Loading...
SKYCREST NEIGHBORHOOD TRAFFIC CALMING PROJECT - 03-0097-EN - ADMINISTRATIVE CHANGE ORDER # 2ADMINISTRATIVE CHANGE ORDER #2 & Final PROJECT: Skycrest Neighborhood Traffic Calming Project (03-0097-EN) Date: January 13, 2010 PROJECT NUMBER: 03-0097-EN PO REFERENCE NO.: ST 104668 COUNCIL AWARD: August 21, 2008 CONTRACTOR: Semper Fi Services, LLC 1611 12th Street East, Unit B Palmetto, FL 34221 DATE OF CONTRACT: August 26, 2008 CODE: 0315-92259-563700-541-000-0000-A CODE: 0315-93286-563500-572-000-0000-B SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT See attached sheet for additional items. STATEMENT OF CONTRACT AMOUNT ORIGINAL CONTRACT AMOUNT Adm. CO #1 - CM - Adm. CO #2 - CM - NEW CONTRACT AMOUNT 2,373,742.24 182,457.65 124,399.91 2,431,799.98 ACCEPTED BY: i By (SEAL) Date: ?' IUD Wit esses: ft\k?J S 2010 By: City of Perry M. Michael D. Quillen, P.E. City Engineer CITY OF CLEARWATER, in PINE AS COUNTY, FLORIDA i am B. Horne, II City Manager it Page 2 of 2 Administrative Change Order #2 Re: Skycrest Neighborhood Traffic Calming Project ITEM QUANTITY UNIT UNIT COST TOTAL COST Decreases Traffic Calmine Code A: 0315-92259-563700-541-000-0000 2 Traffic Control 0.005 LS 67,521.00 ($337.58) 3 Clearing & Grubbing, Erosion Control ar 0.005 LS 83,254.00 ($416.27) 18 8" crushed concrete base 1,377 SY 15.98 ($22,002.38) 22 Concrete sidewalk, 4" 175 SF 3.90 ($683.67) 23 Concrete sidewalk, 6" 171.3 SF 4.40 ($753.72) 26 Straight curb 150.6 LF 15.97 ($2,405.08) 31 Armor-Tile Truncated Dome 18.0 EA 365.00 ($6,570.00) 47 Adjust water valve box I EA 380.00 ($380.00) 56 6" Valve I EA 950.00 ($950.00) 58 6" DIP 4 LF 200.00 ($800.00) 64 Skip Traffic Stripe, (18"-18" Skip), Then 203 LF 3.35 ($680.05) 66 Solid Traffic Stripe, Thermoplastic (Whir 33.445 LF 2.27 ($75.92) 74 Yellow Flexible Delineator 13 EA 51.68 ($671.84) 75 Opti-Curb Reflective Pavement Marking 42 EA 40.36 ($1,695.12) 77 Sign Single Post (Fumish) 4 AS 64.80 ($259.20) 78 Sign Single Post (Install) 4 AS 129.60 ($518.40) 106 Irrigation & electrical sleeves (SCH 80 - 1,508 LF 5.25 ($7,917.00) 110 Contingency 1 LS 214,337.03 ($214,337.03) 113 Amour Tile Mats 18 EA 200.00 $3,600.00) Total (Decreases) Code A: ($265,053.26) Increases Traffic Calming Code A: 0315-92259-563700-541-000-0000 5 Concrete curb removal 664.0 LF 2.00 $1,328.00 21 Concrete brick pavers 43 SF 8.16 $353.57 24 Concrete sidewalk ramp 1,224 SF 4.40 $5,385.60 30 Sod 6,600 SF 0.31 $2,046.00 61 Retro-Reflective Pavement Markers 104 EA 8.10 $842.40 62 Skip Traffic Stripe, (2'-4' Skip), Thermox 14 LF 2.92 $40.88 63 Skip Traffic Stripe, (18"-18" Skip), Then 23 L.F 2.92 $67.16 65 Solid Traffic Stripe, Thermoplastic (Whit 92 LF 0.91 $83.72 66 Solid Traffic Stripe, Thermoplastic (Whit 282 LF 2.27 $640.14 68 Solid Traffic Stripe, Thermoplastic (Yell- 7,267 LF 0.91 $6,612.97 69 Solid Traffic Stripe, Thermoplastic (Yells 378 LF 192 $1,103.76 70 Patterned Textured Pavement (Asphalt) 4,183 SF 11.19 $46,807.77 71 Inlaid'rhermoplastic Pavemcnt Marking 114.2 SF 13.35 $1,524.57 73 Yellow Reflective Nose Paint 100 SF 2.70 $270.00 79 Remove Existing Pavement Marking 1,714.9 SF 16.48 $28,261.55 86 Arachis Glabrata'Ecoturf "Perennial Pea 4 EA 5.91 $23.64 92 Nandina Domestica'Harbor Dwarf "Dwf 33 EA 8.60 $283.80 93 Plumbago Auriculata "Plumbago" 8 EA 6.30 $50.40 107 Water meter assembly 2 EA 168.66 $337.32 111 Torpedo Bore under Driveways 95 LF 13.65 $1,296.75 Total Increases Code A. $97,360.00 Additions Traffic Calmin Code A: 0315-92259-563700-541-000-0000 129 Irrigation Revisions @ S Lake Dr 1 EA 1,168.00 $1,168.00 130 Demo & Replace Splitter Islands @ Aur( 1 EA 29,154.08 $29,154.08 131 Demo & Replace Bulb Out ! S Nimbus 1 EA 13,365.83 $13,365.83 132 Thermo Directional Arrows 16 EA 86.40 $1,382.40 Total Additions Code A: $45,070.31 Net Total (Decreases)/Increases/Additions Code A: ($122,622.95) Decreases Parks Code B: 0315-93286-563500-572-00041000 1001 Pavement removal 95 SY 18.00 ($1,711.44) 1010 Sign Single Post 1 EA 64.44 ($64.44) W 11 - loll Contingency Increases Parks Code B:0315-93286-563500-572-000-0000 1002 12" Type .B stabilization 1003 8" crushed concrete base 1005 Concrete sidewalk, 4" 1006 Curb & gutter, Type 1 1 LS 1,457.72 - - ($1,457.72) Total (Decreases) Code B: ($3,233.60) 19.2 SY $8.00 $153.60 66.2 SY $16.20 $1,072.44 22 SF $3.55 $78.10 10 LF $15.25 $152.50 Total Increases to Code B: $1,456.64 Total Net (Decreases)/Increases Code B: ($1,776.96) Total Net (Decreases)/Increases/Additions to Contract: ($124,399.91)