,anrt.micipal,~orporation.L,he-reinafter.called "CITY") and
LP~URID~CE & ASSOCIATES, A FLORIDA CORPORATION,
hereinaft.er"~~CmrrRACTOR n ,
W I TN E SSE T H:
-. -,.--.........--....- -.....,.......- -
That in conside-ration--of the mutual covenants and agree-
mentshereinpcontained, and in further consideratiQ!Loi'..the-permits
and privileges granted 'hereunder" and the bond given for the faithful
performance hereof, the parties heret.omutually agree as follows:
1. Th-e Gityhereby grants to Contractor the ,permit, right
andpri vilegetoinstall and construct ,the following for Florida
POv-Ter Corporation: ,
Construct an underground electriga.:t..condui t, manhole
and appurtenanges in Eld,riqg~ street f::r9m a point
approximately 50 'feet east oftheea.st line of Garden
Avenue easterly to the existing conduit which is
approximately 80 feet west of the west line of
Myrtle AveniUe.
2. Contractor'agrees to submit the plans for the afore-
said work to the office of the City Engineer and receive approval
from said City Engineer before proceeding with the aforesaid work~
3. Contractor agrees to accomplish the work in an order
which shall be satisfactory to the City Engineer.
4. Contractor agrees th~t the earth excavation incidental
to the above described work shall be done by hand, and no machinery
or power-driven tools will be used in the accomplishment of the said
n excailation, except'-sucnnpo-rtT6f1sasmaybendesignatedby the City
Engineer. Contractor further agrees to water-compact all trenches
during back-filling.
5. Contractor shall be wholly responsible for the repair
and replacement of utilities and other damage caused by theaccom.
i
plishment of the work as aforesaid and Contractor further hereby
covenants and agrees to replace paving removed or damaged by or Qe-
cause of the accomplishment of the aforesaid work, said paving to
..
,~ I r,
be of a type and quality equal to the paving so removed or damaged,
and performed in a manner satisfactory to the City Engineer, of the
City of Clearwater.
6. Contractor hereunto binds himself, his successors and
assigns to the faithful performance of this Agreement; and further
binds himself, his successors and assigns to the forfeiture of the
sum of Five Thousand and no/IOO Dollars ($5,000.00)
to City in the event of Contractor's breach or default of any of
Contractor's covenant$, agreements or obligations of Contractor here-
under. If all of the covenants, agreements or obligations of Con-
tractor hereunder be faithfully performed by said Contractor, then
this bond shall be null and void and of no effect.
7. The aforesaid work shall be accomplished within thirty
(30) days; provided, however, that this time for completion shall be
extended by a period of time equal to any delays caused by strike,
riot, civil commotion, Acts of God, Governmental restrictions, or
natural calamity.
\vITNESS the hands and seals of the parties hereto, this
"l?/ day of ~~ . 1961.
Attest:
~~
City erk
CITY OF CLEARWATER, FLORIDA
Approved as to form and correct-
ness: ~
~ ~
City Attorney
In the preseDc i of:
),-
~---~--';7:~ ----- .-
~(j~-lftctHA~AO :-...I.p
-2-
_.
.,"'t "
t
I
AGREEMENT AND BOND
THIS AGREEMENT, by and between the CITY OF CLEARWATER,
FLORIDA, a mtm.ic.i-pal._~orpora.t.ionLhereinaftercalled "CITY", and
LAURANCE & ASSOCIATES, A FLORIDA CORPORATION,
herei.nafter~~CDNTHACTOR It ,
WIT N E SSE T H:
.... - .-..........-- ---.- -.........._,.- -
That in conside-ratioo'-of the mutual covenants andagre;e-
mentsllereincontained, and in further consideratiQ!1j)fthe-permits
and privileges granted hereunder" and the bond given for the faithful
performance hereof, the parties heret.o mutually agree as follows:
1. The Gity'hereby grants to Contractor the ,permit, right
and 'pri vilegeto'install and construct ..the following for Florida
Power Corporation:
Construct an underground electrica1...condui t, manhole
.andappurtenanges in Eldriqge Street from the existing
conduit "Thich is 110 feet east oft,heeast line of
Myrtle Avenue, easterly to a point approximately 290
feet west to the west line of Greenwood Avenue.
2. Contractor'agrees to submit the ,plans for the afore-
said work to the office of the City Engineer and receive approval
from said City Engineer before proceeding with the aforesaid work.
3. Contractor agrees to accomplish the work in an order
which shall be satisfactory to the City Engineer.
4. Contractor agrees that the earth excavation incidental
to the above described work shall be done by hand, and no machinery
or power-driven tools will be used in the accomplishment of the said
excavafr()ri,u~exc epfsucn~po-rtfons as may beCaesignat-ed-by the City'
Engineer. Contractor further agrees to water-compact all trenches
during back-filling.
5. Contractor shall be wholly responsible for the repair
and replacement of utilities and other damage caused by the accom~
plishment of the work as aforesaid and Contractor further hereby
covenants and agrees to replace paving removed or damaged by or be-
cause of the accomplishment of the aforesaid work, said paving to
, ,
I
I
be of a type and quality equal to the paving so removed or damaged,
and performed in a manner satisfactory to the City Engineer, of the
City of Clearwater.
6. Contractor hereunto binds himself, his successors and
assigns to the faithful performance of this Agreement; and further
binds himself, his successors and assigns to the forfeiture of the
sum of Five Thousand and no/IOO Dollars ($5,000.00)
to City in the event of Contractor's breach or default of any of
Contractor's covenants, agreements or obligations of Contractor here-
under. If all of the covenants, agreements or obligations of Con-
tractor hereunder be faithfully performed by said Contractor, then
this bond shall be null and void and of no effect.
7. The aforesaid work shall be accomplished within thirty
(30) days; provided, however, that this time for completion shall be
extended by a period of time equal to any delays caused by strike,
riot, civil commotion, Acts of God, Governmental restrictions, or
natural calamity.
~
WITNESS the hands and seals of the parties hereto, this
~L
day of ~rMd.?, ' 1961.
Attest:
~~~
c-i Clerk
CITY OF CLEARWATER, FLORIDA
,,~~ 62. ~:.-.P
~fty Manager
Approved as to form and correct-
9~~
City Attorney
- -----~--~" -,u~~f!Pl.~
~ractor -f
In _m_m
---- - --- --
1AA AA~
V.f).
.
-2-
--
~'- ",.
I
t
AGREEMENT AND BOND
THIS AGREEMENT, by and between the CITY OF CLEARWATER,
FLORIDA, a mtmic..ipalc.orporation.l...~hereinafter.called "CITY", and
LAURANCE & l;SSOCIATES, A FLORIDA CORPORATION,
h-ere:inaf:ter'-cal1.ed- "'CDNTRAC T OR It ,
WIT N E SSE T H:
... -..'-..-.'-.."........ -~~. .....,...... ....
That in conside-ration '-of the mutual covenants and agree-
mentsherein'contained, and in further considerati9p_oi""the-permits
and privileges granted 'hereunder,~ and the bond given for the faithful
perfonnancehereof,the parties heretDmutually agree, as ,follows:
1. TheGity -hereby grants to Contractor the -permit, right
and 'pri vilegeuto ~ ,install and construct ,the following for Florida
Power Corporation:,
Construct an underground electriQa..:t.,condui t
,in the alley nqrth of Drew ,Street and eq.st ,of
Garden Avenue from the existing manhole northerly
a distance of 22 feet.
2. Contractor-agrees to submitt.heplans for the afore-
said work to the office of the City Engineer and receive approval
from sa.id City Engineer before proceeding with the aforesaid work.
3. Contractor agrees to accomplish the work in an order
which shall be satisfactory to the City Engineer.
4. Contractor agrees th~t the earth excavation incidental
to the above described work shall be done by hand, and no machinery
or power-driven tools will be used in the accomplishment of the said
c___'exca v_ation.,c_except~sllch--por:ti_on s ~asmay.- be__de,signat.ed_~hy.__the"Gidty~,~c,
Engineer. Contractor further agrees to water-compact all trenches
during back-filling.
5. Contractor shall be wholly responsible for the repair
and replacement of utilities and other damage caused by theaccom-
plishment of the work as aforesaid and Contractor further hereby
covenants and agrees to replace paving removed or damaged by or be-
cause of the accomplishment of the aforesaid work, said paving to
, lr;'
I
,
be of a type and quality equal to the paving so removed or damaged,
and performed in a manner satisfactory to the City Engineer, of the
City of Clearwater.
6. Contractor hereunto binds himself, his successors and
assigns to the faithful performance of this Agreement; and further
binds himself, his successors and assigns to the forfeiture of the
sum of Two Thousand and no/lOO Dollars ($2,000.00)
to City in the event of Contractor's breach or default of any of
Contractor's covenants, agreements or obligations of Contractor here-
under. If all of the covenants, agreements or obligations of Con-
tractor hereunder be faithfully performed by said Contractor, then
this bond shall be null and void and of no effect.
fifteen
7. The aforesaid work shall be accomplished within~
(15)
~ days; provided, however, that this time for completion shall be
extended by a period of time equal to any delays caused by strike,
riot, civil commotion, Acts of God, Governmental restrictions, or
natural calamity.
WITNESS the hands
~ daYOf~'7.
Attest:
~L
C' ..... Clerk . . i
and seals of the parties hereto, this
, 1961.
Approved as to form and
ness: ~
~-
Ci~ orney ,
correct-
CITY OF CLEARWATER, FLORIDA
.~~~~ ~J
/C1 t"y anager
(
Count signed:
In the presence of:
.-i:..~;i~:~l/,p' ......
C~tractor f . ..... ........
-2-
("-=;~':""-':-,;":;J
J
1
AGREEMENT AND BOND
THIS AGREEMENT, by and between the CITY OF CLEARWATER,
FLORIDA, amLmic.i.pal.,c.orp.o.ra:ti.on-L,he-reinafter called "CITY", and
LAURANCE & ASSOCIATES; a Florida Corporation,
.--~.~"' ~
h'ereinaft..er-ca.ll.e-d---"C-oNTRACTOR" ,
WIT N E SSE T H:
-- ...... ..... ........ ...- ..". ....,..--...... -
That in conside-ration--of the mutual covenants andagre,e-
rnents.hereineontained, and in further consideratiQp._o~t.he-permits
and privileges granted'hereunder_, and the bond given for the faithful
performance hereof, the parties heret..omutuallyagree.asfollows:
1. TheGity -he,reby grants to Contractor the ,permit, right
andpri vilege to ,install and construct .,the following
for Florida
Power Cor'poration: '
Construct an undergro~d electrical conduit, manholes' and
appurtenances in Osceol-a-Avenue, Haven Str-e'e'Ccind Oak,Avenue,
connecting to eXi'sting manhole on nor'thwest COJner of Pierce
Street and Osceola Avenue, thence south on Osceola Avenue
extended to new manhole on south side of Haven Street, west
to new manhole on. southeast corner of Haven and Oak, thence
south approximately 30 feet to connect with existing vault.
2. Contractor'agrees to submitthe.plans for the afore-
said work to the office of the City Engineer and receive approval
from said City Engineer before proceeding with the aforesaid work.
3. Contractor agrees to accomplish the work in an order
which shall be satisfactory to the City Engineer.
4. Contractor agrees th~t the earth excavation incidental
to the above described work shall be done by hand, and no machinery
or power-driven tools will be used in the accomplishment of the said
-excavation.., exeep'busuch~-port:i:ons.-asmaYd -be.'des4:-gnated- by.-t-h8'" Git.y ..
Engineer. Contractor further agrees to water-compact all trenches
during back-filling.
5. Contractor shall be wholly responsible for the repair
and replacement of utilities and other damage caused by theaccom.
plishment of the work as aforesaid and Contractor further hereby
covenants and agrees to replace paving removed or damaged by or be-
cause of the accomplishment of the aforesaid work, said paving to
\.. ~- .~
J
1
be of a type and quality equal to the paving so removed or damaged,
and performed in a manner satisfactory to the City Engineer, of the
City of Clearwater.
6. Contractor hereunto binds himself, his successors and
assigns to the faithful performance of this Agreement; and further
binds himself, his successors and assigns to the forfeiture of the
sum of ,Five Thousand and no/l00 Dollars ($5, 000.00)
to City in the event of Contractor's breach or default of any of
Contractor's covenants, agreements or obligations of Contractor here-
under. If all of the covenants, agreements or obligations of Con-
tractor hereunder be faithfully performed by said Contractor, then
this bond shall be null and void and of no effect.
(60)
XX~ days; provided, however, that this time for completion shall be
7.
sb~t.Y___
The aforesaid work shall be accomplished within XX~
extended by a period of time equal to any delays caused by strike,
riot, civil commotion, Acts of God, Governmental restrictions, or
natural calamity.
WITNESS the hands and seals of the parties hereto, this
I?~ay ,Q~. March , 1961.
Attest:
- .....
,----
. >
CITY OF CLEARWATER, FLORIDA
~gh=.JY
~tYManager
and correct- Countersigned:
1~
May r-Commissio .-.--. ---
In the presence of:
....~..~
A~L_L 7j, ;4~7<--
t/
---- ~ --"
-=c
-2-
~- ';.
I
I
AGREEMENT AND BOND
THIS AGREEMENT, by and between the CITY OF CLEARWATER,
FLORIDA, a mtmicipal-,:~-orporation.J..,hereinafter called "CITY") and
LAURANCE &: ASSOCIATES, a Florida Corporation,
hereinaf:t..er-c.a.lJ...ed--"CDNTRACTOR tt ,
WIT N E SSE T H:
.... --...'--.."....:."......... -~-..."..,....... -
That in conside-ration'---of the mutual COvenants and agree-
ments J1ereineontained, and in further consideraticm_of.the--permits
and privilege6.granted'~hereunder,J and the bond given for the faithful
performancebereof, the parties heret..omutually agr-ee,as follows:
1. The Gity-he-reby grants to Contractor the .permit, right
andpri vilegs-'to "install and construct .,the following for Florida
Power Corporation:
Construct an undergroU1l<i,~lectrical conduit, manhole and
appurtenances in Palm Ave~tie:' south of Turner Street, to connect
to existing' conduit in Palm Avenue, southto"new m~ole,' thEm in a
southwesterly direction across east west alley to vault.
2. Contractor-agrees to suhmitthe plans for the afore-
said work to the office of the City Engineer and receive approval
from said City Engineer before proceeding with the aforesaid work.
3. Contractor agrees to accomplish the work in an order
which shall be satisfactory to the City Engineer.
4. Contractor agrees that the earth excavation incidental
to the above described work shall be done by hand, and no machinery
or power-driven tools will be used in the accomplishment of the said
,~ exca-va ti0n',--exc eptsuen. porti. onsas.mayb eciesignat~clJ)Xt,.l113__<C.-tty
Engineer. Contractor further agrees to water-compact all trenches
during back-filling.
5. Contractor shall be wholly responsible for the repair
and replacement of utilities and other damage caused by theaccom-
\
plishment of the work as aforesaid and Contractor further hereby
covenants and agrees to replace paving removed or damaged by or be-
cause of the accomplishment of the aforesaid work, said paving to
!
""
I
I
.
'0
be of a type and quality equal to the paving so removed or damaged,
and performed in a manner satisfactory to the City Engineer, of the
City of Clearwater.
6. Contractor hereunto binds himself, his successors and
assigns to the faithful performance of this Agreement; and further
binds himself, his successors and assigns to the forfeiture of the
sum of Qne Thousand ~d no/lOO Doll~s ($1,000.00)
to City in the event of Contractor's breach or default of any of
Contractor's covenants, agreements or obligations of Contractor here-
under. If all of the covenants, agreements, or obligations of Con-
tractor hereunder be faithfully performed by said Contractor, then
this bond shall be null and void and of no effect.
7. The aforesaid work shall be accomplished within thirty
(30) days; provided, however, that this time for completion shall be
extended by a period of time equal to any delays caused by strike,
riot, civil commotion, Acts of God, Governmental restrictions, or
natural calamity.
WITNESS the hands and seals of the parties hereto, this
>>Po.~y of March, 1961.
CITY OF CLEARWATER, FLORIDA
~~~1
~y .anage.-. .
~~;~t-
~ .Attorney .
In the presence of:
-----' -- - ~'i,.':'~-_'__'-"'==-
rf4- ~
-- - .=~?u.. -,~ -~= '~~-~ ~=_~_~_c --~----- --,-~---
ntractor
~"
00 __
-2-
I
I
~j ,i'-
....
AGREEMENT AND BON~
THIS AGREEMENT, by and between the CITY OF CLEARWATER,
FLORIDA, ,anrtm.ic.ipal._c.orporationL,he-re:Ln.after,called "GITY", and
LAURANCE & ASSOCIATES, a Florida Corporation,
hereinaf':t.er-c.al.J..et:l*CONTRAC T OR ft ,
WIT N E SSE T H:
... -., ........... ..... ...... ........._...- -
That in conside-ration--of the mutual covenants and agree-
mentshereineontained, and in further consideratiQ.!Loi',-the-pennits
and privileges granted"hereunder" and the bond given for thefa1thful
performance hereof, the parties hereto'mutual.lyagree.,as.follows:
1. The Gity'he-reby grants to Contractor the ,permit, right
and 'privilege to'install and construct ,the following for Florida
Power Corporation:
Construct an unqerground electrical conduit, maxihdles,
and appurtenance~~ Alexander Avenue ii'oin a point
'app~oximafely 100' from the'South line ot.Caeveland
northerly to a point approximately 20' south of the
northerly line of Cleveland and in Cleveland from a
point approximately 95' E of the E line of Alexander
southerly to Greenwood, thence Northerly in Greenwood
to exi sting manhole at Laur a.
2. Contractor' agrees to submit the"plans for the afore-
said work to the office of the City Engineer and receive approval
from said City Engineer before proceeding with the aforesaid work.
3. Contractor agrees to accomplish the work in an order
which shall be satisfactory to the City Engineer.
4. Contractor agrees that the earth excavation incidental
to the above described work shall be done by hand, and no machinery
or power-driven tools will be used in the accomplishment of the said
excel vatton , exccept~-such-porni~n&-a-s"may-be ..designa ted.by~tlH:L.Q :ily_____
Engineer. Contractor further agrees to water-compact all trenches
during back-filling.
5. Contractor shall be wholly responsible for the repair
and replacement of utilities and other damage caused by the accom-
plishment of the work as aforesaid and Contractor further hereby
covenants and agrees to replace paving removed or damaged by or Qe-
cause of the accomplishment of the aforesaid work, said paving to
..
I
I
"!:
be of a type and quality equal to the paving so removed or damaged,
and performed in a manner satisfactory to the City Engineer, of the
City of Clearwater.
6. Contractor hereunto binds himself, his successors and
assigns to the faithful performance of this Agreement; and further
binds himself, his successors and assigns to the forfeiture of the
sum of Ten Thousand and nol 100 Dollars ($10,000.00)
to City in the event of Contractor's breach or default of any of
Contractor's covenants, agreements or obligations of Contractor here~
under. If all of the covenants, agreements or obligations of Con~
tractor hereunder be faithfully performed by said Contractor, then
this bond shall be null and void and of no effect.
sixty
7. The aforesaid work shall be accomplished within X~
(60)
~t days; provided, however, that this time for completion shall be
extended by a period of time equal to any delays caused by strike,
riot, civil commotion, Acts of God, Governmental restrictions, or
natural calamity.
WITNESS the hands and seals of the parties hereto, this
.:l Y4day of April , 1961.
Attest:
~/
Gl.~"erk ~~... ..:.
CITY OF CLEARWATER, FLORIDA
. rl ~TZ~-
~Cit anager
- ' -
Approved -, as" ~ c;l-.-fof'm. ,-and correct-
~ , '0.
nes~-
.", --~-
~ Attorney'
In the presence of:
4.cZ--L-> ~ _ ~.../~
~
-.-----~="-_;o~-- -~::.-----~-~~~"-- 0'0- ---~----,-.. --~'- ---
~M~'-----
" - -- '-
-2-