SIDEWALK WAIVER GRANTED (279)
fiyf,XJ.I,,,c/'.
.11IJ(l~ l" 'Ii;~-":..
'j~\iq).:-
~~'\,r"L~
~~c::; )I/~.. ..~\.. . ,;:i'~
~..-:J .20- ':i', ,t~. -'~
~~~~:~:~' "'.~;J
....~ ,...~ ..., ...,. , ~~',i~
'-1f~T~.E. n \~~l
........~ "",1'
"",,,,,,,~I~$
I
,
C I T Y
o F
CLEARWATER
POST OFFICE BOX 4748
CLEARWATER, FLORIDA 33518
CITY MANAGER
May 19, 1986
CERTIFIED MAIL
RETURN RECEIPT REQUESTED
RECEIVED
IDEVCO, INC.
c/o Mr. Joel D. Jones
12425 28th Street North
St. Petersburg, FL 33604
MAY 20 1986
Reference: S. R. 580 -- Bryn Mahr at Countryside II
CITY CLERK
Gentlemen:
In accordance with Section 138.09 of the Code of Ordinances of the City of
Clearwater, I have reviewed your request for a temporary sidewalk installa-
tion waiver.
While technically you meet. the requirements for sidewalk installation, the
widening of S. R. 580 through the above-referenced area would probably result
in the destruction of the sidewalk. In view of the construction which is now
in progress, a temporary waiver of the sidewalk instal1at.ion requirement is
granted on the above-referenced property. Should it be determined that a
sidewalk is required at this location in the future, it will be installed by
the assessment process.
cc: Elizabeth S. Haeseker, Assistant City Manager
Edward V. Bethel, Building Inspections Director
Keith Crawford, Traffic Engineering Director
~~thia Goudeau1 City Clerk
"Equal Employment and Affirmative Action Employer"
tiJ
07o~oo
CITY OF CLEARWATER J
APFlICATION FOR SIDEWALK WAIVE
Fee - $
Date Paid
Receipt No.
c?~gO
/t:I'I-%(,.
-If -- 'J. tTJ-
...
" t.
ADDRESS (Sidewalk Location) - S Gf.. R't'f\<:::Gi"\ 'fO~ 'R6J\.,.(t~l
LEGAL DESCRIPTION (Sidewalk Location) (Lot, Block, Subdivision)
13R:"'H-^ N\A'K\R A"r (..ov,\",n~"/S(~E.][ ---r'RAC, -=tt 22.
OWNER I S NAME
-:t:PE V C'Jl J
h-.\Q"
PHONE 765'-2.52.9
REPRESENTATIVE (If
ADDRESS \ z.~ 2~
any):J ~Rt?Nc.E T ~"'1
2e;-r.t-' '7r Ncvt TU 'ST
,
REASON FOR REQUEST 5~ (:. CQ(<NEi<.. or "SlA'BDI"lS(~ TO $,\<..1. C.OJj.~E~..
of"' 5u.BDI\Jl'Sl6J'~, . CAL.ONu, 5,\<,550) t-:~_(..Juil:~1 wAIIJF'K.,DUt
-rD c..Ci1'ClSTd~\.tC.:r 10"',' Cu.\.;[....'~.,',~\ l.."f C~r~\, .)G C I~ I\T "See, 5~ \
IHIS (,~t'l6.O ('S 1-:~,.i:.: . f'k..., ",-:" \ ~'O'.Jf:.\...) tt<"C" "-, L l..F\,\c.:'~ '''r<...J
t+ LAh)t."S.
, C)~
,
r> eTE.
(IS.
o:!)
/r/"r
~
.Jag > Jo~ E~ '
f. L ? .,;? f ^. 4
-.'.,':' \cJ'..J
ADDRESS
/38.07
Section~3.Q9 of the Code of Ordinances of the City requires that all land
that abuts a public right-of-way, which is to have new construction on it,
either for residential, commercial, industrial or other purposes, shall have
sidewalks constructed by the Owner on, across or adjacent thereto.
The Owner understands and agrees that if the waiver is granted, the City may
install sidewalks at a future date and assess the owner for the full cost of
said sidewalks.
owe:; ~l~J2 [Js^;n'tadve
rx Jw~'L-
I { . 1\ q$(i2>-- ~-
Dat:e- '. -" ~-'
- --- ".
ak
Subscribed and sworn to before me this al: day of
, j
m~ ,- _._i 19~;?~-:
<s . - / -
- - ,
- ,-
~m~Q,~c~~
Notary Public
3 .. ~:.,
'" ~,
'~? ,:1
,~ " ,
My Commission Expires:
NOTARY PUBLIC STATE OF FLORIOA
MV COMMISSION EltP.' OCT. .2~lg89
BONDED THRU GENERAL INS. UNO. "
-_.._,._.~~,.:,';;.:;j
1910-62
Rev.6/83
).
I
t
CITY OF CLEARWATER
Interdepartment Correspondence Sheet
TO:
Elizabeth Haeseker, Asst. City Manager
FROM:
Keith Crawford, Traffic Engineering Director
teAY 1 5 1986
COPIES:
E. Bethel, Building Dept. Director
SUBJECl:
Sidewalk Waiver: S.R. 580 - Bryn Mahr at Countryside II
DATE:
May 14, 1986
We have been requested to waive the requirement for a sidewalk installation on the north
side of S.R. 580 along the Bryn Mahr Development. While this would technically meet the
requirements for sidewalk installation, the widening of S.R. 580 through this area will
probably result in destruction of the sidewalk.
There are no sidewalks along S.R. 580 on the north side between Countryside Boulevard
and Landmark Drive, although this area is totally developed. I am unable to find
paperwork to support this, but it is my remembrance that an arrangement was struck
between the City and U.S. Homes to install a sidewalk which normally would be required
here at other locations in countryside where the City would have had to install the
sidewalk. This was done because of a ditch along the north side which would make it
difficult or impossible to build large portions of the sidewalk. At that time the
waiver process was quite different than it is today.
In view of the construction which is now in progress, it is my recommendation the
sidewalk be waived. There is a sidewalk on the south side of S.R. 580 in this area.
When a final determination can be made of the extension of S.R. 580 east of Countryside
Boulevard it would be appropriate to arrange for a sidewalk on the north side.
t;:p
Attachment (Original)