AGREEMENT & BOND (2)
~
~ "
I
1
?;
AGREEMENT, ,AND BO Np
THIS AGREEMENT, by and between the CITY OF CLEARWATER,
FLORIDA, a municipal corporation, hereinafter called "CITY", and
LAUHANCE &. ASSOCIATES, INC., a Florida Corporation
hereinafter called ilCONTRACTOR", WITNESSETH:
That in consideration of the mutual covenants and agree-
ments herein contained, and in further consideration of the permits
and privileges granted hereunder, and the bond given for the faith-
ful performance hereof, the parties hereto mutually agree as follows~
1. The City hereby grants to Contractor the permit,
right and privilege to install and construct the following for the
Florida Power Corporation:
Construct an underground electrical conduit,
manhole and appurtenances on the North side of
Causeway Boulevard from the existing manhole at
Poinsettia Avenue, Westerly to the ~est side of
l'landalay li.oad, in the City of Clearwater, Pinellas
County, Florida.
2. Contractor agrees to submit the plang for the afore-
said work to the office of theCity Engineer and receive approval
from said City Engineer before proceeding with the aforesaid work,
3. Contractor agrees to accomplish the work in an or-
der which shall be satisfactory to the City Engineer.
4. Contractor agrees that the earth excavaticn inci-
dental to the above described work shall be done by hand, and no
machinery or power-driven tools will be used in the accomplishment
of the said excavation, except such portions as may be designated
by the City Engineer. Contractor further agrees to water-compact
all trenches during back-filling.
.-,..
~ '.-.
I
I
5. Contractor shall be wholly responsible for the re-
pair and replacement of utilities and other damage caused by the
accomplishment of the work as aforesaid and Contractor further
hereby covenants and agrees to replace paving removed or damaged
by or because of the accomplishment of the aforesaid work, said
paving to be of a type and quality equal to the paving so removed
or damaged, and performed in a manner satisfactory to the City En-
gineer, of the City of Clearwater.
6. Contractor hereunto binds himself, his successors
and assigns to the faithful performance of this Agreement; and
further binds himself, his successors and assigns to the forfeit-
ure of the sum of
FIVE THOUSAND DOLLAHS U~5, 000.00) -
to City in the event of Contractor's breach or default of any of
Contractoris covenants, agreements or ooligations of Contractor
hereunder. If all of the covenants, agreements or obljgations
of Contractor hereunder be faithfully performed by said Contract-
or, then this bond shall be null and void and of no effect"
7. The aforesaid work shall be accomplished within
thirty (30) days; provided, however, that this time for completion
shall be extended by a period of time equal to any delays caused by
strike, riot, civil commotion, Acts of God, Governmental restrict-
ions, or natural calamity.
WITNESS the hands and seals of the parties hereto, this
30
day of April
, 195-L.
CITY OF CLEAR",v ATE11, FI,ORIDA
/:~
Manager '-------'---
J\ppr Q.1l.ed. a s t 0 ~oFm~-a-fid corre-c'C--'"
ness:
---ci!:'::d/:f1;~
In the presence of~
~a~J.J
7 / ~;_
~~
.Count-erslgnedC:-~
9fr-tiik -
LAU3.AIITCE & ASSOC 'iES, ING.
~4J
j
-2-
!"
.:.
I
I
AGREEMENT AND BOND
THIS AGREEMENT, by and between the CITY OF CLEAdWATER,
FLORIDA, a municipal corporation, hereinafter called "CITY", and
-------->v.,--"--LAURANCE--&-ASSOeIATE"8 ,--I-NC;.,~a . Flor i da corpora ti ori-~'->
hereinafter called ilCONTRACTOd", WITNESSETH:
That in consideration of the mutual covenants and agree-
ments herein contained, and in further consideration of the permits
and privileges granted hereunder, and the bond given for the faith-
ful performance hereof, the parties hereto mutually agree as follows~
1. The City hereby grants to Contractor the permit,
right and privilege to install and construct the following for the
Florida Power Corporation:
Construct a semi-surface transformer vault ap-
proximately 12' x 6' - )'5" above ground in
center of parkway, Memorial Causeway, approxi-,
mately 2070' West of West terminus of main
bridge.
This construction subject to approval of State Road Department.
, \
\ \
2. Contractor agrees to submit the plan:z: for the afore--
said work to the office of theCity Engineer and receive approval
from said City Engineer before proceeding with the aforesaid work.
3. Contractor agrees to accomplish the work in an or-.
der which shall be satisfactory to the City Engineer.
4. Contractor agrees that the earth excavation inci-
dental tQ the a bove described work shall be done by hand, and no
machinery or power-driven tools will be used in the accomplishment
of the said excavation, except such portions as may be designated
by the City Engineer. Contractor further agrees to vfater--compact
all trenches during back-filling.
,
"
I
I
5. Contractor shall be wholly responsible for the re~
pair and replacement of utilities and other damage caused by the
accomplishment of the work as aforesaid and Contractor further
hereby covenants and agrees to replace paving removed or damaged
by or because of the accomplishment of the aforesaid work, said
paving to be of a type and quality equal to the paving so removed
~'. -. -~-or~udamage-tt,. andcp-erfo~lfiedctn.. a.~-ma nm?r- satiusfa ctor.y-'-to.-tne-.C Ity ~n':'
gineer, of the City of Clearwater.
6. Contractor hereunto binds himself, his successors
and assigns to the faithful performance of this Agreement; and
further binds himself, his successors and assigns to the forfeit-
ure of the sum of
FIVE THOUSAND DOLLARS ($5.000.00) ... .. .. .. ....
to City in the event of Contractor's breach or default of any of
Contractor's covenants, agreements or ooligqtions of Contractor
hereunder. If all of the covenants, agreements or obLigations
of Contractor hereunder be faithfully performed by said Contract-
or, then this bond 'shall be null and void and of no effect.
7. The aforesaid work shall be accomplished within
thirty (30) days; provided, however, that thistime for completion
shall be extended by a period of time eqUEl.l to any delays caused by
strike, riot, civil commotion, Acts of God, Governmental restrict~
ions, or natural calamity.
WITNESS the hands and seals of the parties hereto, this
. AP'h '/
~ day of. .It'F...r,,l~
, 195
8
~
. ~ .-----
A~~...~..,,:, :~~/, . ,
t;~ler~.u u
Approved as to form and correct-
ness:
~~.~-_.
~ty Att.~r'n~
In the presence of:
yor-
LAURANCE. & A~ES. INC.
By: . 0,,. ~a"-4"
C ractor
-2-
A
-:-J1tt; ..,~,
I
1
AGREEMENT AND BOND
THIS AGREEMENT, by and between the CITY OF CLEARWATER,
FLORIDA, a municipal corporation, hereinafter called "CITY'!, and
LAURANGE- &; ASSOCIATES, INC..--AoFLOJ.TDA.CDR.F(lrArlT()l\r~
menta herein contained, and in further consideration of the permits
and privileges granted hereunder, and the bond given for tHe faith~
f'lll performance hereof, the parties hereto mutually agree as follows:
1. The City hereby grants to Contractor the permit,
right and privilege to install and construct the following:
Construct an underground electric~l conduit line,
manhole, and appurtenances in Garden Avenue from
the existing manhole in Park Street, southerly to
Pierce Street, thence T,vesterly in Pierce Street
to the existing manhole, said manhole being ap-
proximately 200 ft. West of the West line of
Garden Avenue.
The above to be constructed for the Florida Power
Corporation.
2. Contractor agrees to submit the planz for the afore-
said work to the office of theCity Engineer and receive approval
from said City Engineer before proceeding with the aforesaid ''fork,
J. Contractor agrees to accomplish the work in an or-.
der which shall be satisfactory to the City Engineer.
4. Contractor agrees that the earth excavation inci-
dental to the above described work shall be done by hand, and no
machinery or power-driven tools will be used in the accomplishment
of the said excavation, except such portions as may be designated
by the City Engineer. Contractor further agrees to water-compact
all trenches during back-filling.
~
..
..JO ,.....11!'
--
I
I
5. Contractor shall be wholly responsible for the re-
pair and replacement of utilities and other damage caused by the
accomplishment of the work as aforesaid and Contractor further
hereby covenants and agrees to replace paving removed or damaged
by or because of the accomplishment of the aforesaid i:rork, said
paving to be of a type and quality equal to the paving so removed
--o-T--damaged~ c- a.nd-perTob.nedina-ma hri-er" -satIsfa cto~ry t otJie - - c-i t y~ En-
gineer' of the City of Clearwater.
6. Contractor hereunto binds himself, his successors
and assigns to the faithful performance of this Agreement; and
further binds himself, his successors and assigns to the forfeit-
ure of the sum of
TEN .1.'HOUSAND .uOLLAHS (::;;1O'J00. 00) - -
to City in the event of Contractor's breach or default of any of
Contractor's covenants, agreements orooligations of Contractor
hereunder. If all of the covenants, agreements or obljgations
of Contractor hereunder be faithfully performed by said Contract-
or, then this bond shall be null and void and of no effect"
7. The afores~id work shall be accomplished within
thirty (30) days; provided, however, that this time for completion
shall be extended by a period of time equal to any delays caused by
strike, riot, civil commotion, Acts of God, Governmental restrict-
ions, or natural calamity.
WITNESS the hands and seals of the parties hereto, this
~~y of
lvIa y
, 1958
Attest: '/~~
tli?t2.,~ ;;J
Gi~lerk .. ..
Approved as to form and correct-
ness:
~r;;.At:O*
In the presence of:
GITIl:t~LOjUDA
&~anager ------
Count er signe d :
LA~:tANCE & ASSOCIATES, INC.,
By: ~ ./~ ~~~ _____
Contractor
~- 1A)o. 2~1L
,~ ,Ja '
11/( / r
-2-
'-------
.'..... ~ -:~
I
,
AGRE~MENT AND BOND
THIS AGREEMENT, by and between the CITY OF CLEARWATER,
FLORIDA, a municipal corporation, hereinafter called IICITyr', and
LAURANCE-& ASSOCIATES, INC.,AFLORIDA--GQRPORA'l'-IONc-_c
hereinafter called iiCONTRACTOd", \<1ITNESSETH:
That in consideration of the mutual covenants and agree-
ments herein contained, and in further consideration of the permits
and privileges granted hereunder, and the bond given for the faith-
ful performance hereof, the parties hereto mutually agree as follows~
1. The City hereby grants to Contractor the permit,
right and privilege to install and construct the following
Construct underground electric cable conduit, manhole
appurtenances and transformer vault along the North
side of Laura Street and across Laura Street from a
point approximately 200 ft. West of the West line of
East Avenue, Easterly to a point approximately 40 ft.
East of the East line of East Avenue. To be con-
structed for the Florida Power Corporation
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
2. Contractor agrees to submit the plan2 for the afore-
said work to the office of theCity Engineer and receive approval
from said City Engineer before proceeding with the aforesaid work.
3. Contractor agrees to accomplish the work in an or-
der which shall be satisfactory to the City Engineer.
4. Contractor agrees that the earth excavation inci--
dental to the above described work shall be done by hand~ and no
machinery or power-driven tools will be used in the accomplishment
of the said excavation, except such portions as may be designated
by the City Engineer. Contractor further agrees to water-compact
all trenches during back-filling.
".. -... -
I
I
t
5. Contractor shall be wholly re sponsible for the re-
pair and replacement of utilities and other damage caused by the
accomplishment of the work as aforesaid and Contractor further
hereby covenants and agrees to replace paving removed or damaged
by or because of the accomplishment of the aforesaid work, said
paving to be of a type and quality equal to the paving so removed
- .~--Or--dama.gM,cand ~performed-cin>acmanner--sat,Lsfact.D.rY_'ctQ__the_Ci:Ly_En..,
gineer, of the City of Clearwater.
6. Contractor hereunto binds himself, his successors
and assigns to the faithful performance of this Agreement; and
further binds himself, his successors and assigns to the forfeit-
ure cf the sum of
FIVE THOUSAND DOLLARS ($5,000.00) - - - - - -
to City ih the event of Contractor's breach or default of any of
Contractor's covenants, agreements or o~ligations of Contractor
strike, riot, civil corr~otion, Acts of God, Governmental restrict-
ions, or natural calamity.
WITNESS the hands and seals of the parties hereto, this
02CJ ~ay of June , 19 5 ~.
CITY OF CLEAiLiJ'ATER, FLORIDA
Approved as to form and correct-
~~!or*
In the presence of~
7710 /4RAJ
~ UJ~ aft.
Counter signed:
LAUItAN, CE &. AS,SO~IAT, " INC., a
Flaf) co ., .'
~v G~. ~
C ractor
l./
-2-
-'~~
I
I
I?) 51
--
..'
'.
AGREEMENT AND BOND
THIS AGREEMENT, by and between the CITY OF CLEArlWATER,
FLORIDA, a municipal corporation, hereinafter called "CITYil, and
.' LAUllAN CE.&-ASSOCIATES, ..,.INC.,.A.,FLORJJ).A.CORPORA'l'=I ON~
hereinafter called nCONTRACTOn", WITNESSETH:
That in consideration of the mutual covenants and agree-
ments herein contained, and in further consideration of the permits
and privileges granted hereunder, and the bond given for' the faith-
ful performance hereof, the parties hereto mutually agree as follo1tfs;
1. The City hereby grants to Contractor the permit,
right and privilege to install and construct the following:
An underground electrical conduit, manholes,
transformer vault and appurtenances in OSceola
from the existing manhole in Drew Street, northerly
to Jones Street, thence easterly on Jones Street, a
distance of 240' to the existing transformer vault.
* * *
* * *
* * *
* *
* *
*
*
~.c
oJ_
-.-
)~
*
*
*
*
*
"-
-.-
2. Contractor agrees to submit the plan~ for the afore-
said work to the office of theCity Engineer and receive approval
from said City Engineer before proceeding with the aforesaid work~
3. Contractor agrees to accomplish the work in an or-
der which shall be satisfactory to the City Engineer.
4. Contractor agrees that the earth excavation inci-
dental to the above described work shall be done by hand, and no
machinery or power.... driven tools will be used in the accomplishment
of the said excavation, except such portions as may be designated
by the City EngineerA Contractor further agrees to water-compact
all trenches during back-filling.
"!I
.6
~~
I
I
..
5. Contractor shall be wholly responsible for the re-
pair and replacement of utilities and other damage caused by the
accompliShment of the work as aforesaid and Contractor further
hereby covenants and agrees to replace paving removed or damaged
by or because of the accomplishment of the aforesaid work, said
paving to be of a type and quality equal to the paving so removed
.,- ordamagedt~and .perf'ormed--i:n-~a~manneF-satl"SIac-t"'6ry "[o~The- C.lty En-
gineer, of the City of Clearwater.
6. Contractor hereunto bindshimself, his successors
and assigns to the faithful performance of this Ag~eement;and
further binds himself, his successors and assigns to the forfeit-
ure of the sum of FIVE THOUSAND DOLLARS ($5,000.00)
to City in the event of Contractor's breach or default of any of
Contractor's covenants, agreements or ooligations of Contractor
hereunder. If all of the covenants, agreements or obljgations
of Contractor hereunder be faithfully performed by said Contract-
or, then this bond shall be null and void and of no effect.
7. The aforesaid work shall be accomplished within
thirty (30) days; . provided, however, that this time for completion
shall be extended by a period of time equal to any delays caused by
strike, ;riot, civil commotion, Acts of God, Governmental restrict-
ions, or natural calamity.
WITNESS the hands and seals of the parties hereto~ this
1() d day of June , 195 8 .
.~
A~~
G iter k ~ . ,
Approved as to form and correct-
ness:
~~~o~ -
In the presence of:
CLEAR~ATER, FLORIDA
~~_.~'"-
~ fhft ~
yor:{fom rssioner
LAURENCE & ASSOCIATES, INC. a
Florid corpora22t, ion
By (} I
-- ..,,' _.l__ ~..L.-
C ractor
-2-